How electricity works in Maldives.
Maldives electricity 2026: STELCO and Fenaka island grids, URA regulation, block tariffs, utility accounts, net metering, licensing, solar growth and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Maldivian rufiyaa (MVR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Maldives energy at a glance.
Key figures for households in Maldives. Each one links to its source on the full overview below.
Electricity price.
1.42 MVR per kWh for households, including taxes. Figures for From 1 June 2025 (unchanged in 2026).
Renewable share.
8% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Maldives.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Maldives below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Maldives requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Maldives.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Maldives, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Maldives, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Maldives.
The energy market in Maldives, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
The Maldives has no national grid. Each inhabited island runs its own small power system, usually a diesel power house with a growing amount of solar PV and battery storage, and a low-voltage network serving the island’s homes and businesses. Two state-owned utilities supply almost all inhabited islands: the State Electric Company (STELCO) serves Greater Malé and 34 islands in the central atolls, and Fenaka Corporation serves about 155 islands in the northern and southern atolls. Resorts and industrial islands generate their own power. About 96% of electricity came from diesel in 2022; by the end of 2025 the government said solar supplied about 8%.
The sector is governed by the Energy Act (Law No. 18/2021) and regulated by the Utility Regulatory Authority (URA). Household tariffs are uniform across the country and use seven consumption bands. After a presidential directive, domestic rates were cut from 1 June 2025, to between MVR 1.25 and MVR 3.83/kWh, and in April 2026 the finance ministry said there were no plans to change them. Generation costs are far higher than tariffs and the difference is covered by government subsidy.
Households and businesses can connect rooftop solar under the Net Metering Regulation (2020/R-46), which credits surplus exports against future bills and pays out credit left unused after six months. Each island grid has a published solar quota. A new General Regulation on Electricity Services (2026/R-57) came into force on 25 June 2026: it sets out how renewable projects are classified, requires every electricity storage system to be registered with the URA, and gives the URA six months to publish technical standards. The government’s target is for 33% of electricity to come from renewable sources by the end of 2028.
Energy snapshot.
Headline figures for electricity in Maldives. Each shows its data year and links to its source.
- Population515,132 peopleSource 52022 (census)
- Households94,424 householdsSource 62022 (census)
- Average household size4.7 people/householdSource 62022 (census)
- Electricity use per householdNot identified from a reliable public source.
- Household price (MVR)1.42 MVR/kWhSource 1From 1 June 2025 (unchanged in 2026)
- Household price (EUR)0.081 EUR/kWhSource 10From 1 June 2025
- Renewable electricity share8%Source 112025
- Solar capacity0.116 GWSource 15July 2026
- Wind capacityNot identified from a reliable public source.
- Energy storage capacity10 MW (battery)Source 11December 2025
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Utility Regulatory Authority (URA)
- System operator
- No national system operator; each island grid is run by its utility (STELCO or Fenaka)
- Distribution networks
- Two state-owned utilities run separate island grids: STELCO (Greater Malé and 34 central islands) and Fenaka (about 155 outer islands); two islands are served by other operators
- Currency
- Maldivian rufiyaa (MVR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Maldives.
- Household price (MVR)
- 1.42 MVR/kWh (From 1 June 2025 (unchanged in 2026))Source 1Derived effective rate for an illustrative household using 300 kWh in a 30-day cycle: 100 kWh at MVR 1.25 plus 200 kWh at MVR 1.50 = MVR 425. Marginal domestic rates run from MVR 1.25 to MVR 3.83/kWh. Excludes any fixed or other charges.
- Household price (EUR)
- 0.081 EUR/kWh (From 1 June 2025)Source 10Converted from MVR 1.42/kWh at EUR 1 = MVR 17.51, derived from the ECB reference rate of USD 1.1355 per euro on 30 September 2026 and the rufiyaa’s managed rate of MVR 15.42 per US dollar (top of the band in place since April 2011; Statistical Yearbook Table 17.14).
- Typical annual electricity bill
- 5,100 MVR/yr (From 1 June 2025 (annualised))Source 1Derived: MVR 425 per 30-day cycle for 300 kWh × 12. Before June 2025 the same consumption cost MVR 535 a cycle (MVR 6,420 a year).
Household price trend (MVR per kWh).Source 1
| Before June 2025 | 1.78 MVR/kWh |
|---|---|
| From June 2025 | 1.42 MVR/kWh |
How tariffs are set
The Energy Act gives the URA power to set maximum prices for electricity services on inhabited islands. Under the Maximum Rate Regulation (2023/R-130) the URA fixes a ceiling for five years at a time, based on the utilities’ costs, investment plans and demand forecasts. In practice the level of the domestic tariff is a government decision: the June 2025 cut was ordered by the President on 30 May 2025 and the URA instructed STELCO and Fenaka to apply it. The same domestic tariff applies on every island, even though costs differ greatly.
Subsidies
Generation is almost entirely from imported diesel, much of it shipped in small quantities to remote islands. The URA’s energy study put generation costs at USD 0.19–0.70/kWh depending on location, while customer tariffs ranged from about USD 0.10 to USD 0.45/kWh. The government covers more than half of domestic electricity costs through fuel and usage subsidies, and in April 2026 the finance ministry said tariffs would not be changed because adjusting them would add to the state’s financial burden. It aims instead to lower costs by adding renewable energy and replacing inefficient generators.
The 2025 cut
Before June 2025 the domestic bands were MVR 1.50, 1.70, 2.15, 2.50, 2.95, 3.55 and 4.25/kWh, the structure introduced in 2009. The 2025 changes reduced every band and flattened the middle of the scale, so that all consumption between 101 and 400 kWh is now charged at MVR 1.50. A household using 300 kWh a cycle now pays MVR 425 instead of MVR 535, about 21% less.
Comparison
Household tariffs are well below the cost of supply, but rise steeply for heavy users: consumption above 600 kWh a cycle costs MVR 3.83/kWh, three times the first band. STELCO data for Malé show that in 2025 about a quarter of domestic consumption fell in the band above 600 kWh.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | One national domestic tariff for STELCO and Fenaka customers, charged in seven bands per 30-day billing cycle since 1 June 2025: 0–100 kWh MVR 1.25; 101–200 kWh MVR 1.50; 201–300 kWh MVR 1.50; 301–400 kWh MVR 1.50; 401–500 kWh MVR 2.66; 501–600 kWh MVR 3.20; above 600 kWh MVR 3.83. Each band is charged on the units within it, starting from the lowest. |
| Prepayment | Limited | The URA’s billing regulation (2023/R-174) allows utilities to supply customers on prepaid systems under a separate agreement, but no general prepaid domestic tariff was identified. |
| Time-of-use | No | No time-of-use or off-peak tariff for households was identified, although STELCO’s new smart meters record consumption in 15-minute intervals. |
| Dynamic | No | There is no wholesale market, so there are no tariffs linked to market prices. |
| Fixed | No | No retail competition and no fixed-price contracts. Rates are set by government decision and enforced through the URA. |
| Other | Yes | Separate band tariffs apply to businesses and government. In Greater Malé business rates run from MVR 3.30 to MVR 6.65/kWh and government rates from MVR 3.30 to MVR 4.35/kWh; outer-island business and government tariffs differ. Since 1 January 2026 councils pay domestic rates for street and public-area lighting. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 3,071 kWh/person/yr (all sectors, including resorts) (2022)Source 7Up from 2,265 kWh in 2018. Includes electricity generated by resorts for tourists.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity use has grown quickly. Total consumption rose from 1,160 GWh in 2018 to 1,779 GWh in 2022, and utility customer demand in the STELCO and Fenaka areas rose from 662 GWh to 955 GWh. In Malé, STELCO recorded 450 GWh of consumption in 2025, of which 252 GWh (56%) was residential; residential use in Malé has more than doubled since 2010, when it was 95 GWh.
The main household loads are air conditioning, lighting, refrigeration and other appliances, with no heating demand. Domestic accounts make up about 76% of utility customer accounts: 114,152 of 149,196 in 2022 (61,511 with STELCO and 52,641 with Fenaka). Accounts grew by about 7% a year between 2018 and 2022.
Per-person figures are inflated by tourism: resorts generated 787 GWh in 2022, more than 40% of national generation, almost all from their own diesel plants.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 59 % of households (houses, flats, apartments) (2022 (census))Source 631% in Malé; 83% on the administrative islands.
- Private rented
- 27 % of households (houses, flats, apartments) (2022 (census))Source 649% in Malé; 8% on the administrative islands. A further 14% have arrangements other than owning or renting.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 41 % of population (Malé area) (2022 (census))Source 5Share of the resident population living in the Malé area (Malé, Hulhumalé, Villimalé and Hulhulé). 46% live on administrative islands and 10% on resorts.
Housing conditions in Malé and on the outer islands are very different. In Malé 49% of households rent and only 31% own their homes. Average monthly rent in Malé was MVR 14,364 in 2022. On the administrative islands 83% of households own their homes and 8% rent.
Most homes have plastered brick walls (97%), and 60% have galvanised tin sheet roofs. Because so many Malé households rent, decisions about rooftop solar there often rest with building owners rather than occupants.
How the grid works in Maldives.
- TransmissionIsland power houses
- DistributionTwo state-owned utilities run separate island grids: STELCO (Greater Malé and 34 central islands) and Fenaka (about 155 outer islands); two islands are served by other operators
- MeteringSTELCO and Fenaka
- Supply2 or more retail suppliers
Physical structure
Electricity is generated on each inhabited island, mostly by diesel generator sets in containerised units or power houses, increasingly combined with solar PV, battery storage and an energy management system. STELCO uses 11 kV for distribution within islands, with 415 V three-phase connections for larger homes and businesses and 230 V single-phase for most homes. In Greater Malé STELCO links the power stations in Malé, Hulhumalé and Hulhulé with a 132 kV submarine cable. Fenaka runs about 200 km of 11 kV and 300 km of low-voltage lines across its islands.
In 2022 installed generation capacity was 406 MW, including 20 MW of solar PV and 8.5 MWh of battery storage. The Asian Development Bank put total installed capacity, including resorts, at about 600 MW in 2024.
Who supplies whom
STELCO serves Greater Malé and 34 islands in the central atolls; Fenaka serves about 155 islands in the northern and southern atolls. The Male’ Water and Sewerage Company (MWSC) supplies R. Dhuvaafaru and Villa Hakatha supplies ADh. Maamigili. Resorts, which occupy separate islands, must generate their own power under URA permits; in 2022 they generated 787 GWh, more than 40% of national output.
Commercial flow
There is no wholesale market or single buyer. Each utility generates and sells to its own customers at the national tariff, and receives government subsidies and fuel at subsidised rates. Independent power producers can hold a URA special licence and sell solar power to the utilities under agreements that, since June 2026, must be registered with the URA before signing.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Climate Change, Environment and Energy | Sets energy policy and renewable targets, issues regulations under the Energy Act (including 2026/R-57 and the net metering rules) and runs donor-funded solar and battery programmes such as ASSURE and ARISE. Energy was previously part of the Ministry of Tourism and Environment. |
| Regulator | Utility Regulatory Authority (URA) | Regulates electricity, water and sanitation, waste and petroleum. Issues utility and operating licences, registers generation and storage facilities, approves designs, meters, cables and panel boards, sets maximum tariffs and handles consumer complaints. |
| Supplier | State Electric Company Limited (STELCO) | State-owned utility for Greater Malé and 34 islands in the central atolls (Kaafu, Alifu Alifu, Alifu Dhaalu, Vaavu and others). Generates, distributes and sells electricity; 81,859 accounts in 2022. It operates 35 power plants. |
| Supplier | Fenaka Corporation Limited | State-owned utility providing electricity, water and sewerage on about 155 outer islands in the northern and southern atolls; 67,967 electricity accounts in 2022. Runs the Magey Solar household solar programme. |
| DSO | STELCO and Fenaka island networks | Each utility owns the 11 kV medium-voltage and 400/230 V low-voltage networks on the islands it serves. There is no separate distribution company. |
| System operator | Island power houses | Each island grid is balanced by its own power house. The only high-voltage link is STELCO’s 132 kV interconnection between Malé, Hulhulé and Hulhumalé; a few nearby Fenaka islands, such as Isdhoo, Kalaidhoo and Dhanbidhoo in Laamu Atoll, are linked at 11 kV. |
| Metering | STELCO and Fenaka | Each utility owns, installs and reads the meters in its area, including the bi-directional meters used for net metering. Meter types must be approved by the URA. |
Compared with the UK system.
| UK concept | Maldives equivalent | How it works |
|---|---|---|
| DNO | Island utility (STELCO or Fenaka) | There is no separate network company. The utility that runs an island’s power house also owns its distribution network and sells electricity to customers there. |
| National Grid/NESO | No equivalent | There is no transmission grid linking the islands. Each island is a separate mini-grid balanced by its own generators, except for the 132 kV link in Greater Malé. |
| MPAN | Utility account number and meter number | A connection is identified by the utility account opened in the customer’s name and the meter registered to it. Both appear on every bill, along with the building and floor or apartment number. |
| MPRN | No equivalent | There is no piped gas network. Households cook mainly with bottled LPG. |
| Meter operator | STELCO or Fenaka | Metering is part of the utility’s service; meter models must be approved by the URA. |
| Supplier | STELCO or Fenaka | Each island has one utility, so customers cannot switch supplier. Tariffs are the same nationwide. |
| Smart-meter infrastructure | Utility-run smart meters | No national data company. STELCO began replacing all its meters with smart meters in 2025, with consumption data shown in its customer app. Fenaka generates bills immediately after each meter reading and offers a bill payment app. |
How a supply point is identified.
Illustrative only: utility account 2045178, meter 38811042, building H. Fehimaage, 3rd floor, Malé (fictional; real formats are not published)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Utility account (with registered meter) (Utility account number) |
| Who issues it? | The island’s utility (STELCO or Fenaka) when a new connection is approved and a supply agreement is signed |
| Format | An account number assigned by the utility’s billing system, linked to a numbered meter at a specific building and floor or apartment. The URA requires both numbers on every bill, but the numbering format is not published. |
| Length | Not published |
| Stays with the property when you switch supplier? | No |
| Where to find it | On every bill, which must show the meter number, meter owner, building and floor or apartment number, bill number, registered customer and utility account number. Also in the STELCO app and Vashani portal and on Fenaka’s online bill payment service. |
| Electronic access | STELCO customers can see bills, make payments and, with a smart meter, view consumption by hour, day and week in the STELCO app or Vashani portal, logging in with the national eFaas digital ID or a phone number. Fenaka customers can view and pay bills online. |
| Third-party access | No open data hub. Installers and other third parties obtain the account and meter numbers from the customer, for example for a net metering application. |
| Who keeps the register | Each utility keeps the register of its own utility accounts, as required by URA Regulation 2023/R-174. There is no national supply-point register. |
| Register scope | Per DSO |
What identifies a connection
The Maldives has no separate, nationally standardised supply-point number. Under the URA’s regulation on registration and billing for public utility services (2023/R-174), a customer opens a utility account in their own name with the utility on their island, and the meter at the premises is registered to that account. Any Maldivian aged 18 or over, any foreigner with permission to work, and any registered company, partnership or association can hold an account. On an island where one utility provides electricity, water and sewerage, a single account can cover all of them.
Rules that protect the link between meter and account
A meter registered to one account cannot be registered to another while it is in use, and the utility service for one premises or apartment cannot be registered to more than one party. A registration cannot simply be changed into another person’s name: an account is closed only on the holder’s written request, after all money owed has been paid. In practice a new occupant therefore opens their own account for the existing meter. Utilities may ask for a deposit only from foreign customers and temporary connections, capped at an amount approved by the URA. Tenants can register in their own name, under conditions set by the regulation.
Billing
Meters are read once per cycle of 28–31 days. If a reading is late, the customer can send the utility a photograph of the meter. Customers must have at least 30 days to pay and no penalty can be charged in that time. Prepaid supply is allowed under a separate agreement.
Fictional example
A family renting a flat on the third floor of a building in Malé might hold STELCO utility account 2045178, with meter 38811042 registered to it. They would quote the account number when paying bills in the STELCO app, and an installer would need both numbers to apply for net metering. (Both numbers are invented, and the real formats are not published.)
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering at the retail tariff: exports offset imports, surplus credit rolls forward for up to six months, and credit still unused after six consecutive months is paid to the customer at the approved general tariff. |
| How is exported electricity paid for? | Exports are first netted against imports in the same billing cycle. If more is imported, the difference is billed at the normal tariff starting from the lowest band. If more is exported, the surplus is carried forward as credit for up to six months; credit left after six consecutive months is paid out at the approved general tariff. Credit can be moved to another meter registered with the same utility on the same island grid. |
| Is there a limit on how much solar an island can take? | Yes. Each utility sets a total net metering capacity for every island grid after a technical study and publishes it. The quota is divided 60% for domestic customers, 30% for private businesses and 10% for government offices and companies, and allocated in order of application. In November 2025 Fenaka’s 149 islands had a combined quota of 38,319 kWp, of which 21,468 kWp was still available. |
| How large can a household system be? | It is limited by the household’s consumption: the expected monthly generation must not exceed average monthly use over the previous 12 months. Magey Solar offers 3 kW and 5 kW systems. |
| What technical protection is required? | Systems must stop exporting within 0.5 seconds of a grid outage (anti-islanding) and may reconnect only after voltage has been within ±6% of nominal and frequency between 47 Hz and 52 Hz for at least three minutes. Total harmonic distortion must stay below 5%, and there must be a weatherproof isolation switch the utility can reach. |
| Do I need a licence to install rooftop solar? | No generation licence is needed for a net metering system, but the system must be connected under the utility agreement, the design must be approved and the wiring must be done and tested by licensed electricians. |
| What about systems that are not net metered? | Under 2026/R-57, renewable projects larger than 100 kWp that sell power are treated as commercial-scale renewable energy, and their agreements with the utility must be registered with the URA. Off-grid systems and pilot projects are separate categories. The URA is to set the tariffs and technical standards for each model. |
Connecting a home system.
- Check the island’s net metering quota. Each utility publishes how much capacity is still available for domestic, business and government customers on each island grid (Fenaka’s list is on its website).
- Size the system. Monthly generation, estimated using 4.5 operating hours a day, must not exceed the premises’ average monthly consumption over the last 12 months. New premises need a load calculation from a licensed party.
- Submit the net metering application to STELCO or Fenaka using the form in the regulation, with the system design. Under the 2026 general regulation, designs must be approved before equipment is bought and installed.
- Install the system with an approved bi-directional meter, compliant inverter protection and an accessible, lockable isolation switch, and pay any connection fee.
- Sign the net metering agreement with the utility. The utility inspects and approves the connection within 10 days.
- From then on the utility reads the meter monthly and bills on actual readings, showing imports, exports and accumulated credit.
Net metering was introduced in 2015 and the current regulation (2020/R-46) took effect in June 2020. Uptake is limited by the island quotas, which each utility sets after a technical study of how much solar its island grid can absorb. A 2025 technology-needs policy brief by the environment ministry recommended better implementation of net metering and the introduction of a feed-in tariff.
The quotas show how much is in use. Fenaka’s November 2025 list of 149 islands shows about 16.9 MWp of the 38.3 MWp quota already taken. On some islands the domestic or business share is fully used.
The government’s Magey Solar programme, run by Fenaka, installs 3 kW or 5 kW net-metered systems on homes for MVR 45,000 or MVR 75,000, with no advance payment and up to five years to pay. By August 2026, 1 MW had been installed on 250 homes, with 748 households allocated in the current phase. STELCO is expected to offer the programme later.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | A URA licence is needed to generate electricity or supply it through a grid as a business. Utility service licences for inhabited islands are awarded by public tender (state-owned enterprises are exempt from tendering) and last 5–30 years. Independent power producers need a special licence. Net metering systems need no licence. | Utility Regulatory Authority | Annual fees under the URA operating licence regulation: MVR 10,000 for an inhabited-island utility licence (MVR 15,000 for a temporary permit) and MVR 20,000 for a special licence (MVR 25,000 temporary). |
| Self-generation (resorts, industry, backup) | Registration of the facility and a URA operating permit. Resorts and other leased islands must generate their own power under URA guideline 2024/G-7. Backup, standby and temporary generator sets need a one-year permit (MVR 2,000). | Utility Regulatory Authority | A commercial and industrial utility licence (including resorts) runs for 5–10 years. Facility registration fees range from MVR 250 for renewable generation to MVR 1,000 for conventional generation. |
| Store electricity | Every system that stores electricity, of any size, must be registered with the URA under Regulation 2023/R-78 (Article 15 of 2026/R-57) and installed to URA standards. | Utility Regulatory Authority | New requirement from 25 June 2026; the URA is to publish technical standards within six months. |
| Export to the grid | Allowed for customers with net metering agreements, within the island quota and a size limit based on consumption. | STELCO or Fenaka under the Net Metering Regulation | Commercial-scale renewable sales (above 100 kWp) require an agreement registered with the URA. |
| Sell or supply electricity to consumers | Only licensed utility service providers may supply electricity through a grid. In practice each inhabited island has one utility. | Utility Regulatory Authority | There is no retail competition. |
| Operate networks | A network/infrastructure operation special licence; transmission and distribution networks must also be registered as facilities (MVR 1,000). | Utility Regulatory Authority | Networks are owned by STELCO and Fenaka. |
| Aggregate, trade, wholesale, balancing, VPP | No licence category exists because there is no wholesale market, balancing market or aggregation framework. | Not applicable | Balancing is done by each utility on each island grid. |
| Electrical installation and design work | Wiring must be carried out by technicians with a specific licence; system designs and panel boards with an incoming breaker above 63 A require URA approval; wiring and cables must be tested. | Utility Regulatory Authority | The Energy Act also requires a licence for power engineering services. Designing engineers must give their licence number on URA applications. |
The Energy Act (Law No. 18/2021), in force since 11 October 2021, replaced the Utility Services Act of 1996 and introduced licensing for anyone generating electricity or supplying it through a grid as a business, and for power engineering services. Detailed rules are in URA Regulation 2023/R-78 on registration of energy facilities and licences, the URA fee schedule, and the General Regulation on Electricity Services (2026/R-57), which replaced the 2006 regulation on public electricity supply.
2026/R-57 sets the main stages for building an electricity system: design approval before procurement, testing and certification of wiring, cables and protection equipment, registration, and licensing. Utilities must publish each island’s maximum renewable hosting capacity and current renewable use every six months, and prepare three-year demand forecasts, updated each September.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale market | No | — | No | None exists. Each utility generates for its own customers on isolated island grids. |
| Frequency control and reserves | No | — | No | STELCO and Fenaka. Provided by the utilities’ own diesel generators and, increasingly, utility-owned batteries in solar hybrid systems. No market for third parties. |
| Demand response | No | — | No | No demand response programme identified. 2026/R-57 includes provisions on demand management by utilities. |
There are no flexibility markets in the Maldives. Island grids are small, run by vertically integrated utilities, and managed by energy management systems that coordinate diesel generators, solar PV and batteries. Distributed assets cannot be aggregated or paid for grid services, and net metering is the only way for customers to export.
Flexibility is instead being added by the utilities themselves: the government reported 158 MW of battery storage under development in 2026 to support island solar hybrid systems.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Utility-led: STELCO began replacing all its meters with smart meters in 2025; no Fenaka smart-meter rollout figures published |
| Reading interval | 15 minutes (STELCO smart meters) |
| STELCO programme | First shipment early 2025; installation started after Ramadan 2025, beginning in Hulhumalé Phase II, with all customers due to be converted |
| Data available to customers | Hourly, daily and weekly use in the STELCO app |
| Fenaka | Bills generated immediately after meter reading; Fenaka Bill Pay app |
| Meter approval | Meter types must be approved by the URA |
| Net metering meters | Bi-directional or back-to-back kWh meters |
| Third-party data access | No national framework |
STELCO
STELCO started a full smart-meter rollout in 2025 after a pilot. Its manager said meter reading and bill delivery had always involved delays, and that smart meters would record consumption every 15 minutes. Installation began in Hulhumalé Phase II and was planned for all STELCO areas. The new STELCO app shows consumption by hour, day and week, allows several bills to be paid at once and includes outage alerts. No official figure for the number of smart meters installed has been published.
Fenaka
Fenaka has introduced immediate billing, in which a bill is produced as soon as the meter is read and can be checked and paid in the Fenaka Bill Pay app. No figures on Fenaka smart meters were identified, and outer-island meters are still read by utility staff.
Governance
There is no national smart-meter mandate, data hub or communications company. Each utility chooses and runs its own system, and the URA approves meter types.
Renewable electricity.
Electricity generation mix (2025).
- Diesel and other fossil fuels: 92%
- Solar: 8%
- Renewable electricity share
- 8% (2025)Source 11Share of electricity from solar as stated by the Minister of Tourism and Environment in December 2025; fossil fuels supplied the other 92%. The URA energy study gives 4.0% for 2022 (76.3 GWh of 1,886.5 GWh, including resorts).
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV (renewable capacity)
- 116 MW (July 2026)Source 15
- Battery storage
- 10 MW (December 2025)Source 11
- Total installed generation (all sources, including resorts)
- 600 MW (2024)Source 16
Targets.
- 33% of electricity from renewable sources by the end of 2028 (government pledge)
- Renewable capacity to double from about 110 MW to 220 MW by the end of the current government’s term (ministry, May 2026)
- Under 2026/R-57 the minister sets a renewable energy target, reviewed every five years
Current position
The Maldives relies almost entirely on imported diesel for electricity. In 2022, 96% of the 1,886.5 GWh generated came from diesel; 76.3 GWh came from solar, of which 55.2 GWh was generated at resorts. Diesel used for power generation rose from 307,000 tonnes in 2018 to 433,000 tonnes in 2022. By the end of 2025 the government said solar supplied about 8% of electricity, and fuel imports cost about 13% of GDP.
Programmes
Most solar has been installed through donor-funded hybrid projects that add PV, batteries and energy management systems to island power houses. ADB’s POISED project installed 28 MW of solar and 12.5 MWh of storage across 160 islands; ADB’s ASSURE project (to September 2028) is adding 20 MW of solar, 40 MWh of storage and 6 MW of rooftop solar; and the World Bank’s ARISE project is adding more. The ministry reported in 2026 that 164 MW of solar hybrid systems were at various stages across 101 islands, that ongoing projects would add 330 MW of renewable capacity, and that a power purchase agreement for 100 MW of floating solar in the Special Economic Zone was being finalised.
Constraints
Solar resources are good (about 1,200 kWh/m² a year), but land is scarce, island grids are small and roofs are limited in Malé. Higher shares of solar on each island need battery storage and modern controls, which is why most new projects combine solar and batteries.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 10 MW (December 2025)Source 11Battery capacity in island solar hybrid systems as stated by the minister. The URA study recorded 8.5 MWh in 2022.
Batteries in the Maldives mainly support island hybrid systems, allowing diesel generators to run less and more efficiently and letting grids absorb more solar. They are owned by the utilities and installed through government and donor projects.
From 25 June 2026, Regulation 2026/R-57 requires every system that stores electricity to be registered with the URA and installed to URA standards, which are due to be published by the end of 2026. No incentive for home batteries was identified.
Storage projects.
- Island solar hybrid battery programme: 158 MW of battery storage across various islands under development in 2026, alongside 164 MW of solar PV in 101 outer islands.
- ASSURE (ADB): 20 MW of solar PV and 40 MWh of battery storage on 20 islands, plus 6 MW of rooftop solar; completion due by 30 September 2028.
- POISED (ADB): 28 MW of solar PV and 12.5 MWh of storage across 160 islands, completed in 2025.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| State Electric Company Limited (STELCO) | 81,859 accounts (55% of utility accounts, 2022) | No | No | No | Yes |
| Fenaka Corporation Limited | 67,967 accounts (45% of utility accounts, 2022) | No | No | No | Yes |
Households cannot choose their supplier: the utility serving their island is the only supplier, and tariffs are set nationally. Export under net metering is credited at the retail tariff rather than through a separate export tariff. Two islands are supplied by other operators: R. Dhuvaafaru by the Male’ Water and Sewerage Company and ADh. Maamigili by Villa Hakatha.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Climate Change, Environment and Energy | Government | Energy policy, renewable targets and regulations | Issues the net metering and general electricity regulations and runs the main solar and storage programmes. |
| Utility Regulatory Authority (URA) | Regulator | Regulator for energy, water, waste and petroleum | Issues licences, permits and approvals, registers generation and storage facilities and publishes regulations and application forms. |
| State Electric Company Limited (STELCO) | Distribution | Utility for Greater Malé and central atolls | Generates, distributes and sells electricity; handles connections and net metering in its area. |
| Fenaka Corporation Limited | Distribution | Utility for the outer islands | Handles connections, net metering applications and quotas and the Magey Solar programme on about 155 islands. |
| Magey Solar programme | Renewable Energy | Government household rooftop solar scheme | Application portal for subsidised household net-metered solar systems. |
| Asian Development Bank – Maldives | Renewable Energy | Development lender | Finances the POISED and ASSURE solar and storage projects on outer islands. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (net metering) | Net Metering Regulation 2020/R-46 | Ministry; administered by the utilities and the URA | Voltage within ±6% and frequency 47–52 Hz for at least three minutes before reconnection; disconnection within 0.5 s on loss of grid; 50 Hz sinusoidal output; total harmonic distortion below 5%. |
| Power quality | IEC 61000-3-7 (flicker); IEC 61400-21 (cited for inverters) | IEC, referenced in 2020/R-46 | The net metering regulation refers to these IEC standards for flicker and power quality. |
| Anti-islanding and isolation | Net Metering Regulation 2020/R-46, Articles 13–14 | Ministry | A lockable, weatherproof isolation switch with on/off indication at the point of common coupling, accessible to the utility, shown on the single-line diagram. |
| System design, wiring and equipment | General Regulation on Electricity Services 2026/R-57 | Ministry; enforced by the URA | Design approval before procurement; approval of panel boards with an incoming breaker above 63 A; testing of wiring, cables and protection equipment. Detailed URA technical standards are due by the end of 2026. |
| Meters, cables and panels | URA approval forms ENE-01, ENE-03, ENE-04 | Utility Regulatory Authority | Panel boards, meter types and cables must be approved by the URA. |
| Installer accreditation | Licensed electricians and power engineering services licence | Utility Regulatory Authority | Wiring must be done by specially licensed technicians (2023/R-174); designing engineers must state their licence number on URA applications. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Utility net metering approval and agreement | Yes | National | Application to STELCO or Fenaka within the island quota; connection approved within 10 days of a compliant installation. |
| URA design approval | Yes | National | Required under 2026/R-57 before equipment is procured and installed; as-built drawings must be submitted if the design changes. |
| Wiring test and certification | Yes | National | Electrical installations are tested before connection; Fenaka provides installation testing and wire test application forms. |
| Storage registration | Yes | National | Any electricity storage system must be registered with the URA (from 25 June 2026). |
| Generation licence | No | National | Not needed for net-metered systems; required for commercial generation and supply. |
| Building or land-use approval | Limited | Local | No specific planning rule for rooftop solar identified. Island and city councils designate sites for larger renewable projects under 2026/R-57. |
A household installing rooftop solar deals mainly with its utility, which manages the island quota, approves the connection and supplies the net meter, and with the URA, which approves designs and equipment. Applications to the URA can be submitted by email; the URA’s standard processing time for many energy applications is 10 working days.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering | Active | Net metering | Exports credited at the retail tariff; unused credit paid out after six months. Subject to island quotas. | June 2020 – |
| Magey Solar programme | Active | Government-financed rooftop solar | 3 kW (MVR 45,000) or 5 kW (MVR 75,000) net-metered systems installed by Fenaka with no advance payment and up to five years of instalments. 1 MW installed on 250 homes by August 2026; 748 households allocated in the current phase. | January 2025 – |
| Import duty exemption for renewable energy products | Active | Duty exemption | Importers apply to the URA for duty exemption on renewable energy products at least 14 days before the shipment arrives. | — |
| Domestic electricity subsidy | Active | Tariff subsidy | The government covers more than half of the cost of domestic electricity; domestic tariffs were reduced from 1 June 2025. | Ongoing |
Data and connectivity.
- Fixed broadband
- 108,763 fixed broadband subscriptions (July (latest month on the CAM 2026 statistics page))Source 35Includes 15,133 LTE fixed broadband and 1,174 satellite subscriptions. The page heading reads "2025 monthly figures".
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
The Maldives is well connected for a dispersed island nation: DataReportal estimated 84.7% internet penetration at the end of 2025, and the Communications Authority reported 844,302 mobile subscriptions and 328,065 mobile broadband subscriptions in its latest monthly figures. This supports app-based services such as STELCO’s smart-meter app and Vashani portal and the national eFaas digital ID. The communications technology used by utility smart meters has not been published.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 1.779 TWh (2022)Source 7National electricity use including resorts. Generation was 1.887 TWh.
- Generation capacity
- 0.6 GW (2024)Source 16All installed capacity including resorts. The URA study recorded 406 MW in 2022.
- Interconnection
- 0 GWNo international interconnection, and no grid between atolls.
- Curtailment
- Not identified from a reliable public source.
Running a separate grid on almost every inhabited island makes the Maldives power system costly and fuel-dependent. Each grid needs its own generators, fuel storage and spare capacity, and fuel is delivered by sea. Generation costs ranged from USD 0.19 to USD 0.70/kWh in the URA study, depending on location.
On islands with net metering, the main limit on new connections is the published quota set by the utility’s technical study. Under 2026/R-57 utilities must publish each island grid’s maximum renewable hosting capacity and current renewable use every six months.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| General Regulation on Electricity Services (2026/R-57) | Current | 25 June 2026 | Replaces the 2006 electricity supply regulation; requires design approval and equipment testing, registration of all storage systems, classification of renewable projects, URA registration of renewable supply agreements, six-monthly publication of hosting capacity, and three-year demand forecasts by utilities. |
| URA technical standards for electricity systems | Upcoming | By December 2026 | 2026/R-57 requires the URA to publish technical standards for generation and supply systems in the government gazette within six months of the regulation taking effect. |
| Domestic tariff reduction | Current | 1 June 2025 | All seven domestic bands cut, to MVR 1.25–3.83/kWh. The finance ministry said in April 2026 there were no plans to change tariffs. |
| Public lighting billed at domestic rates | Current | 1 January 2026 | STELCO and Fenaka bill councils at domestic rates for street and public-area lighting. |
| STELCO smart-meter rollout | Current | 2025 onwards | All STELCO meters are being replaced with smart meters that record use every 15 minutes, with consumption data in the STELCO app. |
| 33% renewable electricity target | Upcoming | End of 2028 | Supported by 164 MW of solar hybrid systems on 101 islands, 158 MW of battery storage, ADB’s ASSURE project (to September 2028) and a planned 100 MW floating solar plant. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Net metering is limited by island quotas (about 16.9 MWp taken across all customer types on Fenaka islands in November 2025); the Magey Solar programme had reached 250 homes by August 2026, against about 94,000 households. |
| Distributed energy market | Low | Distributed generation is small and mainly rooftop solar under net metering; no published data on home batteries or EV charging, and no heating demand. |
| Grid flexibility market | Low | No wholesale, balancing or demand response markets and no aggregation framework; each island grid is run by a single utility. |
| Energy storage adoption | Low | About 10 MW of utility battery storage in island hybrid systems in December 2025, with 158 MW under development; storage registration only became mandatory in June 2026. |
| Renewable growth environment | Medium | Renewable capacity roughly doubled from 53 MW (2023) to 116 MW (July 2026), but solar supplied only about 8% of electricity in 2025; target 33% by the end of 2028. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 38 sources
- Electricity tariffs reduced across all usage bands. The Edition, 2025. accessed 1 October 2026.
- May bills reflect new tariffs as STELCO acts swiftly on President Muizzu’s order. The Maldives Standard, 2025. accessed 1 October 2026.
- No plans to change electricity tariffs, says finance ministry. PSM News, 2026. accessed 1 October 2026.
- Domestic electricity rates to be charged for street lighting and public areas from 01 January 2026. Maldives Financial Review, 2025. accessed 1 October 2026.
- Population and Housing Census 2022: Population Summary. Maldives Bureau of Statistics, 2022. accessed 1 October 2026.
- Population and Housing Census 2022: Household Characteristics Summary. Maldives Bureau of Statistics, 2022. accessed 1 October 2026.
- Energy Supply and Demand Study for the Maldives 2018–2022. Utility Regulatory Authority / Ministry of Tourism and Environment, 2025. accessed 1 October 2026.
- Statistical Yearbook 2026, Table 12.1: Electricity utilization in Malé, 2010–2025. Maldives Bureau of Statistics (data: STELCO), 2025. accessed 1 October 2026.
- Statistical Yearbook 2026, Table 17.14: Exchange rates, 2020–2025. Maldives Bureau of Statistics, 2025. accessed 1 October 2026.
- ECB euro reference exchange rate, US dollar (daily, 28 Sept – 2 Oct 2026). European Central Bank, 2026. accessed 1 October 2026.
- Maldives doubles renewable energy capacity in two years. PSM News, 2025. accessed 1 October 2026.
- Maldives accelerates renewable energy transition. PSM News, 2026. accessed 1 October 2026.
- Installation of 17 MW of energy across 32 islands nears completion. PSM News, 2026. accessed 1 October 2026.
- Renewable energy project to deliver 50MW across 24 islands. PSM News, 2026. accessed 1 October 2026.
- Maldives reaches 116 MW renewable energy capacity. PSM News, 2026. accessed 1 October 2026.
- Empowering Maldives: a sustainable energy future for everyone through renewable innovations. Asian Development Bank, 2025. accessed 1 October 2026.
- Net Metering Regulation, No. 2020/R-46 (Government Gazette Vol. 49, No. 122). Government of Maldives (via Utility Regulatory Authority), 2020. accessed 1 October 2026.
- General Regulation on Electricity Services, No. 2026/R-57 (Government Gazette Vol. 55, No. 99). Ministry of Climate Change, Environment and Energy (via Utility Regulatory Authority), 2026. accessed 1 October 2026.
- Regulation on determining maximum prices for electricity services, No. 2023/R-130. Utility Regulatory Authority, 2023. accessed 1 October 2026.
- Operating licence regulation (energy): licence and registration fees. Utility Regulatory Authority. accessed 1 October 2026.
- ENE-07 Application for non-utility service based power generation and usage. Utility Regulatory Authority. accessed 1 October 2026.
- ENE-02 Application for duty exemption for renewable energy products. Utility Regulatory Authority. accessed 1 October 2026.
- Regulation on registration for public utility services and billing, No. 2023/R-174. Utility Regulatory Authority (published by Fenaka), 2023. accessed 1 October 2026.
- Installation allowance for net metering (updated 26 November 2025). Fenaka Corporation Limited, 2025. accessed 1 October 2026.
- Forms and downloads (new connection, net metering, installation testing). Fenaka Corporation Limited. accessed 1 October 2026.
- President Muizzu launches nationwide home solar initiative. The Maldives Standard, 2025. accessed 1 October 2026.
- Solar systems installed in 250 households under Magey Solar. PSM News, 2026. accessed 1 October 2026.
- STELCO to roll out smart meters nationwide after Ramadan. MMTV, 2025. accessed 1 October 2026.
- STELCO to move all customers to smart meters by September. MMTV, 2025. accessed 1 October 2026.
- STELCO launches Vashani customer service portal. PSM News, 2026. accessed 1 October 2026.
- STELCO app (App Store listing). State Electric Company Limited. accessed 1 October 2026.
- Electric comeback: STELCO hits 7-year profit high. The Maldives Standard, 2025. accessed 1 October 2026.
- Fenaka introduces immediate billing service. PSM News. accessed 1 October 2026.
- Statistical Yearbook 2026, Table 12.5: Electricity consumption in Malé, 2025. Maldives Bureau of Statistics (data: STELCO), 2025. accessed 1 October 2026.
- Telecom statistics: monthly figures. Communications Authority of Maldives, 2026. accessed 1 October 2026.
- Digital 2026: Maldives. DataReportal (Kepios), 2026. accessed 1 October 2026.
- Roof top solar PV system with batteries for climate change mitigation (TNA policy brief). Ministry of Tourism and Environment / UNEP CCC, 2025. accessed 1 October 2026.
- Maldives Energy Act (Law No. 18/2021): overview. CTL Strategies, 2021. accessed 1 October 2026.
Questions about energy in Maldives.
Households pay a national tariff in seven bands per 30-day cycle: MVR 1.25/kWh for the first 100 kWh, MVR 1.50 from 101 to 400 kWh, MVR 2.66 from 401 to 500 kWh, MVR 3.20 from 501 to 600 kWh and MVR 3.83 above 600 kWh. A household using 300 kWh pays about MVR 425, or MVR 1.42/kWh. These rates have applied since 1 June 2025 and are heavily subsidised.
STELCO supplies Greater Malé and 34 islands in the central atolls, and Fenaka Corporation supplies about 155 outer islands. Both are state-owned. Resorts generate their own electricity. Customers cannot choose their supplier.
There is no national supply-point number. A connection is identified by the utility account opened in the customer’s name with STELCO or Fenaka and the meter registered to it. Both numbers, along with the building and floor or apartment number, are printed on every bill.
Yes, through net metering with STELCO or Fenaka. Exports offset your imports at the retail tariff, surplus credit carries forward for up to six months, and credit still unused after six months is paid to you. Systems must be sized so that generation does not exceed your own consumption, and each island has a limited quota.
A government programme run by Fenaka that installs 3 kW or 5 kW net-metered rooftop solar systems on homes for MVR 45,000 or MVR 75,000, with no advance payment and up to five years to pay. By August 2026, 1 MW had been installed on 250 homes.
About 8% in 2025, almost all solar, according to the government; the rest came from imported diesel. Renewable capacity reached 116 MW in July 2026 and the target is 33% renewable electricity by the end of 2028.
Yes. Since 25 June 2026 the General Regulation on Electricity Services (2026/R-57) requires every system that stores electricity to be registered with the Utility Regulatory Authority and installed to its standards.