How electricity works in Portugal.
Portugal electricity market 2026: ERSE tariffs, REN and E-REDES, the CPE supply-point code, smart meters, self-consumption (UPAC) rules, licensing, flexibility and renewables.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Portugal energy at a glance.
Key figures for households in Portugal. Each one links to its source on the full overview below.
Electricity price.
0.244 EUR per kWh for households, including taxes. Figures for 2025-H2.
Household use.
2,531 kWh a year for a typical household. Figures for 2024.
Renewable share.
75.5% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Portugal.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Portugal below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Portugal requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Portugal.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Portugal, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Portugal, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Portugal.
The energy market in Portugal, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Mainland Portugal has a fully open retail electricity market regulated by ERSE (Entidade Reguladora dos Serviços Energéticos). REN operates the transmission grid and the system, E-REDES runs almost all of the distribution network, and wholesale power is traded with Spain in the joint Iberian market (MIBEL). The Azores and Madeira have separate island systems run by vertically integrated regional utilities.
Households can choose among dozens of suppliers, and in June 2026 88.2% of mainland customers were on the free market. Regulated "transitional" tariffs, sold by the last-resort supplier SU Eletricidade, still exist for low-voltage customers and have been extended to the end of 2027. ERSE raised them by an average of 1.0% for 2026. VAT on electricity is split: 6% on the first 200 kWh per 30 days for supplies up to 6.9 kVA and 23% on the rest.
Renewables supplied 68% of mainland electricity consumption in 2025, led by hydro, wind and a fast-growing solar fleet, and consumption reached a record 53.0 TWh. Almost every low-voltage home now has a smart meter read every 15 minutes, and around 237,000 self-consumers had rooftop or other on-site generation at the end of 2024. Self-consumption rules were changed again in 2026, by Law 29/2026 and Decree-Law 130/2026.
Energy snapshot.
Headline figures for electricity in Portugal. Each shows its data year and links to its source.
- Population11,424,031 peopleSource 331 Dec 2025
- Households4,149,096 private householdsSource 42021
- Average household size2.5 people/householdSource 42021
- Electricity use per household2,531 kWh/yrSource 82024
- Household price (EUR)0.244 EUR/kWhSource 12025-H2
- Renewable electricity share75.5%Source 102025
- Solar capacity5.6 GWSource 11end 2024
- Wind capacity5.4 GWSource 10end 2025
- Energy storage capacity3.6 GWSource 10end 2025
- Smart-meter share99%Source 12mid-2025
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- ERSE (Entidade Reguladora dos Serviços Energéticos)
- System operator
- REN – Rede Eléctrica Nacional
- Distribution networks
- E-REDES (about 99.5% of low-voltage customers) plus 10 small low-voltage cooperatives and local operators on the mainland; EDA (Azores) and EEM (Madeira) on the islands
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Portugal.
- Household price (EUR)
- 0.244 EUR/kWh (2025-H2)Source 1Eurostat average household price including all taxes and levies, consumption band DC (2,500–4,999 kWh/yr). Excluding VAT it was €0.2121/kWh; excluding all taxes €0.1625/kWh.
- Typical annual electricity bill
- 442 EUR/yr (2026)Source 2Derived: ERSE’s regulated-market example for a couple without children (3.45 kVA, 1,900 kWh/yr) is €36.82 a month including taxes (except the DGEG fee), × 12. A family of four on 6.9 kVA using 5,000 kWh/yr pays €95.03 a month (about €1,140 a year).
Household price trend (EUR per kWh).Source 1
| 2018-H1 | 0.2246 EUR/kWh |
|---|---|
| 2018-H2 | 0.2293 EUR/kWh |
| 2019-H1 | 0.215 EUR/kWh |
| 2019-H2 | 0.2181 EUR/kWh |
| 2020-H1 | 0.212 EUR/kWh |
| 2020-H2 | 0.2133 EUR/kWh |
| 2021-H1 | 0.2089 EUR/kWh |
| 2021-H2 | 0.217 EUR/kWh |
| 2022-H1 | 0.2199 EUR/kWh |
| 2022-H2 | 0.2222 EUR/kWh |
| 2023-H1 | 0.2071 EUR/kWh |
| 2023-H2 | 0.2299 EUR/kWh |
| 2024-H1 | 0.2426 EUR/kWh |
| 2024-H2 | 0.2626 EUR/kWh |
| 2025-H1 | 0.239 EUR/kWh |
| 2025-H2 | 0.2435 EUR/kWh |
What is in the bill
A Portuguese electricity bill has two main parts: a daily fixed charge that depends on the contracted power (potência contratada, in kVA, up to 41.4 kVA for normal low voltage) and an energy charge per kWh. Both include the network access tariffs that ERSE sets each year and that apply in both the regulated and free markets. For 2026 ERSE raised network access tariffs for normal low voltage by 3.5%, while the regulated end-user tariff rose by 1.0% on average, which is below expected inflation.
Taxes and levies
Since 1 January 2025, energy consumption up to 200 kWh per 30 days (300 kWh for families of five or more) is charged at the reduced 6% VAT rate for contracts up to 6.90 kVA; the rest of the energy is charged at 23%. Bills also carry the Special Consumption Tax on electricity (IEC), the Audiovisual Contribution (CAV) that funds public broadcasting, and a small DGEG fee. Taxes and levies together added about €0.08/kWh to the average band-DC price in the second half of 2025.
Regulated vs free market
In ERSE’s third-quarter 2026 comparison, 22 suppliers offered 321 electricity offers. The cheapest offer for a small household was 11% below the regulated tariff, and a large household could save about €313 a year by switching. Between 7 and 12 suppliers, depending on the consumer type, beat the regulated tariff.
Regional differences
Mainland prices and network tariffs do not vary by region. The Azores and Madeira are supplied by their regional utilities, and ERSE publishes the regulated price changes for the islands separately.
Trend
Eurostat data show household prices (band DC, all taxes) rising from about €0.21/kWh in 2020–21 to a peak of €0.263/kWh in the second half of 2024, then easing to €0.244/kWh in late 2025. Household prices have stayed below the EU average throughout.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Transitional regulated tariffs for normal low voltage are set annually by ERSE and sold by the last-resort supplier SU Eletricidade. About 779,000 mainland customers were still on them in June 2026. Free-market customers can also ask their supplier for "regulated price conditions" or return to the regulated tariff. |
| Fixed | Yes | Fixed-price offers are widely available on the free market. From 28 August 2026, suppliers with more than 200,000 customers must offer at least one fixed-term, fixed-price contract of at least one year. |
| Time-of-use | Yes | Households choose a single-rate (simples), two-rate (bi-horária) or three-rate (tri-horária) tariff option. Many of the cheapest offers listed in ERSE’s comparison are bi-horária. |
| Variable | Yes | Indexed offers pass through the Iberian spot price (OMIE), usually as a monthly average. Suppliers such as Coopérnico, Luzboa, Logica Energy and Portulogos list indexed offers. |
| Dynamic | Limited | Hourly dynamic-price offers exist and are recognised by ERSE as a special type of indexed offer, but they are excluded from its price simulator and only a few suppliers offer them. |
| Other | Yes | The social electricity tariff gives economically vulnerable households a 33.8% discount in 2026 against regulated prices, from any supplier. In November 2024 660,118 customers received it. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,531 kWh/yr (2024)Source 8Domestic electricity consumption per domestic consumer (DGEG data published by INE), provisional. Mainland 2,527 kWh; Greater Lisbon 2,400 kWh.
- Average daily use per household
- 6.9 kWh/day (2024)Source 8Derived: 2,531 kWh per domestic consumer divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 4,549 kWh/person/yr (all sectors) (2024)Source 9Total electricity consumption per inhabitant (DGEG data published by INE).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 14.8 % of homes (reversible air conditioning) (2020)Source 31Derived from ICESD 2020: 32.7% of homes used some cooling equipment, and 45.4% of those used a reversible air-conditioner (heat pump), giving about 14.8% of all homes. 7.3% of cooling homes used cooling-only units and 58.8% used fans.
- Electric vehicles
- 23.2 % of new passenger car registrations (battery electric) (2025)Source 32ACAP data: 225,039 light passenger cars registered in 2025. An official figure for the total plug-in fleet was not identified.
- Electric cooking
- Not identified from a reliable public source.
Portuguese homes use little electricity by EU standards. Domestic consumption averaged 2,531 kWh per consumer in 2024, about 6.9 kWh a day, because the climate is mild, few homes have central heating and many still cook and heat water with bottled LPG or natural gas. In the 2020 household energy survey electricity provided 43.1% of energy used in the home but almost 70% of household energy spending.
Heating is typically done with portable electric heaters (used in 64.8% of homes that heat), wood stoves and fireplaces, or reversible air-conditioners. Cooling is becoming more common: 32.7% of homes used cooling equipment in 2020, nearly half of them with reversible split units. Gas water heaters (esquentadores) were found in 67.3% of homes, and heat-pump water heaters were still rare (0.8%).
National demand grew 3.2% in 2025 to 53.0 TWh, the highest ever, with electrification of transport an important factor. Battery electric cars took 23.2% of new passenger car registrations in 2025. The E-LAR programme has funded induction hobs, electric ovens and heat-pump water heaters to replace gas appliances.
Housing and households.
- Dwellings
- 5,974,719 family dwellings (2021)Source 4Census 2021: 4,142,581 main residences, 1,104,881 second or seasonal homes and 723,215 vacant dwellings.
- Owner-occupied
- 71.2 % of population (2025)Source 5Eurostat EU-SILC (31.5% with a mortgage, 39.7% without). Census 2021 recorded 70% of main residences as owner-occupied.
- Private rented
- 16.3 % of population (market-rate rent) (2025)Source 5Census 2021 recorded 22.3% of main residences as rented or sub-let.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 50.3 % of population (2025)Source 6Detached 33.4%, semi-detached 16.9% (Eurostat EU-SILC).
- Apartments and flats
- 49.6 % of population (2025)Source 628.5% in buildings with fewer than 10 flats and 21.2% in larger blocks.
- Urban population
- 61.5 % of population (2025)Source 7
Portugal is a nation of owner-occupiers: 71.2% of people lived in owner-occupied homes in 2025, and most of those had no mortgage. Renting has grown, especially in the Lisbon and Porto metropolitan areas, where 29.2% of main residences in the Lisbon area were rented in 2021.
The housing stock is split almost evenly between houses and flats. Detached houses dominate in the north and the interior, where rooftop solar is easy to install, while apartment blocks dominate the two big metropolitan areas. For apartment buildings, collective self-consumption lets a condominium share solar output among flats.
Second homes and empty properties are unusually common: 18.5% of family dwellings were second or seasonal homes and 12.1% were vacant in 2021. This is one reason why the number of electricity customers (about 6.5 million) is much higher than the number of households, and why average consumption per contract is low.
How the grid works in Portugal.
- TransmissionREN – Rede Eléctrica Nacional
- DistributionE-REDES (about 99.5% of low-voltage customers) plus 10 small low-voltage cooperatives and local operators on the mainland; EDA (Azores) and EEM (Madeira) on the islands
- MeteringADENE – Operador Logístico de Mudança de Comercializador (OLMC)
- Supply8 or more retail suppliers
Physical flow
Large hydro dams in the north, wind farms, solar parks and the remaining gas plants feed REN’s 400 kV, 220 kV and 150 kV transmission grid. E-REDES takes power down through its high-voltage (60 kV) and medium-voltage networks to MV/LV substations (postos de transformação) and the 400/230 V low-voltage network. Homes have single-phase or three-phase supplies limited by the contracted power, which the smart meter enforces through its built-in power control switch.
Portugal’s only international link is with Spain. In December 2025 a new 400 kV line between Ponte de Lima and Fontefría in Galicia entered operation, raising exchange capacity to 4,200 MW from Spain to Portugal and 3,500 MW in the other direction. Portugal has been a net importer for seven years; net imports supplied 17% of consumption in 2025.
Commercial flow
Generators sell into the Iberian day-ahead and intraday markets run by OMIE or through bilateral contracts and futures (OMIP). Suppliers buy energy, pay ERSE-regulated network access tariffs to REN and the DSOs through the DSO, and bill customers. REN balances the system in real time through system services markets, and imbalances are settled with market agents.
Retail market and switching
Retail supply was opened to all customers in 2006. Customers switch through their new supplier, and the switch is processed through the central platform run by ADENE as logistics operator for supplier switching (OLMC). In 2024 an average of 3,352 electricity switches were completed every day. The smart meter does not change when a customer switches.
28 April 2025 blackout
On 28 April 2025 the whole Iberian Peninsula lost power. ENTSO-E’s final report, published in March 2026, found a cascade of overvoltage-related disconnections in Spain within about 90 seconds; supply in Portugal was restored in about 12 hours. The expert panel pointed to failures of voltage management and recommended better monitoring, coordination and regulation.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Environment and Energy (Ministério do Ambiente e Energia) | Sets energy policy, including the National Energy and Climate Plan (PNEC 2030), the social tariff discount and support programmes run through the Fundo Ambiental. |
| Ministry | DGEG – Direção-Geral de Energia e Geologia | Licensing authority for generation, storage and self-consumption (UPAC), keeps the registers of suppliers and aggregators, accredits electrical technicians and publishes official energy statistics. |
| Regulator | ERSE – Entidade Reguladora dos Serviços Energéticos | Independent regulator for electricity and gas. Sets network access and regulated tariffs, approves the commercial relations, network operation, smart grid services and self-consumption regulations, and supervises the retail market. |
| TSO | REN – Rede Eléctrica Nacional | Owns and operates the very-high-voltage transmission network (about 9,900 km of lines) under a public concession and acts as the system operator, running the system services (balancing) markets. |
| DSO | E-REDES – Distribuição de Eletricidade | EDP group company holding the national high- and medium-voltage distribution concession and the low-voltage concessions of almost all mainland municipalities, serving about 99.5% of low-voltage customers. Installs and reads meters and handles new connections. |
| DSO | Low-voltage cooperatives and local operators | Ten small operators distribute only at low voltage, mainly in the north: CEVE, A Lord, A Celer, CESSN, Casa do Povo de Valongo do Vouga, A Eléctrica Moreira de Cónegos, CEL, CoopRoriz, Cooperativa Eléctrica de Vilarinho and Junta de Freguesia de Cortes do Meio. |
| DSO | EDA (Azores) and EEM (Madeira) | Regional utilities that generate, transmit and distribute electricity on the islands, which are not connected to the mainland grid. |
| Supplier | SU Eletricidade | Last-resort supplier (CUR) on the mainland, selling the regulated transitional tariffs, and last-resort aggregator that buys renewable surplus from self-consumers and small producers. |
| Data hub / registry | ADENE – Operador Logístico de Mudança de Comercializador (OLMC) | Runs the central platform through which supplier (and aggregator) switches are processed for electricity and gas, and the Poupa Energia consumer information portal. |
| Exchange | OMIE and OMIP (MIBEL) | OMIE runs the Iberian day-ahead and intraday markets, coupled with the rest of Europe; OMIP runs the Iberian futures market. Indexed retail tariffs are priced off OMIE. |
| Flexibility market | E-REDES FIRMe local flexibility market | Regulated pilot local flexibility market with Restore, Dynamic and Secure products. The first phase ran from December 2023 to December 2025; FIRMe 2.0 runs from January 2026 to December 2027. |
Compared with the UK system.
| UK concept | Portugal equivalent | How it works |
|---|---|---|
| DNO | Operador da rede de distribuição (ORD) – mostly E-REDES | Low-voltage distribution is legally a municipal responsibility: all 278 mainland municipalities have granted concessions to 11 operators, with E-REDES serving about 99.5% of customers. E-REDES also holds the national HV/MV concession. Most municipal concessions expired in 2021–22 and have been extended while a national tender model is prepared. |
| National Grid/NESO | REN | REN both owns the transmission network and operates the system, combining the roles of the GB transmission owners and NESO. The Iberian wholesale market is run separately by OMIE. |
| MPAN | Código de Ponto de Entrega (CPE) | 20-character code starting "PT", followed by a four-digit network operator code (0002 for E-REDES), a 12-digit location code and two check letters. It identifies the delivery point and stays with the property. |
| MPRN | Código Universal de Instalação (CUI) | Gas installations have a separate code, the CUI, which also appears on bills. The CPE is used only for electricity. |
| Meter operator | The distribution network operator | There is no competitive meter operator market. The DSO owns, installs and reads the meter and makes the data available; suppliers do not install meters. |
| Supplier | Comercializador (registered with DGEG) | About 40 active suppliers compete on the free market; SU Eletricidade is the last-resort supplier for regulated tariffs. Switching is free, unlimited and must be completed within three weeks. |
| Smart-meter infrastructure | DSO smart grid (E-REDES "redes inteligentes") | Each DSO runs its own system: meters talk by power-line communication (PLC PRIME) to data concentrators in MV/LV substations, which use GPRS to reach central systems. There is no national communications provider like DCC. |
How a supply point is identified.
PT 0002 0000 4718 2936 KQ (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Código de Ponto de Entrega (CPE) |
| Who issues it? | The distribution network operator (E-REDES for almost all homes) when the delivery point is created |
| Format | Country code "PT" (2 letters) + network operator code (4 digits, 0002 for E-REDES) + location identification code (12 digits) + check characters (2 letters) |
| Length | 20 characters |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Printed on the electricity contract and on every electricity bill, usually on the first page next to the supply address. If no bill is available, E-REDES provides it through its Balcão Digital online service or by phone. |
| Electronic access | The network operator holds the CPE together with the meter and consumption data. Customers see their 15-minute consumption and injection data on the DSO’s electronic platform (the E-REDES Balcão Digital), and suppliers and the switching operator use the CPE to process contracts and switches. |
| Third-party access | Third parties such as installers, aggregators or energy apps get the CPE from the customer and need the customer’s authorisation to access metering data. The CPE is required for self-consumption registration with DGEG and for applications to grant schemes. |
| Who keeps the register | Each distribution network operator keeps the register of delivery points on its network; supplier and aggregator switching runs through the national platform of the OLMC (ADENE). |
| Register scope | Per DSO |
What the CPE identifies
The CPE identifies the point where electricity is delivered from the public grid to an installation. It is tied to the address, not to the person or the meter: it stays the same when the occupant, owner or supplier changes, and when the meter is replaced. Gas has a separate identifier, the CUI (Código Universal de Instalação), and both often appear on dual-fuel bills.
How to read it
The code always starts with "PT". The next four digits show which network operator created the point: 0002 is E-REDES, which covers almost all homes, while the small low-voltage cooperatives have their own codes. The following 12 digits identify the location, and the last two letters are check characters that allow systems to detect typing errors.
Who holds the register
When a new connection is energised, the network operator creates the CPE in its systems and links it to the meter. Suppliers register contracts against the CPE, and the switching platform of the OLMC, run by ADENE, coordinates changes of supplier between suppliers and the DSO. Households normally get their CPE from a bill or directly from their DSO.
Why it matters for solar and storage
The CPE links the house to everything else in the energy system. Self-consumption registrations on the DGEG portal, production licences for UPACs, contracts with aggregators for selling surplus and applications for grants all require it. A home can have more than one contract linked to the same connection point from 28 August 2026, when Decree-Law 130/2026 gave customers the right to more than one supply or sharing contract per installation.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Surplus is either delivered to the grid unpaid or sold to a registered market aggregator at a contracted price (often indexed to OMIE) or to the last-resort aggregator SU Eletricidade at a price set by government |
| Is there net metering? | No. Energy taken from the grid is bought from the supplier at the normal tariff, and surplus injected into the grid is a separate sale. In collective schemes, shared energy is netted against each member’s consumption every 15 minutes. |
| Which systems need no registration? | Units up to 700 W that do not inject surplus are exempt from prior control. From 28 August 2026 the limit rises to 800 W (Decree-Law 130/2026), covering most plug-in balcony kits that do not export. |
| What are the licensing thresholds? | Above the exemption and up to 30 kW: prior notification. Above 30 kW to 1 MW: prior registration and operating certificate. Above 1 MW: production and operating licences. Since 1 July 2026 the operating licence for renewable self-consumption is deemed granted if DGEG does not decide within 90 days. |
| How is surplus taxed? | For UPACs up to 1 MW, surplus sales are exempt from personal income tax up to €1,000 a year and from VAT up to €13,500 a year. The buyer issues the invoice and handles VAT. |
| Can neighbours share solar power? | Yes, through collective self-consumption (ACC) or renewable energy communities (CER). From 28 August 2026, low-voltage members must be connected to the same substation as the main UPAC or within 2 km; medium-voltage 4 km, high-voltage 10 km and very-high-voltage 20 km, doubled in low-density areas. E-REDES reported 331 collective schemes in operation at the end of 2024. |
| Can a third party own the system? | Yes. From 28 August 2026 a UPAC may be owned or managed by a third party acting on the self-consumer’s instructions, and Law 29/2026 created a renewable energy use contract (CAER) for leasing rooftops or land for UPACs up to 1 MW for up to 15 years, renewable once. |
Connecting a home system.
- Choose an installer: systems above 700 W (800 W from 28 August 2026) must be installed by an electrical technician or company registered with DGEG.
- Register on the DGEG self-consumption portal. Up to 30 kW of installed capacity, file a prior notification (mera comunicação prévia); above 30 kW and up to 1 MW, apply for prior registration and an operating certificate; above 1 MW, a production licence is needed.
- Where surplus will be injected, the DGEG process checks grid access conditions with the network operator; for new connections, ask the DSO for connection conditions before building.
- Install the system to the technical and quality rules; above 4 kW a separate telemetered production meter approved by the DSO is also required.
- Take out civil liability insurance, which every self-consumption installation must have.
- To be paid for surplus, open self-employed activity with the tax authority and sign a contract with a market aggregator or with SU Eletricidade as last-resort aggregator; the buyer issues the invoices on the self-consumer’s behalf.
- The smart meter records consumption and injection every 15 minutes, and surplus is settled from those readings.
Portugal treats rooftop solar mainly as self-consumption: the household uses its own production first and the rest is surplus. The framework dates from 2014, was simplified in 2019 and is now part of Decree-Law 15/2022, which organises the whole electricity system. ERSE estimates that self-consumption produced about 1.5 TWh in 2024, around 2.8% of final electricity consumption.
There is no feed-in tariff or net metering for new household systems. Surplus can be sold through an aggregator, but ERSE found that about 27% of self-consumption output was surplus in 2024 and that most of it was delivered to the grid without payment, because the volumes per household are small and the process involves tax registration. Many households therefore size systems to maximise their own use, and some add batteries.
Grid connection is handled within the DGEG procedure, which checks access to the network with the DSO. Decree-Law 130/2026 also allows flexible (restricted) connections where grid capacity is limited, with conversion to firm capacity once the network is reinforced, and requires network operators to publish available connection capacity at least every quarter.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (grid injection) | Renewables up to 1 MW: prior registration (registo prévio) and operating certificate. Renewables above 1 MW, all non-renewable plants and projects subject to environmental impact assessment: production licence and operating licence. | DGEG | Decree-Law 15/2022. From 28 August 2026, licence decisions are due within one year (six months in renewable acceleration zones) and silence counts as approval for projects not subject to impact assessment. |
| Self-consumption (UPAC) | Exempt up to 700 W without injection (800 W from 28 August 2026); prior notification above that up to 30 kW; prior registration and operating certificate from 30 kW to 1 MW; production licence above 1 MW. | DGEG (electronic portal) | Installation above the exemption must be done by a DGEG-registered technician or company. Civil liability insurance is compulsory. |
| Store electricity | Standalone storage up to 1 MW: prior registration and operating certificate. Above 1 MW: production and operating licences. Storage behind the meter with a UPAC follows the UPAC procedure. | DGEG | Decree-Law 130/2026 presumes storage projects to be of overriding public interest. A collective self-consumption manager or third party may hold up to 6 MW of storage or generation for the scheme. |
| Export / sell surplus | No licence. The UPAC must be registered with DGEG; the self-consumer opens self-employed tax activity and contracts with a registered aggregator or the last-resort aggregator. | DGEG; tax authority (AT) | Income-tax exemption up to €1,000 a year and VAT exemption up to €13,500 a year for UPACs up to 1 MW. |
| Supply (sell) electricity to consumers | Registration as a supplier (comercializador) with DGEG, then accession to the market and network contracts. | DGEG; ERSE (supervision) | Suppliers must follow ERSE’s Commercial Relations Regulation. From 28 August 2026 suppliers with more than 200,000 customers must offer fixed-price contracts and all must have risk-management strategies. |
| Aggregate | Registration as an aggregator with DGEG. Registered suppliers are exempt and only need to notify DGEG before acting as aggregators. | DGEG | DGEG listed 66 registered market aggregators by April 2026. Last-resort aggregation is a licensed activity held by SU Eletricidade. |
| Trade wholesale electricity | No separate licence; participants register as market agents with OMIE (spot) or OMIP (futures) and meet their guarantees. | OMIE / OMIP; ERSE and CMVM (supervision) | EU REMIT rules on market integrity apply. |
| Balancing and system services | No licence; units or aggregated portfolios must be qualified by REN as system services market participants under the Manual of Procedures for Global System Management. | REN; ERSE (rules) | Demand has been able to take part in the standard mFRR product since March 2024, after a 2019–2024 pilot that required at least 1 MW and MV or higher connection. |
| Local flexibility (DSO) | No licence; providers register for E-REDES’s FIRMe 2.0 pilot local flexibility market. | E-REDES; ERSE (pilot approval) | Products: Restore (faults), Dynamic (planned outages) and Secure (peak management). Pilot runs 2026–2027. |
| Remote control of household assets / VPP | No specific licence identified. Remote control is done by aggregators or suppliers under contract with the customer; a third party managing a UPAC must follow the self-consumer’s instructions. | DGEG; ERSE | The self-consumer remains responsible for its grid connection even when a third party manages the system (Decree-Law 130/2026). |
| Distribute electricity | Public concession: national HV/MV concession and municipal LV concessions. | Government; municipalities; ERSE | Private networks inside collective self-consumption schemes are permitted within the rules of the self-consumption regime. |
Decree-Law 15/2022, amended several times and most recently by Law 29/2026 and Decree-Law 130/2026, sets out which activities need registration or a licence. DGEG is the licensing authority for generation, storage and self-consumption and keeps the supplier and aggregator registers. ERSE writes the commercial, network and market rules that participants must follow.
For households, the requirement is a simple notification for most rooftop systems up to 30 kW, made online on the DGEG portal, plus a registered installer. Selling surplus does not need a licence but does require tax registration and a contract with an aggregator.
The aggregator was created as a separate role in 2022. Aggregators combine flexibility, storage and the production or consumption of several customers and sell it in the electricity markets or through bilateral contracts. Peer-to-peer trading and renewable energy communities are also recognised in law.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| mFRR (manual frequency restoration reserve) | Yes | 1 MW in the former pilot; product rules set by REN | Yes | REN. Standard European mFRR balancing product used by REN since March 2024, connected to the European MARI platform. Demand and storage can take part directly or through aggregation. |
| aFRR (automatic frequency restoration reserve) | Restricted | — | Limited | REN. Provided mainly by large hydro and gas plants. Standard aFRR products and connection to the European PICASSO platform are part of ERSE’s ongoing rule changes. |
| FCR (frequency containment reserve) | Developing | — | Unknown | REN. REN ran a pilot from January 2025 to define FCR technical requirements and monitoring, and must propose rules for an FCR procurement market to ERSE. |
| Wholesale (day-ahead and intraday) | Yes | — | Yes | OMIE. Aggregators sell self-consumption surplus and small renewable output into the Iberian spot market. Indexed and dynamic retail tariffs pass spot prices to consumers. |
| Local flexibility (FIRMe 2.0) | Developing | — | Yes | E-REDES. Regulated pilot local flexibility market with Restore, Dynamic and Secure products, after a first phase in 2023–2025 at sites such as Bragança, Beja, Marinha Grande, Paredes de Coura and Tondela. |
| Capacity mechanism | No | — | No | No capacity market for distributed assets was identified as of 2026. |
Flexibility markets in Portugal are opening but remain at an early stage for small assets. Demand and storage have been allowed into REN’s balancing market since the standard mFRR product started in March 2024, after a five-year pilot that was limited to sites of at least 1 MW connected at medium voltage or above. ERSE’s Directive 20/2023 sets special rules for demand participation, and the regulator is working on standard aFRR products, a day-ahead mFRR capacity product and measures to promote aggregation.
At distribution level, E-REDES is running a second regulated pilot of local flexibility from 2026 to 2027. Decree-Law 130/2026 requires network planning to compare new grid investment against buying flexibility from distributed resources, storage and demand response.
Household participation is therefore mostly indirect: through indexed or dynamic tariffs that reward shifting consumption, through aggregators that market self-consumption surplus, and through future aggregator offers. Near-universal smart meters with 15-minute data give the technical basis for this.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| E-REDES FIRMe | DSO platform and pilot for buying local flexibility as an alternative to network investment. |
| DGEG aggregator register | Public list of market aggregators registered with DGEG (66 by April 2026). |
| REN system services market | Market through which REN procures balancing reserves and energy. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | DSO-led rollout essentially complete: 99% of mainland low-voltage installations had a smart meter integrated into the smart grid by mid-2025 |
| Reading interval | 15 minutes |
| Integrated in smart grid (mainland BTN) | 99% (mid-2025) |
| Installed by E-REDES | More than 99% of its installations; about 40,000 meters left to install and 70,000 to integrate in mid-2025 |
| Annual installations | About 450,000–900,000 a year over the last decade |
| Meter makers (E-REDES) | Kaifa, Landis+Gyr, Sagemcom, Janz and ZIV |
| Communications | PLC PRIME from meter to data concentrator in the MV/LV substation, GPRS where PLC is unsuitable and for backhaul |
| Services required (RSRI) | Daily reading with 15-minute data, consumption alerts, standard customer port, online data, remote change of contracted power and tariff |
| Technical specification | Portaria 231/2013 |
| Legal deadline | Integration of all installations by end-2024 (Decree-Law 15/2022) |
Who does what
In Portugal the distribution network operator, not the supplier, owns and installs the meter. E-REDES started large-scale installation around 2015, after pilots such as InovCity in Évora, working city by city and then into rural areas. The meter is part of the network, so a customer keeps the same meter when switching supplier.
Smart grid services
An installation counts as "integrated in the smart grid" only when the meter is installed and the operator provides the full set of services in ERSE’s Smart Grid Services Regulation (RSRI): daily remote readings with 15-minute data, consumption alerts, a standard communication port on the meter, online access to consumption and injection data, and remote changes to contracted power and tariffs. Integration lets the DSO bill on real readings instead of estimates, which used to be based on quarterly readings.
Smaller operators
The ten low-voltage cooperatives and local operators, with about 0.5% of customers, are at different stages. Half had finished installing smart meters by mid-2025 but did not yet provide all the services; four were still installing and one had not started. They expected to finish integration between late 2025 and early 2026.
Data access
Customers can see their data on the DSO’s electronic platform. Third-party access, for example by energy service companies, requires the customer’s authorisation. The standard customer port on the meter allows local in-home devices to read real-time data.
Renewable electricity.
Electricity generation mix (2025).
- Hydro: 29.7%
- Wind: 27.6%
- Gas (incl. cogeneration): 15.6%
- Solar: 12.5%
- Pumped storage output: 8.4%
- Biomass (incl. cogeneration): 5.7%
- Other: 0.5%
- Renewable electricity share
- 75.5% (2025)Source 10Derived: renewable generation of 36,916 GWh divided by total mainland generation of 48,878 GWh (REN). Total generation includes 4,088 GWh from pumped storage. REN also reports renewables met 68% of consumption, because net imports covered 17%.
- Home solar
- 237,000 self-consumers (all sectors, mainland) (end 2024)Source 13About 237,000 self-consumers with 1.8 GW of UPAC capacity; 39% of the capacity is at low voltage and 57% at medium voltage (businesses). A separate household-only count was not identified.
- Solar added each year
- 0.95 GW (grid-connected) (2025)Source 10Grid-connected solar rose from 3,885 MW to 4,839 MW in 2025. Self-consumption additions are extra and not included.
- Hydro (incl. pumped storage)
- 8.4 GW (end 2025)Source 10
- Onshore wind
- 5.4 GW (end 2025)Source 10
- Solar PV (grid-connected)
- 4.8 GW (end 2025)Source 10Excludes about 1.8 GW of self-consumption units (end-2024).
- Self-consumption units (UPAC)
- 1.8 GW (end 2024)Source 13
- Biomass
- 0.69 GW (end 2025)Source 10
- All renewables (grid-connected)
- 19.4 GW (end 2025)Source 10
Targets.
- PNEC 2030 (revised 2024): 51% renewables in gross final energy consumption by 2030.
- PNEC 2030: renewables to supply 93% of electricity consumption by 2030.
- Solar capacity to rise to 20.8 GW, onshore wind to 10.4 GW and offshore wind to 2 GW by 2030.
- Greenhouse gas emissions 55% below 2005 by 2030 and climate neutrality by 2045.
Renewable output reached a record 36.9 TWh in 2025 and supplied 68% of consumption. Hydro had a wet year and was the largest source (27% of consumption), followed by wind (25%), solar (11%) and biomass (5%). Natural gas covered 15% and net imports from Spain 17%. The last coal plants, Sines and Pego, closed between 2021 and 2022.
Solar is the fastest-growing technology. Almost all of the roughly 1,000 MW of new grid-connected capacity in 2025 was photovoltaic, and between December 2025 and May 2026 another 372 MW of solar was added, more than half of it in self-consumption and decentralised production. In the first half of 2026 renewables produced 75.6% of mainland electricity.
In August 2026 the government approved a national programme of renewable acceleration zones (the "green map"), with more than 800 zones for solar and wind in over 147 mainland municipalities. Projects inside these zones benefit from halved licensing deadlines and exemptions from environmental impact assessment.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 19 MW (grid-connected batteries) (end 2025)Source 10Up from 7 MW at end-2024. Pumped hydro storage adds 3,585 MW. Batteries produced 7 GWh in 2025.
Portugal’s storage is mostly pumped hydro, built alongside the large dams of the north. Grid batteries are only beginning to appear: REN counted 19 MW connected at the end of 2025. EU recovery funding has been awarded for at least 500 MW of new grid storage, and a second call in 2026 targets batteries co-located with renewable plants.
Home batteries are sold alongside rooftop solar, and with little or no payment for most household surplus they increase the share of solar output used at home, but no official count of installations exists. Standalone storage up to 1 MW only needs prior registration with DGEG, and Decree-Law 130/2026 presumes storage projects to be of overriding public interest. The reduced 6% VAT rate that applied to solar equipment, including batteries, ended on 30 June 2025.
Storage projects.
- PRR storage competition: EU recovery funds of €99.75 million awarded to 41 projects to install at least 500 MW of storage on the public grid.
- Network flexibility and storage call (AAC 01/C21-i18/2026): €60.25 million call supporting up to 20% of the cost of batteries of at least 1 MVA and two hours’ duration co-located with renewable plants.
- Pumped hydro: Pumped storage plants consumed 5.1 TWh and generated 4.1 TWh in 2025, making them the main source of storage on the system.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EDP Comercial | 58.4% of free-market customers and 38.8% of free-market consumption (ERSE, June 2026) | Unknown | Unknown | Unknown | Yes |
| Goldenergy | 9.8% of free-market customers (ERSE, June 2026) | Unknown | Yes | Unknown | Unknown |
| Endesa | 9.4% of free-market customers (ERSE, June 2026) | Unknown | Yes | Unknown | Yes |
| Galp | 5.7% of free-market customers (ERSE, June 2026) | Unknown | Yes | Unknown | Unknown |
| Iberdrola | 5.7% of free-market customers (ERSE, June 2026) | Unknown | Yes | Unknown | Yes |
| MEO Energia | 4.5% of free-market customers (ERSE, June 2026); largest annual gain (+1.1 points) | Unknown | Yes | Unknown | Unknown |
| Repsol | 2.0% of free-market customers (ERSE, June 2026) | Unknown | Yes | Unknown | Limited |
| SU Eletricidade | Last-resort supplier: about 779,000 regulated customers (June 2026) | No | Yes | No | Yes |
ERSE counted 40 active suppliers in June 2026, 38 of them serving households. EDP Comercial, the former incumbent’s retail arm, still has 58.4% of free-market customers, although its share is slowly falling; Goldenergy, Endesa, Galp, Iberdrola and MEO Energia follow. Market concentration remains high, with a customer-based HHI of 3,689.
Switching is active: 70,359 customers changed supplier within the free market in June 2026 alone. Smaller suppliers such as Coopérnico (a renewable energy cooperative), Luzboa, Logica Energy and Portulogos sell tariffs indexed to the OMIE spot price. Because the DSO provides the meter, every supplier can serve smart-metered customers, and ERSE’s simulator compares offers for all households.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| DGEG – Direção-Geral de Energia e Geologia | Government | Energy licensing and statistics authority | Runs the self-consumption portal, licenses generation and storage, keeps the supplier and aggregator registers and publishes Energia em Números. |
| Fundo Ambiental / Agência para o Clima | Government | Environmental and climate funding agency | Manages support programmes such as E-LAR and storage and flexibility calls, now through the eFundos platform. |
| ADENE – Agência para a Energia | Government | National energy agency and switching operator | Operates the supplier-switching platform (OLMC), the Poupa Energia portal and the energy certification of buildings. |
| ERSE | Regulator | Energy services regulator | Sets tariffs, approves self-consumption, smart grid and market rules, and publishes retail market reports and a price comparison tool. |
| REN – Redes Energéticas Nacionais | Transmission | Transmission owner and system operator | Operates the grid and balancing markets and publishes the annual technical data used in this profile. |
| E-REDES | Distribution | Main distribution network operator | Handles connections, meters, CPE codes, consumption data and the FIRMe local flexibility market. |
| OMIE | Market | Iberian electricity market operator | Publishes the day-ahead and intraday prices used by indexed tariffs and surplus contracts. |
| APREN – Associação Portuguesa de Energias Renováveis | Renewable Energy | Renewable energy trade association | Publishes monthly renewable electricity bulletins and annual analyses. |
| APESF – Associação Portuguesa das Empresas do Setor Fotovoltaico | Storage | Photovoltaic and storage industry association | Represents solar and storage installers and manufacturers in Portugal. |
| DECO | Consumer | Consumer protection association | Advises households on tariffs, switching and self-consumption and runs collective energy purchases. |
| Poupa Energia | Consumer | Public consumer energy information portal | Publishes self-consumption and energy community guides prepared with DGEG and ERSE. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Low-voltage wiring | RTIEBT – Regras Técnicas das Instalações Elétricas de Baixa Tensão (Portaria 949-A/2006) | Government / DGEG | National technical rules for low-voltage electrical installations, applying to PV and storage installations in homes. |
| Grid connection of generators | Portaria 73/2020 (non-exhaustive requirements of EU Regulation 2016/631, RfG) | Government / DGEG | Sets national parameters for connecting generating modules, including small inverters, to the public grid. |
| Self-consumption installations | Regulamento Técnico e de Qualidade (DGEG Despacho 4/2020) | DGEG | Technical and quality rules for UPAC installation, equipment certification and metering. |
| Installer qualification | DGEG register of electrical technicians and installation companies | DGEG | Any UPAC above the exemption threshold must be installed by a registered technician or company, who certifies the installation on the DGEG portal. |
| Smart meters | Portaria 231/2013; ERSE Regulamento dos Serviços das Redes Inteligentes (RSRI) | Government; ERSE | Technical and functional requirements for low-voltage smart meters and the minimum services DSOs must provide. |
| Production metering | Telemetered totaliser meter for UPAC of 4 kW or more | DGEG / DSO | Meter must be approved by the network operator and send data over GSM. |
| Battery storage | No dedicated national home-battery standard identified | — | Batteries are installed under the general low-voltage rules (RTIEBT) and EU product legislation, including CE marking and the EU Batteries Regulation. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Electricity sector prior control (UPAC) | Limited | National | Exempt up to 700 W without injection (800 W from 28 August 2026); prior notification up to 30 kW; registration up to 1 MW; licence above 1 MW. All done on the DGEG portal. |
| Planning (urban) permission – rooftop solar | No | National | Under Decree-Law 130/2026, photovoltaic panels on existing buildings and projects up to 1 MW are not subject to municipal prior control, except on classified heritage buildings, classified sites and their protection zones. |
| Condominium consent | Limited | Local | Installations on the common parts of apartment buildings, and collective self-consumption schemes, need the authorisation of the condominium. |
| DSO connection | Limited | National | Grid access is checked within the DGEG procedure where surplus is injected; new connections need connection conditions from the DSO before construction. |
| Home battery | Limited | National | A battery linked to a UPAC is declared within the UPAC procedure; standalone storage up to 1 MW needs prior registration with DGEG. |
| Heritage protection | Yes | Mixed | Classified buildings and sites keep their protection, and work on them needs heritage authority approval. |
For a typical rooftop system, the main formality is the online prior notification to DGEG, made by or with the registered installer, plus insurance. Municipal planning permission is not normally needed for panels on existing buildings, and Decree-Law 130/2026 confirmed that projects up to 1 MW are outside municipal prior control.
Apartment owners need the condominium’s agreement to use roofs or other common parts. Collective self-consumption schemes must appoint a managing entity (EGAC), agree a sharing method and upload the internal rules to the DGEG platform within three months of the system starting.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Reduced VAT on electricity consumption | Active | VAT relief | 6% VAT instead of 23% on the first 200 kWh per 30 days (300 kWh for families of five or more) for contracted power up to 6.90 kVA. | From 1 January 2025 |
| Social electricity tariff | Active | Bill discount | 33.8% discount in 2026 against regulated prices for economically vulnerable households, applied automatically by all suppliers and kept after switching. | 2026 |
| Tax exemptions on self-consumption surplus | Active | Tax exemption | For UPACs up to 1 MW, surplus sales are exempt from personal income tax up to €1,000 a year and from VAT up to €13,500 a year. | — |
| Solar panel voucher for families | Scheduled | Grant (voucher) | Announced by the government in January 2026 as an E-LAR-style voucher for household photovoltaic equipment. No call had been opened and no amounts published by mid-2026. | — |
| E-LAR programme (second phase) | Closed | Grant (voucher) | Vouchers for induction or electric hobs, electric ovens and heat-pump water heaters to replace gas appliances; up to €300–€500 for the general public and €369–€615 for vulnerable households. Applications closed on 30 June 2026 or when funds ran out. | 11 December 2025 – 30 June 2026 |
| Reduced VAT on solar and renewable equipment | Closed | VAT relief | 6% VAT on solar panels, inverters, batteries and installation expired on 30 June 2025; the normal 23% rate now applies and the 2026 budget did not restore it. | Until 30 June 2025 |
| Programa de Apoio a Edifícios Mais Sustentáveis (PAE+S) | Closed | Grant | Earlier reimbursement scheme for solar panels, heat pumps, windows and insulation; closed with no new phases planned for 2026. | — |
| Network flexibility and storage call | Active | Grant (business) | €60.25 million of recovery funds for grid-scale batteries co-located with renewable plants, covering up to 20% of eligible costs. | 2026 |
Data and connectivity.
- Fixed broadband
- 97.1 % of households with very-high-capacity fixed network coverage (2025)Source 33Fibre to the premises covered 95.5% of households, against an EU average of 74.1%.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- 99.1 % of populated areas, basic 5G (2025)Source 33
Portugal has some of the best fixed connectivity in the EU, with fibre available to more than 95% of households, and near-universal 5G. This makes cloud-connected inverters, batteries, heat pumps and EV chargers straightforward to operate.
Smart meters do not use household broadband. E-REDES meters communicate by power-line communication (PLC PRIME) with data concentrators in neighbourhood substations, and the concentrators use the public GPRS mobile network to reach central systems. Production meters on larger UPACs send data by GSM, which needs a mobile data plan. Home energy equipment usually connects through the household’s Wi-Fi or a built-in mobile modem; common protocols include Modbus and SunSpec for inverters and OCPP for chargepoints.
Grid conditions.
- National peak demand
- 9.4 GW (2025)Source 109,395 MW on 3 December 2025 at 19:45, about 500 MW below the record set in 2021.
- Annual electricity demand
- 53 TWh (2025)Source 10Consumption supplied from the public grid in mainland Portugal, a record 1.6% above the previous high in 2010.
- Generation capacity
- 23.8 GW (end 2025)Source 10Installed capacity connected to the public grid, of which 16.3 GW is connected to the transmission network and 19.4 GW is renewable.
- Interconnection
- 4.2 GW (Spain to Portugal) (2026)Source 293.5 GW from Portugal to Spain, after the new Ponte de Lima–Fontefría 400 kV line (in operation since December 2025).
- Curtailment
- Not identified from a reliable public source.
Demand and adequacy
Mainland demand reached 53.0 TWh in 2025, the highest ever, while peak demand was 9.4 GW in December. Installed capacity of 23.8 GW is far above peak, but much of it is variable wind and solar, so security of supply relies on hydro and pumped storage, gas plants and imports from Spain.
Grid access
Connection capacity, not generation potential, is the main constraint on new renewable projects. Decree-Law 130/2026 introduced flexible connections with conversion to firm capacity, allows consumption sites to share a generator’s connection point up to 50% of its injection capacity, and obliges network operators to publish available capacity at least quarterly. Licensing deadlines are halved in the new renewable acceleration zones.
Iberian dependence
Portugal is electrically an extension of the Iberian system, with Spain as its only neighbour. The April 2025 blackout showed how events in Spain spread to Portugal; restoration took about 12 hours. The new northern interconnector and more storage are intended to make the system more resilient.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Decree-Law 130/2026 amends the electricity system law | Current | 28 August 2026 | Transposes the EU electricity market design directive: 800 W self-consumption exemption, new proximity rules, third-party-owned UPACs, fixed-price contract obligation for large suppliers, two-way contracts for difference for new support schemes, price-crisis powers, flexible connections and renewable acceleration zones. |
| Law 29/2026 – renewable energy use contracts and faster licensing | Current | 1 July 2026 | Creates contracts for leasing roofs and land for UPACs up to 1 MW, introduces tacit approval for self-consumption operating licences after 90 days, and requires ERSE’s comparison tool to show aggregator offers. |
| Renewable acceleration zones ("green map") | Current | 25 August 2026 | Resolution of the Council of Ministers 172-A/2026 approved more than 800 zones for solar and wind with shorter licensing deadlines and environmental impact assessment exemptions. |
| Phase-out of regulated transitional tariffs | Upcoming | End of 2027 | Decree-Law 69/2025 extended regulated transitional low-voltage tariffs until December 2027. About 779,000 customers were still on them in June 2026. |
| National plan for public acceptance of renewables | Upcoming | 26 November 2026 | DGEG must deliver a national plan on community engagement and acceptance of renewable projects within 90 days of Decree-Law 130/2026 entering into force. |
| Low-voltage distribution concession tender | Upcoming | Not before 2026 (date not fixed) | Most municipal low-voltage concessions expired in 2021–22 and have been extended; the model for new concession tenders is still being prepared with municipalities. |
| New balancing products | Upcoming | 2026–2027 | ERSE is preparing standard aFRR products and connection to the European PICASSO platform, a day-ahead mFRR capacity product and rules for an FCR market, alongside measures to promote aggregation. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 237,000 self-consumers and 1.8 GW of UPAC capacity at end-2024 (ERSE), growing 44% a year in number since 2021, against about 6.5 million electricity customers. |
| Distributed energy market | Medium | Self-consumption produced about 2.8% of final electricity consumption in 2024; 331 collective self-consumption schemes operated; 99% smart meter coverage enables 15-minute settlement. |
| Grid flexibility market | Low | Demand and storage can join REN’s mFRR market since 2024 and 66 aggregators are registered, but local flexibility is still a DSO pilot (FIRMe 2.0, 2026–2027) and there is no route for households beyond tariffs and aggregator contracts. |
| Energy storage adoption | Medium | 3.6 GW of pumped hydro storage but only 19 MW of grid batteries at end-2025 (REN); at least 500 MW of new grid storage funded; no official home battery statistics. |
| Renewable growth environment | High | Renewables generated 75.5% of mainland electricity in 2025 and supplied 68% of consumption; grid-connected solar grew 25% in a year; PNEC 2030 targets 93% renewable electricity. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 42 sources
- Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2025. accessed 1 October 2026.
- Comunicado – Tarifas e Preços para a Energia Elétrica em 2026. ERSE, 2025. accessed 1 October 2026.
- Revista Eletrónica do INE – julho de 2026: Estimativas da População Residente 2025. Instituto Nacional de Estatística (INE), 2026. accessed 1 October 2026.
- Habitação em Números: População, Agregados e Alojamentos Familiares – Caracterização Geral (Censos 2021). IHRU – Instituto da Habitação e da Reabilitação Urbana, 2023. accessed 1 October 2026.
- Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
- Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Portugal. World Bank, 2025. accessed 1 October 2026.
- Consumo doméstico de energia elétrica por consumidor (kWh/cons.) – indicador 0014159. INE / DGEG, 2024. accessed 1 October 2026.
- Consumo de energia elétrica por habitante (kWh/hab.) – indicador 0014162. INE / DGEG, 2024. accessed 1 October 2026.
- Dados Técnicos / Technical Data 2025. REN – Redes Energéticas Nacionais, 2026. accessed 1 October 2026.
- Energia em Números – edição 2025. DGEG, 2025. accessed 1 October 2026.
- Relatório de ponto de situação sobre as redes inteligentes de energia elétrica em Portugal continental 2025. ERSE, 2025. accessed 1 October 2026.
- Relatório do Autoconsumo de Energia Elétrica de 2024. ERSE, 2025. accessed 1 October 2026.
- Guia Explicativo do Autoconsumo. ADENE / Poupa Energia, 2025. accessed 1 October 2026.
- Decreto-Lei n.º 130/2026: o que muda no Sistema Elétrico Nacional a 28 de agosto. Pérez-Llorca, 2026. accessed 1 October 2026.
- Alterações ao regime das UPAC e da agregação de eletricidade – Lei n.º 29/2026, de 23 de junho. CMS Portugal, 2026. accessed 1 October 2026.
- Produção de Energia Elétrica – procedimentos de controlo prévio. DGEG. accessed 1 October 2026.
- Agregadores de eletricidade em regime de mercado. DGEG, 2026. accessed 1 October 2026.
- Nota Informativa – Novas regras de organização e funcionamento do Sistema Elétrico Nacional (Decreto-Lei 15/2022). SRS Legal, 2022. accessed 1 October 2026.
- Eletricidade – Distribuição. ERSE. accessed 1 October 2026.
- Síntese Mensal – Mercado retalhista de eletricidade em Portugal continental, junho 2026. ERSE, 2026. accessed 1 October 2026.
- Boletim de Ofertas Comerciais de Eletricidade – 3.º trimestre 2026. ERSE, 2026. accessed 1 October 2026.
- Lei n.º 38/2024 – aumenta o consumo de eletricidade sujeito à taxa reduzida de IVA. Autoridade Tributária e Aduaneira (Portal das Finanças), 2024. accessed 1 October 2026.
- Até quando estará em vigor a medida de IVA reduzido para energias renováveis. Postal do Algarve, 2025. accessed 1 October 2026.
- Programa E-LAR – 2.ª fase. Fundo Ambiental, 2025. accessed 1 October 2026.
- Governo vai lançar apoio à aquisição de painéis solares para famílias. Contas Poupança, 2026. accessed 1 October 2026.
- Projetos-piloto aprovados ao abrigo do artigo 78.º do Regulamento de Operação das Redes (julho 2026). ERSE, 2026. accessed 1 October 2026.
- ERSE aprova o Manual de Procedimentos da Gestão Global do Sistema implementando produto europeu normalizado de energia de balanço. ERSE, 2023. accessed 1 October 2026.
- Portugal and Spain have inaugurated the new 400 kV electricity interconnector in the north. REN, 2026. accessed 1 October 2026.
- Entso-E report finds systemic failures behind 2025 Iberian blackout. pv magazine, 2026. accessed 1 October 2026.
- Inquérito ao Consumo de Energia no Setor Doméstico 2020 (ICESD 2020). INE / DGEG, 2021. accessed 1 October 2026.
- Mercado automóvel cresce 6,2% em Portugal em 2025, com elétricos a representarem quase um quarto das vendas (ACAP data). Forbes Portugal, 2026. accessed 1 October 2026.
- 2026 Digital Decade country report – Portugal (Council document 10476/26 ADD 23). European Commission / Council of the EU, 2026. accessed 1 October 2026.
- Governo revê PNEC 2030 com metas mais ambiciosas. Government of Portugal, 2024. accessed 1 October 2026.
- Análise APREN a 2024: recorde de 80,4% na produção de eletricidade renovável. APREN, 2025. accessed 1 October 2026.
- Portugal com 75,6% de energias renováveis e quase um mês sem depender de fósseis (APREN bulletin, June 2026). Portal Energia, 2026. accessed 1 October 2026.
- Concurso de armazenamento de energia vai apoiar 41 projetos com 100 milhões de euros. RTP, 2025. accessed 1 October 2026.
- Incentives News Flash 08/2026 – Flexibilidade da Rede e Armazenamento (AAC 01/C21-i18/2026). Deloitte Portugal, 2026. accessed 1 October 2026.
- Portaria n.º 73/2020 – requisitos não exaustivos para ligação dos módulos geradores à RESP. Diário da República, 2020. accessed 1 October 2026.
- Transição da plataforma de mudança de comercializador na eletricidade. ERSE, 2020. accessed 1 October 2026.
- Código de Ponto de Entrega (CPE) – glossário. Goldenergy. accessed 1 October 2026.
- Código CPE: o que é, para que serve, como pedir?. ComparaJá. accessed 1 October 2026.
Questions about energy in Portugal.
Eurostat put the average household price at €0.2435/kWh including taxes in the second half of 2025 for a typical consumption of 2,500–4,999 kWh a year, below the EU average. On the regulated tariff in 2026, a couple using 1,900 kWh a year on 3.45 kVA pays about €36.82 a month, and a family using 5,000 kWh on 6.9 kVA about €95.03 a month.
The Código de Ponto de Entrega (CPE): a 20-character code starting "PT", then a four-digit network operator code (0002 for E-REDES), a 12-digit location code and two check letters. It is printed on every electricity bill and stays with the property when you change supplier or move.
Yes. Surplus from a registered self-consumption unit can be sold to a registered aggregator or to SU Eletricidade as last-resort aggregator, after opening self-employed tax activity. There is no net metering, and much household surplus is delivered to the grid unpaid because volumes are small.
Systems up to 700 W that do not export need no registration (800 W from 28 August 2026). Above that and up to 30 kW you file an online prior notification with DGEG and use a registered installer; 30 kW to 1 MW needs prior registration. Municipal planning permission is not normally needed for panels on existing buildings.
REN owns the transmission grid and operates the system. E-REDES, part of the EDP group, runs the distribution network for about 99.5% of low-voltage customers on the mainland, with ten small cooperatives and local operators. ERSE is the regulator.
Yes. By mid-2025, 99% of mainland low-voltage installations had a smart meter integrated into the smart grid. Meters are owned and read by the network operator and record consumption and export every 15 minutes.
The government announced a voucher for household solar equipment in January 2026, but no call had opened by mid-2026. The 6% VAT rate on solar equipment ended on 30 June 2025, so 23% now applies. Surplus income up to €1,000 a year is exempt from income tax.
