How electricity works in Guatemala.
Guatemala electricity market 2026: CNEE quarterly tariffs, AMM wholesale market, EEGSA and Energuate, NIS supply numbers, UAEE net metering and 5 MW distributed generation.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Guatemalan quetzal (GTQ) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Guatemala energy at a glance.
Key figures for households in Guatemala. Each one links to its source on the full overview below.
Electricity price.
1.79 GTQ per kWh for households, including taxes. Figures for Aug–Oct 2026.
Renewable share.
53% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Guatemala.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Guatemala below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Guatemala requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Guatemala.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Guatemala, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Guatemala, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Guatemala.
The energy market in Guatemala, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Guatemala liberalised its electricity sector with the General Electricity Law (Decree 93-96) of 1996. Generation is open to anyone, the wholesale market is run by an independent administrator, the Administrador del Mercado Mayorista (AMM), and the regulator, the Comisión Nacional de Energía Eléctrica (CNEE), sets the regulated tariffs for transmission, distribution and small consumers. Final distribution is a regulated service provided under area authorisations: EEGSA serves the Guatemala City area and Energuate, through its companies DEOCSA (west) and DEORSA (east), serves more than 2.7 million customers in 21 of the 22 departments, alongside around 16 municipal electricity companies.
Households are regulated customers of their local distributor and cannot choose a supplier; only consumers whose demand exceeds 100 kW (grandes usuarios) can buy from a retailer (comercializador) or a generator. The CNEE adjusts tariffs every quarter. From 1 August to 31 October 2026 the social tariff, which covers about 3.9 million families (93% of users), is Q1.42 per kWh at EEGSA, Q2.03 at DEOCSA and Q1.98 at DEORSA, and families using up to 100 kWh a month also receive a contribution from the state utility INDE on their bill.
In 2025 renewable sources supplied about 53% of the energy delivered to the national grid, hydro alone 34.7%, while coal, petroleum coke and fuel oil supplied about 31% and imports from Mexico and the Central American regional market about 16%. Households and businesses can install renewable generation and inject their surplus as self-producers with surplus energy (UAEE) under a net-metering rule that credits exported kilowatt-hours against later consumption but pays nothing for them.
Energy snapshot.
Headline figures for electricity in Guatemala. Each shows its data year and links to its source.
- Population18,687,881 peopleSource 202025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (GTQ)1.79 GTQ/kWhSource 1Aug–Oct 2026
- Household price (EUR)0.209 EUR/kWhSource 14Aug–Oct 2026
- Renewable electricity share53%Source 92025
- Solar capacity0.102 GWSource 182025
- Wind capacity0.107 GWSource 192025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Limited
- Home equipment in grid services
- Restricted
- Regulator
- CNEE (Comisión Nacional de Energía Eléctrica); MEM (Ministerio de Energía y Minas) sets policy
- System operator
- AMM (Administrador del Mercado Mayorista), operator of the national system and wholesale market
- Distribution networks
- EEGSA (Guatemala City area), Energuate (DEOCSA west, DEORSA east) and around 16 municipal electricity companies
- Currency
- Guatemalan quetzal (GTQ)
- Voltage and frequency
- 120/240 V / 60 Hz
Electricity prices in Guatemala.
- Household price (GTQ)
- 1.79 GTQ/kWh (Aug–Oct 2026)Source 1Derived: average of the three main social tariffs (EEGSA Q1.42, DEOCSA Q2.03, DEORSA Q1.98 per kWh) weighted by the CNEE’s rounded user numbers (1.4, 1.4 and 0.9 million). The CNEE tariff is the price per kWh; the bill also carries the municipal street-lighting charge and VAT, and qualifying low-consumption users receive the INDE contribution. Non-social tariffs are Q1.51 (EEGSA), Q2.12 (DEOCSA) and Q2.06 (DEORSA).
- Household price (EUR)
- 0.209 EUR/kWh (Aug–Oct 2026)Source 14Converted from Q1.787/kWh at EUR 1 = Q8.5631, derived from the Banco de Guatemala reference rate of Q7.64157 per US dollar and the ECB reference rate of USD 1.1206 per euro, both for 9 October 2026 (source ecb-usd). EEGSA’s social tariff alone is about EUR 0.166/kWh and DEOCSA’s about EUR 0.237/kWh.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (GTQ per kWh).Source 1
| Nov 2025–Jan 2026 | 1.8 GTQ/kWh |
|---|---|
| Feb–Apr 2026 | 1.79 GTQ/kWh |
| May–Jul 2026 | 1.79 GTQ/kWh |
| Aug–Oct 2026 | 1.79 GTQ/kWh |
How tariffs are set
Under the General Electricity Law, the CNEE sets the tariffs of regulated users (those with demand of 100 kW or less) for each distributor. Every quarter it reviews what EEGSA, DEOCSA and DEORSA actually paid for power and energy in the previous three months under their long-term supply contracts and on the spot market, and adjusts the tariff for the next quarter. The same quarterly process covers the municipal electricity companies.
The price history above is the user-weighted average of the three main social tariffs (Q1.80 for November 2025–January 2026, then about Q1.79), derived from the CNEE’s communiqués. Over the year to August 2026 the social tariff was unchanged at EEGSA and fell 2.4% at DEOCSA and 1.5% at DEORSA, and the CNEE describes four years of broadly stable tariffs since August 2022.
Social tariff and the INDE contribution
Decree 96-2000 created the social tariff for users consuming up to 300 kWh a month. Separately, the state-owned Instituto Nacional de Electrificación (INDE) pays a contribution (aporte económico) on the bills of families with low consumption; in mid-2026 more than 2.3 million families using up to 100 kWh a month received it. The CNEE stresses that this support is applied after the tariff is calculated and does not change the tariff structure.
Regional differences
Tariffs differ by distributor because each buys under its own portfolio of contracts. EEGSA’s customers pay about 30% less per kWh than those of DEOCSA and DEORSA, which serve largely rural areas.
Other charges
Bills also include the street-lighting charge (tasa de alumbrado público), which each municipality sets, and VAT, as shown in the CNEE bill calculator.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Social tariff (Tarifa Social, BTSS) for regulated users consuming up to 300 kWh a month, created by Decree 96-2000. For August–October 2026: EEGSA Q1.42/kWh, DEOCSA Q2.03, DEORSA Q1.98. It covers about 3.9 million families, 93% of users. |
| Regulated | Yes | Non-social tariff (Tarifa No Social, BTS) for other low-voltage regulated users. For August–October 2026: EEGSA Q1.51/kWh, DEOCSA Q2.12, DEORSA Q2.06. It applies to about 300,000 users. |
| Other | Yes | Self-producer tariff (BTSA) for users with their own renewable generation; the CNEE publishes a separate bill calculator for it. Exported energy is credited in kWh against later consumption. |
| Time-of-use | Unknown | No current residential time-of-use schedule could be verified from the CNEE or distributor pages accessed. |
| Dynamic | No | Regulated households do not pay wholesale-linked prices. Only large users above 100 kW can contract freely, including at spot-related prices. |
| Fixed | No | There are no competing fixed-price household contracts; regulated tariffs are reset every quarter by the CNEE. |
Household prices compared with neighbouring countries (EUR per kWh).
- Honduras€0.215
- Guatemala€0.209
- Belize€0.198
- El Salvador€0.168
- Mexico€0.077
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 751 kWh/person/yr (2025)Source 9Derived, all sectors: AMM national system consumption of 14,042.01 GWh in 2025 divided by the World Bank 2025 population of 18,687,881.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity use per person in Guatemala is low by regional standards: about 750 kWh a year across all sectors. Most homes consume little; the CNEE reports that more than 2.3 million families use no more than 100 kWh a month, and 93% of users are on the social tariff for consumption up to 300 kWh a month.
Consumption on the national system grew 4.81% in 2025 to 14,042 GWh, and peak demand reached 2,204 MW, 3.88% more than in 2024 (AMM). Distributors bought 61% of the energy traded on the wholesale market for their regulated customers and retailers 28%, mainly to supply large users.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 56.3 % of population (2025)Source 21
Just over half of Guatemalans live in urban areas, the highest share in and around Guatemala City, which is served by EEGSA. Energuate’s DEOCSA and DEORSA cover most of the rest of the country, much of it rural, and some towns are served by municipal electricity companies.
For a new supply Energuate distinguishes by distance to its network: homes within 40 metres are connected without an application fee and get a meter within 28 days, homes 41–200 metres away pay a refundable financial contribution and are connected within 90 days, and longer extensions require an engineering study and budget.
How the grid works in Guatemala.
- TransmissionAdministrador del Mercado Mayorista (AMM), ETCEE-INDE and private transmission companies
- DistributionEEGSA (Guatemala City area), Energuate (DEOCSA west, DEORSA east) and around 16 municipal electricity companies
- MeteringNot identified from a reliable public source.
- Supply3 or more retail suppliers
Physical flow
Power from hydro plants, sugar-mill cogeneration (bagasse), coal and petroleum-coke plants, fuel-oil engines and a growing number of solar and wind farms flows over the transmission network to the distributors and large users. The system is interconnected with Mexico and, through the SIEPAC line, with the other Central American countries. In 2025 Guatemala imported 2,387.54 GWh, 33% more than in 2024, and exported 1,108.76 GWh (AMM).
Commercial flow
Distributors buy most of their energy through long-term contracts awarded in open tenders that the CNEE supervises (the PEG series; PEG-5-2025 and PEG-6-2026 were in progress in 2026), and buy or sell imbalances on the AMM spot market, where the average opportunity price was US$84.51/MWh in 2025. Generators above 5 MW, retailers trading at least 2 MW, distributors with at least 15,000 users and transmitters of at least 10 MW can be wholesale market agents. Regulated customers then pay the CNEE tariff of their distributor.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio de Energía y Minas (MEM) | Sets energy policy, grants authorisations to use public goods for generation above 5 MW and for transmission and distribution, and publishes the generation expansion plan (2026–2050). |
| Regulator | Comisión Nacional de Energía Eléctrica (CNEE) | Technical body of the ministry with functional independence, created in 1997. Sets regulated tariffs and tolls, issues technical standards (including the distributed generation standard NTGDR), authorises distributed renewable generators, runs supply tenders for distributors and resolves complaints. |
| System operator | Administrador del Mercado Mayorista (AMM) | Private non-profit entity that dispatches the national interconnected system (SNI), runs the spot (opportunity) market and settles transactions between generators, distributors, retailers, importers, exporters and large users. |
| TSO | ETCEE-INDE and private transmission companies | INDE’s transmission business ETCEE and private transmitters such as TRELEC and RECSA own the transmission networks. The CNEE sets each transmitter’s toll. |
| DSO | Empresa Eléctrica de Guatemala (EEGSA) | Distributor for Guatemala City and its surroundings, with about 1.6 million regulated users (1.4 million social and 175,000 non-social tariff users in 2026). |
| DSO | Energuate (DEOCSA and DEORSA) | Distribuidora de Electricidad de Occidente (DEOCSA) and de Oriente (DEORSA), trading together as Energuate, serve more than 2.7 million customers in 21 of the 22 departments. |
| DSO | Municipal electricity companies (EEM) | Around 16 municipal companies distribute in their towns; the CNEE also adjusts their tariffs. |
| Exchange | Ente Operador Regional (EOR) / Mercado Eléctrico Regional (MER) | Plans the regional transmission network, coordinates the Central American regional system and administers the regional market through which Guatemala trades with its neighbours. Guatemala is also interconnected with Mexico. |
Compared with the UK system.
| UK concept | Guatemala equivalent | How it works |
|---|---|---|
| DNO | Distribuidora (EEGSA, DEOCSA, DEORSA or a municipal company) | Each distributor holds an authorisation for a defined territory, awarded by the ministry, and is both network operator and supplier to the regulated customers in it. It connects new supplies, installs and reads meters and must allow distributed renewable generators to connect. |
| National Grid/NESO | AMM (system and market operator) and transmitters (ETCEE and others) | Unlike Great Britain, the system operator is a separate non-profit body that also runs the wholesale spot market and settlement. Transmission networks are owned by several companies, including INDE’s ETCEE. |
| MPAN | NIS (Número de Identificación de Suministro) | Each supply is identified by a NIS issued by the distributor. It appears on the bill and is used for transfers, self-producer applications, complaints and payments. There is no national register or common format across distributors. |
| MPRN | No equivalent | No household gas supply-point identifier was identified in the sources reviewed. |
| Meter operator | The distributor | The distributor owns and installs the meter. For self-producers it must supply and fit a bidirectional meter at its own cost (for regulated users) within 28 days of notification. |
| Supplier | The distributor for regulated users; comercializadores for large users | Households cannot switch. Users above 100 kW may buy from about 17 retailers (comercializadores) or directly from generators at freely agreed prices. |
| Smart-meter infrastructure | No national programme | No national smart-meter mandate or data hub was identified; any advanced metering is deployed by each distributor. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Número de Identificación de Suministro (NIS) |
| Who issues it? | The local distributor (EEGSA, DEOCSA/DEORSA or a municipal company) |
| Format | A numeric supply number assigned by the distributor when the supply is created. No public specification of its structure or length was found; each distributor uses its own numbering. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the electricity bill. Energuate asks applicants for a new supply to give the NIS from their nearest neighbour’s bill so it can locate the property on its network. |
| Electronic access | Energuate customers manage supplies in its online office (oficinavirtual.energuate.com) and app; EEGSA offers online balance checks and bill copies after registration. |
| Third-party access | No regulated third-party data access scheme was identified. A change of account holder requires the holder’s identity document (DPI) and no outstanding debts. |
| Who keeps the register | Each distributor keeps its own customer and supply register; distributors report new self-producers to the CNEE every quarter. |
| Register scope | Per DSO |
In Guatemala the supply (suministro) is the unit the distributor bills, and the NIS is its number. Energuate’s procedures use it throughout: it is needed to change the account holder (cambio de titular), to update contract details and to convert a supply to a self-producer (autoproductor) with solar panels.
When a new home is connected, Energuate asks for the applicant’s DPI, the NIS of the nearest neighbour’s supply (or a copy of that bill) and photos of the site and façade. A meter and service line are installed within 28 days if the home is within 40 metres of the network.
To change the account holder at Energuate the customer gives the NIS of the supply, the holder’s DPI (or, if the holder has died, the death certificate) and must have no unpaid bills. The pages consulted do not say whether the NIS changes when the holder changes, so whether it stays with the property is not confirmed.
Because each distributor runs its own system, a customer moving from an EEGSA area to an Energuate area gets a new supply with a new number. There is no national meter-point register comparable to the UK’s.
No public description of the NIS format was found, so no example is given here.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering in kWh: monthly surplus is credited against later consumption until used up; no payment for exported energy |
| Do self-producers need an authorisation? | No. Under article 36 of the NTGDR (CNEE resolution 227-2014), users with renewable surplus who do not want to sell electricity only need to notify their distributor on its form. The distributor reports new self-producers to the CNEE every quarter. |
| Is exported energy paid for? | No. Article 40 states that self-producers receive no payment for injected energy. If a month’s net reading is an injection, it becomes a kWh credit used against future consumption until exhausted. |
| What charges still apply? | The fixed charge and any capacity charges of the user’s tariff. For tariffs without capacity metering, the distributor may charge distribution charges on the energy it delivers. |
| Who pays for the meter? | For regulated users the distributor supplies and installs the bidirectional meter; large users are responsible for their own metering. |
| Is there a size limit? | The NTGDR does not set a separate kW limit for self-producers in the text reviewed. Single-phase generators may not exceed 50 kW, and projects up to 5 MW that want to sell energy can register as distributed renewable generators (GDR). |
| Can a small generator sell its output? | Yes, as a distributed renewable generator (GDR) of up to 5 MW connected to a distribution network. It needs a connection authorisation from the CNEE (the distributor has 45 days to study the request and the CNEE 30 days to resolve) and becomes a wholesale market participant. |
Connecting a home system.
- Design the renewable system with protection, control and automatic disconnection that prevents injection during network faults or when voltage is outside the distribution standard (NTSD).
- Notify the distributor using its form, giving the NIS, the holder’s DPI and NIT, a single-line diagram and the panel and inverter specifications (Energuate also asks for photos of the meter, panels, inverter, transformer and pole).
- The distributor inspects the installation within 15 days and issues a certificate if it complies.
- The distributor supplies and installs a bidirectional meter within 28 days of the notification.
- The supply is billed on the self-producer basis, with kWh credits carried forward.
Guatemala has two routes for small renewable generation, both set out in the NTGDR, issued by CNEE resolution 227-2014 of 25 August 2014, which replaced the 2008 standard. The self-producer with surplus energy (UAEE) route is for consumers who generate mainly for their own use and accept kWh credits for surplus; the distributed renewable generation (GDR) route is for plants of up to 5 MW that sell energy on the wholesale market or under contract.
Article 16 bis of the regulation of the General Electricity Law obliges distributors to allow GDRs to connect and to carry out the necessary network modifications; the CNEE evaluates their scope and cost.
The CNEE publishes a bill calculator for self-producers (tariff BTSA) and a statistical report on UAEE and GDR for 2020–2024, but the figures in it could not be read for this profile.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Free: no government authorisation, except a ministry (MEM) authorisation to use public goods (such as rivers or geothermal resources) for plants above 5 MW | MEM; environmental approval as applicable | General Electricity Law, article 8. The ministry has 90 days to decide. |
| Self-generate and inject surplus (UAEE) | No authorisation; notification to the distributor, inspection and bidirectional meter | Distributor, under CNEE standard NTGDR | Renewable sources only; surplus credited in kWh, not paid. |
| Distributed renewable generation for sale (GDR) | CNEE connection authorisation for plants up to 5 MW on the distribution network | CNEE, after the distributor’s study | GDRs are wholesale market participants; distributor has 45 days, CNEE 30 days. |
| Store energy | No specific storage licence identified | Not defined in the sources reviewed | Storage is not a defined activity in the NTGDR text reviewed. |
| Wholesale market participation | Agent status with minimum sizes: generators above 5 MW, retailers, importers and exporters trading at least 2 MW, distributors with at least 15,000 users, transmitters of at least 10 MW | AMM; limits set in the regulation of the law (article 39) | The ministry may revise the limits. |
| Supply (retail) to large users | Retailer (comercializador) participation in the wholesale market; customers above 100 kW are free to contract | AMM / CNEE | Prices for large users are freely agreed. |
| Supply to households (final distribution) | Distribution authorisation for a defined territory, awarded by public tender | MEM; tariffs by CNEE | General Electricity Law, article 20. No household retail choice. |
| Transmission | Authorisation where public goods are used; tolls regulated by CNEE | MEM and CNEE | Several private transmitters operate alongside ETCEE. |
| Aggregate DER / VPP / remote control of assets | No specific framework identified | Not defined | Households and small self-producers cannot participate in the wholesale market. |
| Balancing and reserve services | Provided by wholesale market participants under AMM rules | AMM | In 2025 the AMM paid US$13.6 million for fast reserve and US$53.0 million for operating reserve. |
The General Electricity Law separates generation, transmission and distribution and makes generation an open activity. Only the use of public goods for plants above 5 MW, transmission over public land and final distribution need authorisations from the ministry. Prices are free except for regulated transmission and distribution services and for supplies to regulated users.
Installers do not need an energy-sector licence, but self-producer installations must have protection and disconnection that meets the NTGDR, and grid-connected generators follow ANSI, IEEE or IEC standards as applicable.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Spot (opportunity) market | Restricted | 5 MW for generator agents; 2 MW for retailers | No | AMM. Hourly opportunity price; the 2025 average was US$84.51/MWh. Distributed renewable generators up to 5 MW can participate as market participants. |
| Fast and operating reserves (RRa, RRO) | Restricted | — | No | AMM. Reserve services are bought from wholesale market participants; the fast reserve price was US$6.45/kW-month in 2025. |
| Regional electricity market (MER) | Restricted | — | No | EOR. Imports and exports by Guatemalan agents; small resources do not take part. |
Guatemala has a working wholesale market with hourly prices, reserves and regional trade, but it is open only to agents above the size thresholds in the regulation. No framework for aggregating household batteries, demand response or self-producers was identified.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national programme identified; meters are owned and installed by each distributor |
| Reading interval | Not published for household meters |
| Self-producer meter | Bidirectional, supplied by the distributor |
| Meter installation for self-producers | Within 28 days of notification |
| Meter for a new supply (Energuate, ≤40 m) | Within 28 days |
There is no national smart-meter mandate or data hub in Guatemala. Each distributor buys, installs and reads its own meters. The only metering rule found that applies specifically to small consumers is the NTGDR requirement for bidirectional measurement, registration and reading for self-producers.
Renewable electricity.
Electricity generation mix (2024).
- Hydro: 39.9%
- Bioenergy: 22.2%
- Coal: 15.8%
- Oil and petroleum coke: 15.8%
- Wind: 2.3%
- Other renewables (geothermal): 2.2%
- Solar: 1.8%
- Renewable electricity share
- 53% (2025)Source 9Share of all energy supplied to the national interconnected system (SNI) in 2025, including imports, which were about 16% and are counted as not renewable here. Excluding imports, renewables were about 63% of domestic generation (derived from the AMM shares). Ember data via Our World in Data give 68.3% of generation for 2024.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Total installed capacity
- 3.825 GW (2024)Source 16Renewables 2,704 MW (71%), non-renewable 1,122 MW.
- Hydro
- 1.575 GW (2024)Source 16
- Bioenergy
- 0.87 GW (2024)Source 16
- Wind
- 0.107 GW (2025)Source 19
- Solar PV
- 0.102 GW (2025)Source 18
- Geothermal
- 0.049 GW (2024)Source 16
Targets.
- Generation expansion plan 2026–2050 (MEM) and indicative generation and transmission expansion plans 2024–2054 (CNEE) guide future capacity.
- Long-term supply tenders PEG-5-2025 and PEG-6-2026 for power and energy for the distributors were in progress in 2026.
Guatemala’s renewable electricity comes mainly from hydro and from sugar-mill cogeneration with bagasse, which generates mainly during the cane harvest. Coal and petroleum-coke plants and fuel-oil engines make up most of the rest.
The AMM’s 2025 statistics show production by resource of 34.7% hydro, 10.8% biomass, 3.4% solar, 2.2% wind, 1.7% geothermal and 0.1% biogas, against 16.8% coal, 10.2% petroleum coke, 3.9% bunker fuel oil and 0.6% natural gas, with imports making up about 16% of the energy delivered. The mix chart uses Ember’s 2024 data, which exclude imports.
Hydro output follows the rainy season: CNEE data show hydro production peaking in October and falling through the dry months, when thermal plants make up the difference.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is not a separately regulated activity in the NTGDR or the General Electricity Law texts reviewed. System flexibility comes mainly from hydro reservoirs, thermal plants and imports from Mexico and the regional market.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EEGSA (Empresa Eléctrica de Guatemala) | ~1.6 million regulated users (1.4 million social and 175,000 non-social tariff), 2026 | No | Unknown | No | Limited |
| Energuate – DEOCSA (Distribuidora de Electricidad de Occidente) | ~1.45 million regulated users (1.4 million social and 50,000 non-social tariff), 2026 | No | Unknown | No | Limited |
| Energuate – DEORSA (Distribuidora de Electricidad de Oriente) | ~0.95 million regulated users (0.9 million social and 55,000 non-social tariff), 2026 | No | Unknown | No | Limited |
Households are supplied by the distributor for their area, so the “supplier” is decided by address. User numbers are the CNEE’s rounded figures for the social and non-social tariffs. Municipal electricity companies serve the remaining users in their towns.
“Export tariff: Limited” reflects net metering in kWh: surplus is credited but not paid. Large users above 100 kW can instead contract with about 17 retailers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministerio de Energía y Minas (MEM) | Government | Energy policy and authorisations | Grants generation, transmission and distribution authorisations and publishes the generation expansion plan. |
| Comisión Nacional de Energía Eléctrica (CNEE) | Regulator | Electricity regulator | Sets quarterly tariffs, technical standards (NTGDR, NTSD) and handles consumer complaints. |
| Administrador del Mercado Mayorista (AMM) | Market | System and wholesale market operator | Publishes the main operational statistics: generation, demand, imports and prices. |
| INDE / ETCEE | Transmission | State utility: generation, transmission and the social contribution | Owns transmission through ETCEE and pays the contribution on low-consumption households’ bills. |
| EEGSA | Distribution | Distributor for the Guatemala City area | Largest single distribution company by non-social users. |
| Energuate | Distribution | DEOCSA and DEORSA distributors | Serves more than 2.7 million customers in 21 departments and handles self-producer connections there. |
| Ente Operador Regional (EOR) | Market | Regional system and market operator | Runs the Central American regional market used for Guatemala’s imports and exports. |
| CRIE (Comisión Regional de Interconexión Eléctrica) | Regulator | Regional electricity regulator | Regulates the Central American regional market and transmission network. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Distributed generation and self-producers | NTGDR (CNEE resolution 227-2014) | CNEE | Connection, operation, control and commercial rules for GDR up to 5 MW and UAEE net metering. |
| Anti-islanding and protection | NTGDR article 15 protection table | CNEE | Over/under-voltage and frequency trips, disconnection devices and an anti-islanding (loss-of-grid) relay are required in every size band (≤50 kW, to 500 kW, 500–2,000 kW, 2,000–5,000 kW). Single-phase generators are limited to 50 kW. |
| Equipment standards | ANSI, IEEE or IEC (as applicable) | Referenced by the NTGDR | Inverters must filter disturbances and match the 60 Hz nominal frequency. |
| Distribution service quality | NTSD (Normas Técnicas del Servicio de Distribución) | CNEE | Voltage tolerances that self-producer protection must respect. |
| Distribution network design | NTDOID | CNEE | Design and operation of distribution installations. |
| Grid connection (transmission) | Norma Técnica de Conexión (CNEE-70-2023) and NTAUCT | CNEE | Connection to and use of the transmission system. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Notification to distributor (self-producer) | Yes | National | Form submitted to the distributor; no authorisation is needed. Inspection within 15 days, meter within 28 days. |
| CNEE authorisation (distributed generator selling energy) | Limited | National | Only for GDRs up to 5 MW that sell energy; distributor study (45 days) then CNEE resolution (30 days). |
| Environmental approval | Limited | National | GDR applications must include the environmental authorisation for the project; not identified as required for household self-producers. |
| MEM authorisation for use of public goods | Limited | National | Only for plants above 5 MW using State goods. |
For a household rooftop system the only formal step is notifying the distributor and passing its inspection. Municipal permit requirements for small solar installations were not identified in the sources reviewed.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for self-producers (UAEE) | Active | Net metering | Monthly surplus is credited in kWh against later consumption until used; no cash payment. Fixed and capacity charges still apply. | Since CNEE resolution 227-2014 (2014) |
| Social tariff (Tarifa Social) | Active | Regulated tariff | Lower regulated tariff for users consuming up to 300 kWh a month (Decree 96-2000); about 3.9 million families in 2026. | — |
| INDE contribution (aporte económico) | Active | Bill subsidy | Contribution on the bills of families using up to 100 kWh a month; more than 2.3 million families in mid-2026. | — |
Data and connectivity.
- Fixed broadband
- 5.3 fixed subscriptions per 100 people (2024)Source 22
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Fixed broadband is limited (about 5 subscriptions per 100 people in 2024), so any remote meter reading or device control relies largely on mobile networks. No regulatory requirement for smart-meter communications was identified.
Grid conditions.
- National peak demand
- 2.204 GW (2025)Source 92,204.22 MW, up 3.88% on 2024; load factor 75.58%.
- Annual electricity demand
- 14 TWh (2025)Source 9Consumption of the national interconnected system (14,042.01 GWh). Domestic production was 13,308.41 GWh.
- Generation capacity
- 3.825 GW (2024)Source 16
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Demand is growing steadily: consumption rose 4.81% and peak demand 3.88% in 2025. Imports grew 33% in the same year, making trade with Mexico and the regional market an important part of supply.
The seasonal pattern of hydro (high in the rainy season to October) and sugar-cane cogeneration shapes dispatch, with coal, petroleum coke and fuel oil covering the gaps. The CNEE’s 2026 communiqués attribute tariff stability to the diversity of the distributors’ long-term contract portfolios.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Quarterly tariff adjustment August–October 2026 | Current | 1 August 2026 | Social and non-social tariffs unchanged at EEGSA and DEORSA and down 0.5% at DEOCSA. |
| Next quarterly tariff adjustment | Upcoming | 1 November 2026 | The CNEE reviews distributors’ actual purchase costs each quarter and sets tariffs for November 2026–January 2027. |
| Supply tenders PEG-5-2025 and PEG-6-2026 | Upcoming | In progress (2026) | Open tenders to contract power and energy for the distributors’ regulated customers. |
| Generation expansion plan 2026–2050 | Current | 2026 | MEM indicative plan for new generation capacity. |
| NTGDR distributed generation standard | Current | August 2014 | CNEE resolution 227-2014 sets the 5 MW GDR regime and kWh net metering for self-producers. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Total solar capacity was about 0.10 GW in 2025 (IRENA) and unchanged since 2023; self-producer surplus earns kWh credits only. |
| Distributed energy market | Medium | A long-standing framework (NTGDR, 2014) allows self-producers by notification only and GDR plants up to 5 MW to sell on the wholesale market. |
| Grid flexibility market | Low | Wholesale spot and reserve markets exist but require 2–5 MW minimum sizes; no aggregation framework was identified. |
| Energy storage adoption | Low | No official data on battery storage and no storage-specific regulation identified. |
| Renewable growth environment | Low | IRENA shows solar and wind capacity essentially flat between 2023 and 2025, and renewables’ share of supply was about 53% in 2025 as coal, petroleum coke and imports grew. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 22 sources
- Comunicado: tarifas trimestrales agosto a octubre de 2026. CNEE, 2026. accessed 9 October 2026.
- Comunicado: tarifas trimestrales febrero a abril de 2026. CNEE, 2026. accessed 9 October 2026.
- Sector eléctrico. CNEE, 2026. accessed 9 October 2026.
- Planificación y mercado (licitaciones PEG, planes de expansión). CNEE, 2026. accessed 9 October 2026.
- Norma Técnica de Generación Distribuida Renovable y Usuarios Autoproductores con Excedentes de Energía (Resolución CNEE-227-2014). CNEE, 2014. accessed 9 October 2026.
- Ley General de Electricidad (Decreto 93-96). Congreso de la República, via CNEE, 1996. accessed 9 October 2026.
- Reglamento de la Ley General de Electricidad. MEM, via CNEE. accessed 9 October 2026.
- Ley de Tarifa Social para el Suministro de Energía Eléctrica (Decreto 96-2000). Congreso de la República, via CNEE, 2000. accessed 9 October 2026.
- Informe Estadístico 2025. Administrador del Mercado Mayorista (AMM), 2026. accessed 9 October 2026.
- Conócenos. Energuate, 2026. accessed 9 October 2026.
- Nuevos servicios. Energuate, 2026. accessed 9 October 2026.
- Cambio titular del contrato. Energuate, 2026. accessed 9 October 2026.
- Cambio de suministro a autoproductor. Energuate, 2026. accessed 9 October 2026.
- Tipo de cambio de referencia, 9 October 2026. Banco de Guatemala, 2026. accessed 9 October 2026.
- ECB euro reference exchange rate: US dollar (USD). European Central Bank, 2026. accessed 9 October 2026.
- Energy Profile: Guatemala. IRENA, 2025. accessed 9 October 2026.
- Share of electricity production by source: Guatemala (Ember). Our World in Data, 2024. accessed 9 October 2026.
- Installed solar capacity: Guatemala (IRENA). Our World in Data, 2025. accessed 9 October 2026.
- Installed wind capacity: Guatemala (IRENA). Our World in Data, 2025. accessed 9 October 2026.
- Population, total: Guatemala. World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total population): Guatemala. World Bank, 2025. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people): Guatemala. World Bank, 2024. accessed 9 October 2026.
Questions about energy in Guatemala.
It depends on the distributor. From August to October 2026 the social tariff (for users up to 300 kWh a month) is Q1.42 per kWh at EEGSA, Q2.03 at DEOCSA and Q1.98 at DEORSA; the non-social tariff is Q1.51, Q2.12 and Q2.06. Bills also include the municipal street-lighting charge and VAT.
Households are supplied by the distributor for their area: EEGSA around Guatemala City, Energuate (DEOCSA and DEORSA) in most of the rest of the country, or a municipal electricity company. Only users above 100 kW can choose a retailer.
Not for money as a household. As a self-producer (UAEE) you notify your distributor, it fits a bidirectional meter, and any monthly surplus is credited in kWh against future consumption. Plants up to 5 MW that want to sell energy can register as distributed renewable generators with CNEE authorisation.
The NIS (Número de Identificación de Suministro), the supply number your distributor prints on your bill. You need it for changes of account holder, self-producer applications and complaints. Each distributor keeps its own register.
About 53% of the energy supplied to the grid in 2025 came from renewables (AMM), mainly hydro (34.7%) and sugar-cane biomass (10.8%). Coal, petroleum coke and fuel oil supplied about 31% and imports about 16%.
A lower regulated tariff created by Decree 96-2000 for users consuming up to 300 kWh a month. It covers about 93% of users. Families using up to 100 kWh a month may also receive a contribution from INDE on their bill.
Every quarter. The CNEE reviews what the distributors paid for power and energy and adjusts tariffs on 1 February, 1 May, 1 August and 1 November.