How electricity works in Zambia.
Zambia electricity 2026: ZESCO four-band household tariff, ERB regulation, net metering at K1.35/kWh, open access, licensing, hydro dependence and solar growth.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Zambian kwacha (ZMW) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Zambia energy at a glance.
Key figures for households in Zambia. Each one links to its source on the full overview below.
Electricity price.
0.807 ZMW per kWh for households, including taxes. Figures for From 1 November 2025.
Renewable share.
83% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Zambia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Zambia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Zambia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Zambia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Zambia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Zambia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Zambia.
The energy market in Zambia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Zambia’s power sector is built around ZESCO Limited, a state-owned, vertically integrated utility that generates, transmits, distributes and sells most of the country’s electricity and runs the national control centre. Two private network companies operate alongside it: Copperbelt Energy Corporation (CEC), which mainly supplies the Copperbelt mines, and North Western Energy Corporation (NWEC), which distributes power in parts of North-Western Province. Independent power producers sell to ZESCO or CEC under agreements approved by the Energy Regulation Board (ERB), which licenses the sector and sets tariffs under the Energy Regulation Act 2019 and the Electricity Act 2019. Policy sits with the Ministry of Energy.
Households pay a regulated four-band tariff. Since 1 November 2025, when the ERB ended the drought-era emergency tariffs and restored the multi-year tariff framework, ZESCO has charged K0.35/kWh for the first 100 kWh a month, K1.00/kWh from 100 to 200 kWh, K2.42/kWh from 200 to 400 kWh and K3.45/kWh above 400 kWh. These rates exclude 3% excise duty and 16% VAT, which together add 19.48%: a household using 200 kWh a month pays about K0.81/kWh on average including taxes. Pre-approved 2026/27 rates are higher and apply only after ZESCO submits a true-up report.
About four-fifths of electricity comes from hydropower, mainly Kariba North Bank and the Kafue Gorge stations, which left the country exposed when the 2023/24 drought cut reservoir levels. In 2025 generation averaged 729 MW below demand, leading to long daily load shedding and power imports. Solar is now growing quickly: grid-connected solar capacity rose from 183 MW to 308 MW in 2025, and a further pipeline of about 500 MW was under construction. Households and businesses can export rooftop solar power under the national net-metering programme, which had 525 connected prosumers at the end of 2025.
Energy snapshot.
Headline figures for electricity in Zambia. Each shows its data year and links to its source.
- Population19,610,769 peopleSource 162022
- Households4,056,605 householdsSource 162022
- Average household size4.8 people/householdSource 162022
- Electricity use per householdNot identified from a reliable public source.
- Household price (ZMW)0.807 ZMW/kWhSource 4From 1 November 2025
- Household price (EUR)0.036 EUR/kWhSource 25From 1 November 2025
- Renewable electricity share83%Source 22025
- Solar capacity0.308 GWSource 22025
- Wind capacity0 GWSource 22025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy Regulation Board (ERB)
- System operator
- ZESCO’s Transmission Operations and Trade Directorate, which runs the National Control Centre (legal separation from ZESCO is planned under the open-access reforms)
- Distribution networks
- ZESCO distributes nationally; CEC (Copperbelt mining areas) and NWEC (parts of North-Western Province) hold distribution licences in their areas, and the Rural Electrification Authority and private developers run mini-grids.
- Currency
- Zambian kwacha (ZMW)
- Voltage and frequency
- 230 V single-phase / 400 V three-phase, 50 Hz
Electricity prices in Zambia.
- Household price (ZMW)
- 0.807 ZMW/kWh (From 1 November 2025)Source 4All-in average price for an assumed household using 200 kWh a month (the top of the R1 + R2 lifeline bands; no official average use per household is published). Tariff: 100 × K0.35 + 100 × K1.00 = K135.00. The ERB schedule states tariffs exclude 3% excise duty and 16% VAT; VAT is charged on the excise-inclusive amount: K135.00 × 1.03 = K139.05, × 1.16 = K161.30, ÷ 200 = K0.8065/kWh (combined tax factor 1.1948). Marginal all-in band rates: R1 K0.42, R2 K1.19, R3 (200–400 kWh) K2.89, R4 (above 400 kWh) K4.12/kWh.
- Household price (EUR)
- 0.036 EUR/kWh (From 1 November 2025)Source 25Converted from K0.8065/kWh (all-in average at 200 kWh a month, including 3% excise duty and 16% VAT) at the Bank of Zambia average mid-rate for 30 September 2026 of K22.2379 per euro (buying 22.2075, selling 22.2682): 0.8065 ÷ 22.2379 = 0.036. The top band including taxes (K4.12) converts to about EUR 0.185/kWh.
- Typical annual electricity bill
- Not identified from a reliable public source.
Retail tariffs need ERB approval under Part IV of the Electricity Act 2019, and ZESCO applies under a multi-year tariff framework (MYTF) intended to move prices towards cost-reflective levels on a predictable path. The ERB approved a 2024–2027 multi-year schedule, but after the President declared the 2023/24 drought a national disaster in February 2024, it suspended the framework and approved emergency tariffs from 1 November 2024 so that ZESCO could fund emergency imports. The emergency tariff was extended three times and ended on 31 October 2025.
The ERB’s October 2025 decision restored the MYTF for 1 November 2025 to 31 October 2027. The highest residential rate fell by 46%, from K6.39 to K3.45/kWh, while the first 200 kWh a month (bands R1 and R2) stayed at K0.35 and K1.00 to protect low-income “lifeline” users. Demand charges for maximum-demand and distribution customers were removed in favour of energy-only rates.
The current rates run until 31 October 2026. ZESCO must then file a true-up report before moving to the pre-approved 2026/27 rates shown on its tariff page (R1 K0.54, R2 K1.28, R3 K2.83, R4 K4.04/kWh). NWEC was directed to align its residential tariffs with ZESCO’s from November 2025, because it buys bulk power from ZESCO.
Taxes are charged on top of the published tariffs: the ERB schedules state that they exclude 3% excise duty and 16% VAT. VAT is levied on the excise-inclusive amount, so taxes add 19.48% in total (1.03 × 1.16). A household using 200 kWh a month pays K135.00 before tax and K161.30 after tax (100 × K0.35 + 100 × K1.00 = K135.00; × 1.03 = K139.05; × 1.16 = K161.30), an average of K0.81/kWh. Including taxes, the band rates are K0.42, K1.19, K2.89 and K4.12/kWh. Government policy under the National Energy Compact targets full cost recovery for ZESCO by 2027.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | ZESCO metered residential tariff for supplies up to 15 kVA, in force 1 November 2025 to 31 October 2026: R1 0–100 kWh K0.35; R2 100–200 kWh K1.00; R3 200–400 kWh K2.42; R4 above 400 kWh K3.45 per kWh, excluding 3% excise duty and 16% VAT. The bands are applied to each month’s consumption, so the price of the last kWh rises as use increases. |
| Prepayment | Yes | Most households use prepaid meters and buy electricity tokens by meter number from ZESCO customer service centres and pay points, third-party vendors and aggregators, banks, mobile money and the ZESCO mobile app and USSD channels. |
| Time-of-use | No | There is no household time-of-use tariff. The multi-year schedule includes peak and off-peak rates for maximum-demand customers above 15 kVA, but since November 2025 these customers have been billed on simplified energy-only tariffs (MD1 K2.20, MD2 K2.30, MD3 K2.50/kWh). |
| Dynamic | No | No tariff linked to wholesale prices is offered to households. Open-access trading is limited to licensed participants and consumers of at least 1 MW. |
| Other | Limited | Net-metering prosumers receive credit for exports at the ERB reference tariff (K1.35/kWh for 2026). Commercial customers up to 15 kVA pay a separate four-band tariff (C1–C4, K0.66 to K3.16/kWh). |
Household prices compared with neighbouring countries (EUR per kWh).
- Kenya€0.191
- South Africa€0.185
- Zimbabwe€0.075
- Malawi€0.061
- Botswana€0.05
- Zambia€0.036
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 789 kWh/person/yr (2025)Source 2Derived, all sectors: national consumption of 15,470,602.61 MWh in 2025 divided by the 2022 census population of 19,610,769. Large-scale mining accounted for about 63% of this. Residential consumption alone (3,176,042.51 MWh) is about 162 kWh per person.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
National electricity consumption, net of losses, was 15,470.6 GWh in 2025, up 48.2% on 2024, mainly because consumption by large mines on the transmission network more than doubled to 9,713 GWh as copper output grew. Residential customers used 3,176 GWh, down 8.1% on 2024, a year in which load shedding was severe. Finance and property, power supply agreements, manufacturing and agriculture make up most of the rest.
Household demand is shaped by low grid access. The National Energy Compact puts national electricity access at 53.6% (2023 National Energy Access Survey), and most rural households are not connected to the grid. The government targets universal access by 2030 and aims to double annual on-grid connections from about 60,000 to 120,000. Access to clean cooking was put at only 8.9% of the population.
Supply shortages have shaped how connected households use power. Load management in 2025 ran to many hours a day across all ZESCO regions, and generator and battery-backed solar use rose. The tariff structure also affects behaviour, because the first 200 kWh a month are much cheaper than higher bands.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 40 % of population (2022)Source 167,844,628 urban and 11,766,141 rural residents.
Zambia had 19.6 million people in 2022, with a population density of 26.1 people per square kilometre. Sixty per cent live in rural areas. Copperbelt (82.7%) and Lusaka (81.5%) provinces are mostly urban, while more than 80% of the population of Western, Eastern, Luapula and Muchinga provinces is rural. Households average 4.8 people.
The ZESCO prosumer application form asks whether the applicant owns or rents the site, and tenants need the owner’s signed consent to install a net-metered system. ZESCO’s conditions of supply require a meter at every point of supply. When a property with a net-metered system is sold, the net-metering account is closed and the new owner must open a normal account and apply again.
How the grid works in Zambia.
- TransmissionZESCO Transmission Operations and Trade Directorate (National Control Centre), ZESCO Transmission (with CEC)
- DistributionZESCO distributes nationally; CEC (Copperbelt mining areas) and NWEC (parts of North-Western Province) hold distribution licences in their areas, and the Rural Electrification Authority and private developers run mini-grids.
- MeteringLicensed distribution enterprises (mainly ZESCO)
- Supply2 or more retail suppliers
Power flows from ZESCO’s large hydro stations (Kariba North Bank 1,080 MW, Kafue Gorge 990 MW and Victoria Falls 108 MW), IPP plants such as Kafue Gorge Lower (750 MW), Kariba North Bank Extension (360 MW), Itezhi-Tezhi (120 MW) and the 300 MW Maamba coal station, and from imports. It travels over a 330/220/132/88/66 kV grid to ZESCO’s 400 V–66 kV distribution network. The ERB recorded installed capacity of 4,107.86 MW at the end of 2025: 3,174.8 MW hydro, 308 MW solar, 415 MW coal and 203.8 MW diesel on the grid, plus 6.26 MW off-grid.
Drought has turned capacity into a poor guide to supply. In 2025 average available generation was 1,488.93 MW against average demand of 2,217.52 MW, a deficit of 728.59 MW. Kariba’s usable live storage was only 6.22% in December 2025. To narrow the gap ZESCO imported from EDM (Mozambique), Eskom, ZESA (Zimbabwe), CEC and the SAPP day-ahead market. Peak demand was 2,204 MW. Transmission losses were 6.4% and distribution losses 11.8%, both above ERB targets.
Commercially, ZESCO buys most IPP output under ERB-approved power purchase agreements, and CEC buys from its own solar plants and imports to supply the mines. In 2025 the ERB approved 135 agreements: 101 PPAs (91 for solar), 22 power supply agreements, 7 wheeling agreements and 5 system operation agreements. The Electricity (Open Access) Regulations 2024 (SI 40) let licensed generators, traders and consumers of at least 1 MW contract directly and pay to use ZESCO, CEC or NWEC networks. ZESCO, CEC and NWEC launched online open-access application platforms in 2025.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy and makes the statutory instruments under the Electricity Act, including the net-metering, open-access and grid-code regulations. It launched the Electricity Open Access Framework in February 2025. |
| Regulator | Energy Regulation Board (ERB) | Licenses electricity, renewable-energy and petroleum enterprises under the Energy Regulation Act 2019, issues construction permits, approves tariffs, power purchase and supply agreements, sets the annual net-metering reference tariff and monitors power quality. |
| Supplier | ZESCO Limited | State-owned, vertically integrated utility. It owns the large hydro stations (over 2,900 MW), buys from IPPs and imports, and supplies more than one million customers. Under the new market structure it is the designated Public Service Trader for legacy and government-guaranteed contracts. |
| System operator | ZESCO Transmission Operations and Trade Directorate (National Control Centre) | Operates the Interconnected Power System and runs power trading. The ERB varied the System Operator licence in 2025 for its new open-access functions, and the approved market structure provides for legal separation of the System Operator from ZESCO. |
| TSO | ZESCO Transmission (with CEC) | ZESCO owns over 11,100 km of high-voltage lines (330, 220, 132, 88 and 66 kV) interconnected with Zimbabwe, Botswana, Namibia, Tanzania, Malawi and the DRC. CEC owns more than 300 km of transmission on the Copperbelt. |
| DSO | ZESCO Distribution and Customer Service Directorate | Operates about 56,000 km of distribution network from 400 V to 66 kV and handles applications, quotations, connections, meter installation, meter reading, billing and faults. |
| DSO | Copperbelt Energy Corporation (CEC) | Private transmission and distribution network service provider on the Copperbelt, with about 700 km of distribution lines. It mainly supplies mines (26 power supply agreement customers in 2025) and had 208 residential consumers. |
| DSO | North Western Energy Corporation (NWEC) | Private distributor buying bulk power from ZESCO for Kabitaka, Kalumbila and Lumwana. It served 3,681 customers in 2025, 3,583 of them residential. |
| Metering | Licensed distribution enterprises (mainly ZESCO) | Own and install customer meters. Net-metering meters remain the property of the distribution enterprise, although the prosumer pays for them. |
| Exchange | Southern African Power Pool (SAPP) | Regional power pool through which ZESCO and licensed traders such as GreenCo and Kanona buy and sell power. In 2025 ZESCO imported 2,119.7 GWh and exported 1,691.0 GWh. |
Compared with the UK system.
| UK concept | Zambia equivalent | How it works |
|---|---|---|
| DNO | ZESCO Distribution (plus CEC and NWEC in their areas) | ZESCO’s distribution directorate is the network company for most of the country and also the retailer, so connection, metering and supply are handled by one organisation. CEC and NWEC hold distribution licences for the Copperbelt mining areas and parts of North-Western Province. A customer cannot choose between them; the area decides. |
| National Grid/NESO | ZESCO Transmission Operations and Trade Directorate (National Control Centre) | ZESCO owns most of the transmission grid and acts as System Operator, dispatching its own plants, IPPs and imports and managing load shedding during deficits. The open-access market structure approved in 2024 provides for an independent, legally separate System Operator, which had not been completed by 2026. |
| MPAN | ZESCO service number / meter number | A connection is identified by the ZESCO service number and the number of the meter installed at the premises. ZESCO forms, including the net-metering application, ask for the “Service No/Meter No”. Prepaid customers buy tokens using the meter number. There is no national supply-point number or central register. |
| MPRN | No equivalent | There is no piped gas network for homes. Households use LPG cylinders, charcoal and firewood for cooking. |
| Meter operator | The distribution enterprise (ZESCO, CEC or NWEC) | Meters belong to the licensee, which installs, reads, tests and replaces them. Under the net-metering regulations the prosumer pays for the bidirectional meter but it remains the property of the distribution enterprise. |
| Supplier | ZESCO (or CEC/NWEC in their areas) | Households cannot switch supplier. Retail tariffs are approved by the ERB. Competitive supply exists only for open-access participants of at least 1 MW, such as mines and industrial users buying from licensed traders. |
| Smart-meter infrastructure | Prepaid keypad meters; smart-meter pilot in Lusaka | There is no national smart-meter data or communications body like the DCC. Most households use prepaid meters without real-time communication. ZESCO began a six-month smart-grid pilot with communicating prepaid meters in Roma, Lusaka, in February 2026. |
How a supply point is identified.
Service No. 2104 5678 31; Meter No. 0421 0987 654 (fictional, illustrative only, as the official format is not published)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | ZESCO service number (with meter number) |
| Who issues it? | ZESCO Limited (or the licensed distribution enterprise in CEC and NWEC areas) |
| Format | Numeric service number from ZESCO’s customer and billing system, used together with the serial number of the meter installed at the premises. Prepaid meters are identified by the meter number printed on the meter, which is used to buy tokens. ZESCO does not publish the structure or length of either number. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | The meter number is on the meter at the premises and is the number quoted when buying prepaid tokens. ZESCO forms ask for the “Service No/Meter No”; ZESCO account documents and the MyZESCO portal hold the service details. |
| Electronic access | The MyZESCO customer self-service portal (bills, tokens, service requests and account updates), the ZESCO mobile app and a USSD code. Net-metering applications are made through the separate ZESCO net-metering portal, which asks for the ZESCO service or meter number. |
| Third-party access | No regulated third-party data-access scheme was identified. Token vendors, banks, aggregators and mobile-money services use the meter number only to sell prepaid electricity. Installers enter the service or meter number on net-metering applications made with the customer. A Metering and Data Management Procedure for open-access market participants was being drafted in 2025. |
| Who keeps the register | ZESCO’s customer and billing system (and those of CEC and NWEC for their customers). Under the net-metering regulations each distribution enterprise must also keep public registers of prosumers, rejected applications and remaining programme capacity, and submit them to the ERB every quarter. |
| Register scope | Per DSO |
Zambia has no national supply-point register like the UK’s MPAN system. Because ZESCO is both network operator and retailer for most customers, a connection is identified by ZESCO’s own references: a service number in its customer system and the number of the meter installed at the premises. ZESCO’s forms ask for both together as the “Service No/Meter No”. ZESCO’s conditions of supply require a meter at every point of supply, and the meter and service equipment remain ZESCO’s property even when the customer has paid a capital contribution.
Most households are on prepaid meters. To buy electricity the customer, or a vendor, enters the meter number and pays. The customer receives a numeric token and keys it into the meter. Tokens are sold at ZESCO customer service centres and pay points, by third-party vendors and aggregators, through banks and mobile money, and through ZESCO’s app and USSD service. Existing meters do not communicate in real time, which is why ZESCO is piloting smart prepaid meters.
The supply contract belongs to the occupier rather than the property. ZESCO’s conditions of supply ask customers to report within 48 hours when they move out so the contract can be cancelled, and a new occupier must apply for supply and may be asked for a security deposit of about one month’s estimated consumption. Under section 43 of the Electricity Act 2019, a licensee cannot make the next occupier pay a previous occupier’s arrears unless the new occupier agreed to it. No published rule was found on whether the service number itself is reissued, so this is recorded as unknown.
For net metering, regulation 18 of SI 38 of 2024 defines the supply point as the place where the net-metering meter is installed, and the distribution enterprise takes ownership of exported energy there. Registers are kept by each distribution enterprise, not by a national hub, and the ERB receives the prosumer registers quarterly.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Yes |
| How exported electricity is paid | Exports are valued in money at the ERB reference tariff, set each December for the following year: US$0.06/kWh, translated as K1.35/kWh for 2026. The value is credited to the prepaid meter account or deducted from the postpaid invoice. Prosumers who export more than half of their annual generation receive 75% or 50% of the reference tariff the following year. |
| What size of system can connect? | Net metering covers renewable systems up to 5 MW, limited to the customer’s contracted or declared demand. Regulation 5 of SI 38 of 2024 groups systems into micro (up to 2 kW), mini (up to 10 kW single-phase or 30 kW three-phase), small (up to 1 MW) and medium (up to 5 MW). |
| Is there a national cap? | Each distribution enterprise must offer a programme equal to 10% of its historical highest peak demand and may refuse new applicants when it is full. Even then it must still consider systems up to 15 kW single-phase or 26 kW three-phase. |
| How are exports paid? | Billing follows the customer’s normal cycle. For prepaid meters, the value of each export is credited to the meter account and reduces the cost of the next purchase. For postpaid meters, the value of exports is deducted from the invoice. Exports are reconciled annually: prosumers report imports, exports and gross generation by 15 December, and imbalances are settled under the supply agreement, with the option to offset against future bills. |
| Does the export rate depend on how much is exported? | Yes. Prosumers whose annual exports were up to 50% of gross generation in the previous year get 100% of the reference tariff; 50–75% gets 75%; above 75% gets 50%. A prosumer who imports nothing for 90 consecutive days stops being a prosumer and is not paid for later exports. |
| Can the utility limit exports? | Yes. Inverters must accept active and reactive power commands. Systems up to 250 kW not directly controlled by the utility need a Demand Response Enabling Device that can limit exports to 100%, 70%, 30% or 0%. Systems above 30 kW must allow remote monitoring. |
| Can batteries be included? | Yes. The prosumer application form records storage size in kWh or Ah, and the inverter must be grid-tied, non-grid-forming and stop exporting immediately when the grid fails. |
| What happens when the property is sold? | The net-metering account is closed. The new owner must open a normal prepaid or postpaid account and then apply for net metering and sign a new contract. |
Connecting a home system.
- Apply to the distribution enterprise for the area (ZESCO, CEC or NWEC) online or on the approved form, with the ZESCO service or meter number, ID, TPIN, GPS location and, if renting, the owner’s consent. Attach the installer’s credentials and a single-line diagram certified by a competent person registered with the Engineering Institution of Zambia (EIZ).
- Pay the ERB-approved administrative fee and receive a reference number.
- The distribution enterprise carries out a site visit and technical assessment, then issues a quotation or a reasoned rejection within 7 days for systems up to 10 kW single-phase or 30 kW three-phase, 15 days up to 1 MW, and 30 days up to 5 MW.
- Pay the quotation in full within 90 days (2026 fees: K8,712 single-phase prepaid, K12,690 three-phase prepaid, K42,993 maximum-demand), then sign the Net Metering Supply Agreement (NMSA) and Net Metering Connection Agreement (NMCA).
- Submit the detailed design of the renewable energy system for approval, using a grid-tied inverter from ZESCO’s approved list.
- Install the system as designed and submit the installation completion certificate.
- The distribution enterprise installs the bidirectional (four-quadrant) net meter and commissions the system.
Small-scale export is possible through the national net-metering programme created by the Electricity (Net Metering) Regulations 2024 (SI 38 of 2024) under the Electricity Act 2019. ZESCO launched it on 1 August 2024, and the ERB issued application guidelines the same month. Applications go to the licensed distribution enterprise for the area, and prosumers must follow the distribution grid code.
Unlike kWh-banking schemes, Zambian net metering values exports in money. The ERB publishes a reference tariff each December for the next year. It was kept at US$0.06/kWh for 2026, which it translated as K1.35/kWh, and the distribution use-of-system charge was capped at K0.66/kWh. The ERB also fixed connection fees, mainly the cost of the bidirectional meter plus 30% excise duty and VAT on it.
Uptake grew quickly once load shedding began. By 31 December 2025 there had been 1,203 applications, 525 prosumers were connected with 17.7 MW of capacity, 114 more had paid and were awaiting connection, and prosumers had exported 2,979 MWh and earned K4.98 million. Larger exporters, from 100 kW to 3,500 kW, include farms, hotels and factories. Projects that sell power rather than offset their own use are developed as IPPs under ERB-approved PPAs, or as open-access sellers to customers of at least 1 MW.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | ERB generation licence and construction permit for a generating station rated at 250 kW or more, or below 250 kW where it supplies another person (Electricity Act 2019, s.6). The ERB also issues “generation of electricity for own use” licences for stand-alone or non-exporting generators. | ERB | Net-metered systems up to 5 MW are approved by the distribution enterprise under SI 38 of 2024; the regulations and ERB guidelines do not state a separate ERB licence for them. |
| Store electricity | No storage-specific licence category was identified. Storage is included in the definition of an “energy facility” in SI 41 of 2023, so utility-scale projects go through ERB permitting with their generation plant. | ERB | Behind-the-meter batteries can be declared on net-metering applications. |
| Export to the grid | Up to 5 MW: net-metering approval, NMSA and NMCA with the distribution enterprise. Larger or merchant projects: ERB generation licence plus a PPA approved by the ERB, or open-access trading with ERB-licensed counterparties. | Distribution enterprise; ERB | Subject to the 10% programme size per distribution enterprise and network capacity. |
| Supply / sell to consumers | ERB supply licence; retail tariffs need ERB approval (Electricity Act 2019, Part IV). | ERB | Two supply licences were issued in 2025. Households are supplied by the area’s distribution licensee. |
| Distribution | ERB distribution licence. | ERB | Held by ZESCO, CEC and NWEC; two distribution licences were issued in 2025. |
| Trade electricity / wholesale | ERB trading licence. Open access under SI 40 of 2024 is available to traders able to trade at least 1 MW, suppliers with at least 1 MW installed and consumers of at least 1 MW. | ERB | Traders include GreenCo, Kanona and Petrodex; ZESCO holds a trading licence as Public Service Trader. |
| Mini-grids (off-grid supply) | A commercial off-grid system of 250 kW or less (generation, distribution and supply, with or without storage) is a “qualifying off-grid activity” excluded from licensing under SI 41 of 2023. Larger mini-grids need a combined ERB licence. | ERB | Tariff regulation is lighter up to 100 kW, needs ERB approval from 100 kW to 1 MW and periodic review above 1 MW. |
| Install, supply or maintain solar equipment | ERB licence for the manufacture, supply, installation and maintenance of renewable energy generating equipment (195 issued in 2025). Net-metering designs must be certified by an EIZ-registered competent person. | ERB; Engineering Institution of Zambia | Importing renewable energy equipment for household or non-commercial use is excluded from licensing. |
| Balancing and grid services | The System Operator must ensure ancillary services are available (Electricity Act 2019, s.10). A balancing mechanism and balancing agreement were drafted in 2025 and remained under consultation in 2026. | System Operator; ERB | No procurement route for distributed assets yet. |
| Aggregate / VPP | No licence category or rules for aggregating household or small business assets. | Not applicable | Net metering is a bilateral arrangement between each prosumer and the distribution enterprise. |
| Remote control of customer assets | Net-metering inverters must be controllable by the distribution enterprise or System Operator. Systems up to 250 kW not directly controlled need a DRED for stepped export limits. | Distribution enterprise | ZESCO’s smart prepaid meters being piloted support load limiting and remote disconnection. |
Section 10 of the Energy Regulation Act 2019 prohibits establishing or operating an energy enterprise without an ERB licence. Applicants file Form I under the Energy Regulation (General) Regulations 2023 (SI 41), pay an assessment fee within 14 days, and the ERB publishes a notice in the Government Gazette inviting objections. After technical and financial assessment and a Board decision, a provisional licence is issued, followed by a standard licence once the objection period has passed. Since 2025 applicants must also provide police clearance for directors and shareholders.
Two thresholds matter most for distributed energy. The Electricity Act brings generating stations of 250 kW or more, and smaller ones that supply other people, under its generation regime, and SI 41 excludes off-grid supply systems of 250 kW or less from licensing. Net metering up to 5 MW is handled by the distribution enterprise. In 2025 the ERB issued 506 licences and 114 construction permits; electricity accounted for 11 licences and renewable-energy equipment businesses for 195.
The government’s National Energy Compact commits to a one-stop licensing system for IPPs and simpler approval of developer-led mini-grids. A first draft of a revised Electricity Act was consulted on in December 2025.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Open-access bilateral trading | Restricted | 1 MW | No | ERB / System Operator. Licensed generators, traders and consumers of at least 1 MW can contract directly and use the networks under wheeling agreements. Seven wheeling and five system operation agreements were approved in 2025. |
| Balancing mechanism | Developing | — | Unknown | System Operator. A Balancing Mechanism and Balancing Agreement were drafted as annexures to the System Operator Guidelines in 2025 and were still under stakeholder consultation in 2026. |
| SAPP day-ahead and bilateral markets | Restricted | — | No | Southern African Power Pool. Used by ZESCO and licensed traders for imports and exports. Distributed assets have no route to these markets. |
| Utility load management | No | — | No | ZESCO. ZESCO balances supply shortfalls through scheduled load shedding by region. Customers are not paid for reducing demand. |
Zambia has no flexibility market for distributed assets. The System Operator balances the system with ZESCO’s hydro, IPP plants, imports and load shedding. The open-access reform launched in February 2025 is the first step towards a market: it introduces eligible sellers and contestable consumers, wheeling charges set under an ERB pricing methodology, and drafts of trading guidelines, a balancing mechanism and a metering and data management procedure.
The rules for distributed generators focus on control rather than paid services. Net-metering inverters must accept export-limitation commands, and the regulations require prosumers to make systems controllable for frequency management. No payment for these services or third-party aggregation is provided for.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| ZESCO Open Access application portal | Online applications for connection to, and use of, the ZESCO network by open-access participants. |
| ZESCO net-metering portal | Prosumer applications from submission to commissioning, with the regulations, approved tariffs, technical specifications and approved inverter list. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Prepaid keypad meters are the household norm; ZESCO began a six-month smart prepaid meter pilot in Roma, Lusaka, in February 2026 |
| Reading interval | Not published |
| Household metering | Mostly prepaid meters bought by meter number |
| Smart pilot | Roma township, Lusaka, from 11 February 2026 (about six months), with Beacon Power Services |
| Pilot features | Remote monitoring, tamper detection, remote top-up, load limiting, remote connection and disconnection |
| Net-metering meter | Four-quadrant bidirectional, prepaid or postpaid, paid by prosumer, owned by distribution enterprise |
| Meter owner | Licensed distribution enterprise (ZESCO, CEC or NWEC) |
ZESCO’s household meters are mainly prepaid units without real-time communication, so readings and remote functions are limited. In February 2026 ZESCO and Beacon Power Services began installing upgraded prepaid smart meters and modernising the network in parts of Roma, Lusaka, as a six-month smart-grid pilot. Installation is free and any remaining credit moves to the new meter. ZESCO said a successful pilot could lead to a national rollout.
There is no separate national smart-meter body or data hub. Meter data stays with each distribution enterprise. For net metering, regulation 17 of SI 38 of 2024 allows prepaid or postpaid meters that record both imports and exports, and requires a four-quadrant meter where active and reactive energy flow both ways.
Renewable electricity.
Electricity generation mix (2025 (derived from ERB national generation table; excludes CEC Renewables solar and imports)).
- Hydro: 81.3%
- Coal and other thermal: 15.7%
- Solar: 1.7%
- Diesel (LSGO): 1.3%
- Renewable electricity share
- 83% (2025)Source 2Derived from the ERB’s national generation table for 2025 (14,560.23 GWh sent out): hydro 11,834.91 GWh and solar 247.55 GWh. The table excludes CEC Renewables’ solar plants (about 171 GWh, sold to CEC) and imports. Including that solar would give about 83.2%.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 125 MW (2025)Source 2Grid-tied solar rose from 183 MW to 308 MW, mainly from the 100 MW Chisamba (June 2025) and 25 MW Mailo (May 2025) plants.
- Hydro (grid-tied)
- 3,174.8 MW (2025)Source 2
- Solar PV (grid-tied)
- 308 MW (2025)Source 2
- Coal
- 415 MW (2025)Source 2Maamba 300 MW plus newer plants, including the 85 MW United Capital Fertilizer plant (40 MW for the grid).
- Diesel / LSGO
- 203.8 MW (2025)Source 2
- Net-metered distributed generation
- 17.7 MW (December 2025)Source 2525 connected prosumers (all customer types).
Targets.
- Raise non-hydro renewables from 3% to 33% of the generation mix by 2030 (National Energy Compact).
- Procure 3,000 MW of solar capacity by 2030 through competitive procurement (National Energy Compact).
- Presidential Solar Initiative target of 1,000 MW of solar generation capacity.
- Universal electricity access by 2030, from 53.6% in 2023.
- Install solar on public buildings: designs completed for 61 institutions, 11 fitted by December 2025.
Hydropower supplied about 81% of generation in 2025, and Kariba alone provides a large part of the country’s output. The 2023/24 drought showed how risky that is: generation fell to 13,567 GWh in 2024 and recovered only partly, to 14,560 GWh, in 2025. Policy now aims to diversify into solar, more coal (Maamba’s 300 MW Phase II) and imports through new interconnectors.
Solar has moved from a few early plants (Bangweulu 54 MW and Ngonye 34 MW at the Lusaka South economic zone, and CEC’s 34 MW Riverside and 60 MW Itimpi plants in Kitwe) to a much larger pipeline. Chisamba (100 MW, owned by ZESCO’s subsidiary KNBE) and Mailo (25 MW) were commissioned in 2025. Solar sent out reached 427.84 GWh, up 56%. Projects due in 2026 include Itimpi II (136 MW), Chisamba Phase II (100 MW), Chipata West (100 MW), Mabumba (50 MW), Solufy (48 MW), Lunsemfwa (28 MW), Mailo Phase II (25 MW) and Fitula (12 MW). The ERB also issued construction permits for 1,115 MW of solar in 2025.
Many projects have struggled to reach financial close, which the ERB attributes to weak project preparation and financial structuring. Operating plants report inverter and tracker failures, soiling losses and grid disturbances. The ERB is drafting a technical KPI framework for solar plants for 2026.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Grid storage in Zambia is still at the project stage. Storage matters because the evening peak falls after solar output ends, and hydro reservoirs are low. The largest project, Leopards Hill, pairs four-hour storage with solar to supply ZESCO, and the trader GreenCo has said it plans battery systems to improve reliability.
Behind the meter, batteries are common in homes and businesses as protection against load shedding. Complaints to the ERB about renewable equipment in 2025 mainly concerned substandard batteries and inverters. In response, the ERB and the Zambia Bureau of Standards developed a standard for stationary lithium-ion batteries used with solar PV and backup power, which was submitted to ZABS for publication.
Storage projects.
- Leopards Hill Solar and Battery Project: 250 MWp solar PV with a 150 MW / 600 MWh battery about 25 km south-east of Lusaka, developed by Globeleq with Leopard Investment Company. Launched in April 2026, with a ZESCO grid connection agreement and financial close targeted for the end of 2026.
- Choma solar-plus-storage project: 60 MW solar with a 20 MWh battery in Southern Province.
- NWEC solar and storage: NWEC plans solar with storage at Kalumbila (5–20 MW), Lumwana (5 MW) and Kabitaka (2 MW), with construction of a 5 MW plant at Kalumbila due to start in 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| ZESCO Limited | Supplies more than one million customers nationwide | No | No | No | Yes |
| Copperbelt Energy Corporation (CEC) | 238 customers in 2025, mainly mines (26 power supply agreements; 208 residential) | Limited | Unknown | No | Unknown |
Households cannot choose their supplier. ZESCO serves almost all grid-connected homes, NWEC supplies 3,583 residential customers in Kabitaka, Kalumbila and Lumwana at tariffs aligned with ZESCO’s, and CEC supplies a small number of residential consumers on the Copperbelt. Off-grid supply comes from REA mini-grids (21 solar mini-grids and one mini-hydro, about 2 MW, serving 2,989 customers in 2025), private mini-grid operators such as Zengamina, and solar home systems.
Competition exists only above 1 MW: licensed traders such as GreenCo, Kanona and Petrodex buy from generators and the SAPP and sell to mines and industrial users under power supply agreements.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy | Government | Energy policy, statutory instruments, Integrated Resource Plan | Issues the net-metering, open-access and grid-code regulations and leads the National Energy Compact. |
| Energy Regulation Board (ERB) | Regulator | Licensing, permits, tariffs, net-metering reference tariff, power quality | Approves every retail tariff and licenses generators, traders and solar equipment businesses. |
| ZESCO Limited | Transmission | Generation, transmission, system operation, distribution and supply | Handles most grid connections, meters and net-metering applications. |
| Copperbelt Energy Corporation (CEC) | Distribution | Private transmission and distribution on the Copperbelt | Second network operator and an open-access network provider. |
| Southern African Power Pool (SAPP) | Market | Regional power pool and trading markets | Source of a large share of the imports used to cover the deficit. |
| Rural Electrification Authority (REA) | Government | Rural grid extension, mini-grids and off-grid programmes | Runs the Rural Electrification Fund and targets 51% rural access by 2030. |
| Solar Industry Association of Zambia (SIAZ) | Solar | Industry association for solar companies | Represents solar dealers, developers and installers. |
| Engineering Institution of Zambia (EIZ) | Consumer | Registration of engineers and technicians | Net-metering single-line diagrams must be certified by an EIZ-registered competent person. |
| Zambia Bureau of Standards (ZABS) | Government | National standards body | Publishes Zambian standards, including the power quality standard ZS 387 and the forthcoming lithium-ion battery standard. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Distribution Grid Code; Electricity (Transmission) (Grid Code) Regulations, SI 4 of 2026 | ERB / Ministry of Energy | Net-metering prosumers are bound by the distribution grid code (SI 38 of 2024, reg. 4). Voltage 230 V / 400 V ±10% at LV; frequency 50 Hz ±0.15 Hz; power factor not below 0.92. |
| Inverters | IEC 61727; ZESCO approved inverter list (September 2025) | IEC / ZESCO | Grid-tied, non-grid-forming current-source inverters; must accept active and reactive power commands; fault ride-through required from 2 MW. |
| Anti-islanding | IEC 62116 | IEC (via ZESCO technical specifications) | Inverter must stop exporting immediately on loss of grid; a visible, lockable, labelled isolating switch is required. |
| Power quality | IEC 61000-3-2 (LV), IEC 61000-3-6 (MV); ZS 387 | IEC / ZABS | Voltage THD ≤5%, individual harmonic currents ≤3%. |
| Export control | Demand Response Enabling Device (DRED) | ZESCO | Required for systems up to 250 kW not directly controlled by the utility; export limits of 100%, 70%, 30% and 0%. Remote monitoring mandatory above 30 kW. |
| Electrical installation | IEC 60364 (including 60364-6 verification); IEC 60445 | IEC | Dedicated circuit breaker, overcurrent and surge protection, and earthing to ZESCO standards. |
| Batteries | Zambian standard for stationary lithium-ion batteries (submitted for publication) | ERB / ZABS | Covers design, testing and lifecycle of batteries used with solar PV and backup power. |
| Installer competence | ERB renewable-equipment installation licence; EIZ registration | ERB / EIZ | Installer credentials and an EIZ-certified single-line diagram accompany net-metering applications. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Net-metering approval (distribution enterprise) | Yes | National | Site visit, technical assessment and quotation from ZESCO, CEC or NWEC, followed by the NMSA and NMCA. |
| Design approval | Yes | National | Detailed design submitted to the distribution enterprise before installation. |
| Owner’s consent | Limited | Local | Required where the applicant rents the property. |
| Licensee approval of wiring | Yes | National | Section 45 of the Electricity Act 2019 bars installing wiring or extensions to a line without the licensee’s approval. |
| ERB licence and construction permit | Limited | National | For generating stations of 250 kW or more, or smaller plants supplying others, and for businesses that sell or install solar equipment. |
| Environmental approval (ZEMA) | Limited | National | Applies to licensed generation and mini-grid projects; not stated for household net metering. |
| Local planning or building approval | Unknown | Local | No national rule for rooftop PV was identified. |
For a household, permission runs through the distribution enterprise. It acknowledges the application, assesses the site, issues a quotation within regulated time limits, approves the design and commissions the system. Approval is not automatic: the enterprise can reject an application with reasons, and once its programme reaches 10% of peak demand it must still consider only systems up to 15 kW single-phase or 26 kW three-phase. Quotations lapse if not paid within 90 days.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering | Active | Net billing / export payment | Exports credited at the ERB reference tariff of US$0.06/kWh (K1.35/kWh) for 2026, against prepaid credit or postpaid bills, with annual reconciliation. | August 2024 – present; tariff set annually |
| Customs duty suspension and VAT zero-rating on solar products | Active | Tax relief | Solar PV modules, static inverters, lead-acid batteries, solar charge controllers and solar water heaters are zero-rated for VAT (SI 104 of 2021), and duty is suspended on modules and lithium-ion batteries (SI 17 of 2022, SI 86 of 2019). Hybrid inverters attract 16% VAT. | Per Customs Handbook for Solar PV Products, June 2024 |
| Residential lifeline bands | Active | Social tariff | The first 100 kWh a month at K0.35/kWh and the next 100 kWh at K1.00/kWh, kept unchanged when the emergency tariff ended in November 2025. | 1 November 2025 – 31 October 2026 |
| Licence exclusion for household solar imports | Active | Regulatory exemption | Importing renewable energy generating equipment for household or non-commercial use is not a licensable activity under SI 41 of 2023. | September 2023 – present |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Mobile networks are the main communications route. ZICTA’s 2025 market report recorded 26.2 million mobile subscriptions (up 13.1%), 14.7 million internet subscriptions and 3,751 telecommunications towers, with 5G rolling out in urban areas.
Household prepaid meters work offline, with tokens sold through mobile money, USSD and the ZESCO app. Remote monitoring of rooftop systems depends on the installer’s equipment and mobile data, except that net-metered systems above 30 kW must allow monitoring by the distribution enterprise. The smart prepaid meters in ZESCO’s 2026 pilot add two-way communication.
Grid conditions.
- National peak demand
- 2.204 GW (2025)Source 2Peak national system demand (2,299 MW in 2024).
- Annual electricity demand
- 15.5 TWh (2025)Source 2National consumption less losses (15,470.6 GWh). Domestic generation sent out was 14.56 TWh; the balance came from imports.
- Generation capacity
- 4.108 GW (2025)Source 2Installed capacity of 4,107.86 MW. Available capacity is much lower during drought: average generation in 2025 was 1,488.93 MW.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The binding constraint is supply. With hydro reservoirs low, the 2025 deficit averaged 728.59 MW and ZESCO used load shedding across all regions, while importing on average about 100 MW from EDM, 65 MW from Eskom, 67.5 MW via CEC and smaller amounts from ZESA and the SAPP day-ahead market. The grid recorded 48 major disturbances in 2025, half caused by neighbouring systems, and one national blackout triggered by a trip on the Zimbabwe–Mozambique interconnector.
Network weaknesses include the single-circuit 330 kV Kafue West–Kafue Town–Muzuma corridor, which limits power flow from Maamba and Victoria Falls; a double-circuit replacement is under construction. Other projects include the 330 kV Lusaka West–Kabwe line, a 330 kV link from Kalumbila to Kolwezi in the DRC, and the Zambia–Tanzania–Kenya interconnector, which will link the Southern and Eastern African power pools. Interconnectors with Malawi and Mozambique and the ZIZABONA project are also planned. Only 78% of required ZESCO power-quality monitoring sites had sufficient data in 2025, and voltage dips and regulation scored lowest.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Multi-year tariff framework restored | Current | 1 November 2025 | Emergency tariffs ended; residential top band cut from K6.39 to K3.45/kWh; first 200 kWh unchanged; maximum-demand customers moved to energy-only tariffs. In force until 31 October 2026. |
| 2026/27 tariffs after true-up | Upcoming | After 31 October 2026, subject to ERB review | ZESCO must file a true-up report before moving to the pre-approved 2026/27 residential rates (R1 K0.54, R2 K1.28, R3 K2.83, R4 K4.04/kWh, excluding taxes). |
| 2026 net-metering reference tariff | Current | 1 January 2026 | Kept at US$0.06/kWh (K1.35/kWh); distribution use-of-system charge capped at K0.66/kWh; connection fees unchanged. |
| Transmission Grid Code regulations | Current | 2026 (SI 4 of 2026) | Electricity (Transmission) (Grid Code) Regulations, intended to support the integration of variable renewable energy while maintaining stability. The Electricity (Wayleave and Clearances) Regulations followed as SI 2 of 2026. |
| Open-access market rules | Upcoming | Consultation continuing in 2026 | Trading guidelines, System Operator guidelines, a balancing mechanism and agreement, an outage procedure, a metering and data management procedure and a participation agreement, building on the Market Guidelines and network pricing methodology approved in 2025. |
| Independent System Operator | Upcoming | Not announced | The Cabinet-approved market structure provides for legal separation of the System Operator from ZESCO, with ZESCO’s Public Service Trader ring-fenced for legacy contracts. |
| Revised Electricity Act | Upcoming | Draft consulted December 2025 | A first draft of the amended Electricity Bill underwent stakeholder consultation. |
| Smart prepaid meter pilot | Upcoming | Pilot from February 2026; national rollout not decided | Six-month ZESCO pilot in Roma, Lusaka, which could lead to a national rollout. |
| ZESCO performance framework 2026–2028 | Current | January 2026 | New ERB KPI framework with greater weight on quality of service and system losses and a new postpaid-billing indicator. |
| Lithium-ion battery standard | Upcoming | Submitted to ZABS for publication | Technical requirements for stationary lithium-ion batteries used in solar and backup systems. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 525 net-metered prosumers with 17.7 MW of all customer types at the end of 2025, against about 4.06 million households, of whom only about half have electricity access. |
| Distributed energy market | Low | Grid-connected distributed generation limited to 17.7 MW of net metering; mini-grids recorded by REA total about 2 MW; aggregation is not provided for. |
| Grid flexibility market | Low | No flexibility or ancillary-services market for distributed assets; a balancing mechanism is still in draft and open access starts at 1 MW. |
| Energy storage adoption | Low | No operating grid-scale battery identified; the 600 MWh Leopards Hill project targets financial close at the end of 2026. |
| Renewable growth environment | High | Non-hydro renewable capacity rose from 182 MW to 348 MW in 2025 and grid solar from 183 MW to 308 MW, with about 500 MW under construction for 2026 and 1,115 MW of solar construction permits issued in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 28 sources
- ZESCO Tariff Schedule (residential tariffs, current and 2026/2027). ZESCO Limited, 2025. accessed 1 October 2026.
- Energy Sector Report 2025. Energy Regulation Board, 2026. accessed 1 October 2026.
- End of Year Press Briefing by the ERB Director General, 24 December 2025. Energy Regulation Board, 2025. accessed 1 October 2026.
- Tariff Schedule: Approved Multi-Year Tariffs 2024–2027. Energy Regulation Board, 2024. accessed 1 October 2026.
- Press Statement: Approved Reference Tariffs for the Net Metering Programme and the Respective Connection Fees (31 December 2025). Energy Regulation Board, 2025. accessed 1 October 2026.
- The Electricity (Net Metering) Regulations, 2024 (SI No. 38 of 2024). Government of Zambia (via ZESCO net-metering portal), 2024. accessed 1 October 2026.
- Application Guidelines for Net Metering in Zambia. Energy Regulation Board, 2024. accessed 1 October 2026.
- Press Statement: ZESCO Launches Net Metering Program to Boost Renewable Energy Adoption. ZESCO Limited, 2024. accessed 1 October 2026.
- Renewable Energy System Technical Specifications for Net Metering, Version 2. ZESCO Limited. accessed 1 October 2026.
- Prosumer Net Metering Management System. ZESCO Limited. accessed 1 October 2026.
- Prosumer Application Form – Net Metering (DS.13510.FORM.03390). ZESCO Limited. accessed 1 October 2026.
- Customer Advisory: Emergency Tariff Adjustment Takes Effect on 1 November 2024. ZESCO Limited, 2024. accessed 1 October 2026.
- Distribution and Customer Service Directorate. ZESCO Limited. accessed 1 October 2026.
- Transmission Operations and Trade Directorate. ZESCO Limited. accessed 1 October 2026.
- Generation Directorate – power stations. ZESCO Limited. accessed 1 October 2026.
- 2022 Census of Population and Housing: Preliminary Report. Zambia Statistics Agency (copy hosted by ILO), 2022. accessed 1 October 2026.
- National Energy Compact for Zambia (Mission 300). Government of the Republic of Zambia / World Bank, 2025. accessed 1 October 2026.
- The Electricity Act, 2019 (Act No. 11 of 2019). Government of Zambia (via Policy Vault Africa), 2019. accessed 1 October 2026.
- The Energy Regulation (General) Regulations, 2023 (SI No. 41 of 2023). Government of Zambia (via FAOLEX), 2023. accessed 1 October 2026.
- Licensing – Off-Grid Information Hub. Government of Zambia Off-Grid Information Hub. accessed 1 October 2026.
- Licence Requirements for Generation of Electricity for Own Use (LN.FM-023). Energy Regulation Board, 2024. accessed 1 October 2026.
- Zambia adopts an open access regime for the electricity market. Polity, 2024. accessed 1 October 2026.
- Customs Handbook for Solar PV Products in Zambia (June 2024). GOGLA / Ministry of Energy / Zambia Revenue Authority, 2024. accessed 1 October 2026.
- Understanding ZESCO’s billing system in the era of 24-hour power supply. The Zambian Observer, 2026. accessed 3 October 2026.
- Average Exchange Rates (30 September 2026, 15:30). Bank of Zambia, 2026. accessed 1 October 2026.
- Zambia: ZESCO Pilots Smart Grid in Roma to Boost Electricity Reliability. Energy News Africa, 2026. accessed 1 October 2026.
- Zambia launches its largest solar-plus-storage project with 600 MWh battery. ESS News, 2026. accessed 1 October 2026.
- ZICTA reports strong growth in mobile internet usage in 2025 ICT sector review. Zambia Monitor, 2026. accessed 1 October 2026.
Questions about energy in Zambia.
Since 1 November 2025 ZESCO has charged households K0.35/kWh for the first 100 kWh a month, K1.00/kWh from 100 to 200 kWh, K2.42/kWh from 200 to 400 kWh and K3.45/kWh above 400 kWh. These prices exclude 3% excise duty and 16% VAT, which add 19.48% in total. Including taxes, a household using 200 kWh a month pays K161.30, an average of K0.81/kWh (about EUR 0.036/kWh).
ZESCO Limited, the state-owned utility, supplies almost all grid-connected homes. CEC and NWEC distribute electricity in parts of the Copperbelt and North-Western Province. Households cannot choose their supplier, and the Energy Regulation Board approves all retail tariffs.
Yes, through net metering. You apply to ZESCO (or your local distribution company), pay for a bidirectional meter, and sign supply and connection agreements. Exports are valued at the ERB reference tariff, K1.35/kWh in 2026. The value is credited to your prepaid meter or deducted from your postpaid bill.
There is no national supply-point number. A connection is identified by its ZESCO service number and meter number. ZESCO forms ask for the “Service No/Meter No”, and prepaid customers buy tokens using the meter number.
A household net-metering system is approved by the distribution company rather than licensed by the ERB. Generating stations of 250 kW or more, or plants that supply other people, fall under ERB licensing. Businesses that sell or install solar equipment need an ERB licence, and net-metering designs must be certified by an EIZ-registered competent person.
About 83% in 2025, almost all of it hydropower. Solar supplied less than 3%, but capacity is growing fast: grid solar rose from 183 MW to 308 MW in 2025. Coal from Maamba supplied most of the rest.
Most electricity comes from hydropower, and the 2023/24 drought left the Kariba and Kafue reservoirs very low. In 2025 average generation was about 729 MW below demand, so ZESCO imported power and rationed supply through scheduled load shedding.