How electricity works in Zimbabwe.

Zimbabwe electricity 2026: ZETDC stepped US$ tariff, ZERA regulation, STS prepaid meters, net metering up to 5 MW, new 2026 licensing rules and the Kariba–Hwange grid.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in US dollar (tariffs are set in US$ and can be paid in Zimbabwe Gold, ZWG, at the interbank rate) (USD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Zimbabwe energy at a glance.

Key figures for households in Zimbabwe. Each one links to its source on the full overview below.

  • Electricity price.

    0.085 USD per kWh for households, including taxes. Figures for Tariff from 1 December 2023, still in force September 2026.

  • Renewable share.

    31.7% of electricity from renewable sources. Figures for Q1 2026.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Zimbabwe.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Zimbabwe below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Zimbabwe requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Zimbabwe.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Zimbabwe, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Zimbabwe, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Zimbabwe.

Full overview

The energy market in Zimbabwe, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Zimbabwe’s power sector is built around the state-owned ZESA Holdings group. Zimbabwe Power Company (ZPC) runs the Kariba South hydro station and the Hwange coal station, and Zimbabwe Electricity Transmission and Distribution Company (ZETDC) owns the national grid and is the only retailer to households. The Zimbabwe Energy Regulatory Authority (ZERA) licenses sector activities and approves tariffs under the Electricity Act [Chapter 13:19], and the Ministry of Energy and Power Development sets policy and makes the regulations.

Household tariffs are approved by ZERA in US dollars and converted to Zimbabwe Gold (ZiG, ZWG) at the point of purchase. The domestic tariff in force since 1 December 2023 rises in six monthly steps, from US$0.08/kWh for the first 50 kWh to US$0.26/kWh above 400 kWh, plus a 6% Rural Electrification Levy. Domestic electricity is zero-rated for VAT. Almost all households buy electricity in advance through STS prepaid meters.

Generation depends on two large plants. In the first quarter of 2026 Hwange supplied 56.3% of national output, Kariba 31.7% and independent power producers (IPPs) 12.0%. Drought cut Kariba’s water allocation in 2024 and 2025 and led to long load shedding. Better rains raised the 2026 allocation. Households and businesses can feed solar power into the grid under net metering. In July 2026 the government gazetted a package of new regulations: annual cash payment for net-metered surpluses, virtual net metering, and registration in place of licensing for self-supply plants up to 10 MW.

Energy snapshot.

Headline figures for electricity in Zimbabwe. Each shows its data year and links to its source.

  • Population15,178,979 peopleSource 52022
  • Households3,818,992 householdsSource 52022
  • Average household size4 people/householdSource 52022
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (USD)0.085 USD/kWhSource 2Tariff from 1 December 2023, still in force September 2026
  • Household price (EUR)0.075 EUR/kWhSource 3September 2026
  • Renewable electricity share31.7%Source 6Q1 2026
  • Solar capacity0.1 GWSource 72024
  • Wind capacity0 GWSource 72024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
Zimbabwe Energy Regulatory Authority (ZERA)
System operator
Zimbabwe Electricity Transmission and Distribution Company (ZETDC), which operates the national grid and control centre
Distribution networks
A single national distributor: ZETDC owns the backbone network and supplies all grid customers through five regions (Harare, Northern, Southern, Eastern, Western).
Currency
US dollar (tariffs are set in US$ and can be paid in Zimbabwe Gold, ZWG, at the interbank rate) (USD)
Voltage and frequency
220 V single-phase / 380 V three-phase, 50 Hz

Electricity prices in Zimbabwe.

Household price (USD)
0.085 USD/kWh (Tariff from 1 December 2023, still in force September 2026)Source 2The first 50 kWh a month on the domestic stepped tariff cost US$0.08/kWh, plus the 6% Rural Electrification Levy (0.08 × 1.06 = 0.0848). ZERA’s price panel on 17 September 2026 showed US$4.24 (ZWG 109.04) for the first 50 units. Higher bands cost US$0.09–0.26/kWh before the levy. Domestic energy charges are zero-rated for VAT.
Household price (EUR)
0.075 EUR/kWh (September 2026)Source 3Converted from US$0.0848/kWh at the ECB reference rate of 1 EUR = 1.1355 USD on 30 September 2026 (0.0848 ÷ 1.1355 = 0.0747). The top band (US$0.26 plus 6% levy = US$0.2756) converts to about EUR 0.243/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

Zimbabwe uses several currencies. The ZiG (ZWG) replaced the Zimbabwe dollar on 6 April 2024, and the US dollar remains in wide use. ZERA sets electricity prices in US dollars, and customers pay either in US$ or in ZiG converted at the prevailing interbank rate when they buy. ZETDC’s published schedule states that the prices are in USD converted to ZiG at the point of purchase, so the ZiG price of a unit moves with the exchange rate.

The schedule’s prices exclude the 6% Rural Electrification Levy and 15% VAT. Under Statutory Instrument 168 of 2012, domestic electricity charges are zero-rated for VAT, and under SI 215 of 2005 fixed charges for commercial and domestic users are also zero-rated. In practice a household pays the stepped energy rate plus 6%. The levy funds the Rural Electrification Fund, which pays for grid extension to rural institutions and communities.

ZERA approved a 21% tariff adjustment from 1 December 2023, which raised the average tariff from 11.3 to 16.08 US cents/kWh. The National Energy Compact breaks that average down as 10.97 cents for buying electricity (68.3%), distribution 1.27 cents, payroll 1.3 cents, and a return on assets of 1.28 cents. Use-of-system charges for third parties wheeling power are 2.43 cents/kWh for transmission and 5.19 cents/kWh for distribution. Low-voltage commercial and industrial users pay a flat US$0.23/kWh.

The stepped structure is meant to protect small users and discourage heavy use. A household using 500 kWh a month pays an average of about US$0.21/kWh (with the levy) against US$0.0848 for the first 50 kWh. There are no regional price differences, because one national tariff applies wherever ZETDC supplies.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesZERA approves all tariffs under section 53 of the Electricity Act. The domestic stepped tariff in force since 1 December 2023 is, per kWh each month: 1–50 kWh US$0.08; 51–100 kWh US$0.09; 101–200 kWh US$0.16; 201–300 kWh US$0.23; 301–400 kWh US$0.25; above 400 kWh US$0.26. A 6% Rural Electrification Levy is added. Postpaid (conventional meter) domestic customers also pay a fixed US$1.30 a month.
PrepaymentYesMost households have STS prepaid meters on tariff E1.2.2. The steps reset with the first purchase each month. Tokens are bought by meter number at ZETDC offices, on the self-service portal, at banks and through mobile-money channels such as EcoCash. A flat prepaid tariff (E1.2.1, US$0.19/kWh) is also listed.
OtherLimitedLoad-limited domestic supplies (E1.3) pay a fixed monthly charge of US$1.30 plus a fixed amperage charge, from US$4.64 for 1 A to US$43.39 for 30 A, with no metering of energy. ZETDC has been moving these customers to prepaid meters.
Time-of-useNoThere is no household time-of-use tariff. Maximum-demand business customers pay peak, standard and off-peak energy rates. On weekdays the peak runs 07:00–12:00 and 17:00–21:00, and off-peak runs 22:00–07:00.
DynamicNoThere is no domestic wholesale market and no tariff linked to wholesale prices.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
503.8 kWh/person/yr (2023)Source 32World Bank indicator for electric power consumption per capita, all sectors.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households are a minority of electricity demand. In the first quarter of 2026 ZETDC distributed 1,736.7 GWh: manufacturing, transport and construction used 38.3%, mining and quarrying 28.5%, domestic consumers 28.4% and agriculture 4.8%. Over 2025 as a whole, 8,843.3 GWh was distributed. The domestic share changes with the season and with supply. It was 21.1% in the third quarter of 2024, when load shedding was most severe.

Access is the main constraint on household use. The 2022 census found that 62% of the population had some form of electricity, but only 33.7% of households were connected to the grid, while 28.3% relied on off-grid sources such as solar home systems. The National Electrification Strategy puts access at 41%. Urban access was about 85% and rural access about 47% in 2024, according to World Bank data. ZETDC had a backlog of 467,470 connection applications in May 2025, largely because many customers cannot afford connection costs.

Grid-connected homes use electricity for lighting, electric geysers, cooking and refrigeration. To save electricity, the Electricity (Solar Water Heating) Regulations 2019 bar electric geysers from new premises and require solar water heaters instead. Repeated load shedding has led many households and businesses to install solar panels, inverters and batteries for backup. These are not counted in grid consumption statistics.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
38.6 % of population (2022)Source 5Derived: the census reports 61.4% of the population in rural areas. The World Bank estimates 40.5% urban in 2025.

Most Zimbabweans live in rural areas (61.4% in 2022), where homesteads are scattered and the grid often does not reach. Urban housing is mainly low-rise houses on individual stands, and ZETDC prices connections differently for high-density and low-density suburbs.

In cities, several households often share one plot and one connection. When ZETDC moved customers to prepaid meters in 2023, it targeted households with several users on a single bulk meter. New housing estates are supplied under the Electricity (Provision of Backbone Infrastructure) Regulations 2026. These require land developers to build the medium- and low-voltage network for their stands, which then passes to ZETDC. Single-storey houses with their own roofs make rooftop solar and solar water heaters physically straightforward.

How the grid works in Zimbabwe.

  1. TransmissionZETDC Transmission
  2. DistributionA single national distributor: ZETDC owns the backbone network and supplies all grid customers through five regions (Harare, Northern, Southern, Eastern, Western).
  3. MeteringZETDC
  4. Supply1 or more retail suppliers

ZPC’s installed capacity is 2,640 MW: Kariba South hydro (1,050 MW), Hwange units 1–6 (920 MW) and the new Hwange units 7 and 8 (670 MW). Small hydro, bagasse and solar IPPs add 232 MW, giving 2,962 MW of national capacity. Dependable output has been only 1,200–1,600 MW, because the older Hwange units break down often and Kariba is limited by the water the Zambezi River Authority allocates. Peak demand is about 2,000 MW.

Kariba is shared with Zambia, and each country’s generation depends on the annual allocation set by the Zambezi River Authority. After the 2023/24 drought, Lake Kariba fell to about 13% of usable storage, and Kariba produced only 18.6% of Zimbabwe’s electricity in Q3 2024. The 2026 allocation was set at 30 billion cubic metres in November 2025 and later raised to 36 billion, split equally between ZPC and ZESCO. By late June 2026 the lake held 48% of usable storage.

Zimbabwe both imports and exports. In Q1 2026 it imported 371.4 GWh, about 40% from Hidroeléctrica de Cahora Bassa in Mozambique, and exported 445.6 GWh, mainly to NamPower (Namibia), CEC (Zambia) and ZESCO. Annual exports rose to 1,207.7 GWh in 2025. Transfer limits on key interfaces are typically 200–580 MW, constrained by thermal overloads. The planned ZiZaBoNa (Zimbabwe–Zambia–Botswana–Namibia) and MOZISA (Mozambique–Zimbabwe–South Africa) interconnectors would raise capacity.

Commercially ZETDC acts as a single buyer. It buys from ZPC, from IPPs under PPAs and from regional utilities, and sells to all customers at national tariffs. ZETDC also offers wheeling and energy-banking services. A captive or IPP plant can wheel power over the grid to a customer after a grid impact assessment, paying the published use-of-system charges. ZERA has studied third-party access regulations and a revised tariff methodology, and is developing a domestic wholesale market.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Power DevelopmentSets energy policy, and makes regulations under section 65 of the Electricity Act after consulting ZERA. These include the net metering, licensing, solar water heating and 2026 market regulations. It also leads the National Energy Compact.
RegulatorZimbabwe Energy Regulatory Authority (ZERA)Set up under the Energy Regulatory Authority Act [Chapter 13:23]. It licenses generation, transmission, distribution and supply under section 40 of the Electricity Act, registers self-supply plants of 100 kW to 10 MW, approves tariffs and use-of-system charges, and is developing a domestic wholesale market.
SupplierZESA HoldingsState-owned holding company for ZPC, ZETDC, ZESA Enterprises (ZENT) and Powertel. The Mutapa Investment Fund holds the shares on behalf of the state.
TSOZETDC TransmissionOwns and operates 8,164.79 km of 66–420 kV lines (end 2024), forming the central transmission corridor of the Southern African Power Pool. It dispatches ZPC and IPP plants and schedules imports and exports.
DSOZETDC DistributionRuns 119,874 km of 0.4–33 kV distribution lines through the Harare, Northern, Southern, Eastern and Western regions. It connects customers and is the distribution licensee under the net metering regulations.
SupplierZETDC (retail)The only retailer to grid households, and the main buyer of electricity from ZPC, IPPs and imports. Licensed IPPs may also sell directly to selected large customers under PPAs.
MeteringZETDCOwns, installs, seals and tests all customer meters, including the four-quadrant bi-directional meters used for net metering. It runs the STS prepaid vending system and buys meters from approved suppliers.
ExchangeSouthern African Power Pool (SAPP)The regional power pool, headquartered in Harare. In Q1 2026 ZETDC bought 37.8% of its imports on SAPP’s day-ahead market, alongside bilateral supplies from HCB and EDM (Mozambique) and ZESCO (Zambia).

Compared with the UK system.

Compared with the UK system.
UK conceptZimbabwe equivalentHow it works
DNOZETDC DistributionThere is one national network company. It also owns the meter and supplies the electricity, so there are no regional distribution companies and no separate network charge on household bills. The 2026 backbone regulations allow independent distribution licensees in areas ZETDC does not serve.
National Grid/NESOZETDC Transmission and national control centreZETDC owns the transmission grid and balances supply and demand. Load shedding is its main tool when Hwange or Kariba output and imports fall short. There is no independent system operator.
MPANZETDC prepaid meter number (postpaid account number)A prepaid supply is identified by the meter number of its STS meter. The vending system uses it to generate each 20-digit token. Postpaid customers have an account number created in ZETDC’s customer system. There is no separate national supply-point number.
MPRNNo equivalentThere is no piped gas network for homes. Households use LPG cylinders, firewood and electricity for cooking.
Meter operatorZETDCMeters belong to ZETDC even when they are installed on the customer’s premises. ZETDC buys prepaid meters from a list of approved suppliers.
SupplierZETDC (sole retailer)Households cannot choose a supplier. All grid customers pay ZERA-approved national tariffs to ZETDC.
Smart-meter infrastructureSTS prepaid meters; head-end system for smart metersHouseholds use one-way STS keypad meters. ZETDC reads smart meters for larger customers through a head-end system (HES), and has used Iskraemeco meters with meter-data software. There is no national data and communications company like the DCC.

How a supply point is identified.

Prepaid meter number 37140958261 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?ZETDC meter number (prepaid) / ZETDC account number (postpaid)
Who issues it?Zimbabwe Electricity Transmission and Distribution Company (ZETDC)
FormatPrepaid supplies are identified by the STS meter number printed on the meter. Token vending systems ask for 11 digits (some meters show a 12th digit, which is not used). Postpaid supplies have an account number created in ZETDC’s Integrated Customer System (ICS) during enrolment.
LengthPrepaid meter number: 11 digits. Account number: format not published.
Stays with the property when you switch supplier?Yes
Where to find itOn the front of the prepaid meter or the keypad unit, and on token receipts. For postpaid customers, on the bill and on the E22 connection form.
Electronic accessZETDC’s online self-service portal lets customers view tokens, retrieve key-change tokens, pay bills and track applications. A WhatsApp channel and the 24-hour contact centre (704) are also available.
Third-party accessNo regulated data-access route for third parties was identified. Banks, mobile-money operators and token vendors need only the meter number to sell electricity. Installers include the meter or account details on net metering applications made with the customer’s consent.
Who keeps the registerZETDC’s Integrated Customer System (ICS) and STS vending system. ZETDC also keeps the register of net-metered generators required by the net metering regulations.
Register scopeNational

Zimbabwe has no separate supply-point register like the UK’s MPAN system. ZETDC is both network operator and sole retailer, so a supply point is identified by ZETDC’s own numbers. For prepaid customers, the main identifier is the meter number. Each STS meter has a unique number and is programmed with ZETDC’s supply group and token identifier. When a customer buys electricity with that number, the vending system generates a 20-digit encrypted token that only that meter will accept.

ZETDC creates a customer account during connection. Under its enrolment procedure, the applicant submits an E22 application with a copy of their ID and proof of ownership or an offer letter. ZETDC then quotes the connection and records the account in its Integrated Customer System before the meter is commissioned, so that nobody consumes power without being billed. The account number goes on the copy of the E22 sent to the depot, and the prepaid meter is linked to the customer’s details.

The meter and its number stay at the premises. A new occupier keeps buying tokens with the same meter number. The register is national and held by ZETDC. The example of a prepaid meter number in this section is fictional.

The 2023–2024 TID rollover

All STS meters worldwide had to be re-keyed before 24 November 2024, when the original token identifier (TID) period ran out. ZETDC did this between 15 November 2023 and November 2024, area by area. When a customer bought electricity, they received three 20-digit tokens: two key-change tokens and one credit token, entered in order. No site visit was needed, and replacement key-change tokens could be retrieved with the meter number. Meters that were not updated stopped accepting tokens.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingNo
How exported electricity is paidCredit in kWh: each kWh exported offsets 0.8 kWh of consumption for domestic customers and 0.85 kWh for maximum-demand customers. Surplus credits roll over. Since SI 127 of 2026, participants are paid for the cumulative excess at the end of the annual billing cycle, at rates ZERA approves with the Minister under the tariff code.
What size can be net-metered?Up to 5 MW per site since SI 38 of 2022 (the 2018 regulations allowed 100 kW). Inverters above 13.8 kVA must be balanced three-phase. On multiphase connections, units above 4.6 kVA must be spread evenly across the phases.
How are exports valued?In energy, not money, during the year: 0.8 kWh offset per kWh exported for domestic customers and 0.85 kWh for maximum-demand time-of-use customers. The 20% (or 15%) discount pays for use of the network. Under SI 127 of 2026, cumulative surpluses are paid out at the end of the annual billing cycle, at rates ZERA sets, and participants pay any taxes and levies due.
Can credits be shared between sites?Yes, under virtual net metering (section 10A, added by SI 127 of 2026). A participant applies to the distribution licensee with proof of ownership or lease, agreements showing the commercial relationship, and its net metering certificate. ZETDC must decide within 21 days, and the participant pays to integrate with ZETDC’s control centre.
Which technical rules apply?Continuous operation between 47.5 and 52.5 Hz and between 90% and 110% of rated voltage. Power factor of at least 0.98. DC injection no more than 1% of rated current. The unit must stop energising within two seconds of losing grid voltage. Harmonic limits follow IEEE 519.
Can ZETDC disconnect a system?Yes. The generator must disconnect automatically during outages or abnormal network conditions. ZETDC can order immediate disconnection if a system damages the network or affects other customers.
How much is connected?Net metering grew from 81 connections and about 2.1 MW at the end of 2021 to about 75 MW in February 2025. ZESA’s acting chief executive put it at 118 MW in 2026. The National Energy Compact targeted 100 MW by 2025 and a further 200 MW between 2026 and 2030.

Connecting a home system.

  1. Install a grid-tied renewable system (typically solar PV with an inverter certified to IEC 61727 and IEC 62116) on the customer’s side of the ZETDC meter, sized up to 5 MW per site.
  2. Apply to ZETDC for net metering (form ENM1) and for interconnection (form ENM2), with system details. The interconnection cost follows ZETDC’s quotation.
  3. ZETDC reviews the design against the Net Metering Guidelines in the Third Schedule of SI 38 of 2022: voltage, frequency and power-factor limits, protection, labelling and isolation.
  4. The installer declares that the installation complies with IEC 60364-7-712. ZETDC may witness the commissioning tests, including the anti-islanding and cease-to-energise tests.
  5. ZETDC installs a four-quadrant bi-directional meter, which it owns, and records the generator in its net metering register.
  6. From the next billing period, exports are credited against consumption at 0.8 kWh (domestic) or 0.85 kWh (maximum-demand customers) per kWh exported.

Net metering is governed by the Electricity (Net Metering) Regulations 2018 (SI 86 of 2018), made under section 65 of the Electricity Act and amended by SI 38 of 2022 and SI 127 of 2026. Any ZETDC customer with a grid-tied renewable system can apply. The regulations describe the grid as a “virtual battery bank”: a participant exports surplus generation and uses the credits to offset electricity bought later. The 2022 amendment raised the cap from 100 kW to 5 MW per site and cut the credit from 0.9 kWh to 0.8 kWh (domestic) or 0.85 kWh (maximum-demand customers) per kWh exported.

Net metering also helps households under the stepped tariff. Offsetting imports keeps more of a household’s monthly consumption in the cheaper bands, and ZETDC lists this among the reasons for the scheme. Until 2026 surplus credits could only roll over. SI 127 of 2026 adds an annual cash settlement of cumulative surpluses and virtual net metering between supply points, but the payment rate depends on a ZERA tariff decision.

Connection costs have been a barrier. Media reports from 2026 say ZETDC opened a 36-month promotional window, running to March 2027, which defers net metering connection fees and recovers them from the participant’s energy credits. Applications are made through ZETDC’s online platform. Separately, generators that do not offset their own consumption, such as IPPs selling to ZETDC or to third parties, need a ZERA generation licence and a PPA rather than net metering.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for sale (IPP)ZERA generation licence under section 40 of the Electricity Act. Since SI 125 of 2026 there is no licence fee for commercial renewable plants below 10 MW (US$20 application fee). Above 10 MW, solar PV pays US$2,875 plus US$1,437.50 per 25 MW.ZERAA PPA with ZETDC, or with a selected customer, is needed. Projects must also have environmental approval from the Environmental Management Agency (EMA).
Generate for own consumptionNo licence up to 10 MW. Plants of 100 kW to 10 MW must register with ZERA before construction (form GFOC1, US$10 fee) and notify ZERA on completion (form GFOC2). Above 10 MW a licence is needed, with no licence fee for renewables.ZERASet by SI 126 of 2026, which replaced the earlier rule that all plants above 100 kW needed a licence. Registration requires a grid impact assessment and an EMA approval or exemption letter.
Small rooftop generation and export (net metering)No ZERA licence for net-metered systems up to 5 MW. The customer applies to ZETDC (forms ENM1 and ENM2) and receives a net metering certificate.ZETDC (distribution licensee); rules set by the Ministry and ZERASystems of 100 kW or more that also supply the owner’s own load fall under the own-consumption registration rules.
Store electricityNo separate storage licence category was identified. Batteries are declared as part of a generation facility: the 2026 own-consumption forms ask for battery capacity in MWh.ZERABehind-the-meter batteries need no authorisation, but must be isolated so they cannot back-feed a de-energised grid.
Transmit electricityTransmission licence; licence fee US$60,000 plus a US$20 application fee (SI 125 of 2026).ZERAZETDC holds the national transmission licence. The 2026 reforms allow private investment in transmission.
Distribute electricityDistribution licence from ZERA. Independent distribution licensees may serve areas without ZETDC supply for 25-year terms under SI 128 of 2026.ZERAZETDC is the primary distribution licensee and the sole owner of backbone infrastructure in areas it serves.
Supply / sell to end customersLicence under section 40 of the Electricity Act. Licensed IPPs may sell to selected customers under PPAs, which are exempt from regulatory approval.ZERAHouseholds are supplied only by ZETDC. Selling to a third party over the grid requires wheeling arrangements and use-of-system charges.
Export electricity across bordersControlled under the Electricity (Export Control) Regulations 2026 (SI 118). Generators may export up to 30% of available capacity, and retail suppliers up to 20% of contracted capacity.Ministry of Energy and Power Development / ZERADomestic supply has priority. Exports are traded within SAPP.
Wholesale tradingNo domestic wholesale market operates yet. Regional trading on SAPP markets is open to SAPP members and participants, such as ZETDC.SAPP; ZERA for domestic licensingZERA is developing a domestic wholesale market and use-of-system pricing.
Aggregation, VPP, balancing and grid servicesNo licence category or market exists. These services are not open to third parties or distributed assets.ZERAZETDC alone balances the system. Remote control of customer assets has no legal framework beyond ZETDC’s right to disconnect net-metered systems.
Electrical installation workWiring must be done by a contractor holding at least a Class IV electrician journeyman or apprenticeship certificate, following SAZ 400 wiring rules. ZETDC inspects before connection.ZETDC; Apprentice Board (Manpower Planning and Development Act)Planned Energy (Solar Products and Installation) Regulations would add solar product standards and installer competence certification.

The Electricity Act [Chapter 13:19] requires a ZERA licence to generate, transmit, distribute or supply electricity, and the Electricity (Licensing) Regulations 2008 (SI 103 of 2008) set the procedure and fees. The 2026 reforms changed the regime substantially. SI 125 of 2026 abolished licence fees for renewable self-supply and for commercial renewable plants below 10 MW. SI 126 of 2026 replaced licensing with registration for self-supply plants between 100 kW and 10 MW. ZERA must publish a quarterly notice of registered plants and keep a register.

Small consumers face little licensing. A household rooftop system with or without batteries needs no ZERA licence. If it exports, the customer joins ZETDC’s net metering scheme, which has its own application and certificate. A business installing several hundred kilowatts of solar for its own use registers with ZERA, submits a grid impact assessment and environmental documents, and notifies ZERA when the plant is commissioned. Selling electricity to someone else always needs a generation licence.

There is no framework for aggregators, demand response providers or virtual power plants. Battery storage is treated as part of a generation facility rather than as a separate licensed activity.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
SAPP day-ahead and intra-day marketsRestricted—NoSouthern African Power Pool. Regional markets for SAPP members and approved participants. ZETDC bought 37.8% of its Q1 2026 imports on the day-ahead market. Households and small assets have no access.
Domestic wholesale marketDeveloping—NoZERA (in design). ZERA is setting up a domestic electricity wholesale market and developing transmission and distribution use-of-system prices. No start date has been published.
Ancillary services / frequency controlNo—NoZETDC. ZETDC provides balancing from ZPC plants, imports and load shedding. There is no procurement from third parties or distributed assets.
Demand responseNo—NoZETDC. No paid demand-response programme exists. Peak management relies on load shedding and on time-of-use rates for maximum-demand customers.

Distributed assets have no route into flexibility markets in Zimbabwe. The system is balanced by ZETDC alone, using ZPC’s Kariba and Hwange plants, bilateral and SAPP imports and, when supply is short, rotational load shedding. Large customers can only respond to price through time-of-use energy rates.

Planned changes point towards a more open market: ZERA’s domestic wholesale market, third-party access rules, lower use-of-system charges for wheeling, and the 2026 virtual net metering rules, which let banked credits move between supply points. None of these yet creates a way to aggregate household solar or batteries, or to pay for grid services.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Southern African Power Pool (SAPP)Regional power pool and market operator, based in Harare, through which ZETDC trades imports and exports.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepaid STS meters for almost all households; smart meters for large and medium customers
Reading intervalNot applicable for household prepaid meters (no interval data)
Household meter typeSTS prepaid keypad meter, 20-digit tokens
Prepaid migration751,000 domestic and small business points on prepaid by January 2023; full coverage of domestic customers reported in 2025
Smart metersFor large and medium users; at least 50% of eligible customers connected (2025)
TID rolloverCompleted between November 2023 and 24 November 2024
Meter ownershipZETDC, including bi-directional net metering meters
Data systemZETDC Integrated Customer System, STS vending and a head-end system for smart meters

Prepayment is how Zimbabwe’s household metering works. ZETDC introduced prepaid vending in 2012. In January 2023 it launched a US$35 million smart and prepaid metering programme to move the remaining postpaid and load-limited customers. By then 751,000 domestic and small business points had migrated, and about 103,000 remained on the old postpaid system. The National Energy Compact describes domestic customers as fully covered by prepaid metering.

Smart (communicating) meters are used for higher-value customers. ZETDC’s first smart metering project, with Iskraemeco AM550 and MT880 meters and SEP2W meter data management software, covered 40,000 metering points. Later phases focused on large and medium consumers and priority accounts. Its enrolment procedure shows meter reading by hand or through a head-end system. Household STS meters are one-way devices and record no interval data. Net metering customers get four-quadrant bi-directional meters that record import and export separately.

Renewable electricity.

Electricity generation mix (Q1 2026).

  • Coal (Hwange): 56.3%
  • Hydro (Kariba): 31.7%
  • IPPs (mainly solar, small hydro and bagasse): 12%
Source 6
Renewable electricity share
31.7% (Q1 2026)Source 6Kariba hydro’s share of electricity generated in January–March 2026 (926.9 GWh). IPPs supplied another 12.0%. Most IPP output is solar, small hydro and bagasse, but ZIMSTAT does not split it by technology and some private plants are thermal, so IPP output is not counted here. Kariba’s share was only 18.6% in Q3 2024, during the drought.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Large hydro (Kariba South)
1.05 GW (2025)Source 4
Coal (Hwange 1–8)
1.59 GW (2025)Source 4Hwange units 1–6 (920 MW) plus units 7 and 8 (670 MW). The Compact puts total national coal capacity, including private plants, at 1,680 MW.
Small hydro, bagasse and solar IPPs
0.232 GW (2025)Source 4
Solar PV
0.1 GW (2024)Source 7
Bioenergy
0.1 GW (2024)Source 7

Targets.

  • Raise renewable capacity from 1,282 MW (2024) to 2,640 MW by 2030, 48.6% of a projected 5,432 MW (National Energy Compact).
  • Raise renewables excluding large hydro from 7.8% to 29% of the energy mix by 2030.
  • Reach 100 MW of net-metered capacity by 2025, and add a further 200 MW between 2026 and 2030.
  • Install 1 kW solar systems for over one million rural households under the Presidential Rural Solarisation Scheme (from 2025, over five years).
  • Universal household electricity access by 2030.

Zimbabwe’s renewable output rises and falls with Kariba. In a good water year the hydro station supplies a third or more of national generation. In the 2024 drought it fell below a fifth, and Hwange coal supplied most of the rest. The National Energy Compact puts renewables, including large hydro, at about 43% of the mix in 2025, with solar, small hydro and bagasse at 7.8% of installed capacity.

Solar is growing mainly through IPPs and self-supply. ZERA has licensed about 160 generation projects, but only 61 were operating in 2025. Many unsolicited projects have not reached financial close because of currency-convertibility and offtaker risks. The government’s response includes a Government Project Support Agreement framework and a move to competitive procurement. In May 2026 ZETDC issued a World Bank-funded procurement notice for transaction advisers to procure 370 MW of solar PV across five solar parks.

Rooftop solar is widespread because of load shedding, but much of it is off-grid or backup-only and does not appear in statistics. Grid-tied rooftop systems are counted through net metering, about 118 MW in 2026. The 2026 regulations make self-supply easier still by removing licence fees and replacing licensing with registration up to 10 MW.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage in Zimbabwe is mostly behind the meter. Years of load shedding have made inverter-and-battery systems a common household and business purchase, and ZERA has issued consumer guidance favouring lithium iron phosphate batteries and safe installation. No register of these systems exists.

At grid scale, the National Energy Compact presents battery storage as a way to manage more variable solar. ZETDC has tendered for utility-scale capacity. The 2026 own-consumption forms ask developers to declare battery storage in MWh alongside generation capacity, so ZERA will begin recording storage attached to registered self-supply plants.

Storage projects.

  • ZETDC utility battery storage tender: ZETDC invited bids for about 1,800 MWh of battery storage in January 2025. The National Energy Compact lists completing a BESS by Q2 2027 as an action, and says several companies have bid.
  • Mater Dei Hospital, Bulawayo: A 750 kWp solar array with a 1 MWh lithium battery system, launched on 10 March 2026 under the Zimbabwe Renewable Energy Programme.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Zimbabwe Electricity Transmission and Distribution Company (ZETDC)Sole retailer to households and most grid customersNoLimitedNoYes

There is no retail competition. ZETDC supplies every grid-connected household at ZERA-approved national tariffs. Time-of-use rates apply only to maximum-demand business customers, and smart meters only to larger customers. Licensed IPPs can sell directly to selected commercial or industrial customers under PPAs, using private lines or wheeling over the grid, but this is not open to households.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Power DevelopmentGovernmentEnergy policy and regulationsMakes the net metering, licensing and 2026 market regulations, and leads the National Energy Compact.
Zimbabwe Energy Regulatory Authority (ZERA)RegulatorEnergy regulatorLicenses and registers generation, approves tariffs and use-of-system charges, and enforces solar water heating rules.
ZETDCTransmissionTransmission, distribution and retailRuns the grid, connects customers and processes net metering applications.
Zimbabwe Power Company (ZPC)DistributionState generatorOperates Kariba South and Hwange, which supply most of the country’s electricity.
Rural Electrification FundGovernmentRural electrification agencyFunded by the 6% levy on electricity. Extends the grid and solar mini-grids to rural institutions and communities.
Southern African Power Pool (SAPP)MarketRegional power poolHarare-based regional market for Zimbabwe’s imports and exports.
Renewable Energy Association of Zimbabwe (REAZ)Renewable EnergyIndustry associationRepresents renewable energy companies and promotes uptake of renewable technologies.
Standards Association of Zimbabwe (SAZ)ConsumerNational standards bodyPublishes the SAZ wiring rules and the ZWS standards for solar water heaters and other equipment.
Environmental Management Agency (EMA)GovernmentEnvironmental regulatorEnvironmental impact assessments or exemption letters are needed to register or license generation plants.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (net metering)Net Metering Guidelines, Third Schedule to SI 86 of 2018 (as amended by SI 38 of 2022)Ministry of Energy and Power Development / ZERAFrequency 47.5–52.5 Hz, voltage 90–110%, power factor at least 0.98, flicker and harmonic limits, labelling and isolation.
Inverters / anti-islandingIEC 61727; IEC 62116; IEEE 519IEC / IEEE (referenced by the net metering regulations)Inverters must be certified. The unit must stop energising within 2 seconds of losing grid voltage, and DC injection must be no more than 1%.
PV installationIEC 60364-7-712IEC (referenced by the net metering regulations)The installer must declare that the installation complies.
Building wiringSAZ Wiring Rules (SAZ 400)Standards Association of ZimbabweZETDC inspects wiring against these rules before connection. The work must be done by a Class IV electrician or above.
Grid and distribution codesElectricity (Grid Code) Regulations; Electricity (Distribution Code) RegulationsZERASet the network connection and operating requirements, and the earthing rules referenced for embedded generators.
Solar water heatersZWS 744:2003; ZWS 1016; ZWS 1025 and others in SI 235 of 2019Standards Association of Zimbabwe / ZERASolar water heating systems installed under the 2019 regulations must meet the listed Zimbabwe standards.
Appliances and EV chargingSI 119 of 2026 (minimum energy performance and labelling); SI 120 of 2026 (EV charging station safety)Ministry of Energy and Power Development / ZERAMinimum efficiency and labelling for 27 appliance categories; earthing, protection and installation rules for chargers.

Permissions.

Permissions.
PermissionRequiredLevelDetail
ZETDC net metering approvalYesNationalNeeded for any system that exports: application, interconnection quotation, inspection and a bi-directional meter.
ZERA registration (100 kW–10 MW self-supply)LimitedNationalNeeded only for own-consumption plants of 100 kW to 10 MW, before construction. Includes a grid impact assessment and a US$10 fee.
ZERA generation licenceLimitedNationalNeeded for plants that sell electricity, and for self-supply plants above 10 MW.
Environmental approval (EMA)LimitedNationalAn environmental impact assessment or exemption letter is needed for registered or licensed plants. Not normally needed for household rooftop systems.
Electrical inspectionYesNationalZETDC inspects new or altered wiring against the SAZ wiring rules (re-inspection fee US$20), and may witness net metering commissioning tests.
Local authority building approvalLimitedLocalBuilding plans for new premises go to the local authority. Exemptions from the solar water heating rules must be sought from ZERA before plans are submitted.

A household rooftop solar system that does not export needs no permission from ZERA or ZETDC, though the wiring must follow the SAZ rules. Exporting requires ZETDC’s net metering approval and meter. Larger self-supply systems register with ZERA, and selling electricity needs a licence.

The Electricity (Solar Water Heating) Regulations 2019 (SI 235 of 2019) bar owners of new premises from connecting electric geysers and require solar water heating systems that meet Zimbabwe standards. The rules do not apply to existing premises that already have electric geysers. ZERA can exempt premises with technical limitations, cogeneration or renewable surplus used as a dump load. Applications are made before building plans are submitted, and ZERA decides within 30 days.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering (kWh credits with annual surplus payment)ActiveNet meteringExports offset 0.8 kWh (domestic) or 0.85 kWh (maximum-demand customers) per kWh. Since SI 127 of 2026, cumulative surpluses are paid at the end of the annual billing cycle at ZERA-approved rates, and credits can be shared through virtual net metering.Since 2018; amended 2022 and July 2026
ZETDC net metering connection-fee deferralActiveFee deferralReported 36-month promotional window in which connection fees are deferred and recovered from accumulated energy credits.Until March 2027
No licence fees for renewable generationActiveFee exemptionSI 125 of 2026 removed licence fees for renewable self-supply plants of any size and for commercial renewable plants below 10 MW. Only a US$20 application fee applies.From 31 July 2026
Presidential Rural Solarisation SchemeActiveGovernment programmeA government-funded programme to install 1 kW solar systems in over one million rural households over five years from 2025.2025–2030

Data and connectivity.

Fixed broadband
41.6 % of population using the internet (2024)Source 33World Bank (ITU) indicator for individuals using the internet. Not a fixed-broadband figure.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Household metering in Zimbabwe does not depend on telecoms. STS prepaid meters work offline: a customer buys a token through a bank, a mobile-money service such as EcoCash, a vendor or ZETDC’s portal, and types it into the keypad. Mobile money is the main token sales channel.

Smart meters for larger customers communicate with ZETDC’s head-end system over mobile networks, and ZETDC has said its newer meters support 4G/LTE. Mobile networks run by Econet, NetOne and Telecel are expanding, and POTRAZ counted 252 active 5G base stations in mid-2025.

Grid conditions.

National peak demand
2 GW (2025)Source 4Peak demand as stated in the National Energy Compact. Dependable capacity is 1.2–1.6 GW.
Annual electricity demand
8.84 TWh (2025)Source 6Electricity distributed in 2025 (8,843.3 GWh). Generation was 11.23 TWh, derived by adding ZIMSTAT’s quarterly totals. Exports were 1.21 TWh.
Generation capacity
2.962 GW (2025)Source 4National installed capacity, on-grid and off-grid.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Zimbabwe’s grid suffers from too little reliable generation rather than too much variable supply. The older Hwange units break down often, and Kariba depends on the rains, so dependable capacity has stayed well below the 2,000 MW peak. The shortfall is met by imports and load shedding. The Compact records load shedding of 12–14 hours a day at its worst. Network losses are estimated at 18–20%, and ZETDC had a backlog of 467,470 unconnected applicants in May 2025.

Conditions improved in 2025 and 2026. Generation rose 29.5% year on year in Q4 2025 and 20.9% in Q1 2026, helped by the Hwange 7 and 8 units and by a larger Kariba allocation after good rains. Exports exceeded 1.2 TWh in 2025. The transmission network is old and often overloaded, and the Compact estimates that Zimbabwe needs at least 1,607 km of new transmission lines.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Net metering surplus payments and virtual net metering (SI 127 of 2026)CurrentGazetted 31 July 2026Participants are paid for cumulative excess energy at the end of the annual billing cycle, at ZERA-approved rates, and can transfer banked credits between supply points. The payment rate depends on a ZERA tariff decision.
Registration instead of licensing for self-supply up to 10 MW (SI 126 of 2026)CurrentGazetted 31 July 2026Own-consumption plants of 100 kW to 10 MW register with ZERA (US$10). A licence is needed only above 10 MW.
Licence fee overhaul (SI 125 of 2026)CurrentGazetted 31 July 2026No licence fees for renewable self-supply, or for commercial renewable plants below 10 MW. Higher fees for non-renewable plants above 10 MW.
Backbone infrastructure and independent distributors (SI 128 of 2026)CurrentGazetted 31 July 2026Land developers must provide the distribution network for new developments. Independent distribution licensees can serve unserved areas.
Export controls, appliance standards, EV charging and energy management (SIs 118–122 of 2026)CurrentGazetted 31 July 2026Export caps (30% of available capacity for generators, 20% of contracted capacity for retailers). Minimum efficiency standards for 27 appliance categories. EV charging safety rules. Mandatory energy audits for facilities of 100 kVA and above.
Energy (Solar Products and Installation) RegulationsUpcomingApproved by Cabinet 17 March 2026; not yet seen in the GazetteWould set minimum standards for solar products sold in Zimbabwe and require installer competence certification.
Domestic wholesale market and third-party accessUpcomingNo date setZERA is developing a wholesale market, third-party access regulations and revised use-of-system charges.
Competitive solar procurement (ZREP)UpcomingAdvisers being procured from May 2026ZETDC is procuring advisers, with World Bank grant funding, for the competitive procurement of 370 MW of solar PV across five solar parks.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumRooftop solar is widespread for backup and grid-tied net metering reached about 118 MW in 2026 across all customer types, but no residential-only count exists.
Distributed energy marketMediumNet metering is open up to 5 MW per site, with 118 MW reported in 2026. The 2026 rules removed licensing for self-supply up to 10 MW.
Grid flexibility marketLowNo domestic wholesale, ancillary-service or demand-response market. Aggregation is not provided for. Only utility-level trading on SAPP.
Energy storage adoptionLowNo operating grid-scale battery storage. A ZETDC tender of about 1,800 MWh was issued in 2025. Behind-the-meter batteries are not recorded.
Renewable growth environmentMediumSolar capacity was about 0.1 GW in 2024, but there is a target of 2,640 MW of renewables by 2030, a 370 MW competitive solar procurement and a large licensed pipeline.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 35 sources
  1. Electricity Tariffs – As at 1 December 2023 (Tariff for ZiG Billed Customers, revised). ZETDC, 2025. accessed 1 October 2026.
  2. ZERA energy price panel (electricity: first 50 units, as of 17 September 2026). Zimbabwe Energy Regulatory Authority, 2026. accessed 1 October 2026.
  3. ECB euro reference exchange rate, US dollar (daily series). European Central Bank, 2026. accessed 1 October 2026.
  4. National Energy Compact for the Republic of Zimbabwe (Mission 300). Government of Zimbabwe / World Bank, 2025. accessed 1 October 2026.
  5. 2022 Population and Housing Census: Preliminary Report on Population Figures. ZIMSTAT (hosted by UNFPA Zimbabwe), 2022. accessed 1 October 2026.
  6. Index of Electricity Generation, 1st Quarter 2026. Zimbabwe National Statistics Agency (ZIMSTAT), 2026. accessed 1 October 2026.
  7. Yearly electricity data (full release, long format). Ember, 2026. accessed 1 October 2026.
  8. S.I. 38 of 2022: Electricity (Net Metering) (Amendment) Regulations, 2022 (No. 1). Government of Zimbabwe (distributed by Veritas), 2022. accessed 1 October 2026.
  9. S.I. 127 of 2026: Electricity (Net Metering) (Amendment) Regulations, 2026 (No. 2). Government of Zimbabwe (distributed by Veritas), 2026. accessed 1 October 2026.
  10. S.I. 126 of 2026: Electricity (Own Consumption Undertakings Licensing Capacity) Regulations, 2026. Government of Zimbabwe (distributed by Veritas), 2026. accessed 1 October 2026.
  11. S.I. 125 of 2026: Electricity (Licensing) (Amendment) Regulations, 2026 (No. 2). Government of Zimbabwe (distributed by Veritas), 2026. accessed 1 October 2026.
  12. S.I. 128 of 2026: Electricity (Provision of Backbone Infrastructure) Regulations, 2026. Government of Zimbabwe (distributed by Veritas), 2026. accessed 1 October 2026.
  13. How Zimbabwe has changed the rules of energy investment. Zimbabwe Environmental Law Organisation (ZELA), 2026. accessed 1 October 2026.
  14. Zimbabwe’s new energy governance framework: what each regulation does and why it matters. Equity Axis, 2026. accessed 1 October 2026.
  15. S.I. 235 of 2019: Electricity (Solar Water Heating) Regulations, 2019. Government of Zimbabwe (FAOLEX copy), 2019. accessed 1 October 2026.
  16. List of Acts and Regulations. Zimbabwe Energy Regulatory Authority, 2025. accessed 1 October 2026.
  17. Net metering. ZETDC, 2022. accessed 1 October 2026.
  18. Smart Metering. ZETDC, 2022. accessed 1 October 2026.
  19. TID Rollover. ZETDC, 2023. accessed 1 October 2026.
  20. Procedure for Applying for an Electricity Service. ZETDC, 2022. accessed 1 October 2026.
  21. Customer Enrollment Procedure. ZETDC Commercial Department, 2025. accessed 1 October 2026.
  22. General Procurement Notice: Zimbabwe Renewable Energy Project – Technical Assistance (ZREP-TA). ZETDC, 2026. accessed 1 October 2026.
  23. 75MW net-metered into national power grid. Zimbabwe Situation, 2025. accessed 1 October 2026.
  24. Zimbabwe net metering benefits for farms and factories. Energy News Network, 2026. accessed 1 October 2026.
  25. Kariba power generation: key factors influencing output. Energy News Network, 2026. accessed 1 October 2026.
  26. ZETDC in US$35m smart meter rollout. The Anchor, 2023. accessed 1 October 2026.
  27. Want to buy your ZESA prepaid electricity through EcoCash? Try recharge.co.zw. Techzim, 2015. accessed 1 October 2026.
  28. Zimbabwe accelerates 5G rollout with surge in base station deployment. The Herald, 2025. accessed 1 October 2026.
  29. Zimbabwe’s electricity output rises 4.5% year-on-year. The Herald, 2024. accessed 1 October 2026.
  30. Hospital in Zimbabwe commissions solar/BESS plant. Green Building Africa, 2026. accessed 1 October 2026.
  31. Zimbabwean utility invites battery storage plant bids. African Energy, 2025. accessed 1 October 2026.
  32. Electric power consumption (kWh per capita) – Zimbabwe. World Bank, 2023. accessed 1 October 2026.
  33. Individuals using the Internet (% of population) – Zimbabwe. World Bank / ITU, 2024. accessed 1 October 2026.
  34. Access to electricity (% of population) – Zimbabwe. World Bank, 2024. accessed 1 October 2026.
  35. Urban population (% of total population) – Zimbabwe. World Bank, 2025. accessed 1 October 2026.

Questions about energy in Zimbabwe.

Talk to us about Olmack in Zimbabwe.Tell us about your home, housing portfolio or school estate in Zimbabwe. We'll explain what is possible there now.