How electricity works in Sri Lanka.
Sri Lanka electricity market 2026: PUCSL tariffs, CEB unbundling into EDL and NSO, LECO, account numbers, rooftop solar Net Plus, licensing, renewables and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Sri Lankan rupee (LKR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Sri Lanka energy at a glance.
Key figures for households in Sri Lanka. Each one links to its source on the full overview below.
Electricity price.
20.55 LKR per kWh for households, including taxes. Figures for From 11 May 2026.
Household use.
874 kWh a year for a typical household. Figures for 2025.
Renewable share.
60.2% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Sri Lanka.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Sri Lanka below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Sri Lanka requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Sri Lanka.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Sri Lanka, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Sri Lanka, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Sri Lanka.
The energy market in Sri Lanka, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Sri Lanka has an isolated national grid with no connection to India or any other country. For more than 50 years almost the entire power sector was run by the state-owned Ceylon Electricity Board (CEB). Under the Sri Lanka Electricity Act No. 36 of 2024, amended in 2025, the CEB was dissolved at midnight on 8 March 2026 and its functions passed to state-owned successor companies: Electricity Generation Lanka (EGL), the National Transmission Network Service Provider (NTNSP), the National System Operator (NSO), which is now the single buyer of bulk power, and Electricity Distribution Lanka (EDL). The Lanka Electricity Company (LECO) continues to distribute power in coastal towns between Negombo and Galle.
Retail tariffs are set by the Public Utilities Commission of Sri Lanka (PUCSL) and are the same for EDL and LECO customers. Domestic tariffs use steep consumption blocks. Since 11 May 2026 a household using up to 60 kWh a month pays LKR 5–9/kWh plus a small fixed charge, while one using more than 180 kWh pays LKR 32.50/kWh for the first 180 kWh, LKR 100/kWh above that and LKR 2,500 a month in fixed charges. PUCSL left tariffs unchanged for July–September 2026 and was reviewing the NSO’s fourth-quarter filing at the time of writing.
Renewables produced 60.2% of the electricity generated in 2025, led by large hydro (35.4%) and a fast-growing fleet of rooftop solar (9.4%). Rooftop solar capacity reached about 2.4 GW by March 2026, and on sunny weekends and holidays demand can now fall so low that the system operator asks owners to switch systems off. From 11 September 2026 new rooftop systems can only connect under the Net Plus scheme, which pays a fixed feed-in tariff for every kWh generated.
Energy snapshot.
Headline figures for electricity in Sri Lanka. Each shows its data year and links to its source.
- Population21,781,800 peopleSource 10December 2024 (census)
- Households6,111,315 householdsSource 10December 2024 (census)
- Average household size3.5 people/householdSource 10December 2024 (census)
- Electricity use per household874 kWh/yrSource 72025
- Household price (LKR)20.6 LKR/kWhSource 1From 11 May 2026
- Household price (EUR)0.055 EUR/kWhSource 13From 11 May 2026
- Renewable electricity share60.2%Source 72025
- Solar capacity2.73 GWSource 931 March 2026
- Wind capacity0.267 GWSource 931 March 2026
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Public Utilities Commission of Sri Lanka (PUCSL)
- System operator
- National System Operator (Pvt) Ltd (NSO)
- Distribution networks
- Two state-controlled distribution licensees: Electricity Distribution Lanka (most of the island) and LECO (coastal towns from Negombo to Galle)
- Currency
- Sri Lankan rupee (LKR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Sri Lanka.
- Household price (LKR)
- 20.6 LKR/kWh (From 11 May 2026)Source 1Derived effective rate for a household using 73 kWh a month (the 2025 average): 60 kWh at LKR 14.00 plus 13 kWh at LKR 20.00 plus a LKR 400 fixed charge = LKR 1,500. Excludes the 2.5% Social Security Contribution Levy added to electricity bills since October 2022. Marginal rates range from LKR 5.00 to LKR 100.00/kWh depending on monthly use.
- Household price (EUR)
- 0.055 EUR/kWh (From 11 May 2026)Source 13Converted from LKR 20.55/kWh at EUR 1 = LKR 375.40 (30 September 2026). The ECB does not publish an LKR reference rate.
- Typical annual electricity bill
- 18,000 LKR/yr (From 11 May 2026 (annualised))Source 1Derived: LKR 1,500 a month for 73 kWh (average domestic use in 2025) × 12, excluding the 2.5% levy. A household using 200 kWh a month would pay LKR 10,350 a month (180 kWh × 32.50 + 20 kWh × 100 + 2,500 fixed).
Household price trend (LKR per kWh).Source 7
| 2023 | 43.66 LKR/kWh |
|---|---|
| 2024 | 34.14 LKR/kWh |
| 2025 | 24.14 LKR/kWh |
How tariffs are set
PUCSL sets end-user tariffs under the Sri Lanka Electricity Act No. 36 of 2024 using a cost-reflective tariff methodology adopted in 2023. The single buyer, the NSO (until March 2026 the CEB), files a bulk supply tariff each quarter based on forecast demand, hydro output, fuel prices and the cost of IPP and rooftop solar purchases. Distribution costs of EDL and LECO are added, and PUCSL then decides a percentage change and allocates it across consumer categories. Surpluses and deficits are trued up two periods later. Tariffs are uniform across the country.
The 2026 revisions
From 1 April 2026 PUCSL raised tariffs for the second quarter: the bill of a household using 0–30 kWh rose by LKR 15 a month, 91–180 kWh users by LKR 420 and households above 180 kWh by 25%. A drier-than-expected season and higher fuel prices then left the NSO with a forecast deficit of about LKR 39 billion, and in an extraordinary review PUCSL approved an 18.10% overall increase from 11 May 2026. A government subsidy of LKR 15 billion protected households and religious premises using up to 180 kWh, and small hotels, industries and shops, which together make up about 95% of consumers. Domestic users above 180 kWh, and all time-of-use customers, paid 18% more. PUCSL left tariffs unchanged for July–September 2026. Heavy fuel oil and naphtha prices rose about 20% in July after a fixed-price fuel arrangement ended, and the NSO was due to file its fourth-quarter proposal on 4 September 2026.
Taxes and levies
PUCSL tariffs exclude the 2.5% Social Security Contribution Levy, which has been charged on bills from state-owned utilities including electricity since 1 October 2022 and is added to EDL and LECO bills.
Trend
Sri Lanka’s 2022 economic crisis led to very large tariff increases in 2022 and 2023. Average CEB revenue from domestic customers was LKR 43.66/kWh in 2023, fell to LKR 34.14/kWh in 2024 and to LKR 24.14/kWh in 2025 after tariff cuts, then rose again in 2026. Because of the block structure, low-use households pay far less per kWh than the average, and high-use households far more.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households are on the PUCSL-approved domestic block tariff, identical for EDL and LECO. Bills are calculated per 30-day cycle. Households using 0–60 kWh pay LKR 5.00 (0–30 kWh) and LKR 9.00 (31–60 kWh); those using 61–180 kWh pay LKR 14.00, 20.00, 28.00 and 44.00 across four blocks; above 180 kWh the whole bill moves to LKR 32.50 for the first 180 kWh and LKR 100.00 above that. Fixed charges rise with the block reached, from LKR 80 to LKR 2,500 a month. |
| Time-of-use | Yes | Optional domestic time-of-use tariff (D-TOU): LKR 47.00/kWh day (05:30–18:30), LKR 106.00/kWh peak (18:30–22:30) and LKR 33.00/kWh off-peak (22:30–05:30), with a LKR 2,500 monthly fixed charge from 11 May 2026. It mainly suits high-consumption homes and EV owners. |
| Prepayment | Limited | LECO offers an optional prepaid tariff to its retail customers: LKR 17.00/kWh for the first 90 kWh a month and LKR 93.00/kWh above that for domestic use. No prepaid option is listed for EDL customers. |
| Fixed | No | There is no retail competition and no fixed-price contracts. PUCSL can revise tariffs every quarter, and has made extraordinary revisions within a quarter (as in May 2026). |
| Dynamic | No | No tariffs linked to wholesale or spot prices exist. A National Electricity Market with day-ahead and intraday trading is still to be designed by the NSO. |
| Other | Yes | Separate EV charging tariffs (EVC-1 and EVC-2) for dedicated charging supplies, and feed-in tariffs for rooftop solar under the Net Plus scheme. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 874 kWh/yr (2025)Source 7Derived: combined CEB (5,079 GWh) and LECO (743.0 GWh) domestic sales divided by 6,664,133 domestic accounts. CEB reports an average of 69 kWh per domestic account per month.
- Average daily use per household
- 2.39 kWh/day (2025)Source 7Derived: 874 kWh a year per domestic account divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 739 kWh/person/yr (all sectors) (2025)Source 7As published by CEB; 693 kWh in 2024.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 35,268 electric vehicles registered in 2025 (January–November 2025)Source 32All categories, according to the Department of Motor Traffic, after vehicle imports reopened in 2025. A total EV fleet figure was not identified.
- Electric cooking
- Not identified from a reliable public source.
Household electricity use is low by international standards. In 2025 CEB’s 6.14 million domestic accounts used 5,079 GWh, an average of 69 kWh a month, and LECO’s 521,532 domestic accounts used 743 GWh. Domestic sales were 31.6% of CEB sales and rose 8.0% in 2025. LECO domestic accounts use more on average (about 1,425 kWh a year), and Colombo City has by far the highest consumption per account on the CEB network.
Practically every home is connected: the 2024 census found 97.4% of households using grid electricity as their main source of lighting. Cooking is still mostly done with firewood or LPG, and there is no heating demand, so the main household loads are lighting, fans, refrigeration, televisions, water pumps and, in better-off urban homes, air conditioning.
The national system peak occurs in the evening (18:30–22:30), when solar output has gone. The night peak reached a record 2,896 MW on 30 October 2025. Electric vehicles are a new source of demand: 35,268 were registered in the first eleven months of 2025, and PUCSL has added dedicated EV charging tariffs.
Housing and households.
- Dwellings
- 6,030,541 occupied housing units (December 2024 (census))Source 10Up 822,801 since the 2012 census. Housing information was collected only for occupied units.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 95.7 % of occupied housing units (single houses) (December 2024 (census))Source 10A further 4.32% are attached houses; 0.02% other.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 20.5 % of population (2025)Source 12World Bank estimate based on Sri Lanka’s narrow administrative definition of urban areas.
Sri Lanka’s housing stock is overwhelmingly made up of detached single houses with their own roofs: 95.66% of the 6.03 million occupied housing units in the 2024 census. Almost all are built of durable materials (97.9% for walls and 98.1% for roofs). This makes rooftop solar physically possible on most homes, although many rural roofs are small or tiled and the low consumption of most households limits the size of systems that make sense.
About 28% of housing units are in Western Province, which includes Colombo, and only 5.1% in Northern Province. The official urban share is about one-fifth of the population, but this reflects a narrow administrative definition; much of the western coastal belt is effectively suburban.
How the grid works in Sri Lanka.
- TransmissionNational System Operator (Pvt) Ltd (NSO), National Transmission Network Service Provider (Pvt) Ltd (NTNSP)
- DistributionTwo state-controlled distribution licensees: Electricity Distribution Lanka (most of the island) and LECO (coastal towns from Negombo to Galle)
- MeteringEDL and LECO
- Supply2 or more retail suppliers
Physical flow
Large hydro stations in the central hills, the 900 MW Lakvijaya coal plant at Norochcholai, oil-fired plants around Colombo and renewable IPPs feed a transmission network of about 1,000 km of 220 kV and 2,400 km of 132 kV routes. Grid substations step power down to 33 kV, the main distribution voltage (about 36,500 km of route), and then to 400/230 V through nearly 39,000 distribution substations. Colombo City also uses an 11 kV network. Most homes have a single-phase 230 V supply, but much of the low-voltage network is three-phase.
The grid is a single island system with no interconnection to India, so all reserves and balancing have to come from inside Sri Lanka. This is why rapid rooftop solar growth has created stability problems on low-demand days.
Unbundling of the CEB
The Sri Lanka Electricity Act No. 36 of 2024 repealed the CEB Act of 1969 and provided for the CEB to be split into successor companies. The Amendment Act No. 14 of 2025, certified on 18 August 2025, confirmed that only state-owned companies may hold transmission and system operator licences, kept hydropower in permanent state ownership, and replaced the planned wholesale market with a National Electricity Market to be designed by the NSO. The CEB was dissolved at midnight on 8 March 2026 and six companies took over: EGL (generation), NTNSP (transmission), NSO (system operation and bulk purchase), EDL (distribution), an employees’ fund company and Energy Ventures Lanka.
Commercial flow
The NSO is the single buyer. It buys all bulk electricity from EGL, IPPs and renewable generators under power purchase agreements, and from rooftop solar prosumers, and sells it to EDL and LECO at the PUCSL-approved bulk supply tariff. PUCSL required the NSO, EGL, EDL and LECO to sign formal power purchase and sale agreements by 9 September 2026. The distribution licensees bill consumers at the national retail tariff. In 2025 the CEB sold 16,069 GWh with transmission and distribution losses of 9.1%, of which 1,641 GWh went in bulk to LECO.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy, including the National Electricity Policy gazetted on 5 March 2026, and directs the state-owned power companies. In September 2026 it directed EDL to accept new rooftop solar only under Net Plus. |
| Regulator | Public Utilities Commission of Sri Lanka (PUCSL) | Economic, technical and safety regulator. Issues licences and exemptions, sets bulk and retail tariffs and feed-in tariffs, approves generation plans and publishes technical guidelines for rooftop solar and EV charging. |
| System operator | National System Operator (Pvt) Ltd (NSO) | State-owned successor company that dispatches all generation through the National System Control Centre and acts as the single buyer, purchasing power from EGL, IPPs and rooftop solar and selling it to EDL and LECO under the bulk supply tariff. It is to design the future National Electricity Market. |
| TSO | National Transmission Network Service Provider (Pvt) Ltd (NTNSP) | Owns and maintains the 220 kV and 132 kV transmission network and grid substations. Only state-owned companies may hold transmission and system operator licences. |
| DSO | Electricity Distribution Lanka (Pvt) Ltd (EDL) | Took over CEB’s distribution network, retail customers and billing on 9 March 2026. Serves about 7.2 million accounts through four distribution divisions, provincial units and 70 area offices. |
| DSO | Lanka Electricity Company (Pvt) Ltd (LECO) | Distribution licensee that buys power in bulk and serves about 638,000 accounts in towns along the western and southern coast between Negombo and Galle, excluding central Colombo. It has the largest smart-meter base in the country. |
| Supplier | EDL and LECO (distribution licensees) | There are no separate retail suppliers. Each distribution licensee bills and serves the customers in its own area at PUCSL tariffs, so households cannot choose their supplier. |
| Metering | EDL and LECO | Each distribution licensee owns, installs and reads the meters in its area, including the import/export meters for rooftop solar. |
Compared with the UK system.
| UK concept | Sri Lanka equivalent | How it works |
|---|---|---|
| DNO | Distribution licensee: EDL or LECO | Two licensees cover fixed areas. EDL serves most of the island; LECO serves coastal towns between Negombo and Galle. Unlike a UK DNO, each also sells electricity and bills customers. |
| National Grid/NESO | NTNSP (transmission) and NSO (system operator) | NTNSP owns the transmission network; the NSO runs the National System Control Centre and is also the single buyer of all bulk power, a role NESO does not have. |
| MPAN | Electricity account number | Each connection is identified by the distribution licensee’s account number (10 digits on the former CEB/EDL system), printed on the bill and used for payments, SMS bills and solar applications. It identifies the customer account at a premises rather than a nationally standardised supply point. |
| MPRN | No equivalent | There is no mains gas network for households; cooking gas is sold in LPG cylinders, so there is no gas meter point number. |
| Meter operator | EDL or LECO | Metering is not a separate competitive role; the distribution licensee owns and reads the meter. |
| Supplier | EDL or LECO | No retail competition. The licensee for the area is the only supplier, and PUCSL sets the tariff. |
| Smart-meter infrastructure | Utility-run AMI (LECO; EDL in preparation) | No national data communications company. Each licensee runs its own systems: LECO has more than 185,000 smart-meter customers, and EDL inherited CEB’s plan for an advanced metering head-end system using DLMS/COSEM standards. |
How a supply point is identified.
4512309876 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Electricity account number (Account No.) |
| Who issues it? | The distribution licensee for the area (EDL, formerly CEB, or LECO) when a new connection is approved |
| Format | Numeric account number assigned by the licensee’s billing system. On the former CEB system, now operated by EDL, it is a 10-digit number. LECO assigns its own account numbers. |
| Length | 10 digits (EDL/CEB); LECO format not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on every electricity bill, including the thermal-paper bill left by the meter reader, SMS bills and e-bills, and shown in the CEBCare (now EDL) and LECO online accounts. |
| Electronic access | EDL customers can register for SMS bills by texting "REG" and the 10-digit account number to 1987 and can view bills in the utility app; LECO customers can view detailed bills on the LECO website using their account number. LECO has moved to fully paperless billing. |
| Third-party access | There is no open data hub. Solar installers, banks and other third parties obtain the account number from the customer and submit it with applications (for example rooftop solar grid-connection applications) to the licensee. |
| Who keeps the register | Each distribution licensee keeps its own customer and billing register: EDL for the former CEB network and LECO for its franchise area. There is no national supply-point register. |
| Register scope | Per DSO |
What the account number identifies
Sri Lanka has no separate supply-point number like the UK MPAN. The connection is identified by the account number in the distribution licensee’s billing system, which ties together the premises, the meter, the tariff category (domestic, religious, general purpose and so on) and the customer who signed the supply agreement. The meter serial number is a separate reference. A rooftop solar installation is linked to the account; under Net Plus the export meter can carry its own account.
Who issues it
EDL inherited the CEB’s 7.2 million accounts and its billing systems in March 2026, so CEB-issued account numbers continue in use. LECO, which has always been a separate licensee, issues its own numbers for the coastal towns it serves. Because each area has only one licensee, a household never switches supplier and the account number does not need to be portable between companies.
Changes of occupant
The account is held under a supply agreement with a named customer and backed by a security deposit. When a property is sold or the occupant changes, the new owner or occupier applies to the licensee to change the name on the account (a change of tariff customer). Whether the original number is kept is a matter of licensee practice, and no national rule was identified.
Fictional example
A home in Kurunegala served by EDL might have account number 4512309876. The owner would quote this number when paying the bill, registering for SMS bills or applying through a registered solar service provider for a rooftop solar connection.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Net Plus: a PUCSL-set feed-in tariff for every kWh generated, separate from import billing. Legacy net metering and net accounting contracts continue until they expire. |
| Which schemes are open to new rooftop systems? | Only Net Plus. A Ministry of Energy directive dated 11 September 2026 told EDL to stop offering net metering and net accounting for new connections and extensions where grid clearance is granted after that date, in line with the National Electricity Policy. Agreements concluded before then are not reopened. Net Plus Plus, for systems larger than the building’s contract demand, is treated as a power plant. |
| What does Net Plus pay? | For agreements signed from 25 August 2026 to 24 February 2027: LKR 23.11/kWh for systems up to 10 kW, LKR 19.15 for 10–40 kW, LKR 17.11 for 40–250 kW and LKR 15.81 for 250–1,000 kW. New rooftop systems with battery storage receive LKR 45.53/kWh for energy supplied in priority periods for the first 15 years. |
| How did net metering and net accounting work? | Under net metering, exports offset imports and surplus credit could be banked for up to ten years, with no payment. Under net accounting the surplus was paid at a feed-in tariff. Under Net Plus all generation is metered separately and paid for, and all consumption is billed at normal tariffs. |
| Is there a size limit? | Under the PUCSL utility guideline the system capacity cannot exceed the customer’s contract demand. Feed-in tariff bands go up to 1 MW for rooftop prosumers. |
| Can the grid operator switch systems off? | Yes. The guideline allows utilities to limit or disconnect generation for network reasons. In 2026 the NSO repeatedly asked owners to switch off on low-demand holidays, disconnected around 120 33 kV feeders in May, and is fitting about 2,200 rooftop systems above 100 kW with modems for remote control by the end of 2026. |
| Do I need a generation licence? | No. PUCSL has issued a gazetted certificate of exemption for rooftop solar PV prosumers connected in the standard metering configurations. |
Connecting a home system.
- Choose a solar service provider registered with the Sri Lanka Sustainable Energy Authority (SLSEA).
- The provider submits the rooftop solar application, with the electricity account number and system details, to the EDL or LECO area office for an initial clearance. The PUCSL guideline sets one week for this.
- The licensee carries out an initial technical review, including the capacity available on the local transformer and feeder, and issues the clearance and a meter estimate. System size cannot exceed the customer’s contract demand.
- The provider installs the system with inverters meeting IEC 61727, IEC 62116 and IEC 62109, plus the AC isolation and protection required by the guideline.
- The customer pays for the meter and signs the Net Plus agreement. Since 11 September 2026 new agreements are limited to a maximum of 12 years and require a smart meter with remote access.
- The licensee installs the export meter and connects the system; it then pays for all generation at the feed-in tariff in force when the agreement was signed.
Rooftop solar has grown very quickly in Sri Lanka. By the end of 2025 the CEB network alone had 108,979 rooftop solar accounts with 1,935 MW, exporting 1,674 GWh in the year (9.4% of national generation), and by March 2026 rooftop capacity on the EDL and LECO networks had reached 2,419 MW. Net accounting (72,088 accounts) and Net Plus Plus (18,849) were the most popular schemes on the CEB network in 2025.
Feed-in tariffs have been cut repeatedly. Rooftop systems up to 500 kW signed between October 2022 and June 2024 were paid LKR 37.00/kWh for 20 years, falling to LKR 27.06 from July 2024 and to tiered rates now starting at LKR 23.11. The 2026 policy shift to Net Plus only, a 12-year cap on agreements and mandatory smart meters with remote access reflects the cost of rooftop purchases to the single buyer (budgeted at LKR 28.70/kWh in 2026) and concerns about grid stability at midday. Business groups, including the National Chamber of Commerce, have asked the government to reconsider.
Battery storage is now favoured. PUCSL’s August 2026 tariffs pay much more for solar paired with storage that supplies power in priority periods, and the May 2026 tariff decision told the NSO to promote prosumer-level batteries.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Generation licence from PUCSL under the Sri Lanka Electricity Act No. 36 of 2024, unless covered by an exemption. Rooftop solar prosumers in standard metering configurations are exempt by gazetted certificate. | PUCSL | New utility-scale generation is procured by the NSO through competitive tenders under the Act; ground-mounted renewable plants also need SLSEA project approvals and environmental clearance. |
| Store electricity | No separate storage licence category identified. Grid-scale battery projects are procured by the NSO and paid under PUCSL-approved tariffs; home batteries behind a rooftop system need no licence. | PUCSL; NSO | PUCSL set BESS-linked feed-in tariffs from 25 August 2026 and capped the average monthly cost of the 160 MW of BESS already offered at LKR 20/kWh. |
| Export to the grid | No licence for rooftop prosumers. Requires grid clearance and a Net Plus agreement with EDL or LECO, installed by an SLSEA-registered solar service provider. | EDL or LECO; Ministry of Energy (scheme rules) | Larger exporters above contract demand use Net Plus Plus and are treated as power plants. |
| Distribute and supply to consumers | Distribution licence from PUCSL. Only EDL and LECO hold one; there is no separate retail supply market. | PUCSL | Retail competition is foreseen only as a later element of the National Electricity Market. |
| Sell electricity for EV charging | Charge point operators selling electricity to vehicles need a supply exemption certificate (or no-objection letter) from PUCSL and must follow its EV charging codes. | PUCSL | The dedicated EVC-1 and EVC-2 tariff categories require an exemption certificate where electricity is resold. |
| Transmission and system operation | Licences restricted to state-owned companies under the 2025 amendment: NTNSP (transmission) and the NSO (system operation and bulk purchase). | PUCSL | Private parties cannot hold these licences. |
| Trade wholesale electricity | No wholesale market yet; all bulk power is bought by the NSO under power purchase agreements. | NSO; PUCSL | The Minister may direct the NSO to design National Electricity Market models (day-ahead, intraday, long-term contracts, ancillary services) within three years of the 2025 amendment. |
| Aggregate | No aggregator licence. Aggregated rooftop systems and roof-rental models can connect under Net Plus Plus as power plants; a utility-led virtual net metering model is being developed. | PUCSL; EDL; LECO | The ADB-backed Rooftop Solar Aggregation and Virtual Net Metering Project (approved June 2026) will pool about 25 MWp of large rooftop solar and share credits with eligible consumers. |
| Balancing and grid services | Not open to third parties. The NSO dispatches reserves from EGL and contracted plants; no ancillary services market exists. | NSO | Ancillary services (frequency control, reactive power, black start) are part of the future National Electricity Market design. |
| Virtual power plants and remote control of assets | No licence framework. Remote control is exercised by the utilities: new Net Plus agreements need smart meters with remote access, and large rooftop systems are being fitted with modems so the NSO can switch them off. | Ministry of Energy; NSO; EDL; LECO | Around 2,200 rooftop installations above 100 kW are to be remotely controllable by the end of 2026. |
The Sri Lanka Electricity Act No. 36 of 2024, as amended in 2025, makes PUCSL the licensing authority for generation, transmission, system operation and distribution. In practice the sector is almost entirely state-owned: the CEB’s successor companies hold the generation (EGL), transmission (NTNSP), system operator (NSO) and main distribution (EDL) licences, and LECO holds the other distribution licence. Private investors take part as independent power producers selling to the NSO under long-term contracts.
For households and small businesses the key permission is not a licence but a grid connection agreement with EDL or LECO, installed by an SLSEA-registered solar service provider. Rooftop prosumers are exempt from a generation licence, and EV charging operators need a PUCSL supply exemption. There is no framework yet for independent aggregators, demand response providers or virtual power plants to sell services, because there is no market to sell into.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale (National Electricity Market) | Developing | — | No | NSO. Not yet in operation. The 2025 amendment provides for day-ahead and intraday spot markets, long-term contracts, ancillary services and a retail segment, designed by the NSO. |
| Ancillary services (frequency control, reserve, black start) | No | — | No | NSO. Provided by EGL’s hydro and thermal plants and contracted IPPs under central dispatch; no procurement market exists. |
| Grid-scale battery storage tenders | Restricted | Project-scale tenders | No | NSO. A 160 MW BESS tender has been awarded and a further 250 MW tender was planned in 2026, aimed at ending curtailment of renewables in 2027. |
| Rooftop solar with storage (Net Plus BESS tariff) | Yes | — | Limited | PUCSL; EDL; LECO. Rooftop systems with batteries are paid LKR 45.53/kWh for energy supplied in priority periods for 15 years (agreements from 25 August 2026). This is a fixed tariff, not a market. |
| Demand response | No | — | No | No demand response programme for households. The only price signal is the optional time-of-use tariff with an evening peak rate. |
Sri Lanka has no flexibility or ancillary services markets. The NSO dispatches all large generation centrally, and distributed assets connect only under fixed tariffs. Instead of paying for flexibility from small assets, the system currently manages surplus solar by asking rooftop owners to switch off, disconnecting high-solar 33 kV feeders and curtailing renewable IPPs on weekends and holidays.
The direction of policy is towards utility-controlled flexibility: grid-scale batteries procured by the NSO, a higher feed-in tariff for prosumer batteries that supply power in priority periods, and remote control of large rooftop systems. A competitive National Electricity Market, including ancillary services, is provided for in law but still has to be designed.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Rooftop Solar Aggregation and Virtual Net Metering Project | ADB, EU and Japan-funded project (USD 80.5 million total) implemented by EDL and LECO to aggregate large rooftop solar and share credits through virtual net metering. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Utility-led; LECO has more than 185,000 smart-meter customers, EDL is preparing a head-end system; smart meters mandatory for new Net Plus agreements from September 2026 |
| Reading interval | Not published |
| LECO smart-meter customers | More than 185,000 (2026) |
| LECO billing | 100% paperless, using smart-meter data |
| EDL (former CEB) programme | Advanced metering infrastructure with head-end systems at distribution control centres; market sounding in June 2025 |
| Standards | DLMS/COSEM and other open standards specified by CEB |
| Rooftop solar | New Net Plus agreements after 11 September 2026 need a smart meter with remote access |
| Data access for third parties | No national framework |
Who does what
Each distribution licensee owns and runs its own meters; there is no national smart-meter programme or communications company. Most homes still have conventional meters read monthly by a meter reader, who issues a bill on the spot.
LECO
LECO has built the country’s largest smart-meter base, with more than 185,000 customers billed automatically and fully paperless billing. Its system was recognised at the SLASSCOM National Ingenuity Awards in July 2026.
EDL
In June 2025 the CEB invited vendors to a market sounding for advanced metering infrastructure: head-end systems at its distribution control centres, remote reading of rooftop solar and other renewable meters, bulk supply points and substations, interoperability across meter brands using DLMS/COSEM, and integration with meter data management and billing systems. EDL has inherited this programme. The September 2026 Net Plus directive makes remotely accessible smart meters a condition for new rooftop solar connections.
Renewable electricity.
Electricity generation mix (2025).
- Large hydro: 35.4%
- Coal: 27.3%
- Oil: 12.4%
- Solar (rooftop and ground-mounted): 11.3%
- Mini hydro: 8%
- Wind: 4.4%
- Biomass and waste: 1.1%
- Renewable electricity share
- 60.2% (2025)Source 7Share of net generation including IPPs and rooftop solar exported to the CEB network (10,726 GWh of 17,812 GWh). The figure was 53.5% in 2024 and 50.0% in 2023.
- Home solar
- 108,979 rooftop solar accounts on the CEB network (all consumer types) (end 2025)Source 7Up 49% from 73,050 in 2024; provisional. Includes non-domestic rooftops; a domestic-only count was not identified. LECO accounts are additional.
- Solar added each year
- 0.93 GW (2025)Source 7Derived: rooftop solar on the CEB network rose from 1,141 MW to 1,935 MW and IPP ground-mounted solar from 173 MW to 307 MW. Excludes LECO rooftop additions.
- Large hydro
- 1.53 GW (31 March 2026)Source 9
- Rooftop solar (EDL and LECO networks)
- 2.419 GW (31 March 2026)Source 92,052 MW on the former CEB network and 367 MW on LECO’s.
- Ground-mounted solar (IPP)
- 0.307 GW (31 March 2026)Source 9
- Wind
- 0.267 GW (31 March 2026)Source 9
- Mini hydro
- 0.437 GW (31 March 2026)Source 9
- Biomass and municipal solid waste
- 0.064 GW (31 March 2026)Source 9
Targets.
- Increase the renewable share of electricity from 50% to 70% by 2030.
- Carbon neutrality by 2050.
- NSO to revise its generation plan by the end of 2026 to eliminate oil dependency by 2030 (PUCSL tariff condition, May 2026).
- Add at least 450 MW of solar PV and battery storage capacity by the first quarter of 2027 (PUCSL, August 2026).
Hydro has been the backbone of Sri Lanka’s system for decades: large reservoir stations on the Mahaweli, Laxapana and Samanala complexes provided 35.4% of generation in 2025, a wet year, and output swings sharply with the monsoons. In the first quarter of 2026 hydro output was lower and coal (30%) was the largest source. The 900 MW Lakvijaya coal plant supplies about a quarter to a third of electricity, and oil-fired plants fill the gaps, which is why tariffs are so sensitive to rainfall and fuel prices.
Non-conventional renewables (mini hydro, wind, solar, biomass and waste) reached 3,494 MW of capacity by March 2026, half of all installed capacity, with rooftop solar making up most of it. The largest single wind farm is the state-owned 104 MW Thambapavani plant in Mannar. The renewable share of generation rose from 50.0% in 2023 to 53.5% in 2024 and 60.2% in 2025.
Rapid solar growth is causing curtailment. Developers say repeated weekend and holiday shutdowns cost the sector about LKR 2 billion in early 2026, and the NSO expects batteries to end this in 2027.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Sri Lanka has no pumped storage in operation and, as of mid-2026, no confirmed grid-scale battery fleet in commercial service. The case for storage is now urgent: midday solar output exceeds demand on holidays, while the evening peak is met by expensive oil plant. Stakeholders at PUCSL’s May 2026 consultation called for faster battery deployment, and PUCSL’s tariff conditions told the NSO to promote prosumer-level storage.
PUCSL’s 2022 guideline for utilities covers grid-tied hybrid inverters with storage, and the 2026 storage-linked feed-in tariff gives batteries a direct export value for the first time.
Storage projects.
- NSO 160 MW battery storage: Awarded tender with equipment delivered by mid-2026. PUCSL has capped its average monthly cost at LKR 20/kWh for recovery through tariffs.
- Further 250 MW BESS tender: Planned by the NSO to take combined storage above 400 MW and end forced renewable shutdowns.
- Solar-plus-storage feed-in tariffs: From 25 August 2026: LKR 47.08/kWh in priority periods for ground-mounted solar with storage, LKR 53.28 for floating solar with storage and LKR 45.53 for new rooftop solar with storage.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electricity Distribution Lanka (EDL) | ~92% of accounts (7.18 million of 7.82 million, CEB network 2025) | No | Yes | No | Yes |
| Lanka Electricity Company (LECO) | ~8% of accounts (638,201 in 2025) | No | Yes | No | Yes |
There is no retail choice. EDL, which took over the CEB’s customers on 9 March 2026, serves most of the island, and LECO serves its coastal franchise between Negombo and Galle. Both charge the same PUCSL tariffs and offer rooftop solar agreements on the same terms. No green tariffs are offered; the renewable share is the same for every customer.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy | Government | Energy policy and oversight of state power companies | Publishes the National Electricity Policy and issues directives such as the September 2026 Net Plus rule for rooftop solar. |
| Public Utilities Commission of Sri Lanka (PUCSL) | Regulator | Electricity regulator | Sets retail and feed-in tariffs, licenses the sector, publishes quarterly renewable generation reports and rooftop solar guidelines. |
| National System Operator (NSO) | Transmission | System operator and single buyer | Dispatches the grid, buys all bulk power, files the bulk supply tariff and issues curtailment requests. |
| Electricity Distribution Lanka (EDL) | Distribution | Main distribution licensee | Handles connections, billing and rooftop solar agreements for most of the country. |
| Lanka Electricity Company (LECO) | Distribution | Distribution licensee for coastal towns | Serves the Negombo–Galle coastal belt and runs the largest smart-meter system. |
| Sri Lanka Sustainable Energy Authority (SLSEA) | Renewable Energy | Renewable energy and energy efficiency agency | Registers solar PV service providers, approves renewable projects and publishes supporting standards for solar systems. |
| Solar Industries Association of Sri Lanka | Solar | Solar industry association | Represents installers (EPCs), developers and investors in rooftop and ground-mounted solar. |
| PUCSL consumer affairs | Consumer | Complaints and dispute resolution | Consumers can escalate unresolved complaints about EDL or LECO to the regulator. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (rooftop solar) | PUCSL Guidelines on Rooftop Solar PV Installation for Utility Providers (May 2022) | PUCSL | Sets the connection procedure and timescales, protection settings (over-voltage 230 V +10% in 0.2 s and +6% in 1.5 s, under-voltage −6% in 1.5 s, reconnection after 3 minutes) and harmonic limits, and covers hybrid inverters with storage. |
| Installation practice | PUCSL Guideline for Solar PV System Installation for Solar Providers (May 2022) | PUCSL | Design and installation rules for solar service providers. |
| Inverters | IEC 62109-1/-2, IEC 61727, IEC 62116 (SLS 1543, SLS 1547) | IEC; Sri Lanka Standards Institution | Inverter safety, utility interface and anti-islanding test standards required for grid-tied inverters; SLS 1547:2016 adopts IEC 61727. |
| Interconnection | IEEE 1547-2018 | IEEE | Referenced in the PUCSL utility guideline. |
| Wiring | IET Wiring Regulations (BS 7671, 18th edition) | IET | Referenced in the PUCSL guideline for consumer-side installation work. |
| Installer registration | SLSEA-registered solar service provider | Sri Lanka Sustainable Energy Authority | Rooftop solar applications to EDL or LECO are made through a registered provider. |
| EV charging | Guidelines for the Interconnection and Operation of EV Charging Stations; Code of Practice for Charge Point Operators | PUCSL | Charge point operators need a PUCSL supply exemption and must follow the installation and operation codes. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Grid clearance from the distribution licensee | Yes | National | EDL or LECO must issue an initial clearance before a rooftop system is installed, after checking transformer and feeder capacity. |
| Net Plus agreement | Yes | National | Needed to connect and be paid. Maximum 12 years for agreements after 11 September 2026; smart meter with remote access required. |
| Generation licence | No | National | Rooftop prosumers are exempt under a PUCSL certificate of exemption. |
| Registered installer | Yes | National | Applications are submitted through an SLSEA-registered solar service provider. |
| Planning or building approval | Unknown | Local | No national rule requiring planning permission for residential rooftop solar was identified; local authority rules may apply to larger structures. |
| Battery storage approval | Limited | National | Hybrid inverters with storage must meet the PUCSL guideline; the storage-linked feed-in tariff applies only to systems contracted on those terms. |
Permission for rooftop solar is handled almost entirely by the distribution licensee rather than local government. The applicant’s solar service provider applies for clearance, the licensee checks the local network, and the customer signs a Net Plus agreement and pays for metering. PUCSL’s guideline sets one week for the initial clearance and one week for installing the meter once paid.
The main constraint is network capacity. Licensees can refuse or limit connections on overloaded transformers, and in 2026 the system operator has been asking larger systems to switch off on low-demand days.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net Plus feed-in tariff (rooftop solar) | Active | Feed-in tariff | Payment for all generation at PUCSL rates fixed at signing: LKR 23.11/kWh up to 10 kW, falling to LKR 15.81 for 250–1,000 kW. The only scheme open to new rooftop systems since 11 September 2026. | Rates for agreements signed 25 Aug 2026 – 24 Feb 2027 |
| Rooftop solar with battery storage tariff | Active | Feed-in tariff | LKR 45.53/kWh for energy from new rooftop solar with storage supplied in priority periods for the first 15 years, then LKR 15.81. | 25 Aug 2026 – 24 Feb 2027 |
| Net metering and net accounting | Closed | Net metering | Closed to new connections and extensions granted grid clearance after 11 September 2026. Existing agreements continue on their original terms until they expire. | Until 11 Sep 2026 for new connections |
| Government tariff subsidy for low-use households | Active | Tariff subsidy | LKR 15 billion to keep tariffs unchanged in the May 2026 revision for households and religious premises using up to 180 kWh a month and for small businesses. | Approved to end of September 2026 |
| Rooftop Solar Aggregation and Virtual Net Metering Project | Scheduled | Shared solar (virtual net metering) | ADB loan with EU and Japanese grants to pool about 25 MWp of large rooftop solar and give credits to MSMEs and community organisations, implemented by EDL and LECO. | Approved 26 June 2026 |
Data and connectivity.
- Fixed broadband
- 59.7 % of population using the internet (October 2025)Source 34Internet users, not fixed broadband coverage. A reliable fixed broadband coverage figure was not identified.
- 4G coverage
- 91.3 % of mobile connections that are broadband (3G/4G/5G) (end 2025)Source 3430.3 million cellular connections, about 130% of the population. Population coverage by 4G was not identified from an official source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters in Sri Lanka communicate over utility-run systems, mainly cellular modems, rather than a national smart-meter network. The CEB’s 2025 AMI plan specified support for multiple meter brands and custom modems, using DLMS/COSEM. The NSO’s remote control of large rooftop solar uses communication modems fitted to each installation.
Mobile networks are the main route to the internet: three operators (Dialog, SLT-Mobitel and Hutch) serve 30.3 million connections, and 5G spectrum was auctioned in December 2025. Inverters and batteries typically report to manufacturers’ cloud platforms over Wi-Fi or mobile data.
Grid conditions.
- National peak demand
- 2.896 GW (2025)Source 7Night maximum demand recorded on 30 October 2025; day maximum was 2,826 MW.
- Annual electricity demand
- 17.8 TWh (2025)Source 7Net generation including IPPs and rooftop solar exported (17,812 GWh), up 6.0% on 2024. Energy sold was 16,069 GWh.
- Generation capacity
- 6.98 GW (31 March 2026)Source 9Derived sum: major hydro 1,530 MW, thermal oil 1,150 MW, coal 810 MW and non-conventional renewables (including rooftop solar) 3,494 MW.
- Interconnection
- 0 GW (2025)Source 33No interconnection exists. An April 2025 MoU with India covers a proposed HVDC link (Phase I 500 MW), with a horizon of around 2034.
- Curtailment
- Not identified from a reliable public source.
Demand and adequacy
Demand grew 6.0% in 2025 to 17.8 TWh, and PUCSL noted that early 2026 demand was running about 5% above forecasts. The peak is in the evening, after sunset, and was 2,896 MW in October 2025. Adequacy depends heavily on rainfall: in dry years more oil-fired generation is needed, raising costs and prompting extraordinary tariff reviews such as the one in May 2026. Business groups have cited forecasts of a supply shortfall in early 2027.
Midday surplus and curtailment
With about 2.4 GW of rooftop solar on a system whose peak is under 3 GW, midday net demand can fall very low on holidays. In April 2026 large rooftop owners were asked to disconnect for ten days, and on 30–31 May 2026 (Vesak) all owners were asked to switch off between 8:00 and 15:00 while high-solar feeders were disconnected; there were power interruptions caused by system imbalance. The NSO plans to end this with battery storage in 2027 and remote control of large rooftop systems by the end of 2026.
Isolated system
Because there is no interconnection, all reserve and frequency control must be provided domestically, largely by hydro. A 500–1,000 MW HVDC link with India has been studied since 2002; an MoU was signed in April 2025 but the technical design and financing were not finalised.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| CEB dissolved; successor companies take over | Current | 9 March 2026 | EGL, NTNSP, NSO and EDL (plus an employees’ fund company and Energy Ventures Lanka) took over the CEB’s functions under the Sri Lanka Electricity Act No. 36 of 2024, as amended by Act No. 14 of 2025. |
| National Electricity Policy gazetted | Current | 5 March 2026 | Cabinet-approved policy that, among other things, requires new on-grid rooftop solar agreements to use the Net Plus scheme. |
| Net metering and net accounting closed to new rooftop solar | Current | 11 September 2026 | Ministry of Energy directive to EDL: all new and extended rooftop agreements on Net Plus only, capped at 12 years, with smart meters with remote access. |
| Fourth-quarter 2026 tariff review | Upcoming | October 2026 (expected) | The NSO was due to file its Q4 bulk supply tariff on 4 September 2026 after fuel price rises and the end of the fuel subsidy; PUCSL’s decision was pending at the time of writing. |
| Remote control of large rooftop solar | Upcoming | End of 2026 | About 2,200 rooftop systems above 100 kW to be fitted with communication modems so the NSO can switch them off when needed. |
| Grid-scale battery storage and end of curtailment | Upcoming | 2027 | 160 MW of BESS awarded and a further 250 MW tender planned; PUCSL wants at least 450 MW of solar and storage added by the first quarter of 2027. |
| National Electricity Market design | Upcoming | By around August 2028 | The NSO may be directed to design a market with day-ahead and intraday trading, long-term contracts, ancillary services and a retail segment within three years of the 2025 amendment. |
| India–Sri Lanka HVDC interconnection | Upcoming | Around 2034 (Phase I) | MoU signed in April 2025 for a proposed 2 × 500 MW HVDC link; technical and financial studies continue. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | 108,979 rooftop solar accounts on the CEB network at end 2025 (all consumer types) against 6.1 million households; rooftop solar exported 9.4% of national generation, but new connections are now restricted to Net Plus with lower tariffs. |
| Distributed energy market | Medium | About 2.4 GW of rooftop solar by March 2026 and 35,268 EVs registered in 2025, but no published home battery numbers and no heat pump market. |
| Grid flexibility market | Low | No wholesale, ancillary services or demand response markets; aggregation limited to Net Plus Plus and a planned utility-led virtual net metering project. |
| Energy storage adoption | Low | No grid-scale battery confirmed in commercial operation by mid-2026; 160 MW awarded and a storage-linked feed-in tariff introduced in August 2026. |
| Renewable growth environment | High | Renewable share of generation rose from 50.0% (2023) to 53.5% (2024) and 60.2% (2025); about 0.93 GW of solar added on the CEB network in 2025; 70% target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 35 sources
- Decision on Electricity Tariffs, effective from May 11, 2026. Public Utilities Commission of Sri Lanka, 2026. accessed 1 October 2026.
- LECO tariff plan (effective from 11 May 2026). Lanka Electricity Company, 2026. accessed 1 October 2026.
- No electricity tariff changes in 3Q: PUCSL. Daily FT, 2026. accessed 1 October 2026.
- Electricity rate hike likely as CPC ends subsidy, raises fuel prices. Sunday Times (Sri Lanka), 2026. accessed 1 October 2026.
- Electricity tariffs to rise from April 1 with minimal impact on low-consumption households. Newsfirst, 2026. accessed 1 October 2026.
- PUCSL approves 18% electricity tariff hike from today. Daily FT, 2026. accessed 1 October 2026.
- Statistical Digest 2025. Ceylon Electricity Board, 2026. accessed 1 October 2026.
- Statistical Digest 2024. Ceylon Electricity Board, 2025. accessed 1 October 2026.
- Renewable Generation Report 2026, 1st Quarter. Public Utilities Commission of Sri Lanka, 2026. accessed 1 October 2026.
- Census of Population and Housing 2024: Basic Population and Housing Characteristics (press release). Department of Census and Statistics, 2025. accessed 1 October 2026.
- Sri Lanka 2024 census final report launched today. Newswire, 2026. accessed 1 October 2026.
- Urban population (% of total population) – Sri Lanka. World Bank, 2026. accessed 1 October 2026.
- Euro–Sri Lankan rupee history: 2026. Pound Sterling Live, 2026. accessed 1 October 2026.
- Social Security Levy to be added to all utility services. The Morning, 2022. accessed 1 October 2026.
- CEB dissolved; six new companies take over operations. Ada Derana, 2026. accessed 1 October 2026.
- Sri Lanka Electricity (Amendment) Act No. 14 of 2025. LankaLaw, 2025. accessed 1 October 2026.
- Rooftop Solar PV Connection Schemes. Public Utilities Commission of Sri Lanka. accessed 1 October 2026.
- PUCSL announces new renewable energy feed-in tariffs. Newswire, 2026. accessed 1 October 2026.
- PUCSL sets higher solar storage payments. Daily Mirror, 2026. accessed 1 October 2026.
- Solar power shake-up: net metering and net accounting scrapped for new connections. Newswire, 2026. accessed 1 October 2026.
- NCCSL appeals to President, warns Rs. 245 b solar savings at risk. Daily FT, 2026. accessed 1 October 2026.
- Gazette Extraordinary No. 2440/22: certificate of exemption for rooftop solar PV generation. Government of Sri Lanka (Department of Government Printing), 2025. accessed 1 October 2026.
- EV Charging Regulatory Framework. Public Utilities Commission of Sri Lanka. accessed 1 October 2026.
- Guidelines on Rooftop Solar PV Installation for Utility Providers (May 2022). Public Utilities Commission of Sri Lanka, 2022. accessed 1 October 2026.
- Sri Lanka supporting standards for solar systems. Sri Lanka Sustainable Energy Authority. accessed 1 October 2026.
- CEB billing methods: SMS registration with 10-digit account number. Ada Derana, 2022. accessed 1 October 2026.
- Lanka Electricity Company wins award for smart meter billing programme. IoT M2M Council, 2026. accessed 1 October 2026.
- Invitation to participate in market sounding for Advanced Metering Infrastructure (AMI) head-end systems. Ceylon Electricity Board, 2025. accessed 1 October 2026.
- Rooftop solar owners requested to temporarily switch off systems. Ada Derana, 2026. accessed 1 October 2026.
- NSO to remotely control rooftop solar systems via modems. Daily FT, 2026. accessed 1 October 2026.
- Forced renewable power shutdowns will end next year: NSO. Daily FT, 2026. accessed 1 October 2026.
- 223,000 motorcycles, 55,000 cars and 13,000 three-wheelers registered in 2025 – DMT. Ada Derana, 2025. accessed 1 October 2026.
- Indo-Lanka grid interconnection: detailed infrastructure requirements yet to be finalised. The Morning, 2025. accessed 1 October 2026.
- Digital 2026: Sri Lanka. DataReportal (Kepios), 2025. accessed 1 October 2026.
- ADB approves $57.4 million to expand rooftop solar and virtual net metering in Sri Lanka. SolarQuarter, 2026. accessed 1 October 2026.
Questions about energy in Sri Lanka.
Tariffs are set by PUCSL and use consumption blocks. From 11 May 2026 a household using up to 60 kWh a month pays LKR 5.00–9.00/kWh plus LKR 80–210 a month; one using 61–180 kWh pays LKR 14.00–44.00/kWh plus LKR 400–1,500; above 180 kWh the rate is LKR 32.50 for the first 180 kWh and LKR 100.00 above that, plus LKR 2,500. A household using an average 73 kWh a month pays about LKR 1,500, roughly LKR 20.55/kWh, before the 2.5% levy.
Since 9 March 2026 Electricity Distribution Lanka (EDL) has supplied the former CEB customers across most of the island, and LECO continues to supply coastal towns between Negombo and Galle. Both charge the same PUCSL tariffs. The National System Operator buys all bulk power and runs the grid.
There is no separate supply-point number. A connection is identified by the electricity account number issued by EDL (10 digits on the former CEB system) or LECO. It is printed on every bill and is used for payments, SMS bills and rooftop solar applications.
Yes, under the Net Plus scheme, which pays a fixed feed-in tariff for all electricity your system generates while you pay normal tariffs for what you use. For agreements signed between 25 August 2026 and 24 February 2027 the rate is LKR 23.11/kWh for systems up to 10 kW. Net metering and net accounting closed to new connections on 11 September 2026.
Use a solar service provider registered with the Sri Lanka Sustainable Energy Authority. They apply to your EDL or LECO area office for an initial clearance, the utility checks local network capacity, and once you sign a Net Plus agreement and pay for the meter the utility installs it and connects the system. New agreements run for up to 12 years and need a smart meter with remote access.
Sri Lanka’s grid is isolated and has little storage. On holidays and weekends, midday solar output can exceed demand, threatening grid stability, so the system operator has asked owners to switch off and has disconnected some high-solar feeders. Battery storage and remote control of large systems are intended to end this.
About 60% in 2025: large hydro 35.4%, solar 11.3%, mini hydro 8.0%, wind 4.4% and biomass 1.1%. Coal provided 27.3% and oil 12.4%. The target is 70% renewable electricity by 2030.