Countries

Energy in Serbia, explained.

How electricity works in Serbia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Serbia: Not yet available.Olmack is not offered in Serbia yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Serbia.

Serbia electricity 2026: EPS guaranteed-supply zone tariffs, EMS and Elektrodistribucija Srbije, 12-digit metering point code, prosumer net metering, licensing and storage.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Serbian dinar (RSD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Serbia energy at a glance.

Key figures for households in Serbia. Each one links to its source on the full overview below.

  • Electricity price.

    13.947 RSD per kWh for households, including taxes. Figures for 2025-S2.

  • Household use.

    5,246 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    29.7% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Serbia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Serbia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Serbia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Serbia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Serbia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Serbia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Serbia.

Full overview

The energy market in Serbia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Serbia’s electricity market has been open to every customer since 2015, but in practice almost every household still buys from the state utility Elektroprivreda Srbije (EPS), the designated guaranteed supplier, at regulated prices approved by the Energy Agency of the Republic of Serbia (AERS). The household tariff uses three monthly consumption zones. Since 1 October 2025 the “green” zone (up to 350 kWh a month) costs 9.6136 RSD/kWh at the higher rate and 2.4034 RSD/kWh at the lower rate before taxes, the “blue” zone (351–1,200 kWh) 50% more, and the “red” zone (above 1,200 kWh) twice the blue rate.

Eurostat puts the average household price at 13.9473 RSD/kWh (€0.119) including taxes in the second half of 2025. One state-owned transmission system operator, Elektromreža Srbije (EMS), and one distribution system operator, Elektrodistribucija Srbije (EDS), run the networks across the whole country outside Kosovo*. Statistics in this profile, like Eurostat’s and AERS’s, exclude Kosovo*.

Lignite still produced about 63% of net generation in 2025 and hydropower most of the rest. Renewables supplied 29.7% of net generation in 2025, according to Eurostat monthly data. Solar is growing from a low base: about 379 MW was connected by mid-2026, including 147 MW of prosumer systems. Households have been able to self-generate under net metering since 2021, but amendments to the Energy Law adopted at the end of 2024 close net metering to new prosumers after 31 December 2026, when net billing takes over.

Energy snapshot.

Headline figures for electricity in Serbia. Each shows its data year and links to its source.

  • Population6,532,019 peopleSource 61 Jan 2026
  • Households2,520,854 householdsSource 132022 census
  • Average household size2.65 people/householdSource 132022 census
  • Electricity use per household5,246 kWh/yrSource 22024
  • Household price (RSD)13.9 RSD/kWhSource 12025-S2
  • Household price (EUR)0.119 EUR/kWhSource 12025-S2
  • Renewable electricity share29.7%Source 32025
  • Solar capacity0.379 GWSource 35mid-2026
  • Wind capacity0.604 GWSource 5end 2024
  • Energy storage capacity0.614 GW (pumped hydro)Source 5end 2024
  • Smart-meter share23%Source 26Sep 2026
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Energy Agency of the Republic of Serbia (AERS)
System operator
Elektromreža Srbije (EMS AD)
Distribution networks
One national DSO, Elektrodistribucija Srbije d.o.o. Beograd (state-owned, unbundled from EPS since 2021), plus six small closed distribution systems
Currency
Serbian dinar (RSD)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Serbia.

Household price (RSD)
13.9 RSD/kWh (2025-S2)Source 1Eurostat average household price, all taxes included, for annual consumption of 2,500–4,999 kWh. 11.6768 RSD/kWh excluding VAT and 10.0687 RSD/kWh excluding all taxes and levies.
Household price (EUR)
0.119 EUR/kWh (2025-S2)Source 1Eurostat’s own EUR figure for the same band, so no separate conversion was applied. It implies about 117.2 RSD per EUR (13.9473 ÷ 0.119), Eurostat’s average rate for the second half of 2025.
Typical annual electricity bill
73,168 RSD/yr (2024–2025)Source 1Derived: average household consumption of 5,246 kWh (2024) multiplied by Eurostat’s 2025-S2 average price of 13.9473 RSD/kWh including taxes (about €624). It is a rough indication, not an official typical bill, and excludes the monthly public-broadcasting fee collected on the same bill.

Household price trend (RSD per kWh).Source 1

8.34111.14413.9472019-S12025-S2
Serbia household electricity price, RSD per kWh
2019-S18.3413 RSD/kWh
2019-S28.4836 RSD/kWh
2020-S18.6781 RSD/kWh
2020-S28.6622 RSD/kWh
2021-S19.2971 RSD/kWh
2021-S29.5378 RSD/kWh
2022-S19.5041 RSD/kWh
2022-S210.2021 RSD/kWh
2023-S111.3099 RSD/kWh
2023-S212.2637 RSD/kWh
2024-S112.6757 RSD/kWh
2024-S212.9605 RSD/kWh
2025-S112.9118 RSD/kWh
2025-S213.9473 RSD/kWh

How the household bill is built

An EPS household bill has three items set by the regulated price (billed capacity in kW, the guaranteed-supplier cost, and energy by zone and rate), then two levies set by the Government: the fee for supporting privileged (feed-in) producers of renewable electricity and the fee for improving energy efficiency. Excise of 7.5% is charged on the total, and then 20% VAT. The monthly public-broadcasting (RTS) fee is collected on the same bill. In Eurostat’s breakdown for the second half of 2025, the price before taxes and levies was 10.0687 RSD/kWh, rising to 11.6768 RSD/kWh with the levies and excise and 13.9473 RSD/kWh with VAT.

Who sets the price

EPS, as the guaranteed supplier, proposes prices and AERS approves them under its methodology. The 6.6% average increase from 1 October 2025 followed AERS’s approval of a 10% rise in the transmission use-of-system charge and a 16% rise in distribution charges, the first network-tariff increase since October 2021. At the same time AERS approved moving the boundary of the red zone from 1,600 to 1,200 kWh a month. Under its arrangement with the IMF, the Government committed to a further adjustment of the regulated price; reports in 2025 placed it by 1 October 2026 or January 2027, and no approved 2026 increase was identified at the time of writing.

Market share

AERS reports that 46.4% of final consumption was supplied at regulated prices in 2024, all of it to households and small customers. EPS also dominated the open market, with 98.2% of open-market sales and 99.06% of all final consumption. Of 79 licensed suppliers, 11 were active. From October 2025, entrepreneurs and micro and small enterprises may also take guaranteed supply.

Trend

Eurostat data show the average household price rising from about 8.3 RSD/kWh in 2019 to 9.5 RSD/kWh in 2021–2022, then stepping up to 12.3–13.0 RSD/kWh after the 2022–2023 increases and to 13.9 RSD/kWh after October 2025.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesGuaranteed supply from EPS at prices approved by AERS. From 1 October 2025, two-rate meters pay (before VAT and excise): green zone up to 350 kWh a month 9.6136 RSD/kWh higher rate and 2.4034 RSD/kWh lower rate; blue zone 351–1,200 kWh 14.4203 and 3.6051 RSD/kWh; red zone above 1,200 kWh 28.8407 and 7.2102 RSD/kWh. Single-rate meters have their own zone prices. A fixed charge for billed capacity (kW) and a monthly guaranteed-supplier cost are added.
Time-of-useYesTwo-rate metering is common. The lower rate in every zone is a quarter of the higher rate, which encourages night-time water heating and storage heaters. Zone limits are counted on total monthly consumption.
VariableLimitedHouseholds may leave guaranteed supply for one of the licensed market suppliers and return at any time. In 2024 only 4,076 household metering points switched supplier, and AERS notes that households on the open market were mostly flats owned by companies.
DynamicLimitedThe 2024 Energy Law amendments give final customers the right to a dynamic-price contract with any supplier serving more than 200,000 customers, and the May 2026 decree amendment requires a smart meter for it. EPS offers contracts indexed to SEEPEX hourly or monthly day-ahead prices to commercial customers (since May 2025); no household dynamic offer was identified.
OtherYesPayment discounts introduced from the October 2025 bill: 7% for households that take an electronic bill and pay by the 20th of the month, or 6% for those that submit their own meter reading between the 1st and 6th and pay by the 20th. Discounts apply to the energy, capacity and supplier-cost items, not to the levies.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
5,246 kWh/yr (2024)Source 2Derived: Eurostat household electricity consumption of 13,225.4 GWh in 2024 divided by the 2,520,854 households counted at the 2022 census. Divided by AERS’s 3,373,023 household metering points instead, the figure is about 3,920 kWh per metering point.
Average daily use per household
14.4 kWh/day (2024)Source 2Derived: 5,246 kWh a year divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
2,014 kWh/person/yr (residential) (2024)Source 2Derived: 13,225.4 GWh of household consumption divided by a population of 6,567,783 on 1 January 2025 (Eurostat).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
4,605 battery-electric cars (stock) (2025)Source 9Out of 2,573,843 registered passenger cars (0.2%); up from 2,662 in 2024.
Electric cooking
Not identified from a reliable public source.

Serbian households use a lot of electricity: about 5,250 kWh a year on average. Household demand accounts for over 40% of final electricity consumption (13.2 of 30.8 TWh in 2024). Electricity is widely used for space and water heating, because only 13.4% of households have mains gas and district heating serves mainly the larger towns. The quarter-price lower rate and the zone structure shape behaviour: the lower rate rewards night-time storage heating, while the red zone above 1,200 kWh a month doubles the price of very high winter use.

Household consumption has been fairly stable at 13.0–14.1 TWh a year since 2015, dipping in 2022–2023 when prices rose and recovering to 13.2 TWh in 2024. Electric cars are still rare, at about 4,600 battery-electric cars in 2025. Eurostat records 9.3% of the population unable to keep their home adequately warm in 2025.

Housing and households.

Dwellings
3,613,352 dwellings (2022 census)Source 14Final census result. About 2.6 million were occupied; 510,258 were temporarily vacant and 288,883 used seasonally.
Owner-occupied
88.9 % of population (2025)Source 7Only 2.5% are owners with a mortgage or loan.
Private rented
2.6 % of population (2025)Source 7Tenants paying market rent.
Social or public housing
Not identified from a reliable public source.
Houses
68.7 % of population (2025)Source 855.2% detached, 13.5% semi-detached.
Apartments and flats
31.3 % of population (2025)Source 825.7% live in blocks with ten or more dwellings.
Urban population
62.6 % of population (2025)Source 12

Serbia is a country of owner-occupiers: 88.9% of people own their home, almost always outright, and more than two-thirds live in houses. Flats are concentrated in Belgrade, Novi Sad and other cities. For rooftop solar this means most households decide on their own roof, and the prosumer rules allow residential communities (the owners of a block of flats acting together) to become prosumers for the building’s common consumption. The housing stock is much larger than the number of households, so many metering points serve empty or seasonal homes.

How the grid works in Serbia.

  1. TransmissionElektromreža Srbije (EMS AD)
  2. DistributionOne national DSO, Elektrodistribucija Srbije d.o.o. Beograd (state-owned, unbundled from EPS since 2021), plus six small closed distribution systems
  3. MeteringElektrodistribucija Srbije (metering is a network activity)
  4. Supply1 or more retail suppliers

Physically, power from EPS’s lignite and hydro plants flows through the EMS transmission network to substations, where EDS takes it on to homes over medium- and low-voltage networks. In 2024 the transmission system handled 41.1 TWh, and the annual peak of 5,706 MW was reached on 12 January 2024 at 18:00. Distribution losses are high, at 10.37% of energy taken into the distribution system in 2024, partly because of illegal connections and old meters.

Commercially, a household on guaranteed supply has one contract with EPS, which pays EMS and EDS for network use on the customer’s behalf. EDS reads the meter and passes data to the supplier and to EMS for settlement. Serbia trades heavily with its neighbours: Eurostat records 8.5 TWh of imports and 6.5 TWh of exports in 2025, making the country a net importer of about 2 TWh.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Mining and Energy (Ministarstvo rudarstva i energetike)Drafts the Energy Law and the Law on the Use of Renewable Energy Sources, issues energy permits for plants of 1 MW and above, runs renewable auctions for market premiums, co-finances household energy-efficiency subsidies with municipalities, and prepared the 2030 Integrated National Energy and Climate Plan.
RegulatorEnergy Agency of the Republic of Serbia (AERS)Issues licences for energy activities (including storage and aggregation since the 2024 amendments), sets use-of-system charges, approves EPS’s guaranteed-supply prices, approves the transmission and distribution codes, and monitors supplier switching and metering.
TSOElektromreža Srbije (EMS AD)State-owned transmission system operator. Dispatches the system, procures balancing services, runs the connection-study windows for large plants and storage, allocates cross-border capacity (through JAO on the Croatian, Bulgarian and Hungarian borders), and issues and registers guarantees of origin.
DSOElektrodistribucija Srbije d.o.o. Beograd (EDS)The single distribution system operator for Serbia outside Kosovo*, separated from EPS in 2020–2021 and owned by the Republic. Connects customers and small plants, owns and reads the meters, assigns metering point codes, processes supplier switches and keeps the register of prosumers.
SupplierElektroprivreda Srbije (EPS AD)State-owned generator (lignite and hydro) and dominant supplier. Designated guaranteed supplier for households and small customers and supplier of last resort; also the offtaker that buys feed-in tariff output and prosumer contracts.
ExchangeSEEPEX a.d. BeogradOrganised day-ahead market set up by EMS with EPEX SPOT, and intraday market since July 2023; owned by the regional ADEX Group (EMS, the Slovenian TSO ELES, EPEX SPOT and the Hungarian TSO MAVIR). 5,433 GWh traded day-ahead and 115 GWh intraday in 2024, at an average base price of €96.35/MWh.
SettlementEMS (balancing and imbalance settlement)Administers balancing responsibility and balancing groups through its NERA registry and settles imbalances with balance-responsible parties. A member of the European imbalance-netting platform (IGCC) since October 2022.
MeteringElektrodistribucija Srbije (metering is a network activity)Meters at customer premises belong to the distribution system; the DSO installs, verifies and reads them. Households cannot choose a meter operator.

Compared with the UK system.

Compared with the UK system.
UK conceptSerbia equivalentHow it works
DNOOperator distributivnog sistema (Elektrodistribucija Srbije)One company runs the 35 kV, 20 kV, 10 kV and 0.4 kV networks for the whole country, so there is no regional patchwork as in GB. AERS regulates its revenues and charges. A handful of closed distribution systems (for example Belgrade Airport and the NIS refinery sites) also hold distribution licences.
National Grid / NESOElektromreža Srbije (EMS)EMS owns the 400, 220 and 110 kV network and is also the system operator, balancing authority and issuing body for guarantees of origin. Serbia borders eight countries and carries large transit flows, so cross-border capacity allocation is a major EMS activity.
MPANŠifra mernog mesta (metering point code); called “ED broj” on Belgrade billsEDS gives every metering point a 12-digit code, printed at the top left of the electricity bill. It identifies the physical point of delivery, separate from the customer and the meter serial number, and is used for self-readings, online services and supplier contracts. Unlike the MPAN, its internal structure is not published.
MPRNGas metering point at one of the gas distribution companiesOnly 13.4% of households have mains gas, supplied through 31 separate gas distribution systems. Their metering points have no link to the electricity code.
Meter operatorElektrodistribucija Srbije (no competitive metering)Meters are part of the distribution system and belong to EDS, which also had a legal duty to take over older customer-owned metering cabinets and connection lines. Prosumers buy their own two-way meter, which is then fitted at the metering point.
SupplierGarantovani snabdevač (EPS) or a licensed supplierAlmost every household stays on guaranteed supply from EPS at regulated prices. Switching is free and takes up to 21 days, but very few households switch.
Smart-meter infrastructure (DCC / SMETS2)EDS remote-reading (AMI) system; no central data companyEDS reads smart meters through its own head-end system: more than 900,000 were installed by September 2026, with about one million expected by the end of 2026 and another 400,000 financed by the European Investment Bank for 2027. A customer consumption portal was planned for the end of 2026.

How a supply point is identified.

307142085516 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Šifra mernog mesta (metering point code) (Šifra MM; labelled “ED broj” (ED number) on bills in Belgrade)
Who issues it?Elektrodistribucija Srbije, the distribution system operator
FormatA numeric code that EDS assigns to each metering point (the place where electricity is delivered and measured). EDS does not publish the internal structure. The bill also carries a separate customer/invoice reference from the supplier, and each meter has its own serial number.
Length12 digits
Stays with the property when you switch supplier?Yes
Where to find itAt the top left of the electricity bill. Outside Belgrade it is labelled “šifra mernog mesta”; in Belgrade the same code is called the “ED broj”. EDS warns that swapping digits when typing the 12-digit code is one of the most common errors in self-readings.
Electronic accessThe free “ED Srbija” mobile app and the EDS website accept self-readings using the metering point code, the reading to one decimal place, the reading date and a photograph of the meter. Readings sent between the 1st and 6th of the month are used for billing. EPS’s online services provide bills, and EDS planned a consumption portal for smart-metered customers by the end of 2026.
Third-party accessA new supplier starts the switch with EDS on the customer’s behalf for the metering point; the procedure must be completed within 21 days. The 2024 Energy Law amendments require the DSO to keep an up-to-date database of final customers and their suppliers and aggregators for every delivery point and to give eligible parties non-discriminatory access to metering data.
Who keeps the registerElektrodistribucija Srbije keeps the national database of metering points, customers and their suppliers and aggregators, and the register of prosumers (registar kupaca-proizvođača). EMS keeps the registry of market participants and balancing groups (NERA).
Register scopeNational

Serbia identifies a home’s connection through its single DSO. Every metering point on the distribution network carries a 12-digit code assigned by Elektrodistribucija Srbije. The code identifies the physical point of delivery, so it stays with the property when the occupant changes; the customer, the supply contract and the meter itself are recorded against it. EDS counted 3.83 million metering points at the end of 2024, of which 3.37 million were households.

How it is used

Households meet the code mainly when submitting a meter reading. Since 1 June 2025 EDS reads conventional meters in person only once every three months; in the other months bills are based on estimates unless the customer sends a reading between the 1st and 6th. Customers who self-read and pay by the 20th get a 6% discount. Changing supplier, becoming a prosumer, changing the approved connection capacity and moving in or out all refer to the same metering point code.

Metering and data

Smart meters are read remotely, and EDS says smart-metered customers will receive the same monthly, daily and hourly data the DSO sees. Under the Energy Law, a DSO plan for advanced metering must cover at least 80% of delivery points in each customer category where a cost-benefit analysis is positive; EDS has cited 80% coverage by 2030 as its goal. AERS reported in 2024 that 1.36 million meters were still in use after their verification seal had expired, which is one reason for the replacement programme.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidHouseholds and residential communities: kWh-based net metering, with monthly surplus carried forward and an annual settlement on 1 April when any remaining surplus passes to the supplier without payment. Business prosumers: net billing, where surplus becomes a money credit. New household prosumers move to net billing from 1 January 2027.
How large can a household system be?Up to 10.8 kW, and no more than the approved capacity of the connection. The 10.8 kW limit applies from 1 January 2024 under the 2023 amendments to the Law on the Use of Renewable Energy Sources. Business prosumers that started their connection procedure after 1 July 2024 are limited to 150 kW.
How is surplus credited today?Under net metering the household is billed only for the difference between electricity taken from and fed into the grid. Monthly surplus reduces the next bill in kilowatt-hours, and taxes and fees are calculated on net consumption. At the annual settlement on 1 April any surplus left over passes to the supplier without compensation, so systems sized above the household’s own use earn nothing extra.
What changes after 2026?Under the Energy Law amendments adopted at the end of 2024, net metering is closed to new entrants after 31 December 2026. Households that obtain prosumer status by that date keep net metering for the life of their system; later entrants go onto net billing, which values imported and exported electricity at different prices.
Do I need a licence to export?No. The Energy Law exempts generation for own needs from licensing, whether or not surplus is fed into the grid, and also exempts such plants from the energy permit.
Can larger plants sell all their output?Yes, outside the prosumer scheme. Plants up to 1 MW need no AERS licence; larger plants need an energy permit and a generation licence. Support for large wind and solar is through auctioned market premiums (15-year contracts for difference).

Connecting a home system.

  1. Check the limit: the solar system may not exceed the approved connection capacity of the metering point, and household prosumers are limited to 10.8 kW.
  2. Have a contractor install the system to the applicable regulations and standards. No location permit, construction permit or works approval is needed for a household prosumer installation.
  3. Fit a two-way meter at the metering point. The prosumer buys the meter.
  4. Ask the supplier (EPS for almost all households) to change the supply contract to a full-supply contract with net metering.
  5. Submit to Elektrodistribucija Srbije the contractor’s original statement, with confirmation from the responsible contractor, that the equipment, installation and metering point comply with regulations and standards.
  6. EDS connects the plant within five days of the contract and enters the customer in the register of prosumers within five days of connection, from which point prosumer status applies.

Rooftop self-consumption has grown since the 2021 prosumer decree but remains small. At the end of 2025 there were 4,435 household prosumers with 37.1 MW and 1,631 other prosumers (businesses, public buildings, schools and churches) with 88.8 MW. Prosumer capacity rose to 147 MW by mid-2026. EDS recorded about 32 GWh taken into the grid from prosumer connections in 2024.

The approaching end of net metering for new entrants is expected to bring forward household installations in 2026. Larger projects face a different constraint: a May 2026 amendment to the decree on conditions for delivery and supply of electricity postponed the next round of EMS connection studies for large wind, solar and storage projects from July–October 2026 to September–December 2029.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityAERS generation licence required, except for plants with total approved capacity up to 1 MW (unless the same entity’s plants together exceed 1 MW) and for generation for own needs, including where surplus is exported. Separately, a ministry energy permit is needed to build plants of 1 MW and above, and hydro plants of any size.AERS (licence); Ministry of Mining and Energy (energy permit)The energy permit is submitted with the construction-permit application. Plants built under strategic partnerships or public-private partnerships are exempt from it.
Store electricityElectricity storage is a licensed energy activity (Energy Law, Article 16, point 8a, added in 2024). No energy permit is needed to build storage. The licence exemptions in Article 21 do not mention storage, so stand-alone commercial storage needs an AERS licence.AERS; EMS or EDS (connection)Grid-scale battery projects connect through EMS connection-study windows. The May 2026 decree amendment set bank guarantees of €12,500 per MW for generation or storage projects of active customers.
Self-consume and export surplus (household)No licence or energy permit. Prosumer status is obtained by entering the EDS register of prosumers after connection; limit 10.8 kW for households and no more than the approved connection capacity.Elektrodistribucija Srbije; supplierThe prosumer must sign a full-supply contract with net metering with its supplier.
Active customer (self-generation, storage, sale by non-energy businesses)Status introduced by the 2024 amendments for end customers, alone or jointly, who generate, store or sell electricity or offer flexibility as a non-core activity. No supply licence for these activities. Connection studies for active customers at transmission level run in March–June and September–December.EMS / EDS (connection); AERS (rules)Bank guarantees: €12,500/MW for generation or storage, €25,000/MW for consumption facilities without generation; none for generation exclusively for self-consumption.
Supply final customersAERS licence for electricity supply. Guaranteed supply is a public-service obligation assigned to EPS.AERS; Government (guaranteed supplier designation)Of 79 licensed suppliers at the end of 2024, 11 supplied final customers. Suppliers with more than 200,000 customers must offer dynamic-price contracts.
Wholesale supply and tradingAERS licence for wholesale electricity supply, a balance-responsibility contract with EMS, and SEEPEX membership for exchange trading. Foreign companies may hold the licence.AERS; EMS; SEEPEX58 market players held contracts with EMS giving the right to nominate schedules; 47 participants were registered on SEEPEX in 2024.
Aggregate / VPP / remote control of home assetsAggregation is a licensed energy activity (Article 16, point 6a). An aggregator may take part in all electricity markets without the consent of other market participants, and independent aggregators (not linked to the customer’s supplier) are recognised.AERSAERS reported no aggregators in operation in 2022; detailed market rules for aggregation depend on secondary legislation.
Balancing and ancillary servicesBalancing service providers contract with EMS; the 2024 amendments established a balancing market and a market for ancillary services open to storage, demand response and aggregators that meet the technical requirements.EMS; AERS (rules)In 2024 EMS still procured secondary and tertiary reserve from EPS units under contract.

Serbian licensing works in two layers. The Energy Law lists the energy activities that need an AERS licence (generation, distribution, supply, wholesale supply, market operation and, since the end of 2024, aggregation and electricity storage), then exempts small generation up to 1 MW and generation for own needs. Building a plant of 1 MW or more also needs a ministry energy permit, issued before the construction permit. For households none of this applies: becoming a prosumer is a matter of connection and registration with EDS and a contract with the supplier.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency restoration reserves (aFRR / mFRR)Restricted—LimitedEMS. EMS engages balancing providers for secondary and tertiary control, in practice mainly EPS’s hydro and thermal units under contract. Activated balancing energy totalled about 1,051 GWh in 2024. The 2024 amendments require the balancing market to admit storage, demand response and aggregated resources that meet the technical requirements.
Imbalance netting (IGCC and SMM)No—NoEMS. TSO-to-TSO mechanisms: EMS joined the European IGCC platform in October 2022 and nets imbalances with Montenegro and North Macedonia through the SMM mechanism. They reduce balancing needs but are not open to individual assets.
Day-ahead marketYes—YesSEEPEX. SEEPEX day-ahead prices range from 0 to €3,000/MWh and covered 18% of deliveries to final customers in 2024. EPS’s dynamic contracts for businesses are indexed to SEEPEX prices.
Intraday marketYes—UnknownSEEPEX. Launched in July 2023; trading rose to 115 GWh in 2024, still small.
Demand response / local flexibilityDeveloping—LimitedEMS / EDS. The 2024 amendments give active customers the right to offer flexibility services and require system operators to use flexibility, storage and demand management as alternatives to network expansion. Implementing rules were still being developed.

Flexibility in Serbia comes mainly from EPS’s hydro fleet, including 614 MW of pumped storage, and is procured by EMS under contract. The legal framework for an open balancing market, aggregators and active customers was adopted at the end of 2024, but secondary legislation is still needed to put it into practice.

Household flexibility is at an early stage. Most homes are read quarterly, there is no household dynamic tariff, and the price signals are the lower night rate and the consumption zones. Batteries are expected to become the main new source of flexibility: EMS signed connection contracts for seven standalone battery projects (724 MW) in 2026.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
SEEPEXDay-ahead and intraday market results and rules.
EMSBalancing, connection-study windows, cross-border capacity and the guarantees-of-origin registry.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutDSO-led roll-out by Elektrodistribucija Srbije: more than 900,000 smart meters by September 2026, about one million expected by end 2026, plus 400,000 more financed by the EIB during 2027
Reading intervalConventional meters read every three months with monthly estimated or self-read bills; smart meters read remotely with hourly data
Owner / operatorElektrodistribucija Srbije; no competitive metering
Smart meters installedMore than 900,000 of about 3.9 million meters (September 2026); 614,696 at the end of 2024 (AERS)
Target80% of delivery points where a cost-benefit analysis is positive (Energy Law); EDS cites 80% by 2030
FinancingEBRD and EIB loans; €80 million EIB loan for the 400,000-meter second phase
Self-readingED Srbija app (220,000+ users in 2025), 1st–6th of each month
ProsumersTwo-way meter bought by the prosumer

Metering is a DSO responsibility paid for through distribution charges. EDS began installing smart meters in Belgrade and Novi Sad and has extended the programme nationally with international loans. The law requires a plan for advanced metering based on a cost-benefit analysis, but AERS noted in 2024 that EDS had not yet submitted that plan.

Because three-quarters of meters are still read manually, EDS moved to quarterly physical readings in June 2025 and relies on estimates and customer self-readings in between. The May 2026 decree amendment makes a smart meter a condition for a dynamic-price contract, which links future tariff choice to the roll-out.

Renewable electricity.

Electricity generation mix (2025).

  • Coal (lignite): 63.3%
  • Hydro: 23.4%
  • Natural gas: 5.3%
  • Wind: 4.3%
  • Pumped storage: 1.3%
  • Bioenergy: 1.2%
  • Solar: 0.9%
  • Oil and other: 0.4%
Source 3
Renewable electricity share
29.7% (2025)Source 3Derived from Eurostat monthly data: 10,282 GWh from renewables out of 34,587 GWh total net generation in 2025 (pumped-storage output excluded from renewables). The 2024 annual balance gives 31.9% (11,965 of 37,489 GWh gross); 2025 was a drier year for hydro.
Home solar
0.037 GW (end 2025)Source 344,435 household prosumers. All prosumers together had 125.9 MW at the end of 2025 and 147 MW by mid-2026.
Solar added each year
0.134 GW (2025)Source 34Record year: 92 MW of solar plants and 42.1 MW of prosumer systems. About 61 MW followed in the first half of 2026.
Hydro
3.125 GW (end 2024)Source 5Net capacity: 2,382 MW pure hydro, 129 MW mixed and 614 MW pumped storage.
Onshore wind
0.604 GW (end 2024)Source 5
Solar PV
0.379 GW (mid-2026)Source 35Approximate (RES Serbia data). Eurostat: 181.4 MW at the end of 2024.

Targets.

  • Integrated National Energy and Climate Plan (adopted July 2024): 33.6% renewables in gross final energy consumption by 2030 and 45.2% of electricity generation from renewables.
  • About 3.5 GW of new solar and wind capacity by 2030 under the same plan.
  • Greenhouse gas emissions 40.3% below 1990 by 2030.

Serbia’s electricity system is built on domestic lignite and large hydro plants. Renewables, mostly hydro, provide about 30–35% of generation depending on rainfall: AERS calculates that renewables supplied 34.7% of gross electricity consumption in 2024, and Eurostat’s monthly data show 29.7% of net generation in the drier 2025.

New wind and solar were first supported by feed-in tariffs, under which EPS buys the output of “privileged producers”, financed by the levy on every bill. Support for new large plants is now auctioned as market premiums under 15-year contracts for difference. The second auction, in 2025, allocated its full 424.8 MW quota to ten projects totalling 645 MW, with winning wind bids of €53.59–68.25/MWh and solar bids from €50.90/MWh. A third auction had not been announced by mid-2026.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Until the 2024 Energy Law amendments, Serbian law had no licensing category for electricity storage. It is now a licensed activity, storage needs no energy permit, and system operators must not discriminate against storage in balancing and ancillary-service markets. Grid-scale projects connect through EMS connection studies, whose next window for large renewable and storage projects was moved to September–December 2029 by the May 2026 decree amendment.

For households, storage behind a prosumer meter is allowed but has little financial value under kWh-based net metering, where the grid acts as a free annual store. The move to net billing for new prosumers from 2027 and the arrival of dynamic contracts for smart-metered customers would change that.

Storage projects.

  • EMS connection contracts for standalone batteries: Seven standalone battery projects from the September–December 2025 connection-study window signed connection contracts in 2026, totalling 724 MW for injection and 730 MW for absorption.
  • Approved battery pipeline: Industry figures for mid-2026 show 24 battery projects with approved capacity totalling about 4.5 GWh.
  • Fortis Energy, Noćaj (Sremska Mitrovica): Solar plus battery complex: 270 MW of solar with 72 MWh of storage expected to start construction in 2026.
  • EPS pumped-storage hydro: Pumped-storage hydro capacity of 614 MW (Eurostat, end 2024), the largest source of storage and balancing in the system.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Elektroprivreda Srbije (EPS)Guaranteed supplier; 99.06% of all final consumption and 98.2% of open-market sales (2024)UnknownYesLimitedYes

The retail market is effectively one supplier. EPS supplies households and small customers under guaranteed supply and also holds almost all of the open market. At the end of 2024, 79 companies held supply licences but only 11 supplied final customers, mainly businesses. Supplier switching covered 0.42% of metering points in 2024. No household market-share data for other suppliers were identified.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Mining and EnergyGovernmentEnergy policy, energy permits, renewable auctions, household subsidiesPublishes draft laws, auction rules and the energy-efficiency subsidy programme run with municipalities.
Energy Agency of the Republic of Serbia (AERS)RegulatorLicensing, network charges, regulated prices, codesPublishes regulated prices, licence registers and a detailed annual report on the electricity market.
Elektromreža Srbije (EMS)TransmissionTransmission system operatorConnection-study windows for large plants and storage, balancing, guarantees of origin and the national residual mix.
Elektrodistribucija Srbije (EDS)DistributionNational distribution system operator and meter ownerConnections, metering point codes, smart meters, self-reading and the register of prosumers.
SEEPEXMarketPower exchange (day-ahead and intraday)Publishes the hourly reference prices used in dynamic contracts.
Elektroprivreda Srbije (EPS)MarketState generator and guaranteed supplierHousehold tariffs, prosumer contracts and bill discounts.
Energy Community SecretariatRenewable EnergyTreaty body monitoring EU-law alignment in SerbiaAnnual implementation reports assess Serbia’s market reforms, renewables and network codes.
NALEDConsumerBusiness and local-government association with prosumer policy proposalsHas published recommendations for improving the position of prosumers.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Distribution connectionPravila o radu distributivnog sistema (Distribution System Operation Rules)Elektrodistribucija Srbije, approved by AERSSet technical conditions for connecting customers and generators, operation, metering and data exchange, and the functions of advanced meters. The link is to the 2017 edition; later amendments apply.
Connection and supply conditionsUredba o uslovima isporuke i snabdevanja električnom energijom (Decree on conditions for delivery and supply of electricity), amended May 2026Government of SerbiaGoverns connection procedures and study windows, active-customer guarantees and the smart-meter requirement for dynamic-price contracts.
Prosumer installationLaw on the Use of Renewable Energy Sources (2021, amended 2023) and the 2021 decree on prosumersNational Assembly; GovernmentProsumer definition, the 10.8 kW household limit, net metering and net billing, and the contractor’s compliance statement.
Grid code requirements for generators and EU network codesEU connection, market and operation network codes (RfG, CACM, FCA, EB, SO) as adapted by the Energy CommunityEnergy Law amendments 2024 (Official Gazette 94/2024)AERS reports that the end-2024 amendments transposed the Energy Community’s electricity package, including the network codes. A specific national inverter standard for small systems was not identified from official sources.
Smart metersEnergy Law provisions on advanced metering systemsNational Assembly; AERS (opinion on the DSO plan)DSO must analyse costs and benefits, plan for at least 80% coverage where positive and repeat a negative analysis within four years.
Guarantees of originDecree on guarantees of origin (2017); EMS registryGovernment; EMSEMS is the issuing body and registry administrator; imports and exports run through the AIB hub.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Building or location permit for a household systemNoNationalThe prosumer decree removed the need for location conditions, a construction permit or a works approval for prosumer installations.
Supplier contract with net meteringYesNationalThe household asks EPS (or its supplier) to change its supply contract to full supply with net metering.
DSO connection and registrationYesNationalContractor’s compliance statement to EDS; connection within five days of the contract and entry in the register of prosumers within five days of connection.
Two-way meterYesNationalBought by the prosumer and fitted at the metering point.
Ministry energy permitLimitedNationalOnly for plants of 1 MW and above (and all hydro plants), and not for generation for own needs or storage.
AERS licenceLimitedNationalNot needed for prosumers or plants up to 1 MW; required above 1 MW and for storage and aggregation businesses.

For a household, the process runs through the supplier and the DSO only, with no municipal permit or licence. The main practical cost is the two-way meter and any work to bring the metering point up to standard. Large plants follow the full construction-permit route with an energy permit, an EMS or EDS connection study, an AERS licence and, for supported projects, an auctioned market premium.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering for household prosumersActiveNet meteringMonthly kWh netting with annual settlement on 1 April; surplus at settlement passes to the supplier unpaid. Open to new household prosumers until 31 December 2026; existing ones keep it for the life of their system.Since 2021; closed to new entrants after 31 Dec 2026
Net billing for new prosumersScheduledNet billingReplaces net metering for households that become prosumers from 1 January 2027; already applies to business prosumers, whose surplus is credited in money.From 1 January 2027
Household energy-efficiency and clean-energy subsidies (Ministry and municipalities)ActiveGrantCo-financing of 50–65% of costs (up to 90% for energy-vulnerable customers) for windows, insulation, efficient heating, solar collectors, solar panels and heat pumps, through public calls by participating municipalities under the World Bank-supported Clean Energy and Energy Efficiency for Citizens project. Availability depends on each municipality’s call.Project runs to the end of 2027
Renewable auctions for market premiums (CfD)ActiveMarket premium / CfDFifteen-year contracts for difference for wind and solar allocated by auction. The 2025 round awarded 424.8 MW of quota (645 MW of projects); a third round had not been announced by mid-2026.—
Bill discounts for e-billing and self-readingActiveBill discount7% for an electronic bill paid by the 20th, or 6% for a self-reading submitted between the 1st and 6th and paid by the 20th.From the October 2025 bill

Data and connectivity.

Fixed broadband
90.1 % of households with internet access (2025)Source 10
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About 90% of households have internet access, and more than 220,000 customers used the ED Srbija app for meter readings in 2025. Smart meters are read remotely by EDS’s own system, and the Energy Law requires advanced metering systems to allow two-way communication. No public information was identified on the communication technologies EDS uses for its smart meters.

Grid conditions.

National peak demand
5.706 GW (2024)Source 15Maximum hourly load on 12 January 2024 at 18:00, excluding Kosovo*.
Annual electricity demand
31.3 TWh (2025)Source 4Final electricity consumption (31,304 GWh). Distribution losses added a further 3,991 GWh.
Generation capacity
8.96 GW (end 2024)Source 5Total net maximum capacity (8,962 MW), of which 5,052 MW combustible fuels. AERS reports 8,086 MW connected to the transmission network and 354 MW in 413 plants on the distribution network.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Serbia sits at the centre of south-east Europe’s grid and carries large transit flows from north-east to south-west, which AERS links to congestion on cross-border lines and to new 400 kV projects such as the Trans-Balkan Corridor. Serbia was a net importer in 2024 and 2025, with the heaviest imports in hot summers and in December. The main constraint for new renewables is network capacity: the May 2026 decree amendment postponed new EMS connection studies for large wind, solar and storage projects to the end of 2029.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Energy Law amendments (Electricity Integration Package)CurrentAdopted end of 2024 (Official Gazette 94/2024)Active customers, aggregators and independent aggregators, licensed electricity storage, dynamic-price contracts from suppliers with more than 200,000 customers, a balancing and ancillary-services market, a redefined small-customer category, the end of net metering for new prosumers after 2026, and the lifting of the 1989 ban on nuclear power. Bylaws are still being adopted.
Regulated price increase and red-zone thresholdCurrent1 October 2025Average household increase of 6.6%, driven by higher network charges; red zone now starts above 1,200 kWh a month instead of 1,600 kWh; guaranteed supply extended to entrepreneurs and micro and small enterprises.
Connection studies for large renewables and storage postponedCurrentDecree amendment, May 2026The EMS study window moves from 1 July–31 October 2026 to 1 September–31 December 2029. The same amendment introduced bank guarantees for active customers and a smart-meter condition for dynamic-price contracts.
End of net metering for new household prosumersUpcoming31 December 2026 (net billing from 1 January 2027)Households that obtain prosumer status by the end of 2026 keep net metering for the life of their system; later entrants go onto net billing.
Next regulated price adjustmentUpcomingExpected by 1 October 2026 or January 2027 under the IMF arrangementReported commitment to raise regulated household prices by at least inflation plus one percentage point; no approved decision was identified at the time of writing.
Smart-meter roll-out phase twoUpcomingEnd 2026 – 2027About one million smart meters by the end of 2026 and 400,000 more under an €80 million EIB loan during 2027; a customer consumption portal was planned.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionLowLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow4,435 household prosumers with 37.1 MW at the end of 2025, out of about 2.5 million households. Net metering with a 10.8 kW cap and low regulated prices limit the economic case, although uptake is accelerating before net metering closes to new entrants.
Distributed energy marketLowAbout 233 MW of solar plants on the distribution grid and 147 MW of prosumer systems by mid-2026, against more than 8 GW of total capacity. Aggregators and active customers have a legal basis but little activity.
Grid flexibility marketLowBalancing is procured by EMS mainly from EPS units under contract; SEEPEX intraday trading was 115 GWh in 2024; detailed rules for aggregation and demand response are still pending.
Energy storage adoptionLowNo grid-scale battery in operation by mid-2026, apart from 614 MW of long-established pumped hydro. Seven standalone battery projects (724 MW) signed EMS connection contracts in 2026.
Renewable growth environmentMediumRecord solar additions of 134.3 MW in 2025 and 645 MW of wind and solar awarded in the 2025 auction, but renewables were 29.7% of net generation in 2025 (Eurostat) and new large connections are paused until 2029.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 40 sources
  1. Electricity prices for household consumers, bi-annual data (nrg_pc_204), band DC, Serbia. Eurostat, 2026. accessed 1 October 2026.
  2. Complete energy balances (nrg_bal_c): household electricity consumption. Eurostat, 2026. accessed 1 October 2026.
  3. Net electricity generation by type of fuel, monthly data (nrg_cb_pem). Eurostat, 2026. accessed 1 October 2026.
  4. Electricity supply, transformation and consumption, annual data (nrg_cb_e). Eurostat, 2026. accessed 1 October 2026.
  5. Electricity production capacities by main fuel groups and operator (nrg_inf_epc) and for renewables and wastes (nrg_inf_epcrw). Eurostat, 2026. accessed 1 October 2026.
  6. Population on 1 January (tps00001). Eurostat, 2026. accessed 1 October 2026.
  7. Distribution of population by tenure status (ilc_lvho02). Eurostat, 2026. accessed 1 October 2026.
  8. Distribution of population by degree of urbanisation, dwelling type and income group (ilc_lvho01). Eurostat, 2026. accessed 1 October 2026.
  9. Passenger cars by type of motor energy (road_eqs_carpda). Eurostat, 2026. accessed 1 October 2026.
  10. Households – level of internet access (isoc_ci_in_h). Eurostat, 2026. accessed 1 October 2026.
  11. Inability to keep home adequately warm (ilc_mdes01). Eurostat, 2026. accessed 1 October 2026.
  12. Urban population (% of total population) – Serbia. World Bank, 2026. accessed 1 October 2026.
  13. First results of the 2022 Census of Population, Households and Dwellings. Statistical Office of the Republic of Serbia, 2022. accessed 1 October 2026.
  14. New census results published: Serbia has 3.6 million dwellings. N1, 2023. accessed 1 October 2026.
  15. Energy Agency of the Republic of Serbia – 2024 Annual Report. Energy Agency of the Republic of Serbia (AERS), 2025. accessed 1 October 2026.
  16. Energy Law (Official Gazette 145/2014 … 94/2024 and 109/2025), consolidated text. Official Gazette of the Republic of Serbia (via Putevi Srbije), 2025. accessed 1 October 2026.
  17. Serbia adopts changes to Law on Energy – introduces active buyers, dynamic tariffs, auxiliary services market. Balkan Green Energy News, 2024. accessed 1 October 2026.
  18. This is why your electricity bill went up (prices from 1 October 2025). Kurir Biznis, 2026. accessed 1 October 2026.
  19. Electricity prices in Serbia rise by 6.6%. Balkan Green Energy News, 2025. accessed 1 October 2026.
  20. Electricity in Serbia to rise by at least seven percent by the end of September. Biznis.rs, 2025. accessed 1 October 2026.
  21. EPS and EDS introduce two new discounts from the October bill. Balkan Green Energy News, 2025. accessed 1 October 2026.
  22. Which items on the electricity bill are discounted, and which are paid in full. N1, 2022. accessed 1 October 2026.
  23. EDS invites citizens to self-read and get a discount: the most common mistakes explained. 021.rs, 2026. accessed 1 October 2026.
  24. Meter readings via the app: from 1 May the metering point code and a photo are enough. 021.rs, 2025. accessed 1 October 2026.
  25. Meters to be read quarterly: Elektrodistribucija announces new rules from 1 June. Večernje novosti, 2025. accessed 1 October 2026.
  26. Smart meters reach more and more homes: what they bring to citizens. Večernje novosti, 2026. accessed 1 October 2026.
  27. EDS network to have a million smart meters by the end of 2026. Biznis.rs, 2025. accessed 1 October 2026.
  28. Serbia adopts prosumer decree – three steps to electricity from solar panels. Balkan Green Energy News, 2021. accessed 1 October 2026.
  29. Elektrodistribucija Srbije publishes instructions on how households can become prosumers. Balkan Green Energy News, 2021. accessed 1 October 2026.
  30. A new hope for the commercial prosumers. Karanović & Partners, 2023. accessed 1 October 2026.
  31. Free online info session for households that want to produce electricity for their own needs. Balkan Green Energy News, 2026. accessed 1 October 2026.
  32. Serbia delays renewables connection procedure until 2029. Balkan Green Energy News, 2026. accessed 1 October 2026.
  33. EPS offers businesses contracts with a dynamic price. Biznis.rs, 2026. accessed 1 October 2026.
  34. Serbia installs 134.3 MW of solar in 2025. pv magazine, 2026. accessed 1 October 2026.
  35. Serbia adds 61 MW of solar in H1. pv magazine, 2026. accessed 1 October 2026.
  36. Serbia allocates entire quota at second auctions – investors to install 645 MW of wind, solar. Balkan Green Energy News, 2025. accessed 1 October 2026.
  37. Serbia’s EMS signs grid connection contracts for seven battery storage projects. Balkan Green Energy News, 2026. accessed 1 October 2026.
  38. Serbia adopts Integrated National Energy and Climate Plan to 2030. Balkan Green Energy News, 2024. accessed 1 October 2026.
  39. New round of energy-efficiency subsidies for households in Serbia. Balkan Green Energy News, 2024. accessed 1 October 2026.
  40. Distribution System Operation Rules (2017 edition). Elektrodistribucija Srbije, 2017. accessed 1 October 2026.