How electricity works in Belgium.
Belgium electricity market 2026: CREG and the regional regulators, Elia, Fluvius, ORES and Sibelga, the 18-digit EAN, digital meters, capacity tariffs, solar export and flexibility.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Belgium energy at a glance.
Key figures for households in Belgium. Each one links to its source on the full overview below.
Electricity price.
0.35 EUR per kWh for households, including taxes. Figures for 2025-S2.
Household use.
3,149 kWh a year for a typical household. Figures for 2024.
Renewable share.
43.8% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Belgium.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Belgium below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Belgium requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Belgium.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Belgium, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Belgium, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Belgium.
The energy market in Belgium, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Belgium has a fully liberalised electricity market, but responsibility for it is split between the federal state and the three regions. The federal regulator CREG oversees the wholesale market, the transmission grid run by Elia and the federal social tariff. The regional regulators set distribution network tariffs and supply rules: the Vlaamse Nutsregulator (VNR, formerly VREG) in Flanders, CWaPE in Wallonia and Brugel in the Brussels-Capital Region. As a result, rules on solar export, meters and network charges differ depending on where a home is.
Households pay some of the highest electricity prices in the EU. Eurostat’s all-taxes price for a typical household (2,500–5,000 kWh a year) was 0.3499 €/kWh in the second half of 2025. There is no regulated retail tariff: every household buys from a competing supplier on a fixed, variable or dynamic contract, with network charges and taxes passed through. Every connection is identified by an 18-digit EAN code. Digital meters are replacing older meters: about 80% of connections in Flanders now have one, while roll-out in Wallonia and Brussels started later.
Nuclear power produced about 36% of Belgian electricity in 2025, wind 20% and solar 16% (Ember). Belgium was a net importer for the third year running. Parliament repealed the 2003 nuclear phase-out law in May 2025, and two reactors have been extended to 2035. Flanders has charged households a capacity-based network tariff since 2023. Wallonia introduced a midday off-peak band and an optional time-of-use network tariff in January 2026, and Brussels is preparing a capacity tariff from 2028. Since June 2026 all balancing products have also been open to aggregated low-voltage assets.
Energy snapshot.
Headline figures for electricity in Belgium. Each shows its data year and links to its source.
- Population11,867,634 peopleSource 11 Jan 2026
- Households5,225,771 householdsSource 21 Jan 2026
- Average household size2.24 people/householdSource 21 Jan 2026
- Electricity use per household3,149 kWh/yrSource 62024
- Household price (EUR)0.35 EUR/kWhSource 52025-S2
- Renewable electricity share43.8%Source 112025
- Solar capacity11.6 GWSource 12end 2025
- Wind capacity5.85 GWSource 112025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Yes
- Regulator
- CREG (federal) with regional regulators VNR (Flanders), CWaPE (Wallonia) and Brugel (Brussels)
- System operator
- Elia Transmission Belgium
- Distribution networks
- Regional DSOs: Fluvius in all of Flanders; ORES, RESA and a few small municipal operators (AIEG, AIESH, REW) in Wallonia; Sibelga in Brussels
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Belgium.
- Household price (EUR)
- 0.35 EUR/kWh (2025-S2)Source 5Household consumers, band DC (2,500–5,000 kWh/yr), all taxes and levies included. Actual prices vary by region, distribution network area and contract type.
- Typical annual electricity bill
- 1,102 EUR/yr (2025-S2)Source 5Derived: Eurostat 2025-S2 all-taxes price of 0.3499 €/kWh multiplied by the derived average household consumption of 3,149 kWh. Not an official bill statistic. Bills vary widely by region, network area, contract and peak demand.
Household price trend (EUR per kWh).Source 5
| 2019-S1 | 0.2839 EUR/kWh |
|---|---|
| 2019-S2 | 0.286 EUR/kWh |
| 2020-S1 | 0.2792 EUR/kWh |
| 2020-S2 | 0.2702 EUR/kWh |
| 2021-S1 | 0.2702 EUR/kWh |
| 2021-S2 | 0.2994 EUR/kWh |
| 2022-S1 | 0.3437 EUR/kWh |
| 2022-S2 | 0.4489 EUR/kWh |
| 2023-S1 | 0.435 EUR/kWh |
| 2023-S2 | 0.3778 EUR/kWh |
| 2024-S1 | 0.3354 EUR/kWh |
| 2024-S2 | 0.3313 EUR/kWh |
| 2025-S1 | 0.3571 EUR/kWh |
| 2025-S2 | 0.3499 EUR/kWh |
A Belgian bill has three parts: the energy price set by the supplier, regulated network charges (distribution plus transmission) and taxes and levies. Federal taxes include a special excise duty, which was 0.04748 €/kWh for households in July 2026, and a small federal energy contribution of about 0.0019 €/kWh. Regional levies include the Flemish Energiefonds charge per connection, and suppliers also pass on the cost of regional green-certificate and CHP-certificate obligations. VAT on household electricity is 6%.
Network charges differ by region
Flanders has used a capacity tariff since 1 January 2023. Households with a digital meter pay for the average of their highest quarter-hour peak each month, with a minimum of 2.5 kW. In July 2026 the rate ranged from 49.05 €/kW a year (Fluvius Limburg) to 57.10 €/kW a year (Fluvius West) before VAT, plus a per-kWh charge of about 5–6.3 c€ and a fixed data-management fee of 17.85 € a year. Homes with an analogue meter pay a fixed amount equal to 2.5 kW and a higher per-kWh rate. Fluvius says a typical 3,500 kWh household has an average monthly peak of about 4.26 kW.
Wallonia keeps volume-based network tariffs but changed its two-rate time bands on 1 January 2026, adding a daily off-peak window from 11:00 to 17:00 when solar output is high. It also introduced an optional three-level “tarif Impact” in which the evening peak (17:00–22:00) costs about five times the ECO rate. Brussels’ structure is broadly unchanged for 2025–2027. Brugel has approved a Sibelga roadmap for a capacity component (€/kVA of available power) from 1 January 2028 and a three-band time-of-use tariff from 1 January 2030.
Price trend
Belgian retail prices follow wholesale prices closely because there is no regulated tariff. Eurostat’s household price rose from about 0.27 €/kWh in 2021 to a peak of 0.4489 €/kWh in the second half of 2022. It then fell back to 0.33–0.36 €/kWh in 2024–2025. In June 2026 Brugel noted that electricity prices rose after the geopolitical crisis involving Iran in February 2026. From 1 October 2026 CREG banned conditional price promotions: any discount must apply from the first kWh and for the whole contract.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Fixed | Yes | The energy price is fixed for the contract term, usually one to three years. Network charges and taxes are not fixed and change when regulators approve new tariffs. CREG notes that fixed contracts cost roughly 20% more but shield customers from price swings. |
| Variable | Yes | The price is indexed monthly or quarterly to wholesale prices using a published formula. Because a monthly average is applied, short price spikes have a limited effect on the bill. |
| Dynamic | Yes | Prices follow the Belgian day-ahead market by the hour or quarter-hour and need a digital or smart meter reading at that resolution. In Flanders, any supplier with more than 200,000 customers must offer one. In late 2025 dynamic contracts were offered by ENGIE, Luminus, Eneco, OCTA+, EBEM, Ecopower and Frank Energie. |
| Time-of-use | Yes | Two-rate (dag/nacht, bihoraire) metering is widespread. In Wallonia since 1 January 2026, off-peak hours run from 22:00 to 07:00 and from 11:00 to 17:00 every day. The optional Walloon “tarif Impact” has three network price levels (ECO, MEDIUM, PIC) for smart-meter users up to 56 kVA. |
| Off-peak | Limited | Separately metered “exclusive night” circuits for storage heaters and boilers still exist but are being phased out. Brussels is ending them on 1 January 2028, and Flemish customers with a night-only meter could defer the digital-meter switch until 1 January 2028. |
| Regulated | Limited | There is no regulated tariff for the general public. The federal social tariff, set by CREG each quarter, is available only to eligible protected customers, such as recipients of certain social benefits. |
| Prepayment | Limited | Budget or prepayment meters are installed by the DSO for customers in payment difficulty. Their functions are now built into the digital or smart meter. |
Household prices compared with neighbouring countries (EUR per kWh).
- Germany€0.37
- Belgium€0.35
- United Kingdom€0.308
- Luxembourg€0.267
- Netherlands€0.258
- France€0.2
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,149 kWh/yr (2024)Source 6Derived: Eurostat household electricity consumption of 16,315.2 GWh in 2024 divided by the average of Statbel’s private household counts at 1 Jan 2024 (5,163,139) and 1 Jan 2025 (5,199,324). Belgian regulators and suppliers use 3,500 kWh/yr as the reference household for price comparisons.
- Average daily use per household
- 8.6 kWh/day (2024)Source 6Derived: 3,149 kWh/yr derived household average divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 6,830 kWh/person/yr (2025)Source 11All-sector electricity demand per person (80.28 TWh total demand), not residential only.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 395,188 cars (1 Aug 2025)Source 4Fully electric passenger cars, 6.4% of the 6.14 million car fleet, up 55.4% in a year; 81.8% are registered to companies. A further 846,354 hybrid cars (13.8%).
- Electric cooking
- Not identified from a reliable public source.
Belgian households use less electricity than the national total suggests, because heating is still mostly gas- or oil-fired. Eurostat records 16.3 TWh of household electricity use in 2024, roughly 3,150 kWh per household. Total electricity demand was 80.1 TWh in 2025 (Elia), stable compared with 2024 and still below the 2017–2021 average.
Electrification is driven mainly by company cars. A tax regime that favours zero-emission company cars took the battery-electric fleet to 395,188 cars by August 2025. Charging these cars at home raises household peaks, which the Flemish capacity tariff now prices. Heat pumps get a 6% VAT rate on new homes from 2026 to 2030, the same reduced rate already available for renovations of homes over ten years old. Flanders kept heat-pump grants for all income groups in its reformed Mijn VerbouwPremie from 1 March 2026.
Housing and households.
- Dwellings
- 5,827,823 dwellings (1 Jan 2025)Source 3In 4,668,425 buildings, from the cadastral register.
- Owner-occupied
- 70.9% (2025)Source 7Share of population living in owner-occupied housing (EU-SILC): 43.1% with a mortgage, 27.8% without.
- Private rented
- 20.8% (2025)Source 7Tenants paying a market rent, share of population.
- Social or public housing
- 8.3% (2025)Source 7Tenants at a reduced rent or rent-free, which includes social housing. EU-SILC does not separate social housing.
- Houses
- 76% (2025)Source 8Share of population living in houses: 34.3% detached, 41.7% semi-detached or terraced.
- Apartments and flats
- 23.7% (2025)Source 8Share of population living in flats.
- Urban population
- 87.7 % of population (2025)Source 10World Bank estimate (degree-of-urbanisation method).
Belgium is a country of houses and owner-occupiers. Three-quarters of people live in a house, mostly semi-detached or terraced, and about 71% own their home. Many single-family homes with their own roof explain why rooftop solar is so common, especially in Flanders. The housing stock is old: only 7% of Brussels buildings and 23% of Walloon buildings date from after 1981, against 35% in Flanders.
Brussels is the exception, with mostly flats and a majority of tenants. Brussels and Flanders both allow energy sharing between flats in a building and peer-to-peer sales. Since April 2025, Synergrid-approved plug-in solar and battery kits can also be connected, which suits tenants and balconies. Flanders exempts rooftop panels and, from 1 March 2026, small façade and balcony panels from planning permission under conditions.
How the grid works in Belgium.
- TransmissionElia Transmission Belgium
- DistributionRegional DSOs: Fluvius in all of Flanders; ORES, RESA and a few small municipal operators (AIEG, AIESH, REW) in Wallonia; Sibelga in Brussels
- MeteringAtrias Central Market System (CMS), The DSO
- Supply8 or more retail suppliers
Power from Belgium’s nuclear units at Doel and Tihange, gas plants, offshore wind farms and imports flows over Elia’s 380/220/150/70 kV network to substations. There the DSOs take over at medium and low voltage. Belgium sits between France, the Netherlands, Germany, Luxembourg and Great Britain and is a transit hub: cross-border flows totalled 42 TWh in 2025, and net imports were 14 TWh, mainly from France and the Netherlands.
Commercially, a household contracts only with its supplier. The supplier holds access contracts with the DSO, pays network charges on the customer’s behalf, and either belongs to or appoints a balance-responsible party that Elia settles each quarter-hour. Because distribution is regional, a supplier licensed in one region needs a separate licence to serve customers in another. Regional rules also decide how solar export is paid and how meters are rolled out.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | FPS Economy – Directorate-General for Energy | Federal energy administration under the federal energy minister. It issues individual authorisations for generation and storage above 25 MW, federal supply licences, and offshore wind concessions and tenders. The regions handle energy efficiency, renewable support and distribution. |
| Regulator | CREG (Commission de Régulation de l’Électricité et du Gaz) | Federal regulator for transmission (Elia’s tariffs and methodology), the wholesale market, the capacity remuneration mechanism and the social tariff. It also monitors retail prices and supplier practices. |
| Regulator | Vlaamse Nutsregulator (VNR), CWaPE and Brugel | Regional regulators for Flanders, Wallonia (cwape.be) and Brussels (brugel.brussels). They approve distribution tariffs and grant supply licences for distribution-connected customers, and Brugel also runs the green-certificate scheme in Brussels. |
| TSO | Elia Transmission Belgium | Owns and operates the 30–400 kV grid (more than 8,900 km of lines and cables) and is the system operator. It balances the system, buys FCR/aFRR/mFRR reserves, runs the CRM auctions, manages balance-responsible parties and operates interconnectors and the offshore modular grid. |
| DSO | Fluvius | Single distribution operator for electricity and gas in Flanders, with several tariff areas (Antwerpen, Halle-Vilvoorde, Imewo, Kempen, Limburg, Midden-Vlaanderen, West, Zenne-Dijle). It is rolling out digital meters, registers solar panels and batteries, and runs energy sharing. |
| DSO | ORES, RESA and smaller Walloon operators | ORES covers most Walloon municipalities and RESA most of Liège province. AIEG, AIESH and REW serve a few municipalities. They are rolling out smart meters and connect small generation. |
| DSO | Sibelga | Distribution operator for electricity and gas in all 19 Brussels municipalities. It installs bidirectional and smart meters for prosumers and targeted groups, and from 2028 will implement Brussels’ capacity-based network tariff. |
| Data hub / registry | Atrias Central Market System (CMS) | Shared data platform owned by the DSOs, live since November–December 2021 with the MIG6 message standard. It holds the access-point (EAN) register and handles switching, moves, meter readings and billing data for all suppliers and DSOs. |
| Supplier | Licensed suppliers | Competing suppliers bill households for energy, network charges and taxes in one invoice. Flemish consumers could choose from 22 electricity suppliers in September 2025 (CREG). |
| Metering | The DSO | Metering is a regulated DSO task. Fluvius, ORES/RESA and Sibelga own, install and read meters and send validated data to suppliers through the Atrias CMS. |
| Exchange | EPEX SPOT (Belgian bidding zone) | Day-ahead and intraday trading for the Belgian zone, coupled with the rest of the EU. Dynamic household contracts and many injection prices are indexed to the Belgian day-ahead price. |
| Flexibility market | Elia balancing and CRM; Synergrid Flexhub | Elia buys FCR, aFRR and mFRR and runs the CRM. The DSOs’ Flexhub registers delivery points that flexibility service providers use on the distribution grid: 25,247 at 1 May 2026, mostly low-voltage sites in Flanders. |
Compared with the UK system.
| UK concept | Belgium equivalent | How it works |
|---|---|---|
| DNO | Distributienetbeheerder / gestionnaire de réseau de distribution (DNB/GRD) | Each region has its own DSOs, owned by municipalities and their inter-municipal companies: Fluvius covers all of Flanders, ORES and RESA most of Wallonia, and Sibelga Brussels. Their tariffs are approved by the regional regulator, not the federal one, so network charges and their structure differ by region. |
| National Grid / NESO | Elia | Elia owns the transmission grid down to 30 kV and is also the system operator, so there is no owner/operator split as in Great Britain. CREG, not the regional regulators, regulates it, and Elia also runs the capacity auctions. |
| MPAN | EAN code (EAN-18) | An 18-digit number beginning with 54 that identifies the access point, meaning the connection rather than the meter. It is assigned by the DSO when the connection is made and stays with the address. Gas has a separate EAN, and a large solar installation may get a separate injection access point. Unlike the MPAN, it encodes no profile class or region. |
| MPRN | Gas EAN code | Gas connections use the same 18-digit EAN format, issued by the same DSO (Fluvius, ORES/RESA or Sibelga). The gas EAN is a different number from the electricity EAN at the same address. |
| Meter operator | DSO (no competitive metering) | Meters belong to the DSO, which installs, reads and replaces them. Households cannot appoint a meter operator. The digital meter cannot be refused in Flanders, and in Wallonia the communication function can be switched off for a fee. |
| Supplier | Leverancier / fournisseur | Suppliers need a regional supply licence (federal for customers connected above 70 kV). They bill energy plus network charges and taxes, buy the green-certificate obligations, pay for injected solar power and offer fixed, variable or dynamic contracts. |
| Smart-meter infrastructure (DCC / SMETS2) | DSO head-end systems + Atrias CMS | There is no separate communications company. Each DSO runs its own meter head-end (Fluvius digital meters, ORES/RESA and Sibelga smart meters), and validated data reaches suppliers through the shared Atrias platform. Meters have a P1 user port for home energy management. |
How a supply point is identified.
541448820000123457 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | EAN code (European Article Number / GS1 global service relation number) (EAN (EAN-18)) |
| Who issues it? | The distribution network operator: Fluvius in Flanders, ORES, RESA, AIEG, AIESH or REW in Wallonia, and Sibelga in Brussels (Elia for transmission-connected sites) |
| Format | An 18-digit numeric GS1 code beginning with the Belgian prefix 54, followed by digits identifying the operator and access point, with a final check digit. It identifies the access point (the connection) and carries no tariff or profile information. |
| Length | 18 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On every electricity bill and annual statement, on the energy transfer form (energieovernamedocument / document de reprise des énergies) used when moving home, and often on a sticker on or near the meter. The DSO can also look it up from the address. |
| Electronic access | Through the DSO portal: Mijn Fluvius in Flanders (consumption, quarter-hour data and monthly peaks for digital meters), MyORES in Wallonia (with optional 15-minute data), and Sibelga’s online services in Brussels. |
| Third-party access | Suppliers get the data they need for billing through the Atrias CMS. Other parties, such as energy-service companies, aggregators and installers, need the customer’s consent. Flexibility service providers register delivery points in the DSOs’ Flexhub under an FSP-DSO contract. |
| Who keeps the register | The access-point register is kept by the DSOs on the shared Atrias Central Market System, which holds the EAN, address, meter, metering regime, supplier and balance-responsible party for every point in Belgium. |
| Register scope | National |
The EAN is how the Belgian market recognises a connection. When a new home is connected, the DSO creates an access point and gives it an 18-digit EAN. That number then stays with the address through changes of occupant, supplier and meter. Changing a meter for a digital or smart one does not change the EAN, because the code identifies the connection, not the device.
How it is used
Switching supplier needs only the EAN, the address and the customer’s details. The new supplier sends the request through the Atrias platform and the previous contract ends automatically. Moving home is handled with an energy transfer form that records meter readings and the EAN for each fuel. Separate EANs can also exist at one address, for example for an exclusive night meter, a separate injection access point for large solar installations, or an EV charger with its own supplier. The MIG6 standard introduced in 2021 was designed to make this possible.
Who keeps the data
Before November 2021 each DSO group ran its own market systems. Since the move to the Atrias CMS, all DSOs and suppliers use one central platform and message standard (MIG6). This gives Belgium, in practice, a single national access-point register and data hub, even though the DSOs and their regulators remain regional.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Supplier-defined injection price, often a formula linked to the Belgian day-ahead price, credited on the bill. Example: one Flemish co-operative paid about 3.3 c€/kWh in July 2026, and Homegrade uses 3 c€/kWh in a Brussels example. Brussels adds green certificates for 10 years. In Wallonia, net metering continues until 31 December 2030 only for installations of up to 10 kW commissioned before 2024. |
| Is net metering available? | Only as a legacy arrangement. Flanders ended the reverse-running meter as digital meters were installed. Brussels abolished compensation in 2021. Wallonia ended it for installations commissioned from 1 January 2024 but keeps it until 31 December 2030 for earlier installations of up to 10 kW. |
| What do prosumers with an old meter pay? | In Flanders, prosumers still on an analogue meter pay a prosumer tariff based on inverter power, between 51.54 and 65.65 €/kW a year before VAT in July 2026, depending on the Fluvius area. Wallonia applies a prosumer tariff to compensated installations, which can opt for a proportional tariff with a dual-flow or smart meter. |
| Are there size thresholds? | In Flanders, solar up to 25 kVA is registered online. Private owners receiving injection income from 10–25 kVA must register as self-employed. Above 25 kVA a network study is required. Generation or storage above 25 MW needs a federal individual authorisation. |
| Are plug-in solar and battery kits allowed? | Yes. Since 17 April 2025, Synergrid-approved plug-and-play devices may be connected. They must be declared to the DSO, and the meter must be bidirectional. In Brussels they are not eligible for green certificates. |
| Is injection income taxed? | Households that are not VAT-registered and have installations of 10 kW or less are not subject to VAT obligations for selling their surplus (Homegrade). In supplier tariffs, injection payments to private customers are shown as VAT-exempt. |
Connecting a home system.
- Check planning rules: rooftop PV is generally exempt from permits in Flanders and Wallonia under conditions; check heritage rules and, for flats, co-owners’ consent.
- Choose an inverter (and any battery) on Synergrid’s C10/26 homologation list; the installation must meet Synergrid C10/11.
- Have the installation inspected for conformity with the AREI/RGIE electrical regulations by an accredited inspection body before use.
- Register the installation with the DSO, for example in Flanders via Mijn Fluvius within three months of the inspection (up to 25 kVA). Above 25 kVA in Flanders a network study is needed first.
- The DSO fits a digital or bidirectional meter if one is not already there; Fluvius does this within three months of registration.
- Sign up for an injection price with an electricity supplier, which need not be the same as the consumption supplier. In Brussels, also apply to Brugel for green certificates.
Belgium has moved from generous net metering to self-consumption plus a market injection price, at different speeds in each region. Flanders replaced the reverse-running meter with digital meters that measure import and export separately. Prosumers now earn a supplier injection price that is usually well below the import price, and since 2023 they have paid capacity-based network charges like everyone else. Wallonia followed for new installations from 2024, while older small installations keep compensation until the end of 2030. Brussels ended compensation in 2021 but kept green certificates. A 5 kWc system installed in 2026 earns 2.055 certificates per MWh for 10 years, with Elia guaranteeing a minimum of 65 € per certificate.
Because export pays little and evening peaks are charged under the Flemish capacity tariff, Wallonian time bands and future Brussels tariffs, the financial case now rests on self-consumption: running appliances, heat pumps and EV charging at midday, or adding a battery. Energy sharing lets a prosumer pass surplus to a neighbour, another flat in the same building or an energy community. This requires quarter-hour metering (metering regime 3 in Flanders).
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Federal individual authorisation above 25 MW net capacity; at or below 25 MW a reporting form only, copied to CREG. Small installations need no licence, only DSO registration and an AREI inspection. | FPS Economy (DG Energy); CREG | Offshore wind needs a domain concession and, for new zones such as the Princess Elisabeth Zone, a federal tender. |
| Store electricity | Same 25 MW threshold as generation: authorisation above 25 MW, reporting below. Home batteries must be on the Synergrid C10/26 list and declared to the DSO. | FPS Economy; DSO | Storage framework in the Act of 14 February 2022 and Royal Decree of 27 March 2023. |
| Export / inject to the grid | No licence. Requires DSO registration (Flanders: within 3 months, online up to 25 kVA; network study above 25 kVA) and an injection contract with a supplier. | DSO; supplier | Private owners in Flanders injecting from 10–25 kVA must register as self-employed. |
| Sell surplus to a neighbour / share energy | No supply licence for regional energy sharing, peer-to-peer sales within the rules, or energy communities. Participants need quarter-hour metering and registration with the DSO. | Regional regulator; DSO | In Flanders a prosumer may sell peer-to-peer to only one other party; sharing with more requires an energy community or sharing group. |
| Supply electricity to customers | Supply licence from the regional regulator for distribution-connected customers (VNR, CWaPE, Brugel); federal licence from the energy minister on CREG’s advice for customers connected above 70 kV. | VNR / CWaPE / Brugel; federal minister and CREG | A licence in one region does not cover the others. |
| Aggregate / act as flexibility service provider | No licence. An FSP must sign an FSP-DSO contract (flexible access) for distribution-connected sites and register delivery points in Flexhub. It must also be a prequalified balancing service provider with Elia for each product. | DSO (Synergrid framework); Elia; CREG for T&C | Independent aggregators can work through transfer of energy, which went live for all products on 9 June 2026. |
| Trade / wholesale | No trading licence. Exchange membership plus a balance-responsible party (ARP/BRP) contract with Elia, and REMIT registration with the regulator. | Elia; CREG (REMIT) | Balance responsibility is settled per quarter-hour. |
| Balancing / grid services | BSP contract and prequalification with Elia per product (FCR, aFRR, mFRR). Aggregation is allowed, and low-voltage assets are allowed under the transfer-of-energy rules. | Elia; terms approved by CREG | In Wallonia, new aFRR delivery points on the distribution grid were temporarily blocked pending a decree change (expected Q3 2026). |
| Capacity market (CRM) | Prequalification and participation in Elia’s Y-4, Y-2 or Y-1 auctions. Aggregated and foreign capacity can take part. | Elia; CREG; federal government | Three auctions held simultaneously for the first time in 2025. |
| Virtual power plant / remote control of assets | No specific licence. It operates under the FSP/BSP framework above. Behind-the-meter control must respect Synergrid C10/11 power-management rules; the meter’s P1 port may be used as an input but not as a protection system. | DSO; Synergrid; Elia | Customer consent is needed for access to meter data and to use assets. |
Belgium licenses the supply of electricity, not small-scale generation. A household or small business can generate, store, export and share energy without a licence, provided it uses approved equipment, passes the AREI inspection and registers with the DSO. Federal authorisation is needed only above 25 MW, for both generation and storage.
Market roles are contractual rather than licensed. Aggregators and other flexibility providers sign standard contracts with the DSOs (FSP-DSO) and with Elia (BSP, BRP). These contracts were harmonised by Synergrid and approved by CREG and the regional regulators. The main regional difference in 2026 is in Wallonia, where a conflict with the regional decree temporarily stopped new distribution-connected delivery points entering aFRR.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency containment reserve (FCR) | Yes | 1 MW per bid (aggregation allowed) | Yes | Elia. Most low-voltage delivery points in Flexhub are used for FCR, mainly home batteries and other assets in the Fluvius area aggregated by FSPs. FCR has been open to distribution-connected assets since 2018. |
| Automatic frequency restoration reserve (aFRR) | Yes | — | Yes | Elia. Open to low-voltage assets since 2024 (opt-out and pass-through models), with the transfer-of-energy central settlement model since 2026. New Walloon distribution delivery points are temporarily restricted. |
| Manual frequency restoration reserve (mFRR) | Yes | — | Yes | Elia. Open to medium-voltage assets since 2018 and to low-voltage assets (up to 1 kV) since June 2026, coupled to the European MARI platform. |
| Capacity remuneration mechanism (CRM) | Yes | — | Yes | Elia. Annual Y-4, Y-2 and Y-1 auctions. The 2025 Y-1 auction for 2026–27 selected 4,556 MW. Across all auctions, about 1.6 GW of new-build batteries have received capacity contracts up to winter 2029–30. |
| Day-ahead / intraday via transfer of energy | Restricted | — | Limited | Elia / EPEX SPOT. Transfer of energy for day-ahead and intraday trading is available for transmission and medium-voltage sites but not yet for low voltage (still to be decided). Households can still respond to prices through dynamic contracts. |
| DSO local flexibility | Developing | — | Yes | Fluvius, ORES/RESA, Sibelga. DSO flexibility products for congestion management are being developed in Synergrid working groups, with the next framework release (Document Release 4) planned for Q1 2027. |
Belgium is one of the most open European markets for small flexible assets. Synergrid reports that, with the transfer-of-energy release of 9 June 2026, all balancing products are open at all voltage levels. The one exception is transfer of energy for day-ahead and intraday trading at low voltage. Registered delivery points rose by 10,432 in 2025 alone, mostly home batteries in Flanders providing FCR through aggregators.
Batteries matter more and more at system level. Elia’s 2025 adequacy and flexibility study names flexibility as critical as solar surpluses and evening peaks grow. Negative day-ahead prices occurred 6.1% of the time in 2025, which gives value to batteries, dynamic contracts and shifting heat-pump or EV demand.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Synergrid Flexhub | DSO platform registering flexibility delivery points and FSP contracts. Modernised in 2026, it had 25,247 delivery points at 1 May 2026, with about 750 added per month. |
| Elia balancing and CRM platforms | BSP prequalification, reserve procurement, MARI/PICASSO coupling and capacity auctions. |
| Atrias CMS | Central market data hub that supplies metering data for quarter-hour settlement, dynamic tariffs and energy sharing. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Mandatory regional roll-outs: Flanders about 80% complete, finishing by mid-2029; Wallonia and Brussels later (Wallonia all by end 2029, Brussels 80% by 2030) |
| Reading interval | 15 minutes |
| Flanders | About 2.95 million digital electricity meters (80% of customers) by late 2025; free and cannot be refused; full roll-out by July 2029 |
| Flanders solar owners | 89% (about 925,000) had a digital meter by December 2025 |
| Wallonia | About 490,000 smart meters; large-scale roll-out from September 2025; all customers by 31 December 2029; communication function can be disabled for a fee |
| Brussels | About 121,000 smart electricity meters by summer 2025; target 80% by 2030; bidirectional meters for all prosumers |
| Metering regimes (Flanders) | Regime 1: monthly or annual readings for billing. Regime 3: quarter-hour data, required for dynamic contracts, energy sharing and PV over 10 kVA |
| User port | P1 port for real-time data to home energy management; not accepted as a protection system under C10/11 |
Smart metering is a DSO responsibility, and each region set its own roll-out. Flanders made the digital meter mandatory from 1 July 2019 and prioritised solar owners. It reached about 80% of customers by late 2025 and is now replacing the remaining 1.25 million electricity and gas meters, often on older connections that need extra work, by mid-2029. The digital meter records the highest quarter-hour demand each month, which is the basis of the Flemish capacity tariff.
Wallonia changed its decree in 2024 to require smart meters for all customers by 2030 and began large-scale installation in September 2025. ORES reports strong take-up of 15-minute data among MyORES users. Brussels long limited smart meters to targeted groups such as prosumers, new and deeply renovated buildings and EV charging points. Sibelga is now working to 80% coverage by 2030, ahead of capacity tariffs from 2028. All meter data reaches suppliers through the shared Atrias platform.
Renewable electricity.
Electricity generation mix (2025).
- Nuclear: 36.1%
- Wind: 20%
- Gas: 19.5%
- Solar: 15.6%
- Bioenergy: 7.5%
- Hydro: 0.7%
- Other fossil: 0.6%
- Renewable electricity share
- 43.8% (2025)Source 11Share of electricity generation from wind, solar, bioenergy and hydro (Ember). Elia’s provisional review counts only wind and solar, at 22.4 TWh or 34% of production.
- Home solar
- 925,000 installations (Dec 2025)Source 34Flemish solar owners (homes, flats and small businesses) with a digital meter, said to be 89% of all Flemish solar owners. No national count of residential installations was found.
- Solar added each year
- 1.05 GW (2025)Source 12Derived from Elia’s statement that capacity grew 10% to 11.6 GW (11.6 − 11.6/1.10). Ember shows +0.76 GW.
- Solar PV
- 11.6 GW (end 2025)Source 12
- Onshore wind
- 3.6 GW (end 2025)Source 12Up 13% in 2025.
- Offshore wind
- 2.261 GW (since 2020)Source 13
- Gas
- 7.26 GW (2025)Source 11
- Nuclear
- 2.08 GW (2025)Source 11After the closure of Doel 1, Tihange 1 and Doel 2 in 2025; Doel 4 and Tihange 3 remain, extended to 2035.
- Bioenergy
- 0.52 GW (2025)Source 11
Targets.
- Offshore wind: 3.15–3.5 GW more in the Princess Elisabeth Zone, taking the total to 5.4–5.8 GW (FPS Economy).
- Nuclear: Doel 4 and Tihange 3 extended for ten years to 2035; the 2003 phase-out law was repealed in May 2025.
- Digital/smart meters: 100% in Flanders by mid-2029, all Walloon customers by end 2029, 80% in Brussels by 2030.
Belgium’s renewable growth comes mainly from rooftop solar and offshore wind. Solar produced a record 10.1 TWh in 2025 (Elia), up 21% thanks to 10% more capacity and an exceptionally sunny year, with a monthly record of 1,370 GWh in June. Combined wind and solar output hit a quarter-hour record of 9,957 MW on 4 October 2025, about 90% of demand at that moment. Onshore wind capacity grew 13% to 3.6 GW, but wind output dipped to 12.3 TWh in a less windy year.
Offshore wind has stood at 2.26 GW since 2020. The next step, the Princess Elisabeth Zone with its offshore energy island, was put out to tender for a first 700 MW lot in November 2024, but the tender was suspended in July 2025 for redesign. Nuclear output fell 24% in 2025 as three reactors closed. The two extended reactors (about 2 GW) restarted in July and October 2025, and a capacity mechanism supports new gas and battery capacity.
Energy storage.
- Home batteries
- 1,811 MWh (end Jun 2026)Source 43Flanders only: 184,501 registered home batteries (Fluvius data, preliminary). 33,854 were added in 2025. No figures were found for Wallonia or Brussels.
- Grid-scale storage
- 1.6 GW (to winter 2029–30)Source 42New-build battery capacity awarded capacity contracts in all CRM auctions to date, not capacity in operation. Batteries delivered a record of about 640 MW on 11 August 2026.
Storage in Belgium has grown in two ways at once. Behind the meter, Flanders has registered more than 184,000 home batteries totalling about 1.8 GWh. This was driven by the end of net metering and by the capacity tariff, which rewards lower peaks. Many of these batteries are aggregated for frequency containment.
At grid scale, the capacity mechanism has made batteries the main source of new firm capacity. Nearly all new-build capacity in the 2025 auctions was batteries, and about 1.6 GW of new batteries now hold capacity contracts. Battery output on the Elia grid regularly exceeds 500 MW at evening peaks in 2026. Pumped hydro at Coo remains the largest single storage asset.
Storage projects.
- Coo-Trois-Ponts pumped storage (ENGIE): Belgium’s main large-scale storage plant, about 1.1 GW, in the Ardennes. Recently upgraded to add storage and power.
- ENGIE Vilvoorde battery: 200 MW / 800 MWh battery park in Flanders built in two phases, the second due to connect by the end of 2025.
- ENGIE Drogenbos battery: 80 MW / 320 MWh battery selected in a CRM auction.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| ENGIE | — | Yes | Yes | Yes | Yes |
| Luminus | — | Yes | Yes | Yes | Yes |
| Eneco | — | Yes | Yes | Yes | Yes |
| TotalEnergies | — | Yes | Yes | No | Yes |
| Mega | — | Yes | Yes | No | Yes |
| OCTA+ | — | Yes | Yes | Yes | Yes |
| Ecopower | — | Yes | Yes | Yes | Yes |
| Frank Energie | — | Yes | Unknown | Yes | Yes |
The retail market is open in all three regions, but supply licences are regional, so not every supplier is active everywhere. At the end of September 2025, Flemish consumers could choose from 22 electricity suppliers (CREG). ENGIE, Luminus, Eneco, TotalEnergies, Mega and OCTA+ are active in all three regions. Market shares are published by CREG and the regional regulators, but no current national household share figure was confirmed for this profile.
Every supplier offers fixed and variable contracts, and most offer two-rate pricing. Dynamic contracts are spreading: in Flanders, suppliers with more than 200,000 customers must offer one. All suppliers pay prosumers an injection price, typically a discount on the day-ahead price, and in Brussels they must buy surplus power without applying network tariffs or taxes. CREG’s ban on conditional promotions from 1 October 2026 aims to make offers easier to compare.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| FPS Economy – DG Energy | Government | Federal energy administration | Generation and storage authorisations above 25 MW, federal supply licences, offshore wind. |
| CREG | Regulator | Federal electricity and gas regulator | Transmission tariffs, wholesale market, social tariff, CRM oversight, retail price monitoring. |
| Vlaamse Nutsregulator (VNR) | Regulator | Flemish regulator (formerly VREG) | Fluvius tariffs, including the capacity tariff; supply licences; Flemish market data. |
| CWaPE | Regulator | Walloon regulator | Walloon distribution tariffs, the 2026 time bands and tarif Impact, prosumer rules. |
| Brugel | Regulator | Brussels regulator | Sibelga tariffs, green certificates, smart-meter and capacity-tariff roadmap. |
| Elia | Transmission | TSO and system operator | Grid data, balancing, CRM auctions, adequacy studies. |
| Fluvius | Distribution | Flemish DSO | Digital meters, solar and battery registration, energy sharing, open data. |
| ORES | Distribution | Main Walloon DSO | Smart-meter roll-out and connections in most of Wallonia. |
| Sibelga | Distribution | Brussels DSO | Brussels meters, PV and battery declarations, future capacity tariff. |
| Atrias | Metering | DSO-owned central market data platform | Holds the national EAN access-point register and MIG6 market processes. |
| Synergrid | Flexibility | Federation of Belgian network operators | Technical rules C10/11 and C10/26, homologation lists, Flexhub and flexibility contracts. |
| FEBEG | Market | Federation of electricity and gas companies | Industry body for generators, suppliers and traders. |
| EDORA | Renewable Energy | Federation of renewable energy companies (Wallonia/Brussels) | Positions on demand response, renewables and storage. |
| Homegrade | Consumer | Brussels housing and energy advice centre | Clear guidance on PV, batteries, plug-and-play and green certificates in Brussels. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection of generation and storage | Synergrid C10/11 (edition 2.4, 15 Oct 2025) | Synergrid | Applies to all generation operating in parallel with the distribution grid. Covers power limits, phase imbalance (max 5 kVA on three-phase connections), automatic disconnection and battery power-management (EnFluRi sensor). An amendment covers plug-and-play devices. |
| Inverter / device homologation | Synergrid C10/26 list | Synergrid | PV and battery inverters, bidirectional EV chargers, CHP and wind turbines must be on the C10/26 list before connection can start. Plug-and-play kits need a specific homologation. |
| Electrical safety and inspection | AREI / RGIE (Algemeen Reglement op de Elektrische Installaties) | FPS Economy | Mandatory conformity inspection by an accredited body before a PV or battery installation is used; the report is needed to register with the DSO. |
| European network codes | EU RfG (Regulation 2016/631), implemented through C10/11 | European Commission / Synergrid | A full C10/11 revision is planned for RfG 2.0. |
| Installer accreditation | RESCert | Regional authorities | Brussels requires a RESCert-certified installer for PV of up to 5 kWc from 1 January 2026 for green-certificate eligibility. |
| Market data exchange | MIG6 | Atrias | Message standard used since late 2021 for switching, metering data and settlement between DSOs and suppliers. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Planning permission (rooftop PV) | Limited | Regional | Flanders: exempt on a flat roof (max 1 m above the edge) or in or on a pitched roof, and on façades (max 4 m²) or balconies, subject to heritage and local rules. Wallonia: PV roofing on existing buildings is exempt under the CoDT. Brussels: check with the commune, especially for plug-and-play and heritage buildings. |
| DSO registration | Yes | Regional | All PV, batteries and plug-and-play kits must be declared to the DSO. In Flanders this is due within 3 months of inspection, with a fee for late registration (95.44 € in 2025 for systems under 10 kVA). |
| Network study | Limited | Regional | Required in Flanders before installing PV above 25 kVA. |
| Electrical inspection | Yes | National | AREI/RGIE conformity inspection by an accredited body before use. |
| Federal authorisation | Limited | National | Only for generation or storage above 25 MW; a reporting form is needed at or below 25 MW. |
| Co-owners’ consent (flats) | Limited | Local | Shared roofs or façades in co-owned buildings need the agreement of the co-ownership, as set by the deed or building rules. |
For a household, the main formalities are an approved inverter, the AREI inspection and registration with the DSO. Planning permission is rarely needed for ordinary rooftop panels in any region, and Flanders widened its exemptions for façade and balcony panels from 1 March 2026. Larger systems face extra steps, such as a Flemish network study above 25 kVA and self-employed registration from 10 kVA for private owners selling injection.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Brussels green certificates for PV | Active | Green certificates | 10 years of certificates per MWh produced: 2.055 CV/MWh up to 5 kWc and 1.739 CV/MWh for 5–36 kWc (rates from 1 April 2026). Elia guarantees a minimum of 65 € per certificate. Plug-and-play kits are not eligible. | Rates from 1 Apr 2026 |
| Wallonia: compensation for pre-2024 installations | Active | Net metering (legacy) | Installations of up to 10 kW commissioned before 1 January 2024 keep meter compensation (reverse running) until 31 December 2030, subject to the prosumer tariff. Not available to new installations. | Until 31 Dec 2030 |
| Reduced VAT (6%) on heat pumps in new homes | Active | VAT relief | 6% VAT on supply and installation of heat pumps in private homes first occupied less than ten years before the invoice (circular 2026/C/19). Hybrid heat pumps with fossil back-up are excluded. | 1 Jan 2026 – 31 Dec 2030 |
| Reduced VAT (6%) on renovation of homes over ten years old | Active | VAT relief | Includes supply and installation of PV and solar thermal panels and heat pumps on private homes older than ten years; otherwise 21%. | — |
| Flanders Mijn VerbouwPremie – heat pumps | Active | Grant | Since 1 March 2026, higher-income categories 1–2 can claim only for heat pumps: 4,000 € ground-source, 1,500 € air-to-water, 800 € hybrid, 300 € air-to-air and 450 € for heat-pump water heaters. Lower-income categories 3–4 keep the wider premium. | Categories 1–2 until 31 Dec 2027 |
| Flanders retroactive investment premium for solar owners | Closed | Grant | One-off premium of 1,000–2,000 € for owners of PV installed 2014–2020 who lost the reverse-running meter. Applications closed at the end of 2025. | Closed end 2025 |
| Wallonia small-PV grants | Closed | Grant | No direct grants for PV up to 10 kW since 30 June 2018. The region considers these systems viable without public support. | — |
| Federal social tariff | Active | Regulated price | Reduced price set quarterly by CREG for eligible protected customers. It is applied automatically by the supplier. | — |
Data and connectivity.
- Fixed broadband
- 94.7 % of households (2025)Source 9Households with internet access (Eurostat isoc_ci_in_h). Fixed very-high-capacity (gigabit) coverage was 93.8% in 2024.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- 96.9 % coverage (2024)Source 48Overall 5G coverage, up from 40.4% in 2023.
Belgium has high gigabit coverage through cable and fibre and caught up quickly on 5G in 2024. Digital and smart meters send data to the DSOs over the meters’ own communication channels. Households and installers connect energy management systems, batteries and EV chargers to the meter’s P1 user port for real-time readings. Synergrid does not allow the P1 port to replace the dedicated power-management sensor that C10/11 requires for battery systems.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 80.1 TWh (2025)Source 12Non-normalised consumption, provisional. Ember gives 80.28 TWh.
- Generation capacity
- 26.9 GW (2025)Source 11Derived: sum of Ember’s clean (19.17 GW) and fossil (7.76 GW) capacity.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Belgium produced about 67 TWh in 2025 (Ember) against 80 TWh of demand and covered the gap with 13–14 TWh of net imports. The country exported to Great Britain, Germany and Luxembourg while importing from France and the Netherlands. Negative prices occurred 6.1% of the time as solar output rose. Elia’s 2025 adequacy and flexibility study warns that electrification could push demand beyond available capacity from 2028 without the CRM, nuclear extension, more offshore wind or more interconnection.
On the distribution grid, the main pressures are midday solar surpluses and evening peaks from heat pumps and EVs. The regulators are responding through tariff design: the Flemish capacity tariff, Wallonia’s midday off-peak band and Brussels’ planned capacity and time-of-use tariffs.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Transfer of energy for all balancing products at all voltages | Current | 9 June 2026 | Independent aggregators can deliver FCR, aFRR and mFRR from low-voltage assets with central settlement. Day-ahead/intraday transfer of energy at low voltage is still to come. |
| Wallonia: new two-rate time bands and optional tarif Impact | Current | 1 January 2026 | Off-peak 22:00–07:00 and 11:00–17:00 every day. Optional three-level network tariff (ECO/MEDIUM/PIC) for active smart meters up to 56 kVA. |
| Ban on conditional energy promotions | Current | 1 October 2026 | Discounts must apply from the first kWh and for the whole contract; tariff changes require a new product name. |
| Flanders Mijn VerbouwPremie reform | Current | 1 March 2026 | Higher-income households can claim only for heat pumps, at reduced amounts, until the end of 2027. |
| Nuclear phase-out law repealed; two reactors extended | Current | May–October 2025 | Parliament repealed the 2003 Nuclear Exit Act on 15 May 2025. Tihange 3 and Doel 4 restarted after life-extension works and are planned to run until 2035. |
| Walloon decree change for aFRR participation | Upcoming | Expected Q3 2026 | Would lift the temporary block on new distribution-connected delivery points in aFRR in Wallonia. |
| Synergrid flexibility Document Release 4 | Upcoming | Q1 2027 | Next flexibility framework, covering better transfer of energy for day-ahead and intraday trading, an activation register and onboarding. |
| Brussels capacity tariff | Upcoming | 1 January 2028 | A capacity component (€/kVA of available power) in Sibelga’s network tariff; the exclusive-night tariff ends the same day. |
| Brussels three-band time-of-use network tariff | Upcoming | 1 January 2030 | Peak 17:00–22:00, day 07:00–17:00, night 22:00–07:00 for smart-meter users. |
| Completion of digital/smart meter roll-outs | Upcoming | 2029–2030 | Flanders 100% by mid-2029; all Walloon customers by end 2029; Brussels 80% by 2030. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | About 925,000 Flemish solar owners with digital meters (89% of the total) and 11.6 GW of PV nationally at end 2025, mostly rooftop. |
| Distributed energy market | High | 184,501 registered home batteries in Flanders (June 2026); 25,247 flexibility delivery points in Flexhub (May 2026); energy sharing and plug-in solar permitted. |
| Grid flexibility market | High | All Elia balancing products open to aggregated assets at all voltage levels since June 2026; CRM open to batteries and aggregated capacity. |
| Energy storage adoption | Medium | Fast growth in home batteries and about 1.6 GW of new-build batteries holding CRM contracts, but battery output on the grid peaked at about 640 MW in 2026, and much of the contracted capacity is not yet built. |
| Renewable growth environment | Medium | Solar capacity +10% and onshore wind +13% in 2025, but offshore wind unchanged since 2020 and the Princess Elisabeth Zone tender suspended in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 48 sources
- Structure of the population. Statbel, 2026. accessed 1 October 2026.
- Households. Statbel, 2026. accessed 1 October 2026.
- Building stock. Statbel, 2025. accessed 1 October 2026.
- Electric boom in Belgium: +55% cars in one year. Statbel, 2025. accessed 1 October 2026.
- Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2026. accessed 1 October 2026.
- Complete energy balances (nrg_bal_c) – final consumption, households, electricity. Eurostat, 2024. accessed 1 October 2026.
- Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
- Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
- Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Belgium. World Bank, 2025. accessed 1 October 2026.
- Yearly electricity data – Belgium. Ember, 2025. accessed 1 October 2026.
- Elektriciteitsmix 2025 (press release, 26 December 2025). Elia Transmission Belgium, 2025. accessed 1 October 2026.
- Belgian offshore wind energy. FPS Economy, 2026. accessed 1 October 2026.
- Authorisation for the construction of electricity generation and storage facilities. FPS Economy, 2026. accessed 1 October 2026.
- Supply licence. FPS Economy, 2026. accessed 1 October 2026.
- Tariefkaart juli 2026 – Groene Burgerstroom (incl. Fluvius network tariffs and levies). Ecopower, 2026. accessed 1 October 2026.
- Hoe wordt het capaciteitstarief aangerekend?. Fluvius, 2026. accessed 1 October 2026.
- Wat moet je doen zodra je zonnepanelen geïnstalleerd zijn?. Fluvius, 2026. accessed 1 October 2026.
- Changements au niveau des tarifs de distribution en 2026 (communiqué, 3 Nov 2025). CWaPE, 2025. accessed 1 October 2026.
- Décision 390 – feuille de route d’implémentation de la tarification évoluée de Sibelga (8 July 2026). Brugel, 2026. accessed 1 October 2026.
- Proposition 37 relative au coefficient multiplicateur PV (23 June 2026). Brugel, 2026. accessed 1 October 2026.
- Nouvelle plateforme de données centralisée à partir du 1er novembre (communiqué, 10 Sept 2021). Brugel / Atrias, 2021. accessed 1 October 2026.
- Rentabilité d’une installation solaire photovoltaïque, batteries et Plug & Play (July 2026). Homegrade, 2026. accessed 1 October 2026.
- Panneaux photovoltaïques: fin du compteur qui tourne à l’envers. Service public de Wallonie, 2023. accessed 1 October 2026.
- Photovoltaïque: s’informer sur les aides existantes pour une installation de petite puissance. Service public de Wallonie, 2026. accessed 1 October 2026.
- Photovoltaïque: s’informer sur le tarif prosumer. Service public de Wallonie, 2026. accessed 1 October 2026.
- Digitale energiemeter. Vlaamse overheid, 2026. accessed 1 October 2026.
- Wijzigingen Mijn VerbouwPremie vanaf 2026. Vlaamse overheid, 2026. accessed 1 October 2026.
- Omgevingsvergunning: zonnepanelen bij een woning. Vlaamse overheid, 2026. accessed 1 October 2026.
- De nouvelles dispenses de permis d’urbanisme et d’architectes en Wallonie. Notaire.be (Fednot), 2019. accessed 1 October 2026.
- Circulaire 2026/C/19 – herinvoering verlaagd btw-tarief voor warmtepompen. FOD Financiën (via Forum for the Future), 2026. accessed 1 October 2026.
- Welk btw-tarief voor werkzaamheden aan je woning?. Test Aankoop, 2026. accessed 1 October 2026.
- Compteurs « intelligents »: où en est-on en Belgique en 2025. Test Achats, 2025. accessed 1 October 2026.
- Belgian grid operator enters final phase of digital meter rollout. pv magazine, 2025. accessed 1 October 2026.
- PDG Explicit Flexibility (30 June 2026). Synergrid, 2026. accessed 1 October 2026.
- Amendement C10/11 editie 2.3 – plug and play (15 Oct 2025). Synergrid, 2025. accessed 1 October 2026.
- Homologatie van decentrale productie-eenheden. Synergrid, 2026. accessed 1 October 2026.
- Wat is de EAN-code van een energiemeter?. Callmepower, 2026. accessed 1 October 2026.
- Welke leveranciers bieden een dynamisch contract aan?. Callmepower, 2025. accessed 1 October 2026.
- Les offres d’énergie gagnent en transparence à partir du 1er octobre. CREG, 2026. accessed 1 October 2026.
- Pics de prix d’électricité: les ménages doivent-ils éteindre leur climatisation?. CREG, 2026. accessed 1 October 2026.
- Batteries make strong contribution in Belgium’s latest capacity market auctions. ESS News, 2025. accessed 1 October 2026.
- De harde cijfers: Vlaanderen registreert 7.778 thuisbatterijen in eerste halfjaar. Solar Magazine (Fluvius data), 2026. accessed 1 October 2026.
- Batteries are no longer just an add-on: they are helping Belgium manage price spikes. oEnergetice.cz (Elia data), 2026. accessed 1 October 2026.
- Belgium reverses phase-out policy as Denmark reconsiders nuclear. World Nuclear News, 2025. accessed 1 October 2026.
- Supporting the timely restart of Doel 4 nuclear plant in Belgium. Tractebel (ENGIE), 2025. accessed 1 October 2026.
- Coo-Trois-Ponts hydroelectric power station. Tractebel (ENGIE), 2026. accessed 1 October 2026.
- State of the Digital Decade 2025 – Belgium country report (Council ST 10407/25 ADD 3). European Commission / Council of the EU, 2025. accessed 1 October 2026.
Questions about energy in Belgium.
Eurostat’s average household price, including all taxes, was 0.3499 € per kWh in the second half of 2025 for homes using 2,500–5,000 kWh a year. Prices depend on the supplier contract (fixed, variable or dynamic), the region and the network area. In Flanders they also depend on the household’s monthly peak demand under the capacity tariff.
The EAN code: an 18-digit number beginning with 54 that the distribution operator (Fluvius, ORES/RESA or Sibelga) gives to each connection. It is printed on the bill, stays with the address and is used for switching supplier and moving home. Gas has its own EAN.
Yes. Once the installation is inspected and registered with the DSO, a supplier pays an injection price for each kWh exported, usually linked to the wholesale price and well below the import price. Net metering survives only for Walloon installations of up to 10 kW commissioned before 2024, until the end of 2030. Brussels adds 10 years of green certificates.
Since 2023, Flemish households with a digital meter pay part of their network costs based on their average highest quarter-hour demand each month, with a minimum of 2.5 kW. In July 2026 the rate was about 49–57 € per kW a year before VAT, depending on the Fluvius area.
In Flanders, yes: installation is free and cannot be refused, and the roll-out finishes by mid-2029. In Wallonia all customers are due a smart meter by the end of 2029, but the communication function can be switched off for a fee. In Brussels, smart meters go to targeted groups, aiming for 80% coverage by 2030.
CREG regulates transmission (Elia), the wholesale market and the social tariff at federal level. Distribution tariffs and supply licences are regulated regionally by the VNR in Flanders, CWaPE in Wallonia and Brugel in Brussels.
They mainly save money by raising self-consumption and lowering peaks under capacity tariffs. Through an aggregator acting as flexibility service provider, home batteries can also provide grid-balancing services such as FCR, and most of the 25,000 flexibility delivery points registered in May 2026 were low-voltage sites in Flanders.