Energy in Lebanon, explained.

How electricity works in Lebanon: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Lebanon: Not yet available.Olmack is not offered in Lebanon yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Lebanon.

Lebanon electricity market 2026: EDL tariffs, private generators, Law 318/2023 net metering, the new regulator (ERA), rooftop solar, licensing and reforms.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Lebanese pound (LBP) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Lebanon energy at a glance.

Key figures for households in Lebanon. Each one links to its source on the full overview below.

  • Electricity price.

    0.27 USD per kWh for households, including taxes. Figures for Bills from May 2023, unchanged in 2026.

  • Renewable share.

    21.6% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Lebanon.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Lebanon below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Lebanon requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Lebanon.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Lebanon, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Lebanon, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Lebanon.

Full overview

The energy market in Lebanon, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Lebanon’s public electricity system is run by one state utility, Électricité du Liban (EDL), which owns the power stations, the transmission grid and the distribution network and bills almost every household. The day-to-day running of the distribution network, including meter reading and bill collection, has been outsourced to private Distribution Service Providers under a programme approved in 2010. EDL has not been able to supply power around the clock for decades. In 2026 it supplied about 8–10 hours a day in most areas, and much less when fuel ran short, and neighbourhood diesel generators fill most of the gap.

Since May 2023 EDL has charged households 10 US cents per kWh for the first 100 kWh a month and 27 cents above that, plus 25 cents per ampere of subscribed capacity. The bill is set in dollars and can be paid in dollars or Lebanese pounds. Generator power is far dearer. In August 2026 the Ministry of Energy and Water’s maximum generator price was LBP 48,241 per kWh (about USD 0.54) plus a fixed monthly fee, so most households pay two electricity bills and the generator bill is usually the larger.

High prices and unreliable supply led to one of the fastest rooftop solar booms anywhere. Distributed solar grew from 56 MW in 2018 to about 1.5 GW by the end of 2025, mostly installed privately and often with batteries. Renewables, mainly that solar and hydropower, supplied 21.6% of the electricity actually delivered in 2024. Reform is now under way. Law 318/2023 legalised net metering and peer-to-peer renewable sales, the Electricity Regulatory Authority (ERA) foreseen in Law 462/2002 finally received a board in September 2025, and in July 2026 the government approved a policy to restructure EDL and gradually unbundle the sector.

Energy snapshot.

Headline figures for electricity in Lebanon. Each shows its data year and links to its source.

  • Population5,849,421 peopleSource 202025
  • Households1,266,700 primary residences (households)Source 242018–19
  • Average household size3.8 people/householdSource 242018–19
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (LBP)0.27 USD/kWhSource 2Bills from May 2023, unchanged in 2026
  • Household price (EUR)0.238 EUR/kWhSource 40Bills from May 2023, unchanged in 2026
  • Renewable electricity share21.6%Source 12024
  • Solar capacity1.505 GWSource 25End 2025
  • Wind capacity0 GWSource 12025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Electricity Regulatory Authority (ERA), under Law 462/2002, with its board appointed in September 2025. The Ministry of Energy and Water sets policy and the generator price cap.
System operator
Électricité du Liban (EDL), National Control Centre
Distribution networks
EDL’s national network, operated region by region by private Distribution Service Providers under service contracts, plus a few small concessions such as Électricité de Zahlé (EDZ)
Currency
Lebanese pound (LBP)
Voltage and frequency
220 V / 50 Hz (380 V three-phase)

Electricity prices in Lebanon.

Household price (LBP)
0.27 USD/kWh (Bills from May 2023, unchanged in 2026)Source 2EDL low-voltage rate for consumption above 100 kWh a month. The first 100 kWh cost USD 0.10/kWh. A capacity charge of USD 0.25 per subscribed ampere, 11% VAT and stamp duty are added. The tariff is set in US dollars and the bill shows both dollar and Lebanese pound amounts. Private generator power, which supplies most household consumption, cost LBP 48,241/kWh (about USD 0.54) plus a fixed fee in August 2026.
Household price (EUR)
0.238 EUR/kWh (Bills from May 2023, unchanged in 2026)Source 40Converted from USD 0.27/kWh at the ECB euro reference rate of 30 September 2026 (EUR 1 = USD 1.1355). Excludes fixed charges and VAT.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (LBP per kWh).Source 11

30,24439,819.549,395Feb 2026Apr 2026Jun 2026Jul 2026Aug 2026
Lebanon household electricity price, LBP per kWh
Feb 202630244 LBP/kWh
Apr 202649395 LBP/kWh
Jun 202641973 LBP/kWh
Jul 202640746 LBP/kWh
Aug 202648241 LBP/kWh

How an EDL bill is built

An EDL bill has four parts: a monthly capacity charge based on the amperes the household subscribes to, the energy charge in two blocks, stamp duty and VAT. Since bills for May 2023, the capacity charge has been 25 US cents per ampere and the energy charge 10 cents for the first 100 kWh and 27 cents for each kWh above that. The tariff is set in dollars. The bill shows the dollar amount and its value in Lebanese pounds at the rate set by Banque du Liban, and the customer can pay in either currency. The 20% premium over the Sayrafa exchange rate that applied in early 2023 was dropped.

Why the tariff changed

Until the end of 2022, EDL tariffs had not changed since 1994 and were set in pounds. After the currency collapsed they covered only a small part of the cost of fuel. Under the National Emergency Plan, the new dollar tariff applied from November 2022 consumption and was first billed in early 2023. BlomInvest puts EDL’s break-even cost at about USD 0.23/kWh, and the Ministry of Energy and Water says only about 60% of what EDL bills is collected. Losses, mostly theft, were about 40% of energy in 2023, so in 2026 the utility still depends on government support to buy fuel.

The generator bill

Because EDL supplies power for only part of the day, almost every household also subscribes to a neighbourhood diesel generator or owns one. In the 2018–19 CAS survey the figure was 84% of households. The ministry sets a maximum generator price each month from the diesel price, and the Ministry of Economy enforces it. The price moves quickly with oil. It was LBP 30,244/kWh in February 2026 and LBP 49,395 in April, after the regional war pushed up fuel costs, and LBP 48,241 in August. Converted at the ministry’s rate of LBP 89,700 per dollar, the August price was about USD 0.54/kWh, twice EDL’s top rate.

Regional differences

EDL’s tariff is the same nationwide, but supply hours are not. EDL has linked extra hours to areas with good bill payment, and in August 2026 parts of the north were reported to receive about two hours a day. Generator prices are 10% higher above 700 m altitude. In Zahle, the concession company EDZ provides 24-hour supply from EDL power and its own rented generators.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesEDL low-voltage tariff since May 2023 bills: USD 0.10/kWh for the first 100 kWh a month, USD 0.27/kWh above that, and USD 0.25 per ampere of subscribed capacity each month. The earlier "rehabilitation" fee (USD 4.3 a month below 10 kW, USD 8.6 above) was abolished. VAT and stamp duty are added, and the bill can be paid in dollars or Lebanese pounds at the Banque du Liban rate. Industrial, agricultural and other formerly "exceptional" tariffs pay USD 0.27/kWh on all consumption.
OtherYesPrivate neighbourhood generators. Each month the Ministry of Energy and Water publishes a maximum price per kWh based on diesel prices, plus fixed monthly fees by subscribed amperes. For August 2026 the price was LBP 48,241/kWh below 700 m altitude and LBP 53,065 above it. The fixed fee was LBP 385,000 for 5 A and LBP 685,000 for 10 A, plus LBP 300,000 for each further 5 A. Since 2025 operators have had to fit individual meters and charge the official tariff.
Time-of-useNoThere is no household time-of-use tariff. EDL describes day/night and seasonal tariffs as possible once the smart grid planned under its distribution programme is in place, but none has been introduced.
PrepaymentNoHouseholds pay EDL bills in arrears, to the service provider’s collector, at the local EDL distribution office or by bank direct debit. EDL lists prepaid cards as a future function of smart meters. No prepayment tariff is offered.
DynamicNoThere is no wholesale market, so no tariff linked to market prices is possible.
OtherLimitedNet metering. EDL’s scheme, managed with UNDP’s CEDRO project, nets exports against imports on bills issued every two months and resets the balance each December. Law 318/2023 gives net metering a legal basis, but the ERA has not yet issued the rules that put it into effect.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
975 kWh/person/yr (all sectors) (2023)Source 23World Bank "electric power consumption per capita" (IEA-based). It fell from 3,358 kWh in 2019 as grid supply collapsed. It probably does not fully capture diesel-generator and off-grid solar output.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Lebanon’s electricity use is limited by supply more than by need. The NREAP estimates national demand at 17,278 GWh in 2024 but actual supply, from EDL, private generators and solar, at only 10,290 GWh. Before the crisis, total consumption was about 22,880 GWh (2018). Demand fell sharply after fuel subsidies were removed in 2021–22, and the Arab Reform Initiative estimates that about 52% of demand was suppressed.

Households use several sources each day. A World Bank survey of 1,660 households in 2022–23 found that 97% were connected to EDL, yet half received four hours or less of grid power a day. To make up the shortfall, 59.7% used a generator subscription, 4.6% their own generator, 36% home solar and 10% batteries, reaching about 19 hours of electricity a day on average.

Electricity is also used for heating. In the 2018–19 CAS survey, non-central electric heaters were the most common type, used in 35.8% of homes nationally and in 66.4% in Beirut. Kerosene, diesel and wood are more common in the Bekaa and Baalbek-Hermel. Planners put the demand that 24-hour supply would have to meet at 3,000–3,500 MW.

Housing and households.

Dwellings
1,720,000 residential units (2019)Source 1Primary and secondary residences, based on Order of Engineers and Architects permit data with extrapolation (NREAP). About 1.2 million are primary residences, which implies about 0.52 million second homes.
Owner-occupied
69.5 % of primary residences (2018–19)Source 24
Private rented
30.5 % of primary residences (2018–19)Source 24All rented primary residences. The survey does not split private and other landlords.
Social or public housing
Not identified from a reliable public source.
Houses
12.2 % of primary residences (2018–19)Source 24Independent house or villa. A further 2.1% live in a janitor’s room.
Apartments and flats
85.5 % of primary residences (2018–19)Source 2492.7% in Beirut and 91.4% in Mount Lebanon.
Urban population
91 % of population (2025)Source 21

Lebanon is highly urban, and most households live in flats: 85.5% of primary residences in 2018–19 and over 90% in Beirut and Mount Lebanon. Each flat normally has its own EDL meter in a shared meter room, and most households also hold a separate subscription to a neighbourhood generator.

This affects solar. In a block of flats the roof is shared, and space and consent from the other owners limit what one household can install. Law 318/2023 provides for "multiple-tenant" and collective net metering so that one rooftop system can serve several flats, but the ERA has not yet issued the rules for these schemes. In the meantime, systems have been installed privately. A September 2026 ministerial decision would have required municipal approval with engineer certificates and owner consent, but it was withdrawn two days after it was issued.

About 69.5% of primary residences are owner-occupied and 30.5% rented (CAS 2018–19). The housing stock was further damaged in the 2024 war, when the World Bank estimates about 100,000 housing units were partly or completely destroyed (cited in the NREAP).

How the grid works in Lebanon.

  1. TransmissionÉlectricité du Liban (EDL)
  2. DistributionEDL’s national network, operated region by region by private Distribution Service Providers under service contracts, plus a few small concessions such as Électricité de Zahlé (EDZ)
  3. MeteringEDL and its DSPs
  4. Supply2 or more retail suppliers

Physical flow

EDL’s thermal plants burn heavy fuel oil and gas oil. The largest are Zahrani and Deir Ammar, which together have 975 MW and were designed to run on natural gas. The World Bank puts grid-connected capacity at about 2,300 MW, including about 280 MW of hydropower. Power flows over EDL’s 220 kV and 150/66 kV network to substations and then over medium- and low-voltage lines to the meter rooms of buildings. EDL’s output is limited by money for fuel, not by plant: it averaged about 650 MW in 2025. The Iraqi fuel swap ended in 2025, and on 29 December 2025 Lebanon signed a deal to bring Egyptian gas to Deir Ammar.

A second, private network

Alongside EDL’s wires, generator operators run their own cables from diesel sets to subscribers. Buildings switch between the two supplies, and many homes also have rooftop solar and batteries. In practice a Lebanese home may be supplied by three systems, each with its own meter or inverter: EDL, the generator and the household’s own solar.

Commercial flow

There is no market. EDL generates or buys the power it distributes, bills customers through the DSPs and receives treasury support for fuel. Losses were about 40% in 2023: about 4% in transmission, 9% technical distribution losses and 25% theft and unbilled use. Only about 60% of billed revenue is collected. EDL’s December 2025 Cost Recovery Plan aims to raise average output to about 1,013 MW by 2030 and to cover costs from tariff revenue.

Reform plan

The Council of Ministers approved the Ministry of Energy and Water’s policy paper on 23 July 2026. First, EDL becomes a state-owned joint-stock company and its functions are legally separated. Next, its assets are split into a generation company, a transmission company, a single buyer and regional distribution companies licensed by the ERA. Privatisation and public-private partnerships would follow, together with cost-reflective tariffs. The implementing decrees and a timetable had not been published by October 2026.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Water (MoEW)Sets electricity policy, supervises EDL and publishes the monthly maximum generator tariff. Its July 2026 policy paper, approved by the Council of Ministers on 23 July 2026, sets out the restructuring of EDL and the gradual unbundling of the sector.
RegulatorElectricity Regulatory Authority (ERA)Created by Law 462/2002 but left unappointed for more than 20 years. The Council of Ministers appointed its board on 11 September 2025, with Mohammad Marwan Jamal as president. Under Law 318/2023 it sets net metering eligibility, grid connection conditions, wheeling fees and P2P rules, and under Law 462 it issues generation and distribution licences. In 2026 it launched a call for 350 MW of solar, 1,000 MWh of batteries and gas-fired plants.
TSOÉlectricité du Liban (EDL)The state-owned, vertically integrated utility. It owns about 2,000 MW of thermal plant in seven power stations, the high-voltage transmission grid and the distribution network. Its National Control Centre dispatches the system. A few localised hydropower and distribution concessions sit outside EDL, including the Litani River Authority’s hydropower plants.
DSODistribution Service Providers (DSPs)Private companies contracted by EDL since a 2010 Council of Ministers decision to operate the distribution network in defined regions. Their work includes network surveys, maintenance, new connections, customer service, smart-meter installation, meter reading and bill collection. KVA, for example, serves Beirut and the Bekaa. The network and the customer relationship remain EDL’s. EDL tendered consultancy support for the programme in December 2025.
DSOÉlectricité de Zahlé (EDZ)A private distribution concession in Zahle and surrounding villages. It distributes EDL power when available and runs rented diesel generation (Aggreko) the rest of the time, giving 24-hour supply. It has installed more than 10,000 smart meters, offers net metering and reports technical losses of about 5%.
SupplierPrivate generator operatorsThousands of neighbourhood diesel generators sell power over their own low-voltage cables when EDL is off. They have no electricity licence. The Ministry of Energy and Water sets their maximum tariff, the Ministry of Economy enforces it, and since September 2025 meters and filters have been compulsory.
MeteringEDL and its DSPsEDL owns customer meters. The DSPs install, read and replace them. Most residential meters are electromechanical. The DSP contracts include smart-meter roll-out, and the World Bank is financing a USD 31 million central AMI system (meter data management, customer information system and billing).

Compared with the UK system.

Compared with the UK system.
UK conceptLebanon equivalentHow it works
DNOEDL, with a Distribution Service Provider in each regionEDL owns the whole distribution network. In each region a private DSP operates it under contract: it maintains lines, connects customers, reads meters and collects bills, but it is not a licensed network owner like a UK DNO. Zahle is served by the EDZ concession.
National Grid/NESOEDL National Control CentreEDL owns and operates transmission and dispatches its own plants from the National Control Centre, which the World Bank is helping to rebuild. Under the 2026 policy, a separate transmission company and a single buyer would be created after EDL is converted into a state-owned joint-stock company.
MPANEDL subscription (ishtirak) and meterThere is no national meter point number. A connection is an EDL subscription at a set number of amperes, linked to one meter in the building’s meter room. It is identified by the details on the subscription bill and the meter-room number. The subscription stays with the meter when occupiers change.
MPRNNot applicableHomes are not supplied by a mains gas distribution network, so there is no gas supply-point number.
Meter operatorEDL (through the DSP)Meters belong to EDL and are installed and read by the regional DSP. Customers cannot choose a meter operator. Generator operators install their own separate meters.
SupplierEDL, plus a private generatorThere is no supplier choice for grid power. Most households also hold a separate subscription with a neighbourhood generator, a private and largely informal arrangement whose price is capped by the ministry.
Smart-meter infrastructureDSP smart meters and a planned EDL AMI centreThere is no body like the UK DCC. Smart meters, including PRIME power-line meters in Beirut and the Bekaa, are installed under DSP contracts. A central EDL AMI centre with fibre and 4G gateways is financed by the World Bank’s 2024 project but is not yet in operation.

How a supply point is identified.

Fictional illustration of the elements, not a number format: subscription in the name of R. Haddad, 20 A single-phase (4 kW), meter room 3, Building 14, Hamra, Beirut distribution section.

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?EDL subscription (ishtirak) and meter
Who issues it?Électricité du Liban, through the customer office of the local distribution section (run day to day by the regional DSP)
FormatNo published numbering standard. Each connection is a low-voltage subscription with a set capacity in amperes (for example 15 A single-phase = 3 kW, or 3 × 15 A three-phase = 9 kW at 220/380 V), attached to one EDL meter. The bill carries the subscription and meter references, and buildings are also identified by a meter-room number.
LengthNot publicly documented
Stays with the property when you switch supplier?Yes
Where to find itOn the EDL bill, which collectors deliver to the home, and on the meter itself in the building’s meter room. EDL asks customers to bring a bill, or the meter-room number, to any visit to its offices.
Electronic accessNo public online account portal was identified. Bills are paid to the DSP collector, at the EDL distribution office or by bank direct debit (tawteen). Net metering applications are made online and tracked with a reference number. The World Bank-funded AMI centre includes a planned consumer portal.
Third-party accessThere is no regulated data-sharing scheme. An installer or other third party relies on a copy of the customer’s bill, and any change to the subscription, such as upgrading capacity, net metering or transfer, is made at EDL by the customer or their legal representative.
Who keeps the registerEDL’s customer records, held by its distribution sections and operated by the DSPs. A central customer information system is part of the World Bank-financed AMI centre.
Register scopeNational

How a connection is identified

Lebanon has no national meter point number like an MPAN. The unit of record is the EDL subscription (ishtirak), a contract to supply a given capacity in amperes through a specific meter. A new subscription in an existing building is opened at the EDL customer office. The applicant brings an ID card or civil registry extract, a title deed, lease or sale contract, and the meter-room number or a neighbour’s bill so that EDL can locate the building. Capacity above what the building’s connection allows needs a technical survey (form BC8) before the subscription is costed (form C23).

Change of occupier

The subscription and meter stay with the flat. To move it to a new subscriber, EDL asks for a bill for the meter concerned, a title deed, a lease signed at the municipality or a sale contract, and the new subscriber’s ID. No transfer, upgrade, merger or split of a meter is done, and no deposit is returned, until all arrears on that subscription are paid. Unpaid bills therefore stay attached to the meter.

Capacity and charges

Subscriptions are sold in standard sizes: 15, 20, 30, 40, 50 and 60 A single-phase, and 3 × 10 A upwards for three-phase. A one-off subscription fee and a deposit are charged by size. Since 2023 the monthly bill has included 25 US cents per subscribed ampere, so the subscribed capacity directly affects the fixed part of the bill.

Generator subscriptions are separate

A household’s generator supply is a private agreement with the local operator, with its own meter and a fixed fee set by subscribed amperes, such as 5 A or 10 A. Each operator keeps its own subscriber list. It is not linked to the EDL subscription, and there is no public register of generator customers.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringLimited
Net billingNo
How exported electricity is paidNet metering. Under EDL’s scheme, exports are deducted from imports on each two-monthly bill, surplus rolls forward, and the balance is reset to zero at the end of December. Under Law 318/2023, credits are kept over 12-month cycles and part of any remaining surplus is to be paid for at a percentage the ERA has yet to set.
Can households export solar power to the grid?Only through net metering with EDL. There is no feed-in tariff or export payment. EDL’s scheme, run since 2010–11 under annual EDL board decisions, credits exports against consumption. Law 318/2023 gives net metering a legal basis, but the ERA has not yet issued the implementing rules. Very few systems export in practice, because most are built to run during EDL outages.
Is EDL’s net metering scheme still operating?The online application portal is still live. However, net-meter installations largely stopped with the 2019 financial collapse, and EDL’s limited supply hours reduce the value of netting. Law 318/2023 was intended to replace the year-to-year arrangement with a permanent legal framework.
Is there a size limit?Law 318/2023 covers distributed renewable systems of up to 10 MW. No household size limit for EDL’s scheme was found in a primary source. Eligibility is limited to on-site systems mainly serving the applicant’s own demand.
Can I sell power to a neighbour?Law 318/2023 allows renewable producers to sell directly to buyers on the same or adjacent plots without using the grid, and to more distant buyers through EDL’s network on payment of a wheeling fee. The ERA must authorise these sales and set the fee, which had not happened by October 2026.
What technical standards must equipment meet?For net metering, EDL requires inverters to meet IEC 62109-1/-2 (safety), IEC 61000-3 harmonics and flicker standards, and one grid-connection standard from IEC 62116/IEC 61727, VDE-AR-N 4105, G83/2, G59/3, EN 50438 or AS/NZS 4777. Modules must meet IEC 61215 (or IEC 61646) and IEC 61730.
What happens during an EDL outage?Grid-tied inverters must disconnect when the grid fails (anti-islanding, IEC 62116). This is why most Lebanese systems are hybrid, with batteries or a changeover to the generator, so that they keep supplying the home when EDL is off.

Connecting a home system.

  1. Make sure the property has an EDL subscription in the applicant’s name with no arrears.
  2. Have the system designed by a qualified company. LCEC publishes a list of recommended companies whose engineers are registered with the Order of Engineers and Architects and whose technicians hold IRI and IECD solar training certificates.
  3. Apply online through EDL’s net metering portal (edlnetmetering.com), uploading the form and the certificates showing that the inverter and modules meet the required IEC and grid-connection standards. A tracking ID is emailed to the applicant.
  4. EDL studies the application. EDL says the first response normally comes within a month and the whole process can take up to three months, depending on how complete the file is.
  5. EDL inspects the installation and fits a bidirectional (net) meter, after which exports are credited on the bill.
  6. Once the ERA issues its rules under Law 318/2023, applications for individual, multi-tenant and collective net metering, and for peer-to-peer sales, will follow the ERA’s connection procedure.

Most of Lebanon’s 1.5 GW of distributed solar does not export. It was installed from 2021 onwards to keep homes and businesses supplied when EDL and the generator were off, often with batteries and usually without any agreement with EDL. Systems are typically sized and controlled for self-consumption, and many are physically arranged so that they do not feed into the EDL network.

Formal export has existed since 2011 under EDL’s net metering scheme, developed with UNDP’s CEDRO project. Exports are deducted from imports on each two-monthly bill, surplus rolls forward, and the meter balance is reset each December, with no payment for leftover energy. The scheme also allowed "community" or virtual net metering, in which the output of a shared plant is divided among shareholders’ smart-metered accounts. Because the arrangement was renewed each year by the EDL board and EDL supply collapsed after 2019, few new net meters have been installed since.

Law 318/2023 on distributed renewable energy, approved by Parliament on 14 December 2023, sets out a permanent framework: individual, multi-tenant and collective net metering over 12-month cycles, partial payment for surplus, and peer-to-peer sales up to 10 MW. EDL is to set up a dedicated directorate for these customers. Almost every operational detail is left to the ERA, including eligibility, connection procedures and tariffs. With the ERA board appointed only in September 2025, the law was still waiting for its implementing rules in late 2026.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (rooftop solar)No electricity licence. Law 462/2002 allows renewable generation for personal use, and the rooftop installation rules of Higher Council for Urban Planning Decision 39/2019 apply. Engineer certificates and an urban-planning servitude certificate are needed. A joint ministerial decision of 9 September 2026 adding municipal approval for systems under 1.5 MW was withdrawn on 11 September, and the ERA is to set the procedure.Municipality / Higher Council for Urban Planning; ERA (future procedure)Equipment must meet the mandatory LIBNOR standards of Decree 6887/2020. Connection to the grid needs EDL net metering approval.
Generate electricity for sale (utility scale)A generation licence. While the ERA was not appointed, interim laws (most recently Law 129/2019) let the Council of Ministers grant licences on the proposal of the energy and finance ministers. With the ERA board in place, licensing passes to the ERA under Law 462/2002.ERA; previously Council of MinistersEleven 15 MW solar farms (165 MW) were licensed in May 2022 and signed 25-year PPAs at USD 0.057–0.0627/kWh in May 2023. Three wind farms (226 MW) in Akkar are licensed. None had been built by 2026.
Store electricity (batteries)No licence or registration found for behind-the-meter household batteries. Grid-scale storage is being procured through the ERA as part of independent power producer projects.ERAThe ERA’s 2026 call covers up to 1,000 MWh of battery storage alongside 350 MW of solar. LCEC estimates batteries were in about 65% of installed solar capacity at the end of 2022.
Export to the grid (net metering)An approved EDL net metering application and a bidirectional meter. Under Law 318/2023, connection authorisation will follow conditions set by the ERA.EDL; ERAInverters and modules must have the IEC certificates listed by EDL. No export payment applies.
Sell electricity to other consumers (peer-to-peer)Allowed under Law 318/2023 for renewable systems up to 10 MW, through direct power purchase agreements or equipment leasing, subject to ERA authorisation. Sales to the same or adjacent plots need no grid use. Distant sales pay an ERA-set wheeling fee to EDL.ERANot yet operational, because the ERA rules and wheeling fee had not been issued by October 2026.
Supply and distribute electricity (public grid)Reserved to EDL under Decree 4517, apart from historic concessions such as EDZ. Law 462/2002 provides for licensed private distribution after unbundling, and the July 2026 policy plans ERA-licensed regional distribution companies.Council of Ministers / MoEW; ERA in futureThe DSPs work for EDL under service contracts and do not hold supply licences.
Private generator supply (neighbourhood diesel)No electricity licence. Operators must charge no more than the monthly ministry tariff, fit individual meters and install noise and emission filters. These rules have been enforced since the 45-day compliance deadline of 30 September 2025.Ministry of Energy and Water (tariff); Ministry of Economy and Trade (enforcement); municipalitiesInspections are carried out by Ministry of Economy consumer-protection inspectors supported by State Security.
Wholesale trading, aggregation and virtual power plantsNo framework. There is no wholesale market, and no aggregator or VPP licence exists.ERA (future)The policy paper plans a single buyer before any competition is introduced.
Balancing, grid services and remote control of assetsNot open to third parties. EDL’s National Control Centre balances the system with its own plants, and no rules exist for dispatching distributed assets.EDLThe ERA’s 2026 battery tender and the World Bank-financed control centre are the first steps towards grid services.

The legal basis is Law 462/2002 on the organisation of the electricity sector. It provides for unbundling EDL, licensing private generation and distribution, and an independent regulator. For more than two decades it was not applied, and Decree 4517, which gives EDL exclusive rights to generate, transmit and distribute, remained the working rule. Interim laws passed in 2006, 2014, 2015 and 2019 allowed the Council of Ministers to license private generators until the ERA existed. The wind and solar farm licences were issued that way.

Two steps in 2025–26 changed this. The ERA board was appointed on 11 September 2025, which the World Bank had made a condition for part of its 2024 loan. When three ministers issued their own rules for rooftop solar under 1.5 MW in September 2026, the Prime Minister had them withdrawn and the matter referred to the ERA, as the authority competent under Article 26 of Law 462/2002. Small solar installers do not need an electricity licence, but they may apply to LCEC to be listed as recommended companies. From 2027, keeping that listing will require attending World Energy Council Lebanon training seminars.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoEDL. There is no market. EDL dispatches its own plants and buys from a few producers. The 2026 policy plans a single buyer as an interim structure, with competition later.
Frequency control and reservesNo—NoEDL National Control Centre. Reserves come from EDL’s thermal and hydro units. The NREAP and the ERA’s 2026 call include grid-scale batteries to provide ancillary services, but no market for them exists.
Demand-side managementNo—NoEDL. Demand is managed by rationing supply hours by area, not by paid demand response. EDL has linked extra hours to areas with good bill payment.
Peer-to-peer renewable sales (Law 318/2023)DevelopingUp to 10 MW per systemLimitedERA / EDL (wheeling). A bilateral energy-sales framework rather than a flexibility market. Collective net metering will let several consumers share one plant. Neither was in operation in 2026.

Lebanon has no channel for distributed energy resources to sell flexibility. There is no wholesale price, no balancing market, no half-hourly settlement and no aggregator role, and the grid itself runs for only part of the day. Household batteries and solar systems create a great deal of flexibility behind the meter, but they use it to cover outages, not to respond to grid signals.

The first building blocks are being put in place: an independent regulator, a modern control centre and AMI system financed by the World Bank, an ERA tender for 1,000 MWh of grid batteries, and the single-buyer model in the July 2026 policy. Rules for aggregation or the remote control of distributed assets have not been proposed.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
EDL net metering portalOnline application and tracking for net metering, with the technical standards required for inverters and modules.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national roll-out. Smart meters are installed region by region under DSP contracts, with a central EDL AMI system being financed by the World Bank.
Reading intervalNot published
Who installsDistribution Service Providers, under their EDL contracts (approved by the Council of Ministers in 2010)
Beirut and Bekaa contractMore than 250,000 PRIME (power-line) smart meters ordered through KVA, announced in 2021
Zahle (EDZ)More than 10,000 smart meters installed
Central systemEDL AMI centre (meter data management, customer information system, billing, consumer portal, fibre and 4G gateways), USD 31 million under the World Bank project
Typical existing meterElectromechanical, read manually by DSP meter readers
Billing cycle goalShorten EDL’s billing and collection cycle from 12 to 3 months

Smart metering in Lebanon is tied to the distribution programme, not a national mandate. EDL’s plan was that the DSPs would build a smart grid that could compare the energy distributed with the energy billed and collected, and support remote disconnection, prepaid cards and time-of-use tariffs. Progress has been limited, and in 2024 the World Bank cited the lack of smart metering as a cause of EDL’s losses. A 2021 contract for more than 250,000 PRIME power-line meters covered Beirut and the Bekaa, while most homes elsewhere still have electromechanical meters read by hand.

The missing piece has been a central system to use the data. The World Bank’s Lebanon Renewable Energy and System Reinforcement Project (approved in 2024, financing agreement signed in April 2025) funds an EDL AMI centre that must work with the meters installed by all DSPs. The aim is to identify losses, cut the billing cycle from 12 to 3 months and support net metering under Law 318/2023. The project does not pay for the meters themselves, which remain the DSPs’ responsibility.

Renewable electricity.

Electricity generation mix (2024).

  • Fossil fuels (oil-fired plants and diesel generators): 78.4%
  • Solar PV (distributed): 16.6%
  • Hydro: 5%
Source 1
Renewable electricity share
21.6% (2024)Source 1Renewable generation (2,223 GWh: distributed solar 1,706 GWh, hydro 517 GWh) as a share of electricity actually supplied (10,290 GWh). Measured against estimated demand (17,278 GWh) the share was 12.8%.
Home solar
Not identified from a reliable public source.
Solar added each year
424 MW (2025)Source 25Derived from IRENA cumulative figures (1,505 MW at the end of 2025 minus 1,081 MW at the end of 2024). In 2024 about 240 MWp was installed but 131 MWp was destroyed in the war (NREAP).
Solar PV (distributed)
1,505 MW (End 2025)Source 25IRENA figure. The NREAP gives 1,190 MW (provisional) for 2024.
Hydro
282 MW (2024)Source 1Includes the Litani River Authority’s 192 MW Markabi–Awali–Joun cascade.
Biogas
7 MW (2024)Source 1
Wind
0 MW (2025)Source 1226 MW licensed in Akkar but not built.
Thermal (grid-connected)
2,000 MW (2024)Source 19Seven EDL thermal power plants. Available output is much lower because of fuel shortages and the age of the plants.

Targets.

  • 30% of electricity from renewables by 2030, the long-term objective of the NREAP 2025–2030 and the conditional target in Lebanon’s 2020 NDC. The unconditional NDC target is 18% of electricity demand.
  • The NREAP "Green Revolution" scenario reaches 5,742 MW of renewables by 2030, including 2,840 MW of distributed solar, 1,165 MW of utility solar, 826 MW of wind, 300 MW of CSP and 536 MW of hydro, or 54% of demand.
  • The ERA call of July 2026 seeks up to five solar plants totalling 350 MW with 1,000 MWh of storage, and the World Bank project includes a 150 MW solar plant.

Lebanon’s renewable growth has come almost entirely from households and businesses. Distributed solar capacity rose from 92 MW in 2020 to 869 MW in 2022, 1,081 MW in 2023 and about 1.5 GW by the end of 2025. The trigger was the removal of fuel and electricity subsidies in 2021–22, which made generator power very expensive and solar systems cheap by comparison. Because the banking system had collapsed, most systems were bought for cash.

Utility-scale projects have stalled. Eleven solar farms of 15 MW each were licensed in 2022 and signed PPAs in 2023, and three wind farms in Akkar have PPAs, but none has reached financial close. Financiers have been waiting for sector reform. Hydropower, about 282 MW, much of it decades old, varies widely with rainfall, from 347 GWh in 2018 to more than 1,000 GWh in 2020.

Measured against the electricity actually delivered, renewables rose from 2.6% in 2018 to 21.6% in 2024. Against estimated demand, the 2024 share was 12.8%. The rest of supply comes from oil: EDL’s fuel-oil and gas-oil plants and private diesel generators, which the Arab Reform Initiative estimates account for 51% of local production.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
0 MWh (2026)Source 25No grid-scale battery is in operation. Up to 1,000 MWh is sought in the ERA’s 2026 call for expressions of interest.

Batteries are already common behind the meter in Lebanon, because they let solar power cover the evening and night when neither EDL nor the generator is running. No registration or national statistics exist, so the installed total is unknown.

Grid storage is just starting. The ERA’s first call for projects, launched in July 2026, combines 350 MW of solar with up to 1 GWh of batteries, and the government plans to rely on batteries and fast-response units for reserves as more solar is connected.

Storage projects.

  • ERA solar and storage call for expressions of interest: Up to five grid-connected solar plants totalling 350 MW with up to 1,000 MWh of batteries, plus 20–100 MW dual-fuel gas plants, under an IPP model. Submissions closed on 30 September 2026.
  • PV plus storage programme (MoEW): An earlier plan for 300 MW of solar farms with 210 MW of battery storage to provide ancillary services. It was put on hold, and the EBRD has supported feasibility work for a battery auction (NREAP).

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Électricité du Liban (EDL)Sole public supplier outside the small concession areasNoNoNoLimited
Électricité de Zahlé (EDZ)Concession for Zahle and surrounding villagesNoUnknownNoLimited

Households cannot choose a grid supplier. Outside Zahle, EDL is the only one. The second supplier for most homes is the neighbourhood generator operator, a private business, often one per street or building group, that sells power for the hours EDL is off. They have no supply licence but must apply the ministry’s monthly price cap, meter each subscriber and fit filters.

Solar companies are a third source in practice. They sell and install systems outright rather than supplying power. LCEC publishes a list of recommended companies that meet its qualification criteria.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Water (MoEW)GovernmentEnergy policy, EDL supervision, generator tariffPublishes the monthly generator tariff and the 2026 sector policy paper.
Électricité du Liban (EDL)TransmissionState utility: generation, transmission, distribution, supplySets bill rules, connects customers and runs the net metering scheme.
Électricité de Zahlé (EDZ)DistributionPrivate distribution concession in ZahleLebanon’s example of 24-hour local supply with smart meters and net metering.
Lebanese Center for Energy Conservation (LCEC)Renewable EnergyNational energy agency of the MoEWAuthor of the NREAP 2025–2030, solar market statistics and the qualification list of solar PV companies.
Litani River Authority (LRA)Renewable EnergyOwner of the largest hydropower cascade (192 MW)Co-implementer of the World Bank renewable energy and grid project.
Industrial Research Institute (IRI)SolarTesting laboratory and training providerVerifies solar equipment against the mandatory standards of Decree 6887/2020 and runs the certified PV technician course.
Institut Européen de Coopération et Développement (IECD)SolarVocational trainingIts solar panel installation course is mandatory for LCEC-qualified companies.
World Energy Council – Lebanon CommitteeRenewable EnergyIndustry association and trainingRuns technical seminars that become mandatory for LCEC-qualified solar companies from January 2027.
Ministry of Economy and Trade (consumer protection)ConsumerEnforcement of generator tariffs and metersInspects generator operators for compliance with the official tariff, metering and filter rules.
Central Administration of Statistics (CAS)GovernmentNational statistics officeSource of household, housing and energy-use survey data.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Inverters (net metering)IEC 62109-1 and IEC 62109-2; IEC 61000-3-2/-3-4/-3-12 (harmonics); IEC 61000-3-3/-3-5/-3-11 (flicker)EDL (net metering requirements)Certificates for all components are mandatory for net metering approval.
Grid connection and anti-islandingOne of IEC 62116, IEC 61727, VDE-AR-N 4105, G83/2, G59/3, EN 50438 or AS/NZS 4777.2/.3EDLEDL accepts several international connection standards rather than a national grid code for small generators.
PV modulesIEC 61215-1/-2 (or IEC 61646) and IEC 61730-1/-2EDL; LIBNORDesign qualification and safety qualification.
Mandatory national solar standardsDecree 6887 of 8 October 2020LIBNOR (standards); IRI (verification)Makes LIBNOR solar energy and PV standards compulsory for products on the market. Verification is by IRI or another accredited laboratory.
Installer qualificationLCEC qualification of solar PV companies (voluntary listing)LCECRequires electrical and civil/mechanical engineers registered with the Order of Engineers and Architects (5+ years’ experience), an IRI-certified PV technician (mandatory since 1 February 2024) and an IECD-trained installer (since 31 January 2025). From January 2027, applicants must attend at least 70% of the WEC Lebanon seminars.
Rooftop installation (urban planning)Higher Council for Urban Planning Decision 39/2019Higher Council for Urban PlanningRegulates solar PV systems on building rooftops (cited in the NREAP).
Smart meter communicationsPRIME power-line communication (in the Beirut and Bekaa DSP contract)DSP / EDLThe World Bank-financed AMI centre must work with the meters of all DSPs.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Electricity generation licence (own-use solar)NoNationalLaw 462/2002 allows renewable generation for personal use. Systems selling power to others fall under Law 318/2023 and need ERA authorisation.
Building and planning complianceLimitedMixedRooftop systems follow Higher Council for Urban Planning Decision 39/2019. The Ministry of Energy and Water says engineer certificates and an urban-planning servitude certificate were already required. A September 2026 decision requiring a municipal file for systems under 1.5 MW was withdrawn, and the ERA is to set the procedure.
Consent of other owners (apartment buildings)LimitedLocalRoofs of apartment buildings are shared property, so owners’ agreement is needed in practice. The withdrawn 2026 decision would have made owner consent an explicit condition.
EDL approval for grid connection / exportYesNationalNeeded only to export or net-meter. Apply online to EDL with equipment certificates, followed by inspection and a bidirectional meter.
Equipment conformityYesNationalSolar products must meet the LIBNOR standards made mandatory by Decree 6887/2020, verified by IRI or an accredited laboratory.

For a household, installing solar for its own use needs no electricity licence and, outside net metering, no EDL approval. The main conditions come from building and urban-planning rules and from the equipment standards. The rules for small systems were briefly tightened in September 2026, when a joint decision of the interior, public works and energy ministers required a municipal file for systems under 1.5 MW, with engineer certificates and height limits of 3 m on buildings under 15 m and 4.5 m on taller ones. It was withdrawn within two days on the Prime Minister’s instruction, and the subject was referred to the ERA, which had not been consulted.

Installers should expect a permanent ERA procedure for rooftop and building-integrated systems, and separate ERA rules for net metering and peer-to-peer sales under Law 318/2023.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Law 318/2023 net metering and peer-to-peer salesScheduledNet meteringIndividual, multi-tenant and collective net metering over 12-month cycles, with part of any end-of-cycle surplus paid for, and renewable peer-to-peer sales up to 10 MW. It is in law but awaits ERA rules on eligibility, connection, tariffs and wheeling fees.Law ratified 14 December 2023; implementing rules pending
VAT and customs exemption on solar equipmentClosedVAT relief / customs exemptionThe 2022 Budget Law exempted solar power equipment used to generate electricity from VAT (11%), customs duty and the additional 3% duty. The exemption was not extended after 2023.15 November 2022 – 31 December 2023
NEEREA subsidised loansClosedSubsidised loanThe National Energy Efficiency and Renewable Energy Action, run by Banque du Liban through commercial banks with LCEC, offered subsidised loans for solar and efficiency projects. It drove the early solar market in 2011–2019 but stopped working when the banking sector collapsed.2010 – 2019

Data and connectivity.

Fixed broadband
80.6 % of population using the internet (2024)Source 22World Bank / ITU internet-use indicator, not fixed broadband coverage.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Smart-meter communications are mainly over power lines. The Beirut and Bekaa contract uses PRIME narrowband PLC meters with data concentrators, which suits dense apartment blocks with shared meter rooms. The EDL AMI centre being financed by the World Bank is designed with fibre-optic and 4G gateways to collect data from the DSPs’ head-end systems.

Solar installations are usually monitored through the inverter maker’s Wi-Fi or mobile app, independently of EDL.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
17.3 TWh (2024)Source 1Estimated demand. Actual supply from all sources was 10.29 TWh.
Generation capacity
2.3 GW (2024)Source 19Grid-connected installed capacity, mainly fuel-oil and diesel thermal plants plus about 280 MW of hydro. EDL says its maximum available output is up to 1,884 MW (Arab Reform Initiative). It does not include about 1.5 GW of distributed solar or private generators.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The Lebanese grid is rationed. EDL typically supplies 8–10 hours a day, and less when fuel deliveries fall short, as in August 2026, when the fuel budget assumed USD 680 a tonne while market prices approached USD 1,500. Supply is rotated between areas, and stable 24-hour service exists only in a few places, such as the Zahle concession.

The network itself needs investment. The World Bank project finances a new National Control Centre, rehabilitation of the Achrafieh 220 kV substation and the Deir Nbouh–Baalbek 220 kV line, and a substation to connect a 150 MW solar plant. In the longer term, EDL plans to switch Deir Ammar and Zahrani to natural gas and to build two 825 MW gas plants, and the ministry hopes to restore power and gas links through Syria with Jordan and Egypt.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Electricity Regulatory Authority board appointedCurrent11 September 2025The regulator foreseen in Law 462/2002 was finally constituted, with Mohammad Marwan Jamal as president. It is responsible for licences, tariffs and the implementing rules of Law 318/2023.
Sector policy paper: EDL to become a joint-stock companyCurrentApproved 23 July 2026A phased plan: EDL becomes a state-owned joint-stock company with legally separated functions, and is then split into generation, transmission, single-buyer and regional distribution companies licensed by the ERA, before privatisation and partnerships. Implementing decrees had been requested but not published.
ERA rules for distributed renewables (Law 318/2023)UpcomingExpected after 2026; no date setNet metering eligibility and connection procedures, the surplus compensation percentage, wheeling fees and peer-to-peer authorisation, plus a Council of Ministers decree creating EDL’s renewable energy directorate.
Procedure for installing solar systems under 1.5 MWUpcomingReferred to the ERA on 11 September 2026Joint Decision No. 1234 of 9 September 2026, which required municipal files, engineer certificates, owner consent and height limits, was withdrawn. The ERA is to issue the procedure after consulting the Ministry of Environment and other bodies.
ERA call for 350 MW solar, 1,000 MWh storage and gas plantsUpcomingExpressions of interest closed 30 September 2026The first step towards licensing and procurement of IPP projects, including Lebanon’s first grid-scale batteries.
World Bank renewable energy and system reinforcement projectCurrentFinancing agreement signed 24 April 2025USD 250 million for EDL and the Litani River Authority: a 150 MW solar plant, grid reinforcement, a National Control Centre, the AMI centre and hydropower rehabilitation.
Generator meters and official tariff enforcedCurrentSince 30 September 2025Generator operators must fit individual meters and filters and charge the ministry tariff, with inspections by the Ministry of Economy and State Security.
Mandatory training seminars for LCEC-qualified solar companiesUpcomingJanuary 2027Companies seeking or renewing LCEC qualification must attend at least 70% of the World Energy Council Lebanon seminar series.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHighAbout 1.5 GW of distributed solar at the end of 2025 (IRENA), roughly 260 W per person. In 2022–23, 36% of surveyed households used home solar (World Bank).
Distributed energy marketHighMost household electricity comes from distributed sources: private and decentralised supply meets 67–83% of consumption (Arab Reform Initiative), and 84% of households had generator access (CAS 2018–19).
Grid flexibility marketLowNo wholesale, balancing or demand-response market and no aggregator framework. Peer-to-peer sales under Law 318/2023 are not yet operational.
Energy storage adoptionMediumBatteries were part of about 65% of installed solar capacity at the end of 2022 (LCEC) and used by 10% of surveyed households (World Bank 2022–23), but there is no grid-scale storage and no installed total.
Renewable growth environmentHighThe renewable share of supplied electricity rose from 2.6% (2018) to 21.6% (2024), and distributed solar grew by 424 MW in 2025 (NREAP; IRENA).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 40 sources
  1. The National Renewable Energy Action Plan of Lebanon (NREAP) 2025–2030. Lebanese Center for Energy Conservation (LCEC) / Ministry of Energy and Water, 2025. accessed 1 October 2026.
  2. Calculation of electricity bills from the May 2023 issues (احتساب فواتير الكهرباء في الإصدارات اعتباراً من شهر أيار 2023). Électricité du Liban, 2024. accessed 1 October 2026.
  3. Questions and answers: how to read the bill and the meter. Électricité du Liban. accessed 1 October 2026.
  4. New subscription in a completed building connected to the grid. Électricité du Liban. accessed 1 October 2026.
  5. Transfer of a subscription to a new subscriber. Électricité du Liban. accessed 1 October 2026.
  6. Customer service: paying the bill. Électricité du Liban. accessed 1 October 2026.
  7. Distribution Service Providers project. Électricité du Liban. accessed 1 October 2026.
  8. The net metering process and application. Électricité du Liban / UNDP CEDRO. accessed 1 October 2026.
  9. Tender 2025/85: consultancy services to assist in managing the Distribution Service Providers project. Public Procurement Authority (Lebanon) / EDL, 2025. accessed 1 October 2026.
  10. Lebanon: this is the private generator tariff for August (هكذا أصبحت تسعيرة المولدات الخاصة في آب). An-Nahar, 2026. accessed 1 October 2026.
  11. Lebanon: electricity lights up social anger. Libnanews, 2026. accessed 1 October 2026.
  12. Electricity in Lebanon hit by the oil shock. Libnanews, 2026. accessed 1 October 2026.
  13. Electricity in Lebanon: the new roadmap. Libnanews, 2026. accessed 1 October 2026.
  14. Energy ministry publishes the sector policy paper (الطاقة تنشر ورقة سياسة القطاع). Al-Modon, 2026. accessed 1 October 2026.
  15. Lebanon launches energy liberalisation plan (Libanon odstartoval plán liberalizace energetiky). Embassy of the Czech Republic in Beirut, 2026. accessed 1 October 2026.
  16. Minister Joe Saddi’s power sector reset. Ministry of Energy and Water, 2026. accessed 1 October 2026.
  17. Turning the Lights On: Solutions for Lebanon’s Electricity Crisis. BlomInvest Bank, 2026. accessed 1 October 2026.
  18. Navigating the energy shock: electricity and social equity in Lebanon. Arab Reform Initiative, 2026. accessed 1 October 2026.
  19. Lebanon Renewable Energy and System Reinforcement Project (P180501): Project Appraisal Document. World Bank, 2024. accessed 1 October 2026.
  20. Population, total – Lebanon. World Bank, 2025. accessed 1 October 2026.
  21. Urban population (% of total population) – Lebanon. World Bank, 2025. accessed 1 October 2026.
  22. Individuals using the Internet (% of population) – Lebanon. World Bank / ITU, 2024. accessed 1 October 2026.
  23. Electric power consumption (kWh per capita) – Lebanon. World Bank / IEA, 2023. accessed 1 October 2026.
  24. Labour Force and Household Living Conditions Survey 2018–2019, Lebanon. Central Administration of Statistics / ILO / EU, 2020. accessed 1 October 2026.
  25. Lebanon tenders 350 MW of solar. pv magazine, 2026. accessed 1 October 2026.
  26. Lebanon extends deadline for 350 MW solar tender. pv magazine, 2026. accessed 1 October 2026.
  27. Lebanon introduces peer-to-peer renewable energy trading. pv magazine, 2024. accessed 1 October 2026.
  28. Regulating the energy transition: Lebanon’s new law on distributed renewable energy. Lebanese Center for Policy Studies (LCPS), 2024. accessed 1 October 2026.
  29. Notizie dal mondo: Lebanon Electricity Regulatory Authority (ITA network news). ICE – Italian Trade Agency, 2025. accessed 1 October 2026.
  30. Lebanon – September 2025 (Democracy Tracker). International IDEA, 2025. accessed 1 October 2026.
  31. On Salam’s instructions, the decision on solar panels is dropped (صرف النظر عن القرار الأخير المتعلق بألواح الطاقة الشمسية). An-Nahar, 2026. accessed 1 October 2026.
  32. Ministry of Energy clarifies the decision regulating solar panel installation. An-Nahar, 2026. accessed 1 October 2026.
  33. Lebanon: new rules for solar panels. Libnanews, 2026. accessed 1 October 2026.
  34. The Qualification Procedure of Solar PV Companies in Lebanon (July 2026). Lebanese Center for Energy Conservation (LCEC), 2026. accessed 1 October 2026.
  35. Decree 6887: mandatory standards for solar energy and photovoltaic systems. Lebanese Center for Energy Conservation (LCEC), 2020. accessed 1 October 2026.
  36. Lebanon – Corporate – Other taxes. PwC Worldwide Tax Summaries, 2026. accessed 1 October 2026.
  37. New regulations: Lebanon clamps down on non-compliant power generator owners. LBCI, 2025. accessed 1 October 2026.
  38. Power for payment: EDL’s strategy to boost power supply. LBCI, 2023. accessed 1 October 2026.
  39. ADD Grup supplying PRIME smart meters to Lebanon by 2022. PRIME Alliance, 2021. accessed 1 October 2026.
  40. Euro foreign exchange reference rates: US dollar (USD). European Central Bank, 2026. accessed 1 October 2026.