How electricity works in South Sudan.
South Sudan electricity 2026: 5.4% access, US¢40/kWh Juba tariff, JEDCO and SSEC, Ministry of Energy and Dams, diesel-based supply and planned solar.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in South Sudanese pound (SSP) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
South Sudan energy at a glance.
Key figures for households in South Sudan. Each one links to its source on the full overview below.
Electricity price.
0.4 USD per kWh for households, including taxes. Figures for 2023.
Renewable share.
1.3% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in South Sudan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for South Sudan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications South Sudan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in South Sudan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in South Sudan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in South Sudan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in South Sudan.
The energy market in South Sudan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
South Sudan has one of the lowest rates of electricity access in the world. The World Bank estimates that 5.4% of the population had access in 2024: 22.8% in urban areas and 0.7% in rural areas. There is no national grid. The main public network is in Juba, the capital, and almost all grid power comes from diesel and heavy-fuel generators.
In Juba, power is generated by the Ezra Group’s 33 MW thermal plant under a 17-year build-own-operate-transfer power purchase agreement signed with the Government in 2017, and distributed by the Juba Electricity Distribution Company (JEDCO), a joint venture between the state-owned South Sudan Electricity Corporation (SSEC, 48%) and Ezra (52%). World Bank appraisal documents put the average tariff at US¢40 per kWh, among the highest in Sub-Saharan Africa.
The Ministry of Energy and Dams (MoED) sets policy and also acts as regulator, though the World Bank notes that few regulations are formally in place. A National Electricity Bill drafted in 2016 had not become law, and an updated policy, a revised sector law and a grid code are targets of the World Bank-financed ASSIST project, none of which had been achieved by August 2026.
Energy snapshot.
Headline figures for electricity in South Sudan. Each shows its data year and links to its source.
- Population12,188,788 peopleSource 12025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (SSP)0.4 USD/kWhSource 42023
- Household price (EUR)0.357 EUR/kWhSource 92023
- Renewable electricity share1.3%Source 32023
- Solar capacityNot identified from a reliable public source.
- Wind capacity0 GWSource 32024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Ministry of Energy and Dams (MoED), which acts as both policy-maker and regulator; no independent regulator
- System operator
- No national system operator. The Juba grid is run by JEDCO with Ezra’s power plant.
- Distribution networks
- JEDCO (SSEC–Ezra joint venture) in Juba; SSEC networks in other towns largely non-operational; Renk supplied from Sudan
- Currency
- South Sudanese pound (SSP)
- Voltage and frequency
- Not confirmed from an official source in this research
Electricity prices in South Sudan.
- Household price (SSP)
- 0.4 USD/kWh (2023)Source 4Average tariff paid by customers in Juba (US¢40 per kWh), World Bank Project Appraisal Document, April 2023. Residential customers using under 100 kWh a month pay a lifeline rate of US¢31.6 per kWh. Applies to the Juba grid only.
- Household price (EUR)
- 0.357 EUR/kWh (2023)Source 9Converted from US$0.40/kWh at the ECB euro reference rate of 9 October 2026 (EUR 1 = USD 1.1206).
- Typical annual electricity bill
- Not identified from a reliable public source.
Why electricity costs so much
Grid electricity in Juba comes from a thermal plant burning imported fuel, bought under a long-term PPA. The World Bank reported in 2023 that customers pay an average of US¢40 per kWh, compared with US¢4.5 in Ethiopia and US¢6–20 in Uganda (2020 figures). It estimated that adding solar and battery storage to the Juba supply could bring the average tariff down to about US¢26 per kWh.
Getting connected
Connection charges are a major barrier. JEDCO’s minimum connection fee was US$300 for a single-phase meter and up to US$600 for a three-phase meter, rising to several thousand dollars where new poles are needed (World Bank, 2023). The World Bank ASSIST project is meant to finance 40,000 new household connections in Juba.
Diesel outside the grid
Many households and businesses run their own generators. The World Bank estimated off-grid capacity in Juba at 28.93 MW, almost as much as the capacity available on the Juba grid, about 99% of it diesel.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Juba grid tariff averaging US¢40 per kWh (World Bank, 2023), linked to the cost of power bought from the Ezra thermal plant under its PPA with the Government. |
| Other | Yes | Residential lifeline band: US¢31.6 per kWh for households consuming under 100 kWh a month (World Bank, 2023). |
| Prepayment | Yes | JEDCO connects new customers with prepaid meters (World Bank, 2023). |
| Time-of-use | No | No time-of-use tariff was identified. |
| Dynamic | No | There is no wholesale market, so no market-linked tariff exists. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 53.2 kWh/person/yr (all sectors) (2024)Source 2World Bank indicator EG.USE.ELEC.KH.PC.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity use is very low. The World Bank puts consumption at about 53 kWh per person in 2024, and IRENA records total generation of 554 GWh in 2023. A large share of grid generation does not reach households: of about 103 MW of installed thermal capacity in 2023, about 42 MW served the Paloch oil field and only about 34.5 MW was available to the public (World Bank).
Most homes have no grid supply and rely on wood, charcoal, torches and small solar products. The World Bank estimated sales of around 55,000 solar lighting products in 2021. Among households with a Juba grid connection, the lifeline tariff band is set at under 100 kWh a month.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 21.7 % of population (2025)Source 1
South Sudan is overwhelmingly rural: the World Bank estimates that 21.7% of people lived in urban areas in 2025. No recent census or housing survey with dwelling statistics was identified; the National Bureau of Statistics lists the 2008 census as its latest census publication.
Grid electricity is essentially an urban service. In 2024, 22.8% of the urban population had access to electricity compared with 0.7% of the rural population (World Bank). The World Bank reported a grid access rate of about 32% among Juba residents in 2023.
How the grid works in South Sudan.
- TransmissionEzra Group (Juba power plant)
- DistributionJEDCO (SSEC–Ezra joint venture) in Juba; SSEC networks in other towns largely non-operational; Renk supplied from Sudan
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Physical system
South Sudan has no interconnected national grid. The World Bank estimated installed capacity at about 103 MW in 2023, all thermal, of which about 76.5 MW was operational and about 42 MW supplied the Paloch oil field, leaving about 34.5 MW for public supply. Juba’s grid peak fell from 30 MW to about 20 MW in May 2022 and later recovered to about 25 MW.
In the north, a 32 MW, 220 kV interconnector supplies Renk in Upper Nile State from Sudan, but supply was described as unreliable because of power shortages in Sudan. The Government was studying an interconnector with Uganda and had signed a memorandum of understanding on power trade with Ethiopia (World Bank, 2023).
Commercial flow
In Juba, Ezra generates under its PPA with the Government and JEDCO distributes and sells the power. JEDCO reported system losses below 10% and supply reliability above 95% (World Bank, 2023). Outside Juba, earlier town networks financed by donors and SSEC are mostly out of service.
Planned investment
The World Bank’s Energy Sector Access and Institutional Strengthening (ASSIST) project, US$50 million of IDA grants approved on 25 April 2023, finances grid densification in Juba, a solar and battery mini-grid in Yei, solar for health facilities and sector reform. Its August 2026 progress report rated progress moderately unsatisfactory, with 10.71% of funds disbursed and no results yet delivered. The African Development Bank financed a US$38 million Juba distribution rehabilitation project in 2017.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Dams (MoED) | The apex policy-making institution for electricity, which also serves as regulator, although few regulations are formally in place (World Bank, 2023). Oversees SSEC and the World Bank ASSIST project. |
| Supplier | South Sudan Electricity Corporation (SSEC) | State-owned national utility established under the South Sudan Electricity Corporation Act 2011, mandated to expand and operate generation and distribution. Holds 48% of JEDCO. Implementing entity for the World Bank ASSIST project. |
| DSO | Juba Electricity Distribution Company (JEDCO) | Joint venture of SSEC (48%) and Ezra Group (52%), established in May 2018. Operates the Juba distribution network and serves around 33,000 customers: 66% households, 32% businesses and 2% government institutions (World Bank, 2023). |
| System operator | Ezra Group (Juba power plant) | Private company operating a 33 MW thermal plant supplying JEDCO under a 17-year build-own-operate-transfer PPA signed with the Government in 2017. A 20 MW solar hybridisation of the plant was under construction in 2023. |
Compared with the UK system.
| UK concept | South Sudan equivalent | How it works |
|---|---|---|
| DNO | JEDCO (Juba); SSEC elsewhere | JEDCO owns and operates the Juba distribution network and also bills customers. SSEC networks in Wau, Malakal, Rumbek, Yambio, Yei, Maridi and Kapoeta were reported non-operational in 2023 because of poor maintenance and war damage. |
| National Grid/NESO | None | There is no national transmission grid. Juba is an isolated system, and Renk in Upper Nile is supplied from Sudan over a 220 kV interconnector. |
| MPAN | JEDCO customer account and prepaid meter number | There is no national supply-point number. A connection is identified by the account and meter records held by JEDCO. |
| MPRN | Not applicable | No piped gas network was identified. |
| Meter operator | JEDCO | JEDCO installs prepaid meters for new customers. |
| Supplier | JEDCO | Households in Juba cannot choose a supplier: JEDCO is the only grid retailer. |
| Smart-meter infrastructure | None identified | No smart-metering programme or data hub was identified. |
How a supply point is identified.
Fictional illustration, not a real format: JEDCO prepaid meter 04-1182736, single-phase, Munuki, Juba.
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | JEDCO customer account and prepaid meter number |
| Who issues it? | Juba Electricity Distribution Company (JEDCO) |
| Format | No published national numbering standard. JEDCO assigns customer and meter records in its own billing and prepaid vending system. |
| Length | Not publicly documented |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the prepaid meter and on purchase receipts or account documents issued by JEDCO. No public description of the format was found. |
| Electronic access | No regulated online access to consumption data was identified. |
| Third-party access | No regulated data-sharing scheme exists; third parties rely on the customer’s own meter or account details. |
| Who keeps the register | JEDCO keeps its own customer register for Juba. No central register of connections exists. |
| Register scope | Per DSO |
How a connection is identified
South Sudan has no national supply-point identifier. In Juba, the only operating public network, a household connection exists as a customer record in JEDCO’s system linked to a meter. The World Bank reports that new customers are connected with prepaid meters, so the meter itself is the main reference a household uses when buying electricity. No official document setting out number formats, or what happens to the account when a property changes hands, was found for this profile.
Getting a connection
A household applies to JEDCO and pays a connection fee, at least US$300 for a single-phase meter and up to US$600 for three-phase in 2023, more if poles must be added. Under the World Bank ASSIST project, SSEC and JEDCO are to add 40,000 household connections in Juba, but none had been made by August 2026.
No central register
With no national grid, no supplier choice and no settlement system, there is no central register of supply points. Outside Juba, the few working supplies, such as Renk, are run locally.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | No |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | None. No net metering, feed-in tariff or export payment scheme was identified. |
| Can households sell solar power to the grid? | No scheme was identified. There is no net metering, feed-in tariff or export payment. |
| Is there a grid code for connecting generators? | No. A grid code is a target of the World Bank ASSIST project (originally due June 2026) and had not been developed by August 2026. |
| How are independent power producers contracted? | Through agreements with the Government. The World Bank notes that IPP licensing needs a framework that does not yet formally exist. |
Connecting a home system.
- No published procedure exists for households to export power to the Juba grid. Household solar is used on-site or off-grid.
- Utility-scale generation is contracted by the Government through PPAs, such as Ezra’s 2017 agreement.
Export by households is not part of South Sudan’s electricity system. The Juba grid is supplied by a single contracted thermal plant, with solar plants planned by Ezra, the Government (Nesitu) and a private developer. There are no rules for small generators to connect and be paid, and no grid code.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use (household solar or generator) | No electricity licence or registration requirement was identified. | None identified | Diesel generators and solar kits are widely used off-grid. |
| Generate electricity for sale (IPP) | Contracted case by case with the Government through a PPA; no formal licensing regime identified. | Ministry of Energy and Dams | Example: Ezra’s 17-year BOOT PPA (2017). |
| Distribute and supply electricity | State utility (SSEC) or its joint venture (JEDCO); no published licensing procedure identified. | Ministry of Energy and Dams | SSEC was established by the SSEC Act 2011. |
| Store electricity (batteries) | No specific rule was identified. | None identified | Planned batteries are part of utility or government projects. |
| Export to the grid | No scheme or connection procedure exists. | JEDCO / MoED | See the export section. |
| Wholesale trading, aggregation and virtual power plants | No framework; there is no market or aggregator role. | None | |
| Balancing, grid services and remote control of assets | Not open to third parties. | JEDCO / Ezra | No rules for third-party distributed assets. |
The electricity sector rests on the South Sudan Electricity Corporation Act 2011 and the National Electricity Policy 2013. A National Electricity Bill was drafted in 2016 and passed by the Cabinet, but the World Bank described it as containing several gaps. The Ministry of Energy and Dams acts as regulator in the absence of an independent body.
Under the World Bank ASSIST project, an updated national electricity policy, at least one revised or new sector law, a grid code and an SSEC business plan were scheduled for 2024–2026. The project’s August 2026 report records none of these as achieved.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale energy market | No | — | No | There is no market; power is bought under bilateral PPAs. |
| Balancing and reserves | No | — | No | JEDCO / Ezra. Balancing on the isolated Juba grid is done by the power plant. |
| Demand response | No | — | No | No demand-response scheme was identified. |
There is no route for distributed energy resources to provide flexibility services. South Sudan has no wholesale or balancing market and no national grid. Planned battery storage at the Nesitu solar plant and the Yei mini-grid would be operated as part of those utility-scale projects.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No smart-meter programme identified; prepaid meters for new Juba connections |
| Reading interval | Not applicable |
| Meter owner | JEDCO (Juba) |
| Meter type for new connections | Prepaid |
| National programme | None identified |
| Data hub | None |
No smart-metering programme or regulation was identified. In Juba, JEDCO connects new customers with prepaid meters (World Bank, 2023), which lets customers buy electricity in advance and limits arrears on a network with high tariffs.
Renewable electricity.
Electricity generation mix (2023).
- Fossil fuels (oil): 98.7%
- Solar PV: 1.3%
- Renewable electricity share
- 1.3% (2023)Source 3Share of electricity generation: 7 GWh of solar out of 554 GWh (derived; IRENA rounds this to 1%). Imports from Sudan through the Renk interconnector are not quantified here.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 14 MW (2024)Source 3Net capacity change for solar; also 14 MW in 2023.
- Total (all technologies)
- 103 MW (2023)Source 4World Bank estimate of installed capacity, all thermal; about 76.5 MW operational. IRENA shows about 0.2 GW in 2024, with renewables about 14%.
- Solar PV
- Not identified from a reliable public source.
Targets.
- No national renewable electricity target was identified. IRENA lists the revised/updated Nationally Determined Contribution (2021) as the latest relevant policy.
Renewables supply almost none of South Sudan’s electricity: IRENA records 7 GWh of solar out of 554 GWh generated in 2023. Most renewable energy use is traditional biomass for cooking.
Several solar plants were under construction for the Juba grid in 2023: a 20 MW hybridisation of Ezra’s thermal plant, the government’s 20 MW Nesitu plant with 10 MW/35 MWh of batteries, and a 20 MW private plant by Gigawatt Global with an uncertain timeline. The World Bank estimated these would change the Juba mix to about 55% thermal and 45% solar and storage. IRENA records 14 MW of net solar additions in each of 2023 and 2024. The ASSIST project plans a 3 MW solar mini-grid with 12 MWh of batteries in Yei.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage in South Sudan is limited to planned utility and donor projects. No national statistics on installed storage are published.
Storage projects.
- Nesitu solar plant with battery storage (Government): 20 MW solar with 10 MW/35 MWh battery storage, under construction in 2023 (World Bank).
- Yei solar mini-grid pilot (ASSIST project): 3 MW solar and 12 MWh batteries alongside 1.2 MW of existing diesel, to serve about 10,000 households and 400 businesses and institutions. Not built as of August 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Juba Electricity Distribution Company (JEDCO) | Sole grid distributor in Juba; around 33,000 customers (World Bank, 2023) | No | No | No | No |
JEDCO is the only grid retailer in Juba. No JEDCO, SSEC or Ministry website could be reached for this profile, so the World Bank project page is given as the reference. Elsewhere, households rely on their own generators and solar products.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Dams | Government | Energy policy-maker and de facto regulator | Sets electricity policy and oversees SSEC and donor projects. |
| South Sudan Electricity Corporation (SSEC) | Distribution | State-owned national utility | Mandated to expand and operate generation and distribution; co-owner of JEDCO. |
| JEDCO | Distribution | Juba distribution company | Runs the capital’s grid, connections and prepaid metering. |
| ASSIST project (World Bank) | Renewable Energy | Donor-financed sector programme | Finances Juba connections, the Yei solar mini-grid, solar for health facilities and sector reform. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Grid code (not yet developed) | Ministry of Energy and Dams | A grid code is an ASSIST project target; none was developed by August 2026. |
| Sector law | South Sudan Electricity Corporation Act 2011; National Electricity Policy 2013 | Government of South Sudan | A National Electricity Bill drafted in 2016 has not been enacted. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Electricity licence for household solar | No | National | No licence or registration requirement was identified. |
| Connection to the Juba grid | Yes | Local | Arranged with JEDCO; fees of US$300 (single-phase) to US$600 (three-phase) or more in 2023. |
| Building or planning permission | Limited | Local | No specific rule for rooftop solar was identified. |
For a household, installing solar in South Sudan is a private purchase with no electricity-sector approval. A grid supply in Juba requires an application to JEDCO and payment of its connection fee.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Energy Sector Access and Institutional Strengthening Project (ASSIST) | Active | Public investment in connections, mini-grid, health-facility solar and sector reform | US$50 million IDA grants plus a US$3 million Japan PHRD grant, approved 25 April 2023. Targets 40,000 household connections in Juba, a 3 MW solar mini-grid in Yei and solar power for health facilities. Rated moderately unsatisfactory in August 2026, with no results delivered yet. | April 2023 – April 2028 |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
There were 46.6 mobile subscriptions per 100 people in 2023 (World Bank). No smart-meter communications network was identified.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 0.554 TWh (2023)Source 3Total generation, used as a proxy for demand.
- Generation capacity
- 0.103 GW (2023)Source 4Installed, all thermal; about 76.5 MW operational and about 42 MW dedicated to the Paloch oil field.
- Interconnection
- 0.032 GW (2023)Source 432 MW, 220 kV interconnector from Sudan to Renk, Upper Nile State; supply unreliable.
- Curtailment
- Not identified from a reliable public source.
Supply outside Juba is very limited. The Juba network reported losses below 10% and reliability above 95% in 2023, but serves only about 33,000 customers. Off-grid diesel capacity in Juba, about 28.93 MW, was almost as large as the grid supply.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Sector law, policy and grid code (ASSIST targets) | Upcoming | Overdue (targets June 2024 – June 2026) | An updated National Electricity Policy, a revised or new sector law, a grid code and an SSEC business plan are ASSIST project targets; none was achieved by August 2026. |
| ASSIST project closing | Upcoming | 30 April 2028 | Scheduled closing of the World Bank project financing Juba connections, the Yei mini-grid and health-facility solar. |
| Regional interconnection | Upcoming | Under study | A Uganda interconnector feasibility study and a power-trade MoU with Ethiopia were reported in 2023. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No grid-connected residential solar framework; off-grid use of solar lighting products (about 55,000 sold in 2021). |
| Distributed energy market | Low | Distributed generation is mostly private diesel (28.93 MW off-grid in Juba); no framework for customer-owned generation to connect. |
| Grid flexibility market | Low | No wholesale, balancing or demand-response market exists. |
| Energy storage adoption | Low | No installed storage statistics; 35 MWh (Nesitu) and 12 MWh (Yei) planned. |
| Renewable growth environment | Low | Solar supplied about 1% of generation in 2023 (IRENA), though 14 MW of solar was added in each of 2023 and 2024. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 9 sources
- World Development Indicators: population, urban population and access to electricity (South Sudan). World Bank, 2025. accessed 10 October 2026.
- World Development Indicators: electric power consumption per capita, renewable output and mobile subscriptions (South Sudan). World Bank, 2024. accessed 10 October 2026.
- Energy Profile: South Sudan. IRENA, 2025. accessed 10 October 2026.
- Project Appraisal Document: South Sudan Energy Sector Access and Institutional Strengthening Project (P178891). World Bank, 2023. accessed 10 October 2026.
- Implementation Status and Results Report, Sequence No. 6: South Sudan Energy Sector Access and Institutional Strengthening Project. World Bank, 2026. accessed 10 October 2026.
- ASSIST Project: Implementation Support Mission Aide Memoire, May 2026. World Bank, 2026. accessed 10 October 2026.
- World Bank projects in South Sudan (project records). World Bank, 2026. accessed 10 October 2026.
- National Bureau of Statistics: publications. National Bureau of Statistics, South Sudan, 2026. accessed 10 October 2026.
- Euro foreign exchange reference rates (daily). European Central Bank, 2026. accessed 10 October 2026.
Questions about energy in South Sudan.
In Juba, customers paid an average of US¢40 per kWh according to the World Bank in 2023, among the highest tariffs in Sub-Saharan Africa. Households using under 100 kWh a month pay a lifeline rate of US¢31.6 per kWh.
The World Bank estimates 5.4% of the population in 2024: 22.8% in urban areas and 0.7% in rural areas.
The Juba Electricity Distribution Company (JEDCO), a joint venture of the state utility SSEC and Ezra Group, which also runs the 33 MW thermal plant supplying the city.
The Ministry of Energy and Dams sets policy and acts as regulator. There is no independent regulator, and a National Electricity Bill drafted in 2016 has not become law.
There is none. In Juba a connection is identified by JEDCO’s customer and prepaid meter records; there is no national register of supply points.
No scheme was identified. There is no net metering, feed-in tariff or grid code for small generators.
About 1% in 2023, according to IRENA: 7 GWh of solar out of 554 GWh. The rest comes from oil-fired generation.
