Countries

Energy in Singapore, explained.

How electricity works in Singapore: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Singapore: Not yet available.Olmack is not offered in Singapore yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Singapore.

Singapore electricity market 2026: SP Group tariff, Open Electricity Market retailers, NEMS wholesale, solar export rebates, smart meters, licensing and grid rules.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Singapore dollar (SGD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Singapore energy at a glance.

Key figures for households in Singapore. Each one links to its source on the full overview below.

  • Electricity price.

    0.312 SGD per kWh for households, including taxes. Figures for Oct–Dec 2026.

  • Household use.

    5,755 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    3.8% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Singapore.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Singapore below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Singapore requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Singapore.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Singapore, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Singapore, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Singapore.

Full overview

The energy market in Singapore, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Singapore runs a small, dense and almost entirely gas-fired power system. About 95% of electricity is produced from natural gas, while solar, waste-to-energy and a small but growing volume of imports make up the rest. The Energy Market Authority (EMA) regulates the electricity and gas industries and, through its Power System Operator (PSO) division, controls dispatch and the high-voltage system. Energy policy sits with the Ministry of Energy, Trade and Industry (formerly the Ministry of Trade and Industry), whose website moved to meti.gov.sg on 1 October 2026.

The market is liberalised at both wholesale and retail level. Generators bid every half-hour into the National Electricity Market of Singapore (NEMS), run by the Energy Market Company (EMC) since 1 January 2003. Since the Open Electricity Market (OEM) was completed, every household can buy from a licensed retailer, buy at the half-hourly wholesale price through SP Group, or stay with SP Group at the regulated tariff. As at 1 April 2026, 63.08% of residential accounts remained on the regulated tariff and 36.85% were on retailer plans.

One company group owns and runs the whole grid. SP PowerAssets holds the transmission licence and owns the network, SP PowerGrid builds and maintains it, and SP Services reads meters and manages meter data for everyone as the sole Market Support Services Licensee. The regulated household tariff for October to December 2026 is 31.16 cents/kWh including 9% GST. Installed solar passed the original 2030 target of 2 GWp in 2025, and the government has raised the 2030 target to 3 GWp.

Energy snapshot.

Headline figures for electricity in Singapore. Each shows its data year and links to its source.

  • Population6,208,523 peopleSource 1June 2026
  • Households1,487,100 householdsSource 22025
  • Average household size3.06 peopleSource 42025
  • Electricity use per household5,755 kWh/yrSource 52024
  • Household price (SGD)0.312 SGD/kWhSource 9Oct–Dec 2026
  • Household price (EUR)0.217 EUR/kWhSource 37Oct–Dec 2026
  • Renewable electricity share3.8%Source 282025
  • Solar capacity2.17 GWpSource 282025
  • Wind capacity0 GWSource 302024
  • Energy storage capacity0.212 GWSource 282025
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Restricted
Regulator
Energy Market Authority (EMA)
System operator
Power System Operator (PSO), a division of the EMA
Distribution networks
A single national network owned by SP PowerAssets (the transmission licensee) and built and maintained by SP PowerGrid; there are no regional distribution companies
Currency
Singapore dollar (SGD)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Singapore.

Household price (SGD)
0.312 SGD/kWh (Oct–Dec 2026)Source 9SP Group regulated low-tension domestic tariff for 1 October to 31 December 2026: 31.16 cents/kWh including 9% GST (28.59 cents/kWh before GST). Before GST, it is made up of energy costs 22.18, network costs 6.10, the Market Support Services fee 0.23, and the market administration and power system operation fee 0.08 cents/kWh. There is no standing charge in the tariff. Retailer plans may be cheaper or more expensive.
Household price (EUR)
0.217 EUR/kWh (Oct–Dec 2026)Source 37Converted from SGD 0.3116/kWh at the ECB reference rate of 1 EUR = 1.4348 SGD on 9 October 2026.
Typical annual electricity bill
1,793 SGD/yr (Oct–Dec 2026 tariff)Source 9Derived: 5,755 kWh a year (see consumption per household) × SGD 0.3116/kWh = SGD 1,793. A 4-room HDB flat using SP Group’s national average of 4,280 kWh a year would pay about SGD 1,334 at the same rate. This is before any U-Save rebate, which reduces bills for eligible HDB households.

Household price trend (SGD per kWh).Source 12

0.2220.2850.3482021-Q12026-Q4
Singapore household electricity price, SGD per kWh
2021-Q10.2221 SGD/kWh
2021-Q20.2413 SGD/kWh
2021-Q30.2502 SGD/kWh
2021-Q40.258 SGD/kWh
2022-Q10.2722 SGD/kWh
2022-Q20.299 SGD/kWh
2022-Q30.3228 SGD/kWh
2022-Q40.3182 SGD/kWh
2023-Q10.3127 SGD/kWh
2023-Q20.2962 SGD/kWh
2023-Q30.2996 SGD/kWh
2023-Q40.31 SGD/kWh
2024-Q10.3258 SGD/kWh
2024-Q20.3247 SGD/kWh
2024-Q30.3257 SGD/kWh
2024-Q40.3172 SGD/kWh
2025-Q20.3065 SGD/kWh
2025-Q30.2994 SGD/kWh
2025-Q40.3003 SGD/kWh
2026-Q10.2911 SGD/kWh
2026-Q20.2972 SGD/kWh
2026-Q30.3478 SGD/kWh
2026-Q40.3116 SGD/kWh

How the regulated tariff is set

The regulated tariff is the price SP Group charges households that have not chosen a retailer. The EMA approves it using a formula based on the long-term cost of producing and delivering electricity. It is reviewed every quarter, mainly to pass through changes in the price of the natural gas that generates almost all of Singapore’s power. For October to December 2026, the 28.59 cents/kWh charged before GST is made up of energy costs paid to generation companies (22.18 cents), network costs paid to SP Group (6.10 cents), the Market Support Services fee (0.23 cents), and the market administration and power system operation fee paid to EMC and the PSO (0.08 cents). GST at 9% is then added, giving 31.16 cents/kWh.

Household bills therefore follow fuel markets closely. The tariff rose by 17.0% (4.64 cents/kWh before GST) for July to September 2026, then fell by 10.4% (3.32 cents/kWh) for October to December 2026, which cut the average 4-room HDB bill by SGD 12.99 a month before GST. SP Group said lower natural gas prices between 1 July and 15 September 2026 drove the reduction. It warned that rising fuel prices since September 2026 could push the tariff up again the following quarter.

Retail competition

Every household can choose between three ways of buying electricity: a retailer, the wholesale price through SP Group, or the regulated tariff. Switching is free, does not interrupt supply, and a retailer contract can start as early as six business days after the retailer notifies SP Group. Retailers bill either directly or through the SP Group utilities bill, while SP Group continues to bill water, town gas and refuse collection. At 1 April 2026, 36.85% of residential accounts had a retailer price plan.

Rebates and support

The government pays GST Voucher U-Save rebates to eligible HDB households through their utilities accounts. Rebates are used to offset SP Group charges first. Households on a retailer plan can still use them against electricity charges, and retailers must apply any available U-Save balance. Unused rebates roll over and lapse only when the account is closed.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesSP Group (through SP Services) supplies at a single flat EMA-approved rate per kWh for all low-tension domestic customers, reviewed every quarter. For 1 October to 31 December 2026 it is 31.16 cents/kWh including GST, down 10.4% from 34.78 cents/kWh in July–September 2026. This is the default for anyone who does not choose a retailer.
FixedYesUnder the Open Electricity Market, licensed retailers offer standard fixed-price plans at a constant rate for the contract term. Contracts may include a security deposit, early termination charges and auto-renewal. An auto-renewed rate must be lower than the regulated tariff at renewal, and the customer can cancel within 30 days without a penalty.
VariableYesRetailers’ “discount off the regulated tariff” plans move with SP Group’s quarterly tariff but at a fixed percentage discount.
DynamicYesHouseholds can buy at the half-hourly wholesale electricity price through SP Group. The OEM site warns that this price is uncertain and volatile. Only 0.08% of residential accounts used this option at 1 April 2026.
PrepaymentLimitedSP Group runs a Pay-As-You-Use (PAYU) metering scheme. Households on PAYU must clear any arrears owed to SP Group before they can switch to a retailer.
Time-of-useUnknownThe regulated domestic tariff has no peak or off-peak rates; these apply only to high-tension business supplies. Whether individual retailers currently offer household peak/off-peak plans was not confirmed from an official source.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
5,755 kWh/yr (2024)Source 5Derived: household-sector electricity consumption in 2024 (8,422.3 GWh, SingStat) ÷ 1,463,400 resident households (SingStat, 2024). Because the consumption figure covers all households while the denominator counts only resident households, this slightly overstates use per home. SP Group national averages for August 2025 to July 2026 range from 3,093 kWh (3-room HDB flat) and 4,280 kWh (4-room HDB flat) to 6,056 kWh (private apartment) and 9,628 kWh (terraced house).
Average daily use per household
15.8 kWh/day (2024)Source 5Derived from 5,755 kWh per household per year ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
9,548 kWh/person/yr (2024)Source 5Derived: total electricity consumption in 2024 (57,639.7 GWh, all sectors) ÷ 6,036,860 total population (SingStat, 2024). Not residential only.
Heat pumps
Not identified from a reliable public source.
Air conditioning
81.9 % of households (2023)Source 6Resident households owning or having an air conditioner (Household Expenditure Survey).
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households used 8,422.3 GWh of electricity in 2024, about 15% of the national total of 57,639.7 GWh. Industry (22,704 GWh) and commerce and services (23,195 GWh) account for most of the rest. Total consumption reached a record 58.4 TWh in 2025, according to EMC, driven largely by manufacturing.

Use varies with dwelling size. In SP Group’s national averages for August 2025 to July 2026, a 3-room HDB flat used about 3,093 kWh a year and a 4-room flat about 4,280 kWh. A private apartment used about 6,056 kWh, a terraced house about 9,628 kWh and a bungalow about 25,114 kWh. Air conditioning drives this: 81.9% of resident households had an air conditioner in 2023. Demand peaks in the warmest months; EMC reported the highest monthly average system demand in July 2025.

Transport is being electrified. All new car and taxi registrations must be cleaner-energy models from 2030, and the Green Plan aims for all vehicles to run on cleaner energy by 2040. Every HDB town was to be EV-ready by 2025, with charging points in close to 2,000 HDB car parks.

Housing and households.

Dwellings
1,487,100 resident households (2025)Source 2Number of resident households by dwelling type. A separate count of dwellings was not used.
Owner-occupied
91.2% (2025)Source 31,355,700 owner-occupied resident households. Most HDB flats are sold on long leases, so they count as owner-occupied.
Private rented
8.2% (2025)Source 3Derived: 121,200 rented resident households ÷ 1,487,100. This includes both HDB public rental flats and privately rented homes.
Social or public housing
Not identified from a reliable public source.
Houses
4.7% (2025)Source 2Derived: 69,200 resident households in landed properties ÷ 1,487,100.
Apartments and flats
95.1% (2025)Source 2Derived: HDB flats (1,148,000) plus condominiums and other apartments (266,400) ÷ 1,487,100. The remaining 0.2% are other dwelling types.
Urban population
100 % of population (2025)Source 38

Singapore is a fully urban city-state where nearly everyone lives in flats. In 2025, 1,148,000 of 1,487,100 resident households (77%) lived in HDB public housing. Another 266,400 (18%) lived in condominiums and other private apartments, and only 69,200 (4.7%) in landed houses. Home ownership is very high at 91.2%, because HDB flats are sold to households on long leases.

Housing type shapes the energy options. In HDB estates, rooftop solar is deployed at block level: in 2021, town councils and grassroots units held 167 MWp of grid-connected solar, against 15.7 MWp on residential premises. SP Group’s connection forms include a separate letter of consent from HDB, and another from the landlord or management corporation for strata developments. Individual rooftop solar and home batteries are realistic mainly for the roughly 5% of households in landed homes.

How the grid works in Singapore.

  1. TransmissionPower System Operator (PSO), a division of the EMA, SP PowerAssets / SP PowerGrid (SP Group)
  2. DistributionA single national network owned by SP PowerAssets (the transmission licensee) and built and maintained by SP PowerGrid; there are no regional distribution companies
  3. MeteringSP Services (Market Support Services Licensee)
  4. Supply8 or more retail suppliers

Physical flow

Power stations, mostly combined-cycle gas plants owned by competing generation companies, feed the national grid owned by SP PowerAssets. In 2025, CCGT/cogeneration/trigeneration units supplied 95.0% of generation offered into the market. Rooftop and floating solar, waste-to-energy plants, battery storage and a small volume of imports provide the rest. Singapore has one interconnector with Peninsular Malaysia of about 1 GW. A second interconnector of up to 2 GW is being studied for 2030.

SP PowerGrid runs one integrated network of more than 28,000 km of cables and 12,000 substations, and includes a 40 km cross-island cable tunnel about 60 m deep. Customers experienced an average of 0.15 minutes of interruption in 2020.

Commercial flow

Generators sell every half-hour into the NEMS and receive the nodal price at their injection point. Retailers, and SP Services for customers on wholesale prices, pay the Uniform Singapore Energy Price (USEP), a weighted average of nodal prices at up to 900 withdrawal nodes. The average USEP was SGD 116.57/MWh in 2025 and rose to SGD 193.59/MWh in the second quarter of 2026 as fuel prices rose. SP Services provides metered data, and EMC settles daily. Households on the regulated tariff are supplied by SP Services, which buys from the wholesale market and recovers its costs through the EMA-approved tariff.

At the end of 2025 the NEMS had 60 market participants: 20 generators, 25 wholesale market traders and 15 retailers. SP Services’ share of the market was 22.3%, and the top three generation companies together held 50.6%.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy, Trade and Industry (METI)Sets energy policy, including solar and import targets, the nuclear study and decarbonisation funding. Its website moved from mti.gov.sg to meti.gov.sg on 1 October 2026.
RegulatorEnergy Market Authority (EMA)Statutory board regulating the electricity and gas industries under the Electricity Act 2001. It licenses generators, retailers, wholesale market traders, the transmission licensee and the MSSL, and approves the regulated tariff.
System operatorPower System Operator (PSO), a division of the EMAControls dispatch of generation, coordinates scheduled outages, oversees emergency planning and directs the high-voltage transmission system. It also oversees real-time operation of the gas transmission system. Intermittent generators of 1 MWac or more need PSO approval.
TSOSP PowerAssets / SP PowerGrid (SP Group)SP PowerAssets is the transmission licensee and owns the national grid. SP PowerGrid is its appointed agent and builds and maintains it: over 28,000 km of cables and 12,000 substations serving 1.7 million customers.
DSOSP PowerGrid (for SP PowerAssets)There is no separate distribution company. The same SP Group network delivers power island-wide down to homes, and SP PowerGrid connects and energises new supplies and generation meters.
MeteringSP Services (Market Support Services Licensee)The only MSSL. It reads meters, manages meter data, transfers customers between retailers and gives contestable consumers access to the wholesale market. It also supplies non-contestable consumers.
ExchangeEnergy Market Company (EMC)Operates the National Electricity Market of Singapore (NEMS), an SGX Group company. It runs half-hourly market clearing, settlement, the rule-change process and the Demand Response programme.
SupplierSP Group (SP Services) and licensed electricity retailersSP Services supplies households at the regulated tariff or at wholesale prices. Fifteen retailers were registered in the NEMS at the end of 2025.

Compared with the UK system.

Compared with the UK system.
UK conceptSingapore equivalentHow it works
DNOSP PowerAssets / SP PowerGridOne national network company group instead of regional DNOs. SP PowerAssets owns transmission and distribution assets under its transmission licence, and SP PowerGrid builds, maintains and connects. Customers do not choose or pay a network company directly; network costs (6.10 cents/kWh in Q4 2026) are built into the tariff.
National Grid/NESOPower System Operator (EMA) and EMCSystem operation is a division of the regulator (the PSO) rather than a separate company. The wholesale market and its price-setting engine are run by EMC, which co-optimises energy, reserve and regulation every half-hour across about 140 injection nodes.
MPANSP Services utilities/MSS account numberThere is no published national supply-point number like an MPAN. Premises are tracked in SP Services’ systems: the household’s utilities account (or Market Support Services account after switching), the meter number and an internal installation number.
MPRNSP utilities account (town gas supplied by City Energy)Piped town gas is billed on the same SP utilities bill as electricity and water. Gas activation is handled separately by City Energy. There is no separate consumer-facing gas meter point number.
Meter operatorSP Group (SP Services / SP PowerGrid)Consumers may not install their own meters. SP Group installs and maintains all meters, including advanced meters, whichever retailer the household uses. Private AMI generation meters are allowed for solar export, but they must be of an approved type.
SupplierElectricity retailer, or SP Group at the regulated tariffHouseholds can stay with SP Group at the regulated tariff (the default), sign with a licensed retailer, or buy at the wholesale price through SP Group. Switching is free and handled by the retailer with SP Group.
Smart-meter infrastructureSP Group Advanced Metering Infrastructure (AMI)Network-owned advanced meters record half-hourly use and send it over a wireless network. Customers see their data in the SP App. There is no separate national data company like the DCC: SP Services, as MSSL, holds and manages meter data for all retailers.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?SP Services utilities account number (Market Support Services account number after switching) (MSS account)
Who issues it?SP Services Ltd (SP Group), the Market Support Services Licensee
FormatA numeric account reference issued by SP Services when a utilities account is opened. Its format and length are not published on SP Group’s or the OEM’s public pages.
LengthNot published
Stays with the property when you switch supplier?No
Where to find itOn the SP Group utilities bill, in the SP App and on the SP Utilities Portal. Households that have switched use their MSS account number, with the premises postal code and part of their NRIC/FIN/passport number, to register for the OEM e-Services portal.
Electronic accessAccount holders see bills and, with an advanced meter, half-hourly consumption in the SP App and portal. Final readings for advanced meters are taken remotely.
Third-party accessA retailer arranges the switch with SP Group once the customer has signed a contract; the customer does not need to request the transfer separately. Retailers receive the metered (or load-profiled) half-hourly data needed for billing through SP Services. No general open-data access route for other third parties was identified.
Who keeps the registerSP Services keeps the customer, meter and premises records in its billing system. Its forms also refer to an internal “EBS Installation Number” for each installation and a separate MSSL account number for generation accounts.
Register scopeNational

Singapore does not use a published national supply-point code such as the UK MPAN. A residential electricity connection is administered through SP Services’ account and meter records. A new occupant opens a utilities account with SP Group through the SP App, the online portal or a customer service centre. Singaporeans, permanent residents and foreigners aged 18 or over with valid documents can apply. They need identity documents and proof of ownership or tenancy, and a security deposit that depends on the premises type is added to the first bill. Activation takes at least a week. New HDB BTO flats need no appointment, but resale HDB flats and other properties need a safety inspection with the account holder present.

The account belongs to the occupant, not the property. Moving out means closing the account (and getting the deposit refunded after the final bill), and a new owner or tenant opens their own. SP Group has a change of ownership/tenancy form to transfer an account. The meter and the installation stay with the premises. Each meter has a meter number, which households quote when they submit readings, for example by photo to SP Group.

When a household switches to a retailer or to wholesale prices, SP Services creates a separate Market Support Services (MSS) account. SP Services then keeps providing meter reading and data services under it, while the retailer handles the supply contract. The MSS account number is the key identifier for the OEM e-Services portal. Closing it needs 7–8 business days’ notice, arranged through the retailer. If the premises export solar power, SP Services opens a separate generation account (for contestable customers) or credits the rebate to the existing load account.

Format and example

SP Group does not publish the structure or length of utilities or MSS account numbers, so no example in a confirmed format is given here. Every premises is served by the same national register in SP Services’ systems. There are no regional variations.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringUnknown
Net billingYes
How exported electricity is paidRebate for net exported energy, credited by SP Services: under the Simplified Credit Treatment for households on the regulated tariff, or the Enhanced Central Intermediary Scheme. SP Services pays the rebate only after it has received payment from EMC. The rate was not stated on the sources reviewed.
Is there a size limit for household export schemes?The SP Services rebate schemes (Simplified Credit Treatment and Enhanced Central Intermediary Scheme) cover embedded generation units of less than 10 MWac. Above that, the facility must register with EMC as a market participant.
Do I need a special meter?Yes, generation meters must be of the Advanced Metering Infrastructure (AMI) type, installed either by SP PowerGrid or privately from an approved vendor list. A solar generation profile can be used instead of a meter. Requirements follow figure F2.4.10a of the Metering Code.
Can I choose not to be paid for exports?Yes. Embedded generation units below 1 MW can choose “no rebate”, which avoids setting up a generation account.
What about non-solar embedded generators?Non-PV embedded generators must be majority (at least 50%) owned by the load customer and generally sit on land contiguous to the load. New embedded intermittent and non-intermittent generation below 10 MW can register only under the Enhanced Central Intermediary Scheme.
How is GST handled on export payments?Non-GST-registered households declare their status. For GST-registered generators, SP Services issues tax invoices on their behalf and adds GST at the prevailing rate.

Connecting a home system.

  1. Engage a Licensed Electrical Worker (LEW) to design the system and handle submissions to SP Group. In HDB or strata developments, obtain written consent from HDB, the landlord or the management corporation.
  2. Install and test the system. SP PowerGrid energises the connection, and installations up to 45 kVA use SP Group’s electrical installation test application.
  3. For systems of 1 MWac or more, submit the PSO data form for intermittent generation facility registration and obtain PSO approval before the system is switched on.
  4. Choose a metering option for the generation meter: an SP PowerGrid AMI meter (installation charges apply), an approved private AMI meter, or a solar generation profile.
  5. Apply to SP Services with the Application for Net Export Rebate. Choose the Simplified Credit Treatment or Enhanced Central Intermediary Scheme for units below 10 MWac, or “no rebate” for units below 1 MW.
  6. Systems of 1–10 MW may instead register with EMC as a non-exporting intermittent generation facility. Facilities above 10 MW, and standalone facilities, must register with EMC as market participants.

Households can export surplus solar to the grid and be credited for it, but there is no UK-style “smart export guarantee” with competing supplier tariffs. Exports are settled centrally through SP Services, which receives payment from the wholesale market through EMC and passes it on in the next billing cycle. Households on the regulated tariff use the Simplified Credit Treatment, under which the rebate is credited against the existing utilities account. Contestable customers get a separate generation account.

In practice, residential solar is a small part of Singapore’s solar fleet. In 2021 most grid-connected capacity belonged to the private sector (235.5 MWp) and to town councils and grassroots units on HDB estates (167 MWp); floating solar operators are also registered in the NEMS. HDB solar is installed at block level rather than by individual flat owners, so the export scheme is mainly relevant to landed homes and to building owners.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityGeneration licence from the EMA for facilities of 10 MW or more connected to the transmission system. Smaller generators that trade in the wholesale market do so as wholesale market traders.Energy Market AuthorityLicensed capacity in the NEMS (facilities of 10 MW or more plus imports) was 14,717 MW at the end of 2025.
Small-scale and household generation (rooftop solar)No generation licence for household-scale systems. Installation must be done by a Licensed Electrical Worker and connected through SP Group, and PSO approval is required from 1 MWac.EMA (PSO); SP Group for connectionExport is settled through SP Services schemes for units below 10 MWac. Units of 1–10 MW may register with EMC as non-exporting intermittent generation facilities.
Store electricity (grid-connected batteries)Market-connected energy storage systems register with EMC under the Market Rules, which have specific clearing and compensation rules for storage. Licensing follows the generation thresholds above.EMA; EMCThe first energy storage system joined the market in 2021, and registered storage reached 212 MW in 2025. Licensing rules specific to behind-the-meter household batteries were not identified in the sources reviewed.
Export / sell surplus to the gridNo licence for embedded units below 10 MWac using SP Services rebate schemes. Market participant registration with EMC is needed above 10 MW and for standalone facilities.SP Services; EMCUnder the Market Rules, a facility may not convey electricity through the transmission system unless EMC has registered it.
Supply / retail electricity to consumersRetail electricity licence from the EMA to sell to contestable consumers. Retailers registered in the NEMS buy directly from the wholesale market.Energy Market AuthorityThere were 15 retailers in the NEMS at the end of 2025. The EMA rates retailers through its consumer satisfaction survey, published on the OEM website.
Trade in the wholesale marketWholesale market trader licence from the EMA for companies that are neither generation licensees nor retailers. This includes generators below 10 MW and providers of interruptible load.Energy Market Authority; registration with EMC25 wholesale market traders were registered at the end of 2025.
Aggregate demand / offer load curtailmentDone through the wholesale market as a wholesale market trader or demand response participant. Loads in the same zone can be aggregated into a single load registered facility.EMA; EMCCompanies that offer other consumers’ loads to be interrupted are licensed as wholesale market traders.
Balancing / reserves / grid servicesReserves can be sold by generators, retailers and wholesale market traders (including interruptible loads). Regulation is provided only by generators.EMC (market); PSO (security)Primary reserve (9-second response) and contingency reserve (10-minute response) are traded every half-hour.
Virtual power plant / remote control of distributed assetsNo standing VPP licence category was identified. The EMA is piloting a VPP regulatory sandbox with industry partners.Energy Market AuthorityAnnounced in the March 2026 Committee of Supply debate.
Import electricityConditional approval, then a conditional licence, from the EMA for each import project.Energy Market AuthorityBy March 2026 the EMA had granted about 8.4 GW of conditional approvals, of which 3 GW had advanced to conditional licences.
Electrical installation workMust be designed, supervised and certified by a Licensed Electrical Worker (LEW). Fixed EV chargers must also be installed by an LEW and registered with LTA.EMA (electrical worker licensing); LTA (EV chargers)SP Group connection forms require the LEW’s name and licence number.

Electricity licensing in Singapore is set by the Electricity Act 2001 and administered by the EMA. The thresholds are generous for small embedded generation. A household or building owner with rooftop solar does not need a generation licence. The connection is handled through a Licensed Electrical Worker and SP Group, and exports are settled through SP Services. Licensing applies to market-facing activities: generating at 10 MW or more on the transmission system, retailing, trading in the wholesale market (including offering curtailable load), and importing.

Market participation is a separate step from licensing. A facility must be registered by EMC before it can trade or convey electricity through the transmission system. In 2025 EMC changed the Market Rules to model battery storage in market clearing and to compensate storage systems. New registrations in 2025 included several solar companies and Keppel’s energy-as-a-service business, registered as wholesale market traders.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Demand Response programme (energy market)Restricted—YesEnergy Market Company. Introduced in April 2016. Consumers bid load curtailment into the half-hourly energy market. Loads in the same zone can be aggregated into one load registered facility, and scheduled, compliant curtailment earns incentive payments recovered from contestable consumers. Registered DR capacity was 167 MW in 2025, mainly from large consumers.
Reserves (primary and contingency) – interruptible loadYes—YesEnergy Market Company / PSO. Interruptible loads have provided reserves since the early years of the market; the first wholesale market trader started as an interruptible load provider in 2006. Aggregators can offer other consumers’ loads.
Energy and reserves – energy storageYes—UnknownEnergy Market Company. Storage systems have participated since 2021, with dedicated market clearing and compensation rules (EMC rule changes reported in 2025). Registered capacity was 212 MW in 2025.
RegulationNo—NoEnergy Market Company / PSO. Regulation (fine-tuning of generation to load) is bought from generators only.
Virtual power plant sandboxDeveloping—YesEnergy Market Authority. The EMA is piloting a VPP regulatory sandbox with industry partners, alongside the Future Grid Capabilities Roadmap launched with SP Group.

Singapore’s wholesale market has had demand-side participation for many years. Interruptible loads sell reserves, and since 2016 the Demand Response programme has let aggregated loads bid curtailment into the energy market. Both are designed for industrial and commercial loads. Households take no direct part, and there is no residential flexibility tariff or supplier-run demand-turn-down scheme in the sources reviewed.

Growing solar output has made flexibility a priority. EMC has adapted market rules for battery storage, and the EMA is running a VPP sandbox. The EMA is also assessing whether more storage is needed to manage intermittency.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
NEMS (EMC market clearing engine)Half-hourly co-optimised energy, reserve and regulation prices at about 140 injection nodes, re-run five minutes before each period.
SP Group Distributed Energy Management System (DERMS)SP Group’s system for managing solar, storage and EV charging connected to the network.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutSP Group is replacing household cumulative meters with AMI meters as they reach end of life; all 1.58 million household accounts were expected to have one by 2026
Reading interval30 minutes
Who installsSP Group only; consumers may not install their own meters
Data accessHalf-hourly consumption in the SP App
CommunicationsWireless network to SP Group
Cumulative metersRead every two months; alternate months estimated using an EMA-approved method
Without an advanced meterRetailer customers are billed on the Static Residential Load Profile
CostRecovered through network charges; early replacement on request carries a one-off fee

Smart (advanced) meters in Singapore belong to the network, not to suppliers. SP Group installs and maintains every meter and recovers the cost of advanced meters through grid infrastructure charges in the tariff. Meters are replaced on a schedule that depends on the age of existing meters, local development plans and installation efficiency. A household that wants one earlier can pay a one-off installation fee, and SP Group aims to fit it within a month. Installation means a supply interruption of up to 30 minutes.

An advanced meter records use every half-hour and sends it over a wireless network. Customers can see their data in the SP App, and retailers can bill on actual half-hourly use. Households still on cumulative meters are read every two months. Retailers bill them using a statistical load profile that, according to EMA research, peaks at about 6 am and 10.30 pm and is lowest at about 1 pm. A household switching retailer does not need an advanced meter.

Renewable electricity.

Electricity generation mix (2023).

  • Natural gas and other fossil fuels: 96.7%
  • Solar: 1.8%
  • Bioenergy (incl. waste-to-energy): 1.4%
Source 30
Renewable electricity share
3.8% (2025)Source 28Share of metered generation in the NEMS wholesale market. Intermittent generation sources (almost entirely solar) contributed 3.3% and imports 0.5%. Imports are small, so the domestic share is close to the total. IRENA puts the renewable share of 2023 generation at 3% (solar 1,051 GWh and bioenergy 822 GWh of 57,403 GWh).
Home solar
15.7 MWp (2021)Source 8Grid-connected solar on residential premises at the end of 2021 (12.1 MWac), the latest year in the official dataset. Most rooftop capacity on HDB blocks is counted under town councils and grassroots units (167 MWp in 2021).
Solar added each year
0.54 GW (2024)Source 30Net solar capacity change in 2024 (+540 MW).
Solar PV (registered intermittent generation)
2.17 GWp (2025)Source 281,517 MW registered intermittent generation sources, equivalent to 2.17 GWp.
Solar PV
1.459 GW (2024)Source 30
Bioenergy
0.217 GW (2024)Source 30
Fossil fuels
10.9 GW (2024)Source 30
Wind
0 GW (2024)Source 30

Targets.

  • Solar deployment of at least 3 GWp by 2030, raised in 2026 from 2 GWp after the original target was met in 2025, five years early.
  • Solar could meet at most about 10% of projected electricity demand in 2050, according to the government.
  • Electricity imports: about 8.4 GW of conditional approvals and 3 GW of conditional licences granted by March 2026.
  • Up to 2 GW of additional interconnection capacity with Malaysia by 2030, on top of the existing 1 GW interconnector.
  • Energy storage: 200 MWh by 2025 (achieved December 2022).
  • Net zero by 2050.

Singapore has no hydro, little wind and limited land, so its renewable options are largely solar plus imports. Natural gas supplies about 95% of electricity. In 2023, renewables produced 3% of generation: 1,051 GWh from solar and 822 GWh from bioenergy, mainly waste-to-energy. By 2025 the renewable share of metered market generation had risen to 3.8%, including 0.5% from imports.

Solar has grown quickly from a low base on HDB rooftops, commercial and industrial roofs and reservoirs. Registered intermittent capacity reached 1,517 MW (2.17 GWp) in 2025, so the 2 GWp target for 2030 was met five years early. The government has since raised the 2030 target to 3 GWp. Officials expect solar to meet at most about a tenth of future demand, so policy also covers regional imports, a 300 MW biomethane regulatory sandbox, geothermal studies and a study of advanced nuclear such as small modular reactors (no decision has been made).

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
212 MW (2025)Source 28Registered capacity of energy storage systems in the NEMS. The ESS supply offered to the market averaged 21 MW in 2025.

Grid-scale batteries are an established part of the market. The first storage system joined the NEMS in 2021, and registered capacity reached 212 MW by the end of 2025. EMC’s 2025 rule changes added storage-specific market clearing (state-of-charge modelling and offer rules) and compensation arrangements. The EMA is assessing whether more storage is needed to handle intermittency, alongside its VPP sandbox.

Household batteries are uncommon because 95% of households live in flats. No official figures for behind-the-meter storage were identified.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
SP Group (SP Services)63.08% of residential accounts on the regulated tariff (1 April 2026); 22.3% NEMS market share in 2025UnknownNoYesYes
Geneco—UnknownUnknownNoNo
Keppel Electric—UnknownUnknownNoNo
PacificLight Energy—UnknownUnknownNoNo
Senoko Energy—UnknownUnknownNoNo
Tuas Power Supply—UnknownUnknownNoNo
Sembcorp Power—UnknownUnknownNoNo
Union Power—UnknownUnknownNoNo

Fifteen retailers were registered in the NEMS at the end of 2025. Retailers named by EMC or the OEM include Diamond Electric, Flo Energy, Just Electric, Keppel Electric, MyElectricity (joined in 2025), PacificLight Energy, Sembcorp Power, Senoko Energy Supply, Sunseap Energy, Tuas Power Supply and Union Power. Geneco also retails to households. The OEM site lists the retailers currently serving households, with EMA customer-satisfaction ratings, and has a price comparison tool for standard plans.

Retailers do not own meters and cannot offer their own smart meters, because SP Group meters every premises. Export is settled through SP Services rather than retailers. Individual retailers’ green, time-of-use and other product features were not checked against official sources, so they are shown as “Unknown”. The “No” values reflect the central SP Services export and metering arrangements. Market shares of individual retailers are shown only as charts on the OEM statistics page.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy, Trade and IndustryGovernmentEnergy policySets solar, import, gas and nuclear policy, announced through Committee of Supply and Singapore International Energy Week speeches.
Energy Market Authority (EMA)RegulatorElectricity and gas regulator; Power System OperatorLicenses market players, approves the regulated tariff, runs import approvals and the VPP sandbox, and operates the power system.
SP Group (SP PowerAssets, SP PowerGrid)TransmissionNational grid owner and operatorOwns and maintains the only transmission and distribution network, and connects new supplies and generators.
SP ServicesMeteringMarket Support Services LicenseeMeter reading, meter data, retailer switching, solar export rebates and the regulated-tariff supply.
Energy Market Company (EMC)MarketWholesale market operatorRuns the NEMS, publishes prices and annual market reports, and administers the Market Rules and the DR programme.
Open Electricity Market (OEM)ConsumerOfficial consumer information on choosing a retailerRetailer list, price comparison tool, switching guidance and market statistics.
Solar Energy Research Institute of Singapore (SERIS)SolarNational solar research institute at NUSResearch on solar technology and its integration in Singapore.
Sustainable Energy Association of Singapore (SEAS)Renewable EnergyIndustry associationRepresents companies in sustainable energy, including solar and energy efficiency.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Metering for generation and exportMetering Code (figure F2.4.10a); AMI-type generation metersEnergy Market AuthorityGeneration meters must be of the AMI type, installed by SP PowerGrid or bought privately from SP Group’s list of approved AMI meter vendors.
Electrical installationLicensed Electrical Worker (LEW) design and certificationEnergy Market AuthorityConnection applications, installation tests (for example CS12 for installations up to 45 kVA) and generation meter work must be signed by an authorised LEW.
Intermittent generation ≥1 MWacPSO Data Form for Intermittent Generation Facility RegistrationPower System Operator (EMA)PSO approval is needed before turn-on for PV of 1 MWac or more, and for all embedded generation applications.
Market participationSingapore Electricity Market RulesEnergy Market Company / EMACovers registration, dispatch, settlement and, since 2025, rules on market clearing and compensation for energy storage systems.
EV chargingTR 25:2022 (+A1:2025)Land Transport Authority / Singapore StandardsEV chargers need LTA type approval under the EVCA, installation by an LEW, a Certificate of Fitness and registration with LTA.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Connection through SP Group (LEW submission, energisation)YesNationalAn LEW submits the connection and test applications to SP Group, and SP PowerGrid energises the connection.
HDB or landlord/management corporation consentLimitedNationalNeeded where the installation is in an HDB development (form CS3H) or a leased or strata property (form CS3).
PSO approvalLimitedNationalRequired for intermittent generation of 1 MWac or more per site, before turn-on.
Registration with EMCLimitedNationalOptional for 1–10 MW embedded solar (non-exporting intermittent generation facility); required above 10 MW and for standalone facilities.
Generation account / export rebate applicationLimitedNationalNeeded only to be paid for exports; units below 1 MW can opt for no rebate.
EV charger type approval and registrationYesNationalChargers must be LTA type-approved and, once installed and certified, registered with LTA.

Singapore has a single national tier of government, so connection and approval rules are the same everywhere. The practical gatekeepers for a small solar or battery system are the Licensed Electrical Worker and SP Group. The building owner also matters: for the 77% of households in HDB flats, solar is deployed at block level and connection needs HDB consent. Planning and building-control requirements for rooftop structures (URA/BCA) were not checked for this profile.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
GST Voucher – U-SaveActiveUtility bill rebateQuarterly rebates for eligible HDB households, credited to the SP utilities account and usable against electricity charges even after switching retailer. Eligibility is set by the Ministry of Finance.—
Net export rebate (Simplified Credit Treatment / Enhanced Central Intermediary Scheme)ActiveExport paymentSP Services credits embedded generators below 10 MWac for net exported electricity after receiving payment from EMC.—
EV Early Adoption Incentive (EEAI)ActiveVehicle tax rebateNewly registered fully electric cars and taxis get a 45% rebate on the Additional Registration Fee, capped at SGD 7,500 from 1 January to 31 December 2026.Jan–Dec 2026 (current tranche)
Electric Heavy Vehicle Charger Grant (EHVCG)ActiveGrantCo-funds up to 50% of installation costs for heavy-vehicle chargers, capped at SGD 30,000 per charger, for the first 500 private chargers.Jan 2026 – Dec 2028

Data and connectivity.

Fixed broadband
90.8 % of households (2023)Source 6Resident households with an internet subscription or access (any type). There were 1,470,600 residential wired broadband subscriptions in 2025.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Connectivity is near-universal: SingStat reports 100% mobile network coverage in every planning region, and 90.8% of resident households had internet access in 2023. SP Group’s advanced meters send half-hourly readings over a wireless network to SP Group, which shares the data with customers through the SP App and with retailers for billing. Smart-meter communications are part of the network company’s infrastructure, not a separate national data service.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
58.4 TWh (2025)Source 28Electricity consumption settled in the NEMS, a record high. SingStat reports 60,410.4 GWh of generation in 2025.
Generation capacity
14.3 GW (2025)Source 28Total registered capacity of generators in the NEMS, including storage, imports and non-exporting intermittent facilities. Licensed capacity (facilities of 10 MW or more plus imports) was 14,717 MW.
Interconnection
1 GW (2026)Source 31Existing interconnector with Peninsular Malaysia. Up to 2 GW of additional bilateral capacity is planned by 2030.
Curtailment
Not identified from a reliable public source.

The supply margin has improved. EMC reports that generation supply offered to the market rose 5.8% to an average 7,864 MW in 2025, and the supply cushion rose to 16.7%, recovering from record lows in 2022–24. New gas turbine capacity from Meranti Power and PacificLight Power and the Keppel Sakra cogeneration plant contributed. Gas supply security is a policy focus. Singapore GasCo was set up in April 2025 to centralise gas procurement for the power sector, and LNG import capacity is planned to grow to 15 million tonnes a year by 2030.

Imports are still small: average import supply was 50 MW in 2025, up from 3 MW in 2024. They are expected to grow as conditionally licensed projects from Indonesia and Malaysia move forward. Around 1 GW of hydropower from Sarawak has been approved in principle.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Solar target raised to 3 GWp by 2030CurrentMarch 2026Announced after the original 2 GWp target was met in 2025, five years early.
Ministry of Energy, Trade and IndustryCurrent1 October 2026Energy policy now sits with the Ministry of Energy, Trade and Industry, whose website moved from mti.gov.sg to meti.gov.sg.
Centralised gas procurement by Singapore GasCoCurrentEarly 2026GasCo, set up in April 2025, was due to begin buying gas for the power sector in early 2026 to build a more diverse portfolio by price index, contract length and source.
Virtual power plant regulatory sandboxCurrent2026The EMA is piloting a VPP sandbox with industry partners and assessing whether more storage is needed.
Storage-specific Market RulesCurrent2025EMC rule changes on market clearing and offers for energy storage systems (RC390) and on compensation for storage (RC393).
Second Malaysia–Singapore interconnectorUpcomingBy 2030Up to 2 GW of extra bilateral interconnection capacity, on top of the existing 1 GW link.
Regional electricity importsUpcomingLate 2020s – 2030sAbout 8.4 GW of conditional approvals, of which 3 GW are conditional licences, with the first wave from Indonesia and Peninsular Malaysia.
Cleaner-energy vehicles only for new registrationsUpcoming2030All new car and taxi registrations must be cleaner-energy models from 2030.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowOfficial data show 15.7 MWp on residential premises in 2021, a small fraction of national solar; 95% of households live in flats, where solar is deployed at block level.
Distributed energy marketMediumRegistered intermittent (mainly rooftop and floating) solar reached 2.17 GWp in 2025, but provided 3.3% of metered generation.
Grid flexibility marketMediumEstablished DR programme (167 MW in 2025) with zonal aggregation, interruptible load in reserves and storage participation; VPPs still at sandbox stage and households excluded.
Energy storage adoptionMedium212 MW of registered grid storage in 2025, with dedicated market rules; no evidence of significant household storage.
Renewable growth environmentMediumRenewable share of metered generation rose from 2.2% to 3.8% in 2025, and the solar target was raised to 3 GWp; the system remains about 95% gas-fired.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 38 sources
  1. Indicators On Population, Annual (M810001). Department of Statistics Singapore, 2026. accessed 9 October 2026.
  2. Resident Households By Type Of Dwelling, Annual (M810351). Department of Statistics Singapore, 2025. accessed 9 October 2026.
  3. Resident Households By Tenancy, Annual (M810401). Department of Statistics Singapore, 2025. accessed 9 October 2026.
  4. Average Household Size Of Resident And Resident Employed Households By Type Of Dwelling, 2000 - 2025 (17863). Department of Statistics Singapore, 2025. accessed 9 October 2026.
  5. Electricity Generation And Consumption, Annual (M890841). Department of Statistics Singapore (data from EMA), 2025. accessed 9 October 2026.
  6. Ownership/ Availability Of Selected Consumer Durables/ Service, Quinquennial (M211241). Department of Statistics Singapore, 2023. accessed 9 October 2026.
  7. Proportion Of Total Population Covered By A Mobile Network By Planning Region, Annual (M651631). Department of Statistics Singapore, 2025. accessed 9 October 2026.
  8. Installed Capacity of Grid-Connected Solar Photovoltaic (PV) Systems by User Type. Energy Market Authority via data.gov.sg, 2021. accessed 9 October 2026.
  9. Tariff Information (electricity tariff, 1 October – 31 December 2026). SP Group, 2026. accessed 9 October 2026.
  10. Electricity Tariff Revision for the Period 1 October to 31 December 2026. SP Group, 2026. accessed 9 October 2026.
  11. Electricity Tariff Revision for the Period 1 July to 30 September 2026. SP Group, 2026. accessed 9 October 2026.
  12. Historical Electricity Tariff (2014–2026), incl. GST. SP Group, 2026. accessed 9 October 2026.
  13. Historical National Average Household Usage (Aug 2024 – Jul 2026). SP Group, 2026. accessed 9 October 2026.
  14. Network overview. SP Group. accessed 9 October 2026.
  15. Quick guide to your utilities (residential). SP Group. accessed 9 October 2026.
  16. Application for Net Export Rebate (version Dec 2023). SP Services (SP Group), 2023. accessed 9 October 2026.
  17. Resources: Licensed Electrical Workers (connection forms). SP Group. accessed 9 October 2026.
  18. Market Overview. Open Electricity Market (SP Services / EMA). accessed 9 October 2026.
  19. Open Electricity Market Statistics (data as of 1 April 2026). Open Electricity Market, 2026. accessed 9 October 2026.
  20. FAQs: Rollout of Advanced Meters. Open Electricity Market. accessed 9 October 2026.
  21. FAQs: Making the Switch. Open Electricity Market. accessed 9 October 2026.
  22. FAQs: Market Support Services Account. Open Electricity Market. accessed 9 October 2026.
  23. FAQs: e-Services Portal. Open Electricity Market. accessed 9 October 2026.
  24. FAQs: Metering Options. Open Electricity Market. accessed 9 October 2026.
  25. FAQs: General. Open Electricity Market. accessed 9 October 2026.
  26. FAQs: U-Save Rebates. Open Electricity Market. accessed 9 October 2026.
  27. Wholesale Electricity Price. Open Electricity Market. accessed 9 October 2026.
  28. NEMS Market Report 2025. Energy Market Company, 2026. accessed 9 October 2026.
  29. Market Update for January to June 2026. Energy Market Company, 2026. accessed 9 October 2026.
  30. Energy Profile: Singapore. IRENA, 2025. accessed 9 October 2026.
  31. Speech by Minister-in-charge of Energy and Science & Technology Dr Tan See Leng at MTI Committee of Supply Debate 2026 (2 March 2026). Ministry of Energy, Trade and Industry, 2026. accessed 9 October 2026.
  32. Singapore Energy Lecture at the 2025 Singapore International Energy Week (27 October 2025). Ministry of Energy, Trade and Industry, 2025. accessed 9 October 2026.
  33. Singapore Green Plan 2030: Targets. Singapore Government. accessed 9 October 2026.
  34. Transitioning to EVs. Land Transport Authority, 2026. accessed 9 October 2026.
  35. Our EV Roadmap. Land Transport Authority. accessed 9 October 2026.
  36. Regulating the Safety of EV Chargers. Land Transport Authority. accessed 9 October 2026.
  37. Euro foreign exchange reference rates: Singapore dollar (SGD). European Central Bank, 2026. accessed 9 October 2026.
  38. Urban population (% of total population) – Singapore. World Bank, 2025. accessed 9 October 2026.

Questions about energy in Singapore.

Talk to us about Olmack in Singapore.Tell us about your home, housing portfolio or school estate in Singapore. We'll explain what is possible there now.