Countries

Energy in Somalia, explained.

How electricity works in Somalia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Somalia: Not yet available.Olmack is not offered in Somalia yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Somalia.

Somalia electricity 2026: private ESP mini-grids, US$0.60/kWh average cost, National Electricity Authority, Electricity Act 2023, solar hybridisation and access.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Somali shilling (SOS) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Somalia energy at a glance.

Key figures for households in Somalia. Each one links to its source on the full overview below.

  • Electricity price.

    0.6 USD per kWh for households, including taxes. Figures for 2023.

  • Renewable share.

    18.7% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Somalia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Somalia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Somalia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Somalia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Somalia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Somalia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Somalia.

Full overview

The energy market in Somalia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Somalia has no national grid. The public utility, ENEE, collapsed during the civil war, and electricity is now supplied almost entirely by private electricity service providers (ESPs). Each ESP runs its own isolated mini-grid in a town or city, with its own diesel generators, and increasingly solar panels and batteries, its own distribution lines and its own customers. The World Bank estimates that ESPs supply more than 90% of the country’s electricity.

Power is expensive. World Bank project documents put the average cost to consumers at about US$0.60 per kWh, with prices ranging from US$0.25 to US$1.30 per kWh between towns, and Somalia ranks in the top 5% of countries for power cost. Prices are quoted in US dollars.

The legal framework is new. The Electricity Act 2023 created the National Electricity Authority (NEA) as the federal regulator, and Somaliland, which administers its own electricity sector, has set up the Somaliland Energy Regulatory Commission. World Bank and African Development Bank programmes are financing solar and battery hybridisation of ESP mini-grids, new distribution networks in Mogadishu and Hargeisa, and solar systems for schools and health centres. About 54% of people had access to electricity in 2024.

Energy snapshot.

Headline figures for electricity in Somalia. Each shows its data year and links to its source.

  • Population19,654,739 peopleSource 12025
  • Households2,930,000 householdsSource 42025
  • Average household size6.7 people/householdSource 42022
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (SOS)0.6 USD/kWhSource 82023
  • Household price (EUR)0.536 EUR/kWhSource 192023
  • Renewable electricity share18.7%Source 32023
  • Solar capacity0.046 GWSource 3End 2024
  • Wind capacity0.004 GWSource 3End 2024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
National Electricity Authority (NEA), set up under the Electricity Act 2023; Somaliland Energy Regulatory Commission in Somaliland
System operator
No national system operator. Each ESP balances its own isolated mini-grid.
Distribution networks
Private ESPs, each owning generation, distribution and customer billing in its town, such as BECO in Mogadishu, SomPower in Hargeisa and NESCOM in Garowe
Currency
Somali shilling (SOS)
Voltage and frequency
240 V single-phase / 415 V three-phase (low-voltage distribution)

Electricity prices in Somalia.

Household price (SOS)
0.6 USD/kWh (2023)Source 8World Bank estimate of the current average cost of electricity (about US¢60 per kWh), November 2023. Electricity is priced in US dollars. 2017 field data gave a range of US$0.25–1.30 per kWh (weighted average US$0.61) outside Somaliland, and US$0.30–0.90 (average US$0.68) in Somaliland.
Household price (EUR)
0.536 EUR/kWh (2023)Source 19Converted from US$0.60/kWh at the ECB reference rate of 8 October 2026 (EUR 1 = USD 1.1186).
Typical annual electricity bill
Not identified from a reliable public source.

Why electricity costs so much

Somali electricity comes mostly from small high-speed diesel generators run by private ESPs. In 2021 the World Bank counted at least 227 diesel generator sets in the main towns, with a median size of 315 kW, burning more than 121,000 litres of imported diesel a day. Each ESP builds its own generation and network, so there are few economies of scale, generators are often run inefficiently and network losses are between 25% and 40%. The result is one of the highest electricity prices in the world: the World Bank’s RISE indicators place Somalia in the top 5% globally for power cost and the top 15% for power spending as a share of household income.

How much people pay

Prices vary by town and by provider. Field data from 2017 put the cost outside Somaliland at US$0.25–1.30 per kWh, with a weighted average of about US$0.61, and in Somaliland at US$0.30–0.90, with an average of about US$0.68. In 2021 the World Bank reported tariffs of US$0.25–0.55 per kWh in Mogadishu, where the network is largest, and US$0.75–0.80 in Hargeisa, Garowe and Bosaso. Its November 2023 estimate of the average was about US¢60 per kWh. Electricity is priced and paid in US dollars.

Solar is bringing prices down

Adding solar panels and batteries to diesel mini-grids reduces fuel use. In Somaliland, ESPs that hybridised their systems were able to cut consumer tariffs by about 34%, and the World Bank reports reductions of about 40% for some ESPs. The ASCENT project aims to lower the average cost in its areas from about US¢60 to US¢35–45 per kWh, and the SESRP project tracks tariff reductions by participating ESPs.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedLimitedTariffs are set by each ESP. The NEA has published a Tariff Methodology and Tariff Adjustment Formulae Regulation under Articles 13 and 14 of the Electricity Act 2023, to become part of each operator’s licence. Adoption of a tariff methodology by the NEA is a target of the World Bank ASCENT project, due by November 2028.
OtherYesReported ESP tariffs in 2021 (World Bank): Mogadishu US$0.25–0.55 per kWh; Hargeisa US$0.75; Berbera US$0.50; Garowe US$0.79; Bosaso US$0.80.
FixedLimitedWhere customers have no meter, some ESPs charge a fixed fee based on the estimated load, such as the number of light bulbs or appliances (World Bank, 2021).
Time-of-useNoNo time-of-use tariff for households was identified.
DynamicNoThere is no wholesale market, so no market-linked tariff exists.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
23 kWh/person/yr (generation, all sectors) (2023)Source 3Derived: IRENA 2023 generation of 418 GWh divided by the World Bank 2023 population of 18,358,615. Off-grid household solar is probably not fully captured.
Heat pumps
Not identified from a reliable public source.
Air conditioning
0.1 % of homes (2022)Source 4Share of households owning an air conditioner (0.2% in urban areas). 15.2% of households own a fan.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
3.9 % of homes (2022)Source 4Main cooking fuel. Charcoal (47.9%) and firewood (41.3%) dominate; gas is used by 5.7%.

Electricity use in Somalia is very low. IRENA records total generation of 418 GWh in 2023, about 23 kWh per person, one of the lowest levels in the world. Demand is held down by price and by limited access rather than by lack of need: the national Power Sector Master Plan forecasts that required generation capacity could rise to 1,000–4,600 MW by 2037.

In homes with access, electricity is used mainly for lighting, phone charging, televisions and fans. The Somalia Integrated Household Budget Survey 2022 found that 54.1% of households used electricity as their main lighting source, 35.4% used torches and 9.7% used solar lighting. Only 9.4% of households owned a refrigerator, 15.2% a fan and 0.1% an air conditioner. Cooking relies almost entirely on charcoal and firewood.

Access figures vary by source. The World Bank puts access at 54.4% of the population in 2024, with 73.4% in urban areas and 24.4% in rural areas. The 2022 household survey found 61.9% of people had access to electricity in some form, ranging from 80.1% in towns to 39.4% in rural areas and 8.7% among nomadic households.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
48.5 % of households (2022)Source 4Rural 63.3%, urban 42.6%, nomadic 46.7%.
Private rented
28.9 % of households (2022)Source 4Urban 38.5%. A further 17.0% of households stay rent-free with the owner’s permission and 5.5% without permission.
Social or public housing
Not identified from a reliable public source.
Houses
21.4 % of dwellings (2022)Source 4Villas (bungalows) only. Other common dwelling types are iron-sheet houses (20.8%), rooms (16.9%), improvised homes (10.2%), traditional Somali houses (9.5%), tents (8.1%) and huts (7.2%).
Apartments and flats
4.7 % of dwellings (2022)Source 4
Urban population
55.1 % of population (2025)Source 1

Just over half of Somalis live in towns and cities, 55.1% in 2025 according to the World Bank, and a significant part of the rural population is nomadic or pastoralist. Households are large, averaging 6.7 people in 2022.

Housing is mostly low-rise and simply built. The 2022 household survey found that 80.8% of dwellings have iron-sheet roofs, while only 4.7% of households live in apartments. Nomadic households mostly live in traditional Somali houses and tents. Nearly half of households own their home; renting is common in towns, where 38.5% of households rent. 10.2% of households live in improvised homes and 8.1% in tents.

These conditions shape energy use. Electricity from ESP mini-grids is mainly available in towns. In rural and nomadic areas, households rely on torches, small solar lighting kits and solar panels: 26.1% of nomadic households and 13.5% of rural households own a solar panel, compared with 3.2% in towns.

How the grid works in Somalia.

  1. TransmissionNot identified from a reliable public source.
  2. DistributionPrivate ESPs, each owning generation, distribution and customer billing in its town, such as BECO in Mogadishu, SomPower in Hargeisa and NESCOM in Garowe
  3. MeteringNot identified from a reliable public source.
  4. Supply3 or more retail suppliers

Physical system

Somalia’s electricity system is a collection of isolated mini-grids. Before the civil war, ENEE supplied Mogadishu, Hargeisa, Berbera, Burao, Baidoa and Kismayo from about 70 MW of diesel generators, producing about 250 GWh a year (1987). That system was destroyed. Private ESPs filled the gap, starting with generators serving their own premises and extending lines to their neighbours. Distribution is mostly at low voltage (415/240 V) over long distances, which causes high losses.

Installed capacity estimates vary. The World Bank put capacity in the main load centres at about 138 MW in 2020 and about 276 MW in 2023. IRENA records 155 MW at the end of 2024, of which 106 MW is fossil-fuelled, 46 MW solar and about 4 MW wind. In Mogadishu, BECO operates 33 kV lines of more than 25 km and two gas-insulated substations, and reports 47 MW of solar PV, 8 MWh of batteries and 80 MW of base-load generation.

Who runs what

The ESPs are the electricity system. Each owns and operates its own chain from generator to customer. Some have merged: BECO was formed in 2014 when several Mogadishu suppliers combined, after more than five independent suppliers had built networks at different voltages and frequencies. In Hargeisa, SomPower owned about 95% of capacity in 2021.

Building a grid

The World Bank’s Somali Electricity Sector Recovery Project (SESRP, US$150 million, closing December 2026) is financing the first public sub-transmission lines, about 55 km in Mogadishu and 30 km in Hargeisa at 132 kV, plus rehabilitated distribution networks. The government will own the new sub-transmission assets, while ESPs will continue to own and operate their distribution networks under amended licences. The aim is to connect the separate mini-grids into a network that can later become a national grid.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Water Resources (MoEWR)Federal ministry that oversees the energy sector, sets policy and strategy and, according to its own description, approves electricity tariffs. It runs the World Bank and AfDB energy projects (SESRP, ASCENT, HAREACT) through project implementation units. Federal member states also have energy ministries.
RegulatorNational Electricity Authority (NEA)Quasi-autonomous regulator created under the Electricity Act 2023. Its mandate covers licensing of generation, transmission and distribution, compliance with standards, competition and consumer protection. It has issued a Tariff Methodology and Tariff Adjustment Formulae Regulation.
RegulatorSomaliland Energy Regulatory CommissionRegulator for Somaliland, which administers its own electricity sector under the Ministry of Energy and Minerals. Its establishment was recorded as achieved in the World Bank SESRP progress report of December 2024. It took over the issuing of interim three-year ESP licences from the ministry.
DSOElectricity service providers (ESPs)Private companies, at least 55 in the main towns in 2021, each owning and operating its own generation, distribution network and customer billing. Examples include BECO, Blue Sky and Mogadishu Power in Mogadishu, SomPower in Hargeisa, Berbera Electricity Company, and NESCOM in Garowe.
SupplierENEE (Ente Nazionale Energia Elettrica)The pre-war national utility. Before the conflict it ran about 70 MW of diesel generation supplying Mogadishu and the main regional centres. By 2021 it operated only 14 MW in Bosaso and Qardho in Puntland.

Compared with the UK system.

Compared with the UK system.
UK conceptSomalia equivalentHow it works
DNOElectricity service provider (ESP)Each town is served by one or a few private ESPs that own the local low-voltage and medium-voltage network. There is no separate network company: the ESP that owns the wires also generates the power and bills the customer.
National Grid/NESONoneThere is no national transmission grid or system operator. Each ESP mini-grid is an island balanced by its own generators. World Bank projects are building the first government-owned 132 kV sub-transmission lines in Mogadishu and Hargeisa, and an Ethiopia–Somalia interconnector is in preparation.
MPANESP customer account and meter numberThere is no national meter point number. A connection is identified by the account and meter number issued by the ESP that serves it.
MPRNNot applicableNo piped gas network was identified. Gas is the main cooking fuel for 5.7% of households (SIHBS 2022).
Meter operatorThe ESPESPs install and read their own meters. Metering is incomplete, and some customers without meters are charged a fixed fee based on their appliances.
SupplierThe local ESPHouseholds cannot choose a supplier in practice: they buy from the ESP whose network reaches their street.
Smart-meter infrastructureNone identifiedNo national smart-metering programme or data hub was identified.

How a supply point is identified.

Fictional illustration of the elements, not a real format: BECO customer account 0041827, single-phase meter, Hodan district, Mogadishu.

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?ESP customer account and meter number
Who issues it?The electricity service provider (ESP) serving the premises
FormatNo national numbering standard. Each ESP assigns its own customer account number and meter number in its billing system.
LengthNot publicly documented; varies by ESP
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the ESP bill or payment receipt and on the meter. No public description of account number formats was found.
Electronic accessDepends on the ESP. No regulated online access to consumption data was identified.
Third-party accessNo regulated data-sharing scheme exists. A third party, such as an installer, would rely on the customer’s bill or account details.
Who keeps the registerEach ESP keeps its own customer register. There is no central register of connections.
Register scopePer DSO

How a connection is identified

There is no national meter point identifier in Somalia. Because each town’s electricity network belongs to a private ESP, a household connection exists only as a customer record in that ESP’s billing system, linked to a meter where one is installed. The account and meter numbers appear on the bill or payment receipt. No public document describing the format of these numbers, or rules on transferring an account when a property changes hands, was found for this profile.

Metering gaps

The World Bank reported in 2021 that ESP metering systems were deficient and could not provide reliable consumption data, and that some ESPs charged customers without meters a fixed fee based on the number of light bulbs or appliances. Distribution projects financed by the World Bank include metering equipment, and the SESRP progress report of December 2024 identified metering as key to cutting network losses from about 35% to about 20%.

No central register

As there is no national grid, no supplier switching and no settlement system, no central register of supply points exists. The NEA licenses operators but does not publish a customer register. In Somaliland, ESP licensing is handled by the Somaliland Energy Regulatory Commission.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?No
Net meteringNo
Net billingNo
How exported electricity is paidNone. No net metering, feed-in tariff or other export payment scheme for households was identified.
Can households sell solar power to the grid?No scheme for this was identified. There is no net metering, feed-in tariff or export payment, and each local network is owned by a private ESP.
Who owns the solar plants built with public money?Under the SESRP project, the government keeps ownership of the solar PV and battery systems it finances at ESP sites, and the ESPs operate them under a public-private partnership, concession or service agreement that requires them to reduce tariffs.
Is there a grid code for connecting generators?Not yet. Preparation and issue of transmission and distribution grid codes by the NEA is a target of the World Bank ASCENT project, due by November 2028.

Connecting a home system.

  1. No published procedure exists for households to export power to an ESP network. Household and business solar systems are installed to supply the premises directly.
  2. Larger solar and battery systems connected to mini-grids are built by the ESPs themselves or, under World Bank projects, financed by the government and operated by ESPs under contracts.

Export is not part of Somalia’s electricity system. Grid-connected solar exists only where ESPs have added solar panels and batteries to their own diesel mini-grids. Household solar is off-grid, mainly small lighting kits and panels in rural and nomadic areas.

Because each ESP owns generation, network and retail in its area, there is no framework for a third party to inject power into an ESP’s network or be paid for it. The Electricity Act 2023 and the NEA’s licensing regime are expected to define these relationships; the World Bank PAD notes that the ESP mini-grids could eventually support wheeling and sales between networks.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (household solar)No electricity licence or registration was identified for off-grid household systems.None identifiedDonor-funded systems for schools and health centres are procured by the ministries.
Generate electricity for saleLicence from the NEA under the Electricity Act 2023. The NEA’s tariff regulation provides for generation-only licences.National Electricity Authority (Somaliland: Somaliland Energy Regulatory Commission)No published size threshold or exemption was identified.
Distribute and supply electricity (integrated ESP)Licence from the NEA. The tariff regulation covers integrated transmission and distribution operations such as the current ESPs. Before the Act, licences were issued ad hoc by energy ministries.National Electricity Authority (Somaliland: Somaliland Energy Regulatory Commission)The ASCENT project targets five ESPs with operating licences issued by November 2028. In Somaliland, interim integrated licences have a three-year validity.
TransmissionLicence from the NEA. New 132 kV sub-transmission lines built under SESRP will be government-owned.National Electricity AuthorityThe government may outsource operation or create a transmission company.
Store electricity (batteries)No specific licensing rule was identified.None identifiedBatteries at ESP sites are part of the ESP’s licensed operations.
Export to the gridNo export scheme or connection procedure for small systems exists.ESP / NEASee the export section.
Wholesale trading, aggregation and virtual power plantsNo framework. There is no wholesale market and no aggregator role.None
Balancing, grid services and remote control of assetsNot open to third parties. Each ESP balances its own mini-grid.ESPsNo rules exist for dispatching third-party distributed assets.

The federal Electricity Act was approved by the Council of Ministers in December 2020, together with the Electricity Sector Policy, and enacted in 2023. It created the National Electricity Authority, which licenses generation, transmission and distribution. Before the Act, ESPs operated under ad hoc licences from federal and state energy ministries.

The NEA’s first published instrument is its Tariff Methodology and Tariff Adjustment Formulae Regulation, which will form part of every operator’s licence and covers generation-only, network-only and integrated licensees. Grid codes, a least-cost generation plan and a national electrification plan are being prepared with World Bank support.

Somaliland has its own framework: an Energy Policy adopted in 2010, an Electrical Act of 2013 and a regulatory commission that issues ESP licences.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoThere is no market. Each ESP generates for its own customers.
Balancing and reservesNo—NoESPs. Each ESP balances its own isolated mini-grid.
Demand responseNo—NoNo demand-response scheme was identified.

There is no route for distributed energy resources to provide flexibility services. Somalia has no wholesale or balancing market and no interconnected grid. Flexibility within each mini-grid comes from the ESP’s own diesel generators and, increasingly, from batteries installed alongside solar plants to cover evening demand.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national smart-meter programme identified
Reading intervalNot applicable
Meter ownerThe ESP serving the premises
National programmeNone identified
Data hubNone

No smart-metering programme or regulation was identified in Somalia. Metering is the responsibility of each ESP, and the World Bank reported in 2021 that metering was deficient and some customers were billed on estimated loads. Better metering is part of the loss-reduction work under the SESRP and ASCENT projects.

Renewable electricity.

Electricity generation mix (2023).

  • Fossil fuels (diesel): 81.3%
  • Solar PV: 17.2%
  • Wind: 1.4%
Source 3
Renewable electricity share
18.7% (2023)Source 3Share of electricity generation: 78 GWh of renewables (72 GWh solar, 6 GWh wind) out of 418 GWh. No cross-border electricity imports were identified.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Solar PV
46 MW (End 2024)Source 3
Wind
4 MW (End 2024)Source 3
Bioenergy
0.2 MW (End 2024)Source 3
Fossil fuels
106 MW (End 2024)Source 3

Targets.

  • No national renewable electricity target was identified. Somalia’s updated Nationally Determined Contribution (2021) is listed by IRENA as its latest relevant policy.
  • Somaliland’s development plan set a target of 10% of generation from renewables (World Bank, 2021).

Somalia has strong solar and wind resources, and solar is now the main way ESPs reduce their dependence on imported diesel. IRENA records 46 MW of solar and about 4 MW of wind at the end of 2024, providing about 17% and 1% of the 418 GWh generated in 2023. Solar capacity has grown many times over since 2019.

Most solar is attached to ESP mini-grids. BECO, the largest ESP in Mogadishu, reports 47 MW of solar PV at its plants including Jabad Geele, outside the city. Under World Bank projects, SESRP plans about 55 MWp of solar with batteries at ESP sites plus 5.4 MWp at 194 health facilities, and ASCENT targets 30 MW of solar and 90 MWh of batteries by November 2028. The AfDB-financed HAREACT project also covers solar PV and battery generation and new connections.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Battery storage is being added to Somali mini-grids so that daytime solar output can cover evening demand and diesel generators can run less. No national statistics on installed storage are published. The two World Bank projects together plan tens of megawatts of batteries at ESP plants.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
BECO (Benadir Electric Company)About 85% of installed capacity in Mogadishu (World Bank, 2021)NoNoNoNo
SomPowerAbout 95% of installed capacity in Hargeisa (World Bank, 2021)NoNoNoNo
NESCOM (National Energy Corporation of Somalia)Main ESP in Garowe (World Bank, 2021)NoNoNoNo

Each town has its own ESPs. The World Bank lists BECO, Blue Sky and Mogadishu Power as the main ESPs in Mogadishu, SomPower in Hargeisa, Berbera Electricity Company in Berbera, NESCOM in Garowe and ENEE in Bosaso. Only BECO’s own website was consulted for this profile; for the others the World Bank project page is given. No ESP was identified offering export, time-of-use or renewable tariffs.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Water ResourcesGovernmentFederal energy ministrySets energy policy and runs the World Bank and AfDB electricity projects.
National Electricity Authority (NEA)RegulatorFederal electricity regulatorLicenses operators and sets the tariff methodology under the Electricity Act 2023.
BECODistributionLargest ESP in MogadishuOperates generation, 33 kV lines and distribution in the capital, with a large solar fleet.
Somali Electricity Sector Recovery Project (SESRP)Renewable EnergyWorld Bank-financed sector programmeFinances networks, mini-grid hybridisation, solar for public facilities and the new institutions.
ASCENT SomaliaRenewable EnergyWorld Bank-financed clean energy access projectFinances solar PV and batteries at ESP mini-grids through private sector participation.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
TariffsTariff Methodology and Tariff Adjustment Formulae RegulationNational Electricity AuthorityIssued under Articles 13 and 14 of the Electricity Act 2023; forms part of operators’ licences.
Grid connectionTransmission and distribution grid codes (in preparation)National Electricity AuthorityPreparation and issue of grid codes is a World Bank ASCENT project target for November 2028. No grid code is in force.
Safety and service qualityNone identifiedNational Electricity AuthorityThe World Bank reported in 2021 that, without regulations and codes of practice, there was no mechanism to enforce service quality or health and safety standards.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Electricity licence for household solarNoNationalNo licence or registration requirement was identified for off-grid household systems.
Connection to an ESP networkYesLocalA new connection is arranged with the ESP that serves the area, which sets its own connection fee. The World Bank identifies high connection fees as a barrier to access.
Building or planning permissionLimitedLocalNo specific rule for rooftop solar was identified.

For a household, installing solar in Somalia is a private purchase with no electricity-sector approval. Getting a grid supply means signing up with the local ESP and paying its connection fee and tariff. The NEA regulates the ESPs rather than individual customers.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Somali Electricity Sector Recovery Project (SESRP)ActivePublic investment in networks, solar hybridisation and solar for public facilitiesUS$150 million IDA grant approved on 8 December 2021. Finances distribution and sub-transmission in Mogadishu and Hargeisa, solar and batteries for ESP mini-grids, stand-alone solar for health and education facilities, and institutional development.December 2021 – December 2026
Accelerating Sustainable and Clean Energy Access Transformation (ASCENT) SomaliaActiveCapital buy-down for ESP solar and batteries; network reinforcementUS$100 million IDA grant approved on 28 November 2023 and effective from 14 March 2024. Targets 1.82 million people with new or improved electricity service, 260,000 through household connections.March 2024 – November 2028
HAREACT (African Development Bank)ActiveSolar PV and battery generation, connections and clean cookingAfDB-financed project implemented by the Ministry of Energy and Water Resources, covering power generation with solar PV and batteries, distribution and customer connections, and advanced cooking technologies. The amount and dates were not stated on the ministry’s page.—

Data and connectivity.

Fixed broadband
27.9 % of population using the internet (2024)Source 1Internet use, not broadband coverage.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About 28% of Somalis used the internet in 2024 (World Bank). Mobile phones are widespread: 61.7% of households own a basic mobile phone and 40.4% a smartphone (SIHBS 2022). No smart-meter communications network was identified.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
0.418 TWh (2023)Source 3Total generation, used as a proxy for supplied demand.
Generation capacity
0.155 GW (End 2024)Source 3IRENA: 106 MW fossil fuel, 46 MW solar, about 4 MW wind. The World Bank estimated about 276 MW in the main load centres in 2023.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Supply depends on each ESP’s generation and network. Losses are high, about 35% on average across the networks studied for SESRP, because of long low-voltage lines, ageing equipment and gaps in metering. Generators are often run separately rather than synchronised, wasting fuel; the World Bank estimates that synchronisation and solar hybridisation could cut generation costs by about 30%.

In the longer term, Somalia plans to connect its mini-grids into a national grid and to import hydropower from Ethiopia. Somalia has expressed interest in joining the Eastern Africa Power Pool, and the World Bank is preparing a US$230 million Ethiopia–Somalia interconnector project.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Electricity Act 2023 and National Electricity AuthorityCurrent2023The Act created the NEA as federal regulator to license generation, transmission and distribution. The NEA has issued a tariff methodology regulation.
Licensing of ESPs and grid codesUpcomingBy November 2028World Bank ASCENT targets include operating licences for five ESPs, NEA adoption of the tariff methodology, transmission and distribution grid codes, a least-cost generation plan and a national electrification plan adopted by Cabinet.
SESRP closingUpcoming31 December 2026Scheduled closing of the US$150 million Somali Electricity Sector Recovery Project, which finances the first 132 kV sub-transmission lines in Mogadishu and Hargeisa and solar hybridisation of ESP mini-grids.
Ethiopia–Somalia interconnectorUpcomingIn preparationWorld Bank project P179036 (US$230 million, pipeline) aims to enable power trade between Ethiopia and Somalia.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costHighLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow8.8% of households owned a solar panel and 9.7% used solar as their main lighting source in 2022 (SIHBS); no grid-connected residential solar scheme exists.
Distributed energy marketMediumAll grid electricity comes from isolated private mini-grids, and ESPs are adding solar and batteries; there is no framework for customer-owned generation to connect.
Grid flexibility marketLowNo wholesale, balancing or demand-response market exists.
Energy storage adoptionLowNo national storage statistics; batteries are being added at ESP plants under World Bank projects (about 30 MW under SESRP, 90 MWh targeted under ASCENT).
Renewable growth environmentMediumRenewable capacity grew from a very small base to 49 MW by 2024 and supplied 18.7% of generation in 2023 (IRENA); further donor-financed solar is under procurement.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 19 sources
  1. World Development Indicators: population, urban population, internet use and access to electricity (Somalia). World Bank, 2025. accessed 9 October 2026.
  2. Access to electricity (% of population) – Somalia. World Bank, 2024. accessed 9 October 2026.
  3. Energy Profile: Somalia. IRENA, 2025. accessed 9 October 2026.
  4. Somalia Integrated Household Budget Survey (SIHBS) 2022. Somalia National Bureau of Statistics, 2023. accessed 9 October 2026.
  5. Project Appraisal Document: Somali Electricity Sector Recovery Project (PAD4224). World Bank, 2021. accessed 9 October 2026.
  6. Somali Electricity Sector Recovery Project (P173088): project record. World Bank, 2026. accessed 9 October 2026.
  7. Implementation Status and Results Report, Sequence No. 6: Somali Electricity Sector Recovery Project. World Bank, 2024. accessed 9 October 2026.
  8. Appraisal Project Information Document: Accelerating Sustainable and Clean Energy Access Transformation in Somalia (P181341). World Bank, 2023. accessed 9 October 2026.
  9. Implementation Status and Results Report, Sequence No. 1: ASCENT Somalia (P181341). World Bank, 2024. accessed 9 October 2026.
  10. RETRADE-EAPP MPA Phase 2: Ethiopia-Somalia Interconnector Project (P179036): project record. World Bank, 2026. accessed 9 October 2026.
  11. Ministry of Energy and Water Resources: mandate, affiliates and energy projects. Ministry of Energy and Water Resources, Federal Government of Somalia, 2026. accessed 9 October 2026.
  12. ASCENT Somalia. Ministry of Energy and Water Resources, 2026. accessed 9 October 2026.
  13. HAREACT. Ministry of Energy and Water Resources, 2026. accessed 9 October 2026.
  14. Overview: About NEA. National Electricity Authority, 2026. accessed 9 October 2026.
  15. Tariff Methodology and Tariff Adjustment Formulae Regulation. National Electricity Authority, 2026. accessed 9 October 2026.
  16. BECO: Services. BECO, 2026. accessed 9 October 2026.
  17. Jabad Geelle Project 01. BECO, 2026. accessed 9 October 2026.
  18. About Us. BECO, 2026. accessed 9 October 2026.
  19. ECB reference exchange rate, US dollar/Euro (EXR.D.USD.EUR.SP00.A). European Central Bank, 2026. accessed 9 October 2026.

Questions about energy in Somalia.

Talk to us about Olmack in Somalia.Tell us about your home, housing portfolio or school estate in Somalia. We'll explain what is possible there now.