Energy in Bosnia and Herzegovina, explained.

How electricity works in Bosnia and Herzegovina: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Bosnia and Herzegovina: Not yet available.Olmack is not offered in Bosnia and Herzegovina yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Bosnia and Herzegovina.

Bosnia and Herzegovina electricity 2026: three utilities, DERK/FERK/RERS regulation, NOS BiH, block tariffs, prosumer net metering, licensing and grid data.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Convertible mark (KM) (BAM) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Bosnia and Herzegovina energy at a glance.

Key figures for households in Bosnia and Herzegovina. Each one links to its source on the full overview below.

  • Electricity price.

    0.195 BAM per kWh for households, including taxes. Figures for 2026-S1.

  • Household use.

    4,536 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    45.4% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Bosnia and Herzegovina.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Bosnia and Herzegovina below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Bosnia and Herzegovina requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Bosnia and Herzegovina.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Bosnia and Herzegovina, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Bosnia and Herzegovina, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Bosnia and Herzegovina.

Full overview

The energy market in Bosnia and Herzegovina, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Bosnia and Herzegovina has one transmission network but an electricity sector split along the country’s constitutional lines. The State Electricity Regulatory Commission (DERK) regulates transmission, the independent system operator NOS BiH, international trade and the Brčko District; the Federation of Bosnia and Herzegovina is regulated by FERK and Republika Srpska by RERS. Three state-owned, vertically organised utilities serve almost every home: Elektroprivreda BiH (EPBiH) and Elektroprivreda HZ HB (EP HZHB) in the Federation, and Elektroprivreda Republike Srpske (ERS) in Republika Srpska, with Komunalno Brčko serving the Brčko District.

The retail market is legally open, but households remain almost entirely on regulated “public supply” (universal service) prices approved by the entity regulators. DERK counted only three household supplier switches in 2025. Eurostat puts the average household price at 0.1946 KM/kWh (€0.0995) including taxes in the first half of 2026 for a typical consumer, one of the lowest in Europe, though prices rose by about 6.5% year on year.

Coal (lignite and brown coal) still produced about 55% of electricity in 2025 and large hydropower most of the rest. Solar has grown very quickly from a low base: DERK recorded 914 MW of solar capacity at the end of 2025, against about 100 MW at the end of 2022. Households in both entities can become prosumers with net metering for systems up to 10.8 kW, and the country is a net exporter of electricity.

Energy snapshot.

Headline figures for electricity in Bosnia and Herzegovina. Each shows its data year and links to its source.

  • Population3,140,095 peopleSource 82025
  • Households1,155,736 householdsSource 72013 census
  • Average household size3.06 people/householdSource 72013 census
  • Electricity use per household4,536 kWh/yrSource 22024
  • Household price (BAM)0.195 BAM/kWhSource 12026-S1
  • Household price (EUR)0.1 EUR/kWhSource 12026-S1
  • Renewable electricity share45.4%Source 62025
  • Solar capacity0.914 GWSource 6end 2025
  • Wind capacity0.273 GWSource 6end 2025
  • Energy storage capacity0.42 GW (pumped hydro)Source 6end 2025
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
DERK (state level), FERK (Federation of BiH) and RERS (Republika Srpska)
System operator
Nezavisni operator sistema u BiH (NOS BiH)
Distribution networks
Regional: distribution within EPBiH and EP HZHB in the Federation, five ERS-group distribution companies in Republika Srpska, and Komunalno Brčko in Brčko District
Currency
Convertible mark (KM) (BAM)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Bosnia and Herzegovina.

Household price (BAM)
0.195 BAM/kWh (2026-S1)Source 1Eurostat average household price, all taxes included, for annual consumption of 2,500–4,999 kWh. 0.1663 KM/kWh excluding VAT. The Agency for Statistics (BHAS) publishes the same figure as 19.46 KM per 100 kWh.
Household price (EUR)
0.1 EUR/kWh (2026-S1)Source 1Eurostat’s own EUR figure for the same band. The convertible mark is pegged at 1.95583 BAM per euro, so 0.1946 ÷ 1.95583 = 0.0995.
Typical annual electricity bill
883 BAM/yr (2024–2026)Source 1Derived: average household consumption of 4,536 kWh (2024) multiplied by Eurostat’s 2026-S1 average price of 0.1946 KM/kWh including taxes (about €451). An indication only, not an official typical bill.

Household price trend (BAM per kWh).Source 1

0.1650.180.1952019-S12026-S1
Bosnia and Herzegovina household electricity price, BAM per kWh
2019-S10.1707 BAM/kWh
2019-S20.1712 BAM/kWh
2020-S10.1701 BAM/kWh
2020-S20.1763 BAM/kWh
2021-S10.1711 BAM/kWh
2021-S20.1698 BAM/kWh
2022-S10.1735 BAM/kWh
2022-S20.1746 BAM/kWh
2023-S10.171 BAM/kWh
2023-S20.1652 BAM/kWh
2024-S10.1669 BAM/kWh
2024-S20.1769 BAM/kWh
2025-S10.1827 BAM/kWh
2025-S20.189 BAM/kWh
2026-S10.1946 BAM/kWh

How the household bill is built

A public-supply bill has a fixed monthly charge per metering point, energy priced by consumption block or season and by time of day, and network charges that are bundled into the regulated price. In the Federation a renewable-energy levy is added: 0.003524 KM/kWh excluding VAT in 2026, up from 0.002896 KM/kWh in 2025, set each year by the Federation Government. VAT is charged at 17% on the total. In Eurostat’s breakdown for the first half of 2026, the price was 0.1640 KM/kWh before taxes and levies, 0.1663 KM/kWh before VAT and 0.1946 KM/kWh with VAT.

Who sets the price

The three entity-level regulators approve the public-supply prices of the utilities in their area, so tariff structures differ: EPBiH uses green, blue and red monthly consumption blocks, EP HZHB uses a billing-power charge with a higher and lower season, and ERS has its own tariff system approved by RERS. DERK sets the transmission and system-operator charges for the whole country, including a system-service tariff of 2.449 €/MWh for 2026. In Brčko District new tariffs applied from 1 March 2025, averaging 11.23 euro cents/kWh for households; more than 37% of Brčko households receive a subsidised vulnerable-customer price.

Market share

DERK reports 750,308 household customers at EPBiH, 518,786 at ERS, 188,058 at EP HZHB and 33,577 at Komunalno Brčko at the end of 2025, almost all on public supply. The average household price in 2025 was 8.28 euro cents/kWh excluding VAT. Wholesale trading is bilateral: 21 licensed traders moved 4,536 GWh in 2025.

Trend

Eurostat data show the household price almost flat at 0.165–0.176 KM/kWh from 2019 to 2024, then rising to 0.177 KM/kWh in 2025-S1, 0.189 KM/kWh in 2025-S2 and 0.195 KM/kWh in 2026-S1.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesPublic supply (javno snabdijevanje) at prices approved by FERK in the Federation, RERS in Republika Srpska and DERK in Brčko. EPBiH households pay a metering-point charge of 4.80 KM a month plus single-rate energy of 15.90, 16.20 or 16.50 fening/kWh in the green, blue and red consumption blocks. EP HZHB households pay a 1.90 KM metering-point charge, a billing-power charge per kW and seasonal energy prices (15.79 fening/kWh single-rate in the higher season, 12.15 in the lower season). Prices exclude VAT and the renewable levy.
Time-of-useYesTwo-rate meters pay a higher and a lower rate. EPBiH’s lower rate is half the higher rate (for example 19.88 and 9.94 fening/kWh in the green block). Since 28 March 2026 EPBiH’s summer lower-rate hours are 14:00–17:00 and 23:00–08:00 on weekdays and Saturdays, and all day on Sunday; in winter they are 13:00–16:00 and 22:00–07:00.
VariableLimitedHouseholds may leave public supply for a market contract; EPBiH itself offers market supply and a switch must be completed within 21 days. Other suppliers active in 2025 included HEP Energija Mostar, Petrol BH Oil and EFT Bileća, but DERK recorded only three household switches that year.
DynamicNoThere is no organised day-ahead power exchange in the country, so no exchange-indexed household tariff exists.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
4,536 kWh/yr (2024)Source 2Derived: Eurostat household consumption of 5,242 GWh in 2024 divided by the 1,155,736 households of the 2013 census. Using DERK’s 2025 figures instead (5,500.79 GWh across 1,490,729 household customers) gives about 3,690 kWh per household metering point.
Average daily use per household
12.4 kWh/day (2024)Source 2Derived: 4,536 kWh a year divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
3,860 kWh/person/yr (all sectors) (2024)Source 10World Bank electric power consumption per capita (3,859.68 kWh).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households are the largest single group of electricity users: Eurostat records 5,242 GWh of household consumption in 2024 out of 10,882 GWh of final electricity consumption, close to half. DERK puts household consumption at 5,500.79 GWh in 2025. Electricity is used widely for heating and hot water alongside firewood, which is why EPBiH’s block tariff and EP HZHB’s higher winter season are designed to price heavy winter use.

The national system peak reflects this: DERK recorded the 2025 peak of 2,209 MW on 31 December, a winter evening, rather than in summer.

Housing and households.

Dwellings
1,607,998 dwellings (2013 census)Source 71,126,988 were occupied and used only for living; 385,659 were vacant.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
52.7 % of population (2025)Source 9

The housing stock is dominated by single-family houses: four in five residential buildings counted in the 2013 census contained a single dwelling. The census also found almost a quarter of dwellings vacant (385,659 of 1,607,998), a legacy of war-time displacement and emigration, which helps explain why there are far more household electricity metering points (1.49 million) than census households (1.16 million).

Detached houses with their own roofs are the natural setting for household solar, and the support schemes in both entities are aimed at owners of family houses.

How the grid works in Bosnia and Herzegovina.

  1. TransmissionNezavisni operator sistema u BiH (NOS BiH), Elektroprenos BiH (Elektroprijenos BiH)
  2. DistributionRegional: distribution within EPBiH and EP HZHB in the Federation, five ERS-group distribution companies in Republika Srpska, and Komunalno Brčko in Brčko District
  3. MeteringDistribution system operators
  4. Supply4 or more retail suppliers

Physical flow

Large hydro and coal-fired plants, owned mainly by the three utilities, feed a transmission network owned by Elektroprenos BiH and operated by NOS BiH. Power then passes to regional distribution networks at medium and low voltage. BiH is strongly interconnected with Croatia, Serbia and Montenegro through 37 lines and exported 5,137 GWh while importing 2,810 GWh in 2025.

Commercial flow

There is no national power exchange or market operator. Generators sell bilaterally to traders and suppliers; 21 licensed traders traded 4,536 GWh in 2025, and 23 companies held DERK international-trade licences. NOS BiH balances the system and settles imbalances. At retail level, each utility buys mainly from its own power plants to serve its public-supply customers at regulated prices.

Reform gaps

The European Commission notes that the Energy Community electricity integration package has not been transposed, including the creation of day-ahead and intraday markets and full unbundling of the transmission operator. A draft National Energy and Climate Plan from June 2023 had still not been adopted as of June 2026.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Foreign Trade and Economic Relations of BiH; entity energy ministriesEnergy policy is largely an entity competence. The state ministry coordinates international obligations such as the Energy Community; the Federal Ministry of Energy, Mining and Industry and the Republika Srpska Ministry of Energy and Mining are responsible for generation, distribution and renewable policy in their entities.
RegulatorState Electricity Regulatory Commission (DERK / SERC)Regulates transmission, NOS BiH, international trade, ancillary services and all electricity activities in Brčko District; approves the Grid Code and Market Rules and issues licences for transmission, system operation and international trade.
RegulatorRegulatory Commission for Energy in the Federation of BiH (FERK)Licenses generation, distribution and supply in the Federation and approves public-supply prices and distribution tariffs of EPBiH and EP HZHB.
RegulatorEnergy Regulatory Commission of Republika Srpska (RERS)Licenses generation, distribution and supply in Republika Srpska, certifies renewable plants and approves ERS tariffs.
System operatorNezavisni operator sistema u BiH (NOS BiH)Independent system operator for the whole country: real-time control, balancing, ancillary-service procurement and the Grid Code. Member of ENTSO-E.
TSOElektroprenos BiH (Elektroprijenos BiH)Owns, builds and maintains the transmission network (6,520.83 km of lines at the end of 2025, with 37 interconnection lines).
DSOEPBiH and EP HZHB distribution (Federation)Distribution in the Federation is carried out within the two Federation utilities, each in its own service area.
DSOERS-group distribution companies (Republika Srpska)Five licensed distribution companies: Elektrokrajina Banja Luka, Elektro Doboj, Elektro-Bijeljina, Elektrodistribucija Pale and Elektro-Hercegovina Trebinje.
SupplierEPBiH, EP HZHB, ERS and Komunalno BrčkoPublic (universal-service) suppliers to households in their own areas, at regulated prices.
MeteringDistribution system operatorsMeters belong to the distribution network; the local DSO installs and reads them. There is no competitive metering.

Compared with the UK system.

Compared with the UK system.
UK conceptBosnia and Herzegovina equivalentHow it works
DNOOperator distributivnog sistema (ODS)There is no single national DSO. Each utility’s distribution business covers its own territory, so which company connects a home depends on where it is, not on choice. In Republika Srpska five regional companies are licensed by RERS; in the Federation distribution sits within EPBiH and EP HZHB.
National Grid / NESONOS BiH (system operation) and Elektroprenos BiH (network owner)The UK separates the system operator (NESO) from the transmission owner (National Grid); BiH does the same. NOS BiH runs the system and balancing for the whole country, while Elektroprenos BiH owns and maintains the lines.
MPANMjerno mjesto (metering point) number held by the DSOEach connection is a metering point in the records of the local distribution company and appears on the supplier’s bill alongside a customer number. No published national numbering format was identified, and each utility keeps its own register.
MPRNGas metering point at a local gas distributorGas customers are identified by their local gas distributor; no national gas metering-point scheme was identified.
Meter operatorThe DSO (no competitive metering)Households cannot appoint a meter operator. Prosumers must have a bidirectional meter; in Republika Srpska the customer pays for it.
SupplierJavni snabdjevač (public supplier) or a licensed market supplierAlmost every home buys from its area’s utility under public supply. Switching is legally possible but very rare.
Smart-meter infrastructure (DCC / SMETS2)Each DSO’s own remote-reading systemThere is no central data company or common national smart-meter standard; each distribution company procures and runs its own remote-reading system.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Mjerno mjesto (metering point) (MM)
Who issues it?The local distribution system operator (EPBiH or EP HZHB distribution in the Federation, an ERS-group distribution company in Republika Srpska, Komunalno Brčko in Brčko District)
FormatNot published. Each utility uses its own internal numbering for metering points and customers; no national numbering scheme or EIC-based format was identified from a reliable public source.
LengthNot identified from a reliable public source
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the monthly electricity bill from the public supplier, which carries the customer and metering-point details, and in the utility’s online customer portal (for EPBiH, “Moj račun” on mojaenergija.epbih.ba).
Electronic accessUtilities offer online accounts and e-bills (EPBiH: Moj račun, e-račun; separate “E-kancelarija” for market-supply customers). Consumption history is shown in these portals; no national data hub exists.
Third-party accessNo national framework for third-party access to metering data was identified. A new supplier obtains the metering-point details through the switching procedure under the regulators’ supplier-switching rules.
Who keeps the registerEach distribution company keeps its own register of connections and metering points.
Register scopePer DSO

How a home is identified

A household connection is recorded as a metering point (mjerno mjesto) by the distribution company that serves the area. The metering point is where the meter sits and is the unit to which the connection approval (elektroenergetska saglasnost / suglasnost) and the supply contract refer. Because the three utilities and Komunalno Brčko each run their own billing and network records, there is no single national identifier like the UK MPAN, and the published sources reviewed do not describe a common format or length. A fictional example is therefore not given.

How it is used

The metering point is needed for any change at the connection: switching to a market supplier (which must be completed within 21 days in EPBiH’s area), becoming a prosumer, or increasing the approved connection capacity. For prosumers, the DSO confirms the status and replaces or reprograms the meter so that imported and exported energy are recorded separately.

Metering and data

Meters are owned and read by the DSO. Bills are monthly. Prosumer bills are calculated monthly from bidirectional meter readings. There is no central metering data hub; consumption data stay with the distribution company and the supplier.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidNet metering for household systems up to 10.8 kW; net billing with credit at the energy component of the retail price minus 10% (Federation) or minus 5% (Republika Srpska)
How large can a household system be?Net metering applies up to 10.8 kW in both entities. In the Federation a prosumer installation can be up to 150 kW in total; in Republika Srpska net billing covers 10.8–50 kW and a standard scheme applies above 50 kW. In both, the system cannot exceed the approved connection capacity.
How is surplus credited in the Federation?Households up to 10.8 kW may choose net metering for ten years and then move to net billing, or choose net billing from the start. Monetary credit for surplus equals the energy component of the retail price minus 10%. Unused credits expire after the first quarter of the year (31 March). Network charges are paid on all imported energy, and no renewable levy is charged on self-produced energy.
How is surplus credited in Republika Srpska?Settlement is monthly; monetary credit equals the energy component of the retail price minus 5%. A final annual settlement is made on 1 April and any surplus left over is lost. The renewable levy is charged on net consumption.
Do I need a licence to export?No for household prosumers. In Republika Srpska no generation licence or energy permit is needed below 1 MW. In the Federation natural persons may operate generation up to 150 kW, with simplified rules up to 23 kW.
Can neighbours or flats share a system?Republika Srpska’s 2022 law allows jointly acting prosumers in the same building and renewable energy communities, with market access including aggregation and storage.

Connecting a home system.

  1. Check that the planned system does not exceed the approved connection capacity of the home (a household prosumer system can be up to 10.8 kW for net metering).
  2. Apply to the local distribution company for connection approval as a prosumer; in Republika Srpska the DSO uses a simplified procedure and issues the plant certificate for systems up to 50 kW as part of the connection approval.
  3. Install the system with a qualified installer and have a bidirectional meter fitted (in Republika Srpska at the customer’s cost).
  4. The DSO confirms prosumer status after connection; the supplier then bills monthly on the net-metering or net-billing basis.

Both entities introduced prosumer rules modelled on EU law: Republika Srpska through its 2022 Law on Renewable Energy Sources (Official Gazette 16/22), and the Federation through its 2023 Law on Renewable Energy Sources and Efficient Cogeneration (Official Gazette 82/23) with implementing rules from 2024 and 2025. In both, a home can produce, consume, store and export electricity from its own installation, provided it stays within the approved connection capacity.

The key differences are in the credit for surplus energy and the end-of-year treatment. The Federation lets households lock in net metering for ten years; Republika Srpska settles once a year on 1 April and loses any unused surplus. Systems above 150 kW in Republika Srpska must also submit schedules and carry imbalance responsibility.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityRepublika Srpska: no energy permit or generation licence below 1 MW. Federation: FERK generation licence; natural persons (as a registered trade) up to 150 kW, simplified procedure up to 23 kW and a micro-plant category of 2–23 kW.RERS; FERK; DERK in Brčko DistrictLarger plants also need entity energy permits and, for support schemes, renewable plant certificates.
Self-consume and export surplus (household prosumer)No licence. Prosumer status is granted by the DSO after connection; in Republika Srpska plants up to 50 kW receive their certificate from the DSO as part of the connection approval.Local DSO; supplierNet metering up to 10.8 kW in both entities.
Store electricityRepublika Srpska (amended Law on Electricity, Official Gazette 49/26, June 2026): storage is a defined activity; no licence is needed for up to 500 kW at a connection point with the same owner, storing only co-located generation. Federation: no specific storage licence regime identified.RERS; DSO or NOS BiH (connection)Behind-the-meter storage by an active customer may not export from the battery; DSOs may not own storage except for distribution needs. NOS BiH’s Connection Rules of 17 October 2025 cover storage and hybrid plants.
Supply final customersSupply licence from the entity regulator (FERK or RERS) or DERK in Brčko District.FERK; RERS; DERKPublic (universal-service) supply is a public-service obligation of the incumbent utilities. Public EV charging does not need a supply licence in the Federation.
International trade and wholesaleDERK licence for international trade; entity trading licences for domestic wholesale.DERK; FERK; RERS23 companies held DERK international-trade licences at the end of 2025.
Aggregate / VPP / remote control of home assetsRepublika Srpska: active customers may act alone or through an aggregator, sell their own power, offer flexibility and let a third party manage their installation (Law on Electricity as amended in 2026). No separate aggregator licence regime was identified in the Federation.RERS; NOS BiH (balancing)NOS BiH has applied a temporary virtual-power-plant model since April 2022.
Balancing and ancillary servicesPre-qualification and contract with NOS BiH under DERK-approved procedures (October 2025).NOS BiH; DERKSix virtual power plants with 401.56 MW (278.11 MW of it solar) were registered for balancing at the end of 2025.

Licensing follows the split of competences: DERK licenses transmission, system operation and international trade; FERK and RERS license generation, distribution and supply in their entities; DERK also covers every activity in Brčko District. A company active across the country may therefore need licences from more than one regulator.

Small household and business installations are mostly exempt: Republika Srpska exempts generation below 1 MW from both the energy permit and the generation licence, while the Federation has simplified licensing for small plants.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Balancing reserves (FCR, aFRR, mFRR)Restricted—LimitedNOS BiH. NOS BiH procures frequency containment and restoration reserves under procedures approved by DERK in October 2025. Most capacity still comes from the utilities’ hydro plants.
Virtual power plants in balancingDeveloping—YesNOS BiH. A temporary VPP model from 11 April 2022 lets plants be pooled for balancing. At the end of 2025 there were six VPPs totalling 401.56 MW, including 278.11 MW of solar.
Day-ahead and intraday marketsNo—NoNo organised power exchange exists; trading is bilateral. Creating day-ahead and intraday markets is part of the unfinished Energy Community integration package.
Demand response / local flexibilityDeveloping—LimitedDSOs. Republika Srpska’s 2026 amendments define active customers offering flexibility, alone or via aggregators; implementing rules were still to follow.

Market-based flexibility in BiH is at an early stage. The Grid Code approved on 12 May 2025, Market Rules of 11 June 2025, and the Connection Rules and ancillary-service procedures of 17 October 2025 updated the framework, including connection of storage and hybrid plants.

The virtual power plant arrangement is the main route for distributed assets: it allows several plants to be pooled for balancing purposes, and solar plants make up most of the registered VPP capacity. There is no wholesale exchange through which smaller assets could be optimised against hourly prices.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
NOS BiHBalancing, ancillary services, Grid Code, connection rules and system data.
DERKAnnual reports, market rules and licence registers.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutRun separately by each distribution company; no national target or published national count
Reading intervalMonthly billing; interval data depend on each DSO’s remote-reading system
Owner / operatorLocal DSO; no competitive metering
Smart meters installedNo reliable national figure identified
FinancingEBRD-supported smart-metering tender for ERS distribution business units
ProsumersBidirectional meter required (customer-paid in Republika Srpska)
Advanced metersDefined in Republika Srpska’s 2026 electricity-law amendments; required for jointly acting customers

Each of the distribution businesses procures and runs its own meters and reading systems, so coverage and data granularity vary across the country. No national cost-benefit analysis or rollout target was identified.

Republika Srpska’s June 2026 amendments introduce a legal definition of an advanced meter and require one for jointly acting customers, which links metering to the new active-customer and sharing rights.

Renewable electricity.

Electricity generation mix (2025).

  • Coal: 54.6%
  • Hydro: 32.9%
  • Solar: 7.9%
  • Wind: 4.5%
  • Other: 0.1%
Source 6
Renewable electricity share
45.4% (2025)Source 6Derived from DERK: 6,597.6 GWh of renewable generation out of 14,540.2 GWh total generation in 2025. DERK also expresses renewables as 53.5% of consumption (12,330.4 GWh), because the country exports more than it imports. Eurostat gives 38.4% of gross generation for 2024 (6,115 of 15,932 GWh), a drier year.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
2.299 GW (end 2025)Source 62,299.29 MW, including 420 MW of pumped storage.
Coal
2.058 GW (end 2025)Source 6
Solar PV
0.914 GW (end 2025)Source 6
Onshore wind
0.273 GW (end 2025)Source 6

Targets.

  • Renewables were 38.5% of gross final energy consumption in 2024; the Energy Community target for 2030 is 43.6%.
  • The draft National Energy and Climate Plan (June 2023) had not been adopted as of June 2026.
  • No coal phase-out date has been set.

Shares are derived from DERK’s 2025 generation data: thermal (coal) 7,933.9 GWh, large hydro 4,432.6 GWh plus 350.79 GWh of small hydro, solar 1,155.9 GWh (474.2 GWh from transmission-connected plants and 681.68 GWh on distribution networks), wind 648.4 GWh, and small amounts of biomass and industrial generation, out of 14,540.2 GWh in total.

Hydro output swings strongly with rainfall: Eurostat shows hydro generation of 4,712 GWh in 2022, 6,750 GWh in 2023 and 5,086 GWh in 2024. Solar has been the fastest-growing source, with generation rising from 114 GWh in 2022 to 601 GWh in 2024 and about 1,156 GWh in 2025. Large solar and wind plants in Republika Srpska are supported through auctions with a market premium.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Electricity storage has only recently entered the legal framework. Republika Srpska’s June 2026 amendments define storage, exempt installations of up to 500 kW at a connection point from licensing, allow trial operation of up to six months, and give DSOs six months to set technical conditions. Behind-the-meter batteries owned by active customers may not export stored energy to the grid.

Storage projects.

  • Čapljina pumped-storage hydro (EP HZHB): The country’s only pumped-storage plant (420 MW); a rehabilitation is noted by the European Commission.
  • NOS BiH Connection Rules (October 2025): New connection rules cover standalone storage and hybrid generation-plus-storage plants.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Elektroprivreda BiH (EPBiH)750,308 household customers (end 2025)UnknownYesNoYes
Elektroprivreda Republike Srpske (ERS)518,786 household customers (end 2025)UnknownYesNoYes
Elektroprivreda HZ HB (EP HZHB)188,058 household customers (end 2025)UnknownYesNoYes
Komunalno Brčko33,577 household customers (end 2025)UnknownUnknownNoUnknown

The four public suppliers serve almost all households in their own areas. Other licensed suppliers active in 2025, such as HEP Energija Mostar, Petrol BH Oil and EFT Bileća, mainly serve business customers.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
DERK (State Electricity Regulatory Commission)RegulatorState-level regulatorDetailed annual report on the whole electricity sector, transmission tariffs and licences.
FERKRegulatorFederation regulatorPublic-supply prices and licensing rules for the Federation.
RERSRegulatorRepublika Srpska regulatorLicences, DSO register, renewable-plant certificates and RS legislation.
NOS BiHTransmissionIndependent system operatorGrid Code, connection rules, balancing and VPP model.
Elektroprenos BiHTransmissionTransmission network ownerNetwork development and transmission investment.
Operator za OIEiEKRenewable EnergyFederation renewable-energy and cogeneration operatorRuns the Federation’s renewable support and the household prosumer co-financing call.
Agency for Statistics of BiH (BHAS)GovernmentNational statistics officeHalf-yearly household electricity prices and monthly generation statistics.
Energy Community SecretariatRenewable EnergyTreaty body monitoring EU energy-law alignmentAssesses market reform, renewables and network-code implementation.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid codeMrežni kodeks (Grid Code), approved 12 May 2025NOS BiH, approved by DERKTechnical requirements for transmission-connected generators and system operation.
ConnectionConnection Rules, 17 October 2025NOS BiH / DERKIncludes storage and hybrid plants.
Prosumer installation (Federation)Law on Renewable Energy Sources and Efficient Cogeneration (Sl. novine FBiH 82/23); Rulebook on prosumers (30/24, 43/25); Decree 95/24Federation Parliament and GovernmentSize limits, net metering/net billing and DSO confirmation of status.
Prosumer installation (Republika Srpska)Law on Renewable Energy Sources (Sl. glasnik RS 16/22); Law on Electricity as amended (49/26)National Assembly of Republika SrpskaProsumer, energy-community, storage and active-customer rules.
Generator licensing (Federation)FERK Rulebook on licencesFERKThresholds for natural persons and simplified procedures.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DSO connection approvalYesRegionalFrom the local distribution company; RS DSOs apply a simplified prosumer procedure.
Building permit for rooftop PVLimitedMixedIn Republika Srpska a prosumer plant up to 50 kW on a permitted building is treated as an adaptation and needs no building permit. Federation rules vary by canton and municipality.
Energy permitLimitedRegionalNot needed in Republika Srpska below 1 MW.
Generation licenceLimitedRegionalNot needed in RS below 1 MW; small-plant and natural-person thresholds in the Federation.

Permitting depends on the entity and, in the Federation, often on the canton. A household system is usually handled through the DSO’s connection approval and the prosumer confirmation that follows.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Federation co-financing of household prosumer plantsActiveGrantPublic call of 1 October 2026 by the Operator za OIEiEK with 4,000,000 KM: 1.2 million KM fully funds about 100 systems for socially vulnerable households; 2.8 million KM pays 50% of an average cost of 1,829 KM/kW, up to 60% of eligible costs and 7,000 KM, for rooftop systems up to 10.8 kW on owners’ houses with consumption above 4,500 kWh a year. Paid after connection and prosumer status. Open until funds are used, at most 90 days after the last press notice.From 1 Oct 2026
Net metering (Federation)ActiveNet meteringHouseholds up to 10.8 kW may choose net metering for ten years, then net billing.—
Net metering (Republika Srpska)ActiveNet meteringUp to 10.8 kW; annual settlement on 1 April.—
Renewable auctions with market premium (Republika Srpska)ActiveMarket premiumSupport for larger plants is awarded through auctions under the 2024 rulebook.—

Data and connectivity.

Fixed broadband
29.4 fixed subscriptions per 100 people (2024)Source 11Internet users: 86.1% of the population (2024).
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband and internet use are widespread, but no national communications standard for smart metering was identified; each DSO chooses its own remote-reading technology.

Grid conditions.

National peak demand
2.209 GW (2025)Source 6Reached on 31 December 2025.
Annual electricity demand
12.3 TWh (2025)Source 6Total consumption of 12,330.4 GWh.
Generation capacity
5.547 GW (end 2025)Source 6
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

BiH is a structural net exporter: 5,137 GWh exported and 2,810 GWh imported in 2025. Distribution losses were 8.13% in 2025.

Major transmission projects include the Trans-Balkan corridor, expected around 2029, and the upgrade of the Trebinje–Perućica line from 220 kV, due by the end of 2028. The EBRD approved a €46 million transmission loan on 22 June 2026.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Republika Srpska electricity-law amendments (storage, active customers)CurrentJune 2026Sl. glasnik RS 49/26 defines storage, active customers, aggregation and advanced meters; storage up to 500 kW is licence-exempt.
New Grid Code, Market Rules and Connection RulesCurrentMay–October 2025Grid Code 12 May 2025, Market Rules 11 June 2025, Connection Rules and ancillary procedures 17 October 2025.
Federation renewable levy 2026Current1 January 20260.003524 KM/kWh excluding VAT, up from 0.002896 KM/kWh.
Energy Community electricity integration packageUpcomingNot scheduledTransposition pending, including day-ahead and intraday markets and TSO unbundling.
National Energy and Climate PlanUpcomingNot scheduledDraft from June 2023 not adopted as of June 2026.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useMediumLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumNet metering up to 10.8 kW in both entities and a 2026 Federation grant scheme expecting about 500 household systems a year; no national household capacity figure.
Distributed energy marketMedium681.68 GWh of solar and 350.79 GWh of small hydro on distribution networks in 2025 (DERK).
Grid flexibility marketLowNo power exchange; balancing open via a temporary VPP model with six VPPs at end 2025.
Energy storage adoptionLowOnly 420 MW of pumped hydro; no grid-scale batteries identified; storage rules introduced in RS in 2026.
Renewable growth environmentHighSolar capacity rose from 101.56 MW (end 2022) to 914.39 MW (end 2025).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 26 sources
  1. Electricity prices for household consumers (nrg_pc_204). Eurostat, 2026. accessed 9 October 2026.
  2. Complete energy balances (nrg_bal_c). Eurostat, 2024. accessed 9 October 2026.
  3. Production of electricity and derived heat by type of fuel (nrg_bal_peh). Eurostat, 2024. accessed 9 October 2026.
  4. Electricity production capacities for renewables (nrg_inf_epcrw). Eurostat, 2024. accessed 9 October 2026.
  5. Electricity prices for households and non-households, H1 2026. Agency for Statistics of Bosnia and Herzegovina, 2026. accessed 9 October 2026.
  6. Annual Report 2025. State Electricity Regulatory Commission (DERK/SERC), 2026. accessed 9 October 2026.
  7. Census of Population, Households and Dwellings 2013: Final results. Agency for Statistics of Bosnia and Herzegovina, 2016. accessed 9 October 2026.
  8. Population, total – Bosnia and Herzegovina. World Bank, 2025. accessed 9 October 2026.
  9. Urban population (% of total) – Bosnia and Herzegovina. World Bank, 2025. accessed 9 October 2026.
  10. Electric power consumption (kWh per capita) – Bosnia and Herzegovina. World Bank, 2024. accessed 9 October 2026.
  11. Fixed broadband subscriptions (per 100 people) – Bosnia and Herzegovina. World Bank, 2024. accessed 9 October 2026.
  12. Prices of public supply (cijene javne usluge). FERK, 2025. accessed 9 October 2026.
  13. Rulebook on licences. FERK, 2021. accessed 9 October 2026.
  14. Frequently asked questions. FERK. accessed 9 October 2026.
  15. Frequently asked questions. RERS. accessed 9 October 2026.
  16. Register of distribution licences. RERS. accessed 9 October 2026.
  17. Law on Renewable Energy Sources (Sl. glasnik RS 16/22). Republika Srpska / RERS, 2022. accessed 9 October 2026.
  18. Law amending the Law on Electricity (Sl. glasnik RS 49/26). Republika Srpska / RERS, 2026. accessed 9 October 2026.
  19. Bosnia and Herzegovina energy fiche. European Commission, 2026. accessed 9 October 2026.
  20. New RES levy for 2026. EPBiH, 2025. accessed 9 October 2026.
  21. Change in application of tariff rates. EPBiH, 2026. accessed 9 October 2026.
  22. Prosumer status. EPBiH. accessed 9 October 2026.
  23. Prosumer electricity billing. EPBiH. accessed 9 October 2026.
  24. Changing supplier. EPBiH. accessed 9 October 2026.
  25. Public call for co-financing of prosumer plants. Operator za OIEiEK, 2026. accessed 9 October 2026.
  26. Prosumer (kupac-proizvođač). Elektrokrajina. accessed 9 October 2026.

Questions about energy in Bosnia and Herzegovina.

Talk to us about Olmack in Bosnia and Herzegovina.Tell us about your home, housing portfolio or school estate in Bosnia and Herzegovina. We'll explain what is possible there now.