How electricity works in South Korea.
South Korea electricity market 2026: KEPCO tariffs and tiers, the single-buyer pool, the KEPCO customer number, AMI smart meters, solar net metering and licensing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in South Korean won (KRW) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
South Korea energy at a glance.
Key figures for households in South Korea. Each one links to its source on the full overview below.
Electricity price.
192.53 KRW per kWh for households, including taxes. Figures for Oct–Dec 2026.
Household use.
3,805 kWh a year for a typical household. Figures for 2025.
Renewable share.
10.4% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in South Korea.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for South Korea below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications South Korea requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in South Korea.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in South Korea, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in South Korea, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in South Korea.
The energy market in South Korea, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
South Korea’s power sector is built around one state-controlled company. Korea Electric Power Corporation (KEPCO), at least 51% government-owned by law, owns substantially all transmission and distribution, is the only retailer for almost every home and business, and owns six generation subsidiaries: Korea Hydro & Nuclear Power (KHNP) and five thermal generators. Generation was split from KEPCO in 2001, and the Korea Power Exchange (KPX) was created to run a cost-based pool, but the planned privatisation and retail competition never followed. In 2025 KEPCO bought 545,192 GWh: 33.2% from KHNP, 32.7% from the five thermal subsidiaries and 34.1% from independent producers trading through the pool.
Since 1 October 2025 energy policy has sat with the new Ministry of Climate, Energy and Environment (MCEE), which took over the energy functions of the former Ministry of Trade, Industry and Energy. The Korea Electricity Commission reviews licences, market rules and disputes. Retail tariffs are set by KEPCO with government approval, and household rates have not changed since May 2023. A typical non-summer bill for 300 kWh works out at about 193 won/kWh including VAT and the power-industry fund levy.
The grid is an electrical island with no international interconnectors. Fossil fuels supplied 60% of 2025 generation (coal 31.1%, gas 28.0%), nuclear 29.6% and renewables 10.4%, according to Ember. Solar capacity passed 30 GW in 2025, most of it in small and mid-sized projects in the south-west (Honam), where curtailment and grid congestion are now serious constraints. Key reforms for 2025–2027 include the Distributed Energy Act and its seven special zones, a regional industrial tariff, the planned replacement of the Renewable Portfolio Standard with auctions and long-term contracts, energy MyData, and new rules letting the smallest home systems sell surplus power.
Energy snapshot.
Headline figures for electricity in South Korea. Each shows its data year and links to its source.
- Population51,820,000 peopleSource 51 Nov 2025
- Households23,250,000 householdsSource 51 Nov 2025
- Average household size2.16 people/householdSource 52025
- Electricity use per household3,805 kWh/yrSource 12025
- Household price (KRW)192.5 KRW/kWhSource 2Oct–Dec 2026
- Household price (EUR)0.125 EUR/kWhSource 4Oct–Dec 2026
- Renewable electricity share10.4%Source 92025
- Solar capacity30.4 GWSource 92025
- Wind capacity2.45 GWSource 92025
- Energy storage capacity1.404 GWSource 1end 2025
- Smart-meter share94.9%Source 1end 2025
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Ministry of Climate, Energy and Environment (policy, tariff approval, licences above 3 MW) with the Korea Electricity Commission (licensing review, market rules, disputes)
- System operator
- Korea Power Exchange (KPX): national system operator and operator of the cost-based pool
- Distribution networks
- KEPCO owns and operates substantially all transmission and distribution nationwide; small licensed community-energy (구역전기) suppliers and distributed-energy businesses operate locally
- Currency
- South Korean won (KRW)
- Voltage and frequency
- 220 V / 60 Hz (single-phase); 380 V three-phase
Electricity prices in South Korea.
- Household price (KRW)
- 192.5 KRW/kWh (Oct–Dec 2026)Source 2Derived from the residential low-voltage tariff in force since 16 May 2023 for 300 kWh in a non-summer month: base charge 1,600 won; energy charge 200 kWh × 120.0 + 100 kWh × 214.6 = 45,460 won; climate and environment charge 9.0 won/kWh (2,700 won); fuel-cost adjustment +5 won/kWh (1,500 won); 10% VAT (5,126 won) and the 2.7% Electric Power Industry Basis Fund levy (1,380 won). Total 57,760 won. Rates were confirmed unchanged for Q4 2026 on 21 September 2026.
- Household price (EUR)
- 0.125 EUR/kWh (Oct–Dec 2026)Source 4Converted from 192.53 KRW/kWh at the ECB reference rate of 1,539.06 KRW per EUR on 30 September 2026.
- Typical annual electricity bill
- 693,120 KRW/yr (2026)Source 2Derived illustration: 12 × the 57,760-won bill for 300 kWh a month at 2026 rates. It ignores the wider summer tiers (which lower July–August bills at the same usage) and the higher bills of households using more. No official national average household electricity bill was identified.
A Korean bill has four components set by KEPCO with government approval: a base charge and energy charge that depend on the tier reached, a climate and environment charge, and a fuel-cost adjustment. The climate and environment charge, 9.0 won/kWh since 2023, recovers the costs of the Renewable Portfolio Standard, the emissions trading scheme and coal-generation reduction. The fuel-cost adjustment is reset quarterly within a cap of ±5 won/kWh. It has been held at the +5 won/kWh ceiling for 18 consecutive quarters, including Q4 2026, even though the formula pointed higher. On top, customers pay 10% VAT and the Electric Power Industry Basis Fund levy. The levy was cut from 3.7% to 3.2% of the bill in July 2024 and to 2.7% from July 2025.
There is one national tariff: prices do not vary by region or supplier. Network costs are not shown separately. The progressive structure means the price per kWh rises steeply with use. In a non-summer month, a household using 300 kWh pays about 193 won/kWh all-in, while every kWh above 400 kWh costs 307.3 won before charges and tax. Summer bills are the main political pressure point, which is why the tier limits are widened every July and August.
Tariff freeze and KEPCO’s finances
KEPCO raised energy charges by 11.4 won/kWh in January 2023 and 8.0 won/kWh in May 2023 after fuel costs surged, but residential rates have been frozen since. The October 2024 increase applied to industrial customers only. Because tariffs did not keep up with fuel costs, KEPCO built up large debts, which reached about 210 trillion won (group) by mid-2026. Tariff changes therefore remain a government decision rather than an automatic pass-through.
Regional pricing
The Distributed Energy Act (in force since 14 June 2024) provides for prices to differ by region. On 26 August 2026 the ministry published a design for regional industrial tariffs with 11 zones and discounts of up to 10% outside the Seoul capital area, intended to start within 2026, linked to regional wholesale pricing. No regional pricing for households has been announced.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | KEPCO’s residential tariff is the only option for most homes. It is a three-tier progressive (inclining-block) tariff: low-voltage base charges of 910, 1,600 or 7,300 won a month and energy charges of 120.0, 214.6 and 307.3 won/kWh for 0–200, 201–400 and over 400 kWh. In July and August the tiers widen to 300 and 450 kWh. A “super-user” rate of 736.2 won/kWh applies above 1,000 kWh a month in July–August and December–February. |
| Regulated | Yes | Households supplied at high voltage, mainly apartment complexes on a single bulk contract, pay a cheaper residential high-voltage tariff: base charges of 730, 1,260 or 6,060 won and energy charges of 105.0, 174.0 and 242.3 won/kWh. |
| Time-of-use | Limited | A seasonal and time-of-day residential tariff is offered only on Jeju Island, as an alternative to the tiered tariff: a base charge of 4,310 won/kW and energy charges from 125.8 to 220.5 won/kWh by season and time of day. KEPCO says a nationwide offer depends on AMI coverage in each region. Time-of-use tariffs are standard for larger commercial and industrial customers and were restructured in 2026. |
| Dynamic | No | No household tariff linked to the wholesale price exists. Wholesale prices are set in the cost-based pool and only reach customers through government-approved tariff changes. |
| Other | Limited | Households cannot buy a renewable tariff. Companies can procure renewable electricity through KEPCO’s Green Premium scheme, third-party PPAs with KEPCO as intermediary, direct PPAs or certificates, mainly for RE100 commitments. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,805 kWh/yr (2025)Source 1Derived: KEPCO residential-class sales of 88,474 GWh in 2025 divided by 23.25 million census households. The residential class includes common areas of apartment complexes billed on a single residential contract, so the figure slightly overstates in-home use.
- Average daily use per household
- 10.4 kWh/day (2025)Source 1Derived: 3,805 kWh a year divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 12,090 kWh/person/yr (2025)Source 9Total electricity demand across all sectors per person (Ember: 12.09 MWh). Industry used 51.0% of KEPCO’s 2025 sales and households 16.1%.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 899,000 battery-electric vehicles registered (end 2025)Source 11Cumulative registrations (Ministry of Land, Infrastructure and Transport data). 221,000 EVs were newly registered in 2025, 13% of 1.695 million new vehicles. All eco-friendly vehicles, including hybrids and hydrogen, totalled 3.494 million.
- Electric cooking
- Not identified from a reliable public source.
Korean households use relatively little electricity compared with industry. Residential-class sales rose from 79,915 GWh in 2021 to 88,474 GWh in 2025, while total sales were flat at about 549 TWh because industrial demand fell. Rising residential demand reflects more, smaller households and hotter summers rather than electrification of heating.
Space and water heating in most homes rely on gas or district heating rather than electricity, so electricity mainly covers lighting, appliances and summer cooling. The progressive tariff strongly discourages high use, which is one reason electric heating and large heat-pump systems are rare in homes. Electric vehicles are the fastest-growing new load, with 899,000 registered at the end of 2025.
Housing and households.
- Dwellings
- 20,180,000 dwellings (1 Nov 2025)Source 5Up 1.6% on 2024. Counting each unit of subdivided multi-household houses separately gives 23.24 million. 1.722 million homes (8.5%) were vacant. 56.0% of homes are more than 20 years old.
- Owner-occupied
- 58.4% (2024)Source 7Share of households living in a home they own (2024 Korea Housing Survey). 61.4% own a home, though not always the one they live in. Owner-occupation is 52.7% in the capital area and 66.5% in the provinces.
- Private rented
- 38% (2024)Source 7All renting households, including jeonse (lump-sum deposit) and monthly-rent tenancies and public rental housing, which the survey summary does not separate. 3.6% live rent-free.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 19% (2025)Source 6Detached houses, down from 21% in 2020. Multi-family houses (연립·다세대) are a further 14.1%.
- Apartments and flats
- 65.8% (2025)Source 513.29 million apartment units, up from 62.9% of homes in 2020.
- Urban population
- 81.2 % of population (2025)Source 8World Bank urban population estimate (UN World Urbanization Prospects definition).
Two-thirds of Korean homes are apartments, usually in large complexes of high-rise blocks managed by an owners’ association and a management office. This shapes everything from metering to solar. Many complexes are supplied by KEPCO at high voltage under one bulk contract, and the management office splits the bill among flats. In a 2023 survey of 2,687 Seoul complexes, 67.7% used a single contract, 26.8% a “comprehensive” contract (flats on the residential tariff, common areas on a general tariff) and only 5.5% had each flat contracting directly with KEPCO.
Detached houses, 19% of homes, are where rooftop solar and individual connections are simplest. In apartments, small balcony or rooftop systems need the agreement of the owners’ association, and any export is netted at the complex level when the complex holds the KEPCO contract. Tenancies are often jeonse, where the tenant pays a large refundable deposit instead of monthly rent; tenants normally pay the electricity bill but cannot install equipment without the owner’s consent.
How the grid works in South Korea.
- TransmissionKorea Power Exchange (KPX), Korea Electric Power Corporation (KEPCO)
- DistributionKEPCO owns and operates substantially all transmission and distribution nationwide; small licensed community-energy (구역전기) suppliers and distributed-energy businesses operate locally
- MeteringKEPCO, KEPCO customer information system and 한전ON
- Supply1 or more retail suppliers
Large coal, nuclear and LNG plants are concentrated on the coasts, while demand is concentrated in the Seoul capital area, so bulk power flows towards the capital over a backbone that runs up to 765 kV and includes HVDC lines. KEPCO steps power down through its 939 substations to distribution lines and then to 220 V single-phase service. Because Korea cannot import power in an emergency, capacity payments are built around a standard reserve margin of about 12%, and KEPCO is building new HVDC and 765 kV links from the east coast. The south-west (Honam) has most of the solar but limited transmission capacity, which causes congestion and curtailment.
Commercially, generators sell into the KPX cost-based pool. Their offers are not free bids: they are paid an hourly system marginal price based on administratively verified variable costs, plus capacity payments. KEPCO buys almost all power from the pool or under long-term contracts and sells it at regulated tariffs. In 2025 its average purchase price through KPX was 124.63 won/kWh. A planned move to a price-based pool, with day-ahead, intraday and real-time markets, has so far only been piloted on Jeju.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Climate, Energy and Environment (MCEE) | Created on 1 October 2025 from the Ministry of Environment and the energy functions of the Ministry of Trade, Industry and Energy. It sets energy policy and the Basic Plan for Electricity Supply and Demand, approves KEPCO’s tariffs and KPX’s market-rule changes, issues generation licences above 3 MW, exercises the government’s rights as KEPCO shareholder and oversees KEPCO, KHNP, KPX and the Korea Energy Agency. |
| Regulator | Korea Electricity Commission (전기위원회) | Set up in April 2001. It reviews electricity business licences, reviews amendments to the electricity market rules before ministerial approval, arbitrates tariff-related disputes and investigates unfair practices. It is not an independent tariff-setting regulator: retail tariffs are decided by KEPCO and the government. |
| System operator | Korea Power Exchange (KPX) | Runs the national control centre and the cost-based pool (CBP), sets the hourly system marginal price (SMP), runs the demand-response market, the renewable and storage auctions, and the Jeju real-time and ancillary-services pilot market launched in 2024. |
| TSO | Korea Electric Power Corporation (KEPCO) | Owns and builds the transmission network: 36,183 circuit-km of lines from 765 kV down, including HVDC, and 939 substations with 379,998 MVA of transformer capacity at the end of 2025, under the Long-Term Transmission and Substation Plan. Operational dispatch is done by KPX. |
| DSO | KEPCO (distribution) | Owns and operates the distribution network nationwide (556,356 circuit-km of lines and 152,266 MVA of transformer capacity at the end of 2025) down to 220 V low-voltage service. Transmission and distribution losses were 3.52% of gross generation in 2025. It receives every grid-connection application for solar and storage and published its first Long-term Distribution Plan (2024–2028) in July 2025 under the Distributed Energy Act. |
| Supplier | KEPCO (retail) | Holds the only nationwide electricity sales licence and supplies virtually every home. Customers above 30,000 kVA may instead buy directly through KPX, and licensed community-energy (구역전기) suppliers and distributed-energy businesses in special zones may supply local customers. |
| Metering | KEPCO | Owns, installs and reads all revenue meters, including AMI smart meters, and runs the AMI communications network. There is no competitive metering. |
| Data hub / registry | KEPCO customer information system and 한전ON | KEPCO keeps the single national register of customers, supply locations and meters. Customers view bills and usage on the 한전ON portal and app. Since 1 June 2026 KEPCO must transfer electricity usage and billing data to third parties at the customer’s request under energy MyData. |
| Flexibility market | KPX demand-response market and Jeju pilot markets | Registered demand-response aggregators bid curtailment into KPX’s market. Small-scale power brokers pool renewables, storage and EVs of up to 1 MW each. On Jeju a 15-minute real-time market and an ancillary-services market have run since 2024. |
Compared with the UK system.
| UK concept | South Korea equivalent | How it works |
|---|---|---|
| DNO | KEPCO (one national distribution business) | There are no regional network companies. KEPCO owns the distribution network everywhere, through regional headquarters, and is also the retailer and transmission owner. Unlike UK DNOs, it is not legally unbundled, and the Distributed Energy Act leaves open a future separate distribution operator. |
| National Grid / NESO | KEPCO (transmission owner) + KPX (system operator) | KEPCO owns the transmission network and KPX dispatches the system and runs the pool, similar to the split between National Grid and NESO. There are no interconnectors to other countries. |
| MPAN | KEPCO customer number (고객번호) | A 10-digit number that KEPCO assigns to each place where electricity is supplied. It is printed on the bill and is used for payment, moves and name changes. Because there is no supplier choice, it is not used for switching. In many apartment complexes the KEPCO customer number belongs to the whole complex, not the flat. See the supply-point section. |
| MPRN | City-gas customer number (regional gas company) | Piped gas is supplied by regional city-gas companies, each with its own customer numbers; there is no national gas supply-point register equivalent to the MPRN system. Since June 2026 gas usage data can also be transferred under energy MyData. |
| Meter operator | KEPCO | KEPCO owns and maintains every meter and reads it remotely where AMI is installed. A household cannot appoint a meter operator. In single-contract apartment complexes, the flat’s sub-meter is read by the management office, not KEPCO. |
| Supplier | KEPCO (sole retailer) | There is no retail competition for households, so there is no switching process. Tariffs are national and approved by the government. Exceptions are licensed community-energy suppliers in some new towns and, from 2026, distributed-energy businesses selling directly inside designated special zones. |
| Smart-meter infrastructure (DCC / SMETS2) | KEPCO AMI network | KEPCO built a single national AMI system (meters, communications and head-end) under the government’s smart-grid master plan, at a cost of about 1.9 trillion won. It covered 20.5 million households at the end of 2025. There is no separate data-communications company. |
How a supply point is identified.
0912345678 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | KEPCO customer number (고객번호) |
| Who issues it? | Korea Electric Power Corporation (KEPCO) |
| Format | A 10-digit numeric number assigned by KEPCO to each electricity-use location (전기사용장소) under contract. KEPCO does not publish a breakdown of the digits. It is separate from the meter number printed on the meter itself. |
| Length | 10 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Printed at the top of the KEPCO bill or receipt. Customers who have lost it can look it up on the 한전ON website or app by region, name and date of birth, with identity verification, or by calling KEPCO on 123. Flats in single-contract apartment complexes do not have their own number: the complex’s number appears on KEPCO’s bill to the management office. |
| Electronic access | Customers registered on 한전ON can see bills, monthly usage and, where AMI is installed, interval usage data, and can apply online for moves, name changes and net-metering contracts. Since 1 June 2026 customers can ask KEPCO to transfer their usage and billing data to a service provider under energy MyData. |
| Third-party access | There is no switching gateway because KEPCO is the only supplier. Installers and aggregators need the customer’s number and authorisation to apply for connections or net metering. Energy MyData, in force since 1 June 2026 under the Personal Information Protection Commission’s rules for the electricity sector, lets third parties receive a household’s data with consent, with the Korea Energy Agency acting as the energy-sector intermediary. |
| Who keeps the register | KEPCO’s national customer information system, covering every supply location, contract and meter. |
| Register scope | National |
Because KEPCO is the single retailer and network owner, the identifier that matters to a Korean household is its KEPCO customer number. It identifies the supply contract at a particular location: when a household moves out, the outgoing occupant settles the final bill and the incoming occupant takes over the same number by applying for a name change (명의변경). The meter has its own number, which changes if the meter is replaced, while the customer number stays. In detached houses and in apartment complexes where each flat contracts directly with KEPCO (호별계약), each home has its own number and meter.
Apartment complexes
Most Korean households live in apartments, and many never deal with KEPCO directly. In a single contract (단일계약), KEPCO supplies the whole complex at high voltage through one customer number. KEPCO calculates the bill by averaging the complex’s total use per flat on the residential high-voltage tariff, and the management office then charges each flat through the monthly management fee, using its own sub-meters. Under a comprehensive contract (종합계약), flats are charged on the residential low-voltage tariff and common areas on a general tariff, but KEPCO still bills the complex. In a 2023 survey of 2,687 Seoul complexes, about two-thirds were on single contracts. For these households, the practical “supply point” is the complex’s connection, and any solar or battery project must be arranged with the owners’ association and management office.
Generation and export
A home with solar that uses net metering keeps its existing customer number. KEPCO installs or reconfigures a bidirectional meter that records imports and exports separately, and the net-metering contract is attached to that customer number. A generation business selling power, as opposed to self-consumption with netting, needs a separate generation licence and a power purchase contract or KPX membership.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Limited |
| How exported electricity is paid | Net metering (상계거래) with KEPCO: exported kWh are offset against imported kWh, with surplus carried forward. Annual cash settlement of accumulated surplus is available only for systems over 10 kW; most home systems (under 10 kW) receive offsets only. Systems of up to 1 MW that are licensed generation businesses can instead sell to KEPCO or through KPX with RECs. |
| Which systems can use net metering? | Solar systems of up to 1,000 kW, and other renewable systems of up to 10 kW. Net metering was introduced in 2005 for solar under 3 kW and was extended in 2012 and 2016. In May 2020 about 440,000 customers used it, 91% of them households, with an average system of about 3.5 kW. |
| Do households get paid for surplus solar? | Not under current rules for most homes. Systems of 10 kW or less, which covers most house systems, can only offset their exports against future imports. On 23 September 2026 the ministry proposed amending the Electricity Business Act rules so that systems of 10 kW or less can sell surplus power after self-consumption. Public comment runs until 2 November 2026; the change is not yet in force. |
| What sizes count as a generation business? | Anyone selling electricity as a business needs a generation licence: from the city or provincial governor for up to 3,000 kW, and from the ministry after review by the Korea Electricity Commission above 3,000 kW. Generators of 1,000 kW or less may sell to KEPCO outside the pool or join KPX; larger ones trade through the pool. |
| Can grid connection be refused or curtailed? | Yes. KEPCO checks substation and feeder capacity and has restricted new renewable connections in congested areas, especially Honam. Curtailment orders have spread from Jeju to the mainland, mainly affecting larger plants. KEPCO expected connected distributed generation to grow from 25.5 GW at the end of 2024 to 36.6 GW by 2028. |
Connecting a home system.
- Choose an installer and system size. In an apartment, obtain the owners’ association or management office agreement; in a rented home, the owner’s consent.
- If applying for a subsidy, apply through the Korea Energy Agency’s housing support programme with a participating installer, or through a local-government scheme.
- Apply to KEPCO for grid connection of the self-use generation and for a net-metering contract under the KEPCO customer number. KEPCO checks the local distribution capacity.
- Install using equipment certified under the Korea Energy Agency’s KS certification (modules, inverters, junction boxes) and in line with KEPCO’s technical standards for connecting distributed generation to the distribution grid.
- Complete the required electrical safety inspection before use, then KEPCO fits or reprograms a bidirectional meter and starts net metering.
- Each month, exports are netted against imports for the energy charge; the base charge is set on gross consumption. Surplus carries forward. Systems over 10 kW can claim an annual cash settlement of remaining surplus.
Korea combines net metering for self-consumers with a separate route for small generation businesses. A household with a typical 3 kW rooftop system nets its exports against its imports. Because of the progressive tariff, the netted kWh are worth most to households that would otherwise reach the second or third tier. Exports beyond what the home eventually uses earn nothing for systems of 10 kW or less, which is the gap the September 2026 proposal aims to close.
Many small investors instead build solar plants of up to 1 MW, often on farmland or warehouse roofs, as licensed generation businesses. They sell power at the system marginal price plus renewable energy certificates, or under fixed-price contracts awarded by the Korea Energy Agency. IEA PVPS estimates that residential systems were only about 2.5 GW (8%) of Korea’s PV capacity in 2024, while systems under 100 kW made up 43.6% of capacity. The government plans to replace the Renewable Portfolio Standard with competitive auctions and long-term contracts after 2026.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Generation business licence (발전사업 허가) under the Electricity Business Act for anyone selling generated electricity: up to 3,000 kW from the city or provincial governor; above 3,000 kW from the ministry after Electricity Commission review. Self-use generation that only nets against the owner’s consumption needs no business licence. | Ministry of Climate, Energy and Environment / Korea Electricity Commission; city and provincial governments up to 3 MW | Processing period up to 60 days. Land-use and building permits are separate. |
| Store electricity | No licence for behind-the-meter home batteries. Storage that sells power or services to the grid does so as a licensed generation business, through a small-scale power broker, or under a KPX storage contract. | MCEE; KPX; KEPCO for connection | Large batteries are procured through KPX’s central contract market: a second tender for 540 MW/3,240 MWh of six-hour storage (500 MW mainland, 40 MW Jeju) on 15-year contracts was due to be awarded in February 2026. |
| Export surplus power | Net-metering contract with KEPCO for self-use systems (solar up to 1,000 kW; other renewables up to 10 kW). Selling exports for cash requires a generation licence, except for the annual surplus settlement available to self-use systems over 10 kW. | KEPCO | A proposed rule change published on 23 September 2026 would let systems of 10 kW or less trade surplus power. It is not yet in force. |
| Sell / supply electricity to consumers | Electricity sales licence, held nationally only by KEPCO. Community-energy (구역전기) businesses are licensed to generate and supply within a defined area. Registered distributed-energy businesses may sell directly to consumers inside designated distributed-energy special zones. | MCEE / Korea Electricity Commission | South Jeolla, Jeju, Busan (Gangseo) and Gyeonggi (Uiwang) were designated on 5 November 2025, with Ulsan, South Chungcheong and North Gyeongsang deferred. The Korea Energy Agency’s distributed-energy centre now lists seven zones, adding Mipo (Ulsan), Seosan and Pohang. |
| Aggregate distributed resources (VPP) | Registration as a small-scale power brokerage business to pool renewables, storage and EVs of up to 1 MW each for sale through KPX. This is a registration rather than a licence, with no capital requirement and at least two qualified engineers. | MCEE; KPX for market registration | Introduced on 13 December 2018. The Distributed Energy Act also recognises integrated (virtual) power-plant businesses that use distributed resources. |
| Demand response | Registration as a demand-management business with KPX to bid customers’ load reductions into the demand-response market. | KPX; MCEE | Households can join demand-response programmes through registered aggregators. Under the energy MyData roadmap, a cash-reward demand-response service for apartment households nationwide is planned from 2028. |
| Trade on the wholesale market | KPX membership under the electricity market rules. Generators above 1,000 kW must trade through the pool. Consumers above 30,000 kVA may buy directly from the market. | KPX; rule changes reviewed by the Electricity Commission and approved by MCEE | Membership requires an application, business registration, a pledge, trading data and the electricity business licence. |
| Balancing and grid services | Mainland reserves and frequency control are provided by large generators and KEPCO’s own batteries under KPX rules. On Jeju, a real-time and ancillary-services market has been open since June 2024 to qualified resources, with renewables over 1 MW able to bid (mandatory over 3 MW). | KPX | KEPCO launched a regional flexibility service pilot on Jeju using private storage at the end of 2024, with national roll-out planned for 2027. |
| Remote control of customer assets | No separate licence. Control is exercised under the customer’s contract with an aggregator, broker or demand-management business registered with KPX. | KPX; MCEE | Customer data access for such services is covered by energy MyData since 1 June 2026. |
| Operate transmission and distribution networks | Transmission and distribution business licences, held nationally by KEPCO. The Distributed Energy Act allows for distribution-level operation by other bodies in future, but none operates yet outside small local networks. | MCEE / Korea Electricity Commission | KEPCO is required by law to remain at least 51% state-owned. |
The Electricity Business Act regulates by business type: generation, transmission, distribution, sales, community energy and brokerage, with KEPCO holding the network and sales licences. A household that installs solar for its own use and nets its exports is not running an electricity business. It needs a connection and net-metering contract with KEPCO and an electrical safety inspection, but no licence. Only when it sells electricity does it need a generation licence, which in practice many small solar investors obtain from their provincial government.
The Special Act on the Activation of Distributed Energy, in force since 14 June 2024, adds a parallel framework. It requires large developments to supply part of their energy from distributed sources, introduces grid-impact assessments for large new loads, and allows designated special zones where distributed-energy businesses can sell directly to consumers outside the pool. 2026 is the first year in which business models in the special zones, the first of which were designated in November 2025, are expected to operate.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| KPX demand-response market | Yes | — | Yes | KPX. Registered demand-management businesses aggregate customers’ load reductions and are paid when KPX calls on them, mainly at industrial and commercial sites. Households take part through small-scale “citizen DR” (국민DR) programmes run by aggregators. |
| Small-scale power brokerage | Yes | Individual resources of up to 1 MW | Yes | KPX. Brokers pool small renewables, storage and EVs and sell their output through KPX, taking on forecasting and settlement. It gives small generators an alternative to selling to KEPCO, but compensation is still based on the cost-based SMP. |
| Jeju real-time and ancillary-services market (pilot) | Developing | Renewables over 1 MW may bid; over 3 MW must | Limited | KPX. Since 2024 Jeju has had a renewable bidding system, a 15-minute real-time market and a reserve market, the first departure from the cost-based pool. The government intended to extend the design to the mainland, but the RAP/SFOC review of February 2026 found no intraday or real-time market yet operating there. |
| KEPCO regional flexibility service | Developing | — | Yes | KEPCO. A distribution-level flexibility pilot on Jeju using private batteries started at the end of 2024 under the Long-term Distribution Plan, with national roll-out planned for 2027. |
| KPX central contract market for storage | Restricted | — | No | KPX. Long-term (15-year) contracts for grid-scale batteries. The first tender awarded 65 MW/260 MWh of four-hour storage; the second sought 540 MW/3,240 MWh. Projects are utility-scale. |
Korea has a KPX demand-response market and, since December 2018, a legal category for aggregators of small generation, so aggregation is possible. But nearly all value is set administratively: the energy price comes from the cost-based pool, there is no mainland real-time or intraday market, and ancillary services are mostly provided by large plants and KEPCO’s own batteries. The RAP/SFOC review in February 2026 concluded that the market design undervalues distributed resources and that KEPCO’s combined ownership of generation and the network creates a conflict of interest.
The direction of reform is towards more local flexibility: the Jeju real-time market, KEPCO’s regional flexibility service, distributed-energy special zones where VPPs and storage can trade locally, and regional price signals. Households are still largely outside these markets. The tiered tariff and the absence of time-of-use pricing outside Jeju give little reason to shift load, so household flexibility today comes mainly from demand-response events and, from 2028, planned apartment-wide schemes using MyData.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| KPX | Market rules, demand-response market, brokerage registration, SMP data and storage tenders. |
| EPSIS (Electric Power Statistics Information System) | KPX’s public data on demand, generation, capacity and prices. |
| Renewable Energy Cloud Platform (Korea Energy Agency) | Guidance and online procedures for renewable licensing, connection and market participation. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | AMI covers about 20.5 million households (end 2025); the remaining 1.1 million are to be connected from 2026 |
| Reading interval | 15 minutes (AMI load-profile data); billing is monthly |
| Owner and operator | KEPCO (no competitive metering) |
| Coverage | AMI data network for 20.5 million households at 31 December 2025; about 91% of electricity customers per a July 2026 ministry statement |
| Programme cost | 1.8 trillion won spent to end-2025; about 1.9 trillion won in total |
| Policy basis | National smart-grid master plan and AMI roadmap, updated in August 2018 and February 2023 |
| Customer access | 한전ON website and app (usage, bills, interval data where AMI is fitted) |
| Third-party data | Energy MyData since 1 June 2026, with the Korea Energy Agency as intermediary |
| Apartments | In single-contract complexes KEPCO meters the complex; flats are sub-metered by the management office |
Korea’s smart-meter programme was run entirely by KEPCO as part of the government’s smart-grid plan. Rather than a market of suppliers and a central communications body, KEPCO procured the meters (its own standard “AMIGO” electronic meters are still bought in hundreds of thousands a year) and built its own data network and head-end. Remote reading supports billing, outage detection and, on Jeju, the optional residential time-of-use tariff. KEPCO has said a national time-of-use offer depends on AMI coverage in each region.
Critics, including the February 2026 RAP/SFOC review, argue that some early AMI hardware is substandard for advanced uses and should be replaced with more capable smart meters. In July 2026 the ministry, KEPCO and K-water announced a pilot in Paju to share electricity AMI modems with water meters, whose AMI coverage is only about 24%. For many apartment residents the relevant meter is the complex’s sub-meter, not KEPCO’s, which limits what household-level data KEPCO holds.
Renewable electricity.
Electricity generation mix (2025).
- Coal: 31.1%
- Nuclear: 29.6%
- Gas: 28%
- Solar: 6.1%
- Bioenergy: 3.2%
- Other fossil: 1%
- Hydro: 0.6%
- Wind: 0.6%
- Renewable electricity share
- 10.4% (2025)Source 9Share of 624.66 TWh total generation: solar 6.05%, bioenergy 3.15%, hydro 0.61%, wind 0.58% (Ember yearly electricity data). Up from 9.71% in 2024. Korea’s own “new and renewable” statistics also count fuel cells and some waste, so national figures can differ.
- Home solar
- 2.5 GW (2024)Source 10Residential installations, about 8% of cumulative PV. Industrial and commercial self-use systems were a further 1.7 GW; about 86% of capacity belongs to generation businesses.
- Solar added each year
- 3.67 GW (2025)Source 9Derived: Ember installed capacity of 30.35 GW at the end of 2025 minus 26.68 GW at the end of 2024.
- Solar PV
- 30.4 GW (2025)Source 9
- Wind
- 2.45 GW (2025)Source 9
- Hydro (excluding pumped storage)
- 1.83 GW (2025)Source 9
- Bioenergy
- 2.71 GW (2025)Source 9
- Nuclear
- 26.1 GW (2025)Source 9
Targets.
- 11th Basic Plan for Electricity Supply and Demand (February 2025, amended March 2025): renewable capacity from 30.0 GW (2023) to 121.9 GW in 2038 and 29.2% of generation; carbon-free sources 53.0% of generation by 2030 and 70.7% by 2038.
- Government target of 100 GW of renewable capacity by 2030 (reported by IEA PVPS).
- Renewable Portfolio Standard obligation: 15.0% in 2026, rising to 25.0% in 2030 under the current decree, although the RPS is to be replaced by auctions and long-term contracts after 2026.
- Carbon neutrality by 2050 under the Framework Act on Carbon Neutrality (2022).
Renewables are a small share of Korean generation compared with other OECD countries: 10.4% in 2025, with solar the only fast-growing source. Wind, especially offshore wind, has been slow because of permitting, grid and local-acceptance problems. Nuclear and coal each supply about 30% of generation and gas about 28%. The 11th Basic Plan keeps nuclear growing to 35.2 GW by 2038, cuts coal from 39.2 GW to 22.2 GW and expands LNG and renewables.
Solar growth has been driven by the RPS, which obliges large generators to source a rising share from renewables or buy renewable energy certificates (RECs), and by fixed-price contracts for small plants. That favoured small ground-mounted and warehouse-roof plants of under 1 MW in rural provinces, particularly South Jeolla, rather than home rooftops. The resulting cluster of solar in Honam, far from demand in Seoul, now causes curtailment and has led KEPCO to restrict new connections there. The government’s answer is grid expansion, storage tenders, regional pricing and the planned switch from the RPS to auctions with long-term contracts.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 1.404 GW (end 2025)Source 1KEPCO’s own substation batteries for frequency regulation (first 52 MW in 2014–2015; Yeong-Ju in December 2023 and five more substations in September 2024). Private renewable-paired and commercial batteries and pumped hydro are not included.
Storage policy now centres on centrally procured, long-duration batteries contracted by KPX, aimed at absorbing midday solar and easing congestion in the south-west and on Jeju, plus KEPCO’s own grid batteries, which it first deployed for frequency regulation in 2014–2015. According to ESS News, the 11th Basic Plan expects batteries to meet new storage needs into the mid-2030s.
Behind-the-meter storage in homes has little economic case under current rules. Households pay a flat tiered tariff with no time-of-use option outside Jeju, net metering already credits exports at the retail energy charge, and there is no market access for household batteries. Proposals to let small systems trade surplus power, and the VPP models being trialled in the special zones, are the most likely routes for this to change.
Storage projects.
- KEPCO frequency-regulation batteries: Grid batteries at substations, including Seo-Anseong and Shin-Yongin (52 MW pilot, in service July 2015), reaching 1,404 MW in total by September 2024.
- KPX central contract market for storage (second tender): 540 MW/3,240 MWh of six-hour batteries (500 MW mainland, 40 MW Jeju) on 15-year contracts, with proposals due on 12 January 2026 and awards planned for February 2026. The first tender awarded 65 MW/260 MWh.
- Distributed-energy special zones: Busan plans large-scale storage serving industrial estates and the port; Gyeonggi (Uiwang) a park microgrid with solar, storage and EV charging; Jeju power-to-heat, VPPs and V2G using surplus renewables.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Korea Electric Power Corporation (KEPCO) | Sole licensed retailer; sold 549,417 GWh in 2025 (residential 16.1%) | No | Limited | No | Limited |
There is no household retail market in Korea. KEPCO supplies virtually every home, either directly or through an apartment complex’s bulk contract, at national tariffs approved by the government. The only exceptions are a small number of licensed community-energy (구역전기) businesses that generate and supply power in particular new towns and complexes, and distributed-energy businesses allowed to sell directly in the distributed-energy special zones designated from November 2025.
Large consumers above 30,000 kVA can buy directly from the KPX market, and companies can buy renewable electricity through PPAs, but these options are not open to households.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Climate, Energy and Environment (MCEE) | Government | Energy and climate policy, tariff approval, licensing above 3 MW | Since October 2025 the ministry responsible for electricity, renewables and KEPCO; publishes the Basic Plan and tariff decisions. |
| Korea Electricity Commission | Regulator | Licensing review, market-rule review, dispute resolution | Reviews generation licences above 3 MW and changes to the electricity market rules. |
| Korea Electric Power Corporation (KEPCO) | Transmission | Transmission and distribution owner, sole retailer, metering | Handles every grid connection and net-metering contract and publishes tariffs. |
| Korea Power Exchange (KPX) | Market | System operator and market operator | Runs the pool, demand-response market, brokerage, storage tenders and the Jeju real-time market; publishes market data through EPSIS. |
| Korea Energy Agency – New & Renewable Energy Center | Renewable Energy | Renewable subsidies, certification, RPS and fixed-price contracts | Runs the housing and building support programmes, KS certification of renewable equipment, installation standards and the distributed-energy promotion centre. |
| Korea Electrical Safety Corporation (KESCO) | Government | Electrical safety inspections | Carries out the inspections required before and during use of electrical installations, including solar systems. |
| Korea Energy Economics Institute (KEEI) | Consumer | Government energy research institute | Publishes energy statistics, the household energy panel survey and policy research. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | KEPCO technical standards for connecting distributed generation to the distribution grid (분산형전원 배전계통 연계 기술기준) | KEPCO | Sets connection voltage by size, protection, power quality and anti-islanding requirements. Inverter-based systems under 100 kW can rely on the protection built into a certified inverter; larger low-voltage systems need additional protective devices. |
| Equipment certification | KS certification of renewable energy equipment | Korea Energy Agency | Covers small and large grid-connected and stand-alone PV inverters, microinverters, crystalline and thin-film modules, PV junction boxes and batteries. Certified equipment is required for government-supported installations. |
| Module carbon footprint | Carbon verification scheme (탄소검증제) | Korea Energy Agency | Verifies the embodied carbon of PV modules, which is taken into account in competitive renewable procurement. |
| Installation | Renewable energy installation standards (재생에너지설비 시공기준) | Korea Energy Agency | Installation requirements for subsidised systems, which must be installed by participating companies registered with the Agency for each year’s programme. |
| Electrical safety | Pre-use and periodic inspection of electrical installations | Korea Electrical Safety Corporation (KESCO) | Owners of self-use (자가용) electrical installations must have them inspected periodically; solar systems are inspected before connection. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Grid connection and net-metering contract | Yes | National | Applied for with KEPCO under the customer number. KEPCO checks feeder and substation capacity and may refuse or delay connection in congested areas. |
| Generation business licence | Limited | Mixed | Only needed when selling electricity as a business: from the city or provincial governor up to 3,000 kW, from the ministry above. Not needed for self-use systems on net metering. |
| Electrical safety inspection | Yes | National | Carried out by KESCO before the system is used and periodically for self-use installations. |
| Building owner or owners’ association consent | Limited | Local | Required for systems on apartment roofs, façades or balconies and for any installation by a tenant. In single-contract complexes, the management office holds the KEPCO contract. |
| Land-use and development permits | Limited | Local | Ground-mounted plants, especially on farmland or forest land, need local permits in addition to the generation licence. Rooftop systems on existing buildings generally do not. |
| Subsidy approval | Limited | Mixed | Only if using the Korea Energy Agency housing support programme or a local-government grant, which require a participating installer and certified equipment. |
For a household, the essential steps are KEPCO’s connection approval and net-metering contract, certified equipment and a safety inspection. Business licensing applies only to those selling electricity. In practice the biggest hurdles are housing form and grid capacity: two-thirds of households live in apartments where roof space is shared and the KEPCO contract may belong to the complex, and in parts of the south-west new connections are restricted because the grid is full.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Renewable energy housing support programme (주택지원사업) | Active | Grant | Korea Energy Agency subsidy towards the installation cost of solar, solar thermal, geothermal and small wind systems in detached and multi-unit homes, delivered through participating installers selected each year. Installers for the 2026 housing and building programmes were recruited from 28 January to 6 February 2026. Many local governments add their own top-up grants. | 2026 programme year |
| Net metering (상계거래) | Active | Net metering | Exports from self-use solar (up to 1,000 kW) and other renewables (up to 10 kW) are offset against imports on the KEPCO bill, with surplus carried forward and annual cash settlement for systems over 10 kW. | Since 2005 |
| Renewable Portfolio Standard and RECs | Active | Certificate scheme | Large generators must source 15.0% of their generation from renewables in 2026 or buy RECs, giving licensed small solar plants a second income on top of the SMP. The government plans to replace the RPS with competitive auctions and long-term contracts after 2026. | Replacement planned after 2026 |
| Surplus trading for systems of 10 kW or less (proposed) | Scheduled | Export payment | A ministry amendment announced on 23 September 2026 would let small renewable systems sell surplus power after self-consumption. Public comment runs until 2 November 2026; metering and settlement rules are still to be set. | — |
| Tariff discount for self-generating businesses | Closed | Tariff discount | A 50% discount offered to industrial and general (commercial) customers who installed renewable generators for their own use was discontinued by December 2023. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters do not depend on household broadband. KEPCO’s AMI uses its own communications network, and in July 2026 the government began piloting the sharing of electricity AMI modems with water meters. Home energy services, solar monitoring and aggregator control use the household’s broadband or mobile connection. Since June 2026, energy MyData lets those services receive KEPCO usage data with the customer’s consent, rather than relying on separate sensors.
Grid conditions.
- National peak demand
- 96 GW (2025)Source 1Peak load in 2025 (95,951 MW). The 2024 peak was 97.1 GW. Average load in 2025 was 68.0 GW.
- Annual electricity demand
- 624.7 TWh (2025)Source 9Ember electricity demand (equal to generation, as there are no net imports). KEPCO’s sales to customers were 549.4 TWh.
- Generation capacity
- 155.4 GW (2025)Source 1Total capacity at the time of peak usage (155,385 MW). Ember’s installed-capacity total is 158.9 GW.
- Interconnection
- 0 GW (2025)Source 9South Korea has no international interconnectors; Ember records zero net imports. Jeju has its own sub-system with separate market rules.
- Curtailment
- Not identified from a reliable public source.
Korea is an electrical island: all reserve has to come from domestic plants, and the system is planned around a reserve margin of about 12%. Peak demand reached 97.1 GW in 2024 and 96.0 GW in 2025, driven by summer cooling and winter heating. Demand is flat overall, but new semiconductor clusters in the capital area are expected to add load, which is one reason for regional pricing and grid-impact assessments under the Distributed Energy Act.
The main grid problems are geographic. Solar is concentrated in the south-west and nuclear and coal on the east coast, while demand is in and around Seoul. New 500 kV HVDC and 765 kV lines from the east coast are being built, and the 11th Transmission and Substation Plan (May 2025) covers expansion to 2038. Until those lines are built, curtailment and connection limits for renewables in Honam and on Jeju are likely to continue.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Energy policy moved to the Ministry of Climate, Energy and Environment | Current | 1 October 2025 | Electricity, renewables and oversight of KEPCO, KHNP, KPX and the Korea Energy Agency moved from the trade ministry to the new MCEE. |
| Distributed energy special zones begin operating | Current | Designated November 2025; operating from 2026 | Zones in South Jeolla, Jeju, Busan (Gangseo) and Gyeonggi (Uiwang), designated on 5 November 2025, followed by Mipo (Ulsan), Seosan and Pohang, may allow direct sales between distributed-energy businesses and consumers outside the pool, VPPs, storage and sector coupling. |
| Energy MyData for electricity | Current | 1 June 2026 | Customers can require KEPCO to transfer their usage and billing data to service providers, with the Korea Energy Agency as intermediary. |
| Time-of-use reform for business tariffs | Current | 16 April and 1 June 2026 | Midday hours in March–October moved from peak to mid-load and evening hours (18:00–21:00) to peak, to shift demand towards solar output, with weekend midday discounts for some industrial and EV-charging customers. |
| Regional industrial electricity tariffs | Upcoming | Within 2026 | Design published on 26 August 2026: 11 tariff regions and discounts of up to 10% for industry outside the capital area, linked to regional wholesale pricing. |
| Surplus trading for small (≤10 kW) systems | Upcoming | Consultation to 2 November 2026 | Rule change to let small renewable systems sell surplus power rather than only net it. |
| Replacement of the Renewable Portfolio Standard | Upcoming | After 2026 | The RPS is to be phased out in favour of a contract-based system of competitive auctions and long-term contracts. |
| National regional flexibility service | Upcoming | 2027 | KEPCO plans to extend its Jeju distribution-flexibility pilot using private storage nationwide. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | IEA PVPS estimates residential PV at about 2.5 GW (8% of capacity) in 2024. Two-thirds of homes are apartments, and systems of 10 kW or less receive no cash for exports under current rules. |
| Distributed energy market | Medium | KEPCO expected 28.1 GW of connected distributed generation by end-2025, 96% of it solar, mostly in plants under 1 MW. Aggregation (brokerage since 2018, demand response since 2014) exists, and the Distributed Energy Act has been in force since June 2024. |
| Grid flexibility market | Low | Cost-based pool with no mainland real-time or intraday market; real-time and ancillary markets only on Jeju since 2024; no household time-of-use tariff outside Jeju. |
| Energy storage adoption | Medium | KEPCO operates 1,404 MW of grid batteries and KPX tendered 540 MW/3,240 MWh of long-duration storage for 2026 awards, but no home battery market is evident. |
| Renewable growth environment | Medium | Renewable share rose from 9.71% (2024) to 10.39% (2025), with about 3.7 GW of solar added in 2025. Targets are 121.9 GW by 2038 and a government goal of 100 GW by 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 28 sources
- Korea Electric Power Corporation – Annual Report on Form 20-F for the year ended 31 December 2025. KEPCO / U.S. Securities and Exchange Commission, 2026. accessed 1 October 2026.
- 전기요금표 종합 (2023년 5월 16일 시행) – electricity tariff summary. KEPCO, 2023. accessed 1 October 2026.
- 4분기 전기요금 동결…연료비조정단가 +5원 유지 (Q4 2026 tariff freeze). Yonhap via Supple, 2026. accessed 1 October 2026.
- ECB euro foreign exchange reference rates – Korean won (EXR.D.KRW.EUR.SP00.A). European Central Bank, 2026. accessed 1 October 2026.
- 2025 Population and Housing Census (register-based) results. National Data Office, via KDI Economic Information and Education Center, 2026. accessed 1 October 2026.
- Korea’s population slightly up in 2025 on immigration: census. The Korea Times, 2026. accessed 1 October 2026.
- 2024년도 주거실태조사 결과 (2024 Korea Housing Survey). NewDaily, reporting Ministry of Land, Infrastructure and Transport, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Korea, Rep.. World Bank, 2025. accessed 1 October 2026.
- Yearly electricity data (South Korea, 2024–2025). Ember, 2026. accessed 1 October 2026.
- IEA PVPS member profile: Korea. IEA Photovoltaic Power Systems Programme, 2025. accessed 1 October 2026.
- 2025년 말 자동차 등록 현황: 전체 신규 등록 169만대 중 전기차 13%. Newsis, reporting Ministry of Land, Infrastructure and Transport, 2026. accessed 1 October 2026.
- 국내외 주택용 상계거래(Net Metering) 제도 현황. Korea Electric Association Journal (전기저널). accessed 1 October 2026.
- 10kW 이하 재생에너지 ‘남는 전기’ 거래 길 열린다. Energy Daily, 2026. accessed 1 October 2026.
- [인터뷰] 김형중 한국에너지공단 분산에너지진흥센터장. Korea Housing & Architecture Review News (kharn), 2026. accessed 1 October 2026.
- 산업용 지역 전기요금제 설계안 공개 (regional industrial tariff design). Ministry of Climate, Energy and Environment, via KDI EIEC, 2026. accessed 1 October 2026.
- Special Act on the Activation of Distributed Energy (newsletter). Shin & Kim, 2023. accessed 1 October 2026.
- Reforming South Korea’s Power Sector: Setting the stage for the renewable energy transition. Regulatory Assistance Project and Solutions For Our Climate, 2026. accessed 1 October 2026.
- Apartment electricity contract types in Seoul (single, comprehensive and per-unit contracts). Seoul Metropolitan Government, 2023. accessed 1 October 2026.
- Integrated power–water AMI pilot announcement. Financial News, 2026. accessed 1 October 2026.
- 전기·가스 사용정보, 마이데이터로 전송 가능해진다 (energy MyData from 1 June 2026). Byline Network, 2026. accessed 1 October 2026.
- 발전사업 허가 – licensing authority and procedure. Korea Energy Agency – Renewable Energy Cloud Platform. accessed 1 October 2026.
- 전력거래 – power trading for small generators. Korea Energy Agency – Renewable Energy Cloud Platform. accessed 1 October 2026.
- 소규모 전력중개사업 시행 (small-scale power brokerage launch). Ministry of Trade, Industry and Energy, 2018. accessed 1 October 2026.
- 한전, 1차 장기 배전계획 확정 (KEPCO First Long-term Distribution Plan). Daum News, 2025. accessed 1 October 2026.
- 2026년 신재생에너지 보급사업 참여기업 모집 공고. Korea Energy Agency – New & Renewable Energy Center, 2026. accessed 1 October 2026.
- KS-certified renewable energy equipment. Korea Energy Agency – New & Renewable Energy Center. accessed 1 October 2026.
- South Korea to announce results of 3.2 GWh energy storage auction in February 2026. ESS News, 2025. accessed 1 October 2026.
- ‘재생에너지 생산한 주변서 바로 사용’…전남·제주·부산·경기서 시도 (special zones designated). Money Today, 2025. accessed 1 October 2026.
Questions about energy in South Korea.
A household using 300 kWh in a non-summer month pays about 57,760 won, or roughly 193 won/kWh (about €0.13) including VAT and levies, at 2026 rates. The tariff is progressive: 120.0 won/kWh for the first 200 kWh, 214.6 won/kWh up to 400 kWh and 307.3 won/kWh above that, plus a climate charge and fuel-cost adjustment. Residential rates have been frozen since May 2023.
No. KEPCO is the only licensed retailer for households, and tariffs are national. Small exceptions are community-energy suppliers in some new towns and distributed-energy businesses in the distributed-energy special zones designated from November 2025.
The KEPCO customer number (고객번호), a 10-digit number assigned to each supply location and printed at the top of the bill. It stays with the location when occupants change. In many apartment complexes, KEPCO supplies the whole complex under one customer number and the management office sub-meters each flat.
You can export it, but most homes do not get paid. Self-use solar is on net metering with KEPCO: exports offset imports and surplus carries forward. Only systems over 10 kW can claim an annual cash settlement. A proposal published in September 2026 would let systems of 10 kW or less sell surplus power. Larger investors can sell power as licensed generation businesses.
KEPCO owns substantially all transmission and distribution and the meters. The Korea Power Exchange (KPX) operates the system and the wholesale pool. Policy and tariff approval sit with the Ministry of Climate, Energy and Environment, and the Korea Electricity Commission reviews licences and market rules.
Mostly. KEPCO’s AMI network covered 20.5 million households at the end of 2025, with 1.1 million more to follow from 2026. Customers can view usage on the 한전ON app, and since June 2026 can share their data with service providers under energy MyData.
Only on Jeju Island, where households can choose a seasonal time-of-day tariff instead of the tiered one. Elsewhere homes pay the progressive tariff. KEPCO has said a national offer depends on smart-meter coverage.