How electricity works in Botswana.
Botswana electricity 2026: BPC two-band household tariff, BERA regulation, prepaid STS meters, Rooftop Solar Programme export credits, licensing and solar growth.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Botswana pula (BWP) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Botswana energy at a glance.
Key figures for households in Botswana. Each one links to its source on the full overview below.
Electricity price.
0.751 BWP per kWh for households, including taxes. Figures for From 1 August 2026.
Household use.
2,714 kWh a year for a typical household. Figures for 2022/23.
Renewable share.
9.1% of electricity from renewable sources. Figures for Q1 2026.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Botswana.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Botswana below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Botswana requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Botswana.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Botswana, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Botswana, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Botswana.
The energy market in Botswana, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Botswana has a vertically integrated, state-owned power sector. Botswana Power Corporation (BPC) generates, transmits, distributes and sells electricity to every grid-connected customer in the country, and buys power from independent solar producers and from neighbouring utilities. The Botswana Energy Regulatory Authority (BERA), set up under the BERA Act 2016, licenses sector activities and approves BPC’s tariffs. Policy sits with the Ministry of Minerals and Energy.
Households pay a regulated two-band tariff. From 1 August 2026 BERA approved a uniform 9% increase: domestic customers now pay P0.7507/kWh for the first 200 kWh a month and P1.5637/kWh above that, plus a fixed charge of P35.12 a month and a 10-thebe-per-kWh levy, all VAT inclusive. BPC had asked for a 68% rise for domestic customers.
Local generation is still dominated by the Morupule A and B coal stations, and Botswana imported about 43% of the electricity it distributed in 2025, mainly from Eskom in South Africa. Solar is growing fast: the 100 MW Mmadinare plant reached full operation in late 2025, solar supplied 9.1% of local generation in the first quarter of 2026, and government targets 50% renewable electricity by 2030. Households and businesses can export rooftop solar power under the national Rooftop Solar Programme.
Energy snapshot.
Headline figures for electricity in Botswana. Each shows its data year and links to its source.
- Population2,359,609 peopleSource 232022
- Households684,844 householdsSource 232022
- Average household size3.3 people/householdSource 232022
- Electricity use per household2,714 kWh/yrSource 252022/23
- Household price (BWP)0.751 BWP/kWhSource 1From 1 August 2026
- Household price (EUR)0.05 EUR/kWhSource 30From 1 August 2026
- Renewable electricity share9.1%Source 22Q1 2026
- Solar capacity0.109 GWSource 13March 2026
- Wind capacityNot identified from a reliable public source.
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Botswana Energy Regulatory Authority (BERA)
- System operator
- Botswana Power Corporation (BPC), which operates the national grid through its SCADA control system
- Distribution networks
- A single national distributor: BPC owns and operates the 66 kV, 33 kV and 11 kV networks and supplies all grid customers.
- Currency
- Botswana pula (BWP)
- Voltage and frequency
- 230 V single-phase / 400 V three-phase
Electricity prices in Botswana.
- Household price (BWP)
- 0.751 BWP/kWh (From 1 August 2026)Source 1BPC domestic energy charge for the first band (up to 200 kWh a month), VAT inclusive. Consumption above 200 kWh is charged at P1.5637/kWh. Excludes the P35.12 monthly fixed charge and the 10-thebe/kWh levy.
- Household price (EUR)
- 0.05 EUR/kWh (From 1 August 2026)Source 30Converted from P0.7507/kWh at the Bank of Botswana rate of 1 BWP = 0.0661 EUR published for 29 September 2026 (0.7507 × 0.0661 = 0.0496). The second band (P1.5637) converts to about EUR 0.103/kWh.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (BWP per kWh).Source 1
| Until June 2025 | 0.9839 BWP/kWh |
|---|---|
| July 2025 | 0.6887 BWP/kWh |
| August 2026 | 0.7507 BWP/kWh |
BPC proposes tariffs and BERA approves them under section 57 of the BERA Act, after publishing the application and holding a public hearing. For 2026/27 BPC applied on 3 December 2025 for a 46% average increase (68% for domestic customers, taking the average domestic price from P0.90 to P1.57/kWh). After a hearing on 10 February 2026, BERA approved a uniform 9% increase across all customer classes from 1 August 2026. The same decision moved business demand charges from kW to kVA and shortened the maximum-demand window from 12 to 6 months.
The domestic tariff has two bands. In July 2025 the first 200 kWh a month was cut by 30% (from P0.9839 to P0.6887/kWh) to cushion low-income households, while the price above 200 kWh rose 5% and business, mining and government tariffs rose 20–50%. The August 2026 increase took the bands to P0.7507 and P1.5637/kWh. The published tariff schedule is VAT inclusive. The 10-thebe levy on every kWh funds the National Electricity Fund, which pays for free household connections.
Prices remain below cost. BPC’s consultation paper put its average selling price at 127 thebe/kWh in 2024/25 against an average cost of 235 thebe after financial items, mainly because of unreliable local generation and expensive imports. The Minister told Parliament in March 2026 that the average tariff was about 148 thebe/kWh, that imports met about 35% of demand, and that government paid about P2.5 billion to support BPC in 2025/26. BERA has been tasked with a performance-based multi-year tariff framework that keeps social tariffs for low-income customers while moving others to cost-reflective prices. Government customers pay the highest rate (P3.7056/kWh).
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households are on BPC’s domestic tariff (TOU 4, where “TOU” means type of user, not time of use). From 1 August 2026, VAT inclusive: fixed charge P35.12/month; Band 1 up to 200 kWh/month P0.7507/kWh; Band 2 above 200 kWh P1.5637/kWh; levy 10 thebe/kWh. No demand charge applies to households. |
| Prepayment | Yes | Most households use STS prepaid meters and buy 20-digit tokens by meter number through BPC offices, the BPC SmartPower (Motlakase) app, USSD (*192#), banks and mobile channels. BPC is converting remaining postpaid customers to prepaid to improve collection. |
| Time-of-use | No | There is no household time-of-use tariff. Business tariffs differ by size, and medium and large users pay a demand charge, which since August 2026 is measured in kVA over a six-month window. |
| Dynamic | No | There is no domestic wholesale market and no tariff linked to wholesale prices. |
| Other | Limited | During supply shortfalls BPC can apply load management, asking households to keep their load at or below 10 A in the 06:00–10:00 and 18:00–22:00 peaks. Meters over the limit can be switched off and are reviewed hourly. |
Household prices compared with neighbouring countries (EUR per kWh).
- South Africa€0.185
- Zimbabwe€0.075
- Botswana€0.05
- Zambia€0.036
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,714 kWh/yr (2022/23)Source 25Derived: household electricity consumption of 4,576.4 TJ (about 1,271 GWh) in the National Energy Use Survey 2022/23, divided by the 468,344 households the survey found connected to electricity. This is use per connected household, not per household nationally. No official per-household figure was identified.
- Average daily use per household
- 7.44 kWh/day (2022/23)Source 25Derived from the 2,714 kWh/yr per connected household above, divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,856 kWh/person/yr (2025)Source 21Derived, all sectors: 4,379,103 MWh of electricity distributed in 2025 (local generation plus imports), divided by the 2022 census population of 2,359,609. The population has grown since 2022, so this overstates use per person slightly.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 24.4 % (main cooking fuel share) (2022/23)Source 25Share of electricity among household cooking fuels in the National Energy Use Survey 2022/23. LPG was 42.7% and firewood 32.8%.
Electricity demand across all sectors is about 4,800 GWh a year with a national peak of around 700 MW, and has grown by about 5% a year. Statistics Botswana recorded 4,379 GWh distributed in 2025, down from 4,813 GWh in 2024, a year in which local generation fell because of problems at the Morupule plants. Mining, government and commercial customers account for a large share of sales: households are 93% of BPC’s 611,750 customers but pay much lower rates than business and government.
Household use is shaped by climate and by incomplete grid access. The National Energy Use Survey 2022/23 found 73.9% of households connected to electricity. Connected homes used about 2,700 kWh a year on average, mostly for water heating (electric geysers), lighting, refrigeration and, in winter, electric heaters. Electricity was the main source of energy for space heating in 88.2% of households that heat. Biomass, mostly firewood, still provided 66% of all household final energy, and only about a quarter of households cooked mainly with electricity.
Demand peaks in the morning (06:00–10:00) and evening (18:00–22:00). BPC uses geyser load control and, when supply is short, load curtailment that limits households to 10 A at peak times. Government projects demand rising to about 7,000 GWh by 2040.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 66.6 % of population (2022)Source 24Share of the population living in areas classified as urban (66 towns after reclassification of large villages).
Botswana is sparsely populated, with 4.1 people per square kilometre, but two-thirds of the population lives in urban areas, including large villages reclassified as towns. Gaborone and Francistown are the densest areas. Households have become smaller, averaging 3.3 people in 2022 against 3.7 in 2011, and the number of households grew from 550,926 to 684,844.
Most homes are low-rise, detached buildings on individual plots, which BPC identifies by plot number and ward or village when customers apply for services. Free household connections, introduced in 2024 to replace the National Electricity Standard Connection Cost of P5,000 and P2,500, apply to all household structures, including traditional Setswana houses. Single plots with separate roofs make rooftop solar physically simple, but programme rules allow only one Rooftop Solar application per yard, and multiple meters are combined only when registered under the same account.
How the grid works in Botswana.
- TransmissionBPC Transmission
- DistributionA single national distributor: BPC owns and operates the 66 kV, 33 kV and 11 kV networks and supplies all grid customers.
- MeteringBPC, BPC Rooftop Solar Programme Registry
- Supply1 or more retail suppliers
Power flows from BPC’s coal stations at Morupule A (132 MW installed; about 100 MW available) and Morupule B (600 MW), from IPP solar plants and from imports into a 400/220/132 kV transmission grid. It is then stepped down through 66 kV, 33 kV and 11 kV networks to customers. The emergency plants at Orapa (90 MW, dual-fuel but running on diesel) and Matshelagabedi (70 MW) run when coal output and imports fall short. In 2025, local generation of 2,515 GWh covered about 57% of the 4,379 GWh distributed, with the rest imported, so imports were about 43% (derived from Statistics Botswana figures).
When Morupule B was being planned, its environmental impact assessment (published by the World Bank) described the main import route as a single 400 kV line from Eskom’s Matimba power station in South Africa into BPC’s Phokoje substation. Some border towns are supplied directly from Namibia and Zambia under cross-border arrangements. In Q4 2025 Eskom supplied 59.7% of imports, ZESCO 22.4%, NamPower 5.7%, cross-border supplies 8.5% and SAPP 3.7%. BPC lists a new Botswana–South Africa 400 kV interconnector and the Zimbabwe–Zambia–Botswana–Namibia (ZiZaBoNa) 400 kV interconnector, which reaches Botswana at Pandamatenga, as planned projects.
Commercially the system is a single integrated utility. BPC buys IPP output under long-term PPAs reviewed by BERA (25 years for Jwaneng, 30 years for Maun), and the cost of imports, IPPs and its own plants is recovered through national tariffs and government support. Morupule B has had defects since it was commissioned in 2012/13. Remedial work has been completed on the first unit, is under way on the next, and is scheduled to finish in 2027, and Morupule A is due to be decommissioned in 2028.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Minerals and Energy (Department of Energy) | Sets energy policy and the Integrated Resource Plan, owns the Rooftop Solar Programme guidelines and runs rural electrification through the National Electricity Fund. |
| Regulator | Botswana Energy Regulatory Authority (BERA) | Licenses generation, transmission, distribution, single-buyer, retail, import/export activities and any installation above 100 kW under section 35 of the BERA Act 2016; approves BPC tariffs and PPAs; issues the Rooftop Solar Programme Rules. |
| Supplier | Botswana Power Corporation (BPC) | State-owned, vertically integrated utility under the BPC Act. Owns Morupule A and B and the Orapa and Matshelagabedi emergency plants, buys from IPPs and imports, and is the only retailer to grid customers. |
| TSO | BPC Transmission | Owns and operates 1,246 km of 400 kV, 2,200 km of 220 kV and 2,162 km of 132 kV lines and 54 substations, controlled through a SCADA system and seven transmission service centres. Planned reforms would make it a separate TSO with open network access. |
| DSO | BPC Distribution | Runs the 66 kV sub-transmission and 33 kV and 11 kV distribution networks covering all urban areas and 83% of gazetted villages, with 28 customer service centres. |
| Metering | BPC | Owns, installs and reads all customer meters, including the bi-directional meters installed for Rooftop Solar participants at the customer’s cost. |
| Data hub / registry | BPC Rooftop Solar Programme Registry | BPC keeps the register of approved rooftop systems and permits, with access for BERA, which tracks licences for systems above 100 kW. |
| Exchange | Southern African Power Pool (SAPP) | Regional power pool through which BPC buys part of its imports (3.7% of imports in Q4 2025 and 7.8% in Q1 2026), alongside bilateral contracts with Eskom, ZESCO and NamPower. |
Compared with the UK system.
| UK concept | Botswana equivalent | How it works |
|---|---|---|
| DNO | BPC Distribution | There is one national network company, and it is part of BPC. It connects customers, owns the meter and supplies the electricity. There are no regional distribution companies or separate network charges on the bill. |
| National Grid/NESO | BPC Transmission and control centre | BPC owns the transmission grid, dispatches its own plants, IPP solar plants and imports, and manages shortfalls through imports, emergency diesel plants and load shedding. No independent system operator exists yet; government plans to make transmission a separate TSO. |
| MPAN | BPC contract account number and meter number | A connection is identified by the BPC contract account number, quoted on bills, payments and service requests, and by the meter number. Prepaid customers buy tokens using the 11-digit STS meter number. There is no separate national supply-point number. |
| MPRN | No equivalent | There is no piped gas network for homes. Households use bottled LPG, which made up 42.7% of cooking fuel in 2022/23. |
| Meter operator | BPC | BPC owns, installs, tests and replaces all meters. Rooftop Solar meters are paid for by the customer but owned by BPC. |
| Supplier | BPC (sole retailer) | Customers cannot choose a supplier. BPC sells to every grid customer at BERA-approved national tariffs. |
| Smart-meter infrastructure | STS prepaid meters; split smart meters being procured | Prepaid keypad meters, which take 20-digit STS tokens, are the household standard. There is no national smart-meter data system like the DCC. BPC’s tender for single- and three-phase split smart meters with customer interface units was provisionally awarded in July 2026. |
How a supply point is identified.
Contract account 002007315498; prepaid meter 04120345678 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | BPC contract account number (with meter number) |
| Who issues it? | Botswana Power Corporation |
| Format | Numeric contract account number issued by BPC’s billing system and shown on bills and payment guidance. Each meter also has its own number; prepaid meters use an 11-digit STS meter number for token purchases. |
| Length | Contract account: 12 digits in the example BPC publishes; prepaid meter number: 11 digits |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the BPC bill and customer portal (contract account number); on the meter itself and on token receipts (meter number). |
| Electronic access | The BPC customer portal and SmartPower (Motlakase) app show bills, energy use and token purchases; USSD *192# and WhatsApp self-service channels are also available. |
| Third-party access | No regulated data-access route for third parties was identified. Banks and mobile-money vendors only take the meter number to sell tokens, and installers include the account and meter numbers on BPC service or Rooftop Solar applications made with the customer’s consent. |
| Who keeps the register | BPC’s customer billing system; BPC also keeps the Rooftop Solar Programme registry, which BERA can access. |
| Register scope | National |
Botswana has no separate supply-point register like the UK’s MPAN system. Because BPC is both network operator and sole retailer, a connection is identified by two BPC numbers: the contract account number, which BPC asks customers to quote for bank payments and service requests, and the meter number of the installation at the plot. BPC service forms ask for both, together with the plot number and the ward, village or town.
Most households are on prepaid STS meters. Buying electricity needs only the 11-digit meter number: the vending system generates a 20-digit token for that meter, which the customer keys in. The keypad also shows readings, such as present load in amps (code 864), which BPC asks customers to check during load management. BPC has been converting postpaid customers to prepaid and is procuring split smart meters, where a customer interface unit inside the home communicates with the meter.
When people move, BPC uses Move In and Move Out services to change the account holder at the premises. The meter physically stays at the plot, but no published rule was found on whether the contract account number stays with the property or changes with the new account holder, so this is recorded as unknown. A customer with a Rooftop Solar system who sells the property must tell BPC, and the new owner signs a new Interconnection Agreement.
The register is national and held by BPC. No open-data or third-party data-access regime exists, and BERA’s role is regulatory oversight rather than holding meter data.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Limited |
| How exported electricity is paid | kWh-for-kWh credit against the energy part of the bill, banked for 6 months. BPC pays commercial and industrial postpaid customers for leftover banked credits at an avoided-cost rate (P0.98/kWh in the 2024 guidelines). Prepaid customers’ exports are credited automatically by the meter and are not reimbursed in cash. |
| How much can be connected nationally? | The aggregate cap was 10 MW in the 2020 guidelines and 50 MW in the 2024 amendment (20% reserved for domestic customers). Revised guidelines announced in 2026 raise it to 75 MW. About 28 MW had been commissioned by March 2026. |
| What size can a household install? | Up to 13.8 kW on a single-phase supply or 35 kW on three-phase, and no more than 110% of the previous year’s consumption. |
| How are exports valued? | Each exported kWh offsets one imported kWh on the energy part of the bill. The fixed charge cannot be offset. Credits roll over for 6 months under the 2024 amendment (12 months in 2020). BPC then pays commercial and industrial customers for leftover credits at the BERA-approved avoided-cost rate. |
| Is a licence needed? | Not up to 100 kW: these systems need only BPC’s permit (ICA plus Certificate of Completion). Systems from 100 kW to 1 MW also need a BERA licence. |
| Can BPC curtail or refuse a system? | Yes. BPC may curtail rooftop systems during abnormal conditions or low load, may refuse a connection where capacity is not available, and the customer pays for any network upgrades or special studies needed. |
| Is battery storage allowed? | Yes, at the customer’s discretion. Systems with battery backup must have separate backup wiring and automatic and manual isolation so stored energy cannot reach a de-energised grid. |
Connecting a home system.
- Check eligibility: be a BPC customer with an account in good standing, own the system, and install it on the same property as the meter. New buildings must wait three months to establish a consumption history.
- Size the system within the limits: domestic up to 13.8 kW single-phase or 35 kW three-phase; commercial and industrial up to 1 MW; no more than 110% of the previous 12 months’ consumption.
- Apply online through the BPC Rooftop Solar application form. Systems above 100 kW are passed to BERA for a licence.
- BPC checks network capacity at the point of connection and places the application in the first-come, first-served queue against the programme cap. The customer and installer complete the conditional Interconnection Agreement (ICA) before buying equipment.
- Once approved, procure and install within six months, using a licensed electrician, technician or engineer.
- BPC (or its representative) tests and commissions the system, installs the bi-directional meter at the customer’s cost and signs the Certificate of Completion. The ICA plus certificate form a 15-year permit.
Export from small generators is possible only through the national Rooftop Solar Programme (RTS). The Ministry sets the guidelines, BERA issues the programme rules, and BPC runs applications, connection and metering. The scheme launched in 2020. The August 2024 amendment raised the cap to 50 MW, set household limits by supply phase, shortened banking to 6 months and set a P0.98/kWh avoided-cost rate for commercial and industrial credits. In 2026 the Ministry raised the cap to 75 MW and arranged bank loans for installations.
The scheme is net metering in kWh rather than an export tariff. A four-quadrant bi-directional meter records imports, exports and net energy each month. Prepaid customers’ exports are credited to the meter automatically, so there is no cash reimbursement. Postpaid commercial and industrial customers are billed on net values and paid for leftover credits after the banking period. The 2020 rules also allowed a higher-than-1:1 credit for peak-hour exports on time-of-use meters, but no household time-of-use tariff exists.
Larger generation is not connected through RTS. Utility-scale solar is built by IPPs selected through government procurement and sold to BPC under long-term PPAs. Sites up to 20 MW are reserved for 100% citizen-owned companies.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | BERA licence for generation (and authorisation to construct a plant). Any installation with single or aggregate capacity above 100 kW must be licensed. Rooftop systems up to 100 kW need only a BPC permit. | BERA | BPC asks for a licence from the energy department when commissioning standby generators above 25 kVA. |
| Store electricity | No storage-specific licence category is listed in section 35. Storage behind the meter is allowed under RTS. Installations above 100 kW in aggregate fall under the general licensing threshold. | BERA / BPC | Utility batteries (Mmadinare, Jwaneng, Maun) are being procured by BPC and IPPs under PPAs. |
| Export to the grid | Up to 100 kW: BPC Interconnection Agreement and Certificate of Completion (15-year permit). From 100 kW to 1 MW: also a BERA licence. Above RTS limits: IPP procurement and PPA with BPC. | BPC; BERA above 100 kW | Subject to the national RTS cap and network capacity. |
| Sell electricity to consumers | Licence required under section 35 of the BERA Act. In practice BPC is the only retailer. | BERA | No competitive retail market for households. |
| Single buyer | Licensed activity under section 35 of the BERA Act. | BERA | BPC buys all IPP output and imports. |
| Operate or own transmission / distribution | Separate licensed activities: operating a transmission system, owning transmission works, operating a distribution system and owning a distribution network. | BERA | All held by BPC today. Reforms would allow Independent Transmission Providers. |
| Import or export electricity across borders | Licensed activity under section 35 of the BERA Act. | BERA | BPC imports from Eskom, ZESCO, NamPower and through SAPP. |
| Wholesale trading | No domestic wholesale market exists. Regional trading is carried out by BPC through SAPP and bilateral contracts. | BERA / Ministry | Market liberalisation is under review. |
| Aggregate / VPP / balancing and grid services | No licence category or market framework exists. Balancing and reserves are handled within BPC. | Not applicable | Third-party aggregation is not provided for in the RTS rules. |
| Remote control of customer assets | No third-party framework. BPC itself runs geyser load control and load limiting through meters. | BPC | Load curtailment caps households at peak times when supply is short. |
| Design and install rooftop solar | Must be done by a licensed electrician, technician or engineer. Engineers and technicians are certified by the Engineers Registration Board. | Engineers Registration Board; BPC commissioning | The Department of Energy runs a Solar Inspections Training Programme (39 officers certified in July 2026). |
Section 35 of the BERA Act 2016 lists the licensed activities: generation and co-generation, operating a transmission system, single buyer, operating a distribution system, owning transmission works, owning a distribution network, selling to customers and consumers, importing or exporting electricity, and any installation whose single or aggregate capacity exceeds 100 kW. Applicants must show their technical and financial capability and their rights to the land.
BPC holds the core licences, so in practice private parties take part as IPPs (under PPAs reviewed with BERA’s PPA guidelines) or as Rooftop Solar participants. The 100 kW threshold is the main dividing line for small generators: below it, a BPC permit is enough. Government is reviewing the market structure. A Cabinet directive to unbundle and corporatise BPC’s generation business is being implemented, and amending legislation was due to go to Parliament by the second quarter of the 2026/27 financial year.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency control and reserves | No | — | No | BPC. Provided by BPC’s own plants and imports. There is no ancillary-services market open to third parties. |
| Utility demand-side management | No | — | No | BPC. BPC directly controls geysers and limits domestic and small-business supply at evening peaks (from 13.8 kW to 2.3 kW single-phase and from 35 kW to 6.9 kW three-phase, depending on the shortfall). Customers are not paid for this. |
| Regional power trading (SAPP) | Restricted | — | No | Southern African Power Pool. Only utilities such as BPC trade. Distributed assets have no route to these markets. |
There is no flexibility market in Botswana. BPC balances the system with Morupule, IPP solar, emergency diesel plants, imports and, when needed, rotational load shedding. The Ministry stated in March 2026 that the system had no reserve margin.
Demand-side measures are run by the utility rather than bought from customers: geyser control, peak-time load limiting through meters and earlier efficiency programmes, such as the installation of 820,000 CFLs. The planned unbundling and a separate TSO with open network access could create a basis for ancillary-service procurement, but no rules for this had been published by October 2026.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| International REC (I-REC) registration | Botswana has been registered under I-REC. BPC has signed a renewable energy certificate agreement with Debswana and plans to offer certificates to other customers. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Prepaid STS meters are the household norm; a tender for split smart meters with customer interface units was provisionally awarded in July 2026 |
| Reading interval | Not published |
| Household metering | Mostly prepaid keypad (STS) meters |
| Token format | 20 digits, bought by 11-digit meter number |
| Smart meter tender | No. 7392/25-01, floated 28 November 2025 |
| Rooftop solar meter | Four-quadrant bi-directional, paid by customer, owned by BPC |
| Meter owner | BPC |
BPC is still converting postpaid customers to prepaid meters to improve debt collection and protect revenue. Prepaid meters work offline: customers enter a token generated for their meter number, and the keypad shows credit and load.
BPC is now buying split smart meters, where the metering unit sits outside and a customer interface unit inside the home. Tender 7392/25-01 for single- and three-phase units was floated on 28 November 2025. A provisional award was published on 23 July 2026, and no final award had been confirmed by late August 2026. There is no national smart-meter data or communications body. Meter data and any remote functions stay within BPC.
Renewable electricity.
Electricity generation mix (Q1 2026 (local generation only)).
- Coal: 90.8%
- Solar: 9.1%
- Diesel: 0.1%
- Renewable electricity share
- 9.1% (Q1 2026)Source 22Solar share of electricity generated in Botswana in January–March 2026 (82,520 MWh of 901,903 MWh). Quarterly figure; excludes imported electricity, which was about a fifth of supply in that quarter. Solar was 3.2% of local generation in Q1 2025 and 4.5% in Q4 2025.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Utility solar PV (grid-connected)
- 109.3 MWp (March 2026)Source 13
- Rooftop Solar Programme
- 28 MW (March 2026)Source 13Commissioned under the programme (domestic and commercial combined).
- Coal (Morupule A and B)
- 732 MW (2025)Source 12Installed: Morupule A 132 MW, Morupule B 600 MW. BPC and the Ministry describe Morupule A as about 100 MW in 2026.
- Emergency diesel (Orapa, Matshelagabedi)
- 160 MW (2025)Source 12
Targets.
- 50% renewable energy in the national electricity mix by 2030 (Integrated Resource Plan revised up from 30%).
- Renewables at 42% of installed capacity in 2026/27 (Ministry target).
- Up to 1.3 GW of solar by 2030.
- Universal electricity access by 2030.
- Net electricity exporter and regional energy hub by 2036.
Botswana’s renewable electricity is almost entirely solar. The country has over 3,200 hours of sunshine a year. Early plants were small (Phakalane 1.3 MW in 2012, Bobonong 3 MW in 2023, Shakawe 1 MW in 2024, Ghanzi 4 MW). The 100 MW Mmadinare plant near Selebi-Phikwe, built by an IPP, came online in two phases in 2025, and the solar share of local generation rose from 3.2% in Q1 2025 to 9.1% in Q1 2026.
The pipeline is large. The 100 MW Jwaneng plant, built by a Chinese consortium under a 25-year PPA, was due to begin commercial operation in mid-2026, and further 4 MW plants at Ghanzi and Lobatse were under construction. In April 2026 construction started on the 500 MW Maun solar plant with 500 MWh of storage, a government-to-government project with Oman under a 30-year PPA. BPC has signed 15 PPAs in total, including ten small solar plants totalling 30 MW and the 600 MW Mmamabula coal plant, whose first 300 MW is due in Q1 2027.
Solar output does not reduce Botswana’s dependence on imports at night. Coal from Morupule therefore remains the baseload, and government plans to keep additional baseload capacity alongside the solar build-out.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage in Botswana is at the procurement and construction stage. The Ministry plans batteries at the two large solar sites, and the Maun project combines solar and storage from the start. Storage matters in Botswana because demand peaks in the early morning and evening, outside solar hours, when BPC relies on imports or emergency diesel.
Behind the meter, households and businesses may add batteries to Rooftop Solar systems, provided the inverter has separate backup wiring and isolation switches. No figures on home battery numbers were identified.
Storage projects.
- Maun Solar and Battery Storage Project: 500 MW PV with a 500 MWh battery, developed by Okavango Solar (NAQAA Sustainable Energy, Oman) under a 30-year PPA with BPC; construction began in April 2026. The battery is meant to shift solar output to the morning and evening peaks.
- Mmadinare and Jwaneng BESS: 25 MW at each site (50 MW total), at tender preparation stage in March 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Botswana Power Corporation (BPC) | Sole retailer to 611,750 grid customers (571,116 domestic) | Limited | No | No | Limited |
BPC is the only electricity supplier on the grid. Domestic customers cannot switch supplier, and every tariff is set nationally. Export is through the Rooftop Solar net-metering scheme rather than an export tariff, and green electricity is being offered to large users through renewable energy certificates (Debswana was the first). Smart meters are being procured but are not yet widespread.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Minerals and Energy | Government | Energy policy, IRP, Rooftop Solar Programme guidelines, rural electrification | Sets the renewable targets, the RTS cap and the electricity reforms. |
| Botswana Energy Regulatory Authority (BERA) | Regulator | Licensing, tariff approval, RTS rules, PPA review | Issues licences above 100 kW and approves every BPC tariff change. |
| Botswana Power Corporation (BPC) | Transmission | Generation, transmission, distribution, metering and retail | Handles every grid connection, Rooftop Solar application and meter. |
| Southern African Power Pool (SAPP) | Market | Regional power pool | Botswana imports part of its electricity through SAPP and is part of the regional interconnector plans. |
| Statistics Botswana | Government | Census, quarterly electricity generation and distribution statistics | Publishes official generation-by-source, import and distribution data. |
| Engineers Registration Board (ERB) | Consumer | Registration of engineers and technicians | The RTS guidelines require systems to be designed by a licensed electrician, technician or engineer, and ERB certifies engineers and technicians. |
| Botswana Communications Regulatory Authority (BOCRA) | Government | Telecoms regulator | Publishes the mobile coverage data relevant to connected meters and monitoring. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid interconnection | IEEE 1547 | IEEE (referenced in BERA Rooftop Solar Program Rules) | The standard interconnection agreements require facilities to be installed, operated and tested to IEEE 1547. |
| Anti-islanding | RTS Guidelines: disconnect within 2 seconds of grid loss | Ministry of Minerals and Energy | Also a visible, lockable manual disconnect accessible to BPC, unless the system shuts down automatically and cannot be overridden. |
| Metering | IEC 62053-23; BPC meter specifications | IEC / BPC | Four-quadrant bi-directional meter for import, export and net registers, compatible with BPC central systems. |
| Battery backup | RTS Program Rules, rule on battery connectivity | BERA | Inverter must have separate backup wiring, with automatic and manual isolation, so the battery cannot feed the grid during an outage. |
| Equipment and installation | BPC connection specifications, applicable grid code, Botswana Bureau of Standards | BPC / BOBS | BPC publishes the minimum applicable technical standards and references them in the ICA. |
| Installer competence | Licensed electrician, technician or engineer | Engineers Registration Board / BPC | Required for design and installation; BPC witnesses commissioning. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| BPC conditional Interconnection Agreement | Yes | National | Must be in place before installation; equipment should not be bought before it is signed. |
| BPC Certificate of Completion | Yes | National | Issued after testing and commissioning. Together with the ICA it forms the 15-year permit. |
| BERA licence | Limited | National | Only for systems above 100 kW (up to the 1 MW RTS limit). |
| Environmental attestation | Yes | National | The RTS application includes an attestation that all environmental requirements have been or will be met. |
| Account in good standing | Yes | National | Applicants in arrears with BPC are not considered. |
| Local building or planning approval | Unknown | Local | Not specified in the RTS guidelines or rules; no national rule for rooftop PV was identified. |
For a household, all permission runs through BPC: the conditional ICA, the queue position against the national cap, commissioning and the Certificate of Completion. BERA becomes involved only above 100 kW. Approval is not guaranteed, because BPC may decline where network capacity is short or ask the customer to pay for upgrades. An approved applicant who does not install within six months loses the allocation and can reapply after three months.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Rooftop Solar Programme (net metering) | Active | Net metering | kWh credits for exported solar against the energy part of the bill, banked for 6 months. Commercial and industrial customers are paid for leftover credits at the avoided-cost rate. The national cap was raised to 75 MW in 2026. | 2020 – present (operates through NDP11 and NDP12) |
| Rooftop solar bank loans | Active | Finance | The Ministry of Minerals and Energy has partnered with commercial banks to offer loans for rooftop solar installations. Terms were not published. | Announced June 2026 |
| Free household electricity connection | Active | Connection subsidy | Replaced the National Electricity Standard Connection Cost (P5,000 / P2,500) with free connections for all households. Funded by the 10-thebe/kWh levy; in August 2026 BPC reported a backlog of 25,349 meters. | 2024 – present |
| Domestic first-band tariff reduction | Active | Social tariff | The price of the first 200 kWh a month was cut by 30% in July 2025 and remains below the second band after the August 2026 increase. | July 2025 – present |
| Renewable energy certificates (I-REC) | Scheduled | Certificates | Botswana is registered under I-REC; BPC plans to offer certificates from IPP solar to customers. Debswana signed the first agreement. | — |
Data and connectivity.
- Fixed broadband
- 143,628 fixed broadband subscriptions (2024)Source 31BOCRA figure reported by the US Commercial Service.
- 4G coverage
- 98.2 % population coverage (2024)Source 31BOCRA figure reported by the US Commercial Service; the data year is not stated, and 2024 is assumed from the accompanying subscription figures.
- 5G coverage
- 41.9 % population coverage (2024)Source 31Mascom is the only operator with 5G. The data year is not stated, and 2024 is assumed from the accompanying subscription figures.
Mobile coverage is the main communications route. BOCRA reports 4G coverage of 98.2% and 5G coverage of 41.89%, with 4.43 million mobile subscriptions against only about 144,000 fixed broadband lines. In the 2022 census 57.4% of people used the internet.
Household meters are mostly offline STS prepaid meters, with tokens sold over USSD, apps and banking channels. Split smart meters with customer interface units are being procured. No national meter communications standard or data platform had been published, and remote monitoring of rooftop systems depends on the installer’s own equipment and mobile data.
Grid conditions.
- National peak demand
- 0.7 GW (2026)Source 11About 700 MW, as stated by the Minister in March 2026.
- Annual electricity demand
- 4.38 TWh (2025)Source 21Electricity distributed (local generation 2.52 TWh plus imports 1.86 TWh). The Ministry gives annual consumption as about 4,800 GWh.
- Generation capacity
- 1 GW (March 2026)Source 12Derived: Morupule A 132 MW + Morupule B 600 MW + Orapa 90 MW + Matshelagabedi 70 MW + 109.3 MWp grid solar (BPC). Available capacity is lower: Morupule A is quoted at about 100 MW and the Ministry said average output from both coal stations was about 400 MW.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The main constraint is supply, not network capacity. With no reserve margin, BPC depends on imports and emergency diesel when Morupule units trip, and uses rotational load shedding when imports are expensive or unavailable. BPC reports that the time to repair a failed coal unit has fallen to about 12 days and that units now run about 120 days between failures, and it expects local generation to cover at least 72% of demand once Morupule B remediation and the new solar plants are complete.
On the network side, the transmission grid is being extended in the north-west and towards Tsabong, new 132 kV substations have opened at Mochudi and Tlokweng, and new 400 kV interconnectors to South Africa and Zambia are planned. Rooftop connections are checked feeder by feeder. The RTS rules cap inverter generation on protected area networks at 10% of annual load or 100 kW, and BPC can refuse or charge for upgrades where a feeder is full.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Uniform 9% tariff increase and kVA demand charging | Current | 1 August 2026 | BERA approved a 9% increase for all customer classes. Business demand charges moved to kVA, and maximum demand is now based on a six-month window. |
| Rooftop Solar cap raised to 75 MW | Current | 2026 | Revised RTS guidelines raised the aggregate cap from 50 MW to 75 MW, and the Ministry arranged bank loans for installations. |
| Unbundling of BPC generation | Current | Began 15 July 2025 | A Cabinet directive to unbundle and corporatise BPC’s generation business is being implemented; transmission and distribution stay as regulated monopolies. |
| Electricity supply industry legislation | Upcoming | Expected by Q2 2026/27 (July–September 2026) | Amendments to create a transmission system operator with open network access, allow Independent Transmission Providers and move towards a more liberalised market. Passage had not been confirmed as of October 2026. |
| Performance-based multi-year tariff framework | Upcoming | Not announced | BERA has been mandated under the National Energy Compact to introduce multi-year tariffs that are cost-reflective for those who can pay, with social tariffs for low-income customers. |
| Split smart meter procurement | Upcoming | Provisional award July 2026 | BPC tender 7392/25-01 for single- and three-phase split smart meters and customer interface units awaits final award. |
| Mmamabula 600 MW coal IPP | Upcoming | Q1 2027 (300 MW); 2028 (remaining 300 MW) | Under construction; intended to reduce reliance on imports. |
| Grid battery storage procurement | Upcoming | Tender preparation (March 2026) | 50 MW of BESS at Mmadinare and Jwaneng, plus the 500 MWh battery at the Maun solar project. |
| Morupule A decommissioning | Upcoming | 2028 | The site may be repurposed, including for solar PV. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | About 28 MW commissioned across all Rooftop Solar participants by March 2026, against 571,116 domestic customers; 20% of the national cap is reserved for households. |
| Distributed energy market | Low | Distributed generation is limited to the capped RTS scheme (75 MW cap) and small solar IPPs; no aggregation or third-party supply is allowed. |
| Grid flexibility market | Low | No ancillary-services or flexibility market; balancing, demand-side management and load shedding are run inside BPC. |
| Energy storage adoption | Low | No operating grid-scale battery identified; 50 MW at tender preparation and the 500 MWh Maun project under construction. |
| Renewable growth environment | High | Solar share of local generation rose from 3.2% (Q1 2025) to 9.1% (Q1 2026), with 100 MW Jwaneng and 500 MW Maun in the pipeline and a 50% renewables target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 33 sources
- Electricity Tariff Adjustments, 1st August 2026 (VAT inclusive) – Tariffs Information. Botswana Power Corporation, 2026. accessed 1 October 2026.
- Electricity Tariff Adjustments, 1st July 2025 (VAT inclusive). Botswana Power Corporation, 2025. accessed 1 October 2026.
- Public Statement: Adjustment of BPC Electricity Tariffs for the 2026/27 Financial Year. Botswana Energy Regulatory Authority, 2026. accessed 1 October 2026.
- Public Notice: BPC 2026-27 Electricity Tariff Application. Botswana Energy Regulatory Authority, 2025. accessed 1 October 2026.
- 2026–2027 BPC Electricity Tariff Application Consultation Paper. Botswana Power Corporation / BERA, 2025. accessed 1 October 2026.
- Electricity Regulation: licensing of electricity sector activities. Botswana Energy Regulatory Authority, 2026. accessed 1 October 2026.
- Rooftop Solar Guidelines (June 2020). Ministry of Mineral Resources, Green Technology and Energy Security, 2020. accessed 1 October 2026.
- Rooftop Solar Guidelines (Amendment), 2024 – Revision 1 of 2024. Ministry of Minerals and Energy, 2024. accessed 1 October 2026.
- Rooftop Solar Program Rules. Botswana Energy Regulatory Authority, 2021. accessed 1 October 2026.
- Botswana Enhances Energy Security Through Rooftop Solar Programmes (RTS). YourBotswana (citing the Ministry of Minerals and Energy), 2026. accessed 1 October 2026.
- Budget 2026/27: Ministry of Minerals and Energy Committee of Supply Speech. Parliament of Botswana, 2026. accessed 1 October 2026.
- Our Customer Base. Botswana Power Corporation, 2025. accessed 1 October 2026.
- Botswana Power Corporation Electricity Generation Update. Botswana Power Corporation, 2026. accessed 1 October 2026.
- Demand Side Management. Botswana Power Corporation, 2025. accessed 1 October 2026.
- Frequently Asked Questions (Load Management, SmartPower App). Botswana Power Corporation, 2025. accessed 1 October 2026.
- Payment Methods. Botswana Power Corporation, 2025. accessed 1 October 2026.
- Technical Services request form. Botswana Power Corporation, 2025. accessed 1 October 2026.
- Rebuttal statement: Tender for the supply and delivery of single-phase and three-phase split smart meters and customer interface units. Botswana Power Corporation, 2026. accessed 1 October 2026.
- BPC staff recognised at Solar Inspections certificate handover ceremony. Botswana Power Corporation, 2026. accessed 1 October 2026.
- Supply of renewable electricity to Debswana operations. Botswana Power Corporation, 2025. accessed 1 October 2026.
- Electricity Generation and Distribution Stats Brief, Fourth Quarter 2025. Statistics Botswana, 2026. accessed 1 October 2026.
- Electricity Generation and Distribution Stats Brief, First Quarter 2026. Statistics Botswana, 2026. accessed 1 October 2026.
- Population and Housing Census 2022: Key Demographic and Socio-Economic Indicators. Statistics Botswana, 2022. accessed 1 October 2026.
- Population and Housing Census 2022 Analytical Report, Volume 3 (Gender, Disability, Nuptiality, Migration and Urbanization). Statistics Botswana, 2022. accessed 1 October 2026.
- National Energy Use Survey 2022/23 Main Report. Statistics Botswana / Department of Energy, 2023. accessed 1 October 2026.
- BPC Targets 50 per cent Renewable Energy By 2030. Daily News (Government of Botswana), 2026. accessed 1 October 2026.
- Free electricity connection programme: meter and cable shortfall. Daily News (Government of Botswana), 2026. accessed 1 October 2026.
- Take advantage of zero electricity connection fee. Mmegi, 2024. accessed 1 October 2026.
- Botswana breaks ground on landmark 500MW Maun solar project. Government of Botswana, 2026. accessed 1 October 2026.
- Exchange Rates (BWP against major currencies). Bank of Botswana, 2026. accessed 1 October 2026.
- Botswana Country Commercial Guide: Telecommunications. International Trade Administration (US Department of Commerce), 2025. accessed 1 October 2026.
- Prepaid Electricity User Guide (beMobile *174#). First National Bank Botswana. accessed 1 October 2026.
- Morupule B Power Station Project ESIA – Executive Summary (prepared for BPC). World Bank Documents & Reports (Ecosurv for Botswana Power Corporation), 2007. accessed 1 October 2026.
Questions about energy in Botswana.
From 1 August 2026 BPC charges households P0.7507/kWh for the first 200 kWh a month and P1.5637/kWh above that, plus a fixed charge of P35.12 a month and a 10-thebe/kWh levy. The prices include VAT. The first band is about EUR 0.05/kWh.
Botswana Power Corporation (BPC), a state-owned utility, is the only supplier to grid customers. It also owns the transmission and distribution networks and the meters, and BERA approves its tariffs.
Yes, through the Rooftop Solar Programme. You apply to BPC, sign an Interconnection Agreement and receive a bi-directional meter. Each exported kWh offsets one imported kWh on the energy part of your bill, and credits are banked for six months. Households can install up to 13.8 kW single-phase or 35 kW three-phase.
There is no separate supply-point number. A connection is identified by the BPC contract account number on your bill and by the meter number. Prepaid customers buy tokens using the 11-digit meter number.
Not for systems up to 100 kW, which need only BPC’s permit (Interconnection Agreement and Certificate of Completion). Systems above 100 kW, up to the 1 MW programme limit, also need a licence from BERA. Installation must be done by a licensed electrician, technician or engineer.
Solar produced 9.1% of electricity generated in Botswana in the first quarter of 2026, with coal providing almost all the rest. Botswana also imports a large share of its electricity, mostly from South Africa. The government targets 50% renewable electricity by 2030.
The Morupule B coal station has had technical defects since it opened, and local plants cannot meet peak demand of about 700 MW. In 2025 imports supplied about 43% of electricity distributed, mainly from Eskom, ZESCO and NamPower.