Countries

Energy in Indonesia, explained.

How electricity works in Indonesia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Indonesia: Not yet available.Olmack is not offered in Indonesia yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Indonesia.

Indonesia electricity market 2026: PLN tariffs, subsidies, coal-heavy mix, RUPTL 2025–2034, rooftop solar rules (Permen ESDM 2/2024), licensing and grid connection.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Indonesian rupiah (IDR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Indonesia energy at a glance.

Key figures for households in Indonesia. Each one links to its source on the full overview below.

  • Electricity price.

    1,444.7 IDR per kWh for households, including taxes. Figures for Jul–Sep 2026 (unchanged at 1 Oct 2026).

  • Household use.

    1,541 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    16.3% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Indonesia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Indonesia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Indonesia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Indonesia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Indonesia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Indonesia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Indonesia.

Full overview

The energy market in Indonesia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Electricity in Indonesia is supplied almost entirely by one state-owned company, PT PLN (Persero), which owns the transmission and distribution networks across the archipelago, runs its own power stations, buys power from independent power producers (IPPs) and bills every household directly. There is no retail choice and no independent energy regulator: policy, tariffs and licensing sit with the Ministry of Energy and Mineral Resources (Kementerian ESDM), mainly through its Directorate General of Electricity (Ditjen Ketenagalistrikan). In November 2024 the Constitutional Court confirmed that generation, transmission, distribution and sales must operate as an integrated, state-controlled system rather than being unbundled.

Household tariffs are set by the government and reviewed every quarter. Thirteen non-subsidised tariff groups follow an automatic adjustment formula linked to the rupiah–dollar exchange rate, the Indonesian Crude Price, inflation and the coal reference price; the government has nonetheless held them unchanged throughout 2026. For July–September 2026 a 1,300 VA or 2,200 VA household paid Rp1,444.70/kWh and homes of 3,500 VA and above paid Rp1,699.53/kWh, while the lowest-capacity and poorest households remain on subsidised rates. PLN served about 84.7 million household customers at the end of 2024, with an electrification ratio of 98.45%.

Generation is dominated by coal (61% in 2024), followed by gas, with hydro, bioenergy and geothermal providing most of the renewable output and solar and wind together supplying less than 1%. The Ministry reported a renewable share of 16.3% of electricity in 2025. PLN's 2025–2034 business plan (RUPTL) adds 69.5 GW of capacity, 76% of it renewable or storage, and in August 2026 the government launched a programme aiming for 100 GWp of solar. Rooftop solar has been governed since January 2024 by Permen ESDM 2/2024, under which systems need PLN approval within a quota and exported electricity is no longer credited on the bill.

Energy snapshot.

Headline figures for electricity in Indonesia. Each shows its data year and links to its source.

  • Population285,721,236 peopleSource 182025
  • Households85,995,030 householdsSource 52024
  • Average household size3.3 peopleSource 52024
  • Electricity use per household1,541 kWh/yrSource 52024
  • Household price (IDR)1,444.7 IDR/kWhSource 1Jul–Sep 2026 (unchanged at 1 Oct 2026)
  • Household price (EUR)0.072 EUR/kWhSource 17Jul–Sep 2026
  • Renewable electricity share16.3%Source 72025
  • Solar capacity1.494 GWSource 72025
  • Wind capacity0.152 GWSource 72025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Ministry of Energy and Mineral Resources (Kementerian ESDM), through the Directorate General of Electricity; no independent regulator
System operator
PT PLN (Persero), which owns and operates the transmission grids and dispatches each island system
Distribution networks
PLN distribution main units (UID/UIW) by province or region, plus a few separate business-area licence holders such as PT PLN Batam
Currency
Indonesian rupiah (IDR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Indonesia.

Household price (IDR)
1,444.7 IDR/kWh (Jul–Sep 2026 (unchanged at 1 Oct 2026))Source 1Regulated, non-subsidised R-1/TR tariff for 1,300 VA and 2,200 VA households (same for prepaid and postpaid). 900 VA "RTM" (non-subsidised) households pay Rp1,352/kWh and R-2/R-3 (3,500 VA and above) Rp1,699.53/kWh. Excludes regional taxes on electricity and the minimum bill. Subsidised 450 VA and 900 VA households pay lower rates. As at 1 October 2026 the Ministry had not announced a change for Q4 2026 (Fortune Indonesia, 2 October 2026).
Household price (EUR)
0.072 EUR/kWh (Jul–Sep 2026)Source 17Converted from Rp1,444.70/kWh at the ECB reference rate of 1 EUR = 20,036.94 IDR on 9 October 2026.
Typical annual electricity bill
1,793,771 IDR/yr (2024)Source 5Derived: PLN household revenue in 2024 (Rp151,861,297 million, Table 48) ÷ 84,660,382 household customers (Table 44). This is an average across subsidised and non-subsidised households and excludes regional taxes. About EUR 90 at 1 EUR = 20,036.94 IDR (9 October 2026).

Household price trend (IDR per kWh).Source 5

837.011,000.6451,164.2820152024
Indonesia household electricity price, IDR per kWh
2015837.01 IDR/kWh
2016843.72 IDR/kWh
20171056 IDR/kWh
20181102.43 IDR/kWh
20191098.82 IDR/kWh
2020991.92 IDR/kWh
20211024.01 IDR/kWh
20221128.4 IDR/kWh
20231156.15 IDR/kWh
20241164.28 IDR/kWh

How tariffs are set

Retail tariffs are set by ministerial regulation, currently Permen ESDM 7/2024 on electricity tariffs provided by PT PLN (Persero). Customers are grouped by use (household R, business B, industrial I, government P, social S and others) and by the contracted capacity of the connection in volt-amperes, for example 900 VA, 1,300 VA or 2,200 VA. Thirteen non-subsidised groups are subject to a quarterly tariff adjustment calculated from the exchange rate, the Indonesian Crude Price (ICP), inflation and the coal reference price (HBA). PLN publishes the resulting rates each quarter. The other groups, 24 of them in Q3 2026, are subsidised, and the state budget covers the difference between the tariff and PLN's cost of supply.

In practice the government has repeatedly chosen not to pass on cost changes. For Q3 2026 the Ministry announced on 30 June 2026 that tariffs would stay the same despite the formula inputs (exchange rate Rp16,959.32/USD, ICP USD96.12/barrel, HBA USD70/tonne). When tariffs are held below cost, PLN receives compensation payments from the state as well as subsidies. In 2024 PLN recorded Rp77.0 trillion in subsidies and Rp100.2 trillion in compensation, against Rp353.2 trillion of electricity sales.

What households pay

A household on a 1,300 VA or 2,200 VA connection pays a flat Rp1,444.70/kWh. Larger homes of 3,500 VA and above pay Rp1,699.53/kWh. Because many homes are on subsidised or lower-capacity connections, the average realised household price was lower: Rp1,164.28/kWh in 2024 across all R-1 to R-3 customers. The average household customer bought 1,541 kWh in 2024, giving an average bill of roughly Rp1.79 million a year before local taxes.

Temporary relief has been used in the past. Households up to 2,200 VA received a 50% discount in January and February 2025. That discount has ended.

Regional differences

The same national tariff applies across PLN's service area, from Java to Papua, even though the cost of supply on small diesel-fed island systems is far higher. Separate business-area licence holders, such as PT PLN Batam on Batam island, have their own arrangements.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesNon-subsidised household tariffs, July–September 2026 (unchanged at 1 October 2026): R-1/TR 900 VA-RTM Rp1,352.00/kWh; R-1/TR 1,300 VA and 2,200 VA Rp1,444.70/kWh; R-2/TR 3,500–5,500 VA and R-3/TR 6,600 VA and above Rp1,699.53/kWh. The tariff depends on the contracted capacity (VA) of the connection, not on how much is used. A minimum bill of 40 hours × contracted kVA × tariff applies.
RegulatedLimitedSubsidised household tariffs for 450 VA and part of the 900 VA group. They are among the 24 subsidised tariff groups whose rates the government kept unchanged in Q3 2026.
PrepaymentYesResidential groups can be on prepaid ("pra bayar") supply, buying kWh tokens in advance at the same rate per kWh as postpaid (e.g. Rp1,444.70/kWh for 1,300–2,200 VA). Customers who install rooftop solar are switched from prepaid to postpaid when the two-way meter is fitted.
Time-of-useNoPeak (WBP) and off-peak (LWBP) blocks apply only to large business, industrial and government customers above 200 kVA. Household tariffs are flat.
DynamicNoThere is no wholesale market and no dynamic retail tariff.
OtherLimitedPLN offers renewable energy certificates (REC) and "Green Energy as a Service" products, aimed mainly at business customers.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,541 kWh/yr (2024)Source 5Average energy sold per household (R-1, R-2 and R-3 tariff) customer: 1,540.66 kWh (PLN Statistics 2024, Table 47), i.e. 130,433.10 GWh ÷ 84,660,382 household customers.
Average daily use per household
4.2 kWh/day (2024)Source 5Derived: 1,540.66 kWh per household customer per year ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,584 kWh/person/yr (2025)Source 8All sectors. Ministry figure for 2025, above its 1,464 kWh target. The World Bank reports 1,611 kWh per capita for 2024.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households are PLN's largest customer group: in 2024 they bought 130,433 GWh, 42.6% of all electricity sold, compared with 30.1% for industry and 19.2% for business. Average use is low by international standards, at about 1,541 kWh per household per year (4.2 kWh a day). This reflects the large number of small connections: contracted household capacity averaged just over 1 kVA (89,658 MVA across 84.7 million customers in 2024).

Demand is rising steadily. Household sales grew 6.6% in 2024 and per-capita consumption reached 1,584 kWh in 2025 according to the Ministry. Cooling, refrigeration and lighting are the main household loads; there is no heating demand. The government promotes electric cooking and electric vehicles, but no official adoption figures were identified for this profile.

Electrification is close to universal on the main islands but not yet complete everywhere. PLN reported an electrification ratio of 98.45% at the end of 2024, from 100% in Jakarta to 94.3% in West Kalimantan. In 2025 the government's connection-assistance programme (BPBL) connected 205,968 low-income households.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
59.4 % of population (2025)Source 19

Each household connection is an individual PLN account with its own meter and contracted capacity (VA). This capacity, chosen when the connection is made and changeable on request, sets both the tariff group and the maximum load the home can draw.

About 59% of the population lived in urban areas in 2025. Java, with about 55 million PLN customer accounts in 2024, holds well over half of all customers, while the large outer islands and the eastern provinces have smaller, more fragmented grids.

How the grid works in Indonesia.

  1. TransmissionPT PLN (Persero)
  2. DistributionPLN distribution main units (UID/UIW) by province or region, plus a few separate business-area licence holders such as PT PLN Batam
  3. MeteringPT PLN (Persero)
  4. Supply2 or more retail suppliers

Physical system

Indonesia's grid is a set of island systems rather than one network. The Java–Bali system carried a peak load of 42.6 GW in 2024, about 70% of the national peak of 61.3 GW. Sumatra, Kalimantan and Sulawesi have growing backbone grids, while many smaller islands rely on isolated diesel or hybrid systems. Transmission runs at 500 kV on Java and at 275 kV, 150 kV and 70 kV elsewhere. Network losses were 8.55% in 2024 (2.03% transmission, 6.65% distribution).

Commercial flow

PLN plans, builds and operates the system. In 2024 it produced about 56% of its supply through its own and leased plants and bought the rest from IPPs and others under long-term power purchase agreements. There is no wholesale market or power exchange, so prices are set in these contracts and in the regulated retail tariff. Captive generation can be built under own-use licences (IUPTLS), and separate business-area licence holders (IUPTLU) can supply customers within defined areas.

The RUPTL 2025–2034 plans 48,000 circuit-km of new transmission and 108,000 MVA of substations, partly to link island grids and connect remote renewable resources.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Mineral Resources (Kementerian ESDM)Sets energy policy and the National Electricity General Plan (RUKN), and approves PLN's business plan (RUPTL). It issues the tariff regulation (Permen ESDM 7/2024), decides each quarter whether tariffs change, and sets the rooftop solar rules (Permen ESDM 2/2024).
RegulatorDirectorate General of Electricity (Ditjen Ketenagalistrikan, DJK)The Ministry unit that regulates the electricity business: licensing, the grid code (Permen ESDM 20/2020), electrical safety and rooftop solar quotas. There is no independent regulator.
RegulatorDirectorate General of New and Renewable Energy and Energy Conservation (Ditjen EBTKE)Promotes renewable energy and efficiency, runs the national rooftop solar application and reporting system, and registers plug-and-play rooftop systems.
TSOPT PLN (Persero)State-owned utility that owns the 72,656 circuit-km transmission network (500, 275, 150 and 70 kV), dispatches each island system, generates through its subsidiaries PLN Indonesia Power and PLN Nusantara Power, and bought 44% of its energy from IPPs and other suppliers in 2024.
DSOPLN distribution main units (UID / UIW)PLN runs the 1.07 million circuit-km distribution network through regional main units: Unit Induk Distribusi (UID) such as Jakarta Raya, Banten, Jawa Barat, Jawa Timur and Bali, and Unit Induk Wilayah (UIW) such as Papua & Papua Barat, Maluku & Maluku Utara and Nusa Tenggara. These are units of PLN, not separate companies.
DSOPT PLN BatamPLN subsidiary with its own business area on Batam island, with about 383,000 customers in 2024.
SupplierPT PLN (Persero)Sole supplier to households in its business area: contracts, metering, billing, prepaid tokens and customer service through the PLN Mobile app and local offices.
MeteringPT PLN (Persero)Owns and installs prepaid and postpaid meters. It must supply and fit two-way Advanced Meters for rooftop solar customers at its own cost.

Compared with the UK system.

Compared with the UK system.
UK conceptIndonesia equivalentHow it works
DNOPLN Unit Induk Distribusi / Unit Induk WilayahRegional distribution units of the same national company, not separate licensed businesses. A few business-area licence holders, such as PLN Batam, operate their own networks.
National Grid/NESOPLN (transmission and dispatch)PLN owns the transmission grids and dispatches generation itself. There is no independent system operator and no single national grid: Java–Madura–Bali is the largest interconnected system, and Sumatra, Kalimantan, Sulawesi and the eastern islands run separate systems.
MPANID Pelanggan (PLN customer ID)Each connection has a PLN customer number, shown on bills and prepaid receipts and used for payments, token purchases and service requests. It is held in PLN's own customer system, not an independent registry.
MPRNNo equivalentThere is no gas supply-point identifier linked to the electricity account; few homes have piped gas.
Meter operatorPLNPLN owns and installs all meters. There is no competitive metering market.
SupplierPLN (sole supplier)Households cannot switch supplier. Tariffs are set nationally by the government.
Smart-meter infrastructurePLN Advanced MetersNo national smart-meter mandate or central data hub. Two-way Advanced Meters are required for rooftop solar customers. Prepaid token meters are common but are not smart meters in the UK sense.

How a supply point is identified.

532101234567 (fictional, illustrative only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?ID Pelanggan (customer identification number) (IDPEL)
Who issues it?PT PLN (Persero), or the business-area licence holder in its own area (e.g. PLN Batam)
FormatNumeric customer number assigned by PLN when the connection is created. Prepaid connections also have a separate meter number printed on the meter and on token receipts.
LengthNumeric; exact length not confirmed from an official PLN source reviewed for this profile
Stays with the property when you switch supplier?Yes
Where to find itOn the monthly bill (postpaid), on prepaid token receipts, in the PLN Mobile app, and on the label of prepaid meters.
Electronic accessCustomers can view bills and token history and make service requests (new connection, change of capacity, rooftop solar application) through PLN Mobile. There is no open-data or third-party consumption-data access scheme.
Third-party accessThe customer number is widely used by banks, e-wallets and retailers to pay bills and buy tokens, but this gives no access to consumption data. No regulated framework exists for third parties to obtain meter data.
Who keeps the registerPLN's internal customer information system (AP2T)
Register scopeNational

An Indonesian home is identified by its PLN customer ID rather than by a separate supply-point number. The ID belongs to the connection at the address, and the account holder can be changed when a property is sold or let. The ID is linked to a tariff group (R-1, R-2 or R-3) and a contracted capacity in VA. That capacity is limited by a circuit breaker at the meter and determines both the price per kWh and the maximum load.

Postpaid customers are billed monthly from meter readings. Prepaid customers buy token codes through banks, e-wallets, shops or PLN Mobile and enter them on the meter. Payments and token purchases are made against the customer ID or prepaid meter number.

Because PLN is the sole supplier, there is no switching register like the UK's. Customer, metering and billing data sit in PLN's own customer system (AP2T), which PLN also uses for its statistics. Requests for a new connection, a higher capacity or a rooftop solar system are all made against this customer record. Rooftop solar applicants on prepaid supply are moved to postpaid when PLN installs a two-way Advanced Meter.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringLimited
Net billingNo
How exported electricity is paidNone for new systems: under Permen ESDM 2/2024, surplus electricity fed into the grid is not counted when calculating the bill. Systems approved under the previous rules keep export-import netting for 10 years from approval.
Is there a size limit?The previous capacity limit was removed in 2024. Capacity must match the customer's own needs and fit within the quota for that grid system. Capacity is measured by total inverter capacity.
Is exported electricity paid for?No. Under Article 13 of Permen ESDM 2/2024, excess electricity entering the grid is not counted in the customer's bill. Systems operating or approved before the regulation took effect on 31 January 2024 keep the old export-import calculation and capacity charge for 10 years from approval.
Are there parallel-operation or capacity charges?No parallel-operation fee applies to rooftop systems under Permen ESDM 2/2024, and the capacity charge was removed for new systems.
What happens if a system is connected without approval?PLN can require disconnection and a penalty of total inverter capacity × 240 hours × the tariff. If the customer does not comply within one month, PLN can temporarily cut off supply.
Can batteries be added?Yes. Rooftop systems may include batteries or other storage, provided they meet electrical safety rules and the inverter protection requirements in the technical annex.
Which systems are exempt from an SLO inspection?Systems up to 500 kW that are plug-and-play with a single inverter (or several inverters totalling under 10 kW), on one building, one earthing system and one installation, can use a self-declaration plus a Ministry registration number instead of an SLO.

Connecting a home system.

  1. Check the rooftop solar quota published by PLN (or another business-area licence holder) for your grid system.
  2. Apply to PLN in January or July, with copies to Ditjen EBTKE and Ditjen Ketenagalistrikan, through the rooftop solar application. Size the system to your own demand.
  3. PLN must approve or refuse within 30 calendar days after the application window closes; no reply counts as approval. If the quota is used up, the application goes on a waiting list for the next period.
  4. Report the own-use generation to the Minister or governor (systems up to 500 kW), or obtain an own-use supply licence (IUPTLS) for systems above 500 kW.
  5. Have the system built by a certified electrical business (Badan Usaha holding an electricity supporting-services licence) in line with SNI standards and electrical safety rules.
  6. Obtain an SLO (certificate of operating worthiness) from a technical inspection body within 6 months, or, for small plug-and-play systems, a self-declaration and Ministry registration number within 3 months of approval.
  7. PLN installs a two-way Advanced Meter at its own cost within 15 working days, and switches prepaid customers to postpaid.

Rooftop solar (PLTS Atap) is open to any PLN customer, but since 2024 it has been treated as self-consumption only. Permen ESDM 2/2024, in force from 31 January 2024, replaced the 2021 rules. It removed the capacity limit, the export-import netting and the capacity charge, and introduced quotas for each grid system set five years ahead. The licence holder proposes the quotas, considering grid reliability under the grid code, and the Directorate General of Electricity sets them. Applications are accepted twice a year.

Because exports earn nothing, systems are now sized to match daytime consumption, and batteries are the only way to shift surplus output into the evening. Earlier customers keep netting for 10 years from approval. The rules apply in the same way to other business-area licence holders.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (including rooftop solar)Up to 500 kW (by inverter capacity): one-off report to the Minister or governor under risk-based business licensing. Above 500 kW: own-use supply licence (IUPTLS).Minister of Energy and Mineral Resources or provincial governorGrid-connected rooftop systems also need PLN approval within the quota (Permen ESDM 2/2024).
Generate electricity for sale (IPP)Public-interest electricity supply business licence (IUPTLU) for generation, plus a power purchase agreement with PLN or another business-area holderMinistry of Energy and Mineral ResourcesGenerators sell to PLN under contract; there is no wholesale market.
Store electricityNo separate storage licence identified. Behind-the-meter batteries are allowed as part of rooftop solar systems; grid-scale storage is planned through the RUPTL.Ministry of Energy and Mineral Resources / PLNRUPTL 2025–2034 includes 3 GW of storage in 2025–2029.
Export to the gridPLN approval within the rooftop solar quota; exports are not compensated for new systemsPLN (business-area holder), under Permen ESDM 2/2024Legacy systems keep netting for 10 years.
Supply / sell electricity to consumersIUPTLU with a designated business area. There is no competitive retail licence.Ministry of Energy and Mineral ResourcesThe Constitutional Court (decision 39/PUU-XXI/2023) requires supply to remain an integrated, state-controlled business.
Aggregate, trade, wholesale, balancing, grid services, VPPNo licence category exists, because there is no wholesale, balancing or ancillary-services market open to third partiesNot applicablePLN handles all dispatch and balancing internally.
Remote control of distributed assetsNo specific regime. PLN is required to build rooftop solar applications integrated with SCADA or distribution smart-grid systems.PLN / Ministry of Energy and Mineral ResourcesNo third-party control framework identified.
Install electrical / solar systemsElectricity supporting-services business licence with a business-entity certificate; work must meet electrical safety rulesMinistry of Energy and Mineral ResourcesRooftop solar must be installed by such a certified business.

Electricity licensing rests on Law 30/2009 on Electricity and its implementing rules (including Permen ESDM 11/2021 on electricity business). Licences are split between public-interest supply (IUPTLU), which can cover generation, transmission, distribution and sale within a business area, and own-use supply (IUPTLS). Supporting services such as installation, inspection and testing need their own business licences. PLN holds the main IUPTLU for most of the country.

There are no licences for aggregation, trading or flexibility services because those markets do not exist. For households the practical requirements are PLN's rooftop solar approval, a certified installer, an SLO or self-declaration, and, for systems above 500 kW, an own-use licence.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoPLN. There is no power exchange or spot market. Generators sell to PLN under bilateral PPAs and PLN dispatches centrally.
Balancing and ancillary servicesNo—NoPLN. Frequency control and reserves come from PLN's own and contracted plants. No market is open to distributed resources.
Demand responseNo—NoPLN. Large customers above 200 kVA face peak/off-peak price blocks, but no household demand-response programme was identified.

Flexibility from homes and small businesses has no route to market. PLN plans and dispatches each island system centrally and buys from IPPs under long-term contracts, so batteries, electric vehicles and rooftop solar earn nothing from grid services. The only price signal is the peak/off-peak structure for large customers.

Policy is moving towards more variable renewables and storage: the RUPTL 2025–2034 includes storage, and the 100 GWp solar programme launched in 2026 will add large volumes of variable output. Any future flexibility services would, under the current integrated model, be procured by PLN rather than through an open market.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national mandate; two-way Advanced Meters required for rooftop solar customers
Reading intervalNot published
National penetrationNot published by PLN
Meter ownerPLN (or business-area licence holder)
Rooftop solar metersTwo-way Advanced Meter, supplied and installed by PLN at its own cost within 15 working days
PaymentPrepaid token meters and postpaid meters
Consumer data accessPLN Mobile app; no third-party data-access framework

Indonesia has no smart-meter mandate or national meter-data hub. Many households use prepaid token meters, which manage credit locally but do not provide interval data or remote communication.

Permen ESDM 2/2024 defines an Advanced Meter as a kWh meter, provided and installed by the licence holder, that can communicate and measure in both directions, and makes it compulsory for every rooftop solar system. PLN must supply and fit it free of charge. The regulation also requires PLN to build rooftop solar applications integrated with SCADA or distribution smart-grid systems. No figure for the number of Advanced Meters installed was identified.

Renewable electricity.

Electricity generation mix (2024).

  • Coal: 61.5%
  • Gas: 18.5%
  • Other fossil: 1.9%
  • Hydro: 7.4%
  • Bioenergy: 5.7%
  • Geothermal and other renewables: 4.5%
  • Solar: 0.4%
  • Wind: 0.1%
Source 16
Renewable electricity share
16.3% (2025)Source 7Renewable share of the electricity mix reported by the Ministry of Energy and Mineral Resources (target in the national electricity plan: 15.9%). Ember puts the renewable share of generation at 18.1% for 2024 (hydro 7.4%, bioenergy 5.7%, geothermal and other renewables 4.5%, solar and wind 0.5%). Net imports were under 0.3% of supply.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
7.587 GW (2025)Source 7
Bioenergy
3.148 GW (2025)Source 7
Geothermal
2.744 GW (2025)Source 7
Solar
1.494 GW (2025)Source 7
Wind
0.152 GW (2025)Source 7

Targets.

  • RUPTL 2025–2034: 69.5 GW of new capacity, 76% renewable or storage, including 17.1 GW solar, 11.7 GW hydro, 7.2 GW wind, 5.2 GW geothermal, 0.9 GW bioenergy and 0.5 GW nuclear.
  • PLTS 100 GWp programme (launched 25 August 2026): 100 GWp of solar within three years, starting with 14 projects totalling about 5.3 GWp in six provinces.
  • Wind: an additional 5 GW by 2030 and 37 GW installed by 2060.
  • Net zero emissions between 2050 and 2060.

Coal supplied 61.5% of Indonesia's electricity in 2024, and coal generation rose by 12 TWh that year, according to Ember. Gas added 18.5%. Renewable output comes mainly from hydro (7.4%), bioenergy (5.7%) and geothermal (most of the 4.5% "other renewables"). Solar and wind together supplied only 0.5%.

Renewable capacity reached 15.6 GW in 2025 according to the Ministry: hydro 7.6 GW, bioenergy 3.1 GW, geothermal 2.7 GW, solar 1.5 GW and wind 0.15 GW. The Ministry reported a renewable share of 16.3% of electricity in 2025, slightly above the 15.9% in the national electricity plan, noting that new gas and coal capacity held the share back.

Plans are much larger than current deployment. The RUPTL 2025–2034 plans 69.5 GW, three quarters of it renewable or storage. In September 2026 the Minister described a 100 GW pipeline with 70% renewables and 48,000 circuit-km of transmission. A separate PLTS 100 GWp programme began in August 2026, with projects such as a 300 MWp plant at Gilimanuk (Bali) and a 134 MWp floating plant on the Gajah Mungkur reservoir.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Electricity storage is at an early stage. The rooftop solar rules explicitly allow batteries behind the meter, and since exports are no longer credited, storage is the only way for a household to use daytime solar output in the evening. No incentive for home batteries was identified.

At grid scale, storage is planned through PLN's RUPTL, which includes 3 GW of storage in 2025–2029, and pumped hydro such as Upper Cisokan on Java.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
PT PLN (Persero)92.9 million customers, 84.7 million of them households (end 2024)LimitedNoNoNo
PT PLN BatamAbout 383,000 customers on Batam island (2024)UnknownUnknownNoNo

Households cannot choose their supplier. PLN supplies almost every grid-connected home. Its subsidiary PLN Batam has a separate business area on Batam, and a few other licence holders serve defined areas such as industrial estates.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Mineral Resources (ESDM)GovernmentEnergy policy, tariffs, licensingDecides tariffs each quarter, approves the RUPTL and issues the rooftop solar regulation.
Directorate General of Electricity (DJK)RegulatorElectricity business regulation and safetySets rooftop solar quotas and oversees the grid code, licences and electrical safety.
Directorate General of New and Renewable Energy and Energy Conservation (EBTKE)Renewable EnergyRenewable energy policyRuns the national rooftop solar application and registration system.
PT PLN (Persero)TransmissionState utility: transmission, distribution and supplyOwns the grid, supplies households and approves every grid connection.
PT PLN BatamDistributionBusiness-area licence holder for BatamSeparate network and supplier for Batam island.
Asosiasi Energi Surya Indonesia (AESI)SolarSolar industry associationRepresents solar companies in Indonesia.
Yayasan Lembaga Konsumen Indonesia (YLKI)ConsumerConsumer organisationIndependent consumer body that handles complaints, including about utility services.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Electrical installationSNI 0225:2020 (PUIL 2020)Badan Standardisasi Nasional (BSN)General requirements for electrical installations; applies to AC and DC wiring, protection devices, switching and earthing of rooftop solar systems under Permen ESDM 2/2024.
PV modulesSNI IEC 61215-1:2016, SNI IEC 61215-2:2016, SNI IEC 61215-1-1:2016BSN (identical adoption of IEC standards)Design qualification and type approval of terrestrial PV modules; required by Permen ESDM 2/2024.
Inverters / anti-islandingPermen ESDM 2/2024, Annex IMinistry of Energy and Mineral ResourcesInverters must at least provide anti-islanding, over/under-frequency and voltage, overheating, surge, over-current and DC ground-fault protection.
Grid connectionPermen ESDM 20/2020 (Grid Code)Ministry of Energy and Mineral ResourcesRules for connecting to and operating the power system; the basis for rooftop solar quotas.
Commissioning / operating certificateSertifikat Laik Operasi (SLO)Technical inspection bodiesRequired for rooftop systems above 500 kW and for systems that are not plug-and-play; small systems may use a self-declaration and Ministry registration.
Local contentDomestic goods and services rulesGovernment of IndonesiaPermen ESDM 2/2024 requires rooftop equipment to comply with domestic-content regulations.

Permissions.

Permissions.
PermissionRequiredLevelDetail
PLN approval for rooftop solarYesNationalApplication in January or July within the published quota; decision within 30 days or deemed approved.
Own-use supply report or licenceYesMixedReport up to 500 kW; IUPTLS licence above 500 kW, from the Minister or governor.
SLO / registrationYesNationalSLO from an inspection body, or a self-declaration with Ministry registration for small plug-and-play systems.
Certified installerYesNationalInstallation must be carried out by a business holding an electricity supporting-services licence.
Building or planning permitLimitedLocalNo specific national planning requirement for rooftop panels was identified; local building rules may apply.

For a household, the main permission is PLN's approval under the rooftop solar quota, applied for online. The household or its installer must also file the own-use report, use a certified business for the installation, and obtain an SLO or registration number before PLN fits the two-way meter. Connecting without approval risks a penalty and disconnection.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Subsidised household tariffs (450 VA and eligible 900 VA)ActiveTariff subsidyLow-capacity and low-income households pay subsidised regulated rates; the government kept all 24 subsidised groups unchanged in Q3 2026.—
New Connection Assistance Programme (BPBL)ActiveConnection grantGovernment-funded connections for low-income households; 205,968 households connected in 2025.—
50% household electricity discountClosedBill discountDiscount for households up to 2,200 VA, about 81.4 million customers.Jan – Feb 2025
Rooftop solar export-import netting (Permen ESDM 26/2021)ClosedNet meteringClosed to new systems when Permen ESDM 2/2024 took effect on 31 January 2024; systems approved earlier keep netting for 10 years from approval.Until 31 Jan 2024 (legacy systems for 10 years)

Data and connectivity.

Fixed broadband
4.9 fixed subscriptions per 100 people (2024)Source 20
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is limited (4.9 subscriptions per 100 people in 2024), but 72.8% of people used the internet in 2024, so mobile networks are the main channel for app-based services such as PLN Mobile and prepaid token purchases. No national communications standard for smart meters has been published.

Grid conditions.

National peak demand
61.3 GW (2024)Source 5Peak load of PLN, leased and IPP plants; Java–Bali 42.64 GW, outside Java–Bali 18.65 GW.
Annual electricity demand
372.5 TWh (2024)Source 16
Generation capacity
107.5 GW (2025)Source 8National installed capacity reported by ESDM (100.65 GW in 2024). Capacity serving the PLN system, including leased and IPP plants, was 75.94 GW at end 2024 (PLN Statistics 2024).
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

National peak demand reached 61.3 GW in 2024, up 5.2% on 2023, and installed capacity of all kinds reached 107.5 GW in 2025. Reliability varies between systems: in 2026 the Ministry asked PLN to strengthen mitigation after repeated disturbances on the Sumatra system.

Indonesia trades very little electricity with its neighbours; net imports were under 1 TWh in 2024. Solar-based electricity exports from the Riau Islands to Singapore are under discussion between the two governments.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
RUPTL 2025–2034Current2025PLN's ten-year plan: 69.5 GW of new capacity (76% renewable or storage), 48,000 circuit-km of transmission and Rp2,967.4 trillion of investment.
Rooftop solar regulation Permen ESDM 2/2024Current31 January 2024Ended export-import netting for new systems; introduced quotas, twice-yearly applications and free Advanced Meters.
Constitutional Court decision 39/PUU-XXI/2023CurrentNovember 2024Requires electricity supply to remain integrated (no unbundling) and Parliament to be consulted on the national electricity plan.
PLTS 100 GWp programmeUpcomingLaunched 25 August 2026; target within three yearsNational solar programme; 14 first-phase projects totalling about 5.3 GWp in six provinces.
Q4 2026 tariff decisionUpcomingOctober–December 2026As at 1 October 2026 the Ministry had not announced Q4 2026 tariffs.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowSolar of all kinds was 1.5 GW in 2025 and supplied 0.4% of generation in 2024; exports are uncompensated for new rooftop systems and installations are subject to quotas.
Distributed energy marketLowAverage household use 1,541 kWh/yr on small connections (about 1 kVA on average); no verified figures for EVs, home batteries or heat pumps.
Grid flexibility marketLowVertically integrated utility with central dispatch; no wholesale, balancing or demand-response market and no aggregator licence.
Energy storage adoptionLowNo official operating battery capacity; 3 GW of storage planned in RUPTL 2025–2029.
Renewable growth environmentMediumRenewable share 16.3% in 2025 (above the 15.9% plan target) while coal generation still rose in 2024; 76% of RUPTL 2025–2034 additions are renewable or storage and a 100 GWp solar programme began in 2026.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 21 sources
  1. Penetapan Penyesuaian Tarif Tenaga Listrik (Tariff Adjustment) Bulan Juli – September 2026. PT PLN (Persero), 2026. accessed 9 October 2026.
  2. Tariff Adjustment. PT PLN (Persero), 2026. accessed 9 October 2026.
  3. Jaga Daya Beli, Menteri ESDM: Tarif Listrik Tidak Naik. Kementerian ESDM, 2026. accessed 9 October 2026.
  4. Tarif listrik per 1 Oktober 2026. Fortune Indonesia, 2026. accessed 9 October 2026.
  5. Statistics PLN 2024. PT PLN (Persero), 2025. accessed 9 October 2026.
  6. Permen ESDM No. 2 Tahun 2024 tentang PLTS Atap yang Terhubung pada Jaringan Tenaga Listrik Pemegang IUPTLU. JDIH Kementerian ESDM, 2024. accessed 9 October 2026.
  7. Bauran EBT di Sektor Listrik Lampaui Target RUKN. Kementerian ESDM, 2026. accessed 9 October 2026.
  8. Kapasitas Pembangkit Naik 7 GW, Akses Listrik Masyarakat Meningkat. Kementerian ESDM, 2026. accessed 9 October 2026.
  9. Menteri ESDM Umumkan RUPTL PLN 2025-2034. Kementerian ESDM, 2025. accessed 9 October 2026.
  10. Menuju NZE 2050-2060, Pemerintah Dorong Investasi Kelistrikan 100 GW dan Penguatan EBT. Kementerian ESDM, 2026. accessed 9 October 2026.
  11. Dari Gilimanuk hingga Pulau Rengit, Program PLTS 100 GWp Dorong Kemandirian Energi Nasional. Kementerian ESDM, 2026. accessed 9 October 2026.
  12. Hingga 2030, Pemerintah Bidik Tambahan Kapasitas Terpasang PLTB 5 GW. Kementerian ESDM. accessed 9 October 2026.
  13. Kementerian ESDM Menghormati Putusan MK Nomor 39/PUU-XXI/2023. Kementerian ESDM, 2024. accessed 9 October 2026.
  14. Masuki Awal Tahun 2025, Pemerintah Putuskan Tarif Listrik Tetap dan Berikan Diskon untuk Rumah Tangga. Kementerian ESDM, 2024. accessed 9 October 2026.
  15. Indonesia – country electricity profile. Ember, 2025. accessed 9 October 2026.
  16. Yearly electricity data (Indonesia, 2024). Ember, 2025. accessed 9 October 2026.
  17. ECB euro reference exchange rate: Indonesian rupiah (IDR). European Central Bank, 2026. accessed 9 October 2026.
  18. Population, total – Indonesia. World Bank, 2025. accessed 9 October 2026.
  19. Urban population (% of total population) – Indonesia. World Bank, 2025. accessed 9 October 2026.
  20. Fixed broadband subscriptions (per 100 people) – Indonesia. World Bank, 2024. accessed 9 October 2026.
  21. Individuals using the Internet (% of population) – Indonesia. World Bank, 2024. accessed 9 October 2026.

Questions about energy in Indonesia.