How electricity works in Montenegro.
Montenegro electricity 2026: REGAGEN regulation, CGES transmission, CEDIS distribution, EPCG supply, net metering up to 16 kW, licensing and a hydro-led mix.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Montenegro energy at a glance.
Key figures for households in Montenegro. Each one links to its source on the full overview below.
Electricity price.
0.104 EUR per kWh for households, including taxes. Figures for 2026-S1.
Household use.
3,840 kWh a year for a typical household. Figures for 2024.
Renewable share.
59.7% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Montenegro.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Montenegro below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Montenegro requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Montenegro.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Montenegro, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Montenegro, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Montenegro.
The energy market in Montenegro, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Montenegro generates most of its electricity from hydropower, with the rest coming mainly from the coal-fired Pljevlja power station and two wind farms. In 2024, Eurostat data show that 49.7% of gross generation came from hydro, 40.3% from coal, 8.3% from wind and 1.8% from solar. Output varies widely with rainfall and with the availability of the single coal unit: in 2025 Eurostat’s monthly data record no coal-fired generation from April to October.
Households pay among the lower electricity prices in Europe. Eurostat records an average household price of €0.1039/kWh including all taxes and levies in the first half of 2026. The regulator, REGAGEN, reports that households paid an average of 9.14 euro cents/kWh excluding VAT in 2024. The retail market is legally open, but the state-owned utility EPCG is the only active supplier.
The transmission system operator is CGES, which also links Montenegro to Italy through a 600 MW high-voltage direct-current submarine cable. A single distribution system operator, CEDIS, runs the medium- and low-voltage network. The 2024 Law on the Use of Energy from Renewable Sources gives households net metering for rooftop systems up to 16 kW, and net billing between 16 and 50 kW.
Energy snapshot.
Headline figures for electricity in Montenegro. Each shows its data year and links to its source.
- Population623,129 peopleSource 62025
- Households215,227 householdsSource 232023 (census)
- Average household size2.9 people/householdSource 252023 (census)
- Electricity use per household3,840 kWh/yrSource 112024
- Household price (EUR)0.104 EUR/kWhSource 12026-S1
- Renewable electricity share59.7 % of electricity generationSource 32024
- Solar capacity0.03 GWSource 102024
- Wind capacity0.118 GWSource 102024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Regulatory Agency for Energy and Regulated Utilities (REGAGEN / Regulatorna agencija za energetiku i regulisane komunalne djelatnosti)
- System operator
- CGES (Crnogorski elektroprenosni sistem), transmission system operator
- Distribution networks
- One distribution system operator, CEDIS (Crnogorski elektrodistributivni sistem), owned by EPCG.
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Montenegro.
- Household price (EUR)
- 0.104 EUR/kWh (2026-S1)Source 1Eurostat average household price including all taxes and levies, consumption band 2,500–4,999 kWh a year. Excluding taxes and levies the price was €0.0945/kWh.
- Typical annual electricity bill
- 399 EUR/yr (2024–2026)Source 1Derived: 3,840 kWh per household connection (REGAGEN, 2024) multiplied by Eurostat’s 2026-S1 price of €0.1039/kWh including taxes. It is an indication, not an official typical bill. Occupied homes that heat with electricity use considerably more.
Household price trend (EUR per kWh).Source 1
| 2018-S1 | 0.1024 EUR/kWh |
|---|---|
| 2018-S2 | 0.103 EUR/kWh |
| 2019-S1 | 0.1032 EUR/kWh |
| 2019-S2 | 0.1028 EUR/kWh |
| 2020-S1 | 0.0988 EUR/kWh |
| 2020-S2 | 0.0999 EUR/kWh |
| 2021-S1 | 0.098 EUR/kWh |
| 2021-S2 | 0.0974 EUR/kWh |
| 2022-S1 | 0.0961 EUR/kWh |
| 2022-S2 | 0.0982 EUR/kWh |
| 2023-S1 | 0.0968 EUR/kWh |
| 2023-S2 | 0.097 EUR/kWh |
| 2024-S1 | 0.0971 EUR/kWh |
| 2024-S2 | 0.1004 EUR/kWh |
| 2025-S1 | 0.0973 EUR/kWh |
| 2025-S2 | 0.0998 EUR/kWh |
| 2026-S1 | 0.1039 EUR/kWh |
How the household price is built
A household bill combines the supplier’s energy price, regulated network charges for distribution and transmission, a fee for the market operator, the fee that funds renewable support, and VAT. REGAGEN sets the network charges. Under the 2025 Energy Law the first full regulatory period for the network operators starts on 1 January 2027. For 2026 REGAGEN therefore fixed temporary distribution prices at their 2025 level (decision of 21 November 2025).
One supplier in an open market
All customers have been free to choose a supplier for years, and REGAGEN lists six licensed suppliers. Even so, EPCG remained the only active supplier in 2024, serving every category of customer. Its average selling price to customers on the distribution network was 9.09 c/kWh excluding VAT in 2024, up 3.06% on 2023. For households the average rose 4.34%, to 9.14 c/kWh.
Trend and comparison
Eurostat’s household price for Montenegro has been very stable for a decade. Including taxes, it stayed between about €0.096 and €0.104/kWh from 2018 to 2026, with no spike during the 2022 energy crisis. REGAGEN notes that in the second half of 2024 only Kosovo and Bosnia and Herzegovina had cheaper household electricity among the countries Eurostat compares, against an EU average of 28.72 c/kWh. Wholesale prices are far higher: transmission losses bought through the BELEN exchange cost an average of €125.90/MWh in 2024.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Time-of-use | Yes | Almost all household consumption is billed on two-rate meters with a higher (VT) and a lower (NT) daily tariff. In 2024, households with two-rate metering bought 1,512.89 GWh at an average of 9.14 c/kWh excluding VAT, against 23.54 GWh at 9.48 c/kWh for single-rate households (REGAGEN). |
| Variable | Yes | Retail energy prices are set by the supplier rather than approved tariff by tariff by the regulator. The Energy Community reports that 100% of supply is at non-regulated prices. In practice EPCG is the only active supplier, and households have not switched. |
| Other | Yes | Network charges are regulated. For 2026 REGAGEN set temporary distribution prices at the 2025 level. A household on two-rate metering pays a capacity charge of 3.9178 c/kWh (VT) or 1.9589 c/kWh (NT), a losses charge of 1.9130 c/kWh (VT) or 0.9565 c/kWh (NT), and a fixed charge of €0.6916 a month for a connection of up to 8 kW (€1.3832 for 8–16 kW; €2.9824 for 16–34.5 kW). |
| Other | Yes | Green tariff: in 2024 EPCG offered one supply model with a guaranteed fuel mix, made up entirely of renewable energy. REGAGEN reports that customers on it received 100% wind energy that year. |
| Dynamic | No | No dynamic or wholesale-indexed household contracts were identified. The 2025 Energy Law provides for them, and REGAGEN notes that smart metering is a precondition. |
Household prices compared with neighbouring countries (EUR per kWh).
- Italy€0.316
- Croatia€0.166
- Serbia€0.119
- Albania€0.118
- Montenegro€0.104
- Bosnia and Herzegovina€0.1
- Kosovo€0.078
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,840 kWh/yr (2024)Source 11Derived: 1,536.43 GWh sold to households in 2024 divided by 400,099 household customers (REGAGEN). This is an average per household connection, including seasonal homes. Per census household the figure would be about 7,140 kWh.
- Average daily use per household
- 10.5 kWh/day (2024)Source 11Derived: 3,840 kWh a year per household connection divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,464 kWh/person/yr (residential) (2024)Source 11Derived: 1,536.43 GWh of household consumption (REGAGEN) divided by the World Bank 2024 population of 623,525.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 62.4 % of homes (2023 (census))Source 26178,275 of 285,734 dwellings for permanent housing have air conditioning.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households are the largest group of electricity users. REGAGEN reports 1,536 GWh sold to households in 2024, out of 2,780 GWh consumed by all customers on the transmission and distribution networks. Household consumption has grown steadily, from 1,251 GWh in 2015, while industrial demand at 110 kV collapsed after the Podgorica aluminium plant (KAP) cut its load in 2022.
Electricity is a major heating fuel. In the 2023 census, 43.7% of occupied dwellings used electricity as their main source of heat, and 49.8% used firewood. Air conditioning is widespread, especially on the coast, and REGAGEN notes that 2024 had the highest average maximum load during the cooling season in the period 2019–2024. Tourism adds a strong summer element: many of the 400,099 household connections serve seasonal homes.
Housing and households.
- Dwellings
- 392,909 dwellings (2023 (census))Source 24Of these, 285,734 (72.72%) are for permanent housing and 89,083 (22.67%) for seasonal use. 214,530 dwellings were occupied.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 65.6 % of population (2025)Source 7
The 2023 census counted 392,909 dwellings for 215,227 households. Almost a quarter of all dwellings (89,083) are for seasonal use, and a further 71,204 permanent dwellings were temporarily vacant or abandoned. This explains why there are far more household electricity connections than households. Occupied dwellings average 79.3 m², with 27.5 m² of living space per person.
Most permanent dwellings were built between 1981 and 2000, and 62.8% have outer walls mainly of concrete blocks. Only 14.2% of occupied dwellings have central heating installations, so individual electric heaters, air-conditioning units and wood stoves dominate. About two-thirds of the population lives in urban areas (65.6% in 2025, World Bank), with Podgorica alone home to 28.8% of residents.
How the grid works in Montenegro.
- TransmissionCGES (Crnogorski elektroprenosni sistem)
- DistributionOne distribution system operator, CEDIS (Crnogorski elektrodistributivni sistem), owned by EPCG.
- MeteringCEDIS
- Supply1 or more retail suppliers
Physically, Montenegro’s generation is concentrated in a few large plants: the Piva and Perućica hydro stations, the Pljevlja coal plant, and the Krnovo and Možura wind farms, alongside small hydro (55.89 MW) and a growing number of solar plants and rooftop systems. IRENA counts 1,070 MW of installed capacity in 2024. CGES’s network links Montenegro with Albania, Bosnia and Herzegovina, Kosovo and Serbia, and with Italy through a 500 kV HVDC submarine cable. CEDIS takes power from CGES substations and distributes it at 35, 10 and 0.4 kV over more than 20,000 km of lines.
Commercially, EPCG sells its own output to final customers and trades the rest bilaterally or on BELEN. CGES and CEDIS buy energy for their losses through BELEN auctions, and CGES buys ancillary services and balancing energy from EPCG. Since the Italian cable came into service, Montenegro has become a transit hub: REGAGEN reports that transit roughly doubled, and imports and exports each exceeded 5.9 TWh in 2024 (Eurostat), far above domestic consumption.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Mining (Ministarstvo energetike i rudarstva) | Sets energy policy and runs renewable support under the 2024 renewables law: it allocates market premiums through auctions and feed-in tariffs for small plants within quotas set by the Government. It keeps the register of prosumer production estimates and is preparing a battery storage project. |
| Regulator | REGAGEN (Regulatory Agency for Energy and Regulated Utilities) | Issues licences for energy activities, sets network prices and the allowed revenues of CGES, CEDIS and the market operator, approves network rules, monitors the market and supervises suppliers. It also regulates water and other utility prices. |
| TSO | CGES (Crnogorski elektroprenosni sistem) | Owns and operates the 400, 220 and 110 kV network (63 lines, 1,586.7 km, 31 substations). It balances the system, allocates cross-border capacity and acts as Montenegro’s Local Issuing Office for Energy Identification Codes (EIC). Italy’s Terna is its strategic partner. |
| DSO | CEDIS (Crnogorski elektrodistributivni sistem) | The single distribution system operator for 35, 10 and 0.4 kV networks, serving 445,709 customers at the end of 2024. It connects customers and prosumers, owns and reads meters, and keeps the register of prosumers. Distribution losses fell to 10.51% in 2024. |
| Supplier | EPCG (Elektroprivreda Crne Gore) | State-controlled utility that owns the Perućica (307 MW) and Piva (342 MW) hydro plants and the Pljevlja coal plant (225 MW). It was the only active electricity supplier in 2024 and owns CEDIS. |
| Settlement | COTEE (Crnogorski operator tržišta električne energije) | Electricity market operator. It registers market participants, settles imbalances, records supplier switches together with the network operators, and issues and registers guarantees of origin. |
| Exchange | BELEN (Berza električne energije) | Montenegrin power exchange. It has run a day-ahead market since 26 April 2023 (343,403.5 MWh traded in 2024, gate closure 10:15 CET) and a long-term market used by CGES and CEDIS to buy energy to cover network losses. |
| Metering | CEDIS | The distribution operator installs, owns and reads meters on its network. For prosumers it must fit a bidirectional billing meter and a separate meter that records total generation (renewables law, Article 64). |
Compared with the UK system.
| UK concept | Montenegro equivalent | How it works |
|---|---|---|
| DNO | CEDIS | One company runs the whole distribution network, so there is no regional patchwork as in Great Britain. Its use-of-system prices are set by REGAGEN and appear on the customer’s bill as capacity, losses and fixed charges. |
| National Grid / NESO | CGES | CGES owns the transmission network and also operates the system, including balancing and cross-border capacity allocation. Market operation is split off to COTEE, and exchange trading to BELEN. |
| MPAN | Unique consumer number or code assigned by the system operator (jedinstveni potrošački broj / kod) | Montenegro has no published national metering-point number format like the MPAN. REGAGEN’s switching procedure asks the customer to quote the unique consumer number or code assigned by the competent system operator, which for households is CEDIS. CGES, as Local Issuing Office, can also assign EIC codes to metering points and other objects, but no public rule requires EIC codes on household bills. |
| MPRN | No household gas network | The Energy Law covers gas, but no household gas distribution network or gas supply-point identifier was identified. Homes heat mainly with electricity or firewood. |
| Meter operator | CEDIS (no competitive metering) | The distribution operator installs, seals, owns and reads meters. Customers cannot choose a meter operator. Under the 2025 Energy Law, a customer not covered by the smart-meter plan can ask for a smart meter at their own cost, and CEDIS must fit it within four months. |
| Supplier | EPCG, or another licensed supplier | Switching is free and must be completed within 15 days of the request under the Energy Law. In practice EPCG supplies every customer, and the Energy Community reports no switching. |
| Smart-meter infrastructure (DCC / SMETS2) | CEDIS remote-reading system; no central data hub | There is no central data company. CEDIS has installed remotely read electronic meters across its network, which REGAGEN credits for most of the fall in losses since 2007. The 2025 Energy Law requires CEDIS to set up an interoperable smart metering system and include a roll-out plan in its ten-year development plan. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Unique consumer number or code assigned by the system operator (jedinstveni potrošački broj / kod) |
| Who issues it? | CEDIS, as the competent system operator for customers on the distribution network (CGES for customers connected to transmission) |
| Format | No public format is published. REGAGEN’s supplier-switching procedure requires the customer to give the unique consumer number or code assigned by the competent system operator, along with name, personal ID number (JMBG) or tax number, address, tariff model and consumption category. EIC codes, issued in Montenegro by CGES as Local Issuing Office, can be assigned to metering points, but their use for household connections is not documented publicly. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Not documented on a public page that could be read for this profile. The number is linked to the customer’s supply contract and bills with EPCG. |
| Electronic access | The 2025 Energy Law requires that, once smart metering is fully implemented, customers can see near-real-time and historical consumption through a standardised interface at no extra cost. Customers with conventional meters must be able to read them directly or through an online interface. No public description of a current CEDIS customer portal was identified. |
| Third-party access | Under the Energy Law, the system operator must provide a customer’s consumption and export data to the customer or, on request, to a third party acting on their behalf, at no extra cost and in line with data-protection law. Detailed data-access rules are set in the distribution metering rules. |
| Who keeps the register | CEDIS keeps the metering points on the distribution network and a separate register of prosumers (name, type, plant type and approved capacity, location and approved connection capacity). On a supplier or aggregator switch, the network operator and COTEE record the change. |
| Register scope | National |
Montenegro does not give households a published, standard supply-point code like the British MPAN. A connection is identified by the unique consumer number or code that the system operator assigns to the customer. REGAGEN’s switching rules require this code in every request to change supplier. Because CEDIS is the only distribution operator, the register behind these codes is in effect national. No fictional example is given here, because no public source documents the code’s format.
How it is used
A new connection starts with a request for technical conditions from CEDIS, followed by approval of the main project, a contract for building the connection, and finally connection. CEDIS must connect the building within seven days of being notified by the supplier, then installs and seals the meter. To change supplier, the customer applies to the new supplier by the 10th of the month before the desired start date and quotes the consumer code. The switch takes effect at the meter reading for the previous month. Whether the code stays with the property when it changes hands is not documented publicly, so that is left open here.
Metering and data
Bills are monthly. CEDIS sends prosumers’ import, export and generation data to the supplier by the 10th of each month. The Energy Law requires a conventional meter at every metering point not yet equipped with a smart meter, and gives customers the right to take their data, or pass it to another party, without charge.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Yes |
| How exported electricity is paid | By system size (renewables law, Article 66). Up to 16 kW: net metering, where surplus kWh carry forward as an energy deposit and any balance at the annual settlement on 1 April is paid at the contract energy price. 16–50 kW: net billing, where surplus is credited as a money deposit at the contract energy price minus 5%. Above 50 kW: a commercial scheme, where export is invoiced separately at the contract price minus 5% (50–300 kW) or at the full contract price (above 300 kW). |
| How large can a prosumer system be? | No larger than the approved connection capacity of the building. Net metering applies up to 16 kW, net billing from 16 to 50 kW, and a commercial scheme above 50 kW. |
| How is surplus electricity valued? | Under net metering, surplus kWh offset later consumption, and the 12-month balance is settled on 1 April at the energy price in the supply contract, without network or other charges. Any amount left after clearing debts is paid to the prosumer within 30 days. Under net billing, surplus is valued at the contract energy price minus 5%. |
| Do prosumers pay network charges on exported energy? | Network services are billed using REGAGEN’s methodology, which takes account of both energy taken from and fed into the grid. Under net metering, the renewable support fee is charged on the net amount. |
| Who carries balancing responsibility? | The supplier takes balancing responsibility for the prosumer’s metering point. Prosumers above 300 kW must submit daily delivery schedules and pay imbalance costs. |
| Can neighbours in a block of flats share solar power? | Yes. Households and commercial customers in the same building or residential complex can act jointly as prosumers. They agree each member’s share of the plant, appoint a representative, and sign a distribution agreement with the supplier. Renewable energy communities and citizen energy communities are also provided for in law. |
| Does the grid have to accept prosumer output? | Yes. The network operator must take prosumer electricity with priority, unless system security is at risk. |
Connecting a home system.
- Size the system. The installed capacity cannot exceed the approved connection capacity of the building.
- For a system of 16 kW or less, use CEDIS’s simplified connection procedure by notification. CEDIS must decide within 30 days.
- For larger systems, follow the standard CEDIS procedure: technical conditions for connection, approval of the main project, then a contract for the connection works.
- Obtain the building permit or registration required for the plant. The renewables law limits the permit procedure to one year for plants under 150 kW.
- CEDIS fits a bidirectional billing meter at the connection point and a control meter that records total generation.
- Sign the purchase and sale contract with your supplier, which must offer the settlement method that matches your system size and buy back surplus electricity.
Montenegro first introduced net metering and an exemption from balancing responsibility for prosumers through a 2022 amendment to the old Energy Law. The Law on the Use of Energy from Renewable Sources, adopted in August 2024, set the current size-based scheme. It keeps kWh net metering for typical household systems and moves larger systems towards money-based or separate settlement.
Uptake has been quick. CEDIS reports 4,833 prosumer PV systems totalling 24.051 MW at the end of 2024, an increase of 10.28 MW in the year. REGAGEN credits the 2022 incentives and EPCG’s rooftop solar programmes, Solari 3000+, Solari 500+ and Solari 5000+, for much of this growth. The Energy Community reports that prosumers fed 32 GWh into the grid.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | REGAGEN licence, issued for up to 10 years. No licence is needed for generation for own use, or where an entity’s plants total no more than 1 MW (Energy Law, Article 65). | REGAGEN | Building permits and connection approval are separate. Renewable plants seeking support also need privileged producer status. |
| Self-consume and export (prosumer) | No licence. Prosumer status follows connection of the plant to the building’s installation and contracts with CEDIS and the supplier. | CEDIS; supplier | Simplified connection by notification up to 16 kW. Capacity cannot exceed the building’s connection capacity. |
| Store electricity | Storage is a licensed energy activity. No licence is needed for storage for own use, or where an entity’s storage facilities total no more than 500 kW. Network operators may store energy under the Energy Law without a licence. | REGAGEN | Prosumer storage counts as part of the prosumer’s internal installation (renewables law, Article 62). |
| Sell electricity to customers (supply) | REGAGEN supply licence. A supplier licensed in an EU member state or Energy Community party can be licensed on the basis of that authorisation. | REGAGEN | Six suppliers were licensed at the end of 2024, but only EPCG was active. A supplier of last resort provides universal service to households and small businesses. |
| Trade electricity (wholesale) | No licence: electricity trading is on the Energy Law’s list of activities that may be carried out without one. Traders register with the market operator. | COTEE (registration) | REGAGEN counted 80 electricity traders in 2024. Trading on BELEN also requires exchange membership. |
| Aggregate customers or assets | Aggregation is defined as an energy activity in the 2025 Energy Law, and it is not among the activities that may be carried out without a licence. | REGAGEN | The law defines independent aggregators and gives customers the right to switch aggregator free of charge within 15 days. No active aggregator was identified. |
| Balancing and grid services | Provided to CGES under its transmission rules and contracts for ancillary services and balancing energy. | CGES; REGAGEN | The Energy Law lets demand response, storage and aggregators provide balancing services, and lets CEDIS buy flexibility services from aggregators. |
| Virtual power plant / remote control of assets | No specific licensing regime identified. | — | A VPP would operate through an aggregation licence, a licensed supplier or a balance-responsible party. |
| Operate a power exchange | Licensed energy activity (management of the exchange market). | REGAGEN | Carried out by BELEN. |
The 2025 Energy Law follows the EU Electricity Directive. It lists storage and aggregation as energy activities alongside generation, supply and trading, and REGAGEN issues licences for up to 10 years. Small actors are exempt: generation up to 1 MW, storage up to 500 kW, and anything for the owner’s own use need no licence. Unusually, wholesale trading itself needs no licence.
Renewable support is regulated separately by the 2024 renewables law. Producers that win a market premium at auction or a feed-in tariff become privileged producers. Since 1 January 2026, only plants up to 200 kW count as small plants that can qualify for feed-in tariffs (400 kW for plants commissioned by the end of 2025).
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Day-ahead market (BELEN) | Restricted | — | Limited | BELEN. Running since 26 April 2023 and not yet coupled with neighbouring markets. 343,403.5 MWh traded in 2024, with gate closure at 10:15 CET, earlier than neighbouring markets. 29 participants from 14 countries were registered at the end of 2024. |
| Long-term exchange market (BELEN) | Restricted | — | No | BELEN. Trades products of at least seven days. In 2024 it was used only for CGES and CEDIS purchases of energy to cover losses. |
| Balancing and ancillary services | Developing | — | Unknown | CGES. CGES contracts ancillary services and balancing energy, in 2024 from EPCG. The Energy Law opens balancing to demand response, storage and aggregators, but no route for small or aggregated assets was identified in practice. |
| Distribution flexibility services | Developing | — | Limited | CEDIS. The Energy Law allows CEDIS to procure flexibility services from aggregators, demand response and storage operators. No procurement was identified. |
Montenegro’s flexibility comes mainly from its large hydro plants at Piva and Perućica, operated by EPCG. Market-based flexibility from distributed assets is still a framework rather than a practice: the 2025 Energy Law introduces aggregators, demand response and data access, but no aggregator or household demand-response programme was identified.
Market integration is the main reform under way. The renewables law ties the start of market-premium payments to the coupling of the Montenegrin day-ahead market with the single European day-ahead market, or with another market where annual cross-border trade reaches at least 1 TWh.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| BELEN | Montenegrin power exchange (day-ahead and long-term markets). |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Remotely read electronic meters widely installed by CEDIS; a smart metering system is now a legal obligation, with EBRD funding for further meters |
| Reading interval | Monthly billing; interval data not published |
| Responsible party | CEDIS (distribution system operator) |
| Legal basis | Energy Law 2025, Articles 98–102 (smart metering, right to a smart meter, data management) |
| Right to a smart meter | On request, at the customer’s cost, fitted within four months |
| Funding | EBRD loan (Jan 2025): €10 million for smart meters; WBIF grant of €5 million for smart digitalisation |
| Effect on losses | Distribution losses down from 22.76% (2007) to 10.51% (2024) |
| Prosumer metering | Bidirectional billing meter plus a separate generation meter |
CEDIS has replaced much of its meter fleet with remotely read electronic meters, and REGAGEN attributes the long fall in distribution losses mainly to this project and the network reconstruction that came with it. No official share of homes with smart meters was published, however.
The 2025 Energy Law sets EU-style requirements. CEDIS must build an interoperable, secure smart metering system and include its roll-out plan in the ten-year distribution development plan. Once fully implemented, the system must give customers near-real-time and historical data at no cost, show exported energy for active customers, and allow settlement at the same time resolution as imbalance settlement. REGAGEN notes that smart metering is also a precondition for dynamic-price contracts.
Renewable electricity.
Electricity generation mix (2024).
- Hydro: 49.7%
- Coal (lignite): 40.3%
- Wind: 8.3%
- Solar: 1.8%
- Renewable electricity share
- 59.7 % of electricity generation (2024)Source 3Derived: 2,122.1 GWh of renewable gross generation out of 3,552.2 GWh in total (Eurostat). Montenegro was a small net exporter in 2024 (imports 5,952.8 GWh, exports 6,108.1 GWh). Eurostat’s SHARES renewable share of electricity, which normalises hydro and wind output, was 66.6% in 2024 and 63.1% in 2025. In 2025 renewables provided 77.6% of net generation (monthly data, derived), because the coal plant produced nothing between April and October.
- Home solar
- 24.1 MW (end 2024)Source 114,833 PV systems connected to the distribution network as prosumers (CEDIS data reported by REGAGEN). Includes all customer types, not only households.
- Solar added each year
- 14.2 MW (2024)Source 11Derived: 10.28 MW of new prosumer capacity plus the KAP (1.93 MW) and Voli Trade 1 (2 MW) solar plants commissioned in 2024.
- Hydro
- 0.697 GW (2024)Source 10Includes Piva (342 MW), Perućica (307 MW) and small hydro (55.89 MW, REGAGEN).
- Wind
- 0.118 GW (2024)Source 10Krnovo 72 MW and Možura 46 MW. Gvozd phase 1 (54.6 MW) completed in 2026.
- Solar PV
- 0.03 GW (2024)Source 10
- Coal
- 0.225 GW (2024)Source 10Pljevlja thermal power plant, in service since 1982.
Targets.
- The Energy Community lists a 2030 renewable energy target of 50% for Montenegro. Eurostat puts the overall renewable share at 40.8% in 2024.
- REGAGEN notes that the National Energy and Climate Plan had not yet been adopted when it wrote its 2024 report, and the 2014 Energy Development Strategy remained in force.
Hydropower has long been the backbone of Montenegro’s electricity, and its output swings with rainfall: renewable gross generation was 2,550 GWh in 2023 but 2,122 GWh in 2024. Wind now comes from Krnovo (72 MW) and Možura (46 MW), and Gvozd is adding 54.6 MW, with a second phase of 21 MW under way. Utility solar is small (9.5 MW at the end of 2024), but EPCG is building 42 MW of solar plants at sites including the Vrtac, Slano and Krupac dams and Kapino polje.
Investor interest far exceeds what has been built. CGES received 29 connection requests for solar plants totalling 4,151.3 MW between August 2020 and the end of 2024, and signed connection contracts for 2,198.5 MW. Under the 2024 renewables law, new support is allocated through market-premium auctions and feed-in tariffs for small plants and demonstration projects, within three-year quotas set by the Government.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage in Montenegro is so far provided by hydro reservoirs. The 2025 Energy Law treats electricity storage as a separate energy activity: small facilities up to 500 kW and storage for own use need no licence, and network operators may own storage under conditions set in the law. Prosumers may store their own output behind the meter.
Storage projects.
- Government battery energy storage project: In October 2026 the Ministry of Energy and Mining said it planned to select a strategic partner to develop a battery energy storage system.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EPCG (Elektroprivreda Crne Gore) | Only active supplier in 2024, serving all 445,709 distribution customers | Yes | Yes | No | Yes |
EPCG supplies every customer in Montenegro, although REGAGEN had licensed six suppliers by the end of 2024. Its prosumer contracts apply the net-metering, net-billing or commercial settlement required by the renewables law. In 2024 it also offered a green supply model backed by wind energy.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Mining | Government | Energy policy, renewable auctions and feed-in tariffs | Allocates renewable support and leads strategic projects such as battery storage. |
| REGAGEN | Regulator | Licensing, network prices, market monitoring | Licenses energy activities and publishes the annual report on the state of the energy sector. |
| CGES | Transmission | Transmission system operator and EIC issuing office | Operates the grid and the interconnections, including the HVDC link to Italy. |
| CEDIS | Distribution | Distribution system operator and meter owner | Connects prosumers and fits their bidirectional meters. |
| COTEE | Market | Electricity market operator and guarantees of origin | Registers market participants, settles imbalances and issues guarantees of origin. |
| BELEN | Market | Power exchange | Runs the day-ahead market. |
| EPCG | Consumer | Generator and supplier | Supplies all customers and signs prosumer contracts. |
| MONSTAT (Statistical Office of Montenegro) | Government | Official statistics, including the 2023 census | Source of data on households, dwellings and heating. |
| Energy Community Secretariat | Regulator | Monitors transposition of EU energy law | Publishes comparable market indicators for Montenegro. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Prosumer metering and connection | Law on the Use of Energy from Renewable Sources (2024), Articles 62–71 | Parliament of Montenegro | Capacity limit, simplified connection up to 16 kW, bidirectional and generation meters, settlement schemes, jointly acting prosumers. |
| Small power plant connection | CEDIS Technical Requirements No. 10-10-28948 (13 September 2021) | CEDIS | Technical requirements for connecting small power plants to the distribution network. The published document is a scan, so its referenced standards could not be verified. |
| Smart metering and data | Energy Law (2025), Articles 98–102 | Parliament of Montenegro | Interoperability, cyber security, customer data access and the right to a smart meter. Details are set in the distribution metering rules. |
| Quality of supply | Rules on the minimum quality of delivery and supply | REGAGEN | Individual quality standards for network operators and suppliers, with compensation where they are missed. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO connection (CEDIS) | Yes | National | Simplified procedure by notification for systems of 16 kW or less, decided within 30 days. Larger systems go through technical conditions, project approval and a connection contract. |
| Building permit or registration | Limited | Mixed | Required for power plants under the construction rules. The renewables law caps the permit procedure at one year for plants under 150 kW and at two years for larger plants, and the Ministry sets the grounds for a simplified procedure. |
| Licence | No | National | Not needed for generation for own use or for generation totalling up to 1 MW. |
| Supplier contract | Yes | National | A purchase and sale contract with the supplier, which must buy back surplus electricity under the scheme that matches the system size. |
For a household, the process runs through CEDIS and the supplier. Small rooftop systems up to 16 kW benefit from the simplified notification procedure that CEDIS must publish and apply within 30 days. Larger plants follow the full CEDIS connection procedure, and plants above 1 MW in total also need a REGAGEN generation licence.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for prosumers up to 16 kW | Active | Net metering | Surplus kWh carry forward as an energy deposit. On 1 April each year the supplier settles the previous 12 months and pays any surplus at the contract energy price, without network charges. | Since 2024 (net metering first introduced in 2022) |
| Net billing for prosumers of 16–50 kW | Active | Net billing | Surplus is converted into a money deposit at the contract energy price minus 5%, used to reduce later bills. | Since 2024 |
| Market premium auctions | Scheduled | Market premium (auction) | Run by the Ministry within Government quotas. Until the Montenegrin day-ahead market is coupled with the EU market, winning producers sell their output to a designated counterparty at the price achieved in the auction. The Ministry says further renewable auctions are planned. | — |
| Feed-in tariffs for small plants and demonstration projects | Scheduled | Feed-in tariff | Available only for small plants (up to 200 kW for plants commissioned from 2026) and demonstration projects, within quotas set by the Government. No current allocation round was identified. | — |
Data and connectivity.
- Fixed broadband
- 32.3 fixed subscriptions per 100 people (2024)Source 8
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
CEDIS is investing in SCADA and an advanced distribution management system (ADMS), financed by a €35 million EBRD loan signed in January 2025, which also funds smart meters. The communication technology used by CEDIS meters is not described in public sources reviewed. CGES runs its own automatic meter reading system for transmission connections and was expanding it in 2024.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 2.78 TWh (2024)Source 11Consumption by all customers on the transmission and distribution networks (2,779.5 GWh), excluding network losses. Up 3.16% on 2023.
- Generation capacity
- 1.07 GW (2024)Source 10845 MW renewable and 225 MW non-renewable.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The grid’s main constraint is getting power between the coast, where the Italian cable lands at Lastva, and the north. The 400 kV Lastva–Čevo–Pljevlja 2 line, part of the Trans-Balkan Corridor, has been delayed by unresolved property issues, and the Pljevlja 2–Bajina Bašta line to Serbia lacks planning documents. Both are conditions for laying the second 600 MW pole of the Italian cable, which is in CGES’s 2024 ten-year plan.
Losses are moderate. Transmission losses were 1.56% in 2024 and distribution losses 10.51%, against 8.43% that CEDIS’s loss study considered justified. Customers pay only for justified losses.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Energy Law 2025 | Current | March 2025 (amended January 2026) | Transposes the EU Electricity Directive: storage and aggregation as energy activities, smart metering obligations, data access, free switching within 15 days, and supplier of last resort with universal service for households. |
| Law on the Use of Energy from Renewable Sources | Current | August 2024 | Size-based prosumer settlement (net metering, net billing, commercial scheme), energy communities, market premium auctions and feed-in tariffs for small plants. |
| Temporary distribution prices for 2026 | Current | 1 January 2026 | REGAGEN kept distribution network prices at the 2025 level pending the first regulatory period under the new Energy Law. |
| First regulatory period under the 2025 Energy Law | Upcoming | 1 January 2027 | New allowed revenues and network prices for CGES, CEDIS and the market operator. |
| Day-ahead market coupling and market premiums | Upcoming | Not scheduled | Market-premium payments start once the Montenegrin day-ahead market is coupled with the single European market (or another qualifying market). Until then auction winners are paid the price they bid. |
| Smart meters and ADMS/SCADA at CEDIS | Upcoming | In progress | EBRD-financed investment of €25 million in ADMS and SCADA and €10 million in smart meters. |
| Gvozd wind farm phase 2 and battery storage | Upcoming | In preparation | A further 21 MW at Gvozd, and selection of a strategic partner for a battery storage project (Ministry of Energy and Mining). |
| Second pole of the Italy–Montenegro cable | Upcoming | Planned | A further 600 MW, included in CGES’s 2024 ten-year plan, subject to completion of the 400 kV lines to Pljevlja and Serbia. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | 4,833 prosumer systems totalling 24.05 MW at the end of 2024, up 10.28 MW in the year, supported by net metering up to 16 kW. |
| Distributed energy market | Low | Aggregation, demand response and energy communities exist in law, but no aggregator or household flexibility programme was identified. |
| Grid flexibility market | Low | A day-ahead market exists on BELEN but is not coupled, and balancing is provided by EPCG under contract with CGES. |
| Energy storage adoption | Low | No operational battery capacity identified; a government battery project is at the partner-selection stage. |
| Renewable growth environment | Medium | Renewables provide most generation, and wind and solar are growing (Gvozd 54.6 MW, 42 MW of EPCG solar under construction), but hydro output dominates and varies with rainfall. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 27 sources
- Electricity prices for household consumers (nrg_pc_204), Montenegro, band DC. Eurostat, 2026. accessed 9 October 2026.
- Complete energy balances (nrg_bal_c), Montenegro, electricity. Eurostat, 2024. accessed 9 October 2026.
- Gross electricity production by fuel (nrg_bal_peh), Montenegro. Eurostat, 2024. accessed 9 October 2026.
- Net electricity generation by type of fuel – monthly data (nrg_cb_pem), Montenegro. Eurostat, 2025. accessed 9 October 2026.
- Share of energy from renewable sources (nrg_ind_ren), Montenegro. Eurostat, 2025. accessed 9 October 2026.
- Population, total (SP.POP.TOTL), Montenegro. World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total) (SP.URB.TOTL.IN.ZS), Montenegro. World Bank, 2025. accessed 9 October 2026.
- Fixed broadband subscriptions per 100 people (IT.NET.BBND.P2), Montenegro. World Bank, 2024. accessed 9 October 2026.
- Montenegro – contracting party page (key electricity indicators). Energy Community Secretariat, 2025. accessed 9 October 2026.
- Montenegro – Renewable energy statistical profile. IRENA, 2025. accessed 9 October 2026.
- Izvještaj o stanju energetskog sektora Crne Gore za 2024. godinu (Report on the state of the energy sector of Montenegro for 2024). REGAGEN, 2025. accessed 9 October 2026.
- Odluka o privremenim cijenama za korišćenje distributivnog sistema električne energije za 2026. godinu. REGAGEN, 2025. accessed 9 October 2026.
- Postupak promjene snabdjevača (supplier switching procedure). REGAGEN. accessed 9 October 2026.
- Zakon o korišćenju energije iz obnovljivih izvora (Law on the Use of Energy from Renewable Sources). REGAGEN (published text), 2024. accessed 9 October 2026.
- Zakon o energetici – prečišćeni tekst (Energy Law, consolidated text). REGAGEN (published text), 2026. accessed 9 October 2026.
- Crnogorski elektroprenosni sistem – transmission network overview. CGES. accessed 9 October 2026.
- EIC kodovi – registracija učesnika. CGES. accessed 9 October 2026.
- CEDIS – distribution network overview. CEDIS. accessed 9 October 2026.
- Priključenje na distributivni sistem (connection to the distribution system). CEDIS. accessed 9 October 2026.
- Crnogorski operator tržišta električne energije. COTEE. accessed 9 October 2026.
- Od potencijala do konkretnih projekata – Crna Gora ulazi u novi investicioni ciklus. Ministry of Energy and Mining, 2026. accessed 9 October 2026.
- Census 2023: Population of Montenegro by sex and age (Release 133/2024). MONSTAT, 2024. accessed 9 October 2026.
- Census 2023: Structure of households in Montenegro (Release 102/2025). MONSTAT, 2025. accessed 9 October 2026.
- Census 2023: Number of dwellings and type of use by municipalities. MONSTAT, 2024. accessed 9 October 2026.
- Census 2023: Dwellings by area and number of rooms. MONSTAT, 2024. accessed 9 October 2026.
- Census 2023: Dwellings by availability of installations. MONSTAT, 2024. accessed 9 October 2026.
- Census 2023: Dwellings by position in the building, year of construction and type of material. MONSTAT, 2024. accessed 9 October 2026.
Questions about energy in Montenegro.
Eurostat records an average household price of €0.1039/kWh including all taxes in the first half of 2026. REGAGEN reports that households paid an average of 9.14 c/kWh excluding VAT in 2024. Prices are among the lowest in Europe.
Mostly renewable, but it varies with rainfall. In 2024, 59.7% of gross generation came from renewables, mainly hydro, with 40.3% from coal. Eurostat’s normalised renewable share of electricity was 66.6% in 2024.
Yes. Systems up to 16 kW use net metering, with the annual surplus paid at the supply-contract energy price each April. Systems of 16–50 kW use net billing, crediting surplus at the contract price minus 5%. The system cannot exceed your connection capacity.
There is no published national format. Each customer has a unique consumer number or code assigned by the system operator (CEDIS for homes), which must be quoted when changing supplier.
CGES runs the transmission network and CEDIS the distribution network. REGAGEN regulates them, COTEE operates the market and BELEN runs the power exchange. EPCG is the only active supplier.
No. Generation for your own use and generation up to 1 MW in total need no licence. Systems up to 16 kW connect through a simplified CEDIS notification procedure, decided within 30 days.
Yes. Switching is free and the law requires it to be completed within 15 days. Six suppliers are licensed, but EPCG is the only one actively supplying customers.
