Energy in Afghanistan, explained.

How electricity works in Afghanistan: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Afghanistan: Not yet available.Olmack is not offered in Afghanistan yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Afghanistan.

Afghanistan electricity 2026: DABS, about 80% imported power, hydro and new solar, provincial tariffs, supply shortages, grid access, licensing and projects.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Afghan afghani (AFN) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Afghanistan energy at a glance.

Key figures for households in Afghanistan. Each one links to its source on the full overview below.

  • Electricity price.

    2.5 AFN per kWh for households, including taxes. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Afghanistan.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Afghanistan below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Afghanistan requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Afghanistan.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Afghanistan, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Afghanistan, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Afghanistan.

Full overview

The energy market in Afghanistan, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page21 sections

Afghanistan’s public electricity system is run by Da Afghanistan Breshna Sherkat (DABS), a state-owned, vertically integrated utility that was separated from the Ministry of Energy and Water (MEW) in 2009. DABS generates, transmits, distributes and sells electricity, and it also buys most of the country’s power from neighbouring countries. In 2024 Afghan media, citing the sector, reported that domestic plants met only about 20% of electricity needs and that about 80% was imported from Uzbekistan, Tajikistan, Turkmenistan and Iran.

Supply falls well short of demand. In July 2026 a DABS spokesperson put available capacity at about 750 MW against national demand of about 4,000 MW, and Kabul residents reported three to eight hours of power a day. The United Nations Development Programme (UNDP), as reported in August 2026, estimated that only 40–42% of the population has access to the national grid, nearly all of it in urban areas. The World Bank’s wider access indicator, which also counts off-grid solar, was 87.8% in 2024.

Domestic generation is small and mostly renewable. IRENA records 799 MW of installed capacity at the end of 2024, of which 468 MW is hydropower and 54 MW solar, and estimates that hydropower produced 72% and solar 11% of the 1,073 GWh generated in Afghanistan in 2023. A five-year power development plan approved in 2026 and a series of private solar, wind, gas and coal projects aim to reduce dependence on imports.

Energy snapshot.

Headline figures for electricity in Afghanistan. Each shows its data year and links to its source.

  • Population43,844,111 peopleSource 22025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (AFN)2.5 AFN/kWhSource 142023
  • Household price (EUR)0.034 EUR/kWhSource 322023 price, 2026 exchange rate
  • Renewable electricity shareNot identified from a reliable public source.
  • Solar capacity0.054 GWSource 1End 2024
  • Wind capacity0 GWSource 1End 2024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
No independent regulator identified as operating. The Ministry of Energy and Water sets policy, and DABS administers tariffs and connections
System operator
Da Afghanistan Breshna Sherkat (DABS), operating several regional power systems that are each fed largely by imports
Distribution networks
DABS provincial branches distribute and bill grid customers; areas without grid supply rely on local diesel networks, solar and cross-border lines
Currency
Afghan afghani (AFN)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Afghanistan.

Household price (AFN)
2.5 AFN/kWh (2023)Source 14Rate reported for Kabul in January 2023 (Pajhwok, quoting residents and DABS). The same report gave AFN 4.00 per kWh in Herat and AFN 6.25 in Balkh. Diesel-supplied areas pay far more: AFN 28–42 per kWh in Uruzgan in 2025. The full DABS tariff schedule by customer class and consumption band was not found from an official source, so this is a press-reported figure.
Household price (EUR)
0.034 EUR/kWh (2023 price, 2026 exchange rate)Source 32Derived from AFN 2.50/kWh at AFN 73.07 per euro, the midpoint of Da Afghanistan Bank’s transfer buy and sell rates on 9 October 2026 (72.9367 / 73.1967). At the same rate, AFN 6.25 is about EUR 0.086 and AFN 42 is about EUR 0.57.
Typical annual electricity bill
Not identified from a reliable public source.

Prices set by the utility

Electricity prices in Afghanistan are set administratively by DABS, not by a market or an independent regulator. The price a household pays depends mainly on where it lives. Areas supplied by cheap imported power and large hydropower, such as Kabul, have had the lowest rates, while provinces supplied through other routes have paid more. In January 2023 a Balkh resident told Pajhwok that a two-month bill of AFN 5,000 was unaffordable, and the reported rate there was two and a half times Kabul’s.

Imports drive costs

Because most electricity is imported, the cost of supply depends heavily on prices agreed with neighbouring utilities, including Iran’s Tavanir, Barqi Tojik in Tajikistan and suppliers in Uzbekistan and Turkmenistan. Contracts are renewed year by year: DABS extended its Iran contract for the solar year 1405 (2026–27) in February 2026, and in late 2024 it signed supply contracts with Uzbekistan and Tajikistan for 2025. In February 2025 DABS said it had collected AFN 31.5 billion from consumers in the year and paid US$227 million to neighbouring countries (Pajhwok).

Off-grid costs

Where the grid does not reach or is off for long periods, households pay for diesel power, small solar systems or both. Diesel-based local supply is many times more expensive than grid power: the AFN 28–42 per kWh reported in Uruzgan in 2025 is more than ten times the Kabul rate reported in 2023.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesDABS sets one public tariff per area for grid customers, and it differs between provinces. In January 2023 Pajhwok reported AFN 2.50 per kWh in Kabul, AFN 4.00 in Herat and AFN 6.25 in Balkh. A DABS spokesperson said the utility had been trying for a year to address the difference.
OtherLimitedAreas supplied by diesel generation. In Uruzgan the head of the local electricity department said in February 2025 that prices ranged from AFN 28 to AFN 42 per kWh, depending on whether the customer is a home, a market, a government office or another user.
Time-of-useNoNo time-of-use tariff for households was identified.
DynamicNoThere is no wholesale market, so no market-linked retail tariff exists.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Household electricity use in Afghanistan is limited by supply rather than by demand. DABS has said that demand rises sharply in summer, when fans and air conditioners are used, and in winter, when electric heaters are used. In July 2026 its spokesperson said the main problem was a shortage of power, with about 750 MW available against about 4,000 MW of demand.

In November 2025 the DABS chief executive linked recent outages to the large-scale return of Afghan refugees, rapid growth of industrial and residential areas, and higher consumption per household, as well as to drought lowering hydropower reservoirs. Grid access is concentrated in towns and cities: UNDP, as reported by Ariana News in August 2026, found that nearly 90% of grid access is in urban areas.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
25.9 % of population (2025)Source 3

Afghanistan is mainly rural. About 26% of people lived in urban areas in 2025 (World Bank). The national grid is concentrated in Kabul and other cities, so most rural households depend on off-grid sources such as solar home systems or diesel.

No recent official statistics on tenure or dwelling type were found for this profile. The NSIA publishes population and household data, but its website could not be read during research.

How the grid works in Afghanistan.

  1. TransmissionDa Afghanistan Breshna Sherkat (DABS)
  2. DistributionDABS provincial branches distribute and bill grid customers; areas without grid supply rely on local diesel networks, solar and cross-border lines
  3. MeteringNot identified from a reliable public source.
  4. Supply1 or more retail suppliers

Physical system

Afghanistan’s grid grew around import lines from its northern and western neighbours. A 2017 World Bank appraisal describes three main systems: the North East Power System (NEPS), the South East Power System (SEPS) and the Herat system, operating at 132 kV and 110 kV. Turkmenistan supplies the north and west, including Herat, and in October 2026 DABS signed an agreement with Tajikistan’s Pamir Energy to supply border districts of Badakhshan, with a possible 110 kV extension to Faizabad, showing how remote provinces depend on cross-border links.

Imports

Imports are the backbone of supply. In 2015–16, imports were 80% of supply: 1,284 GWh from Uzbekistan, 1,184 GWh from Turkmenistan, 827 GWh from Iran and 471 GWh from Tajikistan, against 1,007 GWh of domestic generation (World Bank). Reporting from 2023 and 2024 gives the same share of about 80%. Imports from Tajikistan are limited to May–September, when it has surplus hydropower. Contracts are renewed every year, and in 2026 DABS discussed new 500 kV lines with Turkmenistan (to the Nur-ul-Jihad substation in Herat) and Tajikistan.

Domestic generation

IRENA records 799 MW of capacity at the end of 2024: 468 MW hydropower, 54 MW solar and 277 MW non-renewable, mainly gas and diesel. The Naghlu hydropower plant east of Kabul is the largest. In the first two months of the solar year 1405 it generated 116,000 MWh, its highest level in 17 years, with all four turbines running after rehabilitation and heavy rainfall (Pajhwok, May 2026).

Commercial flow

There is no market. DABS buys imported power and power from private plants under bilateral contracts, sells it to customers at its tariffs and collects the revenue. It pays neighbouring utilities from that revenue: in February 2025 it reported collections of AFN 31.5 billion and payments of US$227 million to neighbouring countries.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Water (MEW)Sets energy policy, strategy and planning, signs generation agreements with private producers (for example the 10-year extension with Bayat Power in May 2026) and runs some electrification projects.
RegulatorNo independent regulator identifiedWorld Bank documents refer to an Electricity Services Regulation Act, but no independent regulator was identified as operating. Tariffs and connections are administered by DABS, and policy decisions are taken by the ministry and the government’s Economic Commission.
TSODa Afghanistan Breshna Sherkat (DABS)State-owned, vertically integrated utility, spun off from MEW in 2009. Owns the transmission network and import substations, operates domestic hydropower plants such as Naghlu, and buys imported power under annual contracts.
DSODABS provincial branchesDistribution and billing are carried out by DABS through its provincial and city branches. There are no separate distribution companies.
SupplierPrivate generators selling to DABSIndependent producers sell to DABS under agreements with the ministry and DABS. Examples include Bayat Power’s 40 MW gas plant in Jawzjan and the solar, wind and coal projects contracted in 2025–26.

Compared with the UK system.

Compared with the UK system.
UK conceptAfghanistan equivalentHow it works
DNODABS provincial branchThere are no separate network companies. DABS owns and operates the distribution network in every province and is also the retail supplier.
National Grid/NESODABS (several regional systems)World Bank documents describe separate regional systems in the north-east (NEPS), south-east (SEPS) and Herat rather than one national system. DABS operates them, balancing each mainly with imports and domestic hydropower.
MPANDABS customer accountThere is no national meter point number. A connection is a DABS customer account linked to a meter, and the account details appear on the DABS bill.
MPRNNot applicableThere is no household mains gas network. Gas from northern fields is used for power generation, such as at Bayat Power in Jawzjan.
Meter operatorDABSDABS installs, owns and reads meters. It contracted advanced metering infrastructure from a Chinese supplier in 2024.
SupplierDABSThere is no supplier choice. DABS is the only retail supplier on the public grid.
Smart-meter infrastructureNo national programme identifiedNo national smart-metering programme, data hub or regulation was identified.

How a supply point is identified.

Fictional illustration of the elements, not a number format: DABS residential account in the name of A. Rahimi, single-phase meter, Kabul city branch.

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?DABS customer account and meter
Who issues it?Da Afghanistan Breshna Sherkat (DABS), through its provincial branch
FormatNo published national numbering standard was found. A grid connection is identified by the DABS customer account and meter details on the DABS bill.
LengthNot publicly documented
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the DABS electricity bill and on the meter at the premises. No public description of the account number format was found.
Electronic accessDABS reported in November 2025 that it was introducing a new electronic customer service system. Its public website could not be read without JavaScript, and no description of online account access was found.
Third-party accessNo regulated scheme for sharing customer or meter data with third parties exists. An installer or other third party would rely on the customer’s bill.
Who keeps the registerDABS customer records, kept by its provincial branches
Register scopePer DSO

How a connection is identified

Afghanistan has no national meter point number or central registry of supply points. The unit of record is the DABS customer account: a connection for a premises, linked to a DABS meter and billed by the local DABS branch. In 2017 the World Bank reported that households made up almost 93% of grid connections and commercial customers just under 7%. No public document describing the format of the account number, or the rules for transferring an account when a property changes hands, was found for this profile.

Single utility, single register

Because DABS is the only network company and the only supplier, there is no need for a separate identifier to support switching between suppliers. Customer records are held within DABS. Its billing and customer-service systems were being modernised in 2024–25, including the purchase of advanced metering infrastructure and a new electronic customer service system.

Supply outside the grid

Households without a DABS connection, which UNDP puts at well over half of the population, use solar home systems or local diesel networks. These have no national register.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?No
Net meteringNo
Net billingNo
How exported electricity is paidNone identified. No net metering, feed-in tariff or other household export scheme was found.
Can households export solar power to the grid?No scheme was identified. There is no net metering, feed-in tariff or export payment for households.
How do larger generators connect?Through agreements with the ministry and DABS. Projects contracted in 2025–26 include 40 MW solar plants in Dehdadi (Balkh) and Mohammad Agha (Logar), the latter with a 126 MVA substation, and the 845 MW Azizi Energy package of solar and coal plants.
Is there a technical standard for connecting solar to the grid?No published national grid code for small generators was identified. In August 2026 DABS asked Uzbekistan’s Technical Regulation Agency for help with testing laboratories, calibration and international standards.

Connecting a home system.

  1. No procedure for households to export power to the DABS grid was identified. Household solar systems are installed to supply the home directly.
  2. Larger generators connect under project agreements with the Ministry of Energy and Water and DABS, such as the 40 MW solar projects in Balkh and Logar and the 43.2 MW Herat wind project.

Household export is not part of Afghanistan’s electricity system. The grid is short of power for much of the day and is run by a single utility without a regulator to set export rules. Solar on homes, shops and farms is used to supply the premises directly.

Grid-connected renewable generation is developed at utility scale under government agreements. Recent projects include the Naghlu solar project near Kabul, 40 MW plants under construction in Balkh and Logar, a 5 MW solar plant and a 43.2 MW wind plant in Herat (inaugurated May 2025), and 330 MW of solar contracted with Azizi Energy in February 2026 at Naghlu, Barik Ab and Ghazni.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (household solar)No electricity licence or registration requirement was identified for off-grid household systems.None identified
Generate electricity for sale to DABSProject-by-project agreement with the Ministry of Energy and Water and DABS; no published licensing threshold was found.Ministry of Energy and Water / DABSLarge investments are approved by the Economic Commission chaired by the Deputy Prime Minister for Economic Affairs. Bayat Power renewed its agreements with DABS (January 2026) and MEW (May 2026) for 10 years.
Sell electricity directly to consumersNot open to third parties on the public grid. DABS is the only retail supplier.DABSSome private producers supply defined areas under agreements with DABS; local diesel networks operate in areas without grid supply.
Store electricity (batteries)No licensing rule was identified.None identified
Export to the gridNo small-scale export scheme or procedure exists.DABSSee the export section.
Transmission, distribution and importsReserved to DABS.DABSImport contracts are signed with Iran’s Tavanir, Barqi Tojik and suppliers in Uzbekistan and Turkmenistan.
Wholesale trading, aggregation and virtual power plantsNo framework. There is no wholesale market and no aggregator role.None
Balancing, grid services and remote control of assetsNot open to third parties. DABS balances each system with imports and its own plants.DABSNo rules for dispatching distributed assets exist.

Afghanistan has no published, activity-by-activity electricity licensing regime of the kind found in liberalised markets. Generation projects are agreed individually between developers, the Ministry of Energy and Water and DABS, and the largest are approved at government level. All network, import and retail activities remain with DABS.

Small installations used on site, such as household solar systems and solar water pumps, are not subject to any electricity licence identified in this research.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoDABS. There is no market. DABS buys power under bilateral import and generation contracts.
Balancing and reservesNo—NoDABS. Shortages are managed by scheduled outages, not through a market.
Demand responseNo—NoNo demand-response scheme was identified.

There is no route for distributed energy resources to provide flexibility services in Afghanistan. With available supply far below demand, the system operator manages shortages by rotating outages between areas. There is no wholesale, balancing or demand-response market and no aggregator framework.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national programme identified; DABS contracted advanced metering infrastructure in 2024
Reading intervalNot published
Meter ownerDABS
AMI contractUS$2.7 million with a Chinese firm (June 2024)
National programmeNone identified
Data hubNone

DABS owns and reads all grid meters. In June 2024 it signed a US$2.7 million contract with a Chinese company for advanced metering infrastructure (Pajhwok). The scope, number of meters and target areas were not publicly available. No national smart-metering plan, penetration figure or data-access rules were identified.

Renewable electricity.

Electricity generation mix (2023).

  • Hydropower: 72%
  • Solar PV: 11%
  • Fossil fuels: 17%
Source 1
Renewable electricity share
Not identified from a reliable public source.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydropower
468 MW (End 2024)Source 1
Solar PV
54 MW (End 2024)Source 1
Wind
0 MW (End 2024)Source 1Herat wind project (43.2 MW) inaugurated in 2025 is not included.
Fossil fuels
277 MW (End 2024)Source 1Non-renewable capacity.

Targets.

  • A five-year power development plan was approved in 2026, covering 25 generation projects (hydropower, solar, wind and coal), 36 transmission projects, 42 substation projects and 34 distribution projects. No numeric renewable target was published with it.
  • Officials have described a 10,000 MW domestic generation initiative (Ariana News, February 2026). DABS said in July 2026 that 17 generation projects under way would add 1,820 MW in about three years.

Hydropower is Afghanistan’s main domestic source of electricity. IRENA estimates that it produced 773 GWh, or 72% of domestic generation, in 2023, with solar adding 117 GWh (11%) and fossil fuels 183 GWh (17%). Output depends on rainfall: drought lowered reservoirs in 2025, while heavy rain in spring 2026 brought Naghlu to its highest output in 17 years.

Solar and wind are expanding through private projects agreed with the government. Construction of 40 MW solar plants began in Dehdadi, Balkh (May 2025, US$28 million) and Mohammad Agha, Logar (July 2025, US$35.6 million). In Herat, a 43.2 MW wind plant and a 5 MW solar plant were inaugurated in May 2025. In February 2026 the government signed an 845 MW package with Azizi Energy: 330 MW of solar at Naghlu, Barik Ab and Ghazni, expected within two years, and 515 MW of coal-fired plants in Takhar and Baghlan.

Because about 80% of electricity is imported from Uzbekistan, Tajikistan, Turkmenistan and Iran, the renewable share of what Afghans actually consume differs from the domestic generation mix.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No national statistics on energy storage are published, and no grid-scale battery project was identified. Batteries are commonly used with off-grid solar systems and as backup during outages, but this is not measured.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Da Afghanistan Breshna Sherkat (DABS)Sole public grid supplierNoNoNoNo

DABS is the only supplier on the public grid. Private generators such as Bayat Power sell their output to DABS rather than to households. In areas without grid supply, local diesel networks and household solar systems fill the gap.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Water (MEW)GovernmentEnergy and water policy and planningSigns generation agreements and leads sector planning.
Da Afghanistan Breshna Sherkat (DABS)TransmissionNational vertically integrated utilityRuns the grid, buys imports, bills customers and connects new generation.
Da Afghanistan BankGovernmentCentral bankPublishes the official afghani exchange rates used to compare prices.
Bayat PowerRenewable EnergyIndependent power producerOperates the 40 MW gas-fired plant in Jawzjan, an early private generator selling to DABS.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionNone publishedDABSNo published grid code for small generators was identified. Large plants connect under project agreements.
Testing and calibrationInternational standards (in development)DABS, with Uzbekistan’s Technical Regulation AgencyIn August 2026 DABS requested help with laboratory standardisation, equipment calibration and mobile network-diagnostic laboratories.
Supply voltage230 V / 50 Hz, plug types C and FNational practice

Permissions.

Permissions.
PermissionRequiredLevelDetail
Electricity licence for household solarNoNationalNo licence or registration requirement was identified for systems used on site.
Grid connection approvalLimitedNationalNeeded only for generators selling to DABS, agreed project by project with the ministry and DABS.
Building or planning permissionLimitedLocalNo specific rule for rooftop solar was identified.

For households, installing solar in Afghanistan is a private purchase with no electricity-sector approval identified. For utility-scale projects, developers negotiate agreements with the Ministry of Energy and Water and DABS, and the largest projects are approved by the Economic Commission.

Data and connectivity.

Fixed broadband
16.1 % of population using the internet (2024)Source 7World Bank / ITU figure for internet use, not broadband coverage.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About 16% of people used the internet in 2024 (World Bank / ITU). No smart-meter communications network was identified. Remote monitoring of household energy systems is not common.

Grid conditions.

National peak demand
4 GW (2026)Source 13National demand of about 4,000 MW stated by the DABS spokesperson in July 2026, against about 750 MW of available capacity. Not a measured peak, since demand is rationed.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
0.799 GW (End 2024)Source 1468 MW hydro, 54 MW solar and 277 MW non-renewable.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Supply is rationed across the country. In July 2026 Kabul residents reported three to eight hours of power a day. DABS said 17 generation projects with 1,820 MW of capacity would take about three years to complete.

Cross-border links are being strengthened. The CASA-1000 line, which will carry hydropower from Kyrgyzstan and Tajikistan through Afghanistan to Pakistan, was expected to complete its Afghan section in spring 2027 and to start commercial operation in summer 2027 (Ariana News, April 2026). DABS discussed 500 kV lines with Turkmenistan and Tajikistan in September 2026, and Tajikistan said it was ready to increase exports.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Five-year power development plan approvedCurrent2026Covers 25 generation, 36 transmission, 42 substation and 34 distribution projects, aimed at reducing dependence on imports.
Iran electricity import contract extended for 1405CurrentFebruary 2026DABS and Iran’s Tavanir agreed to continue imports for the solar year 1405 (2026–27).
Azizi Energy 845 MW generation packageUpcoming2028–2029 (expected)Signed in February 2026: 330 MW of solar expected within two years and 515 MW of coal-fired plants within three years.
CASA-1000 commercial operationUpcomingSummer 2027 (expected)Transmission link from Kyrgyzstan and Tajikistan through Afghanistan to Pakistan. Construction was reported complete outside Afghanistan in April 2026.
500 kV interconnections with Turkmenistan and TajikistanUpcomingUnder discussion (2026)A 500 kV line to the Nur-ul-Jihad substation in Herat and a planned 500 kV line from Tajikistan.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable share—Low below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowIRENA counts 54 MW of solar in total at the end of 2024, and no figure for household solar or any household export scheme was identified.
Distributed energy marketMediumUNDP estimates only 40–42% of people have grid access, while the World Bank access indicator, which includes off-grid sources, was 87.8% in 2024, implying wide use of off-grid supply.
Grid flexibility marketLowNo wholesale, balancing or demand-response market, no independent regulator and no aggregator framework.
Energy storage adoptionLowNo statistics and no grid-scale storage identified.
Renewable growth environmentMediumInstalled capacity was flat at 799 MW in 2022–24 (IRENA), but several 40–100 MW solar plants and a 43.2 MW wind plant were inaugurated or contracted in 2025–26.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 33 sources
  1. Energy Profile: Afghanistan. IRENA, 2025. accessed 9 October 2026.
  2. Population, total – Afghanistan (API). World Bank, 2025. accessed 9 October 2026.
  3. Urban population (% of total population) – Afghanistan (API). World Bank, 2025. accessed 9 October 2026.
  4. Access to electricity (% of population) – Afghanistan (API). World Bank, 2024. accessed 9 October 2026.
  5. Renewable electricity output (% of total) – Afghanistan (API). World Bank, 2021. accessed 9 October 2026.
  6. Electric power consumption (kWh per capita) – Afghanistan (API). World Bank / IEA. accessed 9 October 2026.
  7. Individuals using the Internet (% of population) – Afghanistan (API). World Bank / ITU, 2024. accessed 9 October 2026.
  8. Afghanistan – Herat Electrification Project: Project Appraisal Document. World Bank, 2017. accessed 9 October 2026.
  9. Afghanistan – DABS Planning and Capacity Support Project: Implementation Completion Report. World Bank, 2021. accessed 9 October 2026.
  10. DABS signs contract to purchase electricity from Uzbekistan for 2025. Ariana News, 2024. accessed 9 October 2026.
  11. DABS ‘draws up’ five-year plan to increase electricity supply. Ariana News, 2023. accessed 9 October 2026.
  12. Less than 42% of Afghans have access to national power grid: UNDP. Ariana News, 2026. accessed 9 October 2026.
  13. Kabul residents decry power outages; DABS links solution to project completion. Pajhwok Afghan News, 2026. accessed 9 October 2026.
  14. Balkh residents complain about high electricity tariffs. Pajhwok Afghan News, 2023. accessed 9 October 2026.
  15. Uruzgan residents resent high power tariffs. Pajhwok Afghan News, 2025. accessed 9 October 2026.
  16. DABS collects 31.5 bln afs from consumers, makes all payments. Pajhwok Afghan News, 2025. accessed 9 October 2026.
  17. DABS sign $2.7m metre deal with Chinese firm. Pajhwok Afghan News, 2024. accessed 9 October 2026.
  18. Naghlu dam power generation reaches highest level in 17 years. Pajhwok Afghan News, 2026. accessed 9 October 2026.
  19. Tajikistan ready to increase electricity exports to Afghanistan. Pajhwok Afghan News, 2026. accessed 9 October 2026.
  20. Da Afghanistan Breshna Sherkat extends electricity import agreement with Iran for 1405. Ariana News, 2026. accessed 9 October 2026.
  21. Afghanistan approves five-year power development plan to boost domestic energy production. Ariana News, 2026. accessed 9 October 2026.
  22. Afghanistan’s DABS outlines causes of power outages and unveils long-term energy strategy. Ariana News, 2025. accessed 9 October 2026.
  23. Afghanistan signs 845MW power deal with Azizi Energy. Ariana News, 2026. accessed 9 October 2026.
  24. Baradar inaugurates $68 million wind and solar power projects in Herat. Ariana News, 2025. accessed 9 October 2026.
  25. DABS inaugurates 40MW solar power project in Dehdadi, Balkh. Ariana News, 2025. accessed 9 October 2026.
  26. Afghanistan launches 40-megawatt solar power project in Logar to tackle energy shortage. Ariana News, 2025. accessed 9 October 2026.
  27. Bayat Power, Ministry of Energy extend power production agreement for another 10 years. Ariana News, 2026. accessed 9 October 2026.
  28. CASA-1000 power project on track to launch in 2027. Ariana News, 2026. accessed 9 October 2026.
  29. Afghanistan, Turkmenistan discuss 500-kV power transmission project. Ariana News, 2026. accessed 9 October 2026.
  30. Afghanistan’s power company seeks Uzbekistan’s support to address technical grid issues. Ariana News, 2026. accessed 9 October 2026.
  31. DABS, Tajikistan’s Pamir Energy sign agreement on electricity supply to Badakhshan. Ariana News, 2026. accessed 9 October 2026.
  32. Exchange rates (home page). Da Afghanistan Bank, 2026. accessed 9 October 2026.
  33. Plug, socket and voltage by country. WorldStandards, 2026. accessed 9 October 2026.

Questions about energy in Afghanistan.