Energy in Luxembourg, explained.

How electricity works in Luxembourg: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Luxembourg: Not yet available.Olmack is not offered in Luxembourg yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Luxembourg.

Luxembourg electricity market 2026: ILR, Creos, the 33-character POD, Smarty meters, Leneda data platform, state-aided prices, solar self-consumption and energy sharing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Luxembourg energy at a glance.

Key figures for households in Luxembourg. Each one links to its source on the full overview below.

  • Electricity price.

    0.267 EUR per kWh for households, including taxes. Figures for 2025-S2.

  • Household use.

    3,523 kWh a year for a typical household. Figures for 2025.

  • Renewable share.

    23.3% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Luxembourg.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Luxembourg below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Luxembourg requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Luxembourg.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Luxembourg, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Luxembourg, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Luxembourg.

Full overview

The energy market in Luxembourg, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Luxembourg is a small, heavily import-dependent electricity market. In 2025 the country consumed 6,529 GWh gross but produced only 1,826 GWh on its own territory; the rest came mainly from Germany, France and Belgium. Luxembourg shares a single wholesale bidding zone with Germany (DE-LU), and its transmission grid is operated by Creos Luxembourg, which also distributes power to most of the country. Three small local distributors serve Diekirch, Ettelbruck and Esch-sur-Alzette. The regulator is the Institut Luxembourgeois de Régulation (ILR).

The retail market is fully open, but concentrated: companies of the Encevo group (Enovos and LEO) supplied 91.3% of residential volumes in 2025. From 1 January 2026 the state is paying part of every household’s network costs and the whole cost of the renewable compensation mechanism for at least three years. The government puts the average 2026 price for a typical 3,900 kWh household at about 25.8 c€/kWh with this aid, against 33.9 c€/kWh without it.

Almost every connection now has a Smarty smart meter recording 15-minute data, and since March 2025 consumption data, contracts and connection requests run through Leneda, the national energy data platform operated by Creos. Each supply point is identified by a 33-character POD number beginning with “LU”. Rooftop solar is growing fast, reaching 746 MW and 33,304 installations at the end of 2025, and solar overtook wind as the largest domestic source of electricity that year. Policy now favours self-consumption, home batteries and energy sharing between neighbours and communities rather than full export at a feed-in tariff.

Energy snapshot.

Headline figures for electricity in Luxembourg. Each shows its data year and links to its source.

Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Restricted
Regulator
Institut Luxembourgeois de Régulation (ILR)
System operator
Creos Luxembourg (TSO), within the German–Luxembourg bidding zone and Amprion’s control block
Distribution networks
Four DSOs: Creos Luxembourg (most of the country), Sudstroum (Esch-sur-Alzette), and the municipal networks of Diekirch and Ettelbruck; plus one industrial network (Sotel Réseau)
Currency
Euro (EUR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Luxembourg.

Household price (EUR)
0.267 EUR/kWh (2025-S2)Source 2Household consumers, band DC (2,500–5,000 kWh/yr), all taxes and levies included. Taxes and levies were net negative because of state aid (excluding-taxes price 0.2834 €/kWh). The government estimates an average of about 0.258 €/kWh for 2026 with aid.
Typical annual electricity bill
1,006 EUR/yr (2026)Source 12Government estimate for a typical household using 3,900 kWh a year, including the state’s contribution to network costs and the compensation mechanism. Without the aid the same household would pay about 1,322 € a year.

Household price trend (EUR per kWh).Source 2

0.180.2230.2672019-S12025-S2
Luxembourg household electricity price, EUR per kWh
2019-S10.1798 EUR/kWh
2019-S20.1799 EUR/kWh
2020-S10.1986 EUR/kWh
2020-S20.1985 EUR/kWh
2021-S10.1988 EUR/kWh
2021-S20.1989 EUR/kWh
2022-S10.2017 EUR/kWh
2022-S20.2042 EUR/kWh
2023-S10.2008 EUR/kWh
2023-S20.2015 EUR/kWh
2024-S10.2029 EUR/kWh
2024-S20.2024 EUR/kWh
2025-S10.2665 EUR/kWh
2025-S20.2665 EUR/kWh

A Luxembourg bill combines the supplier’s energy price with regulated network charges and two levies; VAT on electricity is 8%. Most suppliers bill network charges on the network operator’s behalf (“fourniture intégrée”). The ILR reports that the integrated price actually paid by an average residential customer was 26.65 c€/kWh in 2025, up 6.38 c€ on 2024. Most of the rise came from the reduction of state aid (−7.79 c€) and higher network costs (+1.08 c€). The average supply price excluding network and taxes fell from 129 to 115 €/MWh across all customers.

Network charges by reference power

Smart-meter households are billed according to a reference power. From 1 August 2026 the low-voltage network charge (before VAT) is a monthly fixed fee by reference power, for example 7.42 € for 3 kW, 12.84 € for 7 kW and 19.61 € for 12 kW, plus 0.0510 €/kWh. Any energy drawn above the reference power costs a supplement of 0.0765 €/kWh. A metering fee of 5.72 € a month applies to connections of up to 63 A. Homes still on an analogue meter pay 0.0562 €/kWh. The separate import point of a production installation pays 0.1275 €/kWh with no fixed fee.

Levies and state aid in 2026

The compensation mechanism finances feed-in tariffs for renewables and high-efficiency CHP. From 2026 the state budget covers it, so the household contribution (category A, up to 25,000 kWh a year) is negative: −3.71 c€/kWh. The electricity tax for households is 0.10 c€/kWh. The government also covers part of network costs from 1 January 2026 for at least three years, worth an average 3.8 c€/kWh, at a cost of 150 million € in 2026. Together the government puts the reduction at 7.4 c€/kWh.

Price trend

Prices were stable at about 0.20 €/kWh from 2020 to 2024 because the state froze and subsidised them through the energy crisis. When that aid was reduced in 2025, the Eurostat household price jumped to 0.2665 €/kWh, still below the EU average. Customers rarely switch: 1,736 households (0.6%) changed supplier in 2025.

Tariff types.

Tariff types.
TariffAvailableDetail
VariableYesMost households (267,981 contracts, 95.6%, in 2025) are on products without a price guarantee: the supplier may change the energy price with notice. Enovos’s standard Naturstroum Home Mono energy price fell to 0.13213 €/kWh before VAT from January 2026.
FixedYesProducts with a price guarantee almost disappeared after 2021 but returned in 2024; 12,285 households had one in 2025. The guarantee covers the energy component; regulated network charges and levies still change.
Time-of-useYesDay/night (double-rate) products exist, for example Enovos Naturstroum Home Double at 0.13473 €/kWh by day and 0.12243 €/kWh by night before VAT in 2026. Since March 2025 Enovos has offered “naturstroum drive” for smart-meter homes, with four price periods: 25% below the base price at night and at weekend middays, and 6% above it from 17:00 to midnight.
DynamicLimitedSuppliers with more than 15,000 customers must offer a dynamic-price contract to smart-meter customers. Take-up is tiny: the ILR counted 35 residential dynamic contracts in 2025.
RegulatedLimitedRetail energy prices are not regulated. A default supplier appointed by the ILR serves customers without a contract, and must offer a standard product with ILR-approved terms to households no other supplier will take.
Off-peakLimitedCustomers with storage heating and a time-switch pay a much lower network overshoot supplement at night (0.0076 €/kWh between 22:00 and 06:00, against 0.0765 €/kWh by day).

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
3,523 kWh/yr (2025)Source 1Derived: residential network offtake of 1,017 GWh divided by 288,697 residential customers (ILR). Excludes solar power consumed on site. The government uses 3,900 kWh/yr as its typical household; Eurostat records 881 GWh of household electricity use in 2024.
Average daily use per household
9.7 kWh/day (2025)Source 1Derived: 3,523 kWh/yr derived network offtake per residential customer divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
9,258 kWh/person/yr (2025)Source 1Derived, all sectors: final consumption of 6,397 GWh (ILR) divided by the population at 1 January 2026 (690,959). Residential customers account for only about 15% of gross consumption.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
8.7 % of car fleet (1 Jan 2026)Source 30Battery-electric cars as a share of the passenger-car fleet. 12,664 battery-electric cars were registered in 2025 (12,777 in 2024), and their share of new registrations reached 31% in April 2026.
Electric cooking
Not identified from a reliable public source.

Households take a small share of Luxembourg’s electricity. Residential customers drew 1,017 GWh from the networks in 2025, about 15% of gross consumption, while industry and services account for the rest. Residential offtake has been roughly flat since 2023 because more homes now consume their own solar power: 444 GWh across all customer types was self-consumed or shared in 2025, 7% of final consumption.

Electrification of heating and transport is supported by generous grants. Under Klimabonus Wunnen, a ground-source heat pump replacing a fossil boiler in an existing home earns 12,000 € (14,000 € for orders between January 2026 and June 2027), and an air-to-water heat pump 10,000 € (12,000 €). Battery-electric cars are 8.7% of the fleet. New registrations stagnated in 2025 but recovered in spring 2026.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
64.1% (2025)Source 7Share of population living in owner-occupied housing (EU-SILC), 38.0% of them with a mortgage.
Private rented
28.1% (2025)Source 7Tenants paying a market rent, share of population.
Social or public housing
7.8% (2025)Source 7Tenants at a reduced rent or rent-free; EU-SILC does not separate social housing.
Houses
57% (2025)Source 8Share of population living in houses: 33.5% detached, 23.5% semi-detached or terraced.
Apartments and flats
42.4% (2025)Source 8Share of population living in flats.
Urban population
94.9 % of population (2025)Source 9

Luxembourg has a high share of renters for a western European country: more than a quarter of residents pay a market rent, reflecting a large, mobile international workforce and very high property prices. A little over half of people live in houses, and 42% in flats. Flats are concentrated in Luxembourg City and the southern towns.

This shapes how solar is used. The Klimabonus scheme sets a minimum of 1.5 kW per dwelling for PV on a block of flats. Energy-sharing rules let flat-owners and tenants use power from a shared roof or from a nearby installation without owning panels themselves. A sharing group at the same building or site counts as collective self-consumption, and wider sharing is possible within 100 m, 300 m or nationwide.

How the grid works in Luxembourg.

  1. TransmissionCreos Luxembourg S.A., Amprion (Germany), for balancing
  2. DistributionFour DSOs: Creos Luxembourg (most of the country), Sudstroum (Esch-sur-Alzette), and the municipal networks of Diekirch and Ettelbruck; plus one industrial network (Sotel Réseau)
  3. MeteringLuxmetering G.I.E., Leneda
  4. Supply7 or more retail suppliers

Physically, Luxembourg is supplied mostly from Germany. In 2025 it imported 4,776 GWh: 2,627 GWh from Germany, 1,209 GWh from France and 939 GWh from Belgium. Exports were only 72.6 GWh. Creos’s 220 kV grid is tied to Amprion in Germany, and the BEDELUX interconnector has linked it to the Belgian grid since 2017. The Vianden pumped-storage plant (1,296 MW) sits in Luxembourg but feeds the German grid directly, so it is not counted in national supply. National peak demand reached 1,091 MW on 4 February 2025.

Commercially, a household contracts with one supplier, which buys power in the German–Luxembourg market, is or appoints a balance-responsible party, and usually bills network charges on the DSO’s behalf. Network operators, suppliers and aggregators exchange switching, metering and contract data through Leneda. The law requires a supplier or aggregator change to be completed within three weeks, with the technical switch carried out within 24 hours from 1 January 2026.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of the Economy, SMEs, Energy and TourismSets energy policy and grants supply authorisations and, for non-renewable plants or renewable plants of 10 MW or more, generation authorisations. It runs the PV and wind tenders and sets feed-in tariffs by grand-ducal regulation.
RegulatorInstitut Luxembourgeois de Régulation (ILR)Regulates electricity and gas networks: approves network tariffs, connection conditions and the compensation-mechanism contribution, appoints the default supplier, keeps the register of independent aggregators and acts as consumer mediator. It also publishes the annual market statistics.
TSOCreos Luxembourg S.A.Operates the 220 kV and 65 kV transmission grid (168 km at TSO level) and is also the main DSO. It runs the Leneda energy data platform, manages balance-responsible parties under ILR-approved terms and is replacing its 1960s 220 kV backbone with 380 kV.
System operatorAmprion (Germany), for balancingLuxembourg forms part of Amprion’s control area within the German load-frequency-control block. Under a cooperation model with Creos, Amprion prequalifies and contracts Luxembourg-connected units for German balancing markets.
DSOCreos LuxembourgDistributes electricity across almost the whole country, owns and installs Smarty meters and handles connection of solar and storage.
DSOSudstroum, Ville de Diekirch, Ville d’EttelbruckLocal distribution networks in Esch-sur-Alzette (Sudstroum) and the towns of Diekirch and Ettelbruck. They apply the same national low-voltage connection conditions and smart-metering system.
MeteringLuxmetering G.I.E.Economic interest grouping founded in 2012 by the electricity and gas network operators. It runs the common central system that collects data from all Smarty electricity and gas meters.
Data hub / registryLenedaNational energy data platform required by law, deployed and operated by Creos as TSO and launched to consumers on 20 March 2025. It is the central repository for supply-point, customer and metering data and the single channel for market communication between network operators and suppliers.
SupplierAuthorised suppliers16 companies held a supply authorisation at the end of 2025 and 10 were active. Residential customers were served by Enovos, LEO, Sudstroum, SUDenergie, NordENERGIE, Steinergy and the co-operative Energy Revolt.
ExchangeEPEX SPOT (DE-LU bidding zone)Luxembourg has no separate wholesale price: day-ahead and intraday trading uses the joint German–Luxembourg zone.

Compared with the UK system.

Compared with the UK system.
UK conceptLuxembourg equivalentHow it works
DNOGestionnaire de réseau de distribution (GRD)There are four DSOs. Creos covers almost the whole country, and Sudstroum, Diekirch and Ettelbruck run small local networks. Unlike in Great Britain, the main DSO is the same company as the TSO. DSO tariffs are approved by the ILR, and all DSOs use one national set of low-voltage connection conditions.
National Grid / NESOCreos (TSO) with Amprion for balancingCreos owns and operates the transmission grid, but frequency balancing is handled within Germany’s control block, with Amprion procuring reserves. Luxembourg is in the same bidding zone as Germany, so there is no national wholesale price.
MPANPOD (Point of Delivery / point de fourniture)A 33-character code, “LU” followed by 31 letters and digits, that identifies the electricity supply point. Network operators issue it and the national Leneda platform holds it. It is needed for supplier switching, grants and energy-sharing agreements. It does not encode a profile class.
MPRNGas supply-point identifierGas connections have their own supply point issued by the gas network operator, separate from the electricity POD. Smart gas meters send data through the electricity Smarty meter to the same central system.
Meter operatorThe network operator (no competitive metering)Meters are owned, installed and read by the DSO. The Smarty meter is mandatory for customers on Creos networks, and there is no separate meter-operator market.
SupplierFournisseur with an autorisation de fournitureSuppliers need an authorisation from the minister, given after an ILR opinion. Most bill network charges and levies on one integrated invoice. One group, Encevo (Enovos and LEO), supplies over 90% of residential volumes.
Smart-meter infrastructure (DCC / SMETS2)Luxmetering central system + LenedaA single national smart-metering system for electricity and gas is required by law. Meters communicate over power-line carrier to substation concentrators and then to the Luxmetering central system. Leneda then gives customers, suppliers and authorised third parties access to the data.

How a supply point is identified.

LU0000010588000000000000EFgh71946 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Point of Delivery (point de fourniture) (POD)
Who issues it?The electricity network operator for the supply point: Creos Luxembourg in most of the country, or Sudstroum, Ville de Diekirch or Ville d’Ettelbruck in their areas
FormatThe letters LU followed by 31 alphanumeric characters (letters or digits) in a defined structure. The format is used nationally on bills, contracts and official forms such as Klimabonus grant applications.
Length33 characters (LU + 31 alphanumeric)
Stays with the property when you switch supplier?Yes
Where to find itOn the electricity bill, the energy contract or the supplier’s customer portal; the supplier will also provide it on request. The production installation’s POD is also shown on the network operator’s end-of-works notification.
Electronic accessThrough Leneda (leneda.lu), the national energy data platform, after creating a personal Energy ID with strong authentication (LuxTrust or IDNow). Leneda shows the supply points, contracts and near-real-time consumption and production data linked to that person. Creos customers can also use myCreos.
Third-party accessSuppliers and network operators receive the data they are entitled to through Leneda’s market communication. Any other party, such as an installer, energy-service company, aggregator or sharing organiser, needs the customer to grant access in Leneda. Access can be one-off, time-limited or open-ended, and can be withdrawn at any time.
Who keeps the registerThe network operators administer their supply points, and the data are held centrally on Leneda, which Creos operates by law as the national reference repository for supply points, network users and metering data.
Register scopeNational

The POD identifies the place where electricity is delivered, not the person who buys it. A new connection receives its POD from the network operator, and the code stays with that supply point through changes of occupant and supplier. Swapping a meter does not change it. Gas is identified separately.

The Energy ID: a second identifier for the person

Luxembourg pairs the POD with a personal identifier. Since spring 2025 every customer needs an Energy ID, created on Leneda, for supplier switches, moving home, granting data access to a third party, or consuming and sharing self-produced power. The law requires the platform to give each person and company a unique identifier, so the market can match people to supply points reliably.

Where the POD is used

Suppliers need the POD to switch a customer. Installers enter it on grid connection and Klimabonus forms; a PV grant application asks for the electricity POD if it is not on the end-of-works notification. Energy-sharing agreements list the PODs of every participating supply point so the DSO can allocate shared energy every quarter-hour. A home with solar can have a separate POD for the production installation’s own consumption (import) point, which is billed on its own network tariff.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingYes
How exported electricity is paidTwo routes. Installations below 400 kW can take a guaranteed feed-in tariff for 15 years, paid by the network operator, which falls each year for new installations; choosing it rules out the Klimabonus investment grant. Alternatively, in self-consumption mode the owner sells surplus to a supplier of choice, typically at a percentage of the wholesale price that changes monthly, or shares it with others.
Is net metering available?No. Imports and exports are measured separately by the smart meter. Self-consumed power avoids the full retail price, and exported surplus is either paid at a feed-in tariff or sold to a supplier.
Who pays the feed-in tariff and for how long?Contracts are signed with the network operator, which pays the tariff for 15 years from first injection. Tariffs are set by grand-ducal regulation for installations below 400 kW, with yearly degression. Installations of 200–400 kW can be contracted only by co-operatives or civil companies. Plants of 400 kW or more receive a market premium, mostly through tenders.
Can I combine a grant and a feed-in tariff?No. Klimabonus grants require self-consumption mode, and the owner renounces feed-in tariff remuneration for the life of the installation.
What must be declared?Any generation of 800 W or more must be declared to the network operator, which enters it in the national register of generating plants. Installations below 800 W are exempt from production metering, which covers small plug-in kits.
Can I share surplus with neighbours?Yes. Active customers can share renewable power with others under a sharing agreement notified to the network operator. Options include collective self-consumption in the same building, local sharing within 100 m or 300 m, and national energy communities. Associated plants may total up to 6 MW, and shared energy is allocated every quarter-hour.
Are there limits on export power?Generation must not exceed the agreed connection capacity; if it does, it must be limited or the DSO may disconnect it. Systems that feed the grid need a remote-control interface that lets the DSO stop active power within five seconds.

Connecting a home system.

  1. Ask the commune about building rules and declare the works or apply for a building permit as required.
  2. Choose a qualified installer holding a Luxembourg business authorisation (for prefinancing, one registered for the procedure).
  3. The installer prepares the connection agreement request for the network operator, signed by the customer.
  4. The network operator checks that the request is complete and feasible, then sends the option form: full injection or self-consumption with surplus injection.
  5. Sign the contract with the network operator; in self-consumption mode, also sign a buy-back contract for surplus with a supplier.
  6. The installer installs to the technical connection conditions (VDE-AR-N 4105) and sends the end-of-works notification to the network operator.
  7. The network operator checks the notification, may inspect on site, and for two-meter (full injection) set-ups installs and bills the second meter.
  8. Apply for Klimabonus aid via myguichet.lu (or through the installer under prefinancing), and register any sharing group with the network operator.

Luxembourg kept feed-in tariffs for small installations, but since 2023 policy and grants have steered households towards self-consumption. Owners who take the Klimabonus investment grant give up the tariff for good and sell surplus to a supplier, often at a modest share of wholesale prices. Self-consumption is therefore worth more than export. Around 75% of domestic production was injected into the grid in 2025, down from 87% in 2024, and 23,459 PV installations were in self-consumption mode.

Energy sharing is the distinctive Luxembourg feature. The law of 2 April 2026 established a nationwide right to share renewable electricity, created a paid “sharing organiser” role and kept the layered model the ILR uses in its statistics. The layers are individual self-consumption, collective self-consumption on the same site, local sharing within 100 m and local energy communities within 300 m, which are both exempt from the volumetric network charge, and national communities or multi-site self-consumers. The public portal weshareenergy.lu explains the options.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityPrior individual authorisation from the minister for new generation, except renewable and CHP plants below 10 MW, which are exempt. Every installation of 800 W or more must be declared to the network operator for the national register.Minister for Energy; network operator (register)Since April 2026 the minister must confirm a renewable application of over 10 MW is complete within 30 days.
Store electricityNo licence. Any network user may operate storage within power and capacity limits and operating conditions set by the ILR. Storage feeding the grid is treated like a generator under the connection conditions.ILR; network operatorNo double charging for stored power kept on site or used for flexibility services. Electricity consumed for storage and reinjection is exempt from electricity tax. An active customer’s storage must be connected within 90 days.
Export / inject to the gridNo licence. A connection agreement and injection option (full injection or self-consumption with surplus) with the network operator; a supplier buy-back contract for surplus in self-consumption mode.Network operator; supplierFeed-in tariff contracts (below 400 kW) are signed with the network operator.
Share energy / sell to neighboursNo supply authorisation is needed for sales within an energy-sharing project. The sharing agreement must be notified to the network operator. Associated plants may total up to 6 MW.Network operator; ILR (allocation rules)A paid “organisateur du partage” role was created by the law of 2 April 2026. Selling directly to final customers outside sharing requires a supply authorisation and balance responsibility.
Supply electricity to customersAutorisation de fourniture from the minister, with an ILR opinion. The applicant must be established in the EU, EEA or Switzerland and show technical, economic and financial capacity.Minister for Energy; ILRSimplified application for active customers and energy communities whose main purpose is not profit.
Aggregate / demand responseNo licence. Independent aggregators must notify the ILR at least 20 days before starting, and are entered in a public electronic register. Aggregators are financially responsible for the imbalances they cause.ILRCustomers can sign an aggregation contract without their supplier’s consent, and switching aggregator follows the same deadlines as switching supplier.
Trade / wholesaleNo national trading licence was identified. Market access is through exchange membership in the DE-LU zone and a balance-responsible-party contract under Creos’s ILR-published terms, plus REMIT registration.Creos; ILRLuxembourg has no separate bidding zone.
Balancing / grid servicesPrequalification and a framework contract with Amprion, which acts as contracting party for Luxembourg-connected units in German FCR, aFRR and mFRR markets. Minimum bid of 1 MW.Amprion (with Creos)All German balancing markets have been open to Luxembourg units since 1 January 2025 (FCR only from 2020).
Virtual power plant / remote control of assetsNo specific licence. Active customers may delegate operation of their installations to a third party, who must follow their instructions. Generation and storage that feed the grid must have a remote-control interface for the DSO.ILR; network operatorAggregated operation in markets falls under the aggregator and balancing rules above. Customer consent through Leneda is needed for data access.

Luxembourg licenses the supply of electricity to customers and large non-renewable generation, not household activities. A home may generate, store, export, share and take part in flexibility through an aggregator without any licence. It must declare installations of 800 W or more to the network operator and follow the connection conditions.

The 2023 and 2026 amendments to the 1 August 2007 electricity law transposed the EU active-customer and energy-community rules. They added registration duties rather than licences for aggregators, and created the sharing-organiser role. A supply authorisation becomes necessary only when a producer sells directly to final customers outside an energy-sharing project.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency containment reserve (FCR)Yes1 MW bidYesAmprion (German markets). Luxembourg-connected units have been able to supply FCR in the German market since 1 January 2020, prequalified by Amprion.
Automatic and manual frequency restoration reserve (aFRR / mFRR)Yes1 MW bidYesAmprion (German markets). Opened to Luxembourg-connected units from 1 January 2025 under the Creos–Amprion cooperation model.
Day-ahead / intraday wholesaleYes—YesEPEX SPOT (DE-LU zone). Aggregators may enter electricity markets without other market participants’ consent. Households can also respond to prices through time-of-use or dynamic supply contracts, though take-up is very low.
DSO flexibility servicesDeveloping—YesCreos and other DSOs. The law obliges network operators to procure technical flexibility services through transparent, market-based procedures open to demand response, storage and aggregators, and to set national product specifications. No operational local flexibility market was identified.
Capacity marketNo—NoNo capacity mechanism operates in the DE-LU zone.

Luxembourg has no balancing market of its own. Flexible assets reach balancing markets through Germany: Amprion prequalifies Luxembourg units and contracts with their providers, and since 2025 every German balancing product has been open to them. The 1 MW minimum bid means household batteries can only take part through an aggregator pool. With 9,843 batteries totalling about 101 MWh at the end of 2025, the domestic pool is still small.

Locally, flexibility is developing through tariff design and data rather than markets. The reference-power network tariff charges extra for energy drawn above the chosen power. The FlexBeAn research project (LIST, Creos and the University of Luxembourg, 2022–2025) studied household flexibility, and the government is considering time-of-use network tariffs. A Klimabonus grant for home energy management systems that respond to price signals applies to invoices from 1 October 2026.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
LenedaNational energy data platform giving aggregators and service providers consent-based access to 15-minute metering data.
Amprion balancing platform / regelleistung.netPrequalification and procurement of FCR, aFRR and mFRR for Luxembourg-connected units.
weshareenergy.luGovernment information portal on self-consumption, energy sharing and energy communities.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEffectively complete: 343,701 smart electricity meters by end 2024 (about 98% of customers); installation is mandatory
Reading interval15 minutes (electricity); 1 hour (gas)
MeterSmarty, owned and maintained by the network operator; mandatory for customers on Creos networks
Installed base343,701 electricity and 91,559 gas smart meters at 31 Dec 2024; main roll-out 2017–2020 (53.2 million € for electricity meters)
CommunicationsPower-line carrier to substation concentrators, then fibre or 2G/4G to the Luxmetering central system; GPRS back-up; encrypted
FunctionsBidirectional import/export registers, two controllable relays (e.g. water heaters), maximum-power control, remote connection and disconnection
Customer portP1-type (RJ12) port for in-home displays and energy management (DSMR-based)
Data accessSupplier receives daily data; customers and authorised third parties via Leneda; Creos customers also via myCreos

The 2007 electricity law, as amended in 2012, required the network operators to deploy one common, interoperable national smart-metering system for electricity and gas, run on a shared central system. The DSOs created Luxmetering in 2012 for this purpose, and the Smarty meter was installed mainly between 2017 and 2020. Smart gas meters send data through the electricity meter, so the two networks share one communication chain.

Smarty records 15-minute electricity data, which allows quarter-hour allocation for energy sharing, reference-power network tariffs and dynamic contracts. Remote functions have practical effects: the ILR notes that disconnections for non-payment have become simpler since smart meters arrived. A supplier can request power limitation or a prepayment function for a household in arrears.

Renewable electricity.

Electricity generation mix (2025).

  • Solar: 34.3%
  • Wind: 25.6%
  • Biomass: 23.9%
  • Waste incineration: 6.1%
  • Hydro: 3.9%
  • Gas (CHP): 3.5%
  • Biogas: 2.8%
Source 1
Renewable electricity share
23.3% (2025)Source 4Share of electricity consumption from renewables (EU accounting basis, Eurostat). Used instead of the generation share because most electricity is imported: of domestic generation alone (1,826 GWh), 90.5% came from solar, wind, biomass, hydro and biogas (ILR, 2025).
Home solar
33,304 installations (end 2025)Source 1All PV installations, of which 23,459 operate in self-consumption mode. No separate residential count is published, but the great majority are small rooftop systems.
Solar added each year
0.197 GW (2025)Source 110,694 new installations (+47.3%).
Solar PV
0.746 GW (end 2025)Source 133,304 installations.
Onshore wind
0.231 GW (end 2025)Source 176 turbines.
Biomass
0.075 GW (end 2025)Source 1
Gas CHP
0.06 GW (end 2025)Source 1
Hydro (run-of-river)
0.034 GW (end 2025)Source 1Excludes the 1,296 MW Vianden pumped-storage plant.
Waste incineration
0.021 GW (end 2025)Source 1
Biogas
0.01 GW (end 2025)Source 1

Targets.

  • Renewables: 37% of gross final energy consumption by 2030 (updated PNEC, July 2024).
  • Greenhouse gases: −56% by 2030 versus 2005 (PNEC projection); energy efficiency −42% versus the 2007 reference.
  • PNEC capacity milestones of 1,236 MW of solar and 453 MW of wind by 2030 (as reported by Paperjam).

Domestic generation is small but now mostly renewable. In 2025 solar produced 627 GWh (+74%) and became Luxembourg’s largest source of electricity for the first time, ahead of wind (467 GWh) and biomass (436 GWh, largely waste wood used by industry). Measured against consumption, however, renewables covered 23.3% of electricity use in 2025, because around three-quarters of supply is imported.

Growth is driven by rooftop PV. Capacity rose from 22,610 installations in 2024 to 33,304 at the end of 2025, helped by Klimabonus grants, 3% VAT on residential panels and prefinancing through installers. Larger plants are supported through tenders: the eighth PV tender (35 MW, closing 30 October 2026) offers 15-year market-premium contracts with price caps from 80 €/MWh for industrial land to 185 €/MWh for small carports and floating PV, with extra weighting for storage. Wind grew only 16.9 MW in 2025.

Energy storage.

Home batteries
88.9 MWh (end 2025)Source 19,655 batteries of up to 30 kWh (average 9.2 kWh) with 64,271 kVA of power, as reported to the network operators.
Grid-scale storage
1.296 GW (2025)Source 1Vianden pumped storage, connected directly to the German grid. No battery larger than 1,000 kWh was connected to the Luxembourg grid at the end of 2025; 188 batteries of 30–1,000 kWh totalled 12,253 kWh.

Battery storage in Luxembourg is overwhelmingly behind the meter. The ILR’s first battery census counted 9,843 systems with about 101 MWh at the end of 2025, 98% of them home batteries under 30 kWh. Batteries bought with PV can receive a Klimabonus grant, and a further grant is available only five years after the last storage purchase for the same PV system.

The rules support storage. Any network user may operate storage, there is no double charging for stored power kept on site, and electricity stored for reinjection is exempt from electricity tax. Storage connected with a PV system must not both charge from the grid and export if the owner wants to keep feed-in remuneration. The PV tenders give extra weighting to bids that include storage, but no grid-scale battery had been connected by the end of 2025.

Storage projects.

  • Vianden pumped-storage plant: 1,296 MW pumped-hydro plant in northern Luxembourg, operated as part of the German grid rather than the Luxembourg supply system.
  • Klimabonus home battery grant: Grant of up to 2,250 € for batteries of at least 2 kWh installed with a self-consumption PV system.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Enovos Luxembourg75.68% of residential volume (2025)YesYesUnknownUnknown
LEO12.51% of residential volume (2025)UnknownUnknownUnknownUnknown
Sudstroum7.06% of residential volume (2025)UnknownUnknownUnknownUnknown
NordENERGIE—UnknownUnknownUnknownUnknown
Steinergy—UnknownUnknownUnknownUnknown
Energy Revolt—YesUnknownUnknownUnknown
SUDenergie—UnknownUnknownUnknownUnknown

Sixteen companies held a supply authorisation at the end of 2025, but only ten were active, and seven served households: Enovos, LEO, Sudstroum, SUDenergie, NordENERGIE, Steinergy and Energy Revolt. The Encevo group (Enovos and LEO) supplied 91.3% of residential volumes and Sudstroum 7.06%. Hoffmann Frères (Electris) stopped supplying at the end of 2024, and its customers passed to Enovos. Power Online was authorised in 2026.

Every supplier with more than 15,000 customers must offer a dynamic contract to smart-meter households. Solar owners in self-consumption mode choose any supplier to buy their surplus. Klima-Agence describes the buy-back price as typically a percentage of the wholesale price that changes monthly. The ILR publishes the list of active suppliers.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of the Economy – EnergyGovernmentEnergy ministrySupply and generation authorisations, feed-in tariffs, PV and wind tenders, PNEC.
Institut Luxembourgeois de Régulation (ILR)RegulatorEnergy regulatorNetwork tariffs, connection conditions, compensation mechanism, aggregator register, annual market statistics.
Creos LuxembourgTransmissionTSO and main DSOGrid connection of PV and storage, Smarty meters, Leneda, 380 kV grid project.
SudstroumDistributionDSO for Esch-sur-Alzette and supplierLocal network and connections in Esch-sur-Alzette.
LenedaMeteringNational energy data platform (operated by Creos)Energy ID, supply-point data, 15-minute consumption data and third-party data sharing.
AmprionFlexibilityGerman TSO procuring balancing reserves for Luxembourg unitsPrequalification and contracting for FCR, aFRR and mFRR.
Klima-AgenceConsumerNational energy advice agencyFree advice on PV, batteries, heat pumps, energy sharing and Klimabonus aid.
Guichet.luGovernmentGovernment services portalKlimabonus forms, feed-in tariff and tender information.
weshareenergy.luRenewable EnergyGovernment portal on energy sharingExplains self-consumption levels and energy communities.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Low-voltage grid connectionConditions techniques de raccordement BT (TAB), version 2021.1Luxembourg DSOs (approved under ILR procedure)Joint national conditions for installations up to 1,000 V; the German version prevails. Registration needed for generation of 800 W–10.8 kW; if the DSO does not decide within one month, the installation may be connected.
Generation and storage (inverters)VDE-AR-N 4105 and EU RfG (Regulation 2016/631)VDE FNN / European CommissionApply to generating units and storage from 800 W up to 135 kW (150 kVA). Conformity proof to DIN VDE V 0124-100 for storage; FNN note on storage connection applies.
Remote controlTAB chapter 12Luxembourg DSOsGrid-feeding generation and storage need an interface letting the DSO stop active power within 5 seconds; remote power reduction is mandatory from type B.
Electrical installationsDIN VDE 0100 series, VDE-AR-N 4100DIN / VDEReferenced by the TAB for customer installations, meter cabinets and EV charging (DIN VDE 0100-722). PV warning labels to DIN EN 50438.
Installer qualificationBusiness authorisation (autorisation d’établissement)Ministry of the Economy (Guichet.lu)Installers must be entitled to trade in Luxembourg. For PV prefinancing they must also be registered for the procedure.
Smart meteringSmarty / DSMR-based P1 portLuxmetering network operators; ILR specifications15-minute electricity data; customer port for energy management systems.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Building permit / declarationLimitedLocalSet by each commune’s building regulations. The client must ask the commune and declare the works or apply for a permit as required. Heritage-listed buildings need specific approval.
Network operator connection agreementYesNationalRequest prepared by the installer and approved by the DSO before installation. For small generation, a missing decision within one month counts as approval.
Declaration to the national generation registerYesNationalCommissioning, substantial modification and decommissioning of any installation of 800 W or more, made to the network operator.
End-of-works notificationYesNationalSent by the installer to the network operator, which may inspect and, for two-meter set-ups, fits the second meter.
Ministerial generation authorisationLimitedNationalNot needed for renewable or CHP plants below 10 MW.
Co-owners’ consent (flats)LimitedLocalShared roofs in co-owned buildings need the agreement of the co-ownership; Klima-Agence advises checking this first.

For a household, the formal steps are municipal (building rules) and with the network operator (connection agreement, declaration and end-of-works notification). Communes set their own rules on rooftop panels, so requirements differ across the country. The government has studied harmonising them and introducing fixed deadlines and tacit approval.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Klimabonus Wunnen – photovoltaic grantActiveGrantFormula PPV × (1,155 − 1,155/35 × PPV) € for systems below 15 kWp, capped at 10,000 € from 15 kWp. Minimum 2 kWp (1.5 kW per dwelling on flats), roof, façade or building-integrated, self-consumption mode only (feed-in tariff renounced for life). A social top-up can double the aid for lower-income households.Installations 4 Jan 2026 – 31 Dec 2029 (to 2031 if ordered by end 2029)
Klimabonus Wunnen – home battery grantActiveGrantFormula Q × (500 − 500/18 × Q) € for usable capacity below 9 kWh, capped at 2,250 € from 9 kWh. Minimum 2 kWh, linked to a self-consumption PV system; a further storage grant is possible only five years after the last one.2026–2029
PV prefinancingActiveGrant (prefinanced)A registered installer deducts the grant from the final invoice; deposits may not exceed 30% of the price. Available for PV with or without a battery, not a battery alone, in self-consumption mode.—
Feed-in tariff for small renewablesActiveFeed-in tariff15-year tariff paid by the network operator for PV below 400 kW, falling each year for new installations; cannot be combined with Klimabonus grants. 200–400 kW only for co-operatives and civil companies.—
Eighth PV tender (market premium)ActiveTender / market premium35 MW in four lots (industrial land, roofs, innovative, carports/water basins) with 15-year market-premium contracts; price caps 80–185 €/MWh; storage weighted favourably.Bids by 30 Oct 2026
Klimabonus Wunnen – heat pumpsActiveGrantGround-source 12,000 € and air-to-water 10,000 € when replacing fossil heating in an existing home, each 2,000 € higher for orders between 1 Jan 2026 and 30 Jun 2027; prefinancing from 1 Jan 2027.2026–2030
Klimabonus Wunnen – home energy management systemsActiveGrantNew aid for energy management systems, for invoices dated from 1 October 2026. The amount was not stated in the government announcement.From 1 Oct 2026
State coverage of network costs and compensation mechanismActiveBill subsidyFrom 1 January 2026 for at least three years: the state covers part of network costs (average −3.8 c€/kWh) and the compensation mechanism (household contribution −3.71 c€/kWh). Cost 150 million € in 2026.From 1 Jan 2026 (at least 3 years)
Reduced VAT on residential PV panelsActiveVAT relief3% VAT on photovoltaic panels for residential buildings (batteries excluded), as stated by Klima-Agence.—

Data and connectivity.

Fixed broadband
40.3 subscriptions per 100 people (2024)Source 10Fixed broadband subscriptions (World Bank). Fibre-to-the-premises coverage was 85.2% and very-high-capacity network coverage 95.5% in 2025 (EU Digital Decade).
4G coverage
Not identified from a reliable public source.
5G coverage
99.9 % coverage (2025)Source 35Basic 5G coverage of populated areas.

Smart meters do not depend on consumer broadband. Smarty uses power-line carrier over the low-voltage cables to concentrators in substations, then fibre or 2G/4G to the Luxmetering central system, with GPRS as back-up in remote locations. In the home, the meter’s P1-type port provides real-time readings to displays, energy management systems, batteries and EV chargers. Leneda delivers the validated 15-minute data online.

Grid conditions.

National peak demand
1.091 GW (2025)Source 1National peak on 4 February 2025 at 17:45.
Annual electricity demand
6.529 TWh (2025)Source 1Gross national consumption including losses (+2.98%); final consumption 6.397 TWh.
Generation capacity
1.177 GW (end 2025)Source 1Installed capacity of plants supplying the national system, excluding the 1,296 MW Vianden pumped-storage plant.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Luxembourg imports about 73% of its gross consumption, so security of supply depends on interconnection with Germany. Creos’s 220 kV backbone dates from the 1960s. In 2020 Creos announced a 209 million € project to replace it with a roughly 50 km 380 kV line and a new substation near Bofferdange, removing 75 km of older overhead lines. Commissioning was planned for the end of 2026, with dismantling of old assets by the end of 2028.

On the distribution grid, the main pressures are fast-growing rooftop solar, heat pumps and EV charging. The law allows network operators, with ILR approval, to offer connections with limited guaranteed capacity or operational limits. The reference-power tariff and the TAB rule requiring remote shut-off of feeding systems give DSOs tools to manage local peaks.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
State pays part of network costs and the compensation mechanismCurrent1 January 2026For at least three years; average reduction of 7.4 c€/kWh for households, cost 150 million € in 2026.
Klimabonus Wunnen 2026–2030 adoptedCurrent15 July 2026 (retroactive to 1 January 2026)Formula-based PV and battery grants, higher heat-pump grants, and a new energy-management-system grant for invoices from 1 October 2026.
Energy-sharing reformCurrentLaw of 2 April 2026Nationwide right to share renewable electricity at quarter-hour granularity (up to 6 MW of associated plants) and a new paid “sharing organiser” role.
24-hour supplier and aggregator switchingCurrent1 January 2026Technical switching by network operators within 24 hours of the request, on any working day; overall limit of three weeks.
Leneda and the Energy IDCurrent20 March 2025National energy data platform opened to consumers; an Energy ID is required for switching, moving, data sharing and self-consumption.
Balancing markets open to Luxembourg unitsCurrent1 January 2025All German balancing products (FCR, aFRR, mFRR) open to prequalified Luxembourg-connected units via Amprion.
Eighth PV tender closesUpcoming30 October 202635 MW of market-premium contracts in four lots.
Prefinancing for heat pumps and renovationUpcoming1 January 2027Registered firms deduct the Klimabonus grant from the invoice, as already done for PV.
Time-of-use network tariffsUpcomingUnder consideration (no date set)The economy minister described work on time-varying network tariffs as well advanced but undecided.
Creos 380 kV backboneUpcomingPlanned end 2026; works to end 2028Replacement of the 1960s 220 kV network with a 380 kV line and a new Bofferdange substation (timetable announced in 2020).

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useMediumLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHigh33,304 PV installations at end 2025 (about one for every 11 electricity customers), +47% in a year; solar was the largest domestic generation source in 2025.
Distributed energy marketMedium23,459 PV installations in self-consumption, 9,843 batteries and a statutory nationwide energy-sharing framework; self-consumed and shared power was 7% of final consumption in 2025.
Grid flexibility marketMediumAll German balancing products open to aggregated Luxembourg units since 2025 (1 MW minimum), but no domestic balancing or local flexibility market and only 35 dynamic household contracts in 2025.
Energy storage adoptionLowAbout 101 MWh of batteries in total at end 2025 and no grid-connected battery above 1 MWh; Vianden pumped storage serves the German grid.
Renewable growth environmentHighSolar capacity +35.8% (197 MW) in 2025 and solar output +74%; wind growth was slower (+16.9 MW).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 35 sources
  1. Chiffres-clés 2025 – données statistiques nationales marché de l’électricité (30 June 2026). Institut Luxembourgeois de Régulation (ILR), 2026. accessed 1 October 2026.
  2. Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2026. accessed 1 October 2026.
  3. Complete energy balances (nrg_bal_c) – final consumption, households, electricity. Eurostat, 2024. accessed 1 October 2026.
  4. Share of energy from renewable sources (nrg_ind_ren) – electricity. Eurostat, 2025. accessed 1 October 2026.
  5. Number of private households (lfst_hhnhtych). Eurostat, 2025. accessed 1 October 2026.
  6. Average household size (ilc_lvph01). Eurostat, 2025. accessed 1 October 2026.
  7. Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
  8. Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
  9. Urban population (% of total population) – Luxembourg. World Bank, 2025. accessed 1 October 2026.
  10. Fixed broadband subscriptions (per 100 people) – Luxembourg. World Bank, 2024. accessed 1 October 2026.
  11. Luxembourg’s population reaches 690,959 (STATEC figures). Chronicle.lu (STATEC data), 2026. accessed 1 October 2026.
  12. Aides de l’État pour réduire la facture d’électricité en 2026 (communiqué, 2 December 2025). Government of Luxembourg, 2025. accessed 1 October 2026.
  13. Tarifs réseau et taxes réglementées (électricité), valables à partir du 1er août 2026. Enovos, 2026. accessed 1 October 2026.
  14. Enovos reduces electricity prices from 2026 onwards. Luxtoday, 2025. accessed 1 October 2026.
  15. Enovos launches EV charging tariff with 25% off-peak discount. Paperjam, 2025. accessed 1 October 2026.
  16. Luxembourg is working on more flexible electricity tariffs. Paperjam, 2026. accessed 1 October 2026.
  17. Loi modifiée du 1er août 2007 relative à l’organisation du marché de l’électricité (consolidated version, 7 April 2026). Institut Luxembourgeois de Régulation (ILR), 2026. accessed 1 October 2026.
  18. Fiche PHOT-2026 – Installation photovoltaïque (Klimabonus). Guichet.lu / Administration de l’environnement, 2026. accessed 1 October 2026.
  19. Klimabonus 2026 – aide pour installations techniques. Guichet.lu, 2026. accessed 1 October 2026.
  20. “Klimabonus Wunnen” 2026-2030: un soutien renforcé à la transition énergétique (communiqué, 16 July 2026). Government of Luxembourg, 2026. accessed 1 October 2026.
  21. Production d’électricité à partir de sources d’énergie renouvelables. Guichet.lu, 2026. accessed 1 October 2026.
  22. Photovoltaïque: appel d’offres pour grandes centrales (8e appel). Guichet.lu / Ministry of the Economy, 2026. accessed 1 October 2026.
  23. Informations pour l’installation de panneaux photovoltaïques (November 2025). Klima-Agence, 2025. accessed 1 October 2026.
  24. Conditions techniques de raccordement pour les installations électriques ayant une tension nominale jusqu’à 1000 V (version 2021.1). Luxembourg distribution network operators, 2021. accessed 1 October 2026.
  25. Balancing capacity – participation of units connected in Luxembourg. Amprion, 2026. accessed 1 October 2026.
  26. Smarty – le compteur intelligent. Creos Luxembourg, 2026. accessed 1 October 2026.
  27. Réponse à la question parlementaire n° 57535 sur les compteurs intelligents. Chambre des Députés, 2025. accessed 1 October 2026.
  28. Leneda, the new platform for tracking your energy data. Paperjam, 2025. accessed 1 October 2026.
  29. Inscrivez-vous et créez votre Energy ID sur leneda.lu. Creos / Leneda (via Ville de Diekirch), 2025. accessed 1 October 2026.
  30. +1.1% for car sales in Luxembourg in 2025. Paperjam, 2026. accessed 1 October 2026.
  31. L’électrique retrouve de l’élan sur fond de hausse des carburants. Paperjam (SNCA data), 2026. accessed 1 October 2026.
  32. Mise à jour du Plan national intégré en matière d’énergie et de climat (PNEC) (communiqué, 17 July 2024). Government of Luxembourg, 2024. accessed 1 October 2026.
  33. Solar energy gains ground while wind stagnates. Paperjam, 2024. accessed 1 October 2026.
  34. Creos Luxembourg modernise son réseau électrique (380 kV). FEDIL (Creos member news), 2020. accessed 1 October 2026.
  35. State of the Digital Decade 2026 – Luxembourg country report (Council ST 10476/26 ADD 19). European Commission / Council of the EU, 2026. accessed 1 October 2026.