How electricity works in Egypt: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Egypt: Not yet available.Olmack is not offered in Egypt yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Egypt.

Egypt electricity market 2026: tiered household tariffs, EgyptERA, EETC, nine distribution companies, prepaid meters, net metering, licensing and renewables.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Egyptian pound (EGP) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Egypt energy at a glance.

Key figures for households in Egypt. Each one links to its source on the full overview below.

  • Electricity price.

    1.15 EGP per kWh for households, including taxes. Figures for From August 2026 consumption.

  • Household use.

    1,919 kWh a year for a typical household. Figures for FY 2024/25.

  • Renewable share.

    13% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Egypt.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Egypt below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Egypt requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Egypt.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Egypt, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Egypt, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Egypt.

Full overview

The energy market in Egypt, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Egypt has a state-led electricity sector. The Egyptian Electricity Holding Company (EEHC) owns the main generation companies, the Egyptian Electricity Transmission Company (EETC) and nine regional distribution companies, which also bill households. The Egyptian Electric Utility and Consumer Protection Regulatory Agency (EgyptERA) issues licences, sets the rules for connecting to the grid and calculates tariffs under Electricity Law No. 87 of 2015.

Household prices are set by the state in seven monthly consumption brackets and are heavily subsidised. From August 2026 consumption, the first 50 kWh a month still costs 68 piastres per kWh, while a household using between 101 and 200 kWh a month pays EGP 1.15 per kWh for all of it. The government says it pays about EGP 100 billion a year to cover the gap between cost and tariff.

Natural gas produced about 80% of Egypt’s electricity in 2025, and renewables 13%, mostly from the Aswan High Dam, the Gulf of Suez wind farms and large desert solar parks such as Benban. The official target is 42% renewable electricity by 2030. Rooftop solar is connected through EgyptERA’s net metering scheme, and the first utility-scale battery systems came online in 2025 and 2026.

Energy snapshot.

Headline figures for electricity in Egypt. Each shows its data year and links to its source.

  • Population109,000,000 peopleSource 109 May 2026
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per household1,919 kWh/yrSource 7FY 2024/25
  • Household price (EGP)1.15 EGP/kWhSource 1From August 2026 consumption
  • Household price (EUR)0.02 EUR/kWhSource 11From August 2026 consumption
  • Renewable electricity share13%Source 82025
  • Solar capacity3.27 GWSource 82025
  • Wind capacity3.03 GWSource 82025
  • Energy storage capacity0.5 GWhSource 21August 2026
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Egyptian Electric Utility and Consumer Protection Regulatory Agency (EgyptERA)
System operator
Egyptian Electricity Transmission Company (EETC)
Distribution networks
Nine state-owned regional distribution companies under EEHC, plus a small number of private distribution licensees serving specific developments
Currency
Egyptian pound (EGP)
Voltage and frequency
220 V / 50 Hz (380 V three-phase)

Electricity prices in Egypt.

Household price (EGP)
1.15 EGP/kWh (From August 2026 consumption)Source 1Rate for households using 101–200 kWh a month, charged on all their consumption. Other brackets run from EGP 0.68 to EGP 2.74/kWh. A monthly customer service charge is added (EGP 6 for this bracket in the most recent schedule EgyptERA has published).
Household price (EUR)
0.02 EUR/kWh (From August 2026 consumption)Source 11Converted from EGP 1.15/kWh at the Central Bank of Egypt euro selling rate of 23 September 2026 (EUR 1 = EGP 58.949).
Typical annual electricity bill
2,832 EGP/yr (From August 2026 consumption)Source 1Derived for a household using 200 kWh a month: EGP 230 a month for energy (EgyptERA figure) plus the EGP 6 monthly customer service charge, times 12.

Household price trend (EGP per kWh).Source 5

0.360.7551.15FY 2018/19FY 2019/20Jul 2021–Dec 2023Jan–Jul 2024Aug 2024–Jul 2026From Aug 2026
Egypt household electricity price, EGP per kWh
FY 2018/190.36 EGP/kWh
FY 2019/200.5 EGP/kWh
Jul 2021–Dec 20230.77 EGP/kWh
Jan–Jul 20240.83 EGP/kWh
Aug 2024–Jul 20260.95 EGP/kWh
From Aug 20261.15 EGP/kWh

How household tariffs work

Egypt does not have a standing charge as in Europe. A bill is made up of the energy charge from the bracket table and a fixed monthly customer service charge that rises with consumption. In the schedule EgyptERA published for August 2024 it ran from EGP 1 a month (0–50 kWh) to EGP 40 a month (over 1,000 kWh). Under the bracket system, households using more than 100 kWh lose the cheapest rates. Above 200 kWh, each block is priced at its own rate. Above 650 kWh, all consumption is charged at one rate.

The 2026 increases

Tariffs changed twice in 2026. In April, after a sharp rise in fuel import costs linked to the regional war, commercial tariffs rose by about 20% and the price for households using more than 1,000 kWh a month rose by about 16%. From August 2026 consumption, EgyptERA raised the other household brackets by an average of 12% and left the first bracket of about 4 million subscribers unchanged. The increases were 20 piastres per kWh for the 51–100 and 0–200 kWh brackets, 18 for 201–350, 19 for 351–650 and 31 for the 0–1,000 kWh bracket.

Subsidy

EgyptERA publishes the share of the real cost that households pay. At 50 kWh a month a household pays EGP 34, about 25% of the cost, and the state covers EGP 103. At 300 kWh it pays EGP 403, about 49%. Between 700 and 1,000 kWh it pays 88%, and at 2,000 kWh it pays the full cost of EGP 5,480. EgyptERA says the tariff is set on the basis of the Central Bank exchange rate and will be reviewed if the rate changes.

Trend

Since 2018 the price in the main 0–200 kWh bracket has risen from 36 to 115 piastres per kWh. The largest steps came in 2019, mid-2021, January and August 2024 and August 2026. Prices are still very low in euro terms because of the subsidy and the fall in the value of the pound since 2022.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesAll households pay a state-set tariff in seven brackets based on monthly consumption. From August 2026: 0–50 kWh 68 pt/kWh; 51–100 kWh 98 pt; households using up to 200 kWh pay 115 pt on all units; 201–350 kWh 173 pt and 351–650 kWh 214 pt on the units in each band; over 650 kWh, 241 pt on all units up to 1,000 kWh; over 1,000 kWh, 274 pt on all units, which EgyptERA says covers the full cost.
PrepaymentYesPrepaid card meters have been installed since 2011 and are now the standard for new connections. They are topped up at distribution company offices, payment outlets or by NFC phone apps. The same tariff brackets apply.
Time-of-useNoThere is no time-of-use tariff for households. The current EgyptERA schedule sets a single energy price for each customer category.
DynamicNoThere are no wholesale-linked household tariffs. There is no organised wholesale market for households to be exposed to.
FixedNoHouseholds cannot choose a fixed-price contract or another supplier. The regulated tariff changes when the government approves a revision.
OtherLimitedSeparate regulated tariffs apply to shops and commercial premises (5 brackets), EV charging stations, irrigation and public lighting. Under net metering, solar output is offset against consumption.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,919 kWh/yr (FY 2024/25)Source 7Derived: residential sales of 72,112 GWh divided by 37.58 million residential subscribers of the distribution companies (EEHC annual report). This is per residential account, not per household.
Average daily use per household
5.3 kWh/day (FY 2024/25)Source 7Derived: 1,919 kWh per residential account divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
2,060 kWh/person/yr (all sectors) (2025)Source 8Total electricity demand per person (Ember: 2.06 MWh).
Heat pumps
Not identified from a reliable public source.
Air conditioning
17.7 % of households (survey sample) (2019/20)Source 25Share of households in the CAPMAS HIECS 2019/2020 survey sample with one or more air conditioners (unweighted case counts, 1,965 of 11,085). It was 12.2% in 2017/18. Treat as indicative.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households are the largest group of electricity users in Egypt. In 2024/25 the distribution companies sold 72,112 GWh to 37.6 million residential subscribers, 47% of their sales. The average residential account used about 1,920 kWh a year, or roughly 160 kWh a month. That is low by European standards but rising quickly.

Demand is driven by cooling. National peak demand reached 38 GW in the summer of 2024/25, up from 36.8 GW the year before, and in 2026 the government introduced energy-saving measures, including remote working and limits on shop and billboard lighting, to keep summer demand down.

Air conditioner ownership is growing. Household survey data showed it rising from about 12% to 18% of sampled households between 2017/18 and 2019/20. Electric water heaters are also common. Heat pumps for space heating and electric cars are still rare. EgyptERA licenses public EV charging and sets a separate tariff for it.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
42.9 % of population (2025)Source 28

Egypt’s population lives almost entirely in the Nile Valley and Delta, and just under 43% is classed as urban. No reliable national split between houses and flats was found, but housing in the large cities is mostly in multi-storey blocks.

Two features of the housing stock matter for electricity. First, many apartment blocks have one shared flat roof, so rooftop solar for an individual flat needs the agreement of the building’s other owners. Second, large numbers of buildings were built without permits. These buildings have historically received electricity through "practice" (mumarsa) accounts or later through coded meters rather than a normal contract. EEHC reports 6.8 million requests to install coded meters through its online platform.

Older rent-controlled flats are declining as a share of the stock. They were 7% of residential units in 2017, compared with 15% in 2006.

How the grid works in Egypt.

  1. TransmissionEgyptian Electricity Transmission Company (EETC)
  2. DistributionNine state-owned regional distribution companies under EEHC, plus a small number of private distribution licensees serving specific developments
  3. MeteringDistribution companies, EEHC Unified Platform for Electricity Services
  4. Supply2 or more retail suppliers

Physical flow

Most electricity comes from large gas-fired combined-cycle plants owned by EEHC’s six generation companies, from the Aswan hydro plants, and from private wind and solar plants in the Gulf of Suez, Zafarana and Benban areas. EETC moves power over the extra-high-voltage (220–132 kV) and high-voltage (66–33 kV) grid to substations, where the distribution companies take it down to medium voltage (22–11 kV) and then to 380/220 V for homes. Installed capacity was 60.8 GW in mid-2025 against a peak of 38 GW.

Commercial flow

EETC buys electricity from EEHC generators and from private producers under long-term power purchase agreements, and sells it to the distribution companies at bulk tariffs set by EgyptERA. The distribution companies sell to households at the regulated bracket tariffs. The gap between cost and tariff is covered by state support, which the ministry put at about EGP 100 billion a year in 2026.

Market opening

Electricity Law No. 87 of 2015 provides for a gradual move to a competitive market in which eligible customers can buy from private producers. The first step is the private-to-private (P2P) framework in EgyptERA Circular No. 2 of 2024. It allows up to 500 MW of new wind and solar plants, of up to 100 MW each, to sell directly to industrial customers over the grid. Four 100 MW projects were approved in 2025.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Electricity and Renewable Energy (MoERE)Sets energy policy and the renewable energy strategy, oversees EEHC and NREA, and announces tariff changes approved by the government.
RegulatorEgyptERARegulates the sector under Electricity Law No. 87 of 2015. It issues permits and licences for generation and distribution, calculates tariffs, publishes the grid and distribution codes and the net metering rules, handles consumer complaints and approves private-to-private (P2P) contracts.
TSOEgyptian Electricity Transmission Company (EETC)Owns and operates the national high-voltage grid and international interconnectors, runs the national dispatch centre, and buys power under long-term agreements with state and private generators as the single buyer. It also supplies about 180 very large customers directly.
DSONine EEHC distribution companiesNorth Cairo, South Cairo, Alexandria, Canal, North Delta, South Delta, El Beheira, Middle Egypt and Upper Egypt. Each company owns the medium- and low-voltage network in its area, connects customers, installs meters, reads and bills, and acts as retailer. Together they had 43.8 million customers in 2024/25.
SupplierDistribution companies (as retailers)There is no separate retail market for households. The local distribution company is the only supplier, at regulated tariffs.
MeteringDistribution companiesMeters are owned, installed and read by the distribution company. Prepaid card meters are standard for new connections, and smart meters have been piloted in six companies.
Data hub / registryEEHC Unified Platform for Electricity ServicesA national online portal for new connections, coded meter requests, meter transfers and bill payment. Subscriber records stay with each distribution company. EEHC reports linking 31.6 million subscribers to the national property identification system.

Compared with the UK system.

Compared with the UK system.
UK conceptEgypt equivalentHow it works
DNORegional distribution company (sherket tawzee)Nine state companies, each with a fixed territory. Unlike a UK DNO, the Egyptian distribution company is also your supplier, meter owner and biller. Your company depends on your address and cannot be changed.
National Grid/NESOEETCEETC combines transmission ownership, system operation and the single-buyer role. It dispatches generation from the national control centre and signs power purchase agreements with generators.
MPANSubscriber (account) numberEach connection is identified by the distribution company’s subscriber number (about 10 digits on the bill), together with the meter number. There is no national meter point number like the MPAN. The record is held per company.
MPRNGas customer number (separate)Piped gas is supplied by separate gas distribution companies with their own customer numbers. These are unrelated to the electricity subscriber number.
Meter operatorDistribution company metering departmentThere are no independent meter operators. The distribution company supplies and installs the meter (prepaid, coded or smart) and is responsible for it.
SupplierDistribution companyHouseholds cannot switch supplier. Private generators can sell directly only to eligible large users under the P2P pilot, using the grid for a fee.
Smart-meter infrastructureDistribution company head-end systemsThere is no national communications body like the DCC. Smart meters from the pilot report to head-end systems run by each distribution company. A unified meter data standard (OBIS codes) is being applied to new medium-voltage and transformer smart meters.

How a supply point is identified.

3104578926 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Subscriber number (raqam al-moshtarek)
Who issues it?The regional distribution company
FormatA numeric account code assigned by the distribution company when the connection contract is made. It is printed at the top of the bill, alongside the separate meter number.
LengthAbout 10 digits
Stays with the property when you switch supplier?Yes
Where to find itAt the top of the monthly bill or the prepaid charging receipt, and on the connection contract. Prepaid meter holders can also find it on the charging card records.
Electronic accessThe subscriber number is used to look up and pay bills on the distribution company websites, the EEHC Unified Platform for Electricity Services, the official mobile app and payment networks such as Fawry. Selecting the distribution company is part of the look-up.
Third-party accessThere is no regulated data-sharing scheme for third parties. Anyone with the subscriber number can look up a bill on public portals, but meter data is not available to installers or other companies through any official interface.
Who keeps the registerEach distribution company keeps its own customer register. EEHC runs the national services platform and links records to property identification numbers.
Register scopePer DSO

How a connection is identified

In Egypt the identifier for a home’s electricity connection is the account record held by the regional distribution company, not a national meter point number. When a building gets a legal connection, the company makes a supply contract with the owner or tenant, installs a meter and opens a subscriber account. The subscriber number on the bill, the meter number and the address then identify the connection. There is no national standard for the number’s structure, and companies use their own systems.

Change of occupier

The connection and meter stay with the flat. When a property is sold or let, the new occupier applies to the distribution company, now usually through the Unified Platform, to transfer the meter into their name. They provide their national ID, the sale or lease contract and the latest bill or receipt. The old account is closed and the new occupier takes over the contract for the same meter.

Coded meters and unlicensed buildings

Buildings built without a permit cannot get a normal contract. Such buildings can get a "coded meter" (adad codi), a prepaid meter registered to the unit without full legal status, which replaced estimated "practice" billing. EEHC reports 6.8 million coded-meter requests and 223,000 requests for regular meters through the platform, which shows how much of the housing stock sits outside the formal register.

Prepaid and smart meters

About 21.8 million prepaid meters were in place by October 2025, and 2.6 million were installed in 2024/25 alone. Prepaid accounts keep the same subscriber identity. Credit is loaded onto a card, or through NFC apps, and transferred to the meter, with tariffs applied by bracket within each month. Smart meters are still at pilot scale.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringYes
Net billingNo
How exported electricity is paidNet metering. Exported energy is offset against consumption month by month, and any annual surplus left at the end of June is paid at the latest solar purchase price agreed by EETC.
Can households sell surplus solar power?Only through net metering. Surplus is credited against later bills, and any credit left at the annual settlement is paid at EETC’s latest solar purchase price. There is no separate feed-in tariff for households.
Is there a size limit?Net metering systems must be on the customer’s own premises. Size is limited by the customer’s maximum demand and the available network capacity. EgyptERA rules cap individual projects at 25 MW and a single entity at 30 MW.
Is there a national cap?Yes. EgyptERA Circular No. 4 of 2026 sets a target of 1,000 MW (AC) of net-metered capacity by 2030. Earlier rules applied the same 1,000 MW ceiling to net metering and self-consumption together.
What if I do not want to export?Self-consumption systems under EgyptERA Circular No. 3 of 2023 use solar on site without exporting. Plants above 500 kW need a licence, and batteries in these systems are limited to 20% of plant capacity.
Are there penalties for delay?Circular No. 4 of 2026 sets deadlines for each party and a delay penalty of EGP 1,000 per week.

Connecting a home system.

  1. Choose an installer qualified and registered with the New and Renewable Energy Authority (NREA). Systems must use equipment that meets Egyptian standards, with at least 25% local content approved by NREA.
  2. Submit the application with the documents to the distribution company (or EETC for transmission-connected sites) and pay the study fee: EGP 4,000 for systems up to 500 kW, EGP 30,000 above.
  3. The network operator checks available network capacity and tells the applicant within about a week. Larger systems need a grid impact study and, above 500 kW, an EgyptERA generation licence.
  4. Install the system within the deadline: six months for systems up to 500 kW, one year for larger ones.
  5. The distribution company tests the installation and replaces the meter with a bidirectional meter. Each step has a deadline of about three weeks.
  6. Sign the net metering contract. Surplus is credited monthly and settled once a year.

Net metering has been revised several times, most recently by EgyptERA Circular No. 4 of 2026, issued in February 2026. It covers solar PV installed on a customer’s own premises and connected to the distribution company or EETC network. The customer stays a normal regulated customer. The meter records import and export, and each month the export is deducted from the import before the bracket tariff is applied.

Because household tariffs are subsidised, the value of self-generated power depends on the bracket. Households in the top brackets, who pay EGP 2.41–2.74/kWh, save the most. Low-consumption households, who pay 68–98 piastres per kWh, gain much less. Annual surpluses are paid only at the solar purchase price and only once a year, so systems are usually sized to match consumption.

EgyptERA publishes a dashboard of net-metered and self-consumption solar capacity by distribution company. In the latest version, net-metered systems below 500 kW totalled about 141,000 and those above 500 kW about 77,500 (the dashboard does not label the unit; the values appear to be kW). The Canal, El Beheira and Cairo companies have the most capacity.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (rooftop / self-consumption)Exempt from licensing up to 500 kW, on request and with an NREA-qualified installer. A generation permit and licence from EgyptERA are needed above 500 kW. Self-consumption plants are capped at 30 MW.EgyptERA; NREA (installer qualification)Grid-connected systems also need the network operator’s approval and connection study. EgyptERA Circular No. 3 of 2023 and No. 4 of 2026.
Generate electricity (utility-scale)An EgyptERA permit to build, then a generation licence to operate. The interim licence lasts one year and is renewable; the final licence lasts up to 25 years.EgyptERAMost projects sell to EETC under a long-term PPA. Projects on state land use NREA usufruct agreements.
Store electricity (battery systems)Treated as a generation activity that needs an EgyptERA permit and licence. Hybrid plants are licensed as one unit with their generator. Fees for standalone systems are set by MWh. Behind-the-meter micro systems up to 1 MWh that provide no grid services, and pilot projects, can be exempt from fees.EgyptERAEgyptERA Circular No. 5 of 2026 sets the conditions for battery storage permits and licences. Batteries in self-consumption plants must follow IEC 62619 safety rules above 100 kWh.
Export to the gridOnly through a net metering contract with the distribution company or EETC, or through a PPA for licensed generators.Distribution company / EETC; EgyptERA rulesThere is no merchant export. Annual surplus under net metering is paid at the solar purchase price.
Sell or supply electricity to consumersReserved to licensed distribution companies in their areas. Direct sales by private generators are allowed only under the P2P framework.EgyptERACircular No. 2 of 2024 allows P2P sales: a 500 MW pilot, up to 100 MW per project, wind and solar only, to eligible large customers.
Distribute electricity (private networks)An EgyptERA distribution permit and licence for a defined geographical area.EgyptERAUsed by private distributors in new cities, resorts and industrial zones. EgyptERA has also consulted on mini-grid projects.
Aggregation / virtual power plantsNo licence category exists. Aggregation of small systems for market or grid services is not provided for.EgyptERAThere is no demand-response or flexibility market open to third parties.
Wholesale trading and balancingThere is no open wholesale market. EETC buys centrally and dispatches all plants. Balancing is done by EETC.EETC; EgyptERAP2P contracts are settled through EETC, with grid-use charges based on EgyptERA’s transmission network charge methodology.
Remote control of assets / grid servicesNot provided for small customers. Large plants follow EETC dispatch instructions under the grid code.EETCInverters connected under the small-scale PV code must disconnect automatically outside set limits and have anti-islanding protection.
EV chargingA permit or licence from EgyptERA to operate charging stations.EgyptERARules are in Ministerial Decree No. 14 of 2022 and Circular No. 5 of 2022. EgyptERA sets a separate charging tariff.

Licensing in Egypt follows Electricity Law No. 87 of 2015 and its executive regulations. EgyptERA issues a permit to build or extend a facility and then a licence to operate it. The licence covers generation, distribution and other activities. Applications are decided by the EgyptERA board, which normally meets monthly, and the law gives a 60-day decision period.

For households and small businesses the key threshold is 500 kW. Below it, solar systems are exempt from licensing but must be installed by NREA-qualified contractors and approved by the distribution company. Above it, a generation licence and a grid study are needed. In 2026 EgyptERA also issued specific conditions for battery storage permits and licences (Circular No. 5 of 2026), treating storage as generation and setting separate fee rules for hybrid and standalone systems.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency control and reservesNo—NoEETC. Reserves are provided by EETC-dispatched power plants and, increasingly, by utility-scale batteries attached to solar plants. There is no market in which distributed assets or aggregators can bid.
Demand reductionNo—NoGovernment / distribution companies. Summer peaks are managed through government conservation measures, such as remote working and restrictions on commercial lighting, rather than paid demand response.
Private-to-private (P2P) contractsRestrictedProjects of up to 100 MW (500 MW pilot)NoEgyptERA / EETC. Lets wind and solar developers sell energy directly to industrial customers over the grid. This is a bilateral energy market, not a flexibility market.

Egypt has no flexibility market for distributed energy. EETC dispatches the system centrally, and households have no time-of-use price signal. Rooftop solar and batteries therefore reduce a customer’s own bill but cannot earn money for grid services.

Flexibility is being added at utility scale instead. Battery systems are built alongside large solar plants under EETC power purchase agreements, and the 3,000 MW HVDC interconnector with Saudi Arabia will let the two countries share capacity across their different peak hours. EgyptERA has held consultations on smart mini-grids and battery swapping for electric vehicles, but no aggregator framework has been published.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
EgyptERA P2P registrationRegistration and application forms for private-to-private renewable electricity projects.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepaid meters near universal on new connections (about 21.8 million); smart meters at pilot scale
Reading intervalNot published
Prepaid meters installedAbout 21.8 million (to 30 October 2025)
Prepaid installs in 2024/252.6 million; target 2.5 million in 2025/26
Household smart meter pilotAbout 213,000 meters under a 2017 contract in six distribution companies
Network smart metersAbout 270,000 medium-voltage and transformer meters, completion expected June 2026
Top-up channelsCompany offices, payment networks and NFC phone apps
Who installsThe local distribution company

Egypt has prioritised prepaid metering over smart metering. Prepaid card meters were introduced in 2011, made general in 2014, and now account for about half of the 43.8 million distribution customers. They help companies collect payment and give customers control over spending. Charging by phone using NFC has made top-ups easier.

The household smart meter programme started with a 2017 contract for about 213,000 meters across six distribution companies, of which around 197,000 were being billed through the system. A larger programme of about 270,000 smart meters for medium-voltage customers and distribution transformers, using a unified OBIS data model and head-end system, was due to be completed by June 2026. There is no published national target for household smart meters.

Renewable electricity.

Electricity generation mix (2025).

  • Natural gas: 79.6%
  • Oil and other fossil: 7.4%
  • Hydro: 6.1%
  • Wind: 3.8%
  • Solar: 3.1%
Source 8
Renewable electricity share
13% (2025)Source 8Share of electricity generation: hydro 6.1%, wind 3.8%, solar 3.1%. It was 11.2% in 2024.
Home solar
Not identified from a reliable public source.
Solar added each year
0.72 GW (2025)Source 8Derived: the change in Ember solar capacity from 2.55 GW (2024) to 3.27 GW (2025).
Solar PV
3.27 GW (2025)Source 8
Wind
3.03 GW (2025)Source 8
Hydro
2.83 GW (2025)Source 8
Bioenergy
0.13 GW (2025)Source 8

Targets.

  • 42% of electricity from renewable sources by 2030 (government target).
  • 1,000 MW (AC) of net-metered solar by 2030 (EgyptERA Circular No. 4 of 2026).

Renewable generation reached a record of about 35 TWh in 2025 by NREA figures, up 28%. Wind rose 57% to 10.5 TWh and solar 50% to 7.4 TWh. Ember’s data puts the renewable share at 13% of generation, up from 11.2% in 2024. Hydro, mainly from the Aswan High Dam, is still the largest single renewable source.

Growth comes from large projects sold to EETC under long-term power purchase agreements: wind farms in the Gulf of Suez and Zafarana, the Benban solar complex near Aswan, the 500 MWac Abydos plant at Kom Ombo and the 1.1 GW Obelisk plant near Nagaa Hammadi, which reached full commercial operation in August 2026. Many new projects now include battery storage.

Distributed solar is a small share of the total. Net metering is open to homes and businesses, but subsidised tariffs make it less attractive for low-consumption households.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
500 MWh (August 2026)Source 21Derived: Abydos (300 MWh) plus Obelisk (200 MWh), the two utility-scale battery systems known to be operating.

Storage in Egypt is being developed mainly at utility scale, as battery systems attached to large solar plants under EETC power purchase agreements. These batteries shift midday solar output into the evening peak, when air conditioning demand is highest. The Aswan High Dam also provides flexible hydro capacity.

EgyptERA’s rules for storage are now explicit. Circular No. 5 of 2026 treats battery storage as a licensed generation activity, sets fees for hybrid and standalone systems, and allows exemptions for pilots and small behind-the-meter systems up to 1 MWh that provide no grid services. For self-consumption solar plants, batteries are limited to 20% of plant capacity, and systems over 100 kWh must meet IEC 62619 safety requirements.

Storage projects.

  • Abydos BESS, Kom Ombo (AMEA Power): Egypt’s first utility-scale battery, 300 MWh, attached to a 500 MWac solar plant and brought online in July 2025.
  • Obelisk solar-plus-storage, Nagaa Hammadi (Scatec): 1.1 GW of solar with a 100 MW/200 MWh battery, fully operational in August 2026 under a 25-year PPA with EETC.
  • Abydos 2, Benban (AMEA Power): 1,000 MW of solar with a 600 MWh battery, under construction.
  • Nefertiti and Horus BESS (AMEA Power): Standalone battery projects near Benban and Zafarana with a combined 1.5 GWh, granted a "golden licence" by the government.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EEHC regional distribution companies (nine)43.8 million customers in 2024/25; South Cairo largest with about 7.0 millionNoNoNoLimited
Egyptian Electricity Transmission Company (direct customers)About 180 very large customers on extra-high voltageNoNoNoNo

There is no retail competition in Egypt. Households and small businesses are supplied by the distribution company for their area: North Cairo (about 5.5 million customers), South Cairo (7.0 million), Alexandria (3.1 million), Canal (5.4 million), North Delta (5.1 million), South Delta (5.6 million), El Beheira (3.0 million), Middle Egypt (5.2 million) and Upper Egypt (4.0 million). Private distribution licensees serve some new cities and developments.

Large industrial users can contract with private renewable generators under the P2P pilot. In 2025 four 100 MW projects by KarmSolar, AMEA Power, TAQA and Enara were approved to supply steel, fertiliser, container terminal and other industrial customers.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Electricity and Renewable EnergyGovernmentEnergy policy and oversight of the state electricity companiesAnnounces tariff changes, strategy and major projects.
EgyptERARegulatorRegulator and consumer protectionPublishes tariffs, net metering and storage rules, licensing conditions and grid codes.
Egyptian Electricity Transmission Company (EETC)TransmissionGrid owner, system operator and single buyerSigns PPAs and handles transmission-level connections.
Egyptian Electricity Holding Company (EEHC)DistributionState holding company for generation, transmission and distributionPublishes the annual statistical report and runs the national services platform.
New and Renewable Energy Authority (NREA)Renewable EnergyState renewable energy developer and installer qualification bodyQualifies solar installers and approves local content for net metering systems.
EgyptERA consumer complaints serviceConsumerHandles complaints against distribution companiesConsumers can escalate billing and connection disputes.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (small PV)Technical Requirements for Connecting Small-Scale PV Systems to LV Distribution Networks (ssPV Code)EgyptERAApplies to PV systems up to 500 kW on the low-voltage network. Normal operating range 207–253 V and 49.5–50.5 Hz, with trip limits outside wider bands.
Distribution networkElectricity Distribution Code (EDC)EgyptERAApplies with the ssPV code to all small generators.
Anti-islandingIEC 62116IEC (referenced by EgyptERA)At least one active islanding detection method is required, with a one-minute delay before reconnecting.
Inverters and power qualityIEC 61727IEC (referenced by EgyptERA)Current harmonic limits for PV inverters.
PV modules and installationIEC 61215; IEC 60364-7-712IEC (referenced by EgyptERA)Module approval and electrical installation rules. Net metering systems also need Egyptian-standard equipment and at least 25% local content.
Battery safetyIEC 62619IEC (required by EgyptERA Circular No. 3 of 2023)Required for batteries over 100 kWh in self-consumption solar plants.
Installer accreditationNREA qualified-company registerNREA / EgyptERANet metering systems must be installed by companies qualified by NREA. EgyptERA publishes lists of qualified companies (below 500 kW, and 500 kW to 20 MW).

Permissions.

Permissions.
PermissionRequiredLevelDetail
Distribution company approval and connection studyYesRegionalNeeded for any grid-connected solar system. Study fee EGP 4,000 up to 500 kW, EGP 30,000 above (Circular No. 4 of 2026).
EgyptERA generation licenceLimitedNationalRequired only above 500 kW. Smaller systems are exempt on request.
Qualified installerYesNationalThe installer must be qualified by NREA.
Building owners’ agreementLimitedLocalNeeded where the roof of an apartment block is shared. Proof of ownership or lease is part of the application.
Building permitUnknownLocalNo specific national rule on planning consent for rooftop PV was identified.

For a home or small business, the practical approvals are the distribution company’s technical approval and connection, and the use of an NREA-qualified installer. Circular No. 4 of 2026 sets deadlines for each step and a penalty of EGP 1,000 per week for delays.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering (EgyptERA)ActiveNet meteringSolar output offsets consumption at the household bracket tariff, with annual surplus paid at EETC’s solar purchase price. The scheme was updated by Circular No. 4 of 2026.Current rules from February 2026
Grid integration charge exemptionActiveFee exemptionSelf-consumption solar projects up to 10 MW are exempt from the grid integration charge (Circular No. 3 of 2023).—

Data and connectivity.

Fixed broadband
74.6 % of population using the internet (2024)Source 29
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Mobile networks are the main form of connectivity, and 5G was launched commercially by all four operators in June 2025. Prepaid meters are mostly offline card meters, and top-up by phone uses NFC between the handset and the meter. Smart meters in the pilot programme report to distribution company head-end systems. The new medium-voltage meter programme uses a unified OBIS data model.

Grid conditions.

National peak demand
38 GW (FY 2024/25)Source 7
Annual electricity demand
244.3 TWh (2025)Source 8
Generation capacity
60.8 GW (June 2025)Source 7Hydro 2.8 GW, thermal 52.7 GW, renewables 5.3 GW (EEHC).
Interconnection
3 GW (Saudi link, design) (2026)Source 24Design capacity of the Egypt–Saudi HVDC link in two 1,500 MW poles. Pole I was being commissioned and full operation was targeted for 2026.
Curtailment
Not identified from a reliable public source.

Egypt has a large surplus of installed capacity over peak demand: 60.8 GW installed against a 38 GW peak in 2024/25. Available output in summer depends on fuel supply, and in 2026 the government introduced energy-saving measures to limit demand. Egypt was a small net exporter of electricity in 2025 (1.4 TWh, Ember).

The 3,000 MW HVDC link with Saudi Arabia runs from Badr, east of Cairo, to Tabuk and East Medina over about 1,350 km, including a cable across the Gulf of Aqaba. It is designed to share capacity between the two systems, whose daily peaks occur at different times.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
August 2026 household tariff increaseCurrentAugust 2026 consumptionAverage 12% rise across the household brackets except the first (0–50 kWh at 68 pt/kWh, unchanged). Consumption above 1,000 kWh a month is charged at EGP 2.74/kWh with no subsidy.
April 2026 commercial and high-use household increaseCurrentApril 2026Commercial tariffs rose by about 20% and the tariff for households using more than 1,000 kWh a month by about 16%.
New net metering rules (Circular No. 4 of 2026)CurrentFebruary 2026Updated rules for connecting solar under net metering: a 1,000 MW target by 2030, new fees, local content, a qualified-installer requirement and deadlines with penalties.
Battery storage licensing (Circular No. 5 of 2026)CurrentFebruary 2026Sets the conditions for permits and licences for battery storage, with fee rules for hybrid, standalone and small behind-the-meter systems.
Egypt–Saudi HVDC interconnectorUpcoming2026A 3,000 MW link in two 1,500 MW stages. Pole I commissioning was under way, and full operation was targeted for 2026.
Gradual opening of the competitive marketUpcomingOngoingElectricity Law No. 87 of 2015 provides for a transition to a competitive market. The P2P pilot (500 MW) is the first phase. No date for household retail choice has been set.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNet metering is open to homes, but most homes are flats with shared roofs, tariffs are subsidised, and EgyptERA’s net metering dashboard shows modest totals across all customer types.
Distributed energy marketLowDistributed generation is limited to net metering and self-consumption. There is a 1,000 MW net metering target by 2030, and no aggregation framework.
Grid flexibility marketLowThere are no ancillary service or demand-response markets open to distributed assets. EETC dispatches centrally.
Energy storage adoptionLowAbout 500 MWh of utility batteries were operating by August 2026, with more than 2 GWh under construction or licensed. No data on home batteries exists.
Renewable growth environmentMediumRenewable generation rose 28% in 2025 and the 1.1 GW Obelisk plant came online in 2026, but renewables are still about 13% of generation against a 42% target for 2030.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 29 sources
  1. Press statement on the updated household electricity tariff (August 2026). EgyptERA, 2026. accessed 1 October 2026.
  2. EgyptERA publishes new bracket prices and state subsidy shares. Akhbar El-Yom, 2026. accessed 1 October 2026.
  3. Egypt keeps first household electricity tariff unchanged, raises other brackets by 12%. Ahram Online, 2026. accessed 1 October 2026.
  4. Egypt lifts electricity tariffs (April 2026). Trading Economics, 2026. accessed 1 October 2026.
  5. Electricity tariff pages (August 2024, January 2024, 2021, 2019, 2018) and archive. EgyptERA, 2026. accessed 1 October 2026.
  6. Electricity tariff from August 2024 to April 2026 (incl. customer service charges). EgyptERA, 2024. accessed 1 October 2026.
  7. Annual Report 2024/2025. Egyptian Electricity Holding Company, 2025. accessed 1 October 2026.
  8. Yearly electricity data (Egypt). Ember, 2026. accessed 1 October 2026.
  9. Egypt renewables surge to annual record. MEES, 2026. accessed 1 October 2026.
  10. A new baby is born every 16 seconds in Egypt (CAPMAS population clock). Egyptian Streets, 2026. accessed 1 October 2026.
  11. Official exchange rates at the Central Bank of Egypt, 23 September 2026. Al Mal News, 2026. accessed 1 October 2026.
  12. Circular No. 4 of 2026: rules for connecting solar PV plants under net metering. EgyptERA, 2026. accessed 1 October 2026.
  13. Circular No. 5 of 2026: conditions for permits and licences for battery storage systems. EgyptERA, 2026. accessed 1 October 2026.
  14. Installed and available capacity under net metering. EgyptERA, 2026. accessed 1 October 2026.
  15. New regulations for solar PV self-consumption projects (Circular No. 3 of 2023). Riad & Riad Law Firm, 2023. accessed 1 October 2026.
  16. EgyptERA Circular No. 3 of 2023. ADSERO, 2023. accessed 1 October 2026.
  17. Power Generation, Transmission & Distribution 2026: Egypt. Chambers and Partners, 2026. accessed 1 October 2026.
  18. EBRD supports Egypt with first private-to-private electricity contracts. EBRD, 2025. accessed 1 October 2026.
  19. Technical design specifications and criteria for integrating PV systems into distribution networks in Egypt. PowerQuality.blog, 2021. accessed 1 October 2026.
  20. IFC and AMEA Power launch Egypt’s first battery energy storage system. IFC, 2025. accessed 1 October 2026.
  21. Scatec completes 1 GW/200 MWh solar-plus-storage project in Egypt. pv magazine, 2026. accessed 1 October 2026.
  22. Abydos for Renewable Energy. AMEA Power, 2026. accessed 1 October 2026.
  23. Egypt accelerates clean energy shift with major battery storage investments. SolarQuarter, 2026. accessed 1 October 2026.
  24. $1.8bln power link between Egypt and Saudi Arabia 95% complete. Zawya, 2025. accessed 1 October 2026.
  25. HIECS 2019/2020: variable COND (has an air conditioner). Economic Research Forum / CAPMAS, 2020. accessed 1 October 2026.
  26. CAPMAS: old-rent housing units exceed 3 million (2017 census). Al Mal News, 2025. accessed 1 October 2026.
  27. Online electricity bill enquiry (subscriber number). Banker News, 2026. accessed 1 October 2026.
  28. Urban population (% of total population) — Egypt. World Bank, 2025. accessed 1 October 2026.
  29. Individuals using the Internet (% of population) — Egypt. World Bank / ITU, 2024. accessed 1 October 2026.

Questions about energy in Egypt.

Talk to us about Olmack in Egypt.Tell us about your home, housing portfolio or school estate in Egypt. We'll explain what is possible there now.