Countries

Energy in Honduras, explained.

How electricity works in Honduras: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Honduras: Not yet available.Olmack is not offered in Honduras yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Honduras.

Honduras electricity market 2026: quarterly CREE tariffs, ENEE as single buyer and distributor, the CND system operator, net billing for self-generators and grid data.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Honduran lempira (HNL) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Honduras energy at a glance.

Key figures for households in Honduras. Each one links to its source on the full overview below.

  • Electricity price.

    6.51 HNL per kWh for households, including taxes. Figures for Oct–Dec 2026.

  • Household use.

    1,766 kWh a year for a typical household. Figures for 2025.

  • Renewable share.

    57.4% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Honduras.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Honduras below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Honduras requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Honduras.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Honduras, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Honduras, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Honduras.

Full overview

The energy market in Honduras, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Honduras’s electricity sector is organised under the Ley General de la Industria Eléctrica (LGIE, Decree 404-2013), which opened generation to competition and created an independent regulator, the Comisión Reguladora de Energía Eléctrica (CREE). A 2022 reform (Decree 46-2022) declared electricity a public good and a human right, placed the system and market operator back inside the state utility as the Centro Nacional de Despacho (CND), and reinforced the central role of the Empresa Nacional de Energía Eléctrica (ENEE).

In practice ENEE is the only distributor on the national interconnected system (SIN) and the only buyer of power from private generators. It owns the large reservoir hydro plants and the transmission network, buys most of its energy through long-term contracts, and supplied 2,170,368 metered customers at the end of 2025, of which 1,998,955 were households. Only the Bay Islands and parts of Gracias a Dios are served by small private island utilities outside the SIN.

Tariffs for regulated customers are set by CREE every quarter, mainly to pass through changes in generation cost. Fossil-fuel plants still produced about 43% of electricity in 2025, so tariffs move with oil prices and the lempira–dollar exchange rate. The Secretaría de Energía (SEN) reported a renewable share of generation of 57.41% in 2025, led by hydropower, with solar, biomass, wind and geothermal making up the rest. Households may install renewable generation for their own use and are credited for surplus energy at a CREE-approved avoided-cost tariff.

Energy snapshot.

Headline figures for electricity in Honduras. Each shows its data year and links to its source.

  • Population10,186,738 peopleSource 17June 2026
  • Households2,986,250 householdsSource 17June 2026
  • Average household size3.41 people/householdSource 17June 2026
  • Electricity use per household1,766 kWh/yrSource 142025
  • Household price (HNL)6.51 HNL/kWhSource 1Oct–Dec 2026
  • Household price (EUR)0.215 EUR/kWhSource 24Oct–Dec 2026
  • Renewable electricity share57.4%Source 142025
  • Solar capacity0.563 GWSource 142025
  • Wind capacity0.238 GWSource 142025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
CREE (Comisión Reguladora de Energía Eléctrica)
System operator
Centro Nacional de Despacho (CND), the system and market operator within ENEE
Distribution networks
ENEE is the sole distributor on the national grid; small private utilities serve the isolated Bay Islands and Gracias a Dios systems
Currency
Honduran lempira (HNL)
Voltage and frequency
120 V (120/208 V three-phase) / 60 Hz

Electricity prices in Honduras.

Household price (HNL)
6.51 HNL/kWh (Oct–Dec 2026)Source 1ENEE residential tariff, energy charge for each kWh above the first 50 kWh a month, in force from October 2026. The first 50 kWh cost L5.0031/kWh and there is a fixed charge of L59.74 a month. Excludes any public-lighting charge, any state subsidy and any taxes, which were not verified.
Household price (EUR)
0.215 EUR/kWh (Oct–Dec 2026)Source 24Derived: L6.5102/kWh converted at the 27.0307 HNL/USD rate CREE used for the tariff (Banco Central de Honduras, 29 September 2026) and the ECB reference rate of USD 1.1206 per euro on 9 October 2026.
Typical annual electricity bill
11,531 HNL/yr (Oct–Dec 2026 tariff (annualised))Source 1Illustrative, derived: 150 kWh a month = L59.74 fixed + 50 kWh × L5.0031 + 100 kWh × L6.5102 = L960.92 a month, × 12. 150 kWh is close to the 2025 average of about 147 kWh per residential customer. Excludes taxes, public lighting and subsidies.

Household price trend (HNL per kWh).Source 14

4.9725.7416.512025 Q12026 Q4
Honduras household electricity price, HNL per kWh
2025 Q16.407 HNL/kWh
2025 Q25.82 HNL/kWh
2025 Q35.2146 HNL/kWh
2025 Q44.9719 HNL/kWh
2026 Q25.7372 HNL/kWh
2026 Q36.468 HNL/kWh
2026 Q46.5102 HNL/kWh

How tariffs are set

CREE approves the tariff structure that ENEE must apply and adjusts it every quarter under the Regulation for the Calculation of Provisional Tariffs (Resolution CREE-016 of 2016, as amended). The quarterly adjustment compares the actual cost of energy and capacity purchased in the previous three months with the projected base generation cost (Costo Base de Generación), which the system operator calculates each year. For 2026 the projected cost was 125.86 USD/MWh. Transmission costs are reviewed annually and three-yearly and the distribution value added every five years.

Generation makes up about two-thirds of the average tariff (63.6–68.8% in the four quarters of 2025, according to SEN), with distribution about 20–23% and transmission and commercial costs the remainder.

Recent movements

Residential prices fell through 2025 as fuel costs eased, then rose sharply in 2026. The price for each kWh above 50 kWh was L6.407 in the first quarter of 2025 and L4.9719 in the last; it was L5.7372 in April–June 2026, L6.4680 in July–September (an average tariff rise of 12.48%) and L6.5102 from October 2026. For the fourth quarter of 2026 CREE calculated that generation costs between June and August had exceeded projections by USD 214.2 million because bunker and diesel prices were 55.71% and 99.61% above forecast and hydro output was lower than expected. ENEE chose to defer USD 104.9 million of that balance to later quarters, so the average tariff rose by only 0.64%, from L5.98 to L6.02/kWh, mainly reflecting the exchange rate.

Cross-subsidy

CREE’s tariff model contains a cross-subsidy within the residential category (factors of 0.83 and 1.08 in the October 2026 calculation): the cost-based average price of homes using up to 50 kWh a month is L8.41/kWh but they are charged L5.0031, while consumption above 50 kWh is charged slightly above its calculated cost. The distribution regulation also requires bills to show any direct state subsidy and discounts for older people and pensioners where legislation grants them; the current direct-subsidy arrangements were not verified.

Comparison

Commercial low-voltage customers pay slightly more per kWh than households above 50 kWh, while medium- and high-voltage industrial customers pay L4.33 and L4.09/kWh plus demand charges because they do not use the low-voltage network.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesServicio Residencial (Oct–Dec 2026): fixed charge L59.74 a month; homes using 0–50 kWh pay L5.0031/kWh; homes using more pay L5.0031 for the first 50 kWh and L6.5102 for each further kWh. Commercial low-voltage customers (Servicio General en Baja Tensión) pay L59.74 plus L6.5115/kWh.
Time-of-useLimitedCREE’s tariff schedule includes an hourly (tarifa horaria) option with a demand charge: for residential customers above 50 kWh, Oct–Dec 2026, L240.1125/kW-month plus L6.2667/kWh at peak, L4.9887 in the intermediate block and L3.5104 off-peak. It requires suitable metering; take-up was not found.
PrepaymentLimitedThe distribution service regulation (Acuerdo CREE-028) allows ENEE to install prepayment meters at its discretion or at a customer’s request, with tariffs that reflect the utility’s working-capital savings. No published prepayment tariff or roll-out figures were found.
OtherYesSelf-generating households (usuarios autoproductores) move to a two-part (binomial) tariff for the energy they draw from the grid and are credited for surplus at the CREE excess-energy tariff (L2.5005/kWh at low voltage from October 2026).
DynamicNoNo residential tariff linked to the spot price exists; regulated tariffs are reset quarterly.
FixedNoThere is no retail competition and no fixed-price contract offer for households.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,766 kWh/yr (2025)Source 14Derived: 3,529.79 GWh billed to the residential sector in 2025 divided by 1,998,955 residential customers at December 2025 (ENEE data in SEN’s IEASEN 2025) ≈ 1,766 kWh per customer, about 147 kWh a month. 71.45% of residential customers use 150 kWh a month or less, while the 3.83% using more than 500 kWh account for about a quarter of residential consumption.
Average daily use per household
4.84 kWh/day (2025)Source 14Derived from the average residential consumption of about 1,766 kWh a year per customer.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
735.6 kWh/person/yr (2025)Source 14All sectors: 7,389.73 GWh billed by ENEE divided by the INE population estimate (ENEE/SEN). The World Bank gives 816 kWh per person for 2024 on a different basis.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Household electricity use is low by regional standards and very unequal. In December 2025, 54.48% of ENEE’s residential customers used 100 kWh a month or less and a further 16.97% used 101–150 kWh, while 76,537 customers (3.83%) used more than 500 kWh a month and accounted for about a quarter of residential energy. Households took 47.77% of electricity billed in 2025, commerce 26.86% and industry 19.61%.

National demand peaks in the evening, between 19:00 and 21:00, with a smaller midday peak. The 2025 system peak of 2,086.72 MW was recorded at 19:36 on 21 May, in the hot dry season when cooling loads are highest.

Access is still incomplete. SEN’s electricity coverage index was 84.64% in 2025 (94.38% urban, 72.86% rural) and its access index, which includes off-grid solutions, 86.44%; Gracias a Dios had only 10.44% coverage. In INE’s June 2026 survey 90.63% of dwellings were lit by the public grid, 2.59% by private collective systems and about 3.4% by solar systems or lamps. SEN also notes that some households are connected without a meter and do not appear in ENEE’s customer database.

Housing and households.

Dwellings
2,956,273 dwellings (June 2026)Source 18Occupied dwellings in the EPHPM June 2026: 1,768,079 urban and 1,188,194 rural.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
56.1 % of population (June 2026)Source 17Derived: 5,718,292 urban residents out of 10,186,738 (EPHPM). The World Bank estimates 59.3% for 2025.

Honduras has close to 3 million households, 60% of them in urban areas; Tegucigalpa’s Distrito Central (360,388 households) and San Pedro Sula (226,345) are the largest cities. Households are relatively large (3.41 people on average) and income is low: INE’s June 2026 survey classed 61.1% of households as poor.

Housing conditions vary sharply between town and country. Rural households are larger, much less likely to have piped water or sewer connections, and more likely to rely on solar kits, private collective systems or candles for light. These factors, rather than building type, shape where rooftop solar and other distributed energy are practical.

How the grid works in Honduras.

  1. TransmissionCentro Nacional de Despacho (CND), ENEE Transmisión
  2. DistributionENEE is the sole distributor on the national grid; small private utilities serve the isolated Bay Islands and Gracias a Dios systems
  3. MeteringNot identified from a reliable public source.
  4. Supply1 or more retail suppliers

Physical flow

In 2025 Honduras had 3,577 MW of generating capacity in about 117 plants on the SIN: 1,451.8 MW of bunker and diesel engines, 934.3 MW of hydro, 562.5 MW of solar, 245.4 MW of biomass, 238.1 MW of wind, 105 MW of coal and 40 MW of geothermal. Solar plants are concentrated in the south (Choluteca and Valle) and industry in the north-west around San Pedro Sula. Energy moves over a largely radial 69/138/230 kV transmission network to ENEE’s distribution system, with transmission losses of 3.45% in 2025. Interconnections with Guatemala, El Salvador and Nicaragua link Honduras to the Central American Regional Electricity Market (MER); Honduras imported 485.53 GWh in 2025 and exported only 3.97 GWh.

Commercial flow

Private generators sell to ENEE under long-term contracts, many awarded in public tenders, and any differences are settled in the national spot market (Mercado Eléctrico de Oportunidad) operated by the CND at marginal cost. ENEE recovers these purchases, plus transmission, distribution and commercial costs, through the quarterly CREE tariff. The 2022 reform allowed ENEE to renegotiate power-purchase contracts, and Decree 3-2025 approved a set of renegotiated contracts whose costs are now passed through to tariffs.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistrySecretaría de Estado en el Despacho de Energía (SEN)Sets energy policy, publishes national energy statistics and is preparing a National Energy Policy 2050 with the Inter-American Development Bank.
RegulatorComisión Reguladora de Energía Eléctrica (CREE)Approves tariffs every quarter, issues technical standards (including the self-generator standard NT-UAP), keeps the public register of electricity companies, licenses transmission and distribution and handles escalated consumer complaints.
System operatorCentro Nacional de Despacho (CND)Dispatches the SIN, operates the national wholesale market (contracts and spot market), calculates the base generation cost and plans generation and transmission expansion. Since the 2022 reform it is a public body within ENEE’s structure; the former Operador del Sistema (ODS) web address now redirects to it.
TSOENEE TransmisiónOwns and operates 3,058.87 km of 69, 138 and 230 kV lines and 72 substations; links to Guatemala, El Salvador and Nicaragua through the regional SIEPAC network.
DSOENEE DistribuciónThe only distributor on the SIN, organised in three regions (Centro-Sur, Noroccidente and Litoral Atlántico). Connects customers, owns and reads meters, bills and approves self-generation connections. Distribution losses were 33.89% at the end of 2025.
SupplierEmpresa Nacional de Energía Eléctrica (ENEE)Single buyer of energy from private generators and the only retail supplier to regulated customers on the SIN.
DSOIsolated-system utilities (RECO, BELCO, UPCO, INELEM, CEGASA)Private companies serving the Bay Islands (Roatán, Guanaja, Utila) and parts of Gracias a Dios outside the SIN; CREE sets their tariffs separately.

Compared with the UK system.

Compared with the UK system.
UK conceptHonduras equivalentHow it works
DNOENEE DistribuciónOne state-owned distributor covers the whole interconnected system, instead of regional network companies. It also bills customers, so network operation and retail supply are in the same organisation.
National Grid/NESOENEE Transmisión and the Centro Nacional de Despacho (CND)ENEE owns the transmission network; the CND, also within ENEE since 2022, dispatches generation, runs the wholesale market and plans expansion, with CREE approving the plans.
MPANClave (ENEE customer code) plus meter numberThere is no national meter-point number. Each supply contract has a customer code (clave) in ENEE’s billing system, printed on the bill alongside the meter number, tariff and location.
MPRNNo equivalentHonduras has no piped natural-gas network for homes; cooking uses LPG, firewood or electricity.
Meter operatorENEE (the distributor)The distributor installs, seals, reads and calibrates meters, using laboratories accredited by the Organismo Hondureño de Acreditación under ISO/IEC 17025. Self-generators may supply their own bidirectional meter if ENEE has none available.
SupplierENEE (no choice)Households cannot change supplier. Only consumers with demand above 5 MW can become qualified consumers and buy directly from generators.
Smart-meter infrastructureNo national programme identifiedThere is no DCC-style data network or national smart-meter mandate. Investment has focused on distribution automation, such as the Korean-funded control centre opened at La Cañada substation in September 2026.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Clave (código de usuario)
Who issues it?The distributor (ENEE on the national grid)
FormatA numeric customer code allocated in the distributor’s commercial system when a supply contract is opened, printed on each bill together with the meter number. Its structure is not set out in published regulation.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the monthly bill: the distribution service regulation requires every bill to show the customer’s name, address, tariff, clave, location and meter number, plus the payment due date.
Electronic accessNot verified. ENEE operates customer-service lines (118 free from mobiles) and regional offices; no regulated online data-access service was identified.
Third-party accessNo regulated third-party data-access scheme exists. Self-generator applications must quote the customer code, and distributors report each self-generator’s data to CREE quarterly.
Who keeps the registerENEE’s commercial (billing) database; distributors must also keep a register of self-generators that CREE can audit.
Register scopePer DSO

In Honduras a residential supply point is identified through the customer’s supply contract with the distributor rather than through a national meter-point number. When a home is connected, ENEE signs a supply contract that records the customer’s identity and contact details, the address of the property, the voltage, contracted capacity, number of phases, service-cable size, deposit and tariff category, and enters a new account in its billing system. The first bill must be issued within 32 days. The account is referred to by its clave, and the physical meter has its own number; both appear on every bill.

Because ENEE is the only distributor on the interconnected system, its billing database is effectively the national register for the SIN. Customers on Roatán, Guanaja, Utila or in Gracias a Dios hold accounts with the local island utility instead, under that company’s numbering.

The same customer code is used in other regulated processes. A household applying to connect solar panels must give its customer code on the application, and the distributor’s self-generator database records the code, the UTM coordinates of the installation, the substation, circuit and transformer it is connected to, the installed capacity and any battery storage.

The sources reviewed do not say whether a clave stays with the property or with the customer when the occupant changes; the regulation provides for terminating a contract and closing the account when a customer leaves. No fictional example is given because the code’s format is not published.

Complaints follow the same identifier: a customer first complains to the distributor and receives a case number (número de gestión), and can escalate to CREE if the distributor does not resolve it within the regulated time.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingYes
How exported electricity is paidSurplus credited on the bill at a CREE-approved avoided-cost tariff, adjusted quarterly (L2.5005/kWh at low voltage from October 2026); excess credit rolls over to later bills
Who can export?Residential and commercial customers with renewable generation on their own premises (usuarios autoproductores), under the CREE technical standard NT-UAP (Acuerdo CREE-10-2023, amended by CREE-07-2025). Generation must be intended to supply the customer’s own demand, which the distributor checks annually.
Are there size bands?Type A covers all residential customers and low-voltage commercial customers; type B is medium-voltage commercial customers with up to 1 MW of generation; type C is medium-voltage customers above 1 MW, who need full power-flow and short-circuit studies.
How are exports paid?As credits on the bill. CREE sets the excess-energy tariff quarterly from ENEE’s avoided cost, using the cost of solar energy in the wholesale market and marginal costs in the hours when solar systems inject. Under the transitional method approved by Acuerdo CREE-57-2026, the rate from 1 October 2026 is L2.5005/kWh (USD 92.50/MWh) at low voltage and L3.0077/kWh at medium voltage, against L2.31 and L2.82 the previous quarter. A definitive methodology is being developed by consultants.
Is battery storage allowed?Yes. Since the 2025 amendment self-generators may use storage systems to store their surplus; the application must state the battery power (kW) and capacity (kWh).
What equipment standards apply?Medium-voltage applicants must provide manufacturing certificates such as UL or IEC 61215 and, for panels, IEC 61730, and a design signed by a registered electrical engineer (CIMEQH).

Connecting a home system.

  1. Check grid information published by the distributor to confirm there is no restriction at the connection point.
  2. Submit an authorisation request to the distributor, signed by the contract holder, with the customer code, technology, capacity in kVA, expected output, start date, any battery storage, a sworn declaration, the last paid bill and equipment data sheets.
  3. The distributor approves or rejects the request within 10 working days for residential and low-voltage commercial customers (type A) or 15 working days for medium-voltage customers, and sets technical conditions and the metering required.
  4. Install the system within the 90-day validity of the approval, with the protection and disconnection devices the distributor specifies.
  5. Notify the distributor of the start date 15 days in advance; it may inspect the installation.
  6. The distributor installs a bidirectional meter within 15 days, the customer signs an addendum to the supply contract and moves to a two-part tariff, and surplus is credited on subsequent bills.

The LGIE (Article 15) obliges distributors to buy surplus renewable energy injected by residential and commercial customers, crediting it on the monthly bill at a tariff approved by CREE, and to install bidirectional meters. For several years this obligation existed without a working payment mechanism: the 2020 distribution regulation said injected energy would only be recorded until a tariff was issued. CREE now publishes a quarterly excess-energy tariff for ENEE’s self-generators.

The scheme is net billing rather than kWh netting. Energy drawn from the grid is charged at the self-generator’s two-part retail tariff, while exported energy is valued at the much lower avoided-cost rate (about L2.50/kWh against L6.51/kWh for residential consumption above 50 kWh in late 2026). The value of a system therefore depends mainly on how much of its output is used on site.

Customers who are qualified consumers (demand above 5 MW) are treated differently: their surplus is sold in the national spot market at the marginal price at their transmission node.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (self-consumption)No licence; distributor authorisation under NT-UAP for any grid-connected renewable systemDistributor (ENEE), with CREE oversightType A, B or C depending on voltage and size; non-renewable self-generation is not covered by the excess-energy tariff.
Generate electricity (sale to the market)Registration as a generating company in CREE’s public register, environmental licence and authorisation by the CND as a market agentCREE; Secretaría de Recursos Naturales y Ambiente; CNDMust be a company (sociedad mercantil). A CREE permit is needed to study a resource, and a connection contract with the network owner.
Store electricityBehind-the-meter storage declared in the NT-UAP application; no separate licence identifiedDistributor; CREEGrid-scale storage participates in the spot market as an asset; no specific storage licence regime was found.
Export to the gridAllowed for authorised self-generators using renewablesDistributor; tariff set by CREEPaid by bill credits at the avoided-cost excess tariff.
Sell / supply electricity to consumersDistribution and sale to regulated users require a CREE operating licence for public electricity service plus registrationCREEENEE is the only distributor on the SIN; generators may sell directly only to qualified consumers (demand above 5 MW).
AggregateNo aggregator role exists in the regulationCREENot provided for in the LGIE or market rules reviewed.
Trade / wholesaleMarket agents (generators, distributors, qualified consumers, traders) must be registered and authorised by the CND to transactCREE register; CND under the market operation regulation (ROM, Acuerdo CREE-074-2020)Regional trading in the MER also follows the rules of the regional regulator (CRIE) and operator (EOR).
Balancing / grid servicesProvided by generators dispatched by the CND; ancillary services are traded through contracts and the spot marketCND; CREENo route for small distributed assets was identified.
VPP / remote control of assetsNo specific rules—Distributors define protection and disconnection devices for self-generators and may disconnect unsafe or unauthorised systems.
Install equipmentMedium-voltage self-generation designs must be signed by an electrical engineer registered with CIMEQHCIMEQH; distributorFor residential (type A) applications, the NT-UAP does not require an engineer’s certificate.

Licensing in Honduras is light for households but structured around a small number of authorised companies. CREE’s public register is for companies of the electricity sector (generators, transmitters, distributors and traders); transmission and distribution companies also need an operating licence for public service. Households never need a licence to generate for their own use, but they must obtain the distributor’s authorisation before connecting any system and can be disconnected without notice, and reported to CREE for sanctions, if they connect without it.

Market access is restricted. Only qualified consumers with demand above 5 MW (set by Decree 46-2022) can leave the regulated tariff and contract with generators, and there is no role for aggregators, independent suppliers or virtual power plants.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
National spot market (Mercado Eléctrico de Oportunidad)Restricted—NoCND. Open to registered market agents; prices are marginal costs by node. Self-generators on regulated tariffs cannot participate.
Regional Electricity Market (MER)Restricted—NoEOR / CND. Contracts and spot transactions with other Central American countries through authorised agents; ENEE coordinates Honduras’s transactions.
Demand response / flexibility servicesNo—NoNo residential demand-response or local flexibility market was identified. Load reductions in 2025 were imposed by the operator (3.35% of energy not supplied).

Flexibility in the Honduran system comes from reservoir hydro (El Cajón, Patuca III, Cañaveral), thermal engines and regional imports, all scheduled by the CND. Distributed assets have no route into these markets: households are regulated customers of ENEE, there is no aggregator licence, and the only price signal available to them is the optional hourly tariff.

Supply security is the more pressing issue. In June–August 2026 thermal plants supplied 51.25% of generation and hydro only 22.84%, and energy not supplied exceeded forecasts by 28.74 GWh. The government’s 2026–2030 plan proposes tendering 1,600 MW of firm capacity based on liquefied natural gas and encouraging small and medium renewable plants with storage.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
CND real-time operation dashboardThe system operator’s website publishes daily operation reports, marginal costs and a real-time generation view.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national smart-meter programme identified
Reading intervalMonthly reading (manual) for most households
Meter types described by the regulatorClock-dial, cyclometer and digital
PrepaymentPermitted at ENEE’s discretion or customer request
Bidirectional metersInstalled within 15 days for authorised self-generators
Meter testingLaboratories accredited under ISO/IEC 17025 (OHA)
Distribution losses (end 2025)33.89% including non-technical losses

Metering is the distributor’s responsibility. ENEE installs and seals meters, reads them monthly, and must show the previous and current readings and at least six months of consumption history on each bill. CREE’s consumer guide explains how to read the three common meter types and calculate consumption from the difference between readings.

Loss reduction rather than smart metering drives investment. The 2022 reform created a National Programme for Loss Reduction within ENEE, and distribution losses, which include theft and unbilled supply, were still about a third of energy at the end of 2025. No official figure for the number of smart or remotely read meters was found.

Renewable electricity.

Electricity generation mix (2025).

  • Oil (bunker and diesel): 35.6%
  • Hydro: 32%
  • Solar: 8.9%
  • Biomass: 7.4%
  • Petroleum coke / coal: 7%
  • Wind: 6.8%
  • Geothermal: 2.3%
Source 14
Renewable electricity share
57.4% (2025)Source 14SEN’s renewability index of electricity generation for 2025 (hydro 32.0%, solar 8.9%, biomass 7.4%, wind 6.8%, geothermal 2.3%). Imports from the regional market were 485.53 GWh, about 3.8% of energy required, so the generation share is used. Ember data via Our World in Data give 55.4% for 2024.
Home solar
Not identified from a reliable public source.
Solar added each year
0.035 GW (2025)Source 21Derived from IRENA data: 0.589 GW in 2025 minus 0.554 GW in 2024. Capacity had been almost flat at about 0.53 GW from 2021 to 2023.
Hydro
0.934 GW (2025)Source 1451 plants.
Solar PV
0.563 GW (2025)Source 1418 plants on the SIN.
Biomass
0.245 GW (2025)Source 1415 plants.
Wind
0.238 GW (2025)Source 143 wind farms.
Geothermal
0.04 GW (2025)Source 141 plant.

Targets.

  • Government Plan 2026–2030: tender 1,600 MW of firm capacity from LNG-based plants and promote small and medium hydro, solar and wind plants with storage, and rooftop solar for homes and small businesses (as summarised by SEN).
  • National Energy Policy 2050 under preparation by SEN with IDB support (2026).

Honduras built most of its non-hydro renewable capacity in the mid-2010s, when a large wave of solar plants in the south pushed the renewable share of generation above half. SEN notes that since 2015 the generation mix has been predominantly renewable; the share reached 57.41% in 2025, although dry years cause large swings.

Hydropower remains the backbone, led by ENEE’s El Cajón, Patuca III, Cañaveral and Río Lindo plants, but output varies with rainfall: in mid-2026 hydro supplied less than a quarter of generation. Solar has grown slowly since the first wave: IRENA data show about 0.53 GW from 2021 to 2023 and 0.59 GW in 2025. In 2025 the weighted generation cost of wind was 0.1475 USD/kWh, geothermal 0.1271 and fossil thermal 0.1398 (SEN).

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is at an early stage. The 2025 amendment to the self-generator standard explicitly allows households and businesses to add batteries and requires them to be declared to the distributor, and storage appears for the first time as a line in CREE’s 2026 generation-cost plan. The best-documented systems are solar-battery-diesel hybrids on isolated systems where diesel is expensive.

Storage projects.

  • Perla de Guanaja (isolated system): 600 kWp solar with 6.88 MWh of battery storage and diesel back-up on Guanaja (SEN).
  • Perla de Brus Laguna (isolated system): 400 kWp solar with 420 kW / 1.68 MWh of storage and a 624 kW diesel generator in Gracias a Dios (SEN).

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Empresa Nacional de Energía Eléctrica (ENEE)2,170,368 metered customers (December 2025); sole supplier on the SINNoLimitedNoYes

Households cannot choose a supplier. On the national grid ENEE supplies every regulated customer at CREE tariffs; on the Bay Islands and in parts of Gracias a Dios customers are served by RECO (Roatán, 73.35 MW of capacity), BELCO, UPCO (Utila), INELEM and CEGASA, whose tariffs CREE regulates separately.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Secretaría de Energía (SEN)GovernmentEnergy ministryPolicy, electrification programmes and the annual statistical report on the electricity sector (IEASEN).
Comisión Reguladora de Energía Eléctrica (CREE)RegulatorElectricity regulatorPublishes current tariffs, excess-energy tariffs, technical standards and the company register.
Centro Nacional de Despacho (CND)TransmissionSystem and market operatorOperation reports, marginal costs, generation data and expansion planning.
Empresa Nacional de Energía Eléctrica (ENEE)DistributionState utility: generation, transmission and distributionConnections, billing, self-generator authorisations and outage information.
Instituto Nacional de Estadística (INE)GovernmentNational statistics officeHousehold survey (EPHPM) data on households, housing and access to electricity.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (self-generation)Norma Técnica de Usuarios Autoproductores Residenciales y Comerciales (NT-UAP)CREEAcuerdo CREE-10-2023 as amended by CREE-07-2025: application, studies, metering, protection, payment of surplus and storage.
Distribution serviceReglamento de Servicio Eléctrico de DistribuciónCREEAcuerdo CREE-028 (La Gaceta 13 January 2020): connections within 15 days where no network extension is needed, deposits, metering, billing content, disconnection.
Power qualityNorma Técnica de Calidad de Distribución (NT-CD)CREELimits that self-generators must not breach; basis for network-impact assessments.
PV modulesIEC 61215-1/-2:2016 and IEC 61730-1/-2:2016 (or UL)IEC / UL (required by CREE NT-UAP)Certificates required for type B and C self-generators.
Short-circuit contributionNT-UAP short-circuit ratio ≤ 0.1CREEInverter-based generation and batteries count with a factor of 1, asynchronous machines 6 and synchronous machines 8.
Metering laboratoriesISO/IEC 17025Organismo Hondureño de Acreditación (OHA)Meter test laboratories must be accredited or recognised by OHA.
Installer accreditationCIMEQH registrationColegio de Ingenieros Mecánicos, Electricistas y Químicos de HondurasRequired for the engineer who designs and installs medium-voltage self-generation (types B and C).

Permissions.

Permissions.
PermissionRequiredLevelDetail
Distributor authorisation (NT-UAP)YesNationalRequired before connecting any grid-tied renewable system; decided within 10 working days for homes.
Bidirectional meter and contract addendumYesNationalInstalled by the distributor within 15 days; addendum approved by CREE.
Network studiesLimitedNationalQualitative capacity and short-circuit checks for type B; full power-flow and protection studies for type C (over 1 MW).
Environmental licenceLimitedNationalRequired for generation projects selling to the market; not mentioned for household self-generation in NT-UAP.
Municipal permitsLimitedLocalCREE’s guide lists municipal procedures for land use when siting generation projects; no specific rule for rooftop systems was identified.

For a household the decisive permission is the distributor’s authorisation. The NT-UAP sets deadlines on both sides: the distributor must respond within 10 working days (15 for larger customers), the customer has 10 working days to correct an incomplete application, an approval lapses after 90 days if the system is not connected, and the distributor must explain any refusal or any network reinforcement needed in writing. CREE resolves disputes over the protection devices a distributor requires.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Excess-energy tariff for self-generators (tarifa de excedentes)ActiveNet billing / export paymentSurplus renewable energy credited on the ENEE bill at L2.5005/kWh (low voltage) from 1 October 2026, adjusted quarterly under the transitional method of Acuerdo CREE-57-2026.Quarterly; transitional until a definitive methodology is approved
Residential cross-subsidy in the tariff structureActiveTariff subsidyCREE’s tariff model charges homes using up to 50 kWh a month L5.0031/kWh against a cost-based average of L8.41/kWh, the difference being covered by the cross-subsidy built into the tariff structure (factors 0.83 and 1.08).—

Data and connectivity.

Fixed broadband
4.58 fixed subscriptions per 100 people (2024)Source 23
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Internet access is overwhelmingly mobile: INE’s June 2026 survey found 70.3% of people aged five and over had used the internet in the previous three months, almost all of them via mobile phones, while only 3.08% of households had a fixed telephone line and 15.62% a computer. Any remote meter reading or smart-home control would therefore depend mainly on cellular networks. The national metering standard for wholesale (commercial) metering references IEC 61850 and ANSI C12.18/C12.19/C12.21 communication protocols.

Grid conditions.

National peak demand
2.087 GW (2025)Source 142,086.72 MW at 19:36 on 21 May 2025 (CND).
Annual electricity demand
12.8 TWh (2025)Source 1412,777.21 GWh of system demand (CND); 7,389.73 GWh was billed to customers, the difference reflecting losses.
Generation capacity
3.577 GW (2025)Source 14
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Demand grew from 6,536 GWh in 2008 to 12,777 GWh in 2025, and the peak from 1,205 MW to 2,087 MW. The system is tight: energy not supplied in 2025 was 85,227 MWh, mostly from automatic or manual feeder openings and faults, and distribution losses of about a third of energy remain the sector’s largest financial problem. The weakly meshed transmission network is concentrated in the centre, the north-west and the south, which limits where new plants can connect.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Transitional excess-energy tariff methodology (Acuerdo CREE-57-2026)CurrentJuly 2026Avoided-cost formula for paying self-generators’ surplus, adjusted quarterly; CREE has commissioned a definitive methodology.
Battery storage for self-generators (Acuerdo CREE-07-2025)CurrentApril 2025Amendment to NT-UAP allowing storage systems and adding battery data to applications and registers.
Deferred generation-cost recoveryUpcomingFuture quarterly adjustmentsUSD 104.9 million of generation costs from June–August 2026 was deferred to later quarterly tariffs, with interest, under the provisional tariff regulation.
National Energy Policy 2050UpcomingIn preparation (2026)Long-term energy policy being drafted by SEN with IDB technical cooperation.
Tender for 1,600 MW of firm capacityUpcomingGovernment Plan 2026–2030Proposed tender for LNG-based firm capacity, alongside support for small renewable plants with storage.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo published count of self-generators; 71% of households use 150 kWh a month or less and surplus is paid at about 38% of the retail price above 50 kWh.
Distributed energy marketMediumA complete connection standard (NT-UAP) with deadlines, storage provisions and a quarterly excess tariff exists, though the payment method is still transitional.
Grid flexibility marketLowNo aggregator role, no demand-response market and wholesale access only above 5 MW.
Energy storage adoptionLowStorage permitted for self-generators only since 2025; known projects are small hybrid mini-grids on isolated systems.
Renewable growth environmentMediumRenewables supplied 57.41% of generation in 2025, but solar capacity grew only from about 0.53 GW (2021) to 0.59 GW (2025) and policy now prioritises gas-fired firm capacity.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 24 sources
  1. Informe de 4to ajuste tarifario 2026 (tariffs from October 2026). Comisión Reguladora de Energía Eléctrica (CREE), 2026. accessed 9 October 2026.
  2. Tarifas vigentes ENEE. Comisión Reguladora de Energía Eléctrica (CREE), 2026. accessed 9 October 2026.
  3. Informe de 3er ajuste tarifario 2026 (tariffs from July 2026). Comisión Reguladora de Energía Eléctrica (CREE), 2026. accessed 9 October 2026.
  4. Informe de 4to ajuste tarifario 2025 (tariffs from October 2025). Comisión Reguladora de Energía Eléctrica (CREE), 2025. accessed 9 October 2026.
  5. Tarifas vigentes usuarios autoproductores. Comisión Reguladora de Energía Eléctrica (CREE), 2026. accessed 9 October 2026.
  6. Informe de ajuste de la tarifa de excedentes de usuarios autoproductores (from October 2026). Comisión Reguladora de Energía Eléctrica (CREE), 2026. accessed 9 October 2026.
  7. Norma Técnica de Usuarios Autoproductores Residenciales y Comerciales (compiled version). Comisión Reguladora de Energía Eléctrica (CREE), 2025. accessed 9 October 2026.
  8. Reglamento de Servicio Eléctrico de Distribución (Acuerdo CREE-028). Comisión Reguladora de Energía Eléctrica (CREE), 2020. accessed 9 October 2026.
  9. Guía regulatoria: desarrollo de proyectos de generación de energía eléctrica en Honduras. Comisión Reguladora de Energía Eléctrica (CREE), 2024. accessed 9 October 2026.
  10. Registro público de empresas del sector eléctrico. Comisión Reguladora de Energía Eléctrica (CREE). accessed 9 October 2026.
  11. Autorización y registro de consumidores calificados. Comisión Reguladora de Energía Eléctrica (CREE). accessed 9 October 2026.
  12. Preguntas frecuentes. Comisión Reguladora de Energía Eléctrica (CREE). accessed 9 October 2026.
  13. ¿Cómo leer su medidor?. Comisión Reguladora de Energía Eléctrica (CREE). accessed 9 October 2026.
  14. Informe Estadístico Anual del Subsector Eléctrico Nacional (IEASEN) 2025. Secretaría de Energía (SEN), 2025. accessed 9 October 2026.
  15. Honduras inaugura Centro de Control de Distribución para modernizar la red eléctrica de la región Centro-Sur. Secretaría de Energía (SEN), 2026. accessed 9 October 2026.
  16. Honduras avanza en la construcción de su Política Energética Nacional 2050. Secretaría de Energía (SEN), 2026. accessed 9 October 2026.
  17. EPHPM junio 2026: Cuadro resumen de indicadores. Instituto Nacional de Estadística (INE), 2026. accessed 9 October 2026.
  18. EPHPM junio 2026: Cuadros de vivienda. Instituto Nacional de Estadística (INE), 2026. accessed 9 October 2026.
  19. EPHPM junio 2026: Cuadros de acceso a tecnología. Instituto Nacional de Estadística (INE), 2026. accessed 9 October 2026.
  20. Share of electricity production by source: Honduras (Ember). Our World in Data, 2024. accessed 9 October 2026.
  21. Installed solar PV capacity: Honduras (IRENA). Our World in Data, 2025. accessed 9 October 2026.
  22. Norma Técnica de Medición Comercial. Comisión Reguladora de Energía Eléctrica (CREE). accessed 9 October 2026.
  23. Fixed broadband subscriptions (per 100 people): Honduras. World Bank, 2024. accessed 9 October 2026.
  24. ECB euro reference exchange rate: US dollar (EXR.D.USD.EUR.SP00.A). European Central Bank, 2026. accessed 9 October 2026.

Questions about energy in Honduras.

Talk to us about Olmack in Honduras.Tell us about your home, housing portfolio or school estate in Honduras. We'll explain what is possible there now.