How electricity works in Belize.
Belize electricity 2026: BEL single national utility, PUC-set mean rate BZ$0.4427/kWh plus monthly COPA, ~half of supply imported from Mexico, smart meter rollout.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Belize dollar (BZD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Belize energy at a glance.
Key figures for households in Belize. Each one links to its source on the full overview below.
Electricity price.
0.443 BZD per kWh for households, including taxes. Figures for Jan–Jun 2026 (maintained for Jul 2026–Jun 2027).
Renewable share.
48.2% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Belize.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Belize below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Belize requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Belize.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Belize, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Belize, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Belize.
The energy market in Belize, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Belize has one national electricity utility, Belize Electricity Limited (BEL). BEL owns and operates the transmission and distribution network across the country, buys power from domestic hydro, biomass and thermal producers and from Mexico’s Comisión Federal de Electricidad (CFE), runs its own gas turbines for backup and peak supply, and bills every grid-connected customer. The Public Utilities Commission (PUC) regulates BEL, sets its tariffs and licenses generation and network activities. Energy policy sits with the Ministry of Public Utilities, Energy and Logistics.
Imports are central to the system. Ember data show Belize generated 0.47 TWh in 2024 against demand of 0.85 TWh, and in August 2026 BEL’s Executive Chairman said CFE supplied 51 MW against a national peak of about 130 MW. Domestic generation is mostly renewable — hydropower and sugar-cane bagasse biomass made up about 85% of it in 2024 — but because almost half of electricity is imported, renewables met only around half of total demand.
Prices are regulated. From 1 January 2026 the PUC set BEL’s Mean Electricity Rate at BZ$0.4427 per kWh, and from mid-2026 a monthly Cost of Power Adjustment (COPA) passes changes in power purchase costs through to bills, capped at about 1.5 Belize cents per kWh a month. In September 2026 the Government declared an emergency to let BEL procure extra generation ahead of a projected 2027 supply shortfall, while a 15 MW solar plant with battery storage, a 40 MW solar-plus-storage project and a nationwide smart meter programme are under way.
Energy snapshot.
Headline figures for electricity in Belize. Each shows its data year and links to its source.
- Population397,483 peopleSource 92022
- Households110,719 householdsSource 92022
- Average household size3.6 people/householdSource 92022
- Electricity use per householdNot identified from a reliable public source.
- Household price (BZD)0.443 BZD/kWhSource 1Jan–Jun 2026 (maintained for Jul 2026–Jun 2027)
- Household price (EUR)0.198 EUR/kWhSource 29Jan–Jun 2026
- Renewable electricity share48.2%Source 112024
- Solar capacity0.007 GWSource 152025
- Wind capacity0 GWSource 162025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter share18.3%Source 22January 2026
- Market structure
- Vertically integrated
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Public Utilities Commission (PUC)
- System operator
- Belize Electricity Limited (BEL), which dispatches the national grid and the import link with Mexico
- Distribution networks
- One national transmission and distribution network owned and operated by BEL, serving all grid-connected customers; some remote communities are off-grid
- Currency
- Belize dollar (BZD)
- Voltage and frequency
- 110/220 V, 60 Hz (North American-style supply)
Electricity prices in Belize.
- Household price (BZD)
- 0.443 BZD/kWh (Jan–Jun 2026 (maintained for Jul 2026–Jun 2027))Source 1PUC-approved Mean Electricity Rate (MER): BEL’s average price across all customer classes, not a residential-only price, before GST and before the monthly COPA charge (up to about BZ$0.015/kWh in August–September 2026). The residential block rates in the PUC’s amended Schedule 6A could not be read from a public source and are not shown.
- Household price (EUR)
- 0.198 EUR/kWh (Jan–Jun 2026)Source 29Converted from BZ$0.4427/kWh at the fixed rate of BZ$2.00 per US dollar (Central Bank of Belize) and the ECB reference rate of USD 1.1206 per euro on 9 October 2026, i.e. BZ$2.2412 per euro.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (BZD per kWh).Source 1
| 2025 | 0.409 BZD/kWh |
|---|---|
| 2026-01 | 0.4427 BZD/kWh |
Belize uses a price-cap style regime under the Electricity Act. In a Full Tariff Review every four years the PUC sets BEL’s allowed costs and a Mean Electricity Rate (MER) — the average price per kWh across all customers — and reviews it each year in an Annual Review Proceeding for the tariff period running from 1 July to 30 June. Individual tariffs for social, residential, commercial and industrial customers are then set so that they average out to the MER.
The 2025–2026 increases
For most of 2023 to 2025 the MER stayed at BZ$0.4090 per kWh. In June 2025 the PUC rejected BEL’s request for an increase from July 2025. In December 2025 BEL applied for an extra BZ$0.0549 per kWh to recover power purchase costs that had exceeded revenue; the PUC approved BZ$0.0337, taking the MER to BZ$0.4427 from 1 January 2026. The PUC’s 2026/27 annual review decision in July 2026 kept the approved rates for July 2026 to June 2027.
Cost of power and COPA
Power purchases are the largest part of BEL’s costs, and they swing with hydro output, CFE import prices and the amount of diesel or heavy-fuel generation needed. BEL said its average cost of power was 54 cents per kWh in May 2024 against an average tariff of 40 cents, and 20 cents in October 2024. To stop such gaps accumulating, the PUC approved a Cost of Power Adjustment under a regulatory sandbox. COPA appears as its own line on the bill, is recalculated monthly on a six-month rolling average and is capped; in August 2026 the underlying gap was 4.3 cents per kWh but the charge was capped at 1.5 cents. It can also fall below zero when power costs drop, for example in the wet season when hydro output rises.
General Sales Tax
Residential electricity bills below a monthly threshold are exempt from GST. From 1 September 2026 the Government raised that threshold from BZ$100 to BZ$200 a month, which it said covers about 91,000 households, or 96% of residential customers. The COPA line is outside GST.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | BEL’s tariffs for each customer class are set by the PUC so that the average across all sales equals the approved Mean Electricity Rate — BZ$0.4427/kWh from 1 January 2026, an increase of BZ$0.0337 (8.42%) on the previous BZ$0.4090. The PUC spread the increase across classes to limit the effect on household bills. Its decision on BEL’s 2026/27 annual review left the rates unchanged for July 2026 to June 2027. |
| Other | Yes | Social Rate: a discounted rate for low-consumption households. From 2026 the Cabinet widened eligibility from 60 to 80 kWh a month, extending it to about 17,000 more residential customers. Social Rate customers are exempt from the COPA charge. |
| Variable | Yes | Cost of Power Adjustment (COPA): a separate monthly per-kWh line on bills that passes the difference between BEL’s actual cost of power and the PUC-approved reference cost through to customers, using a six-month rolling average and a cap of about ±1.5 Belize cents per kWh. It was 1.5 cents in August 2026 and is exempt from GST. |
| Time-of-use | No | No residential time-of-use tariff was found. The smart meter programme is intended to make more advanced pricing possible. |
| Dynamic | No | There is no wholesale market or retail competition, so no spot-indexed tariff exists. COPA is the only element that moves month to month. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,038 kWh/person/yr (2024)Source 14All sectors (electricity demand per person, Ember via Our World in Data).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Belize is a small system: total demand was about 0.85 TWh in 2024 (Ember), national consumption of around 720 GWh a year was reported in August 2026, and BEL’s Executive Chairman put peak demand at about 130 MW. Demand per person was about 2,040 kWh in 2024, compared with about 1,680 kWh in 2018 (Ember).
The peak comes on hot evenings. In late August 2026 BEL reported evening demand of 117–122 MW against roughly 103–109 MW of available in-country generation, with the gap covered by imports from Mexico. Hot, dry periods are doubly difficult: cooling demand rises while lower rainfall reduces hydro output.
In the 2022 census, 87.4% of households said their main source of lighting was BEL’s grid.
Housing and households.
- Dwellings
- 110,719 households (2022)Source 9Households, not dwellings: the census press release reports households.
- Owner-occupied
- 67.8% (2022)Source 9
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 87.5% (2022)Source 10Census finding that 7 in 8 households occupy an undivided private house.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 42.2% (2022)Source 9Share of households in urban areas; 57.8% are rural.
Belize is mostly rural and low-rise. In the 2022 census 57.8% of households were rural, about two-thirds owned their home and seven in eight lived in a detached, undivided house with on average two bedrooms. Belize District, which includes Belize City, is the most populous district, followed by Cayo.
For rooftop solar, this housing stock means most households control their own roof and electrical installation.
How the grid works in Belize.
- TransmissionBelize Electricity Limited (BEL), Belize Electricity Limited (BEL)
- DistributionOne national transmission and distribution network owned and operated by BEL, serving all grid-connected customers; some remote communities are off-grid
- MeteringBelize Electricity Limited (BEL)
- Supply1 or more retail suppliers
Physically, the grid is a national network run by BEL linking the main towns and districts. Power enters from domestic hydro plants on the Macal River (Chalillo, Mollejon and Vaca, about 57 MW), sugar-mill biomass generation (BELCOGEN, about 12.5 MW, and Santander, about 8 MW, both seasonal), the BAPCOL thermal plant (22.5 MW), BEL’s own gas turbines at Westlake (28 MW) and San Pedro (16 MW) and a little solar. On top of that, a contracted import of up to 55 MW comes over the link with Mexico’s CFE.
Commercially, BEL is a vertically integrated single buyer: it holds power purchase agreements with the independent producers and CFE, pays for their energy and recovers the cost through PUC-approved tariffs. There is no wholesale market, no retail competition and no separate settlement body.
Supply adequacy
Imports are both cheap and unreliable. CFE has at times curtailed supply when demand in Mexico’s Yucatán Peninsula is high, and in 2024–2026 BEL accumulated large debts to CFE. In August 2026 BEL said CFE supplied only 51 MW against a peak of about 130 MW, and the Cabinet authorised an emergency declaration so BEL could procure extra generation, including temporary diesel units at Westlake, to cover a projected 2027 shortfall.
Licensing reform
Electricity activities are licensed by the PUC under the Electricity Licensing and Consent Regulations. In May 2026 the PUC published a notice proposing to grant BEL an electricity licence under the updated regime.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Public Utilities, Energy and Logistics | Sets national energy policy and leads government-backed generation projects such as the solar and battery storage procurements. |
| Regulator | Public Utilities Commission (PUC) | Sets BEL’s tariffs through full and annual tariff reviews, approves COPA charges and power purchase agreements, and issues electricity licences, including distributed and self-generation licences. |
| System operator | Belize Electricity Limited (BEL) | Dispatches all generation on the national grid, operates the import link with Mexico and declares supply emergencies. |
| TSO | Belize Electricity Limited (BEL) | Owns and operates the national transmission network. |
| DSO | Belize Electricity Limited (BEL) | Owns and operates distribution in all districts and on Ambergris Caye and Caye Caulker. |
| Supplier | Belize Electricity Limited (BEL) | Sole retail supplier to all grid-connected customers; buys from independent producers and CFE. |
| Metering | Belize Electricity Limited (BEL) | Owns, installs and reads all meters, and is replacing them with smart meters under the CDB-financed Power VIII programme. |
Compared with the UK system.
| UK concept | Belize equivalent | How it works |
|---|---|---|
| DNO | Belize Electricity Limited (BEL) | There is one network company for the whole country. BEL owns and runs the distribution network as well as transmission and retail supply. |
| National Grid/NESO | BEL (transmission and dispatch) | BEL owns the transmission system and dispatches all generators and imports. There is no independent system operator. |
| MPAN | BEL customer account and meter number | There is no national supply-point code. With a single utility and no supplier switching, BEL identifies supply by the customer account and meter in its own billing system. |
| MPRN | None | No piped-gas supply-point system equivalent to the MPRN was identified. |
| Meter operator | BEL | BEL owns and maintains every meter. There is no competitive metering market. |
| Supplier | BEL | Households cannot choose a supplier. BEL bills all grid customers at PUC-approved tariffs. |
| Smart-meter infrastructure | BEL AMI (Power VIII) | Instead of a central data hub such as the DCC, BEL runs its own advanced metering infrastructure, deploying about 115,000 smart meters over three years with near-real-time usage data via a customer app. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | BEL customer account number and meter number |
| Who issues it? | Belize Electricity Limited (BEL) |
| Format | Not publicly documented. BEL identifies each connection by the customer account in its billing system and the serial number of the meter installed at the premises. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the BEL electricity bill. |
| Electronic access | Customers with smart meters can see near-real-time consumption, usage alerts and energy budgets in BEL’s mobile app. |
| Third-party access | No regulated third-party data access framework exists. Data requests go through BEL. |
| Who keeps the register | BEL customer and billing system |
| Register scope | National |
Belize has no standardised supply-point identifier comparable to an MPAN or an EAN code. Because BEL is the only network operator and the only retail supplier, there is no switching process and no need for a central register of supply points. Each connection is recorded in BEL’s customer and billing system against an account and the meter installed at the premises.
What changes with smart meters
Under the Power VIII programme, financed by the Caribbean Development Bank, BEL is replacing legacy meters at no cost to customers. The new meters send readings over a dedicated communications network, which lets BEL read meters remotely, detect outages automatically and give customers near-real-time data. The meter, rather than a separate identifier, remains the physical anchor of the connection.
Who keeps the register
BEL holds the only record of connections nationwide. The PUC regulates BEL’s service and tariffs but does not keep a separate register of supply points.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Exported energy is credited on the customer’s BEL bill at BEL’s avoided cost of power (about 25 Belize cents per kWh when the rules were introduced in 2024), not at the retail rate. |
| Can a household sell solar power to the grid? | Yes, within limits. The Electricity Licensing and Consent Regulations (S.I. 39 of 2024) let distributed generators sell excess energy to BEL, with payment calculated as BEL’s avoided cost and deducted from the bill. |
| Does a small rooftop system need a licence? | When S.I. 39 of 2024 came into force the PUC said installations below 3 kW needed only registration with the PUC and a BEL inspection, while larger systems needed one of the licence classes, with fees from BZ$100 to BZ$10,000. Replacement regulations proposed by the PUC in November 2025 revise the classes and thresholds. |
| Is it net metering? | No. Exports are valued at avoided cost rather than offset one-for-one against the retail rate, so it works as net billing. |
| Have installers objected? | Yes. In 2024 the Belize Solar Industry Alliance said the regulations and tariffs gave grid-tied residential solar paybacks of 10–15 years and asked the Government to revise them. |
Connecting a home system.
- Check which PUC class applies: very small systems need only registration with the PUC, larger ones a distributed generation licence (minor, intermediate or major) or self-generation licence.
- Apply to the PUC on the relevant application form; the PUC publishes notices of proposed licences and invites objections before granting them.
- BEL inspects the installation to confirm the equipment meets technical and safety standards before it is connected.
- Once connected, energy exported to the grid is credited against the customer’s BEL bill at the avoided-cost rate.
A framework for customer generation took years to settle. BEL submitted distributed generation proposals to the PUC in 2022, arguing that exports should be paid at wholesale rather than retail prices and that capacity charges were needed to cover grid costs. The approach adopted in the Electricity Licensing and Consent Regulations of 2024 follows that logic: generators are paid BEL’s avoided cost, applied as a bill credit.
The PUC regularly publishes notices proposing to grant intermediate and major distributed generation licences, which shows the regime is in use for commercial and larger installations. Uptake by households has been modest, and IRENA still records only about 7 MW of solar in the whole country.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use (self-generation) | PUC self-generation licence above the exemption threshold; small systems register only | Public Utilities Commission | The PUC’s November 2025 proposal said private generation below 75 kW would remain exempt. |
| Generate and export (distributed generation) | Minor, intermediate or major distributed generation licence depending on capacity; registration only below the lowest threshold (3 kW under the 2024 rules) | Public Utilities Commission | Excess energy is sold to BEL at avoided cost. Licence fees ranged from BZ$100 to BZ$10,000 across 15 licence classes. |
| Generate for sale to BEL (independent power producer) | PUC generation licence plus a PUC-approved power purchase agreement with BEL | Public Utilities Commission | Examples: hydro, biomass (BELCOGEN), BAPCOL thermal and the BAPCOL 15 MW solar plant. |
| Store electricity | Covered by the licensing and consent regulations; storage service providers are among those named by the PUC | Public Utilities Commission | Thresholds for stand-alone storage could not be verified. |
| Transmission, distribution and retail supply | Exclusive network and retail role held by BEL under its licence | Public Utilities Commission | The PUC proposed a new licence for BEL in May 2026. |
| Wholesale trading | No wholesale market; bilateral PPAs with BEL only | Public Utilities Commission | Imports from CFE are bought by BEL under contract. |
| Aggregation, VPP and balancing services | No framework; no market exists | — | All balancing is done by BEL dispatching contracted plant and imports. |
| Remote control of customer assets | No framework | — | No demand-response or direct load-control programme was found. |
The Electricity Licensing and Consent Regulations of 2024 (S.I. 39) replaced a three-licence regime with 15 classes covering everything from home generation to utility-scale wind, solar and biofuel plants, and required anyone already carrying on licensable activities to apply within six months. In November 2025 the PUC consulted on replacement regulations for 2026, intended to simplify applications and make fees more consistent, with private generation below 75 kW exempt. Existing licences continue until they expire.
Because BEL is the only buyer, a licence to generate is of practical use only with an agreement to sell to BEL or the right to export under the distributed generation rules.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing and reserves | No | — | No | BEL. BEL balances the system with its own gas turbines, contracted plant and imports. No market for third-party balancing services exists. |
| Demand response | No | — | No | BEL. No demand-response programme was found. |
There is no market through which household batteries, solar or flexible loads can be paid for flexibility. The system is small, with a peak of about 130 MW, and BEL as single buyer and dispatcher handles balancing directly. Planned grid batteries (see Storage) are utility- or government-owned assets rather than aggregated customer devices.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Nationwide AMI rollout under way (about 115,000 meters over three years; over 21,000 installed by January 2026) |
| Reading interval | Not published |
| Programme | Power VIII Project (AMI and grid modernisation) |
| Financing | CDB loans of US$27.2m plus a US$330,000 grant; BEL counterpart US$7.05m |
| Meters planned | About 115,000 |
| Installed | Over 21,000 (22 January 2026) |
| Cost to customer | None |
| Customer access | BEL mobile app with near-real-time usage, alerts and budgets |
BEL is replacing its legacy meters with smart meters across the country. The Caribbean Development Bank approved financing in December 2025 for the Power VIII Project, which covers about 115,000 smart meters with communications and analytics systems, plus feasibility studies for transmission upgrades. It is the largest CDB financing to BEL and the first without a sovereign guarantee.
The rollout is phased over three years by area; by late January 2026 more than 21,000 meters had been installed, including 1,200 in San Pedro. BEL says the meters allow near-real-time consumption data, automatic outage notification, better billing accuracy and easier integration of solar.
Renewable electricity.
Electricity generation mix (2024).
- Hydropower: 51.1%
- Bioenergy: 34%
- Oil: 12.8%
- Solar: 2.1%
- Renewable electricity share
- 48.2% (2024)Source 11Share of electricity demand, derived from Ember data: renewable generation (hydro 51.1%, bioenergy 34.0% and solar 2.1% of 0.47 TWh ≈ 0.41 TWh) ÷ demand of 0.85 TWh. Belize is a large net importer from Mexico, so the domestic-generation share (87.2% renewable in 2024) would overstate how renewable supply is.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0 MW (2025)Source 15IRENA capacity unchanged at 6.96 MW from 2023 to 2025.
- Hydropower (Macal River plants)
- 0.057 GW (2024)Source 20Chalillo, Mollejon and Vaca, as listed by BEL in November 2024.
- Biomass (BELCOGEN and Santander)
- 0.021 GW (2024)Source 20Derived: BELCOGEN 12.5 MW + Santander 8 MW, both seasonal (sugar harvest).
- Solar PV
- 0.007 GW (2025)Source 15
Targets.
- 75% renewable energy in electricity generation by 2030 (NDC, reaffirmed in NDC 3.0, 2025).
- Government tender for 80 MW of solar PV and plans for battery storage for grid reliability (2025–2026).
Belize’s own generation is mostly renewable. In 2024 hydropower produced 51% of domestic electricity and bagasse-fired biomass from the sugar industry 34%, with oil-fired plant at 13% and solar 2% (Ember). Both main renewable sources are seasonal: hydro output peaks in the wet season and biomass generation follows the sugar-cane harvest. Imports from Mexico’s CFE fill the gap, so the renewable share of total consumption is about half.
Solar has barely grown for years, at about 7 MW. That is now changing: BEL and BAPCOL signed a 15-year power purchase agreement in July 2025 for a 15 MW solar plant with a 1.5 MW battery at Buena Vista, Corozal, due by the end of 2026; a 40 MW solar plant with 20 MW / 80 MWh of storage is being prepared with Saudi Fund for Development financing; and the Government has tendered 80 MW of solar PV.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage is seen as essential to integrating solar and reducing dependence on CFE imports. In November 2024 BEL outlined plans for about 60 MW of batteries at sites including San Pedro, Orange Walk, Ladyville and Dangriga. The programme has since been taken forward by the Government with World Bank support, as a 45.1 MW / 180.2 MWh tender across four sites.
Behind-the-meter batteries are used by some homes and businesses for backup, but there is no published count and no scheme that pays them for grid services.
Storage projects.
- BRRES battery storage (45.1 MW / 180.2 MWh): Belize Reliant and Resilient Energy System project: World Bank-supported early market engagement in 2026 for batteries at four grid sites, with five years of operation and maintenance.
- 40 MW solar + 20 MW / 80 MWh storage: Government project financed by the Saudi Fund for Development; consultant procurement launched December 2025.
- BAPCOL Buena Vista solar (15 MW + 1.5 MW battery): Under a 2025 PPA with BEL; completion due by end of 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Belize Electricity Limited (BEL) | 100% of grid-connected customers | No | No | No | Limited |
BEL is the only electricity supplier. It is regulated by the PUC. There is no retail competition and no green tariff; customers who want renewable power install their own systems under the distributed generation rules.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Public Utilities, Energy and Logistics | Government | Energy policy | Leads energy policy and government solar and storage procurements. |
| Public Utilities Commission (PUC) | Regulator | Electricity, water and telecoms regulator | Sets tariffs, approves COPA and PPAs, and issues generation and distributed generation licences. |
| Belize Electricity Limited (BEL) | Distribution | National utility | Runs the grid, buys all power and supplies every grid customer. |
| Belize Solar Industry Alliance (BSIA) | Solar | Solar industry group | Represents solar installers and has lobbied for changes to the distributed generation rules. |
| Statistical Institute of Belize (SIB) | Government | National statistics office | Publishes the census and household data used for energy planning. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Distributed generation licensing | Electricity Licensing and Consent Regulations (S.I. 39 of 2024) and successor regulations | Government of Belize / PUC | Sets licence classes, thresholds and fees for generation and storage. |
| Grid connection | BEL inspection before connection | BEL | BEL inspects distributed generation installations to confirm equipment meets technical and safety standards. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| PUC registration or licence | Yes | National | Registration for the smallest systems; a distributed or self-generation licence above the threshold. |
| BEL inspection | Yes | National | Required before a grid-tied system is connected. |
| Planning permission | Unknown | Local | No specific planning rule for rooftop solar was found. |
For a home solar system the key steps are national: registration or a licence from the PUC and an inspection by BEL. No separate planning regime for rooftop solar was identified.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Social Rate | Active | Discounted tariff | Lower tariff for households using up to 80 kWh a month (raised from 60 kWh in 2026); exempt from COPA. | — |
| GST exemption for residential bills | Active | Tax relief | Residential bills under BZ$200 a month are exempt from GST from 1 September 2026 (previously BZ$100). | From 1 Sep 2026 |
| Distributed generation export credit | Active | Net billing | Excess energy from licensed or registered systems credited at BEL’s avoided cost. | — |
Data and connectivity.
- Fixed broadband
- 71.3 % of households (2022)Source 10Households with internet access of any type (2022 census), not fixed broadband specifically.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
The Power VIII programme includes its own communications and analytics systems for BEL’s smart meters. Household internet access stood at 71.3% in 2022.
Grid conditions.
- National peak demand
- 0.13 GW (2026)Source 18About 130 MW, as stated by BEL’s Executive Chairman in August 2026.
- Annual electricity demand
- 0.85 TWh (2024)Source 13Ember. A BEL-reported figure of about 720 GWh a year was cited in August 2026.
- Generation capacity
- 0.124 GW (2024)Source 20Firm in-country supply listed by BEL in November 2024, excluding CFE imports.
- Interconnection
- 0.055 GW (2024)Source 20Maximum contracted import from CFE (Mexico). Actual supply has often been lower, e.g. 51 MW in August 2026.
- Curtailment
- Not identified from a reliable public source.
Belize’s system is tight. Peak demand of about 130 MW is close to firm in-country capacity, so supply depends on CFE imports, and when Mexico curtails exports BEL has to run expensive thermal plant or shed load. In September 2026 the Cabinet authorised an emergency declaration and procurement of additional generation for an anticipated 2027 shortfall.
Of roughly 720 GWh consumed a year, CFE imports supplied about 52%, hydro about 25%, biomass 16% and fossil fuel about 6%, according to figures reported in August 2026.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| COPA monthly cost-of-power pass-through | Current | 2026 | Monthly COPA line on bills under a PUC regulatory sandbox, capped at about 1.5 cents/kWh. |
| GST threshold raised and Social Rate widened | Current | 1 Sep 2026 | GST exemption for residential bills raised to BZ$200 a month; Social Rate eligibility raised to 80 kWh a month. |
| Replacement electricity licensing regulations | Upcoming | 2026 | Regulations replacing S.I. 39 of 2024 (consulted on in November 2025; existing licences continue until expiry), with new licence classes and fees; private generation below 75 kW proposed to be exempt. Only the consultation draft could be verified; final adoption is not confirmed. |
| Smart meter rollout | Upcoming | Three-year programme financed December 2025 | About 115,000 smart meters to be installed nationwide over three years. |
| New solar and storage capacity | Upcoming | From end-2026 | 15 MW BAPCOL solar with battery (end-2026), 40 MW solar + 20 MW/80 MWh storage, 80 MW solar tender and 45.1 MW/180.2 MWh battery programme. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Low | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | IRENA records about 7 MW of solar in total, unchanged since 2019; exports are paid at avoided cost. |
| Distributed energy market | Low | A distributed generation licensing and net-billing framework exists since 2024, but uptake is small and installers have criticised its economics. |
| Grid flexibility market | Low | No wholesale, balancing or demand-response market; BEL balances the system directly. |
| Energy storage adoption | Low | No operational grid-scale battery confirmed; 45.1 MW/180.2 MWh and 20 MW/80 MWh projects in procurement. |
| Renewable growth environment | Medium | Pipeline of 15 MW (under construction), 40 MW and 80 MW of solar against a peak of about 130 MW, and a 75% renewable target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 37 sources
- PUC approves MER of $0.4427 per kWh effective January 1, 2026. The San Pedro Sun, 2025. accessed 10 October 2026.
- New Year’s light bill going up 8.42%. Amandala, 2025. accessed 10 October 2026.
- BEL Explains Power Rate Increase as New Electricity Prices Take Effect. Love FM, 2026. accessed 10 October 2026.
- PUC rejects BEL rate increase for July 2025–June 2026. The San Pedro Sun, 2025. accessed 10 October 2026.
- Belize Electricity Limited welcomes PUC initial decision on tariff submission. Breaking Belize News, 2026. accessed 10 October 2026.
- COPA charge on August 2026 bills. The San Pedro Sun, 2026. accessed 10 October 2026.
- BEL cost of power adjustment. Great Belize Productions, 2026. accessed 10 October 2026.
- Cabinet Brief, 4 September 2026. Government of Belize Press Office, 2026. accessed 10 October 2026.
- 2022 Population and Housing Census key findings (press release). Statistical Institute of Belize, 2024. accessed 10 October 2026.
- SIB reveals results of 2022 Population and Housing Census. Amandala, 2024. accessed 10 October 2026.
- Share of electricity production by source — Belize (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity generation — Belize (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity demand — Belize (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Per capita electricity demand — Belize (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Installed solar PV capacity — Belize (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Cumulative installed wind capacity — Belize (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Belize power supply and CFE dependence. Great Belize Productions, 2026. accessed 10 October 2026.
- BEL electricity shortfall. The San Pedro Sun, 2026. accessed 10 October 2026.
- What Replaces CFE? Belize Looks to “Distributed Generation”. Great Belize Productions, 2026. accessed 10 October 2026.
- BEL press briefing on supply and demand. Amandala, 2024. accessed 10 October 2026.
- CDB financing for BEL Power VIII Project (AMI and grid modernisation). Caribbean Development Bank, 2025. accessed 10 October 2026.
- BEL smart meter rollout in San Pedro. The San Pedro Sun, 2026. accessed 10 October 2026.
- Belize early market engagement: 45.1 MW / 180.2 MWh BESS. World Bank, 2026. accessed 10 October 2026.
- Belize opens solar consultancy tender. pv magazine, 2025. accessed 10 October 2026.
- Utility-scale agreement for first major solar plant in Belize. The Energy Industry Times, 2025. accessed 10 October 2026.
- BEL and BAPCOL 15 MW solar plant. The San Pedro Sun, 2025. accessed 10 October 2026.
- Belize Hosts LXV Meeting of OLACDE Council of Experts. Government of Belize Press Office, 2026. accessed 10 October 2026.
- Belize launches NDC 3.0. Great Belize Productions, 2025. accessed 10 October 2026.
- ECB euro reference exchange rate: US dollar. European Central Bank, 2026. accessed 10 October 2026.
- Belize Commemorates 50 Years of Exchange Rate Stability. Central Bank of Belize, 2026. accessed 10 October 2026.
- International voltage and plug guide. Interpower. accessed 10 October 2026.
- Belize’s Energy Sector Overhaul: New Legislation Explained. Love FM, 2024. accessed 10 October 2026.
- PUC Proposes New 2026 Electricity Licensing Rules in Sector Overhaul. Love FM, 2025. accessed 10 October 2026.
- Belize Solar Industry Alliance Implores GOB to Revise New Solar Energy Regulations. Love FM, 2024. accessed 10 October 2026.
- Distributed generation pricing debate. Channel 5 Belize, 2022. accessed 10 October 2026.
- PUC proposes to grant electricity licences for intermediate distributed generation. Public Utilities Commission, 2025. accessed 10 October 2026.
- Public Notice – PUC Proposes to Grant Electricity Licence to Belize Electricity Limited. Public Utilities Commission, 2026. accessed 10 October 2026.
Questions about energy in Belize.
BEL’s PUC-approved Mean Electricity Rate — the average price across all customers — has been BZ$0.4427 per kWh (about €0.20) since 1 January 2026. A monthly Cost of Power Adjustment of up to about 1.5 cents per kWh is added, and households on the Social Rate pay less.
Belize Electricity Limited (BEL) is the only utility. It runs the grid, buys power from local producers and from Mexico’s CFE, and bills all grid customers. The Public Utilities Commission regulates it.
About half is imported from Mexico. Domestic generation is mainly hydropower and sugar-cane biomass, with some oil-fired plant and a little solar.
Yes, under the Electricity Licensing and Consent Regulations. Systems must be registered or licensed by the PUC and inspected by BEL, and exports are credited at BEL’s avoided cost rather than the retail price.
There is none. With a single utility and no supplier switching, BEL identifies each connection by the customer account and meter number in its own billing system.
Yes. BEL is installing about 115,000 smart meters nationwide over three years under a CDB-financed programme; more than 21,000 were in place by January 2026.