How electricity works in Yemen.
Yemen electricity 2026: a divided public grid, long outages, off-grid solar in most homes, tariffs in Aden and Sana’a, grid capacity, licensing and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Yemeni rial (YER) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Yemen energy at a glance.
Key figures for households in Yemen. Each one links to its source on the full overview below.
Electricity price.
234 YER per kWh for households, including taxes. Figures for 2023.
Renewable share.
20% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Yemen.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Yemen below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Yemen requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Yemen.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Yemen, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Yemen, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Yemen.
The energy market in Yemen, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Yemen’s public electricity system was built around a single state utility, the Public Electricity Corporation (PEC), which owned the power stations, the transmission network and the distribution grid. Electricity Law No. 1 of 2009 provided for PEC to be split into generation, transmission and distribution companies and for an independent regulator, but none of this had been done when the World Bank reviewed the sector in 2022. Since the conflict that began in 2014–15, the national grid has broken into separate local systems, and the institutions are divided between the internationally recognised government, based in Aden, and the de facto authorities in Sana’a.
Grid supply is scarce and unreliable. Before the war, the installed capacity was about 1.5 GW. During the conflict, only about 303 MW of the 906 MW of previously connected plant was working, and in 2022 the World Bank estimated that only about 12% of the population relied on public electricity. In Aden, power cuts of 18–20 hours a day were reported in the second quarter of 2026, and demand there was nearly three times the available supply. The government depends on Saudi fuel grants to keep its power stations running.
Households filled the gap with solar. Market studies found solar in up to 75% of households in some cities, including Sana’a, and the World Bank estimates that more than US$200 million a year was spent on household off-grid solar after the conflict began. IRENA counts 403 MW of solar capacity at the end of 2024 and estimates that solar produced 20% of the country’s electricity in 2023. Prices differ widely across the front line. In 2023 the Sana’a Center reported YR 12 per kWh in government-held areas and YR 234 per kWh in areas held by the Sana’a authorities, where a different rial exchange rate applies.
Energy snapshot.
Headline figures for electricity in Yemen. Each shows its data year and links to its source.
- Population41,773,878 peopleSource 22025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (YER)234 YER/kWhSource 152023
- Household price (EUR)0.392 EUR/kWhSource 232023 price, 2026 exchange rates
- Renewable electricity share20%Source 12023
- Solar capacity0.403 GWSource 1End 2024
- Wind capacity0 GWSource 12024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- No independent regulator. Electricity Law No. 1 of 2009 provides for one, but it has not been set up. The Ministry of Electricity and Energy sets policy and supervises PEC.
- System operator
- Public Electricity Corporation (PEC), now run as separate local systems, with separate administrations in Aden and Sana’a
- Distribution networks
- PEC branches and local power systems in each governorate, plus private generators and solar mini-grids that sell to neighbourhoods without a formal legal basis
- Currency
- Yemeni rial (YER)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Yemen.
- Household price (YER)
- 234 YER/kWh (2023)Source 15Price per kWh reported for areas held by the Sana’a-based authorities, where most Yemenis live. In government-held areas, including Aden, the reported public tariff was YR 12 per kWh. In Hadramawt, the reported rates were YR 120–150 in the Wadi and YR 220–250 on the coast (2023). The two zones use different rial notes and exchange rates. No more recent official tariff was found.
- Household price (EUR)
- 0.392 EUR/kWh (2023 price, 2026 exchange rates)Source 23Derived from YR 234/kWh at YR 533 per US dollar, the midpoint of the YR 531–534 rate in Sana’a-held areas in the second quarter of 2026 (Sana’a Center), and the ECB euro reference rate on 9 October 2026 (EUR 1 = USD 1.1206). The government-area tariff of YR 12/kWh is less than one euro cent at the Aden rate of about YR 1,562 per dollar (June 2026).
- Typical annual electricity bill
- Not identified from a reliable public source.
Two price systems
Electricity prices in Yemen depend on who controls the area. In government-held areas, centred on Aden, the public tariff reported in 2023 was YR 12 per kWh. That price was set long before the conflict and is paid in a rial that has lost most of its value, falling from about YR 1,220 per dollar at the start of 2024 to about YR 2,340 in March 2025, before recovering to about YR 1,562 in June 2026. At that rate, YR 12 is less than one US cent. In the areas held by the Sana’a-based authorities, where old rial notes trade at about YR 531–534 per dollar, the reported price was YR 234 per kWh, about US$0.44. There, electricity is sold at close to the cost of diesel generation.
Subsidies and collection
Before the war, the tariff was about 8 US cents per kWh and covered only about a quarter of the economic cost of supply (World Bank, 2017). In government-held areas, the gap is now covered by the state budget and by fuel grants. The Sana’a Center estimated subsidies at US$75–100 million a month in 2023, and the government’s spending on fuel and rented power plants at about US$1.2 billion a year in 2025. Saudi Arabia provided a US$81.2 million grant for 339 million litres of diesel and mazut in January 2026, for more than 70 power stations, and a further US$150 million emergency fuel grant in the second quarter of 2026. Collection is weak: about 45% of Hadramawt customers did not pay their bills in 2018, and losses there were 31.5–43.5%.
What households actually pay for
For most households, the main electricity cost is not a utility bill. It is buying and replacing solar panels, batteries and inverters, and paying neighbourhood generator operators. The World Bank estimated typical lifecycle costs of about US$3,300 per kW for household solar systems in 2018. No regular official statistics on these costs are published.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Limited | Public tariff in government-held areas. The Sana’a Center reported a price of YR 12 per kWh in 2023, far below the cost of the diesel and crude oil used in the power stations. It cited government subsidies of US$75–100 million a month and collection rates as low as 20% in some areas. Supply depends on fuel deliveries. Aden had 2 hours a day in late October 2023 and cuts of 18–20 hours a day in spring 2026. |
| Other | Yes | Areas held by the Sana’a-based authorities. The reported price in 2023 was YR 234 per kWh, in old rial notes that trade at about YR 531–534 per US dollar (Q2 2026). Power is sold by the public utility and by private and commercial generating stations at prices close to cost. |
| Other | Limited | Hadramawt. The Sana’a Center reported YR 120–150 per kWh in Wadi Hadramawt and YR 220–250 per kWh on the coast in 2023. Generating costs ranged from about US$0.06 per kWh for the private Al-Jazeera plant to US$0.34 for diesel units. |
| Time-of-use | No | No time-of-use tariff for households was identified. |
| Dynamic | No | There is no wholesale market, so no market-linked tariff exists. |
Household prices compared with neighbouring countries (EUR per kWh).
- Somalia€0.536
- Yemen€0.392
- Djibouti€0.277
- Saudi Arabia€0.049
- Oman€0.032
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 99 kWh/person/yr (all sectors) (2024)Source 5World Bank “electric power consumption per capita” (99.01 kWh). It was 220.6 kWh in 2010, before the conflict. Off-grid solar is probably not fully captured.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Yemen has one of the lowest levels of electricity use in the world. The World Bank series puts consumption at about 99 kWh per person in 2024, down from about 220 kWh in 2010 and 255 kWh in 2014. Demand that could not be met by the grid has been largely suppressed or shifted to off-grid supply. In 2017, Sana’a needed about 500 MW but received about 40 MW for a few hours a day. In 2026, Aden’s shortfall was about 400 MW at peak.
Household use is mostly small-scale. Typical home solar systems power lights, phone charging, fans, televisions and sometimes refrigerators and water pumps. Air conditioning, needed in the hot coastal cities of Aden, Hodeidah and Mukalla, depends on grid or generator power, which is why summer outages in these cities regularly cause protests, such as those in Mukalla in July 2025.
The World Bank access figure rose to 86.3% of the population in 2024. Most of that access is from solar and private generators rather than the public grid, and it often means a few hours of limited power a day.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 37 % of population (2025)Source 3
Yemen is mostly rural. About 37% of people lived in towns and cities in 2025 (World Bank), and the World Bank estimates that about two-thirds of the population live in rural and peri-urban areas. Before the war, 85% of urban residents and only 23% of rural residents had public electricity (2014).
No official housing statistics have been published since the 2004 census. That matters for energy because rural homes were never widely connected to the grid, and in towns the grid has largely failed, so both depend on equipment the household installs itself. Flat roofs are common, which makes rooftop solar easy to fit, and solar panels are now a familiar sight on houses across the country.
How the grid works in Yemen.
- TransmissionPublic Electricity Corporation (PEC)
- DistributionPEC branches and local power systems in each governorate, plus private generators and solar mini-grids that sell to neighbourhoods without a formal legal basis
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Physical system
Before the conflict, Yemen had about 1.5 GW of installed capacity, of which about two-thirds was usable. Most power came from oil-fired plants and the 340 MW Marib I gas plant, linked by a national transmission grid. Fighting cut the lines from Marib and damaged substations, with 25% of distribution substations damaged in Aden, 50% in Taiz and 37% in Sana’a by October 2015. The grid split into islands. IRENA counts 2,148 MW of installed capacity at the end of 2024, of which 1,745 MW is fossil-fuelled and 403 MW is solar, but available output is far lower because of fuel shortages and plant condition.
Who runs what
The internationally recognised government in Aden and the de facto authorities in Sana’a each run their part of PEC. In the government areas, power stations depend on crude oil from PetroMasila and Marib and on fuel imports, much of it paid for by Saudi grants. In 2026, emergency generators with a combined capacity of 200 MW were delivered to Mukalla and Seiyun, and another 100 MW was expected for Aden.
Solar plants
Two utility-scale solar plants were built with UAE funding and run by Global South Utilities (GSU): 120 MW in Aden and 53 MW in Shabwa. In mid-January 2026 GSU shut them down and evacuated its staff, according to the Sana’a Center. Solar plants supply only during the day, so evening demand still relies on thermal plants.
Commercial flow
There is no market. PEC buys fuel and rents generation, sells power at the tariff and collects what it can. In government areas the gap between costs and revenue is covered by the state and donors. Elsewhere, private generator operators and the Sana’a authorities sell power at prices close to cost. Households and businesses that can afford it have stepped outside the system with their own solar.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Electricity and Energy | Sets policy and supervises PEC. Since the conflict, there have been separate ministries in Aden (internationally recognised government) and Sana’a (de facto authorities). |
| Regulator | Independent regulator (not established) | Electricity Law No. 1 of 2009 provides for an independent regulator. The World Bank reported in 2022 that it had not been created. Tariffs and licences are decided by the ministry and the government. |
| TSO | Public Electricity Corporation (PEC) | The state-owned, vertically integrated utility. Before the war it ran the national grid, fed largely by the 340 MW Marib I gas-fired plant, which supplied about half of the energy generated. The national grid has since collapsed into local systems. In government areas, PEC’s Aden operation (often called the Aden Electricity Corporation) runs plants such as Al-Haswa, Al-Mansoura and PetroMasila (Al-Raies), whose nominal 270 MW yields about 60 MW. |
| DSO | PEC governorate branches and local systems | Distribution is carried out by PEC branches in each area. In practice each city or governorate runs its own island grid with its own power stations. In Hadramawt, for example, the Wadi and the coast have separate systems. |
| Supplier | Private power producers and generator operators | Private generation has sold to PEC since 2006 and supplied 38% of generation in 2013. Since the war, private and commercial generating stations also sell directly to neighbourhoods. The World Bank notes that there is no formal legal basis for these sales, even though they take place. In February 2025 the Aden authorities cancelled contracts with independent diesel producers. |
| Supplier | General Authority for Rural Electrification (GARE) | Set up in 2009 to lead rural electrification. The World Bank says it “failed to establish itself in the sector”. |
Compared with the UK system.
| UK concept | Yemen equivalent | How it works |
|---|---|---|
| DNO | PEC branch / local power system | There are no separate licensed network companies. PEC owns the distribution network, run as local grids city by city. Where the public grid does not reach or does not supply power, private generator and solar operators run their own small networks. |
| National Grid/NESO | PEC (no national system operation) | Before 2015 PEC operated a national transmission grid. It has broken into local systems, and each is balanced by the power stations that serve it. There is no independent system operator. |
| MPAN | PEC subscriber account | There is no national meter point number. A grid connection is a PEC subscription linked to a meter. The account details appear on the PEC bill. PEC had about 2 million subscribers in 2012. |
| MPRN | Not applicable | There is no mains gas network for homes. Cooking gas is sold in cylinders. |
| Meter operator | PEC | PEC installs and reads its own meters. Private generator operators meter or charge their customers under their own arrangements. |
| Supplier | PEC, plus private generator operators | There is no supplier choice on the public grid. In practice, households use whatever is available: the PEC supply when it is on, a neighbourhood generator, and their own solar system. |
| Smart-meter infrastructure | None identified | No national smart-metering programme or data hub was identified. |
How a supply point is identified.
Fictional illustration of the elements, not a number format: PEC subscription in the name of A. Saleh, single-phase residential meter, Crater district, Aden branch.
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | PEC subscription (subscriber account) and meter |
| Who issues it? | Public Electricity Corporation (PEC), through its local branch |
| Format | No published national numbering standard. A grid connection is a PEC subscription linked to a meter at the premises, identified by the account and meter details printed on the PEC bill. |
| Length | Not publicly documented |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the PEC bill and on the meter at the premises. No public description of the account number format was found. |
| Electronic access | No public online account service was identified. PEC’s website could not be reached. |
| Third-party access | No regulated data-sharing scheme exists. A third party, such as an installer, would rely on the customer’s bill. |
| Who keeps the register | PEC’s customer records, held by its local branches. Since the conflict they have been administered separately in Aden and Sana’a. |
| Register scope | Per DSO |
How a connection is identified
Yemen has no national meter point number. The unit of record is the PEC subscription: an account for a premises, linked to a PEC meter, issued by the local branch. PEC had about 2 million subscribers in 2012 (Sana’a Center). No public document describing the account number format, transfer rules or customer procedures was found for this profile.
A divided register
Since the conflict, the PEC branches in government-held areas and in areas held by the Sana’a authorities have been run separately, so there is no single national customer register in practice. Each local system keeps its own records and bills its own customers.
Supply outside the subscription
For many households, the PEC subscription is only one of several supplies. Neighbourhood generator and solar mini-grid operators keep their own customer lists, with no public register. Household solar systems need no connection or registration. The World Bank estimated in 2022 that only about 12% of the population relied on public electricity.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | No |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | None. No net metering, feed-in tariff or other export payment scheme for households was identified. |
| Can households export solar power to the grid? | No scheme for this was identified. There is no net metering, feed-in tariff or export payment. Household systems are built to run independently of the grid, which is usually off. |
| Can I sell solar power to my neighbours? | Neighbourhood sales from private generators and solar systems happen widely, but the World Bank reported in 2022 that there is no formal legal basis for selling privately produced electricity directly to end users. |
| Is there a technical standard for connecting solar to the grid? | No national grid-connection code for small generators was identified. Donor programmes set their own product rules: the World Bank’s second electricity access project required VeraSol-certified household products before subsidy payments, and its first project produced a PV standards guideline. |
Connecting a home system.
- No procedure exists for households to export power to the PEC grid. Household solar systems are installed off-grid, to supply the home directly, usually with batteries.
- Larger solar projects, such as the 120 MW Aden plant, have been developed under agreements with the government, not through a general connection procedure.
Export is not a feature of Yemen’s electricity system. Almost all solar in the country is off-grid, installed by households, farms, businesses and public facilities to supply their own needs during outages. Grid supply is so limited that a household would rarely have a working grid to export into, and there is no regulator to set export rules.
Grid-connected solar exists only at utility scale. The UAE-funded 120 MW plant in Aden and 53 MW plant in Shabwa feed the local grids directly. The Sana’a Center reported plans for a “Shams” solar project of 25 MW, rising to 98 MW across several governorates, with World Bank technical assistance.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use (household solar) | No electricity licence or registration was identified for off-grid household systems. | None identified | Hundreds of thousands of systems have been installed privately. Donor programmes such as the World Bank projects run through UNOPS require certified products for subsidised sales. |
| Generate electricity for sale to PEC | Private producers have sold power to PEC under contracts since 2006. Electricity Law No. 1 of 2009 is the legal framework, but the licensing regulator it foresees has not been set up, so contracts are agreed with the government and PEC. | Ministry of Electricity and Energy / PEC | In February 2025 the Aden authorities cancelled contracts with independent diesel power producers. |
| Sell electricity directly to consumers | No formal legal basis, according to the World Bank (2022), although neighbourhood sales by private generator and solar operators take place widely. | None in practice; local authorities | Prices are set by operators. In some places local authorities intervene. |
| Store electricity (batteries) | No licensing rule was identified. | None identified | Batteries are usually part of household solar systems. |
| Export to the grid | No export scheme or connection procedure for small systems exists. | PEC | See the export section. |
| Transmission, distribution and public supply | Reserved to PEC. The 2009 law provides for unbundling into separate companies, which has not taken place. | Ministry of Electricity and Energy / PEC | Run separately by the authorities in Aden and Sana’a since the conflict. |
| Wholesale trading, aggregation and virtual power plants | No framework. There is no wholesale market and no aggregator role. | None | |
| Balancing, grid services and remote control of assets | Not open to third parties. Each local system is balanced by PEC’s own and rented plants. | PEC | No rules exist for dispatching distributed assets. |
Yemen’s electricity law is Law No. 1 of 2009. It was meant to open the sector by splitting PEC into generation, transmission and distribution companies and creating an independent regulator to license operators and set tariffs. The conflict broke out before these reforms took effect, and in 2022 the World Bank reported that none of them had been carried out.
In practice, the market that has grown since 2015 operates outside formal licensing. Solar retailers, of whom more than 170 were registered in Sana’a in 2014–16, import and sell equipment. Neighbourhood generator and solar operators sell power to their neighbours. Public facilities have been solarised through donor programmes. None of these activities has a specific electricity licence.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale energy market | No | — | No | PEC. There is no market. PEC runs its own and rented plants in each local system. |
| Balancing and reserves | No | — | No | PEC. Supply is rationed by scheduled outages rather than balanced by a market. |
| Demand response | No | — | No | No demand-response scheme was identified. |
There is no route for distributed energy resources to provide flexibility to the grid. Yemen has no wholesale or balancing market, no regulator and, in most places, no grid supply for much of the day. The flexibility that households have in their batteries is used to cover outages.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme identified |
| Reading interval | Not applicable |
| Meter owner | PEC, through its local branches |
| National programme | None identified |
| Data hub | None |
No smart-metering programme or regulation was identified in Yemen. PEC meters customers through its local branches, and with collection rates as low as 20% in some government areas (Sana’a Center, 2023), billing and collection rather than meter technology are the main concern.
Renewable electricity.
Electricity generation mix (2023).
- Fossil fuels (oil and gas): 80%
- Solar PV: 20%
- Renewable electricity share
- 20% (2023)Source 1Solar PV made 510 GWh of 2,553 GWh of total generation (IRENA estimate, which includes off-grid solar). The World Bank series gives 10.25% for 2021. All other generation is from oil and gas.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 120 MW (2024)Source 1
- Solar PV
- 403 MW (End 2024)Source 1IRENA estimate including off-grid systems.
- Wind
- 0 MW (2024)Source 1
- Hydro
- 0 MW (2024)Source 1
- Fossil fuels
- 1,745 MW (End 2024)Source 1Installed capacity. Available output is much lower because of fuel shortages and plant condition.
Targets.
- A National Strategy for Renewable Energy and Energy Efficiency was adopted in 2010 (listed by IRENA). No current national renewable target was identified.
Solar in Yemen grew because the grid failed, not because of policy. After the conflict began, households, farms and businesses bought solar systems to replace grid power. The World Bank estimates spending of more than US$200 million a year on household off-grid solar. In 2019, about 75% of the population used small solar systems, according to the Sana’a Center.
IRENA records 403 MW of solar capacity at the end of 2024, up 120 MW in that year, and estimates that solar provided 510 GWh, or 20% of total generation, in 2023. The rest of Yemen’s electricity comes from oil- and gas-fired plants and diesel generators. There is no wind or hydropower capacity.
Donors have supported solar for public services. The World Bank’s second Emergency Electricity Access Project (US$100 million, implemented by UNOPS) had reached 3.02 million people by December 2024. It had powered 347 facilities with more than 7 MW, including 205 health centres, 54 schools and 88 solar pumping systems, and sold 67,402 household solar units through microfinance institutions in its first round.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Batteries are an everyday item in Yemen. Off-grid household solar systems rely on them to supply power in the evening and at night, but no statistics on installed storage are published, and no grid-scale battery project was identified.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Public Electricity Corporation (PEC) | Sole public supplier, run separately in Aden and Sana’a | No | No | No | No |
PEC is the only public supplier. Its website could not be reached for this profile. Alongside PEC, private generator operators and solar mini-grids sell power to neighbourhoods, and solar retailers sell household systems outright. These businesses are not licensed electricity suppliers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Public Electricity Corporation (PEC) | Transmission | State utility for generation, transmission and distribution | Owns the public grid and bills grid customers. |
| UNOPS Yemen | Renewable Energy | Implementer of the World Bank electricity access projects | Runs the solar programmes for households, health centres, schools and water wells. |
| World Bank – Yemen Emergency Electricity Access Project, Phase II | Renewable Energy | Donor financing for off-grid solar | The largest public programme for household and facility solar in Yemen. |
| Sana’a Center for Strategic Studies | Consumer | Independent research centre | Publishes regular reporting on electricity supply, tariffs and fuel in both parts of Yemen. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Household solar products (donor programmes) | VeraSol certification | World Bank / UNOPS (project requirement) | Products must be VeraSol certified before subsidy payments under the second Emergency Electricity Access Project. |
| PV installation guidance | PV standards guideline | Developed under the World Bank Emergency Electricity Access Project | Reported in the project’s 2023 completion report. No published national mandatory standard was identified. |
| Grid connection | None identified | PEC | No grid code for small generators was found. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Electricity licence for household solar | No | National | No licence or registration requirement was identified for off-grid household systems. |
| Grid connection approval | Limited | National | Only relevant to utility-scale projects, which are agreed with the government and PEC. There is no household connection procedure for solar. |
| Building or planning permission | Limited | Local | No specific rule for rooftop solar was identified. |
For a household, installing solar in Yemen is a private purchase. Systems are bought from local retailers, sometimes with microfinance, and installed without any electricity-sector approval. Rules on solar products have come mainly from donor programmes, not from national regulation.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Yemen Emergency Electricity Access Project, Phase II (World Bank / UNOPS) | Closed | Subsidised solar sales through microfinance; solar for public facilities | US$100 million IDA grant approved on 30 June 2022, with a scheduled closing date of 30 September 2026. It targeted 3.5 million people, including 200,000 households with off-grid solar. No extension was identified when this profile was written. | June 2022 – September 2026 |
| Yemen Emergency Electricity Access Project (World Bank) | Closed | Subsidised solar sales; solar for public facilities | The first phase reached 114,167 households and 3.23 million people through solarised critical facilities, working with six microfinance institutions. | 2018 – 2023 |
Data and connectivity.
- Fixed broadband
- 17.5 % of population using the internet (2019)Source 7Latest World Bank / ITU figure. Internet use, not broadband coverage.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Connectivity is limited. The latest World Bank figure shows 17.5% of people using the internet in 2019. No smart-meter communications network was identified. Household solar systems are usually stand-alone and are not monitored remotely.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 2.553 TWh (2023)Source 1Total generation, used as a proxy for supplied demand. Actual demand is far higher.
- Generation capacity
- 2.148 GW (End 2024)Source 11,745 MW fossil fuel and 403 MW solar. Available capacity is far lower.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Yemen’s grid is rationed everywhere, and how much supply there is depends mainly on fuel. In Aden, supply improved to more than 20 hours a day by mid-February 2026, then fell back to cuts of 18–20 hours a day as fuel ran short, before improving to about two hours on for every six hours off in May–June after Saudi fuel support. In Wadi Hadramawt, more than 85% of generating capacity was cut in early 2026 because of fuel shortages.
Fixing the grid is expensive. The national transmission network was damaged during the war and has not been restored. Each region runs on local plants, many of them rented diesel units. Emergency generation of 200 MW for Mukalla and Seiyun arrived in 2026, and a further 100 MW was expected for Aden.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Electricity Law No. 1 of 2009: unbundling and regulator not implemented | Current | Law of 2009 | The law provides for splitting PEC into generation, transmission and distribution companies and for an independent regulator. The World Bank reported in 2022 that none of this had been done. |
| Saudi fuel grants for power stations | Current | January and Q2 2026 | A US$81.2 million grant for 339 million litres of diesel and mazut for more than 70 power stations (January 2026) and a US$150 million emergency fuel grant (Q2 2026). |
| GSU solar plants in Aden and Shabwa shut down | Current | Mid-January 2026 | Global South Utilities shut its 120 MW Aden and 53 MW Shabwa solar plants and evacuated staff, according to the Sana’a Center. |
| Emergency generation for Aden | Upcoming | 2026 | After 200 MW of emergency generators arrived for Mukalla and Seiyun, a further 100 MW was expected for Aden. |
| Independent diesel power contracts cancelled in government areas | Current | February 2025 | The electricity corporation in Aden cancelled contracts with independent private power producers, citing diesel shortages and costs. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | Solar is used by up to 75% of households in some cities (World Bank), and about 75% of the population used small solar systems in 2019 (Sana’a Center). |
| Distributed energy market | High | Only about 12% of the population relied on public electricity in 2022 (World Bank), while access from all sources, mostly solar and private generators, reached 86.3% in 2024. |
| Grid flexibility market | Low | No wholesale, balancing or demand-response market, no regulator and no aggregator framework. |
| Energy storage adoption | Medium | Batteries are common in household off-grid solar systems, but there are no statistics and no grid-scale storage. |
| Renewable growth environment | Medium | Solar rose to an estimated 20% of generation in 2023 and capacity grew by 120 MW in 2024 (IRENA), but the utility plants stopped in January 2026. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 23 sources
- Energy Profile: Yemen. IRENA, 2025. accessed 9 October 2026.
- Population, total – Yemen, Rep. (API). World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total population) – Yemen, Rep. (API). World Bank, 2025. accessed 9 October 2026.
- Access to electricity (% of population) – Yemen, Rep. (API). World Bank, 2024. accessed 9 October 2026.
- Electric power consumption (kWh per capita) – Yemen, Rep. (API). World Bank / IEA, 2024. accessed 9 October 2026.
- Renewable electricity output (% of total) – Yemen, Rep. (API). World Bank, 2021. accessed 9 October 2026.
- Individuals using the Internet (% of population) – Yemen, Rep. (API). World Bank / ITU, 2019. accessed 9 October 2026.
- Yemen – Second Phase of the Emergency Electricity Access Project: Project Appraisal Document. World Bank, 2022. accessed 9 October 2026.
- Yemen Emergency Electricity Access Project-Phase II (P178347): project data. World Bank, 2022. accessed 9 October 2026.
- Disclosable Version of the ISR – Yemen Emergency Electricity Access Project-Phase II – Sequence No. 5. World Bank, 2025. accessed 9 October 2026.
- Yemen Emergency Electricity Access Project: Project Appraisal Document. World Bank, 2018. accessed 9 October 2026.
- Yemen – Emergency Electricity Access Project: Implementation Completion and Results Report. World Bank, 2023. accessed 9 October 2026.
- Restoring Service Supply in Yemen’s Electricity Sector (policy note). World Bank, 2017. accessed 9 October 2026.
- Priorities for the Recovery and Reform of the Electricity Sector in Yemen. Sana’a Center for Strategic Studies, 2021. accessed 9 October 2026.
- Blackouts and Blackholes: Yemen’s Vanishing Electricity Supply. Sana’a Center for Strategic Studies, 2023. accessed 9 October 2026.
- Corruption in Hadramawt’s Electricity Sector. Sana’a Center for Strategic Studies, 2023. accessed 9 October 2026.
- The Economy — The Yemen Review, October–December 2024. Sana’a Center for Strategic Studies, 2025. accessed 9 October 2026.
- The Economy — The Yemen Review, January–March 2025. Sana’a Center for Strategic Studies, 2025. accessed 9 October 2026.
- The Economy — The Yemen Review, April–June 2025. Sana’a Center for Strategic Studies, 2025. accessed 9 October 2026.
- Politics and Diplomacy — The Yemen Review, July–September 2025. Sana’a Center for Strategic Studies, 2025. accessed 9 October 2026.
- The Economy — The Yemen Review, January–March 2026. Sana’a Center for Strategic Studies, 2026. accessed 9 October 2026.
- The Economy — The Yemen Review, April–June 2026. Sana’a Center for Strategic Studies, 2026. accessed 9 October 2026.
- Euro foreign exchange reference rates: US dollar (USD). European Central Bank, 2026. accessed 9 October 2026.
Questions about energy in Yemen.
It depends on the area. In 2023, the Sana’a Center reported a public tariff of YR 12 per kWh in government-held areas such as Aden, which is less than one US cent at current rates, and YR 234 per kWh (about US$0.44) in areas held by the Sana’a authorities. Hadramawt rates were YR 120–250 per kWh. Many households pay mainly for solar equipment and private generators.
The national grid was damaged in the conflict and split into local systems, and power stations depend on fuel the authorities struggle to pay for. In 2022 the World Bank estimated that only about 12% of the population relied on public electricity. Aden had cuts of 18–20 hours a day in spring 2026.
Very common. Studies found solar in up to 75% of households in some cities, including Sana’a. IRENA estimates 403 MW of solar capacity at the end of 2024 and a 20% share of generation in 2023.
No. There is no net metering, feed-in tariff or export scheme. Household systems are off-grid. Neighbourhood sales of private power happen, but the World Bank notes that there is no formal legal basis for them.
There is no national meter point number. A grid connection is a PEC subscription linked to a meter, identified by the account details on the PEC bill. Since the conflict, the PEC branches in Aden and Sana’a have kept separate records.
There is no independent regulator. Electricity Law No. 1 of 2009 provides for one, but it has not been created. The Ministry of Electricity and Energy and the Public Electricity Corporation run the sector, with separate administrations in Aden and Sana’a.