How electricity works in Venezuela.
Venezuela electricity market 2026: state operator CORPOELEC under the MPPEE ministry, 91% hydro generation, off-grid self-generation only, and a pending reform of the 2010 electricity law.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Venezuelan bolívar (VES) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Venezuela energy at a glance.
Key figures for households in Venezuela. Each one links to its source on the full overview below.
Renewable share.
91.1% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Venezuela.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Venezuela below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Venezuela requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Venezuela.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Venezuela, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Venezuela, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Venezuela.
The energy market in Venezuela, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Venezuela’s electricity sector is a state monopoly. Under the Organic Law of the Electrical System and Service (LOSSE, Official Gazette No. 39,573 of 14 December 2010) the state reserves generation, transmission, distribution and retail supply to a single operator and service provider, the Corporación Eléctrica Nacional (CORPOELEC), which reports to the Ministry of Popular Power for Electrical Energy (MPPEE). The ministry is both policy-maker and regulator, and it also carries out national dispatch of the system.
The National Electrical System (SEN) is dominated by the hydroelectric plants on the lower Caroní river in Bolívar state. According to Ember data, hydropower supplied 91.1% of the 80.1 TWh generated in 2024, with gas and oil-fired plants supplying almost all of the rest; solar and wind together supplied less than 0.04%. The MPPEE states that the Simón Bolívar (Guri) plant alone generates more than 70% of the country’s electricity.
Households cannot choose a supplier and cannot connect their own generation to the grid: the LOSSE defines self-generation as generation for the producer’s exclusive use that operates independently of the SEN. In June 2026 the National Assembly approved in first discussion a partial reform of the LOSSE that would open generation and retail supply to private and mixed companies and introduce cost-reflective tariffs; it was in public consultation and had not been verified as enacted at the time of writing.
Energy snapshot.
Headline figures for electricity in Venezuela. Each shows its data year and links to its source.
- Population28,516,896 peopleSource 12025
- Households7,128,554 householdsSource 32011
- Average household size3.82 people/householdSource 32011
- Electricity use per householdNot identified from a reliable public source.
- Household price (VES)Not identified from a reliable public source.
- Household price (EUR)Not identified from a reliable public source.
- Renewable electricity share91.1%Source 202024
- Solar capacity0.005 GWSource 242025
- Wind capacity0.05 GWSource 252025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Ministry of Popular Power for Electrical Energy (MPPEE) — policy, regulation, tariffs and supervision under the LOSSE; no separate regulator
- System operator
- National dispatch is a function of the MPPEE under LOSSE Article 49; CORPOELEC owns and operates the transmission network
- Distribution networks
- CORPOELEC is the sole distributor and retailer nationwide; the former regional utilities were merged into it from 2007
- Currency
- Venezuelan bolívar (VES)
- Voltage and frequency
- 120 V / 60 Hz
Electricity prices in Venezuela.
- Household price (VES)
- Not identified from a reliable public source.
- Household price (EUR)
- Not identified from a reliable public source.
- Typical annual electricity bill
- Not identified from a reliable public source.
How prices are set
There is no competitive electricity market. The LOSSE makes the MPPEE responsible for identifying the costs of generation, transmission, dispatch, distribution and customer service, classifying users and designing the tariff scheme, which the national executive approves together with any subsidies (Articles 27, 59–62). The ministry must review those costs every year to decide whether tariffs should be adjusted (Article 59), and the tariff scheme must contain incentives for efficient use (Article 63).
Subsidies and taxes
The law allows targeted, explicit subsidies inside the tariff scheme, aimed in particular at covering minimum consumption, electrifying unserved areas, favouring priority sectors and funding efficiency projects, and provides for a subsidy fund financed from public budgets (Articles 66–68). Article 57 exempts the activities of generation, transmission, dispatch, distribution and retail supply from national, state and municipal taxes.
Billing in practice
CORPOELEC bills monthly and collects payment through its online portal (pagos.corpoelec.com.ve), bank transfers and its customer service centres (CIAU). Some customers receive two account lines, one for electricity and one for sanitation services. Payment plans (convenios de pago) are available for large arrears.
Proposed change
The partial reform of the LOSSE approved in first discussion in June 2026 would introduce a tariff system that reflects costs directly in consumption and a tariff structure aimed at financial self-sufficiency of the sector. It had not been verified as enacted at the time of writing.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households are billed by CORPOELEC under a tariff scheme (esquema de tarifas) set by the national executive on the MPPEE’s proposal (LOSSE Articles 27 and 59–62). Users are classified by use, consumption level, geographic location and technical characteristics of supply. The current residential rates are not published on the CORPOELEC or MPPEE websites. |
| Other | Limited | Plan Borrón y Cuenta Nueva (2023): CORPOELEC ran state-by-state campaigns in which residential users updated their records and settled accumulated arrears from previous years with a single flat payment; afterwards bills were sent by text message. |
| Time-of-use | No | No residential time-of-use tariff was identified. |
| Dynamic | No | There is no wholesale market, so no tariffs linked to market prices exist. |
Household prices compared with neighbouring countries (EUR per kWh).
- Colombia€0.231
- Guyana€0.185
- Brazil€0.182
- Trinidad and Tobago€0.056
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,821 kWh/person/yr (all sectors) (2024)Source 22Total electricity demand per person (Ember data via Our World in Data).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Demand per person was about 2,820 kWh a year in 2024 across all sectors, according to Ember. National demand of 80.1 TWh in 2024 was met almost entirely from domestic generation.
Supply reliability is a major factor in how households use electricity. The MPPEE’s own reporting in 2026 describes a thermal recovery plan to add more than 1,300 MW to the SEN before December 2026 (including 600 MW at Planta Centro in Carabobo and 450 MW at Termozulia), and measures to conserve water in the lower Caroní reservoirs ahead of El Niño conditions.
The Law on the Rational and Efficient Use of Energy (Official Gazette No. 39,823 of 19 December 2011) provides for energy-efficiency certification of buildings and of all energy-consuming equipment sold in the country, and allows the executive to grant income tax, VAT or import duty exemptions for efficient or renewable equipment by decree.
Housing and households.
- Dwellings
- 8,216,443 dwellings (2011)Source 3Family and collective dwellings, 2011 census; 6,950,836 family dwellings were occupied, 634,509 vacant, 233,239 under construction and 390,942 used occasionally.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 89.3 % of population (2025)Source 2World Bank. The 2011 census recorded 88.8% of the population as urban.
The 2011 census counted 8.2 million dwellings and 7.1 million households, with an average of 3.82 people per household. Household size was smallest in the Distrito Capital (3.41) and largest in Amazonas (4.44) and Delta Amacuro (4.34). The census also found 619,524 households (9%) living in inadequate dwellings.
Almost nine in ten Venezuelans live in urban areas. A residential electricity contract is tied to the property: CORPOELEC requires the title deed or a registered rental contract to open a residential service or change its holder, and a load census form detailing the electrical load requested.
How the grid works in Venezuela.
- TransmissionMPPEE — national dispatch (Despacho del Sistema Eléctrico), CORPOELEC
- DistributionCORPOELEC is the sole distributor and retailer nationwide; the former regional utilities were merged into it from 2007
- MeteringCORPOELEC
- Supply1 or more retail suppliers
Physical flow
Most electricity is generated at the hydroelectric complex on the lower Caroní river in Bolívar state in the south-east, led by the Simón Bolívar (Guri) plant, and carried over long high-voltage lines to the population and industrial centres in the north and west. Thermal plants, such as Planta Centro in Carabobo and Termozulia in Zulia, support the western and central regions; in 2026 the MPPEE was running a recovery plan to return thermal units to service.
Commercial flow
There is no wholesale market or settlement between companies: CORPOELEC generates, transmits, distributes and sells electricity within one state corporation and bills customers under the tariff scheme approved by the executive. The ministry dispatches the system and must approve international exchanges of electricity.
International links
International exchanges require MPPEE approval under the LOSSE. In April 2026 the governments of Venezuela and Colombia discussed electrical interconnection for western Venezuela at a bilateral commission meeting; no capacity figure for existing interconnectors was found on an official page.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio del Poder Popular para la Energía Eléctrica (MPPEE) | Governing body of the sector under the LOSSE: sets policy, prepares the system development plan, issues technical and quality standards, proposes tariffs and subsidies, supervises CORPOELEC, authorises self-generation of 2 MW or more and approves international exchanges. |
| Regulator | MPPEE (no separate regulator) | The LOSSE gives regulatory functions, including rules on relations between the operator and users and handling of user complaints, to the ministry itself. |
| System operator | MPPEE — national dispatch (Despacho del Sistema Eléctrico) | Article 49 of the LOSSE makes dispatch a competence of the national executive through the MPPEE, which coordinates regional and distribution dispatch centres and can order generation connections and disconnections in emergencies. |
| TSO | CORPOELEC | Transmission is exercised exclusively by the operator and service provider (LOSSE Article 48). |
| DSO | CORPOELEC | Sole distributor nationwide, including public lighting (LOSSE Articles 50–52). |
| Supplier | CORPOELEC | Sole retailer: metering, reading, billing and collection are its obligations under LOSSE Article 31. |
| Metering | CORPOELEC | Installs and reads meters; users must keep the meter in good condition and allow access to the supply point (LOSSE Article 35). |
Compared with the UK system.
| UK concept | Venezuela equivalent | How it works |
|---|---|---|
| DNO | CORPOELEC | There are no regional network companies. The regional utilities were merged into CORPOELEC, which runs every distribution network in the country as part of the same state company that generates and sells the power. |
| National Grid/NESO | CORPOELEC (transmission) and the MPPEE (dispatch) | CORPOELEC owns and operates the transmission network. Balancing and dispatch are not delegated to a company but are a legal competence of the ministry. |
| MPAN | Cuenta contrato and meter number | There is no national meter-point numbering scheme. A supply is identified in CORPOELEC’s commercial system by the service contract account (cuenta contrato) and the meter number, both shown on the monthly bill; the customer’s identity card (cédula) or tax number (RIF) can also be used to look up the account. |
| MPRN | No equivalent (separate gas arrangements) | Piped gas is handled outside the electricity sector; no national gas meter-point identifier linked to electricity was identified. |
| Meter operator | CORPOELEC | Meter installation, reading and maintenance are done by CORPOELEC itself; there are no independent meter operators. |
| Supplier | CORPOELEC | Retail supply is reserved to the state operator; households cannot switch supplier. |
| Smart-meter infrastructure | CORPOELEC smart-meter projects | There is no national smart-metering programme with a central data platform. CORPOELEC installs smart meters project by project, chiefly for commercial users and new housing developments, with readings sent over telephone lines. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Cuenta contrato (service contract account) and número de medidor |
| Who issues it? | CORPOELEC |
| Format | Account number assigned by CORPOELEC when a service contract is signed; a meter serial number identifies the physical meter. The structure of the account number is not publicly documented. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the monthly CORPOELEC bill; the meter number can also be obtained by telephone ((0500) 502 0000) or at a CIAU customer service centre. |
| Electronic access | Balances can be checked and bills paid on pagos.corpoelec.com.ve after registering with the identity card number. |
| Third-party access | No data-access framework for third parties exists. A tenant can pay using the owner’s identity card number or the contract account; other requests need written authorisation from the account holder. |
| Who keeps the register | CORPOELEC commercial system |
| Register scope | National |
Every residential customer must sign a service contract with CORPOELEC (LOSSE Article 35). The contract is opened or transferred at a CIAU customer service centre on presentation of the title deed or registered rental contract, the identity card, the tax number (RIF) and a load census form; the account must be in good standing before a change of holder.
Because CORPOELEC is the only supplier, the account number is not used for switching, unlike a UK MPAN. It serves billing, payment and complaints. A customer can look up an account using the cuenta contrato, the identity card, the RIF or the meter number. Where several families share one meter, they can apply to CORPOELEC to have the service separated into individual supplies.
The format and length of the cuenta contrato are not published, so no example is given here.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | No |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | None for households. Self-generation must operate independently of the grid; only self-generation of 2 MW or more can be requisitioned by the dispatch authority during a declared state of exception, and is then paid under the LOSSE. |
| Can a household sell surplus solar power to CORPOELEC? | No. The LOSSE defines self-generation as generation for the producer’s exclusive consumption that operates independently of the national system, and reserves generation for the grid to CORPOELEC. |
| Is there a size limit? | Self-generation of 2 MW or more needs MPPEE authorisation; smaller systems are not subject to that authorisation under the law. |
| Could this change? | The 2026 reform bill would open generation to private and mixed companies and prioritise solar and wind projects. Whether it creates distributed generation or export rules could not be verified. |
Connecting a home system.
- Self-generation for own use below 2 MW: no ministry authorisation is required by the LOSSE, but the installation must operate independently of the SEN.
- Self-generation of 2 MW or more: apply to the MPPEE for authorisation (habilitación) under LOSSE Article 46.
- Renewable installations are subject to the registers and certifications issued by the MPPEE (Law on Rational and Efficient Use of Energy, Article 11).
Households can install solar panels and batteries for their own use, but not in parallel with the grid: there is no net metering, net billing or export payment. Self-generation is legally treated as an island separate from the SEN, which is why rooftop solar in Venezuela, where it exists, is used for backup or off-grid supply rather than for exporting.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for the grid | Reserved to the state operator (LOSSE Articles 8 and 43); not open to private parties under the 2010 law | National executive / MPPEE | The 2026 reform bill would allow private and mixed companies in generation. |
| Self-generation for own use | MPPEE authorisation (habilitación) for 2 MW or more; must operate independently of the SEN | MPPEE | Installations of 2 MW or more can be requisitioned during a state of exception (Article 47). |
| Store electricity | No specific framework; behind-the-meter storage for own use is treated like self-generation | MPPEE | No grid-connected storage rules were identified. |
| Export to the grid | Not permitted for self-generators | MPPEE | Self-generation must operate independently of the SEN. |
| Supply / sell electricity to consumers | Reserved to CORPOELEC (Articles 8 and 54) | National executive | The reform bill would open retail supply (comercialización). |
| Transmission and distribution | Reserved to CORPOELEC (Articles 48 and 50) | National executive | |
| Wholesale trading, balancing, aggregation, VPP | No market exists; dispatch is a ministry competence (Article 49) | MPPEE | No licence category exists for these activities. |
| Remote control of customer assets / grid services | No framework | MPPEE |
The 2010 LOSSE leaves no room for private electricity businesses connected to the grid: generation, transmission, distribution and retail supply are reserved to the state through CORPOELEC, and dispatch to the ministry. Mixed companies are allowed only to build works and supply goods and services to the sector, with the state holding at least 60% of the capital (Article 10).
The reform bill approved in first discussion on 2 June 2026 (31 amended and 11 new articles) would allow participation by the state, mixed companies in which the republic holds more than 50%, companies with minority public participation and private companies domiciled in Venezuela, in generation and retail supply. Licensing rules under it had not been published.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing / ancillary services | No | — | No | MPPEE. Dispatch and balancing are carried out by the ministry with CORPOELEC’s own plants; there is no market in which third parties can offer services. |
Venezuela has no wholesale, balancing or flexibility market and no legal role for aggregators or demand response providers. In emergencies the dispatch authority can order the connection or disconnection of generation, transmission and distribution units and can use self-generation of 2 MW or more during a declared state of exception.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Project-by-project installations by CORPOELEC; no national rollout target |
| Reading interval | Not specified nationally |
| Responsible party | CORPOELEC |
| Example deployment | 418 smart meters for commercial users in Zulia (April 2025) |
| Communications | Telephone lines (Zulia commercial meters) |
| Domestic manufacture | Announced in May 2025; no quantities published |
CORPOELEC has installed smart meters in commercial premises (for example in Zulia and Puerto Ayacucho) and in new housing developments of the Gran Misión Vivienda Venezuela programme, such as El Gigante in Ciudad Guayana. The MPPEE describes them as allowing real-time consumption monitoring by computer or telephone. It also reports large batches of conventional meters being fitted, for example 4,255 meters in La Guaira in January 2025, to bring unmetered supplies onto measured billing.
Renewable electricity.
Electricity generation mix (2024).
- Hydro: 91.1%
- Gas: 4.5%
- Oil: 4.4%
- Wind: 0%
- Solar: 0%
- Renewable electricity share
- 91.1% (2024)Source 20Share of generation (Ember data via Our World in Data, 91.14%): hydro 91.10%, wind 0.02%, solar 0.01%. Total generation and total demand were both 80.13 TWh in 2024, so net imports were negligible.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0 GW (2025)Source 24Derived from IRENA capacity: 4.705 MW (2025) − 4.305 MW (2024) = 0.4 MW, rounded.
- Solar PV
- 0.005 GW (2025)Source 24
- Wind
- 0.05 GW (2025)Source 25
- Hydro
- Not identified from a reliable public source.
Targets.
- No quantified national renewable electricity target was identified. The 2026 LOSSE reform bill states an aim to prioritise solar and wind projects.
Venezuela’s electricity is among the most renewable in the world because of its large hydro fleet, but the share depends on rainfall in the Caroní basin: hydro rose from 77.6% of generation in 2020 to 91.1% in 2024 as thermal output fell. Wind capacity has stood at about 50 MW since 2015, and solar at under 5 MW.
The MPPEE reported in January 2026 that a solar farm at El Vigía, Mérida, intended to add 50 MW to the Andean region, was under construction. The ministry has also installed solar street lighting and small hybrid systems in isolated areas. The Law on the Rational and Efficient Use of Energy commits the state to promote renewable equipment in new and existing buildings and makes renewable installations subject to MPPEE registers and certifications.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
There is no regulatory framework for grid-connected storage. Batteries are used behind the meter as backup during outages, but no official data on their number or capacity exist.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| CORPOELEC (Corporación Eléctrica Nacional) | Sole supplier nationwide | No | No | No | No |
CORPOELEC is the operator and service provider designated by LOSSE Article 28 and is attached to the MPPEE. It serves customers through more than 240 CIAU customer service centres across the 23 states and Caracas, and through its online payment portal.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministerio del Poder Popular para la Energía Eléctrica (MPPEE) | Government | Ministry, regulator and dispatch authority | Sets policy, tariffs proposals, technical standards and authorisations for self-generation; publishes the laws of the sector. |
| CORPOELEC | Transmission | State operator for generation, transmission, distribution and supply | The only electricity company customers deal with. |
| Instituto Nacional de Estadística (INE) | Government | National statistics office | Publishes census housing and household data. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Technical and safety standards | Standards issued by the MPPEE under LOSSE Article 27 | MPPEE | The ministry issues technical, safety, quality and installation standards for the SEN; no grid-connection standard for inverters or distributed generation was identified. |
| Appliance and building efficiency | Energy-efficiency certification (Law on Rational and Efficient Use of Energy, Articles 27–33) | MPPEE with the ministries for commerce/metrology, oil and housing | All energy-consuming equipment sold in Venezuela is subject to efficiency certification under technical regulations. |
| New connections | CORPOELEC feasibility request (solicitud de factibilidad) | CORPOELEC | Requires a technical description signed by a registered engineer, UTM coordinates, nearby pole numbers and, where relevant, a non-linear load study. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| New residential supply / change of holder | Yes | National | Applied for at a CORPOELEC CIAU with the title deed or registered rental contract, identity card, RIF and load census form. |
| Feasibility study for new developments | Yes | National | CORPOELEC validates whether a site can be served; municipal land-use conformity is required. |
| Self-generation authorisation | Limited | National | Required from the MPPEE for installations of 2 MW or more. |
| Grid connection of household generation | No | National | Not available: self-generation must operate independently of the SEN. |
For a household, the practical permissions concern the supply contract with CORPOELEC. Rooftop solar for own use, kept separate from the grid, needs no ministry authorisation below 2 MW under the LOSSE; municipal building rules may apply.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Tax exemptions for efficient and renewable equipment | Active | Enabling provision (tax exemption by decree) | Article 36 of the Law on the Rational and Efficient Use of Energy allows the President in Council of Ministers to exempt efficient or renewable equipment from income tax, VAT or import duty by decree. No decree currently in force applying it to solar equipment was identified. | Law in force since December 2011 |
Data and connectivity.
- Fixed broadband
- 12.9 fixed subscriptions per 100 people (2024)Source 276.68% of the population used the internet in 2024 (World Bank).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters installed by CORPOELEC for commercial users in Zulia communicate over telephone lines. No national smart-meter communications standard was identified.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 80.1 TWh (2024)Source 23Ember data via Our World in Data; equal to total generation (80.13 TWh).
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The SEN depends heavily on one hydro complex, and the MPPEE’s 2026 reporting focuses on recovering generating capacity: returning thermal units at Termozulia, Planta Centro and Guanta to service, with a target of more than 1,300 MW before December 2026, and conserving water in the lower Caroní reservoirs. Access to electricity is reported by the World Bank at 100% of the population.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Partial reform of the Organic Law of the Electrical System and Service | Upcoming | Approved in first discussion 2 June 2026; public consultation from 9 June 2026 | A bill amending 31 articles and adding 11 would open generation and retail supply to private and mixed companies, allow independent operators and mixed management models, introduce cost-reflective tariffs aimed at financial self-sufficiency, and prioritise solar and wind projects. Final approval and publication in the Official Gazette had not been verified as of 9 October 2026. |
| Thermal generation recovery plan | Current | 2026 | The MPPEE announced on 1 October 2026 a plan to add more than 1,300 MW to the SEN before December 2026, mainly from Planta Centro and Termozulia. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | — | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Solar capacity of 4.7 MW in 2025 (IRENA); grid-connected household generation is not permitted under the LOSSE. |
| Distributed energy market | Low | Self-generation must operate independently of the SEN; no net metering or export framework. |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; dispatch is a ministry function. |
| Energy storage adoption | Low | No storage framework or official capacity statistics. |
| Renewable growth environment | Low | Wind capacity unchanged at 50.2 MW since 2015 and solar under 5 MW; solar and wind below 0.04% of 2024 generation. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 25 sources
- Population, total – Venezuela (API). World Bank, 2025. accessed 9 October 2026.
- Urban population, access to electricity, fixed broadband and internet users – Venezuela (API). World Bank, 2025. accessed 9 October 2026.
- Viviendas, hogares y personas, Censo 2011. Instituto Nacional de Estadística (INE), 2011. accessed 9 October 2026.
- Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial Nº 39.573, 14 December 2010). MPPEE, 2010. accessed 9 October 2026.
- Ley de Uso Racional y Eficiente de la Energía (Gaceta Oficial Nº 39.823, 19 December 2011). MPPEE, 2011. accessed 9 October 2026.
- AN aprueba Reforma Parcial de la Ley Orgánica del Sistema y Servicio Eléctrico. MPPEE, 2026. accessed 9 October 2026.
- Sistema Eléctrico Nacional avanza hacia un nuevo marco legal. MPPEE, 2026. accessed 9 October 2026.
- Inicia consulta pública de la Reforma Parcial de la Ley Orgánica del Sistema y Servicio Eléctrico. MPPEE, 2026. accessed 9 October 2026.
- Plan de recuperación termoeléctrica prevé incorporar más de 1.300 MW al SEN antes de diciembre. MPPEE, 2026. accessed 9 October 2026.
- Estado Mayor avanza en el plan de recuperación del SEN tras inspección en El Guri. MPPEE, 2026. accessed 9 October 2026.
- Ministro Márquez inspecciona avances de la granja de paneles solares en El Vigía. MPPEE, 2026. accessed 9 October 2026.
- Venezuela y Colombia evalúan cooperación de interconexión eléctrica para el occidente del país. MPPEE, 2026. accessed 9 October 2026.
- Instalados más de 400 medidores inteligentes a usuarios comerciales zulianos. MPPEE, 2025. accessed 9 October 2026.
- Medidores inteligentes serán fabricados en Venezuela. MPPEE, 2025. accessed 9 October 2026.
- Search results: medidor (meter installation news, incl. La Guaira, January 2025). MPPEE, 2025. accessed 9 October 2026.
- Plan Borrón y Cuenta Nueva (second phase). MPPEE, 2023. accessed 9 October 2026.
- Preguntas frecuentes. CORPOELEC, 2026. accessed 9 October 2026.
- Trámites. CORPOELEC, 2026. accessed 9 October 2026.
- Actualiza tus datos. CORPOELEC, 2026. accessed 9 October 2026.
- Share of electricity generated by renewables: Venezuela (Ember). Our World in Data, 2024. accessed 9 October 2026.
- Share of electricity production by source: Venezuela (Ember). Our World in Data, 2024. accessed 9 October 2026.
- Per capita electricity demand: Venezuela (Ember). Our World in Data, 2024. accessed 9 October 2026.
- Electricity demand: Venezuela (Ember). Our World in Data, 2024. accessed 9 October 2026.
- Installed solar capacity: Venezuela (IRENA). Our World in Data, 2025. accessed 9 October 2026.
- Installed wind capacity: Venezuela (IRENA). Our World in Data, 2025. accessed 9 October 2026.
Questions about energy in Venezuela.
No current residential tariff is published by CORPOELEC or the Ministry of Electrical Energy. Tariffs are set by the national executive on the ministry’s proposal and include targeted subsidies; a 2026 reform bill proposes moving to cost-reflective tariffs.
The state company CORPOELEC generates, transmits, distributes and sells electricity everywhere in the country. Households cannot choose another supplier.
About 91% of electricity generated in 2024 came from hydropower, mainly the Guri and other plants on the Caroní river. Gas and oil supplied almost all the rest; solar and wind were negligible.
No. The electricity law treats self-generation as generation for your own use that must operate independently of the national grid, and there is no net metering or export payment.
There is none. Your supply is identified by your CORPOELEC contract account (cuenta contrato) and meter number, both on your monthly bill. You can also look up your account with your identity card or RIF.
The Ministry of Popular Power for Electrical Energy (MPPEE). It sets policy, proposes tariffs, issues technical standards, handles complaints and dispatches the national system; there is no separate regulator.
In June 2026 the National Assembly approved in first discussion a reform of the 2010 electricity law that would allow private and mixed companies into generation and retail supply. It was under public consultation and its final approval had not been verified as of October 2026.