How electricity works in Mali.
Mali electricity market 2026: EDM-SA supply, CREE regulation, hydro from Manantali, rationing in 2024, prepaid ISAGO meters, licensing thresholds and grid projects.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in West African CFA franc (XOF) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Mali energy at a glance.
Key figures for households in Mali. Each one links to its source on the full overview below.
Electricity price.
101.8 XOF per kWh for households, including taxes. Figures for 2024.
Household use.
1,003 kWh a year for a typical household. Figures for 2024.
Renewable share.
57.1% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Mali.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Mali below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Mali requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Mali.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Mali, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Mali, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Mali.
The energy market in Mali, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Mali’s public electricity service is run by Énergie du Mali (EDM-SA), a company wholly owned by the State since 31 March 2018. EDM-SA holds the concession for the public electricity service signed on 21 November 2000 and, as the central buyer, generates, buys, imports, transmits, distributes and sells electricity. It serves Bamako and 32 operating centres through the interconnected grid (Réseau Interconnecté, RI) and a further 33 isolated centres with their own power plants and local networks. The sector is regulated by the Commission de Régulation de l’Électricité et de l’Eau (CREE), created by Ordinance 00-021/P-RM of 15 March 2000.
Hydropower is the backbone of supply. Most of it is bought from the Manantali, Félou and Gouina plants developed with neighbouring countries under the Senegal River Basin Development Organisation (OMVS); the rest comes from EDM-SA’s own Sélingué and Sotuba plants. Thermal plants (EDM-SA’s own, rented units and independent producers), imports from Côte d’Ivoire and the 50 MWp Akuo solar plant at Kita make up the balance.
2024 was marked by a severe supply crisis. Lacking the money to buy fuel for its thermal plants, EDM-SA produced and bought 1,842.72 GWh, 35% less than in 2023, and rationed electricity: according to the company, customers received less than six hours of power a day. Household tariffs have barely changed in more than 20 years, and in January 2026 the government extended EDM-SA’s concession by three years while it works to close the gap between costs and revenues.
Energy snapshot.
Headline figures for electricity in Mali. Each shows its data year and links to its source.
- Population25,198,821 peopleSource 132025
- Households2,295,655 householdsSource 102022
- Average household size9.3 people/householdSource 102022
- Electricity use per household1,003 kWh/yrSource 12024
- Household price (XOF)101.8 XOF/kWhSource 12024
- Household price (EUR)0.155 EUR/kWhSource 142024
- Renewable electricity share57.1%Source 12024
- Solar capacity0.053 GWSource 12024
- Wind capacity0 GWSource 112024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Commission de Régulation de l’Électricité et de l’Eau (CREE)
- System operator
- EDM-SA (interconnected grid, RI)
- Distribution networks
- EDM-SA in its concession area (interconnected grid and 33 isolated centres); rural electrification outside it supported by AMADER
- Currency
- West African CFA franc (XOF)
- Voltage and frequency
- 50 Hz (nominal low-voltage level not confirmed from an official source)
Electricity prices in Mali.
- Household price (XOF)
- 101.8 XOF/kWh (2024)Source 1Average revenue per kWh sold at low voltage, excluding tax (prix moyen BT HT), from EDM-SA’s 2024 annual report. This is an average across all low-voltage customers, not a tariff, and excludes VAT and other charges. The current official tariff grid could not be located online; EDM-SA states that the tariff system has barely changed in more than 20 years.
- Household price (EUR)
- 0.155 EUR/kWh (2024)Source 14Converted from 101.80 FCFA/kWh at the fixed parity of 655.957 FCFA per euro, as shown by the BCEAO on 9 October 2026 (accessed 10 October 2026).
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (XOF per kWh).Source 1
| 2020 | 103.78 XOF/kWh |
|---|---|
| 2021 | 105.17 XOF/kWh |
| 2022 | 112 XOF/kWh |
| 2023 | 113.82 XOF/kWh |
| 2024 | 101.8 XOF/kWh |
Electricity tariffs are uniform across EDM-SA’s concession. Under Ordinance 00-021, the CREE approves the tariff grids presented by operators before they are applied, and tariffs are formalised by interministerial order. The current low-voltage grid was not found in a published official source. The last tariff order located for this profile, from 2001, set a social tariff with four rising blocks for 5 A meters and a two-block normal tariff for larger connections, plus a CREE levy per kWh, monthly meter rental and maintenance charges, and a public lighting charge set by each municipality.
Prices below cost
EDM-SA’s average revenue per kWh sold at low voltage was 101.80 FCFA (excluding tax) in 2024, against an average cost of supply of 198.00 FCFA/kWh and an average production cost of 155.00 FCFA/kWh. The company posted a net loss of 62.2 billion FCFA on electricity in 2024 after 180.1 billion FCFA in 2023, and the State paid an operating subsidy of 30 billion FCFA plus 5 billion FCFA in additional support.
Other charges on the bill
Bills can include a meter rental and maintenance charge, a public lighting charge introduced by local authorities, and stamp duty. Customers without a reading history may be billed a flat rate based on the average of the previous 12 months or on the meter setting.
Reform
In its 2024 annual report EDM-SA calls for a revision of the tariff system, which it says has barely changed in more than 20 years, so that the tariff burden better reflects each customer group’s ability to pay. No new tariff grid had been published by October 2026.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Uniform national low-voltage tariffs approved by the CREE and fixed by interministerial order, applied by EDM-SA across its concession. Domestic customers are on single-phase (2-wire) meters from 5 to 30 A or three-phase (4-wire) meters. The detailed grid currently in force was not found published online. |
| Other | Yes | A social tariff exists for the smallest single-phase (5 A) connections. Under the 2001 interministerial order, the first 100 kWh a month on these meters were exempt from VAT; whether later orders changed this was not verified. |
| Prepayment | Yes | Prepaid ISAGO meters are recharged by buying credit, including online with the meter number (minimum 500 FCFA). EDM-SA reports that almost all new connections in 2024 were made with prepaid meters. |
| Time-of-use | Limited | Time-of-day (binôme horaire) tariffs with peak, standard and off-peak periods have existed for medium-voltage customers since at least 2001. No time-of-use offer for households was identified. |
Household prices compared with neighbouring countries (EUR per kWh).
- Burkina Faso€0.156
- Mali€0.155
- Senegal€0.128
- Algeria€0.031
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,003 kWh/yr (2024)Source 1Average annual consumption per low-voltage (BT) customer, as reported by EDM-SA (1,003.32 kWh). Low-voltage customers include small businesses as well as households. 2024 was depressed by rationing; the figure was 1,653.08 kWh in 2023 and 1,905.49 kWh in 2020.
- Average daily use per household
- 2.75 kWh/day (2024)Source 1Derived: 1,003.32 kWh per low-voltage customer in 2024 divided by 365. Includes small businesses and reflects rationing.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Half of the population has access to electricity. The World Bank puts access at 49.5% in 2024: 88.6% in urban areas and 31.4% in rural areas.
EDM-SA had 915,282 customers at the end of 2024, of which 912,015 were connected at low voltage. Bamako and its surroundings accounted for 633,856 customers. Sales to low-voltage customers fell from 1,493.77 GWh in 2023 to 915.04 GWh in 2024 because of production shortfalls, and only 14,414 new connections were made in 2024, against 76,869 the year before.
According to EDM-SA, rationing in 2024 pushed businesses, public services and better-off households to install their own generators, solar panels and batteries, at a cost it estimates at four to five times the EDM-SA tariff, while others went without electricity for more than eighteen hours a day.
No reliable national figures were identified for air-conditioner ownership, electric cooking or electric vehicles.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 32.2 % of population (2025)Source 13World Bank estimate.
The 2022 census counted 2,295,655 ordinary households with an average of 9.3 people, among the largest in the world. Households are smaller in towns (7.8) than in rural areas (10.2). Bamako alone has 537,932 households, 23.4% of the national total.
INSTAT has published a separate census report on dwelling characteristics, but its housing tenure and dwelling-type figures could not be checked for this profile, so they are left blank.
How the grid works in Mali.
- TransmissionÉnergie du Mali (EDM-SA), SOGEM (OMVS)
- DistributionEDM-SA in its concession area (interconnected grid and 33 isolated centres); rural electrification outside it supported by AMADER
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Physical flow
At the end of 2024 EDM-SA’s system had 896.26 MW of hydro and thermal capacity plus 53.11 MWp of solar. The interconnected grid had 739.82 MW: EDM-SA’s own plants (232.52 MW thermal and 52.70 MW hydro), 178.60 MW from the OMVS plants at Manantali, Félou and Gouina, 174 MW of rented thermal units, the 92 MW Albatros independent thermal plant and a 10 MW import capacity from Côte d’Ivoire, plus the 50 MWp Akuo solar plant at Kita. The isolated centres had 136.44 MW of diesel and 3.11 MWp of solar.
The interconnected grid reached its 2024 peak of 385.67 MW on 3 February, down from 474.91 MW in 2023 because of rationing. Its 225 kV backbone includes the 2012 interconnection with Côte d’Ivoire via Sikasso, Koutiala and Ségou, and the Sikasso–Bougouni–Sanankoroba–Bamako line, whose Sikasso–Bougouni section entered service in 2023.
Commercial flow
EDM-SA is the central buyer: it purchases OMVS hydro (800.88 GWh in 2024), output from independent producers and rented plants, solar power from Akuo (82.49 GWh) and imports from the Ivorian utility CIE (111.38 GWh), and resells it with its own generation at regulated tariffs. In 2024, 64% of the electricity supplied came from partners and 36% from EDM-SA’s own plants.
Isolated centres
Of the 33 isolated centres, 23 run entirely on diesel generators, eight have diesel–solar hybrid plants and two (Kadiolo and Zégoua) are supplied across the border from the Ivorian 30 kV network. Isolated centres produced 139.59 GWh in 2024, 93% of it thermal.
Reliability
Rationing caused energy not supplied on the interconnected grid to reach 1,699 GWh in 2024, more than the energy sold, against a contractual limit of 1.5%. EDM-SA billed 80% of the energy it produced and bought in 2024.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministère de l’Énergie et de l’Eau | Defines electricity policy, acts as the contracting authority (maître d’ouvrage) for the public electricity service, grants concessions and authorisations, and authorises imports and exports of electricity. |
| Regulator | Commission de Régulation de l’Électricité et de l’Eau (CREE) | Created by Ordinance 00-021/P-RM. Regulates the electricity concessionaire and its dealings with permit holders and self-producers, approves tariff grids before they are applied, defends users’ interests and gives a binding opinion on concessions. |
| TSO | Énergie du Mali (EDM-SA) | Owns and operates the 63, 150 and 225 kV lines of the interconnected grid (2,040 km of transmission lines in 2024) and dispatches its own plants, independent producers, OMVS hydro and imports from Côte d’Ivoire. |
| TSO | SOGEM (OMVS) | The OMVS energy management company operates the 225 kV Manantali–Bamako line and the regional 225 kV network linking the Manantali, Félou and Gouina plants with Senegal and Mauritania. |
| DSO | Énergie du Mali (EDM-SA) | Operates 27,721 km of 33, 30 and 15 kV and low-voltage distribution lines (2024) across the interconnected grid and 33 isolated centres. |
| Supplier | Énergie du Mali (EDM-SA) | Sole supplier to households in its concession, at regulated tariffs, with postpaid and prepaid (ISAGO) meters. |
Compared with the UK system.
| UK concept | Mali equivalent | How it works |
|---|---|---|
| DNO | EDM-SA | There are no regional network companies. EDM-SA owns and runs the distribution networks of the interconnected grid and of the isolated centres in its concession. Rural localities outside it can be electrified by private or local operators under ministerial authorisations, with AMADER support. |
| National Grid/NESO | EDM-SA (and SOGEM for OMVS lines) | EDM-SA operates the national transmission network and dispatches the interconnected grid. The regional 225 kV lines serving the OMVS hydro plants are operated by SOGEM. There is no independent system operator. |
| MPAN | Référence client / numéro du compteur | A postpaid customer is identified by a 16-character customer reference (référence client) used to pay bills; a prepaid customer is identified by the meter number used to buy credit. Both are issued by EDM-SA. There is no national meter-point register. |
| MPRN | No equivalent | Mali has no piped natural gas network for households. |
| Meter operator | EDM-SA | EDM-SA supplies, installs and maintains meters; customers pay a monthly meter rental and maintenance charge. The customer’s internal installation starts immediately after the meter or circuit breaker. |
| Supplier | EDM-SA | There is no retail competition. Households buy from EDM-SA at tariffs approved by the CREE. |
| Smart-meter infrastructure | Prepaid ISAGO meters (STS) | Prepaid meters run on a token-based vending system. In 2024 EDM-SA deployed new prepaid management software as part of migrating to the STS2 international standard (the TID rollover project). No smart-meter programme with remote reading was identified. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Référence client (postpaid) / numéro du compteur (prepaid) |
| Who issues it? | Énergie du Mali (EDM-SA) when the supply contract is signed |
| Format | Postpaid: customer reference of 16 characters without spaces, as required by EDM-SA’s online bill payment. Prepaid: the meter number of the ISAGO meter; its format is not published. |
| Length | 16 characters (customer reference); meter number not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | The customer reference appears on EDM-SA bills and is entered to pay a bill online; the meter number is used to buy prepaid credit. |
| Electronic access | Customers can pay bills, buy prepaid credit and view account and prepaid credit history through EDM-SA’s online agency and mobile applications. |
| Third-party access | No framework for third-party access to metering or customer data was identified. Third parties can pay a bill or buy credit if they know the reference or meter number. |
| Who keeps the register | EDM-SA customer management systems |
| Register scope | National |
In Mali a household connection is identified by references issued by EDM-SA, the only supplier in its concession. For postpaid supply, the customer reference (référence client) is a 16-character code with no spaces that customers enter to pay a bill online. For prepaid supply, the ISAGO meter number is the key identifier: credit is bought against it, with a minimum of 500 FCFA.
When a new occupant moves into a house that already has a connection, EDM-SA asks them to go to their agency with, preferably, the references of the customer who held the previous subscription; the change is handled as a transfer (mutation). Terminating a contract requires a written request on an agency form and a final meter reading. This suggests the connection and meter remain with the property while the subscription changes hands, but EDM-SA does not state whether the customer reference itself is reissued.
There is no national data hub or meter-point register of the European type. Records are held in EDM-SA’s customer and prepaid vending systems; in 2024 it was also modelling its distribution network and meters in a geographic information system.
No example is given because the character set of the customer reference and the format of the meter number are not documented in the official sources consulted.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | No |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | No scheme identified. EDM-SA is studying how to integrate self-producers’ surplus into its distribution network. |
| Can households sell surplus solar power to EDM-SA? | No published scheme was identified. EDM-SA’s 2024 annual report lists ongoing work to implement the recommendations of studies on integrating self-producers’ surplus into its distribution network. |
| How is solar treated legally? | Under Ordinance 00-019, any production from a source other than hydro, including solar and wind, is treated as thermal production for licensing purposes. |
| Who buys power from independent producers? | The transmission or distribution concessionaire acts as central buyer on its network and must send its supply and connection agreements with producers to the CREE. |
Connecting a home system.
- Self-production installations require either a declaration or an authorisation for self-production, depending on installed capacity, under Ordinance 00-019/P-RM.
- Producers selling power to the public need an authorisation (thermal, including solar, above 50 kW and up to 250 kW) or a concession (above 250 kW, and all hydro), and sell to EDM-SA as central buyer.
- No standard procedure or contract for households to inject surplus into the low-voltage grid was identified.
Mali has no net-metering or feed-in arrangement for small self-producers. Ordinance 00-019 of 2000 recognises self-production (autoproduction) as private activity outside the public service, subject to a declaration or an authorisation according to installed capacity, but does not set terms for injecting surplus.
Large solar plants sell their entire output to EDM-SA under contract: the 50 MWp Akuo plant at Kita supplied 82.49 GWh in 2024. EDM-SA reports that it is following up studies on integrating self-producers’ surplus into its distribution network, and that it began installing solar arrays at 12 of its own agencies in 2024.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (for the public) | Authorisation for thermal plants (including solar and wind) above 50 kW and up to 250 kW; concession above 250 kW and for all hydro plants | Minister of Energy (authorisations by ministerial decision); concessions after a tender, with CREE binding opinion, approved by decree | Ordinance 00-019/P-RM of 15 March 2000. Plants under 50 kW are not covered by the authorisation regime set out in the ordinance. |
| Self-produce electricity | Declaration or authorisation for self-production, depending on installed capacity | Ministry of Energy | Capacity thresholds are set by implementing texts that were not verified for this profile. |
| Export surplus to the grid | No framework identified | EDM-SA; CREE | Studies on integrating self-producers’ surplus were under way in 2024. |
| Store electricity | No specific storage licensing regime identified | — | Not addressed in the ordinance. |
| Transmit electricity | Concession | Minister of Energy, with CREE binding opinion | Each transmission network is managed by a single concessionaire. |
| Distribute electricity | Authorisation for low-voltage distribution from MV/LV transformer points; concession once medium-voltage installations are needed | Minister of Energy | In rural areas the State may grant authorisations to communities or private operators. |
| Sell / supply electricity to end users | Public service under a concession or authorisation; EDM-SA is the sole supplier in its concession | Minister of Energy; tariffs approved by the CREE | Direct supply contracts between producers and eligible customers were allowed in principle after a 10-year moratorium, subject to a specific decree; none was identified. |
| Import or export electricity | Prior authorisation | Minister of Energy | May be refused if contrary to sector policy. |
| Aggregate, trade, balancing, grid services, VPP, remote control of assets | No regime identified | — | There is no organised wholesale or flexibility market in which these activities exist. |
The legal framework remains Ordinance 00-019/P-RM of 15 March 2000 on the organisation of the electricity sector and its implementing Decree 00-184/P-RM, together with Ordinance 00-021/P-RM creating the CREE. In principle the ordinance opens production, transmission, distribution, import, export and sale to any person, but public-service activities require a concession or authorisation.
EDM-SA’s public service concession was signed on 21 November 2000 for 20 years. In January 2026 the Council of Ministers approved an amendment extending it by three years from 21 November 2025 and withdrawing from the concessionaire the role of project owner for construction works.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Energy, balancing and ancillary services | No | — | No | EDM-SA. EDM-SA balances the interconnected grid with its own plants, OMVS hydro, independent producers and imports. No market for distributed resources, demand response or aggregation was identified. |
Mali has no wholesale electricity market or flexibility market open to distributed resources. In 2024 the main demand-side tool was load rationing imposed by EDM-SA because of the fuel shortage.
Mali’s grid is connected to the OMVS regional network and to Côte d’Ivoire, and is part of the West African Power Pool (WAPP) projects, including planned interconnections with Guinea and Mauritania.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme identified; prepaid ISAGO meters dominate new connections |
| Reading interval | Not published |
| Meter ownership | EDM-SA (rental charge paid by customer) |
| Payment modes | Prepaid (ISAGO) and postpaid |
| Prepaid standard | Migration to STS2 under way (2024) |
| Smart-meter share | Not published |
EDM-SA offers prepaid ISAGO meters and reports that almost all of the 14,414 new connections made in 2024 used prepaid meters. Customers can buy credit online with their meter number.
In 2024 EDM-SA acquired new prepaid management software for the migration to the STS2 international standard (the TID rollover project), as well as a new vending portal. No information was identified on communicating meters with remote reading or their reading intervals.
Renewable electricity.
Electricity generation mix (2024 (EDM-SA production and purchases)).
- Hydro: 52.6%
- Thermal: 36.9%
- Imports (Côte d’Ivoire): 6%
- Solar: 4.5%
- Renewable electricity share
- 57.1% (2024)Source 1Derived: hydro (969.72 GWh, including 800.88 GWh bought from OMVS plants) plus solar (82.53 GWh) as a share of the 1,842.72 GWh produced and bought by EDM-SA in 2024, including 111.38 GWh imported from Côte d’Ivoire. Excluding imports, renewables were about 60.8% of generation. The share was unusually high in 2024 because fuel shortages cut thermal output by 56%; IRENA puts renewables at 38% of national generation in 2023.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 40 MW (2024)Source 11IRENA’s estimate of net solar capacity added nationally in 2024; no solar was added to EDM-SA’s system that year.
- Hydro (EDM-SA own)
- 52.7 MW (2024)Source 1
- Hydro (OMVS: Manantali, Félou, Gouina — Mali’s share)
- 178.6 MW (2024)Source 1
- Solar PV (grid and isolated centres)
- 53.1 MWp (2024)Source 1
- Thermal (interconnected grid)
- 498.5 MW (2024)Source 1EDM-SA plants, rented units and the Albatros independent plant.
- Thermal (isolated centres)
- 136.4 MW (2024)Source 1
Hydropower supplies most of Mali’s renewable electricity. In 2024 hydro plants provided 969.72 GWh to EDM-SA, 800.88 GWh of it from the OMVS plants at Manantali, Félou and Gouina and the rest from Sélingué and Sotuba. Hydro output was stable while thermal output collapsed, which is why its share rose from 36.6% to 56.9% of the interconnected grid’s supply.
Grid-connected solar is still limited to the 50 MWp Akuo plant at Kita and small hybrid plants in isolated centres. Construction of solar plants at Sanankoroba, Safo and Tiakadougou was launched in 2024; Sanankoroba is planned at 200 MWp with 20 MWh of storage under a 2023 agreement with Russia.
Over a normal year the share is lower: IRENA records 38% renewables in Mali’s 2,863 GWh of generation in 2023 (hydro 969 GWh, solar 66 GWh, bioenergy 39 GWh).
Further hydro projects include doubling the Sotuba plant (2 × 3.5 MW) and mini- and micro-hydro plants with associated networks for 22 villages. No current national renewable target was verified from an official source for this profile.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage on Mali’s grid is at project stage. The two largest planned systems are the 80 MWh battery at Sirakoro under the ECOWAS PRAE-BEST project and 20 MWh at the Sanankoroba solar plant.
No licensing or market rules specific to storage were identified.
Storage projects.
- PRAE-BEST battery storage at Sirakoro: The ECOWAS Regional Electricity Access Project includes 80 MWh of battery storage at the Sirakoro substation, along with about 2,000 km of 30 kV lines and connections for 68,000 households. Overall progress was 18% at the end of 2024.
- Sanankoroba solar plant: Planned 200 MWp solar plant with 20 MWh of storage, under a protocol signed with Russia in October 2023; works launched in 2024.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Énergie du Mali (EDM-SA) | Sole supplier in its concession (915,282 customers, end 2024) | No | Limited | No | No |
EDM-SA is the only supplier for customers on the interconnected grid and in the isolated centres of its concession. Outside it, rural electrification operators supply some localities under authorisations, with support from AMADER.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Commission de Régulation de l’Électricité et de l’Eau (CREE) | Regulator | Electricity and water regulator | Approves tariff grids, regulates the concessionaire and handles user interests. |
| Énergie du Mali (EDM-SA) | Transmission | National electricity company | Runs generation, purchases, transmission, distribution and supply; publishes annual activity reports. |
| Agence Malienne pour le Développement de l’Énergie Domestique et de l’Électrification Rurale (AMADER) | Distribution | Rural electrification and household energy agency | Supports rural electrification and household energy, created by Law 03-006 of 2003. |
| Organisation pour la Mise en Valeur du fleuve Sénégal (OMVS) | Transmission | Regional river basin organisation | Owns the Manantali, Félou and Gouina hydro plants and the regional network that supply most of Mali’s hydropower. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (transmission) | Technical regulation for transmission network management and access | Ministry of Energy, after CREE opinion | Ordinance 00-019 provides for a ministerial order setting technical rules for managing and accessing the transmission network; the order itself was not located. |
| Voltage levels | Ordinance 00-019/P-RM definitions | Government of Mali | Low voltage below 1 kV; medium voltage from 1 kV to 33 kV; high voltage above 33 kV. |
| Internal installations | Ordinance 00-019/P-RM | Government of Mali | At low voltage the customer’s installation starts immediately downstream of the meter or circuit breaker; building and maintaining it is the owner’s responsibility. |
| Prepaid metering | STS (migration to STS2) | EDM-SA | Migration of the prepaid vending system to STS2 under way in 2024. |
| Inverters, anti-islanding, installer accreditation | None identified | — | No national technical standard for small grid-connected solar was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Self-production declaration or authorisation | Yes | National | Required before self-producing, the form depending on installed capacity (Ordinance 00-019). |
| Supply contract with EDM-SA | Yes | National | New connections are requested from EDM-SA, including online; the customer pays connection costs and, for postpaid supply, an advance on consumption. |
| Authorisation or concession (production for the public) | Yes | National | Authorisation for thermal (including solar) plants above 50 kW up to 250 kW; concession above 250 kW. |
| Planning permission | Unknown | Local | No national rule on planning consent for rooftop solar was identified. |
A household installing solar panels for its own use falls under the self-production regime of Ordinance 00-019. Because no surplus-injection scheme exists, such systems normally operate behind the meter or off-grid.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Tax exemption on renewable energy equipment | Active | VAT and import duty relief | Decree 2014-0816/P-RM of 27 October 2014 suspended VAT and import duties on listed renewable energy equipment such as solar modules, charge regulators, inverters and solar batteries. In March 2020 the Council of Ministers adopted an ordinance exempting renewable energy equipment from VAT and import duties, except the community solidarity levy and statistical fee. No repeal was identified in the sources consulted, but current customs practice was not verified. | From 2014 (renewed 2020) |
Data and connectivity.
- Fixed broadband
- 36.8 % of population using the internet (2024)Source 13Share of individuals using the internet (ITU via World Bank), not fixed-broadband coverage.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use reached 36.8% of the population in 2024, according to the World Bank.
EDM-SA is moving its network interconnections onto its own fibre-optic network and offers bill payment and prepaid credit purchase through its website and mobile applications. No information was identified on communication technologies used for metering.
Grid conditions.
- National peak demand
- 0.386 GW (2024)Source 1Peak on the interconnected grid (385.67 MW on 3 February 2024), constrained by rationing. 474.91 MW in 2023.
- Annual electricity demand
- 1.84 TWh (2024)Source 1Electricity produced and bought by EDM-SA (1,842.72 GWh), down from 2,837.90 GWh in 2023. Energy not supplied on the interconnected grid was estimated at 1,699 GWh.
- Generation capacity
- 0.949 GW (2024)Source 1Derived: 896.26 MW of hydro and thermal capacity plus 53.11 MWp of solar on EDM-SA’s system, including OMVS hydro attributable to Mali and rented units.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The grid has been short of generation rather than network capacity. Fuel consumption by EDM-SA’s plants fell from 382.74 million litres in 2023 to 167.10 million litres in 2024 for lack of funds, and imports from Côte d’Ivoire fell by 56%.
Major works under way include the 225 kV Sikasso–Bougouni–Sanankoroba–Bamako line, the 225 kV Guinea–Mali interconnection (127 km from Sanankoroba to the Guinean border), the Manantali–Bamako 225 kV line, studies for a Mali–Mauritania interconnection and a 330 kV Ghana–Burkina Faso–Mali line, and the 100 MW heavy-fuel-oil plant at Sirakoro, almost complete at the end of 2024.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Extension of EDM-SA’s concession | Current | 23 January 2026 | The Council of Ministers approved amendment No. 4 to the 2000 concession contract, extending it by three years from 21 November 2025 and removing the concessionaire’s role as project owner for construction works. |
| Tariff system revision | Upcoming | Not scheduled | EDM-SA’s 2024 annual report calls for revising tariffs, unchanged in substance for more than 20 years, to restore the sector’s finances. No new grid had been published by October 2026. |
| Integration of self-producers’ surplus | Upcoming | Under study | EDM-SA is implementing the recommendations of studies on integrating self-producers’ surplus into its distribution network. |
| Guinea–Mali 225 kV interconnection | Upcoming | Under construction (55% at end 2024) | A 127 km double-circuit 225 kV line from Sanankoroba to the Guinean border, with electrification of 80 localities along the route. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential solar statistics and no grid-export scheme; self-production is used behind the meter or off-grid. |
| Distributed energy market | Low | Distributed generation consists of self-production (generators, solar and batteries) adopted during rationing, without a framework for grid injection. |
| Grid flexibility market | Low | No wholesale or flexibility market; EDM-SA is the central buyer and system operator. |
| Energy storage adoption | Low | No operating grid storage identified; 80 MWh at Sirakoro and 20 MWh at Sanankoroba are at project stage. |
| Renewable growth environment | Medium | Hydro supplied 52.6% of EDM-SA’s supply in 2024 and IRENA records 40 MW of solar added nationally that year, but grid solar remains 53 MWp and large solar plants are still under construction. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 14 sources
- Rapport annuel d’activités 2024 (compte rendu technique et financier). Énergie du Mali (EDM-SA), 2026. accessed 10 October 2026.
- À propos. Énergie du Mali (EDM-SA). accessed 10 October 2026.
- Foire aux questions. Énergie du Mali (EDM-SA). accessed 10 October 2026.
- Paiement de facture. Énergie du Mali (EDM-SA). accessed 10 October 2026.
- Achat de crédit compteur. Énergie du Mali (EDM-SA). accessed 10 October 2026.
- Ordonnance n°00-019/P-RM du 15 mars 2000 portant organisation du secteur de l’électricité. Government of Mali (via FAOLEX), 2000. accessed 10 October 2026.
- Arrêté interministériel n°01-1474/MMEE-MICT-MEF portant fixation des tarifs de consommation d’électricité. Journal officiel de la République du Mali (via FAOLEX), 2001. accessed 10 October 2026.
- CREE (Commission de Régulation de l’Électricité et de l’Eau). Primature du Mali. accessed 10 October 2026.
- Communiqué du Conseil des ministres du vendredi 23 janvier 2026. Présidence de la République du Mali, 2026. accessed 10 October 2026.
- Résultats globaux du RGPH5 (rapport préliminaire). Institut National de la Statistique (INSTAT), 2023. accessed 10 October 2026.
- Energy Profile: Mali. IRENA, 2025. accessed 10 October 2026.
- Énergie : le Mali passe à l’exonération de ses équipements d’énergies renouvelables. Financial Afrik, 2020. accessed 10 October 2026.
- World Development Indicators: population, urban population, access to electricity, internet users — Mali. World Bank, 2025. accessed 10 October 2026.
- Historique du franc CFA (cours de l’euro). BCEAO. accessed 10 October 2026.
Questions about energy in Mali.
Tariffs are regulated and uniform across EDM-SA’s concession. EDM-SA’s average revenue from low-voltage customers was 101.80 FCFA/kWh excluding tax in 2024, well below its average cost of supply of 198 FCFA/kWh. The tariff system has barely changed in more than 20 years.
Énergie du Mali (EDM-SA), a company wholly owned by the State, supplies all customers in its concession, which covers the interconnected grid around Bamako and 33 isolated centres. It had 915,282 customers at the end of 2024.
The Commission de Régulation de l’Électricité et de l’Eau (CREE) regulates the sector and approves tariff grids. The Ministry of Energy and Water sets policy and grants concessions and authorisations.
No scheme for households to sell surplus solar power was identified. Self-production requires a declaration or authorisation, and EDM-SA is studying how to integrate self-producers’ surplus into its distribution network.
Postpaid customers are identified by a 16-character EDM-SA customer reference, used to pay bills; prepaid customers by their meter number, used to buy credit. There is no national meter-point register.
In 2024, 52.6% of the electricity supplied by EDM-SA came from hydro plants (mostly the OMVS plants at Manantali, Félou and Gouina), 36.9% from thermal plants, 6.0% from imports from Côte d’Ivoire and 4.5% from solar.
EDM-SA lacked the money to buy fuel for its thermal plants. Production and purchases fell by 35%, and the company rationed supply, with customers receiving less than six hours of electricity a day.