Energy in Burundi, explained.

How electricity works in Burundi: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Burundi: Not yet available.Olmack is not offered in Burundi yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Burundi.

Burundi electricity market 2026: REGIDESO single utility, AREEN regulator, new Jiji–Mulembwe hydro, low access, Cash Power prepaid meters and off-grid solar.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Burundian franc (BIF) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Burundi energy at a glance.

Key figures for households in Burundi. Each one links to its source on the full overview below.

  • Renewable share.

    61.3% of electricity from renewable sources. Figures for 2021.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Burundi.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Burundi below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Burundi requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Burundi.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Burundi, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Burundi, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Burundi.

Full overview

The energy market in Burundi, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Burundi’s electricity sector is built around one state-owned utility. The Régie de Production et de Distribution de l’Eau et de l’Électricité (REGIDESO) produces, transmits, distributes and sells electricity, as well as supplying drinking water in urban centres. The World Bank describes the sector as largely vertically integrated and operating as a single buyer: independent power producers sell their output to REGIDESO, which resells it to customers. The water and energy regulator, AREEN, was established in 2014 and reorganised in 2018; the Agence Burundaise d’Électrification Rurale (ABER) is responsible for rural electrification and off-grid investment, and the Ministry of Hydraulics, Energy and Mines sets policy.

The system is small but has grown quickly. REGIDESO reported in December 2025 that national installed capacity had risen from under 50 MW in 2020 to more than 170 MW, after the Kabu 16 (20 MW), Jiji (32.5 MW) and Mulembwe (17 MW) hydropower plants came online between 2024 and 2025. Peak demand rose from 53 MW to 80 MW in the two years before the World Bank’s 2024 appraisal of the ASCENT access project.

Access to electricity remains among the lowest in the world. World Bank data put national access at 20.1% of the population in 2024: about 70% in towns but only 3.6% in rural areas, where most Burundians live. REGIDESO cites targets of 70% access by 2030 and 100% by 2040, and Burundi has joined the World Bank and African Development Bank energy compact initiative; the 2023 least-cost electrification strategy combines grid extension, mini-grids and stand-alone solar.

Energy snapshot.

Headline figures for electricity in Burundi. Each shows its data year and links to its source.

  • Population14,047,786 peopleSource 12024
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (BIF)Not identified from a reliable public source.
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share61.3%Source 52021
  • Solar capacityNot identified from a reliable public source.
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
Autorité de Régulation des secteurs de l’Eau potable et de l’Énergie (AREEN)
System operator
REGIDESO (national dispatching centre; operates generation, transmission and distribution)
Distribution networks
REGIDESO serves urban centres nationally through four regional directorates; ABER runs rural mini-grids; private distributor Weza Power is being contracted for four peri-urban areas
Currency
Burundian franc (BIF)
Voltage and frequency
200–240 V, 50 Hz (49.5–50.5 Hz operating range stated by REGIDESO)

Electricity prices in Burundi.

Household price (BIF)
Not identified from a reliable public source.
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

How prices are set

Electricity in Burundi is sold by REGIDESO at administered prices. AREEN’s mandate is to ensure the transparent and profitable development of the water and electricity sector and to control and regulate it; World Bank support under the ASCENT project includes developing a tariff model for the regulator. A sharp tariff increase was applied in 2017, but the utility still made accounting losses in 2017–19.

Cost pressures

Cost of supply has been driven up by thermal generation. The World Bank’s 2023 project paper puts REGIDESO’s average selling price at US$0.16/kWh, against US$0.2198/kWh paid to thermal independent producers and around US$220/MWh for rented diesel generation. Technical and commercial losses were estimated at 32% in 2024. New hydro capacity from Kabu 16, Jiji and Mulembwe is intended to displace much of this expensive thermal output.

Data caveat

No household tariff schedule could be verified from REGIDESO or AREEN for 2026, so the price fields are left empty rather than estimated.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesAll grid customers buy from REGIDESO at administered tariffs. The current schedule is not published on REGIDESO’s website. The World Bank records a sharp tariff increase in 2017 and is supporting AREEN to develop a tariff model.
PrepaymentYesREGIDESO’s commercial directorate runs a dedicated meter inspection and Cash Power service, which administers prepaid meters. The share of customers on prepayment is not published.
Time-of-useUnknownNo time-of-use offer for households identified.
DynamicNoThere is no wholesale market; REGIDESO is the single buyer and retailer.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
24.5 kWh/person/yr (all sectors) (c. 2023)Source 8Average electricity consumption per capita cited in the June 2024 ASCENT project appraisal; the 2023 Jiji–Mulembwe project paper gives 23 kWh, against a sub-Saharan average of 480 kWh.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Very low use

Burundians use some of the least electricity in the world, about 24.5 kWh per person per year across all sectors. Most households are not connected: in 2024 only 20.1% of the population had access, and in rural areas just 3.6%.

What energy is used for

Biomass dominates household energy. The World Bank estimated in 2020 that wood and wood fuel were the main cooking and heating fuel for 98% of the population and biomass made up 95% of primary energy consumption. Where the grid has arrived, REGIDESO reports that it powers lighting, phone charging, grain milling and welding businesses that previously relied on candles, small solar panels or diesel generators.

Customer base

REGIDESO served about 170,000 electricity customers at the time of the 2024 ASCENT appraisal, 64% of them in Bujumbura, up from about 100,000 in 2020.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
24.8 % of population (2024)Source 4World Bank estimate; 25.69% in 2025.

A rural country

About three-quarters of Burundians live in rural areas. Rural electrification is planned hill by hill (colline): REGIDESO’s 2025 access programme aims to electrify 1,400 isolated hills.

Implications for electricity

Grid access is concentrated in towns. The 2024 ASCENT appraisal put access at 72.5% in Bujumbura and 42.6% in other urban centres, against 1.8% in rural areas. The 2023 national least-cost electrification strategy plans for 60% of the population to be served by the main grid, 28% by stand-alone solar and 12% by mini-grids.

How the grid works in Burundi.

  1. TransmissionREGIDESO
  2. DistributionREGIDESO serves urban centres nationally through four regional directorates; ABER runs rural mini-grids; private distributor Weza Power is being contracted for four peri-urban areas
  3. MeteringREGIDESO
  4. Supply1 or more retail suppliers

Physical flow

Burundi’s grid is dominated by hydropower, which made up 95% of production capacity in 2024. Major plants include Kabu 16 (20 MW, Cibitoke, inaugurated October 2024 and self-financed by REGIDESO), Jiji (32.5 MW, inaugurated June 2025) and Mulembwe (17 MW, injecting since September 2025 and officially inaugurated in June 2026), alongside older hydro, the Ruzibazi plant, a share of the regional Rusumo Falls plant, thermal plants run by independent producers and the Mubuga solar plant. REGIDESO states supply voltage of 200–240 V and frequency of 49.5–50.5 Hz.

Interconnection

Burundi is linked to the Democratic Republic of Congo: the DRC–Burundi interconnection feeds the Rubirizi substation, which is also designed to evacuate power from the future regional Ruzizi III plant. With the Nile Basin Initiative’s NELSAP, REGIDESO is preparing a 220 kV line from the Horezo substation towards Kigoma in Tanzania, the 22 MW Ruvyironza hydro plant and a shared Burundi–Tanzania plant on the Ruvubu, with construction targeted to start by 2028.

Commercial flow

There is no wholesale market. REGIDESO generates power itself, buys from independent producers and imports, and sells to all grid customers. The 2015 electricity law (no. 1/13 of 23 April 2015), revised in March 2024 and complemented by the 2019 PPP law, opens all parts of the value chain, including distribution, to private participation.

Reliability and losses

Supply has historically been constrained, with costly rented diesel generation used to fill gaps. Technical and commercial losses were estimated at 32% in 2024. The ASCENT project (US$190 million in total, per REGIDESO) is rehabilitating Bujumbura’s distribution network with around 200 new transformers.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Hydraulics, Energy and MinesSets energy policy and oversees REGIDESO and ABER. Under the 2015 electricity law, generation projects above 500 kW on private land need ministerial authorisation.
RegulatorAutorité de Régulation des secteurs de l’Eau potable et de l’Énergie (AREEN)Established in 2014 and reorganised in 2018 to control, regulate and monitor the water and electricity sectors. Issues licences to mini-grid operators and sets their tariffs based on annual revenue requirements; being strengthened with World Bank support (tariff model, operator monitoring, dispute resolution).
TSOREGIDESOOperates generation, the high-voltage network and the national dispatching centre. Power from the Jiji and Mulembwe plants is evacuated via the Kabezi substation; the Rubirizi substation, inaugurated in December 2025 and fed by the DRC–Burundi interconnection, is described as the heart of the high-voltage network.
DSOREGIDESODistributes electricity in urban centres through four regional directorates (West, South, North, East) and is extending the grid to 36 localities and 1,400 hills.
DSOWeza PowerPrivate distribution company that, under the World Bank ASCENT project, will install, operate and maintain local distribution grids in four peri-urban areas, aiming to connect 45,000 households, businesses and industries.
DSOAgence Burundaise d’Électrification Rurale (ABER)Rural electrification agency; in 2020 it operated five mini-grids serving about 600 customers and it implements off-grid investments under ASCENT.
SupplierREGIDESOThe single buyer and retailer to grid customers; handles subscriptions, billing, collection and prepaid (Cash Power) sales.
MeteringREGIDESOSupplies and installs customer meters, inspects them and runs the Cash Power prepaid service; in 2026 it took delivery of more than 20,000 meters to clear a backlog of paid-for connections.

Compared with the UK system.

Compared with the UK system.
UK conceptBurundi equivalentHow it works
DNOREGIDESO (plus ABER mini-grids and Weza Power)There are no regional network companies. REGIDESO owns and operates the grid across all regions; ABER runs isolated rural mini-grids, and a private distributor, Weza Power, is being introduced in four peri-urban areas following the 2024 revision of the electricity law.
National Grid/NESOREGIDESO dispatching centreThe same utility dispatches all plants and imports from its national dispatching centre and buys from independent producers as single buyer.
MPANCash Power meter number / REGIDESO customer accountThere is no regulator-issued supply-point number. Prepaid customers are identified by the meter they buy credit for, and postpaid customers by their REGIDESO subscription; REGIDESO does not publish the format of either.
MPRNNo equivalentThere is no piped gas network for homes; households cook mainly with wood and charcoal.
Meter operatorREGIDESOREGIDESO supplies, connects and inspects meters through its commercial directorate; there is no competitive metering.
SupplierREGIDESO (no choice)Households cannot switch supplier. Off the grid, households buy solar products from private companies or are served by mini-grids.
Smart-meter infrastructureCommunicating meters for large customersNo national smart-meter data network. Since 2021 REGIDESO has installed communicating meters at its 400 largest delivery points, linked to a central monitoring platform, to protect revenue.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Cash Power prepaid meter number / REGIDESO customer subscription (Cash Power)
Who issues it?REGIDESO, which supplies and registers the meter in its systems when a connection is made
FormatNot published. REGIDESO does not document the structure of its prepaid meter numbers or postpaid account references.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the meter installed at the premises and on REGIDESO documents issued to the subscriber; REGIDESO publishes no guidance on this.
Electronic accessNo public online account or data-access service identified on REGIDESO’s website.
Third-party accessNo consumer data-sharing scheme or public look-up identified.
Who keeps the registerREGIDESO’s commercial systems (customer service, billing and Cash Power services). No regulator-held register identified.
Register scopeNational

What identifies a connection

Burundi has no regulator-issued supply-point identifier. A grid connection is administered by REGIDESO as a subscription: the commercial directorate handles new subscriptions, billing and collection, and a specific service handles meter inspection and Cash Power (prepaid) meters. For prepaid customers the meter itself is the practical identifier, since electricity credit is bought for a specific meter. REGIDESO does not publish the format or length of meter or account numbers, so no example is given here.

Getting connected

To apply for an electricity (or water) connection, REGIDESO asks for a statement of family composition, a passport photograph, a land title or other document proving ownership of the plot, and a photocopy of the national identity card. The applicant pays for the meter and then waits for it to be supplied and installed; REGIDESO’s June 2026 delivery of more than 20,000 meters was intended to clear a long-standing backlog of customers who had already paid, and new orders were temporarily suspended during the shortage. In newly electrified localities meters have been offered at subsidised prices (BIF 6,000 was cited in one 2026 REGIDESO report).

Smart and communicating meters

In 2021 REGIDESO contracted a supplier to replace meters at its 400 largest delivery points, which account for 56% of monthly sales, with communicating meters monitored from a control centre, to bill all energy delivered to them and curb meter tampering.

Data caveat

Whether a prepaid meter number stays with the property on change of occupier, and how consumers can access their data, is not documented publicly.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Unknown
Net meteringNo
Net billingNo
How exported electricity is paidNo net-metering or export-payment scheme identified. Independent producers sell to REGIDESO under bilateral agreements.
Can households sell surplus solar power to the grid?No scheme exists. No net metering, net billing or feed-in arrangement for small producers was identified from REGIDESO, AREEN or the World Bank project documents.
Is a licence needed for a rooftop system?Under the 2015 electricity law, power projects below 500 kW must simply be declared, while projects above 500 kW on private land require authorisation from the ministry and hydro plants require a public concession. The law was revised in March 2024 and the current thresholds could not be verified.
Is there a feed-in tariff?No feed-in tariff identified. Generators sell to REGIDESO as single buyer under negotiated agreements.

Connecting a home system.

  1. Small generation projects below 500 kW must be declared under the 2015 electricity law; projects above 500 kW on private land need ministerial authorisation (thresholds may have changed with the March 2024 revision).
  2. Systems for own use can be installed off-grid; no procedure for connecting and exporting from a home system to the REGIDESO grid has been published.
  3. Mini-grid operators require a licence from AREEN, which sets their tariffs.

Current position

Self-generation is allowed and is widespread in the form of small solar products, because most of the country is not on the grid. However, there is no published framework for households or businesses to export power to REGIDESO’s network or be credited for it.

Off-grid first

The government’s 2023 least-cost electrification strategy expects 28% of the population to be served by stand-alone solar and 12% by mini-grids, so distributed solar in Burundi is primarily an access solution rather than a grid-export one.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (small, below 500 kW)Declaration only under the 2015 electricity lawMinistry of Hydraulics, Energy and MinesLaw no. 1/13 of 23 April 2015; revised March 2024 (current thresholds not verified).
Generate electricity (above 500 kW)Ministerial authorisation for projects on private land; state contract for projects on public land; public concession for hydro plantsMinistry of Hydraulics, Energy and MinesOutput is sold to REGIDESO as single buyer.
Mini-grid (generation, distribution and sale)Licence from AREEN; tariffs set by AREEN on annual revenue requirementsAREENFramework described in the 2020 SOLEIL project appraisal; ABER runs public mini-grids.
Distribute and supply electricityOpened to private participation by the March 2024 law revision and the 2019 PPP law; contracted case by caseGovernment / AREENWeza Power is the first private distributor contracted, for four peri-urban areas under ASCENT.
Store electricityNo storage-specific licence identified—Batteries in solar home systems need no licence.
Export to the gridNo framework for small producers identifiedREGIDESO / AREENNo net metering.
Trade electricity / wholesale marketNot applicable: no wholesale market—REGIDESO contracts imports and IPP output bilaterally.
Aggregate, VPP, balancing and grid servicesNo framework: not defined in regulation—REGIDESO balances the system centrally.
Remote control of customer assetsNo specific rules identified—No aggregator or demand-response rules.

The legal basis

The electricity sector is governed by law no. 1/13 of 23 April 2015, which allows several production regimes and self-supply, and provides light-handed regulation for small projects. It was revised in March 2024 and, together with the PPP law no. 1/10 of 19 July 2019, now allows private participation in every segment, including distribution.

Institutions

Authorisations for generation are handled by the ministry, while AREEN licenses and sets tariffs for mini-grid operators. REGIDESO itself operates under its 1997 statutes (decree no. 100/164 of 5 September 1997) as a public company.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Reserves and frequency controlNo—NoREGIDESO. Provided by REGIDESO’s hydro plants, thermal IPPs and imports; no ancillary services market.
Cross-border tradeRestricted—NoREGIDESO. Interconnection with the DRC and shared regional plants; planned 220 kV link to Tanzania. Only the national utility participates.

Burundi has no wholesale, balancing or demand-response market and no regulatory definition of aggregators. REGIDESO balances supply and demand centrally from its dispatching centre. With demand still largely unserved, the sector’s priority is adding capacity and connections rather than flexibility.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo household rollout; communicating meters at the 400 largest delivery points since 2021
Reading intervalNot published
Meter owner/operatorREGIDESO
Household meteringCash Power prepaid and postpaid meters
Smart meters400 largest customers (56% of monthly sales), from 2021
Recent supplyMore than 20,000 meters delivered in June 2026

Prepaid metering

REGIDESO runs a dedicated Cash Power service for prepaid meters within its commercial directorate. Meter shortages have been a recurring bottleneck: customers have paid for connections and waited for meters, which REGIDESO began clearing with a delivery of more than 20,000 meters in June 2026 and distribution in Bujumbura communes from July 2026. The ASCENT project also funds 26,000 meters for new customers.

Communicating meters for large users

Under a revenue-protection programme started in 2021, a Chinese contractor replaced meters at REGIDESO’s 400 largest delivery points with communicating meters that send consumption data continuously to a central platform, alongside a new information system for commercial and technical management.

Renewable electricity.

Electricity generation mix (2021).

  • Renewables (mainly hydro): 61.3%
  • Thermal (fossil): 38.7%
Source 5
Renewable electricity share
61.3% (2021)Source 5Renewable electricity output as a share of total output (World Bank WDI; latest year available). The share fell from 88% in 2016 as diesel and fuel-oil plants were added; the 2023 World Bank project paper states that thermal IPPs supplied 28.5% of the energy mix in 2022. The 69.5 MW of hydro commissioned in 2024–25 is not yet reflected.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Total installed (all sources)
170 MW (December 2025)Source 14REGIDESO: “more than 170 MW”, up from under 50 MW in 2020.
Jiji and Mulembwe hydro
49.5 MW (2025)Source 15Jiji 32.5 MW and Mulembwe 17 MW; about 235 GWh a year expected.
Kabu 16 hydro
20 MW (2024)Source 18
Solar PV
Not identified from a reliable public source.

Targets.

  • 70% access to electricity by 2030 and 100% by 2040 (REGIDESO, 2025).
  • Universal Access Program: universal access by 2030 (World Bank, 2024).
  • Least-cost electrification strategy (2023): 60% grid, 28% stand-alone solar, 12% mini-grids.
  • 40% of Burundians using solar cooking by 2030 (REGIDESO, Renewable Energy Access Day 2025).
  • National installed capacity target of 200 MW (REGIDESO, 2026).

Hydro-led system

Hydropower is the backbone of Burundi’s grid, representing 95% of production capacity in 2024. The renewable share of generation fell from 88% in 2016 to 61% in 2021 as diesel and fuel-oil plants were hired to meet demand, but the commissioning of Kabu 16, Jiji and Mulembwe between 2024 and 2025 roughly tripled national capacity from 2020 levels.

Pipeline

Planned capacity includes the 22 MW Ruvyironza hydro plant, a shared Burundi–Tanzania plant on the Ruvubu, the regional Ruzizi III plant and the Kirasa project, for which REGIDESO met funders including Afreximbank in December 2025.

Off-grid solar

Stand-alone solar is central to the access plan. The World Bank-financed SOLEIL-Nyakiriza project (approved 2020) supports mini-grids and solar products for rural households, enterprises, schools and health centres, and ABER implements off-grid investments under ASCENT.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage in Burundi is currently limited to the batteries in solar home systems and mini-grids. No grid-scale battery project or storage-specific regulation was identified.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
REGIDESOAll grid customers (about 170,000 in 2024)NoUnknownNoNo

REGIDESO is the only retailer on the national grid. ABER operates rural mini-grids, Weza Power is being contracted to distribute electricity in four peri-urban areas, and private companies sell solar home systems off the grid.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Hydraulics, Energy and MinesGovernmentEnergy policySets policy and authorises larger generation projects.
AREENRegulatorWater and energy regulatorRegulates the electricity sector and licenses mini-grid operators.
REGIDESOTransmissionGeneration, transmission, distribution and retailCounterparty for every grid connection and power purchase.
Agence Burundaise d’Électrification Rurale (ABER)DistributionRural electrification and mini-gridsImplements off-grid and rural electrification investments.
World Bank – ASCENT Burundi and SOLEIL-NyakirizaRenewable EnergyAccess financeMain financier of grid extension, off-grid solar and the Jiji–Mulembwe plants.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Supply quality200–240 V, 49.5–50.5 HzREGIDESOOperating ranges stated by REGIDESO’s electricity directorate.
Generation authorisationElectricity law no. 1/13 of 23 April 2015 (revised March 2024)Government of BurundiDeclaration below 500 kW; authorisation or concession above (2015 text).
Grid code / inverters / installersNot identified—No published grid code, inverter connection standard or installer accreditation scheme was found.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Declaration of small generation (<500 kW)YesNationalUnder the 2015 electricity law; current thresholds after the 2024 revision not verified.
Ministerial authorisation (>500 kW)LimitedNationalFor projects on private land above 500 kW.
AREEN mini-grid licenceYesNationalFor operators selling power through mini-grids.
Grid export approvalNoNationalNo route for small producers to export has been published.

For a household installing solar for its own use, the practical requirement is buying and installing equipment; the 2015 law requires only a declaration for projects under 500 kW. Larger and grid-connected projects involve the ministry, AREEN and REGIDESO.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
SOLEIL-Nyakiriza (Solar Energy in Local Communities)ActiveGrantWorld Bank-financed project (US$100 million, approved February 2020) supporting mini-grids, stand-alone solar products for households and solar for schools and health centres, targeting new or improved access for 300,000 people.—
ASCENT BurundiActiveGrantWorld Bank access programme (approved June 2024) financing Bujumbura network rehabilitation, 26,000 meters for new customers, Weza Power’s peri-urban distribution concessions and ABER off-grid investments.—
Subsidised meters in newly electrified localitiesActiveConnection subsidyREGIDESO reported meters offered for BIF 6,000 in localities connected under the 36-locality programme.—

Data and connectivity.

Fixed broadband
0.02 fixed broadband subscriptions per 100 people (2023)Source 68.6% of the population used the internet in 2024.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is almost non-existent and internet use is low. REGIDESO’s communicating meters for large customers report to a central platform; household meters are not communicating.

Grid conditions.

National peak demand
0.08 GW (c. 2023)Source 8Peak demand rose from 53 MW to 80 MW in the two years before the June 2024 appraisal.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
0.17 GW (December 2025)Source 14REGIDESO: more than 170 MW installed. The World Bank recorded 102 MW in 2023.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Rapid capacity growth

Installed capacity grew from 80 MW in 2021 to 102 MW in 2023 and more than 170 MW by December 2025, as new hydro came online. REGIDESO cites a 200 MW national target.

Network expansion

Phase I of the 36-locality programme involves 323 km of medium-voltage and 235 km of low-voltage lines and 70 transformer stations; Phase II targets 1,400 isolated hills, and PERK II extends the network to the provincial centres of Ruyigi, Cankuzo and Kirundo.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Electricity law revisionCurrentMarch 2024Revision of law no. 1/13 of 2015 expanding private participation across the value chain, including distribution.
Jiji and Mulembwe hydropower in serviceCurrentJune 2025 / June 202649.5 MW added; Mulembwe officially inaugurated on 16 June 2026.
Private distribution in peri-urban areas (Weza Power)UpcomingUnder ASCENT (from 2024)Private operator to connect 45,000 customers in four peri-urban areas.
Burundi–Tanzania 220 kV line and Ruvyironza hydroUpcomingConstruction targeted by 2028Prepared with NELSAP and TANESCO.
Access targetUpcoming203070% access to electricity by 2030 and 100% by 2040.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowStand-alone solar is planned to serve 28% of the population, but no official count of installed systems exists and only 3.6% of rural people had electricity access in 2024.
Distributed energy marketLowABER operated five mini-grids with about 600 customers in 2020; no export framework for distributed generation.
Grid flexibility marketLowNo wholesale, balancing or demand-response market; single buyer.
Energy storage adoptionLowNo grid-scale storage identified.
Renewable growth environmentMediumCapacity rose from under 50 MW (2020) to more than 170 MW (2025), mostly new hydro (Kabu 16, Jiji, Mulembwe).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 28 sources
  1. Population, total – Burundi (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  2. Access to electricity (% of population) – Burundi. World Bank, 2024. accessed 10 October 2026.
  3. Access to electricity, urban and rural – Burundi. World Bank, 2024. accessed 10 October 2026.
  4. Urban population (% of total) – Burundi. World Bank, 2025. accessed 10 October 2026.
  5. Renewable electricity output (% of total) – Burundi. World Bank, 2021. accessed 10 October 2026.
  6. Internet users and fixed broadband subscriptions – Burundi. World Bank, 2024. accessed 10 October 2026.
  7. Taux de change du jour. Banque de la République du Burundi, 2026. accessed 10 October 2026.
  8. Burundi – Accelerating Sustainable and Clean Energy Access Transformation (ASCENT) Project Appraisal Document. World Bank, 2024. accessed 10 October 2026.
  9. Project Information Document – ASCENT Burundi (Additional Financing). World Bank, 2024. accessed 10 October 2026.
  10. Burundi – Jiji and Mulembwe Hydropower Project: Additional Financing (Project Paper). World Bank, 2023. accessed 10 October 2026.
  11. Burundi – Solar Energy in Local Communities Project (PAD). World Bank, 2020. accessed 10 October 2026.
  12. Documents exigés pour le raccordement en eau et électricité. REGIDESO. accessed 10 October 2026.
  13. Vers un accès universel à l’énergie : la REGIDESO accélère l’électrification du Burundi. REGIDESO, 2025. accessed 10 October 2026.
  14. Rubirizi, un poste électrique stratégique inauguré. REGIDESO, 2025. accessed 10 October 2026.
  15. Inauguration de la centrale hydro-électrique de Jiji. REGIDESO, 2025. accessed 10 October 2026.
  16. Le Burundi inaugure officiellement le barrage hydroélectrique de Mulembwe. REGIDESO, 2026. accessed 10 October 2026.
  17. La centrale de Mulembwe est déjà fonctionnelle. REGIDESO, 2025. accessed 10 October 2026.
  18. Inauguration de la centrale hydroélectrique de Kabu 16. REGIDESO, 2024. accessed 10 October 2026.
  19. REGIDESO et NELSAP cap sur Ruvyironza et le 220 kV. REGIDESO, 2026. accessed 10 October 2026.
  20. Rencontre entre le Directeur Général de la REGIDESO et les bailleurs de fonds du projet Kirasa. REGIDESO, 2025. accessed 10 October 2026.
  21. La REGIDESO a reçu plus de 20 000 compteurs d’électricité. REGIDESO, 2026. accessed 10 October 2026.
  22. La distribution des compteurs électriques se poursuit. REGIDESO, 2026. accessed 10 October 2026.
  23. Bientôt, des compteurs « communicants » à la REGIDESO. REGIDESO, 2021. accessed 10 October 2026.
  24. Une lumière d’espoir pour un pays qui se développe. REGIDESO, 2026. accessed 10 October 2026.
  25. Journée sur l’Accès à l’Energie Renouvelable au Burundi 2025. REGIDESO, 2025. accessed 10 October 2026.
  26. Direction de l’Électricité. REGIDESO. accessed 10 October 2026.
  27. Direction Commerciale. REGIDESO. accessed 10 October 2026.
  28. Cadre légal. REGIDESO. accessed 10 October 2026.

Questions about energy in Burundi.