Energy in South Africa, explained.

How electricity works in South Africa: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in South Africa: Not yet available.Olmack is not offered in South Africa yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in South Africa.

South Africa electricity 2026: Eskom and municipal tariffs, NERSA, NTCSA, STS prepaid meters, rooftop solar registration, Homeflex net billing, SAWEM and IRP 2025.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in South African rand (ZAR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

South Africa energy at a glance.

Key figures for households in South Africa. Each one links to its source on the full overview below.

  • Electricity price.

    3.436 ZAR per kWh for households, including taxes. Figures for Apr 2026–Mar 2027.

  • Renewable share.

    13.6% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in South Africa.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for South Africa below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications South Africa requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in South Africa.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in South Africa, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in South Africa, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in South Africa.

Full overview

The energy market in South Africa, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

South Africa’s power system is still dominated by Eskom, the state-owned utility that owns most generating capacity, but the industry is in the middle of a legal and structural reform. Transmission and system operation moved into a separate Eskom subsidiary, the National Transmission Company South Africa (NTCSA), in July 2024; the Electricity Regulation Amendment Act came into force on 1 January 2025; and a South African Wholesale Electricity Market (SAWEM), run by NTCSA as market operator, is being prepared. Distribution is split between Eskom and the electricity departments of the municipalities, which between them deliver about 60% of electricity to end users.

Households cannot choose their supplier. They buy from whichever licensed distributor serves their address, Eskom or the municipality, at tariffs approved each year by the National Energy Regulator of South Africa (NERSA). Eskom’s direct-customer tariffs rose by an average of 8.76% on 1 April 2026 and its bulk tariffs to municipalities by 9.01% on 1 July 2026. More than 80% of households pay for electricity in advance using prepaid meters built on the Standard Transfer Specification (STS), a 20-digit token system that originated in South Africa.

Coal still produced about 81% of electricity in 2025, but rooftop and other privately owned solar has grown very quickly since the load-shedding crisis of 2022–2023: NTCSA estimated 9.4 GW of rooftop and unregistered-contract PV in August 2026, more than three times the utility-scale PV contracted to the grid. Load-shedding has not been implemented since 16 May 2025.

Energy snapshot.

Headline figures for electricity in South Africa. Each shows its data year and links to its source.

  • Population63,100,945 peopleSource 10mid-2025
  • Households19,551,000 householdsSource 112024
  • Average household size3.2 people/householdSource 112024–2025
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (ZAR)3.436 ZAR/kWhSource 1Apr 2026–Mar 2027
  • Household price (EUR)0.185 EUR/kWhSource 7Apr 2026–Mar 2027
  • Renewable electricity share13.6%Source 132025
  • Solar capacity12.2 GWSource 15August–September 2026
  • Wind capacity4.14 GWSource 15September 2026
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Limited
Home equipment in grid services
Developing
Regulator
National Energy Regulator of South Africa (NERSA)
System operator
National Transmission Company South Africa (NTCSA), an Eskom subsidiary
Distribution networks
Eskom Distribution plus municipal distributors, including the eight metropolitan municipalities; municipalities distribute about 60% of electricity
Currency
South African rand (ZAR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in South Africa.

Household price (ZAR)
3.436 ZAR/kWh (Apr 2026–Mar 2027)Source 1Eskom Homelight 60A energy charge, including 15% VAT, for Eskom direct (non-local-authority) customers. This is a single all-in c/kWh rate with no fixed charge. Homepower 4 customers pay 355.56c/kWh (energy, network demand and ancillary charges combined) plus about R17.86 a day in fixed charges. Municipal tariffs differ, e.g. City of Cape Town Domestic block 1 is 413.79c/kWh from 1 July 2026.
Household price (EUR)
0.185 EUR/kWh (Apr 2026–Mar 2027)Source 7Converted from R3.4361/kWh at the ECB reference rate of 30 September 2026 (EUR 1 = ZAR 18.6123).
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (ZAR per kWh).Source 1

2.372.9033.4362023/24 (block 1)2024/25 (block 1)2025/262026/27
South Africa household electricity price, ZAR per kWh
2023/24 (block 1)2.3697 ZAR/kWh
2024/25 (block 1)2.6716 ZAR/kWh
2025/263.1593 ZAR/kWh
2026/273.4361 ZAR/kWh

How tariffs are set

NERSA sets Eskom’s allowed revenue for multi-year periods and approves the annual percentage increase. For 2026/27 it corrected a R54.7 billion error in Eskom’s regulatory asset base, so the increase for Eskom direct customers rose to 8.76% from 1 April 2026, rather than the 5.36% approved earlier in the MYPD6 decision, and the increase for municipalities (which buy in bulk from Eskom) to 9.01% from 1 July 2026. Each municipality then applies for its own retail tariffs, based on its bulk purchase cost and cost-of-supply study; these must also be approved by NERSA.

Structure of Eskom residential tariffs

Eskom’s residential suite is Homelight (subsidised, energy charge only), Homepower (single energy rate plus daily network capacity, generation capacity and service charges) and Homeflex (time-of-use). For 2026/27 Eskom doubled the fixed share of the Homepower and Homeflex service and administration charge to 66.66% of its cost-reflective value, and lowered energy rates to compensate. Homelight subsidies are funded by an affordability subsidy charge paid by non-local-authority customers, and rural network subsidies by an electrification and rural subsidy charge.

Taxes and municipal surcharges

Tariffs carry 15% VAT. Municipalities add a surcharge on the electricity they resell, which funds other municipal services, so municipal customers usually pay more than Eskom direct customers in neighbouring areas. City of Cape Town tariff schedules, for example, show a separate unregulated component of 11.45c/kWh within the energy charge for 2026/27.

Trend

Eskom tariffs have risen much faster than inflation for more than 15 years. Homelight 60A cost 236.97c/kWh (block 1) in 2023/24 and 343.61c/kWh in 2026/27. In 2025/26 Eskom removed the inclining-block structure from Homelight and introduced fixed charges on Homepower, which raised costs for low-use Homepower customers. Falling sales — Eskom sold 178 TWh in 2025/26, its lowest in 18 years — are partly a response to these price rises, as households and businesses install their own solar.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesAll household tariffs are regulated. NERSA sets Eskom’s allowed revenue through the multi-year price determination (MYPD6) and approves each municipality’s tariffs every year. Eskom direct-customer tariffs change on 1 April, municipal tariffs on 1 July.
PrepaymentYes81.0% of households used electricity from prepaid meters in 2024 (GHS 2024). Customers buy STS tokens from vendors, banks, retailers or apps and enter the 20-digit code on the meter keypad. For Eskom Homepower prepaid, the variable and fixed parts are combined into one c/kWh rate and one R/day charge on the vending system.
OtherYesSubsidised low-use tariffs: Eskom Homelight 20A (270.30c/kWh incl. VAT) and Homelight 60A (343.61c/kWh), and municipal "lifeline" or indigent tariffs. Qualifying poor households also receive Free Basic Electricity, a free monthly allocation of units administered by the distributor.
Time-of-useLimitedEskom Homeflex is a seasonal three-period time-of-use tariff (high-demand season June–August). It is mandatory for Eskom residential customers with grid-tied generation and optional for others. The City of Cape Town introduced an opt-in residential time-of-use tariff for customers with AMI meters from 1 July 2026. Most municipalities offer only inclining-block or flat tariffs to homes.
FixedLimitedSeveral distributors combine an energy charge with a monthly or daily fixed charge, for example Cape Town’s Home User tariff (R424.30 a month plus 355.95–469.06c/kWh from 1 July 2026). These are fixed charges, not fixed-price contracts: there are no competitive fixed-term retail offers for households.
DynamicNoNo household tariff follows wholesale prices. A day-ahead price will only emerge once SAWEM starts trading.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
3,660 kWh/person/yr (all sectors) (2025)Source 13Total electricity demand (236.8 TWh) per person, all sectors, as published by Ember. Residential consumption alone is much lower.
Heat pumps
Not identified from a reliable public source.
Air conditioning
6.6 % of households (2024)Source 11Households owning air conditioning (8.4% urban, 8.1% metro, 2.4% rural).
Electric vehicles
3,898 plug-in cars sold in 2025 (2025)Source 41Derived: 1,088 battery electric plus 2,810 plug-in hybrid new vehicle sales reported by naamsa. Brands that do not report to naamsa (including BYD) are excluded. A further 12,818 conventional hybrids were sold.
Electric cooking
77.3 % of households (main cooking fuel) (2024)Source 11Mains electricity as main energy source for cooking; a further 4.5% cooked with electricity from other sources such as generators. 88.3% of households own an electric stove.

Electricity access has widened since 2002, when 76.7% of households were connected to mains supply; GHS 2024 put the figure at 90.2% and GHS 2025 at 90.6%. Most connected homes buy prepaid electricity (81.0% of all households), 11.3% are billed on conventional meters, and 7.7% get electricity from another source such as a landlord or neighbour — 15.4% in Gauteng and 19.4% in the City of Johannesburg.

Household demand is shaped by electric cooking (77.3% of households), electric water heating in suburban homes, and widespread use of portable heaters in the Highveld winter, which is why Eskom’s tariffs and the national peak are highest in June–August. Air conditioning is uncommon (6.6% of households). Appliance ownership is high in urban areas: 84.3% of urban households own a fridge and 47.4% a washing machine.

Electric vehicles are still a very small market. naamsa recorded 1,088 battery electric and 2,810 plug-in hybrid sales in 2025, out of a new-vehicle market in which new-energy vehicles (including conventional hybrids) were 2.8% of sales.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
60.1 % of households (2024)Source 11Owned, whether or not fully paid off. A further 14.8% occupied their dwelling rent-free.
Private rented
25.1 % of households (all rented) (2024)Source 11All rented dwellings; not split between private and public landlords. Renting is most common in Gauteng (39.1%).
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
63.8 % of population (2025)Source 43

Housing in South Africa ranges from suburban freestanding houses with large roofs to state-subsidised "RDP" houses, informal dwellings and traditional homesteads. In 2024, 84.1% of households lived in formal dwellings, 11.7% in informal dwellings (18.6% in the Western Cape) and 3.9% in traditional dwellings, concentrated in the Eastern Cape and KwaZulu-Natal.

Three-fifths of households (60.1%) own their home and a quarter rent, with renting far more common in Gauteng (39.1%) than in Limpopo or the Eastern Cape. Rooftop solar is concentrated in owner-occupied suburban houses and on commercial roofs: in GHS 2024, 3.0% of households owned solar panels, rising to 4.4% in metropolitan areas and 1.1% in rural areas.

Informal settlements and backyard dwellings often have no metered connection of their own and receive electricity through a landlord, neighbour or illegal connection, which complicates both billing and the registration of small generators.

How the grid works in South Africa.

  1. TransmissionNational Transmission Company South Africa (NTCSA), NTCSA System Operator
  2. DistributionEskom Distribution plus municipal distributors, including the eight metropolitan municipalities; municipalities distribute about 60% of electricity
  3. MeteringDistributor-owned meters (STS prepaid, conventional, smart)
  4. Supply6 or more retail suppliers

Physical flow

Eskom’s coal stations in Mpumalanga and Limpopo, the Koeberg nuclear station near Cape Town, pumped storage schemes and around 7.9 GW of contracted renewable IPPs (mostly in the Northern, Eastern and Western Cape) feed the transmission grid operated by NTCSA. Power is stepped down to Eskom Distribution networks or to municipal intake points, and then reaches homes at 230 V single-phase or 400 V three-phase. South Africa also trades with neighbouring countries through the Southern African Power Pool and was a net exporter of 5.9 TWh in 2025.

Commercial flow

NTCSA currently buys electricity from Eskom’s generation division and from IPPs under long-term power purchase agreements signed through the government’s REIPPPP and related programmes, and sells it on to Eskom Distribution, municipalities and large direct customers at NERSA-regulated tariffs. Municipalities resell to their residents with a surcharge. Private generators can also sell directly to customers by wheeling power over the network, either through a licensed trader or bilaterally.

The reform programme

The Electricity Regulation Amendment Act 38 of 2024, in force since 1 January 2025, provides for an independent transmission system operator within five years (NTCSA fills the role in the meantime), a market operator, a central purchasing agency to take over existing IPP contracts, and a competitive wholesale and retail trading framework overseen by NERSA. NERSA approved NTCSA’s market operator licence in November 2025. NTCSA submitted the Market Code to NERSA on 25 February 2026; NERSA held a public hearing on 1 July 2026 and expected to finalise the trading rules by 30 September 2026.

Municipal finances

Municipal non-payment is the system’s main financial weakness. Municipal arrear debt to Eskom was R111.6 billion at the end of March 2026. Where municipalities fail to pay, Eskom has interrupted bulk supply, and NERSA is developing performance indicators for municipal distributors.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryDepartment of Electricity and Energy (DEE)Formed in 2024 from the energy functions of the former Department of Mineral Resources and Energy and the Ministry of Electricity. Owns the Integrated Resource Plan (IRP 2025), issues section 34 determinations for new capacity, and oversees the Independent Power Producer Office procurement programmes.
RegulatorNational Energy Regulator of South Africa (NERSA)Licenses and registers generation, transmission, distribution, trading and market operation under the Electricity Regulation Act; approves Eskom and municipal tariffs; approves the Grid Code and Market Code; and is drafting trading rules, the wholesale tariff methodology and municipal performance indicators.
TSONational Transmission Company South Africa (NTCSA)Wholly owned Eskom subsidiary that began trading on 1 July 2024. Owns and operates the transmission grid, houses the System Operator, buys power from Eskom generators and IPPs as the central buyer, and trades with the Southern African Power Pool. Under the 2024 Amendment Act it acts as transitional transmission system operator until an independent TSO is established within five years.
System operatorNTCSA System OperatorBalances supply and demand, procures operating reserves (instantaneous, regulating, ten-minute, supplemental and emergency reserves) and publishes the weekly system status report, including rooftop PV estimates.
DSOEskom Distribution and municipal distributorsEskom Distribution supplies homes directly in many townships, rural areas, farms and some suburbs; municipalities (8 metros and many local municipalities) distribute in the remaining areas and buy bulk power from Eskom. Municipalities distribute about 60% of electricity to end users and Eskom about 40%. A few private licensed distributors serve specific estates and industrial sites.
SupplierThe local distributor (no retail choice)Households are supplied by their licensed distributor. Licensed private traders sell to larger businesses through wheeling over the Eskom or municipal network.
MeteringDistributor-owned meters (STS prepaid, conventional, smart)Each distributor owns and reads its own meters. Prepaid meters follow the STS (IEC 62055-41) token standard, maintained by the STS Association, which allocates manufacturer codes and manages the encryption keys used by vending systems.
ExchangeSouth African Wholesale Electricity Market (SAWEM)Planned day-ahead and intraday market operated by NTCSA under a Market Code, initially targeted for 1 April 2026 and then for the third quarter of 2026.

Compared with the UK system.

Compared with the UK system.
UK conceptSouth Africa equivalentHow it works
DNOLicensed distributor: Eskom Distribution or the municipalityThere are no regional network companies. Whether Eskom or the municipality owns the local network depends on historic supply areas, so neighbouring suburbs can have different distributors. The distributor owns the network and the meter, handles connections and outages, and is also the household’s retailer.
National Grid/NESONTCSA (transmission owner, System Operator and central buyer)One Eskom subsidiary combines the roles of transmission owner, system operator and, until SAWEM matures, the buyer of power from Eskom and IPP generators.
MPANMeter number (STS decoder reference number) and distributor account numberThere is no national supply-point number. For prepaid homes the practical identifier is the 11- or 13-digit STS meter number, which identifies the meter, not the connection, and changes if the meter is replaced. Billed customers are identified by the distributor’s own account and premises references.
MPRNNo equivalentThere is no national piped-gas network for homes; most gas cooking uses LPG cylinders (7.2% of households cooked mainly with gas in 2024). The few piped-gas suppliers use their own account numbers.
Meter operatorThe distributorDistributors buy, install and maintain meters themselves or through contractors. There is no separate competitive metering role.
SupplierThe distributor (Eskom or municipality); licensed traders for businessesHouseholds cannot switch supplier. NERSA has licensed private traders, which sell renewable power mainly to commercial and industrial customers using wheeling arrangements.
Smart-meter infrastructureDistributor-run AMI and prepaid smart metersNo national communications network or data hub exists. Each distributor runs its own head-end systems; Eskom reported 1.76 million smart meters by June 2026, mostly prepaid smart meters installed to tackle non-payment and illegal connections.

How a supply point is identified.

0457 1234 5678 4 (fictional 13-digit meter number)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?STS meter number (decoder reference number, DRN) (DRN)
Who issues it?Allocated by the meter manufacturer under a manufacturer code assigned by the STS Association; linked to the property by the distributor’s vending or billing system
FormatManufacturer code (2 or 4 digits) + 8-digit unique serial + 1 Luhn check digit. Older meters use 2-digit codes (MM UUUUUUUU L); since about 2015 only 4-digit codes are issued (MMMM UUUUUUUU L).
Length11 or 13 digits
Stays with the property when you switch supplier?No
Where to find itPrinted on the prepaid meter or its keypad unit and on every token receipt, which also shows details such as the key revision number. Billed (conventional or credit) customers find their account number on the municipal or Eskom bill.
Electronic accessVendors (banks, retailers, apps) submit the meter number to the distributor’s online vending system, which looks up the supply group, tariff and key and returns a 20-digit encrypted token. Eskom publishes the technical specifications for online vendors.
Third-party accessThere is no consumer data-sharing scheme. Installers and energy service companies get the meter or account number from the customer. Interval data from smart meters is held by the distributor and released at the customer’s request under its own procedures.
Who keeps the registerEach distributor keeps its own customer and meter records in its billing and vending systems. The STS Association keeps the register of manufacturer codes and key management, not of customers or addresses.
Register scopePer DSO

No national supply-point register

South Africa has no equivalent of a national meter point number. Because households cannot switch supplier, there has never been a need for a central registry of supply points. Each distributor identifies a connection in its own systems by account number, erf (plot) or stand number and meter number, and these formats differ between Eskom and each municipality.

The STS meter number

For the 81% of households on prepaid meters, the number that matters is the STS decoder reference number, usually just called the meter number. It is allocated by the manufacturer: the first two or four digits are a manufacturer code issued by the STS Association, followed by an eight-digit serial number and a Luhn check digit, which lets vending systems detect typing errors. It identifies the meter, not the supply point: if the meter is replaced, the household gets a new meter number and the distributor relinks the account.

How tokens work

When a customer buys electricity, the vendor sends the meter number to the distributor’s vending system. The system encrypts the purchase using a key derived from the meter number and the distributor’s supply group code, and returns a 20-digit token that only that meter can accept. Because the token carries the value, no communication with the meter is needed. Key change tokens update the meter’s keys; in 2024 every STS meter had to be moved from key revision 1 to 2 by entering two key change tokens before 24 November 2024, when the token identifier counter (which counts minutes from 1993) rolled over.

Smart and billed meters

Conventional and smart credit meters are identified by the distributor’s meter serial and account numbers. Eskom’s prepaid smart meters still accept STS tokens but can also be read and controlled remotely. Generation registrations are recorded against the customer’s account, and Eskom converts registered residential customers to the Homeflex tariff with a bidirectional meter.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingYes
How exported electricity is paidDistributor-set: Eskom credits exported kWh at Gen-offset Homeflex rates, capped at consumption in each time-of-use period; municipalities set their own feed-in or credit rates where they allow export
Is there net metering?No. Eskom uses net billing: exports are credited at the Gen-offset Homeflex rate for each time-of-use period (2026/27, incl. VAT: 164.11c/kWh off-peak to 366.15c/kWh peak in the low-demand season), but credited exports cannot exceed the energy imported in that period during the month. Import is charged at full Homeflex rates.
How much does Cape Town pay for export?From 1 July 2026 the City of Cape Town buys excess generation from approved residential SSEG customers on the Home User tariff at 124.18c/kWh plus a feed-in incentive of 28.75c/kWh (both incl. VAT). Credits offset the bill, and the green attributes pass to the City.
What are the simplified connection limits?Under NRS 097-2-3, systems up to 350 kVA on the low-voltage network can use the simplified criteria. On a shared LV feeder the generator must be below 25% of the customer’s notified maximum demand, up to 20 kVA; on a dedicated feeder up to 75%. Systems above 4.6 kVA must be balanced across phases (a single-phase dedicated connection may take up to 13.8 kVA). Total SSEG under a transformer is also capped.
Do off-grid or non-exporting systems need registration?Yes, if they are connected to the distributor’s network in any way. Eskom states that national regulations require all SSEG systems under 100 kW connected to the network to be registered, including systems that do not export. Fully islanded systems with no connection are exempt.
Is there a registration fee?Eskom waived registration and connection fees (up to R10,000 for urban and residential customers, R36,000 for rural customers) and the smart meter cost for systems up to 50 kW until 30 September 2026. Municipal fees vary.
Can a household sell power to someone else?Not in practice. Wheeling to third parties needs a connection and wheeling agreement with the network owner and, if the power is sold to others, registration with NERSA and normally a licensed trader. It is used by commercial generators, not homes.

Connecting a home system.

  1. Check that the distributor (Eskom or the municipality) allows grid-tied generation at the address and obtain its application form. Unregistered grid-tied systems are not permitted.
  2. Design the system to NRS 097-2-1 (inverter utility interface) and the NRS 097-2-3 simplified connection criteria; larger or non-compliant systems need a grid impact study.
  3. Use an inverter with an NRS 097-2-1 type-test certificate. A registered electrical contractor installs the system to SANS 10142-1 and SANS 10142-1-2 and issues a Certificate of Compliance.
  4. Submit the application with the CoC, inverter test certificate and commissioning or installation test report; some municipalities also require sign-off by a registered engineer or technologist.
  5. The distributor approves the connection and installs or reprograms a bidirectional meter. Eskom moves registered households to the Homeflex time-of-use tariff.
  6. Exported energy is credited on the account monthly under the distributor’s SSEG tariff.

South African households can connect solar PV and batteries to the grid and receive credit for exports, but the rules are set by each distributor rather than nationally, and some smaller municipalities still do not allow export or charge high fees. Eskom and the large metros have formal small-scale embedded generation (SSEG) processes based on NRS 097-2-1, NRS 097-2-3 and SANS 10142-1-2.

Compensation is modest compared with import prices. Eskom’s Gen-offset credit uses Homeflex energy rates excluding part of the generation capacity charge and the service charge, and is capped at monthly consumption per time-of-use period, so a household cannot become a net seller. Cape Town pays a fixed feed-in rate plus an incentive, credited against the bill, with cash paid out only in limited cases.

A large share of systems were installed during load-shedding without registration, many with batteries for backup. Distributors have used fee waivers and amnesty campaigns to bring them onto their records, because unregistered inverters create safety risks for line workers and hide demand from network planners.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityLicence from NERSA under the Electricity Regulation Act unless exempt under Schedule 2. Exempt without registration: facilities with no grid connection, standby or backup only, supply to customers without wheeling, and facilities up to 100 kW that meet the Grid Code and distributor conditions. Exempt but must register with NERSA: connected facilities of any size that wheel under a connection agreement, or that neither import nor export.NERSA; the distributor (connection approval)Schedule 2 as substituted in January 2023 removed the earlier 100 MW cap, so large embedded plants supplying their own or wheeled load now register rather than hold a licence. IPPs selling to NTCSA under government programmes hold generation licences.
Store electricityEmbedded generation combined with energy storage is exempt from licensing irrespective of size if it meets Code requirements, subject to registration with NERSA. Home batteries behind the meter fall within the SSEG process of the distributor.NERSA; distributorUtility-scale stand-alone storage procured under the BESIPPPP programme is contracted to NTCSA and licensed by NERSA.
Export to the gridNo licence for small systems; requires the distributor’s SSEG approval, a compliant inverter, a Certificate of Compliance and a bidirectional meter. Eskom requires the Homeflex tariff.Eskom or municipalityEach municipality sets its own SSEG policy, fees and credit rates in its tariff book, which NERSA approves.
Supply / sell electricity to consumersDistribution licence for the network operator that sells to end users. Resale at or below the distributor’s tariff (for example by a landlord or body corporate) is exempt from licensing if a service delivery agreement with the distributor is in place, subject to registration.NERSAHousehold retail competition does not exist; the local distributor is the only seller to homes.
Distribute electricityDistribution licence from NERSA. Eskom, municipalities and a small number of private companies (for example Sasol and AECI sites) hold distribution licences. Reticulation that only links generation facilities to a connection point is exempt with registration.NERSAMunicipalities have a constitutional responsibility for electricity reticulation; SALGA has litigated for exclusive municipal distribution rights.
Trade electricityTrading licence from NERSA. Licences have been granted to private traders including PowerX, EnPower Trading, Envusa Trading, Discovery Green and NOA Trading, and to NTCSA for trading and cross-border trading.NERSANERSA’s trading rules (covering wheeling credits, top-up energy and non-bypassable charges) were in consultation in 2026, with finalisation expected by 30 September 2026.
Wholesale market participationRegistration as a participant under the Market Code administered by NTCSA as market operator, once SAWEM begins operating. Participants will normally need a generation, trading or distribution licence.NTCSA (market operator); NERSA (Market Code approval)Launch was moved from 1 April 2026 to the third quarter of 2026 to complete market, operational and regulatory requirements.
Balancing and ancillary servicesNo separate licence; providers contract with the NTCSA System Operator and must meet the Grid Code and the Ancillary Services Technical Requirements. Demand response may provide some reserves.NTCSA System Operator; NERSA (Grid Code)Reserves are mostly provided by Eskom generators, pumped storage and contracted industrial demand response; there is no route for aggregated household assets.
Aggregation / virtual power plantNo specific licence or aggregator role exists. An aggregator selling energy would need a trading licence; one providing services to NTCSA would contract under the System Operator’s procurement rules.NERSA; NTCSAMunicipal ripple-control of geysers is the main existing form of household load control.
Remote control of household assetsNo licensing regime. Remote control of geysers by municipalities and Eskom’s remotely controllable smart meters are operated by the distributor under its supply conditions.DistributorThird-party control of inverters and batteries is not regulated specifically; inverter settings must still comply with NRS 097-2-1.

The Electricity Regulation Act 4 of 2006, as amended by Act 38 of 2024, requires a NERSA licence to generate, transmit, distribute, trade, import or export electricity, or operate a market, unless an activity is exempted in Schedule 2. Schedule 2 was rewritten in 2022 and corrected in January 2023, and is now the main route for private generation: most embedded plants are exempt from licensing but must register with NERSA if they wheel power or connect without exporting, while small systems up to 100 kW need only the distributor’s approval.

For households this means no national licence or registration is needed for rooftop solar or a home battery, but the distributor’s SSEG approval is compulsory for any system connected to the grid. The new market framework adds licences for traders and a market operator; the role of independent aggregators of household devices is not yet defined.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Operating reserves (instantaneous, regulating, ten-minute, supplemental, emergency)Restricted—NoNTCSA System Operator. Reserve requirements are set annually in the Ancillary Services Technical Requirements. Instantaneous reserve can be provided by generators or demand-side load; providers are mainly Eskom plant and large industrial customers.
Demand response (industrial)Restricted—LimitedNTCSA / Eskom. Contracted interruptible load from large industrial customers, used during system emergencies. Household participation is not available.
Wholesale (SAWEM day-ahead and intraday)Developing—UnknownNTCSA (market operator). Planned to start with day-ahead and intraday trading. Rules for small and aggregated participants have not been published.
Battery storage IPP procurementYesUtility scale (e.g. 77–153 MW per BW1 project)NoIPP Office / NTCSA. Competitive tenders for grid-scale batteries under long-term contracts with NTCSA. Bid Window 1 awarded 513 MW/2,052 MWh across five Northern Cape and North West substations.
Municipal load controlRestricted—NoMunicipalities. Ripple-control or smart-meter switching of geysers and load limiting to reduce peaks; mandatory where installed, not a paid market.

Distributed energy resources cannot yet earn money from flexibility services in South Africa. Reserves are procured by the NTCSA System Operator mainly from Eskom’s fleet and large industrial loads, and there is no aggregator role in the Grid Code or the draft market rules. Household batteries are used for backup and self-consumption, and Homeflex owners can shift use to cheaper periods.

This may change as SAWEM introduces day-ahead and intraday prices, and as municipalities with smart meters introduce time-of-use tariffs. Grid-scale batteries are being procured through government tenders rather than through open markets.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
NTCSA Weekly System Status ReportWeekly adequacy outlook, peak demand statistics, renewable output records and rooftop PV estimates by province.
IPP Office procurement programmesGovernment procurement of renewable, gas and battery storage capacity (REIPPPP, BESIPPPP and others).

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutDistributor-led; no national programme. Eskom had installed 1.76 million smart meters by June 2026
Reading intervalNot nationally specified
Eskom smart meters installed1,764,643 (parliamentary reply, June 2026)
Eskom smart meters on load-reduction feeders375,563 (21%)
ProvincesAbout 94% in Gauteng, Mpumalanga, Limpopo and KwaZulu-Natal
Households on prepaid meters81.0% (GHS 2024)
Prepaid standardSTS / IEC 62055-41; ~50 million meters in 94 countries worldwide
Token20-digit encrypted token; key revision moved from KRN1 to KRN2 before 24 November 2024

Prepaid first

South Africa’s metering history is defined by prepayment. The STS token standard was developed in South Africa for electrification programmes and is now an IEC standard used by about 500 utilities in 94 countries. Its strength is that a token can be bought anywhere and entered on a meter with no communications link; its limitation is that conventional STS meters record no interval data and cannot be read remotely.

Eskom’s smart meter programme

Eskom’s current smart meter rollout is aimed mainly at reducing non-payment, illegal connections and transformer overloading in areas subject to "load reduction" (targeted interruptions on high-loss feeders). By June 2026 it had installed 1,764,643 smart meters, about 94% of them in Gauteng, Mpumalanga, Limpopo and KwaZulu-Natal, and planned to end load reduction by 2027. Over 122,000 planned conversions were delayed by community resistance and safety incidents.

Municipal metering

Municipalities choose their own metering. Several metros have advanced metering infrastructure (AMI) for larger customers and SSEG installations; Cape Town requires AMI metering for its new residential time-of-use tariff and charges an AMI administration fee to SSEG customers. There is no national meter data hub or common data-access framework.

Renewable electricity.

Electricity generation mix (2025).

  • Coal: 81.4%
  • Solar: 8%
  • Wind: 4.7%
  • Nuclear: 4.2%
  • Hydro: 0.8%
  • Other fossil (diesel): 0.8%
  • Bioenergy: 0.2%
Source 13
Renewable electricity share
13.6% (2025)Source 13Share of electricity generation from renewables (solar 8.0%, wind 4.7%, hydro 0.8%, bioenergy 0.2%). Including nuclear (4.2%), low-carbon sources supplied 17.8%.
Home solar
3 % of households owning solar panels (2024)Source 114.4% in metros, 3.8% in other urban areas and 1.1% in rural areas. No official residential-only capacity figure is published.
Solar added each year
2.58 GW (Sept 2025–Sept 2026)Source 15Derived from NTCSA week-39 reports: rooftop estimate up from 7,345.3 MW to 9,430.1 MW and contracted PV up from 2,285.2 MW to 2,780.2 MW.
Utility-scale PV (contracted with NTCSA)
2.78 GW (September 2026)Source 15
Rooftop and other uncontracted PV (estimate)
9.43 GW (August 2026)Source 15NTCSA estimate; includes ground-mounted PV without NTCSA contracts. Gauteng 3,055.7 MW.
Wind
4.14 GW (September 2026)Source 15
Concentrated solar power
0.6 GW (September 2026)Source 15
Hydro (excl. pumped storage)
0.75 GW (2025)Source 13

Targets.

  • IRP 2025 (approved by Cabinet on 15 October 2025): about 105 GW of new capacity by 2039, at an estimated cost of R2.2 trillion.
  • New capacity by 2030: 11,270 MW solar PV, 7,340 MW wind, 3,100 MW battery storage, 5,400 MW distributed generation and 6,000 MW gas.
  • New capacity by 2039: 25,000 MW solar PV, 34,000 MW wind, 8,500 MW battery storage, 16,000 MW distributed generation, 16,000 MW gas and 5,200 MW nuclear (potentially up to 10,000 MW).

South Africa generated 242.8 TWh in 2025, of which coal supplied 81.4%. Renewables rose to 13.6% of generation (33.1 TWh), up from 2.6% in 2015, with solar at 8.0% and wind at 4.7%. Koeberg nuclear station provided 4.2%.

Utility-scale renewables have been built mainly through the government’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) since 2011, concentrated in the Northern, Eastern and Western Cape. Since 2022, private projects selling to mines and businesses through wheeling have added a second pipeline, and NTCSA reported a record PV output of 2,475 MW in January 2026.

The fastest growth has been behind the meter. NTCSA’s estimate of rooftop and other uncontracted PV rose from 7.3 GW in September 2025 to 9.4 GW in August 2026, with a third of it in Gauteng. Much of this sits on commercial, industrial and agricultural premises rather than homes.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage in South Africa developed in two very different ways. Behind the meter, households and businesses installed large numbers of lithium-ion batteries with hybrid inverters during load-shedding, mainly for backup rather than grid services. At grid scale, Eskom built the first utility batteries under its BESS programme, and government tenders under the Battery Energy Storage IPP Procurement Programme (BESIPPPP) are now adding larger four-hour systems at constrained substations, mostly in the Northern Cape.

IRP 2025 plans 3,100 MW of new battery storage by 2030 and 8,500 MW by 2039. Several large hybrid solar-plus-storage projects procured under the Risk Mitigation IPP programme also provide dispatchable output.

Storage projects.

  • Eskom BESS Phase 1: About 199 MW/833 MWh at eight distribution substations in the Western Cape, Eastern Cape, Northern Cape and KwaZulu-Natal, including Skaapvlei (80 MW/320 MWh) and Pongola (40 MW/160 MWh). Phase 2 (144 MW/616 MWh) was delayed by funding constraints.
  • BESIPPPP Bid Window 1: Five four-hour projects totalling 513 MW/2,052 MWh: Oasis Aggeneis (77 MW), Mogobe (103 MW), Oasis Mookodi (77 MW), Oasis Nieuwehoop (103 MW) and Red Sands (153 MW). Mookodi and Mogobe were expected to start commercial operation in September 2026; Aggeneis and Nieuwehoop by November 2026.
  • Pumped storage: Eskom operates Drakensberg (1,000 MW), Palmiet (400 MW) and Ingula (1,332 MW) pumped storage schemes, used for peaking and reserves.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Eskom (direct residential customers)About 40% of electricity distributed to end users (NERSA, 2024)UnknownYesNoYes
City of Cape Town—UnknownYesNoYes
City Power Johannesburg—UnknownUnknownNoUnknown
eThekwini Municipality (Durban)—UnknownUnknownNoUnknown
City of Tshwane—UnknownUnknownNoUnknown
City of Ekurhuleni—UnknownUnknownNoUnknown

There is no competitive household retail market: the "supplier" is whoever distributes electricity in the area. Eskom is the largest single distributor, and the eight metropolitan municipalities (Johannesburg through City Power, Cape Town, eThekwini, Tshwane, Ekurhuleni, Nelson Mandela Bay, Buffalo City and Mangaung) are the largest municipal ones. Each publishes its own tariffs and SSEG rules, and quality of service differs widely.

Licensed private traders such as EnPower Trading, PowerX, Envusa Trading, Discovery Green and NOA Trading sell renewable electricity to businesses through wheeling over Eskom and some municipal networks. They do not serve households.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Department of Electricity and EnergyGovernmentElectricity and energy policy, IRP, procurement determinationsPublishes the Integrated Resource Plan and issues ministerial determinations for new generation, storage and ancillary services.
Independent Power Producer OfficeGovernmentRuns government IPP procurement programmesManages REIPPPP, battery storage and gas procurement rounds and publishes project data.
National Energy Regulator of South Africa (NERSA)RegulatorElectricity, gas and petroleum pipelines regulatorApproves Eskom and municipal tariffs, licenses and registers generators and traders, and approves the Grid Code and Market Code.
National Transmission Company South Africa (NTCSA)TransmissionTransmission owner, system operator, central buyer and market operatorPublishes weekly system status reports and grid connection capacity assessments, and is preparing SAWEM.
EskomDistributionState utility: generation and distributionLargest distributor; publishes the annual tariff booklet and runs SSEG registration for its customers.
Association of Municipal Electricity Utilities (AMEU)DistributionAssociation of distribution utilitiesRepresents municipal distributors on technical standards (including NRS specifications) and SSEG practice.
South African Local Government Association (SALGA)GovernmentAssociation of municipalitiesRepresents municipalities on electricity distribution, tariffs and Eskom debt.
STS AssociationMeteringCustodian of the Standard Transfer SpecificationMaintains the prepaid token standard, allocates manufacturer codes and manages vending keys.
South African Photovoltaic Industry Association (SAPVIA)SolarSolar industry associationRuns the PV GreenCard installer certification programme and publishes installed-capacity data.
South African Wind Energy Association (SAWEA)Renewable EnergyWind industry associationRepresents wind developers on procurement, grid access and policy.
South African Energy Storage Association (SAESA)StorageEnergy storage industry associationIndustry voice on battery standards, procurement and market rules.
South African National Energy Development Institute (SANEDI)GovernmentEnergy research and efficiency agencyRuns energy efficiency programmes and research on smart grids and clean energy.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Inverter utility interfaceNRS 097-2-1NRS / Standards South Africa (SABS)Grid interconnection of small-scale embedded generation: protection, anti-islanding, power quality and settings. Inverters need an NRS 097-2-1 type-test certificate.
Simplified connection criteriaNRS 097-2-3NRS / Standards South Africa (SABS)Limits for LV-connected generators without detailed studies: up to 350 kVA; on shared feeders below 25% of NMD and 20 kVA; on dedicated feeders up to 75% of NMD.
Wiring regulationsSANS 10142-1SABSWiring of premises. A registered person must issue a Certificate of Compliance (CoC) under the Electrical Installation Regulations of the Occupational Health and Safety Act.
Embedded generation wiringSANS 10142-1-2SABSWiring requirements for embedded generation installations connected to the LV network, including isolation for utility safety.
Grid connection (larger plants)South African Grid Code, including the Renewable Power Plants Grid Connection CodeNERSAApplies to plants connected at medium and high voltage and to IPPs; sets fault ride-through, reactive power and control requirements.
Prepaid meteringSTS / IEC 62055-41 (STS Edition 2)STS Association / IECToken transfer standard for prepaid meters; Edition 2 adds stronger cryptography and currency tokens.
Installer certification (voluntary)PV GreenCardSAPVIAIndustry quality and safety certification for PV installers, with theory and practical assessment. Not a legal requirement; the legal requirement is a CoC from a registered electrician.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Distributor SSEG approvalYesLocalCompulsory for any generator or battery inverter connected to the Eskom or municipal network, including non-exporting systems.
NERSA licence or registrationNoNationalNot needed for household systems up to 100 kW that meet the distributor’s conditions (Schedule 2).
Certificate of Compliance (electrical)YesNationalIssued by a registered electrical contractor for the installation under SANS 10142-1 and 10142-1-2.
Building plan approvalLimitedLocalSet by municipal by-laws under the National Building Regulations; some municipalities require plans or structural sign-off for roof-mounted or ground-mounted arrays.
Heritage approvalLimitedRegionalAlterations to protected or older buildings may need a permit from the provincial heritage resources authority.
Body corporate / homeowners’ association consentLimitedLocalNeeded in sectional title schemes and many estates under their rules.

For a household the main approval is technical: the distributor’s SSEG application, supported by a compliant inverter, a Certificate of Compliance and a test report. Requirements, forms and fees differ between Eskom and each municipality, and some municipalities fine owners of unregistered systems.

Planning-type approvals are local. Municipal by-laws decide whether building plans are needed for solar arrays, and sectional-title bodies corporate and estate associations often have their own rules on visible roof installations.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
City of Cape Town SSEG feed-in tariff and incentiveActiveExport paymentFrom 1 July 2026, 124.18c/kWh (incl. VAT) for excess generation from approved residential SSEG customers on the Home User tariff, plus a 28.75c/kWh feed-in incentive reviewed annually by Council.1 July 2026 – 30 June 2027 (rates)
Eskom Gen-offset (Homeflex net billing)ActiveNet billingMonthly bill credit for exported energy at Gen-offset Homeflex rates per time-of-use period, capped at energy consumed in that period.Ongoing (2026/27 rates from 1 April 2026)
Eskom SSEG registration fee waiverClosedFee waiverRegistration and connection fees (up to R10,000 urban/residential, R36,000 rural) and the smart meter cost waived for Eskom customers’ systems up to 50 kW. Extended from 31 March 2026; no further extension had been identified.March 2023 – 30 September 2026
Solar panel tax rebate (section 6C)ClosedTax creditIndividuals could claim 25% of the cost of new solar PV panels, up to R15,000, for panels brought into use between 1 March 2023 and 29 February 2024. Batteries and inverters did not qualify.1 March 2023 – 29 February 2024
Free Basic ElectricityActiveSocial subsidyFree monthly electricity allocation for registered indigent households, administered by Eskom and municipalities (City Power: 50–120 kWh a month depending on circumstances).—

Data and connectivity.

Fixed broadband
17.4 % of households with fixed internet at home (2024)Source 1182.1% of households had some form of internet access, mostly mobile (75.6%). Fixed internet at home was 49.0% in Cape Town.
4G coverage
99.5 % of population covered by 4G/LTE (2025)Source 44
5G coverage
58 % of population covered by 5G (2025)Source 44

Mobile coverage is almost universal for 4G, and fibre is expanding quickly in suburbs, but most households rely on prepaid mobile data rather than fixed broadband. Inverters and batteries are therefore monitored over home Wi-Fi where available, or over built-in cellular modems.

Prepaid STS meters need no communications at all. Smart meters deployed by Eskom and municipalities use the distributor’s own head-end systems, commonly over cellular or radio networks; there is no national smart meter communications provider.

Grid conditions.

National peak demand
31.9 GW (2025)Source 15Annual peak of RSA contracted demand, 31,902 MW on 7 July 2025 (including renewables and interruptible supply). The 2026 peak to mid-September was 30,749 MW.
Annual electricity demand
236.8 TWh (2025)Source 13
Generation capacity
69.7 GW (2025)Source 13Derived: Ember fossil (51.2 GW) plus clean (18.5 GW) capacity, including estimated rooftop solar. NTCSA reports Eskom installed capacity of 50,286 MW and installed dispatchable capacity of 51,441 MW including two IPP open-cycle gas turbine stations.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

From load-shedding to surplus

After record load-shedding in 2022 and 2023, the system has stabilised. Load-shedding has not been implemented since 16 May 2025: by 20 September 2026, 490 consecutive days. Eskom reported an energy availability factor of 67.96% for the 2026/27 financial year to date, its best in six years, and by September 2026 the system was reported to have surplus capacity of around 2–3 GW as sales fell and private solar grew.

Load reduction

Separate from load-shedding, Eskom interrupts supply on high-loss feeders in some areas ("load reduction") to protect transformers from overloading caused by illegal connections. In September 2026 this still affected 247,617 Eskom customers, 3.4% of its base, mostly in Gauteng and KwaZulu-Natal; Eskom aims to end it by March 2027.

Grid constraints

The best wind and solar resources are in the Northern, Eastern and Western Cape, where transmission capacity for new connections has run out. The government’s Independent Transmission Projects programme prequalified seven consortia in December 2025 for an initial phase of about 1,064 km of new lines; the request for proposals has since been delayed to 2027.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
South African Wholesale Electricity Market (SAWEM) launchUpcomingTargeted for Q3 2026 (originally 1 April 2026)NTCSA, licensed as market operator in November 2025, submitted the Market Code to NERSA on 25 February 2026; NERSA held a hearing on 1 July 2026. Trading is to begin with day-ahead and intraday markets.
Electricity trading rules and wholesale tariff methodologyUpcomingTrading rules expected by 30 September 2026NERSA is finalising trading rules (including wheeling credits and non-bypassable charges), a wholesale tariff methodology (draft published 20 May 2026), a vesting contract framework between the central purchasing agency and Eskom divisions, and KPIs for municipal distributors.
Electricity Regulation Amendment Act 38 of 2024Current1 January 2025Provides for an independent TSO within five years (NTCSA in the interim), a market operator, a central purchasing agency and a competitive trading framework, and tougher penalties for infrastructure crime.
Eskom tariff increase for 2026/27Current1 April 2026 (Eskom direct); 1 July 2026 (municipal bulk)8.76% for direct customers and 9.01% for municipalities, after NERSA corrected a R54.7 billion error in its MYPD6 calculation. Fixed share of Homepower and Homeflex service charges raised to 66.66%.
Eskom prepaid option for SSEG householdsUpcomingBeing tested in 2026Eskom announced a prepaid option for residential customers with registered rooftop solar, being tested with the intent of broader rollout, alongside simplified "Easy Electricity" prepaid purchase options.
Eskom smart meter rollout and end of load reductionUpcomingMarch 2027Eskom aims to remove all feeders from load reduction, relying on smart prepaid meters to cut losses and non-payment.
IRP 2025Current15 October 2025Cabinet-approved plan for about 105 GW of new capacity by 2039, including 25 GW solar PV, 34 GW wind, 8.5 GW batteries, 16 GW distributed generation, 16 GW gas and 5.2 GW nuclear.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMedium3.0% of households owned solar panels in 2024 (4.4% in metros), while NTCSA estimated 9.4 GW of rooftop and other uncontracted PV in August 2026, much of it commercial.
Distributed energy marketMediumRapid growth of rooftop PV and backup batteries since 2022; EV uptake is very low (1,088 battery EV and 2,810 plug-in hybrid sales in 2025) and heat pumps are not tracked.
Grid flexibility marketLowNo aggregator role and no household access to reserves or demand response; wholesale market (SAWEM) not yet trading.
Energy storage adoptionMediumWidespread behind-the-meter batteries for backup, Eskom BESS Phase 1 (about 199 MW) and 513 MW of BESIPPPP projects due from late 2026; no official count of home batteries.
Renewable growth environmentMediumRenewables rose from 2.6% of generation in 2015 to 13.6% in 2025, with about 2.6 GW of new PV in the year to September 2026; coal still supplies over 80%.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 48 sources
  1. Tariffs and Charges Booklet 2026–2027. Eskom, 2026. accessed 1 October 2026.
  2. Tariffs and Charges Booklet 2025–2026. Eskom, 2025. accessed 1 October 2026.
  3. Tariffs and Charges Booklet 2024/2025. Eskom, 2024. accessed 1 October 2026.
  4. Tariffs and Charges Booklet 2023/2024. Eskom, 2023. accessed 1 October 2026.
  5. Eskom implements NERSA decision for Financial Year 2027. Eskom, 2026. accessed 1 October 2026.
  6. Nersa approves higher electricity hikes for 2026/27 after R54.7bn error. Engineering News, 2026. accessed 1 October 2026.
  7. Euro foreign exchange reference rates – ZAR. European Central Bank, 2026. accessed 1 October 2026.
  8. Budget 2026/27, Annexure 6: Electricity Generation and Distribution – Consumption and Generation tariffs. City of Cape Town, 2026. accessed 1 October 2026.
  9. Joburg households have to deal with electricity price increase from July 1. TimesLIVE, 2026. accessed 1 October 2026.
  10. Mid-year population estimates 2025 (Statistical release P0302). Statistics South Africa (via Eastern Cape Provincial Treasury), 2025. accessed 1 October 2026.
  11. General Household Survey 2024 (Statistical release P0318). Statistics South Africa, 2025. accessed 1 October 2026.
  12. Government welcomes gains in service delivery (GHS 2025). SAnews, 2026. accessed 1 October 2026.
  13. Yearly electricity data (full release, long format) – South Africa. Ember, 2026. accessed 1 October 2026.
  14. South Africa – country electricity profile. Ember, 2026. accessed 1 October 2026.
  15. Weekly System Status Report – 2026 Week 39. National Transmission Company South Africa, 2026. accessed 1 October 2026.
  16. Weekly System Status Report – 2025 Week 39. National Transmission Company South Africa, 2025. accessed 1 October 2026.
  17. DPE, Eskom and the National Transmission Company South Africa announce commencement of trade by NTCSA. Eskom, 2024. accessed 1 October 2026.
  18. Launch of SAWEM delayed, but NTCSA says preparations are well advanced. Engineering News, 2026. accessed 1 October 2026.
  19. Market code submitted to NERSA ahead of SAWEM launch. Energize, 2026. accessed 1 October 2026.
  20. NERSA advances South Africa’s electricity market reforms with seven key regulatory projects. SolarQuarter, 2026. accessed 1 October 2026.
  21. Nersa reinforces shift to competitive electricity market as it approves market operator licence and new grid rules. Engineering News, 2025. accessed 1 October 2026.
  22. New year, new Electricity Regulation Amendment Act. Bizcommunity, 2025. accessed 1 October 2026.
  23. Electricity Regulation Act 4 of 2006 – Schedule 2 (as substituted, Gazette 47877, 17 January 2023). Acts Online, 2023. accessed 1 October 2026.
  24. Nersa outlines 11-month process for finalising electricity trading rules. Engineering News, 2025. accessed 1 October 2026.
  25. NERSA focuses on strengthening municipal role in electricity distribution. Energize, 2024. accessed 1 October 2026.
  26. Eskom records over R30 billion in profit, charging customers more as sales decline. BusinessTech, 2026. accessed 1 October 2026.
  27. Eskom’s power-generating capacity at a record high; its sales at a record low. Engineering News, 2026. accessed 1 October 2026.
  28. Eskom extends rooftop solar registration fee waiver by six months and advances prepaid residential option. Eskom, 2026. accessed 1 October 2026.
  29. Solar registration fees continue to remain zero for the majority of Eskom’s residential customers and include a free smart meter until March 2026. Eskom, 2025. accessed 1 October 2026.
  30. SSEG application control document (evaluation against NRS 097-2-1 and NRS 097-2-3). Matatiele Local Municipality, 2026. accessed 1 October 2026.
  31. What is a 4 digit manufacturer code?. STS Association, 2026. accessed 1 October 2026.
  32. STS Edition 2 brochure. STS Association, 2026. accessed 1 October 2026.
  33. TID Rollover 2024: What you need to know. Prepaid24, 2024. accessed 1 October 2026.
  34. Prepayment specifications. Eskom, 2026. accessed 1 October 2026.
  35. Question CW688 to the Minister of Electricity and Energy (smart meters and load reduction). Parliamentary Monitoring Group, 2026. accessed 1 October 2026.
  36. Eskom continues to record progress. SAnews, 2026. accessed 1 October 2026.
  37. Battery Energy Storage Independent Power Procurement Programme – Bid Window 1, South Africa – update. Engineering News, 2026. accessed 1 October 2026.
  38. Eskom leads large-scale commercial BESS rollout. Engineering News, 2024. accessed 1 October 2026.
  39. South Africa IRP 2025: renewables roadmap. Pinsent Masons (Out-Law), 2025. accessed 1 October 2026.
  40. How does the solar rebate work?. South African Revenue Service, 2024. accessed 1 October 2026.
  41. SA’s EV sales fell in 2025 (but the total NEV market grew). Cars.co.za (naamsa data), 2026. accessed 1 October 2026.
  42. Plug-in hybrid sales quadruple in one year in SA. Engineering News, 2026. accessed 1 October 2026.
  43. Urban population (% of total population) – South Africa. World Bank, 2026. accessed 1 October 2026.
  44. The State of the ICT Sector Report of South Africa, 31 March 2026. ICASA, 2026. accessed 1 October 2026.
  45. Ancillary Services Technical Requirements 2024/25 – 2028/29. Eskom / System Operator, 2023. accessed 1 October 2026.
  46. SAPVIA launches PV GreenCard. SAPVIA, 2017. accessed 1 October 2026.
  47. South Africa delays RFP for $1bn inaugural private grid procurement to 2027. Engineering News, 2026. accessed 1 October 2026.
  48. Seven international-led consortia prequalify to bid for $1bn inaugural private grid-build programme. Engineering News, 2025. accessed 1 October 2026.

Questions about energy in South Africa.