Morocco energy at a glance.
Key figures for households in Morocco. Each one links to its source on the full overview below.
Electricity price.
1.163 MAD per kWh for households, including taxes. Figures for 2026.
Renewable share.
25.9% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Morocco.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Morocco below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Morocco requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Morocco.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Morocco, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Morocco, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Morocco.
The energy market in Morocco, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Morocco’s electricity sector is led by the state. The Office National de l’Électricité et de l’Eau Potable (ONEE) runs the national transmission grid and the national control centre, buys most of the country’s electricity as single buyer, and owns a large part of the conventional generation fleet. Masen, the Moroccan Agency for Sustainable Energy, develops and contracts the large solar and wind programmes. The Autorité Nationale de Régulation de l’Électricité (ANRE), created by Law 48-15, regulates access to the grid, sets network tariffs and, since 2026, sets the price paid for surplus renewable power.
Retail distribution is being reorganised. Under Law 83-21, twelve regional multi-service companies (Sociétés Régionales Multiservices, SRM), one for each region, are taking over electricity, water and sanitation distribution from ONEE’s distribution branch, the municipal régies and the private concession holders such as Lydec, Redal and Amendis. The first SRM started in Casablanca-Settat on 1 October 2024, and the remaining regions followed during 2025. Households cannot choose their supplier. They pay a regulated block tariff to whichever body distributes in their area.
Coal still produced about 60% of Morocco’s electricity in 2024, but wind, solar and hydro made up about 45% of installed capacity. The official target is more than 52% renewable capacity by 2030. Law 82-21 on self-production of electricity, whose main implementing decree was published in March 2026, lets households and businesses install their own generation, store energy and sell up to 20% of their annual output to the grid. ANRE has so far set a surplus tariff only for medium and higher voltages, not for household low-voltage connections.
Energy snapshot.
Headline figures for electricity in Morocco. Each shows its data year and links to its source.
- Population36,828,330 peopleSource 11 September 2024
- Households9,275,038 householdsSource 12024
- Average household size3.9 people/householdSource 12024
- Electricity use per householdNot identified from a reliable public source.
- Household price (MAD)1.163 MAD/kWhSource 22026
- Household price (EUR)0.106 EUR/kWhSource 42026
- Renewable electricity share25.9%Source 52024
- Solar capacity0.928 GWSource 5End 2024
- Wind capacity2.39 GWSource 5End 2024
- Energy storage capacity0.814 GWSource 5End 2024
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Autorité Nationale de Régulation de l’Électricité (ANRE)
- System operator
- Office National de l’Électricité et de l’Eau Potable (ONEE), Electricity Branch
- Distribution networks
- Twelve regional multi-service companies (SRM), one per region, replacing ONEE distribution, municipal régies and private concessions from October 2024
- Currency
- Moroccan dirham (MAD)
- Voltage and frequency
- 220 V / 50 Hz (380 V three-phase)
Electricity prices in Morocco.
- Household price (MAD)
- 1.163 MAD/kWh (2026)Source 2Derived: tranche 3 domestic rate of MAD 0.96880/kWh excluding VAT (households using 151–210 kWh a month, charged on all units) from the regulated grid in force since 1 January 2023 in the Rabat-Salé area, plus 20% VAT, the rate for electricity from 1 January 2026. Grids differ slightly between distribution areas. The SRMs kept the grids of the bodies they replaced. Meter rental and other bill items are not included.
- Household price (EUR)
- 0.106 EUR/kWh (2026)Source 4Converted from MAD 1.163/kWh at the Bank Al-Maghrib reference rate of 1 October 2026 (EUR 1 = MAD 11.0017).
- Typical annual electricity bill
- 2,790 MAD/yr (2026)Source 2Derived for a household using 200 kWh a month: 200 kWh × MAD 0.96880 (tranche 3, all units) = MAD 193.76 a month excluding VAT, plus 20% VAT, times 12. Meter rental and other bill items are not included. The figure is illustrative, not an official average bill.
Household price trend (MAD per kWh).Source 2
| 2017–2022 | 1.087 MAD/kWh |
|---|---|
| 2023 | 1.104 MAD/kWh |
| 2024 | 1.124 MAD/kWh |
| 2025 | 1.143 MAD/kWh |
| 2026 | 1.163 MAD/kWh |
How household tariffs work
The household tariff has six bands. A home using no more than 150 kWh a month pays the first band price for its first 100 kWh and the second band price for the rest. Once monthly consumption goes above 150 kWh, the whole month is charged at the price of the band reached, so a household using 220 kWh pays the fourth band price on every unit. This structure protects small consumers and raises the price steeply for large ones.
Who sets the price
Retail tariffs are set by the government, not by ANRE. ANRE sets the tariffs for using the transmission grid (TURT), the medium-voltage distribution networks (TURD) and system services (TSS). From 1 March 2026 these were 6.85, 6.07 and 6.81 centimes per kWh. ANRE has started a full overhaul of the tariff framework, covering network tariffs, the price of surplus renewable power, self-producers’ contributions and storage, and plans to bring it into force on 1 March 2027.
VAT
The 2024 Finance Act raised VAT on electricity in steps from 14% to 16% in 2024, 18% in 2025 and 20% from January 2026. Electricity generated from renewable sources is taxed at 10%. The regulated prices are published excluding VAT, so the price a household pays rose with each step even though the base tariff did not change.
Regional differences and trend
Each distribution area historically had its own grid, with small differences between ONEE’s areas, the municipal régies and the private concessions. When the SRMs took over, they adopted the existing grids of the bodies they replaced, and the Interior Ministry and SRM Casablanca-Settat have both stated that tariffs have not been raised since the SRMs started. Base prices have barely moved since 2017. On the Rabat-Salé grid the tranche 3 price rose from MAD 0.95327 to MAD 0.96880/kWh (excluding VAT) between 2017 and 2023, so most of the recent increase in what households pay comes from VAT.
Price history
The chart shows the tranche 3 price including VAT. It is derived from the Rabat-Salé grids of 2017 and 2023, with the VAT rate in force each year (14% before 2024, then 16%, 18% and 20%). It assumes the 2023 grid continued to apply from 2024 to 2026, which matches official statements that the SRMs have not raised tariffs.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households pay a regulated tariff set by the state for “domestic use and private lighting”. Up to 150 kWh a month, billing is progressive: 0–100 kWh at MAD 0.81476 and 101–150 kWh at MAD 0.96880 per kWh (excluding VAT, Rabat-Salé grid from 1 January 2023). Above 150 kWh, billing is selective: all units are charged at the rate of the band reached: up to 210 kWh MAD 0.96880, up to 310 kWh MAD 1.07689, up to 510 kWh MAD 1.25541, above 510 kWh MAD 1.47872. |
| Time-of-use | No | There is no time-of-use option for household low-voltage customers. Medium-voltage customers pay peak, standard and off-peak rates (MAD 1.30801, 0.93782 and 0.65999/kWh excluding VAT on the Rabat-Salé grid) plus an annual fixed charge per kVA. |
| Dynamic | No | There is no organised wholesale market and no wholesale-linked retail tariff. |
| Fixed | No | Households cannot choose a supplier or a fixed-price contract. Prices change only when the state revises the regulated grid. |
| Prepayment | Unknown | No national prepayment tariff was identified. Bills are issued after meter readings and can be paid at agencies, through partner banks or online through the Fatourati platform. |
| Other | Limited | Separate regulated tariffs apply to shops and professional lighting, motive power, public lighting and administrations. Large renewable producers can sell directly to medium and high-voltage consumers under Law 13-09, which is not open to households. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,250 kWh/person/yr (all sectors) (2025)Source 20Total electricity demand per person (Ember: 1.25 MWh).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
National demand is growing quickly. Net energy demand reached 45.7 TWh in 2024, about 4% more than in 2023, and ONEE reported about 49 TWh in 2025. National peak demand rose from 7,580 MW in July 2024 to 7,990 MW in 2025 and a new record of about 8,400 MW in July 2026. Summer heat and air conditioning drive the peak.
Industry, water pumping and desalination take a growing share of demand. ANRE expects strong growth from new factories, seawater desalination plants, green hydrogen projects and infrastructure for international sporting events. Household demand is relatively modest by European standards. Electricity covered 1.25 MWh per person across all sectors in 2025, a little under a third of the world average according to Ember.
Access is almost universal: the 2024 census found that 97.1% of households have electricity. No official breakdown of household electricity use by purpose (cooling, water heating, cooking) was found.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 69.4 % of households (2024)Source 161.5% in urban areas and 85.3% in rural areas.
- Private rented
- 19.7 % of households (2024)Source 1All tenants: 28.0% in urban areas and 3.2% in rural areas. A further 10.8% of households have other arrangements, such as free housing.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- 24.4 % of urban households (2024)Source 1Urban households only. Apartments are rare in rural areas.
- Urban population
- 62.8 % of population (2024)Source 1
The typical Moroccan home is a “maison marocaine moderne”: a terraced town house of two or more storeys built on a small plot, often with a flat roof terrace. These houses held 65.4% of urban households in 2024. Apartments are growing fast in the large cities, rising from 17.5% of urban households in 2014 to 24.4% in 2024. In rural areas most homes are still traditional rural dwellings.
Most households own their home: 69.4% nationally, 61.5% in towns and 85.3% in the countryside. Renting is mainly urban, at 28% of urban households. Flat roof terraces on owner-occupied houses are physically well suited to rooftop solar. In apartment buildings, roof space is shared and installations need the co-owners’ agreement.
Households are getting smaller. The average fell from 4.6 people in 2014 to 3.9 in 2024, and the number of households grew by about 2.4% a year, much faster than the population (0.85% a year). This adds to the number of homes needing a connection.
How the grid works in Morocco.
- TransmissionONEE – Electricity Branch, ONEE national dispatch
- DistributionTwelve regional multi-service companies (SRM), one per region, replacing ONEE distribution, municipal régies and private concessions from October 2024
- MeteringNetwork operator (SRM or ONEE), No central data hub
- Supply4 or more retail suppliers
Physical flow
Large coal, gas and oil plants, wind farms, the Noor solar complexes, hydro dams and two pumped-storage stations feed ONEE’s 400 and 225 kV transmission network. Two 700 MW submarine cables under the Strait of Gibraltar connect it to Spain, and in 2024 net imports through them were 2,539 GWh, about 5.5% of national demand. The lines to Algeria are intact but have carried no power since the end of October 2021. ONEE substations step the voltage down to the medium-voltage (5.5–30 kV) distribution networks, which carry it to low-voltage (up to 1,000 V) feeders serving homes.
Commercial flow
ONEE buys the output of independent power producers under long-term power purchase agreements and of Masen’s solar and wind projects, adds its own generation and imports, and sells in bulk to the distributors (about 45% of its sales in 2024), to its own distribution customers and to very large industrial users. The distributors resell to households and businesses at regulated tariffs. Alongside this sits a smaller market under Law 13-09: private renewable producers can sell directly to industrial consumers connected at medium, high or very high voltage, paying ANRE’s network tariffs. Law 40-19 lets them also sell to distributors, up to 40% of the energy each one supplies.
Distribution reform
Until 2024, distribution was split between ONEE (mainly small towns and rural areas), municipal régies in several cities, and private concessions in Casablanca (Lydec), Rabat (Redal) and Tangier-Tetouan (Amendis). Law 83-21 replaces all of them with twelve SRMs, whose capital is held by the state, the regions and other local authorities, alongside ONEE. Each SRM operates under a management contract with its region and also takes over water, sanitation and, where relevant, public lighting.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy Transition and Sustainable Development (MTEDD) | Sets energy policy, grants authorisations for renewable plants under Law 13-09 and for self-production installations of 5 MW or more under Law 82-21, and receives declarations for off-grid self-production. |
| Regulator | Autorité Nationale de Régulation de l’Électricité (ANRE) | Created by Law 48-15 and given wider powers by Law 40-19. Sets the transmission, distribution and system-services tariffs (TURT, TURD, TSS) and the surplus-energy tariff, approves the grid code and the renewable hosting capacity, oversees ONEE’s accounting separation and settles access disputes. It does not set household retail prices. |
| TSO | ONEE – Electricity Branch | State-owned. Owns and operates the 225/400 kV transmission network (29,806 km in 2024) and the interconnections with Spain and Algeria, runs national dispatch, and buys power from IPPs and Masen projects as single buyer. Also generates power and, until the SRMs take over fully, distributes in parts of the country. |
| System operator | ONEE national dispatch | Balances supply and demand, procures reserves and system services from its own and contracted plants, and may curtail renewable injection within limits set by regulation. |
| DSO | Sociétés Régionales Multiservices (SRM) | Twelve regional public limited companies created under Law 83-21. Each distributes electricity, water and sanitation in one region, bills customers and connects small generators. Casablanca-Settat started on 1 October 2024 (after acquiring Lydec), followed by Souss-Massa, Marrakech-Safi and the Oriental in late 2024 and the other eight regions in 2025. |
| Supplier | SRM and ONEE (regulated retail) | There is no separate supply licence for households. The body that distributes in an area also supplies and bills households at the regulated tariff. |
| Metering | Network operator (SRM or ONEE) | Meters belong to the network operator, which installs, reads and replaces them. Under Law 82-21 only the network operator may install the smart meter required for self-production. |
| Data hub / registry | No central data hub | Each operator keeps its own customer and metering records. Law 82-21 requires network operators to keep a dated register of self-production declarations and connection requests, and to report new installations monthly to the administration and ANRE. |
Compared with the UK system.
| UK concept | Morocco equivalent | How it works |
|---|---|---|
| DNO | Société Régionale Multiservices (SRM) | One SRM per region owns or operates the medium and low-voltage networks, connects customers and small generators, and also runs water and sanitation. Unlike a DNO it also bills households directly. |
| National Grid/NESO | ONEE Electricity Branch | ONEE owns and operates the transmission network and national dispatch, which in Britain are split between National Grid and NESO. It is also the single buyer and a major generator. ANRE has approved accounting separation of its activities, but it has not been fully unbundled. |
| MPAN | Contract (abonnement) number and meter number | There is no national supply-point number. Each connection is identified by the distributor’s subscription contract number and the meter number printed on the bill. The format depends on the operator. |
| MPRN | No equivalent | There is no piped gas grid for homes. Households cook with bottled butane, so there is no gas supply-point number. |
| Meter operator | The network operator itself | There is no competitive metering market. The SRM or ONEE supplies, installs and reads meters. |
| Supplier | SRM or ONEE as regulated retailer | Households cannot switch supplier. Only large renewable producers can sell directly to medium and high-voltage consumers. |
| Smart-meter infrastructure | Operator-led programmes; Decree 2-24-804 | There is no DCC-style national system. ONEE uses a Siemens EnergyIP meter data management platform, and Decree 2-24-804 of October 2024 sets the functions of the smart meters required for self-production. |
How a supply point is identified.
Contract no. 30041234 · Meter no. 19-0056781 (fictional, illustrative only)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Numéro de contrat (subscription contract number) with meter number |
| Who issues it? | The local distributor: the regional SRM, or ONEE in areas it still serves |
| Format | Operator-specific contract or customer reference, plus the serial number of the meter. No national standard format. |
| Length | Varies by operator (not standardised nationally) |
| Stays with the property when you switch supplier? | No |
| Where to find it | Printed on each electricity bill with the meter number, the meter reading (index), the reading date, the quantity consumed and the bands and prices applied. |
| Electronic access | Through the distributor’s online agency or mobile app, and through the Fatourati interbank payment platform, which uses the bill reference to look up unpaid bills. |
| Third-party access | No regulated data-access scheme for third parties. Data is released by the operator to the account holder, or on their instructions. |
| Who keeps the register | Each SRM (inheriting the customer files of ONEE, the régie or the concession it replaced) or ONEE |
| Register scope | Per DSO |
How a home connection is identified
Morocco has no equivalent of the British MPAN or the European EAN code. A home connection is defined by the subscription contract (abonnement) between the occupant and the local distributor, and by the meter installed at the property. The bill shows the contract or customer reference, which is used for payments and enquiries, and the meter number, which identifies the physical metering point. The format of these references depends on the operator, and many SRMs are still using the numbering of the bodies they took over.
What happens when someone moves
The connection and meter stay with the building, but the contract belongs to the subscriber. A new occupant takes out a new subscription with the distributor and is given a new contract reference. This is why the identifier is marked as not staying with the property. The meter number does stay, unless the meter is replaced.
Who holds the records
There is no national register of supply points. Each SRM holds the customer and meter records for its region, inherited from ONEE, the municipal régie or the private concession it replaced. ONEE keeps the records for any areas it still serves. Under Law 82-21, network operators must also keep a dated register of self-production declarations and connection requests, which sets the order of priority for hosting capacity, and report the installations connected each month to the administration and to ANRE.
Getting at the data
Customers can view bills and consumption through their distributor’s online agency or app, and pay through Fatourati, banks and agencies. No regulated scheme lets energy-service companies or installers access a customer’s metering data, so they need the customer’s own bills or the customer’s request to the operator.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | No |
| Net billing | Limited |
| How exported electricity is paid | Regulated surplus tariff set by ANRE, capped at 20% of the installation’s annual production. From 1 March 2026 to 28 February 2027: 21 centimes/kWh at peak hours and 18 centimes/kWh off-peak for medium, high and very high-voltage connections. No low-voltage tariff has been set yet. |
| Can households sell surplus power? | The law allows it, up to 20% of annual production, but ANRE’s February 2026 decision set a surplus tariff only for medium, high and very high voltage. The low-voltage tariff will be set after the regulatory and technical framework is in place. |
| Is there net metering? | No. Imports and exports are metered separately, by time period. Self-consumption reduces the bill, and any surplus up to the cap is paid at a separate regulated tariff, not netted at the retail price. |
| What happens to exports above 20%? | Energy injected beyond 20% of annual production does not qualify for the regulated surplus tariff. The cap can be revised at the producer’s request under conditions set by regulation, but that decree had not been issued by October 2026. |
| Can the grid limit my output? | Yes. Renewable self-production is limited to the hosting capacity at the connection point, and the transmission operator may curtail injection for security reasons within a threshold set by regulation. |
| Is a smart meter required? | Yes, for every grid-connected self-production or self-consumption installation. Only the network operator may install it, and it must show imported and exported energy in real time by time period. |
| Can storage be added? | Yes. Law 82-21 allows self-producers to build storage and use storage services under conditions set by regulation. |
Connecting a home system.
- Check the available hosting capacity, which ANRE approves and publishes each year based on data from ONEE and the distributors.
- Below the low-voltage threshold set by decree (reported as 11 kW): file a declaration with the local distributor before installing. The distributor gives a technical opinion on the network’s capacity before issuing the receipt.
- From that threshold up to 5 MW, on low or medium voltage: apply to the network operator for a connection approval (accord de raccordement).
- 5 MW and above, on medium, high or very high voltage: apply to the Ministry for an authorisation, which is granted after a technical opinion from ONEE (and from the distributor for medium-voltage connections).
- The network operator installs a smart meter that records imports and exports by time period, and the subscription contract is amended. The operator may not refuse this change or cut supply because of the installation.
- Any surplus, up to 20% of annual production, is bought by the network operator at the ANRE tariff for that voltage level, where one exists. The producer also pays a contribution for system and distribution services set by ANRE.
Before 2026, small renewable installations had no clear legal route to connect to the low-voltage grid. Law 82-21 of February 2023 created one, but it could not be used until its implementing decree (No. 2-25-100) was adopted by the Government Council on 23 October 2025 and published in the Bulletin officiel in March 2026. Supporting decrees on certificates of origin (2-24-761) and smart meters (2-24-804) had been published in November 2024.
ANRE then issued a set of decisions between 30 January and 20 February 2026: the hosting capacity of the national system for 2026–2030, revised network tariffs, and the first regulated tariff for surplus renewable energy. The surplus tariff of 21 and 18 centimes per kWh is far below the household retail price of roughly MAD 1 per kWh, so the economics of home solar depend on using the power on site rather than exporting it.
For most households the practical position in 2026 is that rooftop solar for self-consumption can be declared and connected, but surplus exports are not yet paid. The low-voltage tariff and the related technical rules are part of ANRE’s tariff overhaul due by March 2027.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use (self-production) | Off-grid: declaration to the administration. Grid-connected below the decree threshold (reported as 11 kW) on low voltage: declaration to the distributor. From the threshold to 5 MW on low or medium voltage: connection approval from the network operator. 5 MW and above: Ministry authorisation. | MTEDD; SRM or ONEE as network operator | Law 82-21 and Decree 2-25-100. ONEE, distributors and Masen cannot be self-producers. The self-producer does not have to own the installation and can have a third party build and run it. |
| Generate renewable electricity for sale | Under Law 13-09: below 20 kW no formality, 20 kW to 2 MW prior declaration, above 2 MW authorisation. Authorisation applicants must be companies registered in Morocco and in good standing with the tax and social-security authorities. | MTEDD, with a technical commission and ONEE’s technical opinion | Law 40-19 removed the requirement to site solar projects of 2 MW or more in designated zones. Wind projects must still be in zones set by the administration. |
| Generate conventional (fossil) electricity | Contracted by ONEE as single buyer through competitive tenders and power purchase agreements | ONEE / Government | There is no merchant route to sell fossil generation to the grid. |
| Store energy | Allowed for self-producers and renewable producers under conditions to be set by regulation. No separate storage licence regime identified. | MTEDD; ANRE for tariffs | Law 82-21 art. 15 and Law 40-19. ANRE’s 2027 tariff overhaul includes storage and flexibility mechanisms. |
| Export surplus to the grid | Up to 20% of annual production, sold to the network operator at the ANRE tariff. Requires a smart meter installed by the operator. | ANRE; network operator | There is no tariff for low voltage yet. |
| Sell electricity to third parties | Only renewable producers under Law 13-09, and only to consumers connected at medium, high or very high voltage, or to distributors (up to 40% of the energy each supplies) | MTEDD; ANRE for network access | Low-voltage customers, including households, can only be supplied by their distributor. |
| Supply / retail to households | Exclusive right of the regional SRM (or ONEE where it still distributes) | Interior Ministry and regions (Law 83-21 management contracts) | There is no competitive retail licence. |
| Distribution network operation | Regional SRM under Law 83-21 and a management contract with the region | Interior Ministry; regions | Replaced ONEE distribution, municipal régies and private concessions from October 2024. |
| Transmission and system operation | Reserved to ONEE as transmission system operator | Law; ANRE oversight | Network access and tariffs are regulated by ANRE. ANRE has approved accounting separation of ONEE’s activities. |
| Wholesale trading | No organised wholesale market or power exchange. ONEE buys as single buyer. | ONEE | Cross-border trading with Spain is handled by ONEE. |
| Export electricity abroad | Renewable exports need ONEE’s technical opinion and the administration’s approval, under an agreement with ONEE | MTEDD; ONEE; ANRE | Introduced by Law 40-19. ANRE oversees the operations and ONEE manages them. |
| Aggregation / virtual power plant | No legal framework or licence category | None | There is no aggregator role in law. |
| Balancing and grid services | Provided by plants contracted with or run by ONEE. Self-producers pay for system services rather than selling them. | ONEE; ANRE sets the system-services tariff (TSS) | There is no market for third parties to offer reserves. |
| Remote control of distributed assets | No specific authorisation regime identified | None identified | The transmission operator may curtail renewable injection for system security within limits set by regulation. |
Morocco’s licensing system is built on three laws. Law 13-09 (2010), amended by Law 40-19 (2023), governs renewable plants that sell electricity. Law 82-21 (2023) governs generation for the producer’s own use. Law 83-21 governs distribution by the SRMs. Conventional generation and transmission remain with ONEE, which the founding Dahir of 1963, as amended, makes the single buyer and grid operator.
Under Law 82-21 the procedure depends on capacity and voltage level. Small installations need only a declaration, mid-sized ones need the network operator’s connection approval, and those of 5 MW or more need the Ministry’s authorisation. Only installations of 5 MW or more can use the public grid to carry power from a production site to a separate consumption site. Every self-producer connected to the grid pays a contribution for system and distribution services set by ANRE.
Activities common in European markets, such as aggregation, demand response, independent storage trading and retail supply competition, have no legal category in Morocco. The 2026–2027 reforms focus on network tariffs and surplus pricing. They do not open retail supply or create a balancing market.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency reserves (primary, secondary, tertiary) | No | — | No | ONEE. Reserves are provided by ONEE’s plants, contracted plants and the pumped-storage stations. Law 82-21 defines these as system services that self-producers pay for through a contribution, not services they can sell. |
| Balancing / supply-demand adjustment | No | — | No | ONEE national dispatch. Handled centrally by ONEE. There is no balancing market open to third parties. |
| Wholesale energy | No | — | No | ONEE (single buyer). There is no power exchange. Bilateral sales under Law 13-09 are limited to renewable producers and medium or high-voltage consumers. |
| Surplus energy purchase | Restricted | — | No | Network operators at ANRE tariff. Self-producers on medium voltage and above can sell up to 20% of annual output at 21/18 centimes per kWh (peak/off-peak). There is no low-voltage tariff yet. |
| Demand response | No | — | No | There is no household demand-response programme. Medium-voltage time-of-use tariffs give a price signal to larger users. |
Morocco has no flexibility market for distributed assets. Flexibility comes from ONEE’s dispatchable plants, the 814 MW of pumped storage at Afourer and Abdelmoumen, the molten-salt thermal storage at the Noor Ouarzazate CSP plants, and the interconnection with Spain.
Distributed resources connect through Law 82-21, which treats them as self-consumers. They pay for system services and may sell a limited surplus, but they cannot sell reserves or be aggregated. ANRE’s tariff overhaul for March 2027 includes “storage and flexibility mechanisms”, but no market design had been published by October 2026.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| ANRE hosting capacity platform | Publishes the renewable hosting capacity of the transmission and distribution networks approved by ANRE for 2026–2030. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Early stage: ONEE programme for large customers, plus compulsory smart meters for self-producers |
| Reading interval | Not specified publicly for households; measurement by time period for self-producers |
| Legal basis | Law 82-21 arts. 18–20; Decree 2-24-804 of 22 October 2024 on smart-meter functions |
| Who installs | Only the network operator (SRM or ONEE) |
| ONEE platform | Siemens EnergyIP meter data management, contracted in 2021 for more than 100,000 smart meters |
| First customers | Very high, high and medium-voltage customers. Low voltage is to follow. |
| National penetration | Not published |
Most Moroccan homes still have conventional meters that are read manually. The bill shows the meter index, the reading date and the consumption. ONEE’s smart-metering programme, built on a Siemens EnergyIP meter data management platform contracted with Atos and Siemens in 2021, was designed for more than 100,000 meters and started with very high, high and medium-voltage customers. Low-voltage customers, the vast majority of accounts, were left for later phases.
Law 82-21 makes a smart meter compulsory for any grid-connected self-production installation. The meter must show imported and exported energy in real time by time period and offer output ports for the data. Only the network operator may install it. Decree 2-24-804 sets its functions, and ANRE sets the minimum metering rules, including the billing period and how the surplus is calculated. As self-production grows, this is likely to be the main route by which smart meters reach homes.
With the SRM reform, metering responsibility moved to the new regional companies, which inherited a mix of systems from ONEE, the régies and the private concessions. No national rollout target or data-access standard comparable to the British smart-meter programme has been set.
Renewable electricity.
Electricity generation mix (2024).
- Coal: 60%
- Wind: 21.4%
- Natural gas: 9.9%
- Solar: 3.7%
- Fuel oil and gasoil: 3.4%
- Pumped storage: 0.8%
- Hydro: 0.7%
- Renewable electricity share
- 25.9% (2024)Source 5Derived from ANRE/ONEE generation data: wind 9,363 GWh, solar 1,617 GWh and hydro 321 GWh out of 43,713 GWh. ANRE quotes 27% because it also counts pumped-storage output. Ember estimates 23.3% for 2025.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Coal
- 4.116 GW (End 2024)Source 5
- Wind
- 2.39 GW (End 2024)Source 5
- Fuel oil and gasoil
- 1.628 GW (End 2024)Source 5
- Hydro (dams)
- 1.306 GW (End 2024)Source 5
- Solar (PV and CSP)
- 0.928 GW (End 2024)Source 5
- Natural gas
- 0.834 GW (End 2024)Source 5
- Pumped storage
- 0.814 GW (End 2024)Source 5
Targets.
- More than 52% of installed electricity capacity from renewable sources by 2030 (national energy strategy).
- ANRE-approved renewable hosting capacity of 9,338 MW for 2025–2029, of which 1,324 MW on distribution networks; updated for 2026–2030 by Decision 01/26 of 30 January 2026.
Renewables made up about 45% of Morocco’s installed capacity at the end of 2024 (5,439 MW) but a much smaller share of generation, about 26%, because coal plants supply most of the baseload and hydro output was only 321 GWh. Wind is the largest renewable source, producing 9,363 GWh in 2024, 43% more than in 2023, mostly from independent producers selling to ONEE and private producers selling to industry under Law 13-09.
Solar output fell by 25% in 2024 to 1,617 GWh, because the Noor Ouarzazate III CSP tower was out of service. Masen, which accounts for about 86% of solar production, is now building photovoltaic plants with batteries, including Noor Midelt II and III (800 MW of PV with 602 MWh of storage), awarded to ACWA Power in August 2025.
Self-production is a growing share of new capacity. In 2024 OCP commissioned a 67.3 MW self-production solar plant at Benguerir, and a 30 MW solar plant under Law 13-09 was connected to the Tangier medium-voltage network. Following Law 40-19, ANRE now sets the network’s renewable hosting capacity each year, which caps how much new capacity can connect in each zone.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 0.814 GW (pumped storage) (End 2024)Source 5Afourer and Abdelmoumen (350 MW) pumped-storage stations. Battery systems at Noor Midelt II and III (602 MWh) were contracted in 2025 and are not yet counted.
Large-scale storage in Morocco has so far meant pumped hydro and solar thermal. The two pumped-storage stations, 814 MW in total, shift coal and wind output to the evening peak, and the Noor Ouarzazate CSP plants store heat to produce power after dark. Batteries are now being added to new solar plants, starting with Noor Midelt II and III.
For homes and businesses, Law 82-21 explicitly allows self-producers to install storage, under conditions to be set by regulation. Because surplus exports are capped at 20% of annual output and low-voltage surplus is not yet paid, batteries can help a self-producer use more of their own generation. ANRE has included storage in its tariff framework review due by 2027.
Storage projects.
- Abdelmoumen pumped-storage station (STEP): 350 MW, Taroudant province. Commissioned by ONEE in October 2024 and generated about 135 GWh in its first period of operation.
- Noor Midelt II and III: Two 400 MW photovoltaic plants with battery storage totalling 602 MWh, able to discharge 230 MW over two hours. Awarded by Masen to ACWA Power in August 2025 under 30-year power purchase agreements.
- Noor Ouarzazate CSP: Concentrated solar power plants with molten-salt thermal storage that generate after sunset. Part of the 580 MW Noor Ouarzazate complex.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| SRM Casablanca-Settat | About 2.7 million electricity customers (April 2026) | No | Limited | No | Limited |
| Other regional SRMs (eleven regions) | Exclusive distributor and retailer in each region (Rabat-Salé-Kénitra, Tanger-Tétouan-Al Hoceima, Fès-Meknès, Marrakech-Safi, Souss-Massa, Oriental, Béni Mellal-Khénifra, Drâa-Tafilalet, Guelmim-Oued Noun, Laâyoune-Sakia El Hamra, Dakhla-Oued Eddahab) | No | Limited | No | Limited |
| ONEE (direct customers) | Supplies the distributors in bulk, very large high-voltage customers (about 12% of its 2024 sales) and its remaining distribution customers | No | Limited | No | Limited |
| Private renewable producers under Law 13-09 | Direct sales to medium and high-voltage industrial consumers only | Yes | No | No | No |
There is no retail competition for households. Each home is supplied by the body that distributes in its area, which since 2024–2025 is the regional SRM. The SRMs apply the regulated grids they inherited and bill households directly, usually for water and sanitation as well. Time-of-use pricing exists only for medium-voltage customers.
The only competitive segment is renewable electricity sold directly by private producers to large consumers on medium, high or very high voltage under Law 13-09, mainly from wind farms, using ONEE’s and the distributors’ networks at ANRE’s tariffs.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy Transition and Sustainable Development | Government | Energy policy, authorisations under Laws 13-09 and 82-21 | Grants authorisations for renewable plants and large self-production projects and receives declarations for off-grid installations. |
| ANRE – Autorité Nationale de Régulation de l’Électricité | Regulator | Electricity regulator | Publishes network tariffs, the surplus-energy tariff, hosting capacity and the grid code. It is the main source for the rules on connecting distributed generation. |
| ONEE – Office National de l’Électricité et de l’Eau Potable | Transmission | Transmission system operator, single buyer, generator | Operates the national grid and dispatch, and gives the technical opinion on large connections and exports. |
| SRM Casablanca-Settat | Distribution | Regional distributor (largest SRM) | The first SRM, which took over Lydec, ONEE and régie distribution in Morocco’s largest region in October 2024. |
| Masen – Moroccan Agency for Sustainable Energy | Renewable Energy | Developer and contracting authority for large solar and wind programmes | Runs the Noor solar complexes and the tenders for new solar-plus-storage capacity. |
| AMEE – Moroccan Agency for Energy Efficiency | Renewable Energy | Public energy-efficiency agency | The public agency for energy efficiency, a reference point for efficiency programmes in buildings and industry. |
| IRESEN – Research Institute for Solar Energy and New Energies | Renewable Energy | Applied research and testing | Public research institute working with partners such as CEA and CNRS on solar and battery storage. |
| AMISOLE – Association Marocaine des Industries Solaires et Éoliennes | Solar | Solar and wind industry association (founded 1987) | Represents solar and wind companies and has worked on quality labelling for PV installations. |
| FENELEC – Fédération Nationale de l’Électricité, de l’Électronique et des Énergies Renouvelables | Consumer | Industry federation for electrical and renewable-energy companies | Represents electrical contractors and equipment makers, including installers of solar systems. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (transmission) | Code du Réseau Électrique National de Transport (CRENT) | ANRE (approved); ONEE (applies) | Approved by the ANRE Council. Sets the non-discriminatory technical requirements for connecting to and using the transmission network and for data exchange between ONEE and network users. |
| Self-production regime | Law 82-21 and Decree 2-25-100 | Parliament; Government | Installations must comply with the national or international standards adopted in Morocco, and owners must protect people and property against electrical risks. |
| Smart metering | Decree 2-24-804 (22 October 2024) | Government | Defines the functions of the smart meter required for self-production installations. |
| Certificates of origin | Decree 2-24-761 (22 October 2024) | Government | Sets out how certificates of origin for renewable electricity are issued and by which body. |
| Metering and surplus calculation | ANRE minimum metering conditions (Law 82-21 art. 20) | ANRE | ANRE sets the billing period and the method for calculating surplus energy, after consulting network operators. |
| Voltage levels | Law 82-21 definitions | Parliament | Low voltage up to 1,000 V; medium voltage 5.5–30 kV; high voltage 30–150 kV; very high voltage 150 kV and above. |
| Installer accreditation | No national certification scheme for solar installers identified | — | There is no Moroccan equivalent of MCS. Industry associations have promoted voluntary quality labels. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Declaration to the distributor (small grid-connected self-production) | Yes | Regional | Below the decree threshold (reported as 11 kW) on low voltage. Filed with the SRM or ONEE before installation. The distributor’s technical opinion on network capacity is needed for the receipt. |
| Connection approval (accord de raccordement) | Limited | Regional | Required from the decree threshold up to 5 MW on low or medium voltage. Issued by the network operator within the available hosting capacity. |
| Ministry authorisation | Limited | National | Required for self-production of 5 MW or more, and for renewable plants above 2 MW selling under Law 13-09. |
| Declaration for off-grid systems | Yes | National | Off-grid self-production connected to a consumption installation must be declared to the administration (Law 82-21 art. 3). |
| Smart meter installation by the network operator | Yes | Regional | Required for every grid-connected self-production installation. Only the network operator may install it. |
| Planning or building permission | Unknown | Local | No national rule specific to rooftop solar was identified. Municipal urban-planning rules apply, and apartment buildings need the co-owners’ consent for shared roofs. |
For a household, the main formalities in 2026 are the self-production declaration to the local distributor and the installation of a smart meter by that distributor. Larger installations need a connection approval and, from 5 MW, a Ministry authorisation. Applications are ranked by date and time of receipt in a register kept by the network operator, because connections are limited by the hosting capacity at each point of the network.
Law 82-21 requires the administration to digitise these procedures so applicants can follow their files and see their place in the queue. Changing an installation after declaration or approval needs the prior agreement of the administration or network operator.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Reduced VAT on renewable electricity | Active | VAT relief | Electricity generated from renewable sources is taxed at 10% VAT, compared with 20% for other electricity in 2026. | From 2024 Finance Act transition; rates in force 2026 |
| Regulated surplus-energy tariff | Active | Export payment | 21 centimes/kWh at peak and 18 centimes/kWh off-peak for surplus up to 20% of annual production, for installations on medium, high and very high voltage. Not yet available on low voltage. | 1 Mar 2026 – 28 Feb 2027 |
| Low-voltage surplus tariff | Scheduled | Export payment | ANRE has said it will set the tariff for the low-voltage network once the regulatory and technical framework is in place. | — |
Data and connectivity.
- Fixed broadband
- 32.1 fixed broadband subscriptions per 100 households (March 2026)Source 26Derived: 2.977 million fixed internet subscriptions (1.495 million FTTH, 1.400 million ADSL, others) divided by 9.275 million households (RGPH 2024). Another 1.34 million 4G/5G home boxes are counted as mobile.
- 4G coverage
- 86.8 % of mobile internet subscriptions (March 2026)Source 26Share of 38.1 million mobile internet subscriptions using 4G.
- 5G coverage
- 8.4 % of mobile internet subscriptions (March 2026)Source 265G was launched commercially in November 2025.
Mobile networks dominate internet access: about 90% of internet subscriptions are mobile. Three operators (Itissalat Al-Maghrib, Medi Telecom and Wana Corporate) cover the country with 4G, and 5G was launched in November 2025, reaching 8.4% of mobile internet subscriptions by March 2026. Fixed broadband is growing through fibre, which overtook ADSL in late 2025, but it still reaches only about a third of households.
For smart meters and connected energy equipment, this makes cellular networks the obvious channel outside the main cities. No national standard for smart-meter communications has been published. ONEE’s programme uses its own meter data management platform, and Decree 2-24-804 deals with meter functions rather than communication protocols.
Grid conditions.
- National peak demand
- 8.4 GW (July 2026)Source 21Record reported by ONEE. The 2025 peak was 7,990 MW and the 2024 peak 7,580 MW.
- Annual electricity demand
- 45.7 TWh (2024)Source 5Net energy demand. ONEE reported about 49 TWh for 2025.
- Generation capacity
- 12 GW (End 2024)Source 5Includes 814 MW of pumped storage.
- Interconnection
- 1.4 GW (2019)Source 22Two 700 MW submarine links with Spain (1997 and 2006). The lines to Algeria (two 225 kV and one 400 kV) have carried no power since October 2021 and are not counted.
- Curtailment
- Not identified from a reliable public source.
Demand is growing faster than in most of the region, driven by industry, desalination and summer cooling, and the national peak broke records in 2024, 2025 and 2026. The system relies on coal for baseload, on gas and oil plants and pumped storage for the peak, and on imports from Spain, which covered 5.5% of demand in 2024.
Grid capacity is the main limit on new renewables. Since Law 40-19, ANRE approves each year a hosting capacity for renewable energy across the transmission and distribution networks. For 2025–2029 this totalled 9,338 MW, of which 1,324 MW on distribution networks, and a new decision for 2026–2030 was adopted on 30 January 2026. Connection requests are queued by date and time within this capacity.
Major transmission work is under way, including a high-voltage link to carry renewable power from the southern provinces to the centre and north, called for in the Throne Day speech quoted in ANRE’s 2024 annual report. A third interconnector with Spain was agreed in 2019, and Morocco and Portugal agreed in July 2026 to revive a planned link.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Self-production decree (2-25-100) in force | Current | March 2026 | Makes Law 82-21 operational: declaration, connection-approval and authorisation regimes, deadlines, required documents and the role of network operators. |
| First regulated surplus tariff | Current | 1 March 2026 | ANRE Decision 04/26: 21/18 centimes per kWh (peak/off-peak) for medium voltage and above, valid to 28 February 2027. |
| Network tariffs adjusted | Current | 1 March 2026 | TURT 6.85, TURD 6.07 and TSS 6.81 centimes per kWh. |
| VAT on electricity reaches 20% | Current | 1 January 2026 | Final step of the 2024 Finance Act transition from 14%. Renewable electricity is taxed at 10%. |
| All regions transferred to SRMs | Current | October 2024 – 2025 | Twelve regional multi-service companies replace ONEE distribution, the régies and the private concessions under Law 83-21. |
| Overhaul of the tariff framework | Upcoming | 1 March 2027 (planned) | ANRE review of network tariffs, infrastructure remuneration, surplus pricing, self-producers’ contributions, and storage and flexibility mechanisms. |
| Low-voltage surplus tariff | Upcoming | Not yet dated | ANRE will set the surplus tariff for household low-voltage connections once the technical framework is in place. |
| Decree to raise the 20% surplus cap | Upcoming | Not yet dated | Law 82-21 allows the cap to be revised at the producer’s request under conditions set by decree, which has not yet been adopted. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | The legal route for household self-production only became usable in March 2026, there is no low-voltage surplus tariff and no official count of residential installations. |
| Distributed energy market | Low | Distributed generation is limited to self-consumption under Law 82-21, with exports capped at 20% of annual output and connections limited by published hosting capacity. |
| Grid flexibility market | Low | There is no wholesale, balancing or reserve market open to third parties and no legal role for aggregators. ONEE provides all system services. |
| Energy storage adoption | Medium | 814 MW of pumped storage and CSP thermal storage are operating, and 602 MWh of batteries were contracted with Noor Midelt II and III in 2025. No home-battery data exists. |
| Renewable growth environment | High | Renewable capacity rose about 18% in 2024 to 5,439 MW (45% of the total), wind output rose 43%, and the target is more than 52% of capacity by 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 28 sources
- Recensement Général de la Population et de l’Habitat 2024 – Principaux résultats. Haut-Commissariat au Plan (HCP), 2024. accessed 1 October 2026.
- Grille tarifaire hors TVA (en vigueur depuis le 1er janvier 2023). Redal (Rabat-Salé distribution area), 2023. accessed 1 October 2026.
- Grille tarifaire hors TVA (en vigueur depuis le 1er janvier 2017). Redal (Rabat-Salé distribution area), 2017. accessed 1 October 2026.
- Cours de référence. Bank Al-Maghrib, 2026. accessed 1 October 2026.
- Rapport annuel 2024. Autorité Nationale de Régulation de l’Électricité (ANRE), 2025. accessed 1 October 2026.
- L’ANRE fixe le tarif de l’excédent de l’énergie électrique pour la période de régulation allant du 1er mars 2026 au 28 février 2027. ANRE, 2026. accessed 1 October 2026.
- L’ANRE approuve et publie la capacité d’accueil du système électrique national au titre de la période 2026-2030. ANRE, 2026. accessed 1 October 2026.
- L’ANRE fixe le tarif de rachat de l’excédent d’électricité pour 2026-2027. Finances News Hebdo, 2026. accessed 1 October 2026.
- Dahir n° 1-23-21 portant promulgation de la loi n° 82-21 relative à l’autoproduction de l’énergie électrique. Ministère de la Justice (Adala), 2023. accessed 1 October 2026.
- Autoproduction d’électricité : le cadre réglementaire finalisé. Le360, 2025. accessed 1 October 2026.
- Produire sa propre électricité au Maroc : les nouvelles règles du solaire. Les Énergies Renouvelables, 2026. accessed 1 October 2026.
- Maroc : Publication de la Loi n°40-19, un nouveau cadre juridique pour les producteurs indépendants d’énergie. White & Case, 2023. accessed 1 October 2026.
- Flash info Maroc : le nouveau cadre législatif du secteur des énergies renouvelables au Maroc. CMS. accessed 1 October 2026.
- Factures d’eau et d’électricité : Laftit dément toute hausse de prix. Hespress FR, 2025. accessed 1 October 2026.
- Voici les dates d’entrée en service des SRM dans huit régions. Hespress FR, 2025. accessed 1 October 2026.
- SRM-CS : une proximité renforcée grâce à l’amélioration des services. EcoActu, 2026. accessed 1 October 2026.
- Électricité : l’ANRE planche sur un cadre tarifaire plus clair et prévisible. Hespress FR, 2025. accessed 1 October 2026.
- Hausse de la TVA sur les factures d’eau et d’électricité : ce qui va changer dans vos montants mensuels. Le360, 2024. accessed 1 October 2026.
- Morocco – Corporate – Other taxes. PwC Worldwide Tax Summaries, 2026. accessed 1 October 2026.
- Morocco – electricity data. Ember, 2026. accessed 1 October 2026.
- Morocco sets new record for electricity consumption. North Africa Post, 2026. accessed 1 October 2026.
- Spain and Morocco agree to build third power interconnection project. Enerdata, 2019. accessed 1 October 2026.
- Maroc-Algérie : ce réseau intact qui ne sert à rien. Bladi.net. accessed 1 October 2026.
- ACWA Power wins 800 MW Noor Midelt II & III solar projects in Morocco. IPP Journal, 2025. accessed 1 October 2026.
- Atos et Siemens accompagnent le Maroc dans la gestion intelligente de son réseau électrique. Atos, 2021. accessed 1 October 2026.
- Observatoire des abonnements à Internet au Maroc – situation à fin mars 2026. Agence Nationale de Réglementation des Télécommunications (ANRT), 2026. accessed 1 October 2026.
- Le Conseil de l’ANRE approuve le Code du réseau électrique national de transport. SNRTnews. accessed 1 October 2026.
- Maroc – EnR et efficacité énergétique : les fondamentaux. Team France Export, 2026. accessed 1 October 2026.
Questions about energy in Morocco.
Households pay a regulated block tariff. On the Rabat-Salé grid, the price excluding VAT runs from MAD 0.81 per kWh for the first 100 kWh a month to MAD 1.48 per kWh for homes using more than 510 kWh a month. With 20% VAT in 2026, a household using 151–210 kWh a month pays about MAD 1.16 per kWh, roughly €0.11.
The regional multi-service company (SRM) for your region, or ONEE in any areas it still serves. Since October 2024 the SRMs have replaced ONEE distribution, the municipal régies and private operators such as Lydec, Redal and Amendis. Households cannot choose another supplier.
Law 82-21 lets self-producers sell up to 20% of their annual production to the network operator at a tariff set by ANRE. In 2026 that tariff (21 centimes per kWh at peak, 18 off-peak) applies only to medium voltage and above. A low-voltage tariff for homes has not yet been set.
No. Imports and exports are measured separately by a smart meter installed by the network operator. Solar power used on site reduces the bill, and any surplus up to the 20% cap is paid at the separate ANRE tariff.
There is no national supply-point number. A connection is identified by the distributor’s subscription contract number and the meter number on the bill. The contract is personal, so a new occupant takes out a new one, while the meter stays with the property.
Yes. Small grid-connected systems must be declared to the local distributor before installation, larger ones up to 5 MW need the network operator’s connection approval, and 5 MW and above need a Ministry authorisation. A smart meter must be installed by the network operator.
About 26% of generation in 2024 came from wind, solar and hydro, with wind alone at 21%. Renewables made up about 45% of installed capacity, and the target is more than 52% of capacity by 2030.