How electricity works in Slovenia.
Slovenia electricity market 2026: ELES as combined TSO and DSO, five distribution companies, GSRN metering points, 99% smart meters, self-supply rules and incentives.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Slovenia energy at a glance.
Key figures for households in Slovenia. Each one links to its source on the full overview below.
Electricity price.
0.212 EUR per kWh for households, including taxes. Figures for 2025-H2.
Household use.
4,321 kWh a year for a typical household. Figures for 2025.
Renewable share.
39.7% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Slovenia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Slovenia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Slovenia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Slovenia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Slovenia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Slovenia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Slovenia.
The energy market in Slovenia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Slovenia has a fully open electricity market with an unusual network structure. Since the distribution operator SODO was merged into it on 2 October 2023, the state-owned company ELES has been the combined operator of both the transmission and the distribution system. ELES contracts the day-to-day distribution work (connections, metering, maintenance) to five regional distribution companies: Elektro Ljubljana, Elektro Maribor, Elektro Celje, Elektro Gorenjska and Elektro Primorska. The regulator is the Energy Agency (Agencija za energijo, AGEN) in Maribor.
Household prices have been set by the market since the last government price cap ended on 28 February 2025. Eurostat puts the average household price, including network charges and taxes, at €0.212/kWh in the second half of 2025. A new network-tariff method introduced on 1 October 2024 charges households for “agreed power” in five time blocks, with a higher-price season from November to February. This is possible because 98.8% of distribution-network users had a smart meter at the end of 2025.
Domestic generation is a mix of nuclear power (the Krško plant, shared 50:50 with Croatia), hydropower, coal from the Šoštanj plant, and fast-growing solar. Solar capacity reached 1,571 MW at the end of 2025. Rooftop systems have been the main driver: about 64,000 self-supply installations were running at the end of 2025. Annual net metering is closed to new entrants. New systems are covered by the Act on the Promotion of the Use of Renewable Energy Sources (ZSROVE-1), in force since 30 December 2025, under which surplus electricity is bought by the household’s supplier. Nationwide energy sharing between network users started on 1 July 2026.
Energy snapshot.
Headline figures for electricity in Slovenia. Each shows its data year and links to its source.
- Population2,135,107 peopleSource 41 Jan 2026
- Households868,900 householdsSource 52025
- Average household size2.4 people/householdSource 62025
- Electricity use per household4,321 kWh/yrSource 12025
- Household price (EUR)0.212 EUR/kWhSource 32025-H2
- Renewable electricity share39.7%Source 122025
- Solar capacity1.571 GWSource 13End 2025
- Wind capacity0.005 GWSource 12025
- Energy storage capacity0.185 GWSource 142025
- Smart-meter share98.8%Source 1End 2025
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Yes
- Regulator
- Energy Agency (Agencija za energijo, AGEN)
- System operator
- ELES, d.o.o. (combined transmission and distribution system operator)
- Distribution networks
- ELES is the single legal DSO. Five regional distribution companies carry out distribution tasks under contract.
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Slovenia.
- Household price (EUR)
- 0.212 EUR/kWh (2025-H2)Source 3Eurostat average household price for the 2,500–4,999 kWh/yr band, all taxes and levies included.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (EUR per kWh).Source 3
| 2019-H1 | 0.1634 EUR/kWh |
|---|---|
| 2019-H2 | 0.1666 EUR/kWh |
| 2020-H1 | 0.1448 EUR/kWh |
| 2020-H2 | 0.1694 EUR/kWh |
| 2021-H1 | 0.1662 EUR/kWh |
| 2021-H2 | 0.1711 EUR/kWh |
| 2022-H1 | 0.139 EUR/kWh |
| 2022-H2 | 0.1956 EUR/kWh |
| 2023-H1 | 0.1917 EUR/kWh |
| 2023-H2 | 0.2113 EUR/kWh |
| 2024-H1 | 0.2084 EUR/kWh |
| 2024-H2 | 0.2006 EUR/kWh |
| 2025-H1 | 0.181 EUR/kWh |
| 2025-H2 | 0.2121 EUR/kWh |
A Slovenian bill has five parts: the energy price from the supplier, the network charge (omrežnina) for transmission and distribution, the RES and CHP support levy (prispevek OVE + SPTE) and other energy levies, excise duty, and VAT. For a typical household in 2025, AGEN put energy at 57.1% of the average annual final price, network charges at 21.3%, levies at 2.8%, and excise and VAT together at 18.8%. VAT on electricity is charged at the standard 22% rate. A temporary 9.5% rate ended on 31 May 2023.
Network charges by time block
Since 1 October 2024 the network charge has had two parts: a charge per kW of agreed power (dogovorjena moč) in each of five time blocks, and a charge per kWh. The blocks are periods of the day set from the system peak load. Block 1 is the most expensive and occurs only in the higher season (January, February, November and December). The lower season, March to October, uses blocks 2 to 5. Users choose their agreed power for each block. For three-phase connections of up to 43 kW, the minimum is 20% of the connection power, and never less than 2.8 kW. New users are billed on their measured 15-minute peak until enough history exists. The same postage-stamp tariffs apply across the whole country.
The first winter under the new method produced high bills, and the government and AGEN softened it. An emergency law (ZNUOPOVO) cut the household block-1 power charge to the block-2 level in January and February 2025. AGEN then charged block 1 at 50% for November 2025 to February 2026. AGEN plans to revise the time blocks for 2027.
Price level and trend
Eurostat’s household price for the 2,500–4,999 kWh band was €0.16–0.17/kWh from 2019 to 2021. It reached €0.21/kWh in the second half of 2023. It fell to €0.181/kWh in the first half of 2025, when the price cap and reduced network charges still applied, and rose to €0.212/kWh in the second half of 2025. AGEN reports that the average annual final price for a typical household fell 4.3% in 2025, mainly because network charges were 30.2% lower than in 2024. AGEN and Eurostat both place Slovenia below the EU average, below Austria and Italy, and above Croatia and Hungary.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Variable | Yes | Most households buy at a supplier’s published price-list rate, which the supplier can change with notice. Prices have been set by the market since the government cap ended on 28 February 2025. At the end of 2025, 11 suppliers were serving households. |
| Time-of-use | Yes | Suppliers usually price energy at a higher (VT) and a lower (MT) rate. AGEN’s profile of an average household assumes 1,996 kWh at VT and 2,100 kWh at MT a year. Separately, the network charge applies to every user and varies by five time blocks and two seasons (higher season November–February). |
| Dynamic | Limited | Under Article 17 of the Electricity Supply Act (ZOEE), suppliers with more than 100,000 customers must offer dynamic-price contracts: E 3, ECE, Elektro energija, Energija plus and GEN-I in 2025. Any customer with a smart meter may ask for one. Only 2,259 households, with four suppliers, had such a contract in 2025. |
| Fixed | Yes | Suppliers also offer fixed-price contracts for a set period. AGEN regulates how suppliers manage the risks of these contracts. |
| Regulated | No | The government capped household prices between 2022 and February 2025. The last cap (Uradni list RS 96/24) applied from 1 November 2024 to 28 February 2025: VT 0.084, MT 0.070 and single rate 0.077 EUR/kWh, for all consumption. No cap was in force in 2026 at the time of research. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,321 kWh/yr (2025)Source 1AGEN average annual consumption of all household customers. It rose because the 2025 balance counted, for the first time, the actual consumption at net-metered self-supply points (over 10 MWh a year on average). Households without self-supply used just over 3,900 kWh.
- Average daily use per household
- 11.8 kWh/day (2025)Source 1Derived: AGEN average household consumption of 4,321 kWh divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 6,800 kWh/person/yr (2025)Source 12Total electricity demand (all sectors) per person, Ember.
- Heat pumps
- 119,000 units (2025)Source 2Approximate starting value used in the national flexibility needs assessment, which projects more than 216,000 by 2035.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 24,548 battery-electric passenger cars (2025)Source 9AGEN reports 29,219 electric passenger and light commercial vehicles (about 2% of the fleet) and 2,545 public charging points in 2025.
- Electric cooking
- Not identified from a reliable public source.
Households used 3,817 GWh of electricity in 2025 (AGEN). The 15% rise on 2024 is mostly an accounting change: for the first time, the 2025 balance counted the actual electricity drawn from the grid at net-metered self-supply points (720 GWh), not just the annual net figure. Eurostat’s energy balance gives 4,249 GWh for household final consumption in 2024.
Average use per household was 4,321 kWh in 2025. Households with solar self-supply on annual net metering draw far more from the grid (over 10 MWh a year on average) because many also have heat pumps and electric vehicles. Average use in other households is slowly falling, to just over 3,900 kWh.
Heating is electrifying quickly. The national flexibility assessment starts from about 119,000 heat pumps in 2025 and expects more than 216,000 by 2035, and battery-electric vehicles could exceed 280,000 by 2035. Because network charges depend on agreed power by time block, when a home heats water, charges a car or runs a heat pump now directly affects its bill.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 74.2 % of population (2025)Source 7Eurostat EU-SILC, share of population living in owner-occupied homes (58.8% with no mortgage).
- Private rented
- 7.6 % of population (2025)Source 7Tenants paying a market rent.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 72.6 % of population (2025)Source 867.5% in detached houses and 5.2% in semi-detached or terraced houses.
- Apartments and flats
- 27.1 % of population (2025)Source 8
- Urban population
- 56 % of population (2025)Source 11
Slovenia is a nation of owner-occupiers living in houses: about three-quarters of people live in a home their household owns, and nearly two-thirds of the population live in a detached house. This is why rooftop solar spread so widely under the self-supply scheme. The roof and the meter usually belong to the same household, and most homes have a single-family connection that the household controls.
Flats account for about 27% of the population and are concentrated in cities. Multi-apartment buildings can use collective self-supply. Since 1 July 2026 residents can also receive shared energy under the national energy-sharing scheme, without needing their own roof.
How the grid works in Slovenia.
- TransmissionELES, d.o.o.
- DistributionELES is the single legal DSO. Five regional distribution companies carry out distribution tasks under contract.
- MeteringDistribution companies (EDP), Single entry point (EVT) of the national data hub, and Moj elektro
- Supply6 or more retail suppliers
Large power plants (the Drava and Sava hydro chains, the Šoštanj coal plant, the Brestanica gas plant and the Krško nuclear plant) feed the ELES transmission grid. Electricity moves from there through 110 kV/medium-voltage substations to the regional networks of the five distribution companies. Most solar is connected at medium and low voltage, and on sunny days power now flows back up from parts of the low-voltage network. AGEN monitors this when setting tariffs.
Commercially, suppliers and traders belong to balance groups and buy on bilateral contracts or the BSP exchange. Borzen registers these contracts and settles imbalances monthly on a 15-minute interval with a single price. Since 1 January 2026 intraday trading has closed 30 minutes before delivery. With PICASSO and MARI in operation, ELES now buys balancing energy through the European platforms, not through its own intraday trades.
Slovenia is interconnected with Austria, Italy and Croatia, and directly with Hungary since the 400 kV Cirkovce–Hévíz line started operating in 2022. Domestic generation covered 82.8% of final consumption in 2025, compared with 97.1% in 2024, mainly because of weaker hydropower output. Half of Krško’s output belongs to Croatia under the intergovernmental agreement.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Infrastructure and Energy (Ministrstvo za infrastrukturo in energetiko) | Responsible for energy policy under the government formed in June 2026, taking over energy from the former Ministry of the Environment, Climate and Energy. Issues energy permits for generation above 1 MW. |
| Regulator | Energy Agency (Agencija za energijo, AGEN) | Independent regulator in Maribor. Sets the network-charge method and tariffs, regulates ELES, monitors the retail and wholesale markets, registers REMIT market participants and publishes the annual Report on the State of the Energy Sector. |
| TSO | ELES, d.o.o. | Operates the 400/220/110 kV transmission grid and is responsible for balancing and frequency reserves. It is part of the Slovenia–Croatia–Bosnia and Herzegovina (SHB) load-frequency control block. |
| DSO | ELES (combined operator) with five distribution companies | ELES became the distribution system operator when SODO merged into it on 2 October 2023. With government consent, it contracts distribution tasks to Elektro Ljubljana, Elektro Maribor, Elektro Celje, Elektro Gorenjska and Elektro Primorska, which own and run the regional networks. |
| Metering | Distribution companies (EDP) | Install, own and read the meters in their areas through their head-end systems. Meter data is pushed to the national metering-data platform. |
| Data hub / registry | Single entry point (EVT) of the national data hub, and Moj elektro | The distribution operator set up the EVT as the central point of access to metering data for suppliers, aggregators, service providers and consumers. Moj elektro is the free portal and app through which users see their own 15-minute data. |
| Settlement | Borzen, d.o.o. | The electricity market operator. It keeps the contract register, runs monthly balance settlement on a 15-minute interval with a single imbalance price, and acts as the RES support centre (support schemes, investment-aid calls, guarantees of origin). |
| Exchange | BSP Energy Exchange (ADEX group) | Slovenian day-ahead and intraday power exchange, now part of the regional ADEX group with SEEPEX (Serbia) and HUPX (Hungary). |
| Supplier | 21 active suppliers (11 serving households, end 2025) | GEN-I held 35.2% of household supply in 2025. ECE, E 3, Energija plus, Elektro energija and Petrol each held 9.8–15.1%. |
Compared with the UK system.
| UK concept | Slovenia equivalent | How it works |
|---|---|---|
| DNO | ELES as legal DSO; five distribution companies (Elektro Ljubljana, Maribor, Celje, Gorenjska, Primorska) | There is one legal distribution operator for the whole country: ELES, which is also the TSO. The five regional companies do the work that a UK DNO does (connections, faults, metering), but as contractors to ELES, not as separately licensed DSOs. Network charges are the same across the country. |
| National Grid/NESO | ELES | ELES owns and operates the transmission grid, balances the system in real time and procures FCR, aFRR and mFRR. It joined the European PICASSO (aFRR) and MARI (mFRR) platforms in July 2026. |
| MPAN | Identifier of the metering site (identifikator merilnega mesta) and GSRN of the metering point | Each metering site has two identifiers, assigned by the distribution operator in the connection consent (SZP). One is a short number made of the distribution-area code, a hyphen and a serial (for example 4-1234567). The other is an 18-digit GS1 GSRN starting 38311158. Each metering point at the site (for consumption, export, network billing, flexibility and so on) has its own GSRN. |
| MPRN | Gas metering points of the local gas DSOs | Gas is separate. It is distributed by 12 gas distribution operators under local concessions, and its metering points have nothing to do with the electricity identifiers. |
| Meter operator | Distribution companies (on behalf of ELES) | Households cannot choose who installs their meter. The regional distribution company installs, owns, reads and replaces it as part of the regulated distribution service. |
| Supplier | Dobavitelj električne energije | Every supplier can serve the whole country. The supplier bills energy and passes through network charges and levies on one bill. Under ZSROVE-1, a household with self-supply signs a self-supply contract with its supplier that includes the terms for buying its surplus. |
| Smart-meter infrastructure | Advanced metering system (NMS) with the EVT data hub | There is no separate national communications company like the DCC. Each distribution company runs its own head-end system and communicates with meters over power-line carrier (PLC) or point-to-point mobile links. The distribution operator’s single entry point (EVT) gives suppliers, aggregators, consumers and authorised third parties standardised access to the data, regardless of area or supplier. |
How a supply point is identified.
2-1048576 / 383111580004821937 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Identifikator merilnega mesta (metering-site identifier) and GSRN merilne točke (metering-point GSRN) (MM / GSRN) |
| Who issues it? | The distribution operator (ELES, acting through the regional distribution company), in the connection consent (soglasje za priključitev, SZP) |
| Format | The metering site (merilno mesto) has two identifiers. (1) A short number: the distribution company’s area code of up to two digits without leading zeros, a hyphen, and a serial number of up to seven digits that is unique in that area. (2) A GS1 GSRN made of the 8-digit operator prefix 38311158 and a 10-digit suffix. Each metering point (merilna točka) at the site also has its own 18-digit GSRN with the same prefix. |
| Length | Short identifier: up to 10 characters (2 + hyphen + 7). GSRN: 18 digits. |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On the electricity bill: the regulator’s rules on bill content require the metering-site number or its GS1 GSRN and the meter number, plus the GSRN of each billing metering point. It also appears in the connection consent and in the Moj elektro portal. |
| Electronic access | Users can register free on Moj elektro (web and app) to see 15-minute data for their metering sites. Moj elektro also has a public API, where a usage point can be queried by the short identifier or by GSRN. |
| Third-party access | Suppliers, aggregators and energy-service providers authorised by the user get data through the distribution operator’s single entry point (EVT). The distribution operator must provide self-supply billing data free of charge to the user’s supplier or authorised third party. Owners of a metering site, or their authorised representative, may inspect the register entries about it. |
| Who keeps the register | The distribution operator keeps a single register of metering sites and a single register of metering points (SONDSEE Articles 163–169), maintained through the distribution companies. |
| Register scope | National |
In Slovenia the metering site (merilno mesto, MM) is the physical place where a customer’s installation is connected and measured. The metering point (merilna točka, MT) is a data object at that site used for one purpose: measuring, energy billing, network-charge billing, balance settlement, flexibility or aggregation. A household normally has one site with one or more metering points. A home with solar self-supply or a battery has extra points for exported energy, and a member of energy sharing or community self-supply has points for the shared or allocated energy.
How the identifiers are built
The System Operating Instructions for the Distribution System (SONDSEE, Uradni list RS 77/24 and 110/25) fix the format. The metering-site number is the distribution area code (up to two digits), a hyphen, and a serial number of up to seven digits, for example 2-1048576 (fictional). The same site also has a GS1 GSRN: the operator’s 8-digit prefix 38311158 followed by 10 digits, giving 18 digits in total, for example 383111580004821937 (fictional). Every metering point gets its own GSRN with the same prefix. The distribution operator assigns the identifiers when it issues the connection consent, or later at the request of the user or an authorised party.
What the register holds
The metering-site register records, among other things, the area code, the valid connection consent, the address, the owner of the metering site, the network location (substation, feeders, transformer station), whether the site is for consumption, production or both, the meter type and whether it is remotely read, whether the I1 real-time interface is used, the connection power and the reading frequency. The metering-point register records the GSRN, the person liable for network charges, the point type, the agreed power for each time block, the user group and voltage level, and flags such as self-supply, community self-supply and levy exemptions.
Who owns it and how changes are made
The identifier belongs to the connection, not to the person: it stays with the property when the occupant or owner changes. The registered owner of the metering site can be different from the person paying for the electricity. Users, or their supplier acting on their behalf, must report changes within 30 days, and the distribution operator must enter correct data within eight working days. Changing supplier does not change the identifiers. The new supplier is linked to the existing billing metering point, and the old supplier loses access to that point’s data.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Supplier-defined buy-back under a self-supply contract (ZSROVE-1). Annual net metering continues only for systems that entered the old scheme. |
| Is annual net metering still available? | Not for new systems. Only sites whose connection application was filed by 31 December 2023 and which were registered as self-supply customers by 31 December 2024 could join. Existing participants remain on annual netting. At the end of 2025, 57,507 households were on annual netting. |
| How are new self-supply systems paid for exports? | Through the supplier. Under ZSROVE-1, the self-supply contract is a type of supply contract that must include terms for buying the electricity exported to the grid. Prices and the settlement interval are set by each supplier. AGEN’s 2025 analysis compared single-rate, multi-rate (“active”) and exchange-indexed dynamic self-supply models. |
| Do self-supply customers pay network charges on exports? | No. Under ZSROVE-1, no network charges or other levies are paid on electricity fed into the grid or on self-produced electricity used in the building. Network charges and levies are paid on electricity taken from the grid. |
| Is there a size limit? | Under the self-supply regulation (Uradni list RS 43/22, as amended), the connection power of an individual self-supply device may not exceed 0.8 times the consumption connection power of the site it is connected to. The simple connection procedure applies up to 50 kW. |
| Which technical standard applies to inverters? | SIST EN 50549-1 (low voltage) and SIST EN 50549-2 (medium voltage), plus Annex 5 of SONDSEE. Annex 5 covers the connection and operation of generation devices and storage connected to the distribution network. |
| Can surplus be shared with another household? | Yes, since 1 July 2026. Under ZOEE-A, a network user can allocate surplus energy to other users anywhere in Slovenia, for payment or free of charge, on 15-minute billing intervals. Large companies are excluded, and customers on annual net metering cannot be recipients. |
Connecting a home system.
- Check that the roof installation complies with the national rules for siting photovoltaic devices. A system of up to 1 MW on an existing building is installed as maintenance work, without a building permit.
- Apply to the regional distribution company for a connection consent (SZP). For self-supply devices of up to 50 kW, ZSROVE-1 allows a simple application: the distribution operator must decide within one month, otherwise the right to connect is deemed granted.
- Have the system installed. The application must include, among other things, the manufacturer’s declaration that protection settings meet SONDSEE and SIST EN 50549-1/-2.
- The distribution operator connects and registers the site as a self-supply customer and sends a contract on use of the system. If it misses the 15-day deadline, the customer can ask AGEN to order the connection.
- Sign a self-supply contract with a supplier, which includes the terms for buying surplus electricity. Alternatively, sell the output under a renewable PPA (in which case the household counts as a producer), or take part in energy sharing.
Slovenia’s rooftop solar boom was built on annual net metering, which treated the grid as a free seasonal battery. By the end of 2025, 64,092 self-supply devices with 822 MW of connection power were operating, almost all of them solar. Connections slowed sharply in 2025 (4,658 new devices, about 57 MW) once only late-registered applications could still join the old scheme.
Systems approved after 1 January 2024 operate under market rules. The household agrees buy-back terms with its supplier, pays network charges only on grid imports, and can add a battery, join a community, or take part in energy sharing since July 2026. Because the network charge depends on agreed power by time block, a battery can lower a household’s costs. AGEN’s 2025 case study found the saving small for a net-metered home and potentially larger under market self-supply models.
For households still on annual netting, a government regulation (Uradni list RS 37/26) compensates suppliers for the cost of serving them.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Energy permit (energetsko dovoljenje) from the minister for plants above 1 MW connected to the public grid. No permit below 1 MW. Households with self-supply are not treated as producers unless they sell their surplus under a renewable PPA. | Ministry of Infrastructure and Energy | The SPOT portal also lists energy permits for heat plants above 1 MW and for sites with connection power above 5 MW. A device declaration (deklaracija) from AGEN is needed for support and guarantees of origin, but none is issued for self-supply devices below 50 kW. |
| Store electricity | No dedicated licence identified. A storage system needs a connection consent and must meet SONDSEE Annex 5. Self-supply customers may install and operate storage behind the meter. | Distribution operator (connection); AGEN (rules) | Large batteries go through spatial and building procedures. HSE’s planned ~200 MW / 400 MWh battery at Šoštanj is at the spatial-planning stage. |
| Export to the grid | Connection consent (SZP) from the distribution operator. A simple procedure with deemed approval applies to self-supply devices up to 50 kW. | ELES via the regional distribution company | The device must not exceed 0.8 times the consumption connection power for individual self-supply. |
| Sell surplus electricity (household) | No licence. Sold through a self-supply contract with a supplier, a renewable PPA, or energy sharing. | — | Energy undertakings may not take part in energy sharing as sharers, but they may organise it. |
| Supply electricity to consumers | No separate supply licence was identified. Suppliers must belong to a balance group, provide financial security to the distribution operator (SONDSEE Annex 6), follow the ZOEE consumer rules, and register under REMIT if active in wholesale markets. | AGEN (supervision); Borzen (balance groups) | Suppliers with more than 100,000 customers must offer dynamic-price contracts. |
| Aggregate / operate a VPP | No dedicated licence. Aggregation may be done by an independent aggregator or by a supplier. Participation in each market depends on that market’s prequalification and contracts. | ELES (balancing); distribution operator (flexibility services) | Six aggregators were active at the end of 2025, all also suppliers, with 1,912 network users in their portfolios. |
| Wholesale trading | Registration as a market participant with AGEN under REMIT, membership of a balance group, and exchange membership to trade on BSP. | AGEN; Borzen; BSP | 85 market participants were registered with AGEN in 2025. |
| Balancing and frequency services | Prequalification and a balancing-service contract with ELES. FCR is procured through FCR Cooperation. aFRR and mFRR balancing energy has gone through PICASSO and MARI since July 2026. | ELES | Planned reserves for 2025: FCR ±14 MW, aFRR ±60 MW, mFRR +190/−66 MW. |
| Local grid (DSO) flexibility services | Offers are submitted under SONDSEE Annex 7 (flexibility services used by the distribution operator) and entered in the temporary flexibility register through Moj elektro or CEEPS. | Distribution operator | Elektro Ljubljana’s 2025 tender for flexibility at ten congested transformer stations received no bids. |
| Remote control of customer assets | No specific licence. Control depends on the customer’s contract with an aggregator or supplier. Real-time meter data is available locally through the I1 interface. | — | 62.5% of 15-minute meters have an I1 port. Any active customer without a compliant one can have the meter replaced free of charge. |
Slovenia regulates energy activities mainly through obligations tied to specific roles and contracts, not through a general licensing regime. The Energy Act (EZ-2, Uradni list RS 38/24) sets the framework. The Electricity Supply Act (ZOEE, as amended by ZOEE-A in 2025) governs supply, network operation, active customers, aggregation and energy sharing. ZSROVE-1 governs renewables, self-supply, guarantees of origin and support.
For households the main approval is technical: the connection consent from the distribution operator. Beyond that, a household with solar and a battery needs no permit to consume, store, export or share its own renewable electricity. It becomes a “producer” only if it sells its surplus under a renewable PPA instead of a self-supply contract.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency containment reserve (FCR) | Yes | — | Yes | ELES (via FCR Cooperation). ELES has procured FCR through the international FCR Cooperation platform since 2021. Planned volume for 2025 was ±14 MW. |
| Automatic frequency restoration reserve (aFRR) | Yes | — | Yes | ELES / PICASSO. Capacity is procured locally for upward and downward directions separately (±60 MW planned for 2025). Since July 2026, aFRR balancing energy has been exchanged through PICASSO. |
| Manual frequency restoration reserve (mFRR) | Yes | — | Yes | ELES / MARI. +190/−66 MW planned for 2025. ELES has been on MARI since 15 July 2026. |
| Day-ahead and intraday wholesale | Yes | — | Yes | BSP Energy Exchange. Aggregators traded on all Slovenian wholesale markets. Their total traded energy was 255 GWh in 2025, of which 57.4 GWh (22.5%) came from network users’ flexibility. |
| DSO local flexibility | Developing | — | Yes | Distribution operator. There is a standard “Flexibility” data service in Moj elektro and CEEPS, a temporary flexibility register and SONDSEE Annex 7 rules. Elektro Ljubljana’s 2025 tender received no offers. |
Aggregation is legal and in use. At the end of 2025 six aggregators were active (GEN energija, GEN-I, HSE, Kolektor sETup, NGEN and Petrol), all of them also suppliers. Their portfolios included 1,912 network users, and two aggregators with battery fleets expanded into sources abroad. Distribution companies report fast growth in customer-side batteries.
Local DSO flexibility markets are still developing. Implicit flexibility, meaning households shifting use to avoid expensive network time blocks or prices, is likely to matter more. AGEN’s 2026 national flexibility needs assessment expects explicit flexibility to stay limited to 2030–2035. It says Slovenia’s future needs are mostly downward flexibility to absorb solar, through flexible connections for PV and dynamic network tariffs. Slovenia must set a national non-fossil flexibility target within six months of the assessment’s submission in July 2026.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Moj elektro / CEEPS | Portals of the distribution data hub used for metering data, consents to data access and collecting flexibility offers. |
| BSP Energy Exchange | Day-ahead and intraday market, part of the ADEX group. |
| SunContract P2P marketplace | The only active peer-to-peer platform in 2025, trading 22.3 GWh among customers in one supplier’s balance group. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Essentially complete: 98.8% of distribution users had an advanced meter at the end of 2025 |
| Reading interval | 15 minutes |
| Users with advanced meter | 98.8% (end 2025) |
| Remotely read | 99.3% of advanced meters |
| 15-minute capable | about 98.1% |
| Local real-time port (I1) | 62.5% of 15-minute meters |
| Communications | Power-line carrier (PLC) and point-to-point links |
| Data access | Moj elektro portal/app and API; EVT for third parties |
The rollout was led by the distribution companies under a government regulation and a national roll-out plan. These set the system architecture, roles, minimum functions and data-exchange standards (CIM-based). Slovenia now ranks near the top in Europe for 15-minute metering coverage, which made the time-block network tariff possible.
Meter data flows from each company’s head-end system into the national metering-data platform (POMP) and is shared through the single entry point (EVT). B2B and B2C data services are already running, and B2G is planned. The share of billing points with good-quality 15-minute data for the previous month exceeded 91% by mid-2026. AGEN says the focus has moved from installing meters to data quality and communications.
Users can read real-time data locally through the I1 interface, which serves home energy management and battery control. An active customer whose meter lacks a compliant I1 port is entitled to a free replacement.
Renewable electricity.
Electricity generation mix (2025).
- Nuclear: 39.2%
- Hydro: 27.3%
- Coal: 14.7%
- Solar: 10.4%
- Gas: 6.5%
- Bioenergy: 2%
- Wind: 0.1%
- Renewable electricity share
- 39.7% (2025)Source 12Share of domestic generation (hydro 27.28%, solar 10.35%, bioenergy 1.95%, wind 0.07%). Ember counts the full output of the Krško nuclear plant, half of which belongs to Croatia. Hydropower output fell in 2025 because of poor hydrology. AGEN estimates the renewable share of gross final energy consumption (all energy uses) at 25.4% in 2025.
- Home solar
- 822 MW (End 2025)Source 1Connection power of 64,092 self-supply devices (households and small businesses), of which 64,031 are solar. Community self-supply adds 418 devices with 21.5 MW.
- Solar added each year
- 146.5 MW (2025)Source 13Of which 74.4 MW was individual self-supply.
- Solar
- 1.57 GW (2025)Source 12
- Hydro
- 1.14 GW (2025)Source 12
- Coal
- 1.07 GW (2025)Source 12
- Nuclear
- 0.7 GW (2025)Source 12Whole Krško plant, half owned by Croatia.
- Gas
- 0.54 GW (2025)Source 12
- Bioenergy
- 0.07 GW (2025)Source 12
- Wind
- 0.005 GW (2025)Source 1
Targets.
- At least 33% renewables in gross final energy consumption by 2030 (NECP), including at least 55.4% in electricity.
- Solar capacity of about 3.45 GW by 2030 and 5.7 GW by 2035 in the NECP-based scenario used for the national flexibility assessment.
- Coal generation to be phased out (scenario basis of the national flexibility assessment).
In 2025 the Krško nuclear plant and the large hydro plants on the Drava, Sava and Soča produced most of Slovenia’s electricity. The Šoštanj lignite plant’s share is shrinking. Renewables made up about 40% of electricity taken into the system, and hydro output fell 13% in a dry year. Solar was the fastest-growing source, up about 25% on 2024.
Solar capacity more than tripled in four years, from 468 MW at the end of 2021 to 1,571 MW at the end of 2025. The ministry reports at least 400 MW more with confirmed co-financing, to be built by 2027. Wind is negligible (4.5 MW).
The renewable share of gross final energy consumption was 25.4% in 2025 by the Jožef Stefan Institute’s estimate, still well short of the 33% target for 2030.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 0.185 GW (2025)Source 14Avče pumped-storage hydro plant only. No official total for utility-scale batteries was identified.
Storage in Slovenia has so far meant pumped hydro at Avče, used together with the Soča hydro plants. Battery storage is now arriving from two directions. Utilities are planning large batteries at existing power-plant sites (Šoštanj and Brestanica). Households and businesses are adding batteries to self-supply systems, encouraged by agreed-power network charges and by investment aid of up to 225 EUR/kWh for businesses under Borzen’s 2026 call.
The 2026 national flexibility assessment assumes widespread battery deployment in its scenario to 2035. Batteries fed 49 GWh into the grid in 2025.
Storage projects.
- Avče pumped-storage plant (SENG): 185 MW generating / 180 MW pumping on the Soča. It used 437 GWh for pumping in 2025.
- HSE SAŠA battery, Šoštanj: About 200 MW / 400 MWh planned at the Šoštanj thermal plant site, reusing the unit 5 grid transformer. A draft spatial arrangement was put to public consultation in February 2026.
- Brestanica (TEB) battery: 40 MW / 80 MWh announced by the GEN-group gas plant at Brestanica as a priority investment (2026). No completion date announced.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| GEN-I | 35.2% of household supply (2025) | Unknown | Yes | Yes | Yes |
| ECE | 15.1% of household supply (2025) | Unknown | Yes | Yes | Unknown |
| E 3 | 13.5% of household supply (2025) | Unknown | Yes | Yes | Unknown |
| Energija plus | 13.1% of household supply (2025) | Unknown | Yes | Yes | Unknown |
| Elektro energija | 12.4% of household supply (2025) | Unknown | Yes | Yes | Unknown |
| Petrol | 9.8% of household supply (2025) | Unknown | Yes | Unknown | Unknown |
Household supply is highly concentrated (HHI 2,070 in 2025), and GEN-I clearly leads. Five suppliers each served more than 100,000 customers in 2025, which obliges them to offer dynamic-price contracts. The smaller suppliers together held 1% of household volumes. Household switching rose to 2.2% in 2025 from 0.5% in 2024, after two years in which price caps had left the market “dormant”.
Smart meters are provided by the distribution companies, not by suppliers, so “smart meters: Yes” means that the supplier’s customers have them. Self-supply buy-back terms vary by supplier. GEN-I, for example, publishes self-supply price lists with separate purchase and buy-back prices on 15-minute settlement. Two-rate (VT/MT) pricing is standard across suppliers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Infrastructure and Energy | Government | Energy policy, energy permits, national energy and climate plan | Responsible for energy policy since June 2026. |
| Agencija za energijo (AGEN) | Regulator | National energy regulator | Sets network tariffs and methods, publishes the annual energy-sector report, the bill and network-cost comparison tools, and REMIT registration. |
| ELES | Transmission | Combined transmission and distribution system operator | Grid operation, balancing, connection rules (SONDSEE) and the legal DSO role. |
| Elektro Ljubljana | Distribution | Regional distribution company (central Slovenia) | Connections, meters and network operation in its area. |
| Elektro Maribor | Distribution | Regional distribution company (north-east) | Connections, meters and network operation in its area. |
| Elektro Celje | Distribution | Regional distribution company (east-central) | Connections, meters and network operation in its area. |
| Elektro Gorenjska | Distribution | Regional distribution company (north-west) | Connections, meters and network operation in its area. |
| Elektro Primorska | Distribution | Regional distribution company (west) | Connections, meters and network operation in its area. |
| Borzen | Market | Electricity market operator and RES support centre | Balance settlement, contract register, support schemes, investment-aid calls and the RES contact point for citizens. |
| BSP Energy Exchange | Market | Power exchange (ADEX group) | Day-ahead and intraday prices (SIPX index). |
| Moj elektro | Metering | National metering-data portal | Free access to 15-minute consumption and export data. |
| Eko sklad | Renewable Energy | Slovenian Environmental Public Fund | Household grants and loans for heat pumps, insulation and efficiency. |
| Zveza potrošnikov Slovenije (ZPS) | Consumer | Consumers’ association | Consumer advice and comparisons on energy contracts. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (distribution) | SONDSEE (Uradni list RS 77/24, 110/25) | ELES | System operating instructions for the distribution system. They cover connection, metering, registers, flexibility services and billing, with annexes on metering-site types, network-impact assessment and connection boxes. |
| Generation and storage connection | SONDSEE Annex 5 | ELES | Rules for connecting and operating generation devices and storage on the distribution network. The same rules currently apply to storage and EV chargers until specific European rules exist. |
| Inverters / interface protection | SIST EN 50549-1 and SIST EN 50549-2 | SIST (national adoption of CENELEC standards) | The self-supply connection application needs the manufacturer’s declaration that protection settings meet SONDSEE and EN 50549. Low-voltage devices up to 16 A per phase that comply with EN 50549-1 need operating instructions in Slovenian. |
| Grid code (EU) | Regulation (EU) 2016/631 (RfG) and related network codes | European Commission / ELES | Requirements for generators, applied through SONDSEE and the transmission operating instructions. |
| Metering | MID-compliant advanced meters; I1 local interface | Distribution operator / AGEN | Meters meet MID requirements for 15-minute billing. I1 provides near-real-time local data. |
| PV siting | Regulation on detailed spatial rules for siting photovoltaic devices and solar collectors (2024) | Government of Slovenia | Makes PV mandatory on new buildings and car parks of 1,000 m² or more, and sets national conditions for installations on roofs, façades and car parks. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Building permit for rooftop PV up to 1 MW on an existing building | No | National | Treated as maintenance works. The prescribed form is submitted to the distribution company, and the national PV siting rules must be followed. |
| Building permit for PV of 1–10 MW | Yes | National | Treated as a power plant (complex structure), needing a building permit and an operating permit. |
| Spatial plan for PV above 10 MW | Yes | Mixed | Needs a municipal (OPN/OPPN) or national (DPN) spatial plan before permitting. |
| Connection consent (SZP) from the distribution operator | Yes | National | Needed for every generation device or battery connected to the grid. Self-supply up to 50 kW uses the simple procedure with deemed approval after one month. |
| Energy permit | Limited | National | Only for generation above 1 MW connected to the public grid. |
| AGEN device declaration | Limited | National | Needed for support schemes and guarantees of origin. Not issued for self-supply devices below 50 kW, where the distribution operator supplies the technical data and Borzen issues guarantees of origin. |
For a typical home system the process is short: no building permit, a connection consent from the regional distribution company, installation by a contractor, registration as a self-supply customer, and a self-supply contract with the chosen supplier. Heritage-protected buildings and areas may impose extra conditions under the national PV siting rules.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Borzen investment aid for household self-supply (JP SO-02) | Active | Grant | Grants for individual and community self-supply solar systems of households outside annual net metering. As published, the call offered 675 EUR/kW with a battery (capped at 40% of costs) and 250 EUR/kW without a battery (25%), and more for community systems. The ministry listed it as open in January 2026. Check Borzen for remaining funds and any amended rates. | — |
| Borzen JP-OVE-05: self-supply PV up to 1 MW and batteries | Active | Grant (de minimis) | €30 million for legal entities, cooperatives, sole traders and municipalities: 180 EUR/kW of PV and 225 EUR/kWh of storage (between 0.5 and 2 kWh per kW), up to 45% of eligible costs. Batteries qualify only with a new PV device. Applications have been accepted since 12 May 2026 until funds are exhausted. | From 12 May 2026 |
| Eko sklad 114SUB-OB24 household grants | Active | Grant | €63.5 million call for households. Replacing an old boiler with an air-to-water heat pump: up to 40% of costs, maximum €2,500. Ground- or water-source heat pump: up to €6,000. Also covers off-grid solar water heating, insulation, windows and ventilation. Amended in 2026. | — |
| Annual net metering (old self-supply scheme) | Closed | Net metering | Closed to new entrants. Applications had to be filed by 31 December 2023 and the site registered by 31 December 2024. Existing participants (57,507 households at the end of 2025) remain on annual netting. | — |
| Energy sharing (souporaba) | Active | Energy sharing | Since 1 July 2026, network users can allocate surplus renewable electricity to other users anywhere in Slovenia, free or for payment, on 15-minute intervals. Large companies and net-metered recipients are excluded. | From 1 July 2026 |
| EV purchase grants for individuals (JP REPWR-SUB-EVFO25) | Closed | Grant | Recovery-plan grants for new and used zero-emission vehicles, managed by Borzen. The budget was raised to €19.0 million in April 2026. The call ran until 30 May 2026 or until funds were exhausted. | — |
| Household electricity price cap | Closed | Price regulation | Government caps on household retail prices ended on 28 February 2025. | Sep 2022 – Feb 2025 |
Data and connectivity.
- Fixed broadband
- 93.5 % of households with internet access (2025)Source 10
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters communicate with the distribution companies’ data concentrators over power-line carrier (PLC), or point-to-point over mobile networks where PLC is not suitable. Market data exchange uses CIM-based and ebIX-based standardised messages through the EVT data hub. Moj elektro offers a REST API that home-energy systems can use with a user-issued token.
For behind-the-meter control, the I1 interface provides 1-second or 5-second readings, depending on meter generation, to local devices such as battery controllers and home energy managers.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 14.4 TWh (2025)Source 12AGEN reports total consumption of 13,228 GWh including losses and Avče pumping, or 11,977 GWh by final customers.
- Generation capacity
- 5.12 GW (2025)Source 1AGEN total installed capacity of 5,117.4 MW, counting 50% of Krško.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The main local constraint is at low and medium voltage, where clusters of rooftop solar cause reverse power flows and some transformer stations are congested. AGEN mapped self-supply connections by transformer station to identify high-penetration areas. The distribution companies invested a record €267 million in 2025. The national flexibility assessment found that transmission constraints do not materially change system-level flexibility needs, which are mostly downward.
Supply reliability: customers were without supply for 187 minutes on average in 2025, counting all causes.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| ZSROVE-1 renewables act in force | Current | 30 Dec 2025 | New act on renewables, self-supply, energy communities, guarantees of origin and support. It confirms market-based self-supply with no network charges on exports and simplifies connections up to 50 kW. |
| Nationwide energy sharing | Current | 1 Jul 2026 | ZOEE-A provisions on energy sharing apply, allowing surplus to be allocated to users anywhere in Slovenia on 15-minute intervals. |
| ELES joins PICASSO and MARI | Current | Jul 2026 | aFRR (early July) and mFRR (15 July) balancing energy are now exchanged on the European platforms, replacing ELES’s own intraday balancing trades. |
| 30-minute intraday gate closure | Current | 1 Jan 2026 | Intraday trading now closes 30 minutes before delivery. |
| New government and energy ministry | Current | Jun 2026 | Energy moved to the new Ministry of Infrastructure and Energy. The minister has stressed security of supply, competitive prices and domestic production. |
| Guarantees of origin move to Borzen | Upcoming | 1 Jan 2027 | Under ZSROVE-1, AGEN issues guarantees of origin until 31 December 2026, after which the support centre (Borzen) takes over. |
| Revised network-tariff time blocks | Upcoming | 2027 | AGEN plans to update the allocation of the five time blocks based on its analysis of network loading and reverse flows. |
| National non-fossil flexibility target | Upcoming | Within six months of July 2026 | After submitting its flexibility needs assessment in July 2026, Slovenia must set an indicative national target for non-fossil flexibility (storage, demand response) under Regulation (EU) 2019/943. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | 64,092 self-supply devices (822 MW) at the end of 2025. 6.7% of household customers had self-supply. |
| Distributed energy market | High | Most of the 1.57 GW of solar is on the distribution network. Energy sharing has been available nationwide since July 2026, and 418 community self-supply devices were operating at the end of 2025. |
| Grid flexibility market | Medium | Six aggregators active in balancing and wholesale markets, with PICASSO/MARI since July 2026. DSO local flexibility markets are still developing, and a 2025 tender received no bids. |
| Energy storage adoption | Low | Pumped hydro at Avče (185 MW). Large batteries are planned (Šoštanj ~200 MW / 400 MWh, Brestanica 40 MW / 80 MWh), and no national battery total is published. |
| Renewable growth environment | Medium | Solar more than tripled between 2021 and 2025 (+146.5 MW in 2025), but the overall renewable share of 25.4% remains far from the 33% target for 2030, and wind is negligible. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 33 sources
- Poročilo o stanju na področju energetike v Sloveniji v letu 2025. Agencija za energijo, 2026. accessed 1 October 2026.
- Nacionalna ocena potreb po prožnosti v letu 2026 (ciljni leti 2030 in 2035). Agencija za energijo, 2026. accessed 1 October 2026.
- Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2025. accessed 1 October 2026.
- Population on 1 January (tps00001). Eurostat, 2026. accessed 1 October 2026.
- Number of households by household composition, number of children and age of youngest child (lfst_hhnhtych). Eurostat, 2025. accessed 1 October 2026.
- Average household size – EU-SILC survey (ilc_lvph01). Eurostat, 2025. accessed 1 October 2026.
- Distribution of population by tenure status, type of household and income group (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
- Distribution of population by degree of urbanisation, dwelling type and income group (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
- Passenger cars, by type of motor energy (road_eqs_carpda). Eurostat, 2025. accessed 1 October 2026.
- Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Slovenia. World Bank, 2025. accessed 1 October 2026.
- Yearly electricity data, full release (long format) – Slovenia rows. Ember, 2025. accessed 1 October 2026.
- Slovenija več kot potrojila sončne kapacitete v štirih letih. Government of the Republic of Slovenia, 2026. accessed 1 October 2026.
- Črpalna hidroelektrarna Avče na reki Soči (publication). Soške elektrarne Nova Gorica (SENG). accessed 1 October 2026.
- Sistemska obratovalna navodila za distribucijski sistem električne energije (SONDSEE). Uradni list RS / ELES, 2024. accessed 1 October 2026.
- Moj elektro API – OpenAPI specification. Informatika d.o.o. (Moj elektro). accessed 1 October 2026.
- Akt o načinu izkazovanja informacij na računu za električno energijo in v dodatnem pojasnilu. Agencija za energijo (via Tax-Fin-Lex), 2025. accessed 1 October 2026.
- Notice of Merger and Changes to the Company. ELES, 2023. accessed 1 October 2026.
- Novi Zakon o spodbujanju rabe obnovljivih virov energije (ZSROVE-1) – webinar. Borzen, 2026. accessed 1 October 2026.
- Uredba o samooskrbi z električno energijo iz obnovljivih virov energije. Uradni list RS, 2022. accessed 1 October 2026.
- Obvestilo investitorjem glede rokov za vključitev v sistem samooskrbe z letnim netiranjem. Government of the Republic of Slovenia, 2024. accessed 1 October 2026.
- Energetsko dovoljenje. SPOT (Slovenian business point), 2026. accessed 1 October 2026.
- Uredba o podrobnejših pravilih urejanja prostora za umeščanje fotonapetostnih naprav – gradivo za medije. Ministry of Natural Resources and Spatial Planning, 2024. accessed 1 October 2026.
- Javni poziv JP-OVE-05 – naložbena pomoč za naprave za samooskrbo do 1 MW in hranilnike. Borzen, 2026. accessed 1 October 2026.
- Javni poziv JP SO-02 – naložbena pomoč za samooskrbo gospodinjskih odjemalcev. Uradni list RS / Borzen, 2024. accessed 1 October 2026.
- Javni poziv 114SUB-OB24 – čistopis s spremembo 18. 3. 2026. Eko sklad, 2026. accessed 1 October 2026.
- Sprememba javnega poziva za nepovratne spodbude fizičnim osebam za e-vozila JP REPWR-SUB-EVFO25. Government of the Republic of Slovenia, 2026. accessed 1 October 2026.
- Slovenia fully integrates with EU power market by joining MARI platform. Balkan Green Energy News, 2026. accessed 1 October 2026.
- Slovenia’s new government slams predecessor over green transition strategy. Balkan Green Energy News, 2026. accessed 1 October 2026.
- After adding PV unit, Slovenian gas power plant TEB launches battery project. Balkan Green Energy News, 2026. accessed 1 October 2026.
- Poziv javnosti k podaji pripomb na osnutek elaborata prostorske ureditve za BHEE HSE SAŠA. HSE d.o.o., 2026. accessed 1 October 2026.
- GEN-I cenik za samooskrbo (presežki), arhiv do 28. 2. 2025. GEN-I, 2025. accessed 1 October 2026.
- Expiration of reduced VAT rate measure. Crowe Slovenija, 2023. accessed 1 October 2026.
Questions about energy in Slovenia.
Eurostat puts the average household price at €0.212/kWh, including network charges and taxes, in the second half of 2025 (2,500–4,999 kWh/yr band). Prices have been set by the market since the government cap ended in February 2025.
Each metering site (merilno mesto) has a short identifier, made of the distribution-area code, a hyphen and a serial number (for example 2-1048576), and an 18-digit GS1 GSRN starting 38311158. The distribution operator assigns both in the connection consent. They are printed on the bill and stay with the property.
ELES operates both the transmission and the distribution system. Five regional distribution companies (Elektro Ljubljana, Maribor, Celje, Gorenjska and Primorska) run the local networks and meters under contract to ELES. AGEN regulates them.
Yes. New systems are covered by ZSROVE-1: you sign a self-supply contract with your supplier, which buys your surplus on its own terms, and you pay no network charges on exports. Since July 2026 you can also share surplus with other users. Annual net metering is closed to new systems.
No building permit is needed for photovoltaic devices of up to 1 MW on an existing building. They are treated as maintenance works. You do need a connection consent from the regional distribution company, which is deemed granted after one month for self-supply systems up to 50 kW.
Since October 2024 households pay for agreed power (kW) in five time blocks and for energy used. The most expensive block applies only from November to February. This is possible because nearly all homes have 15-minute smart meters.
Yes. 98.8% of distribution users had an advanced meter at the end of 2025, almost all read remotely in 15-minute intervals. Users can see their data free on the Moj elektro portal.