Energy in Tanzania, explained.

How electricity works in Tanzania: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Tanzania: Not yet available.Olmack is not offered in Tanzania yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Tanzania.

Tanzania electricity 2026: TANESCO D1 and T1 household tariffs, EWURA regulation, net-metering rules, licensing thresholds, hydro-led mix and off-grid solar.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Tanzanian shilling (TZS) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Tanzania energy at a glance.

Key figures for households in Tanzania. Each one links to its source on the full overview below.

  • Electricity price.

    292 TZS per kWh for households, including taxes. Figures for From 1 April 2016 (still in force June 2026).

  • Renewable share.

    64.6% of electricity from renewable sources. Figures for FY 2025/26.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Tanzania.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Tanzania below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Tanzania requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Tanzania.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Tanzania, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Tanzania, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Tanzania.

Full overview

The energy market in Tanzania, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Electricity on the Tanzanian mainland is supplied almost entirely by the Tanzania Electric Supply Company Limited (TANESCO), a state-owned utility that generates, transmits, distributes and sells power and runs the national grid. It is the only holder of a transmission licence, a supply licence and a cross-border trade licence, and owned 83.58% of installed capacity in the 2025/26 financial year (July to June). One small private company, Mwenga Power Services, also holds a distribution licence. Private generators sell to TANESCO under power purchase agreements approved by the Energy and Water Utilities Regulatory Authority (EWURA), which licenses the sector and sets tariffs under the Electricity Act, Cap. 131. Policy sits with the Ministry of Energy, and the Rural Energy Agency (REA) funds rural electrification. Zanzibar has its own utility, the Zanzibar Electricity Corporation (ZECO), regulated by the Zanzibar Utilities Regulatory Authority (ZURA).

Household tariffs are low and have not changed since 1 April 2016. Households that use less than 75 kWh a month on average are placed on the D1 lifeline tariff of TZS 100/kWh for the first 75 kWh and TZS 350/kWh beyond that. Other homes pay the T1 general tariff of TZS 292/kWh, with no standing charge. Most households use prepaid LUKU meters. In a 2023 national survey, 52.6% of mainland households with mains electricity were on D1, and more than 72% spent less than TZS 10,000 a month on electricity.

In 2025/26 hydropower produced 62.82% of electricity and natural gas 32.01%. The 2,115 MW Julius Nyerere hydropower station now dominates supply, and installed capacity, including 67 MW of contracted imports, reached 4,648.69 MW against peak demand of 2,672.59 MW. Grid-connected solar is still small: the 50 MW Kishapu plant was the first large solar farm, and all solar capacity together was 82.44 MW. Off-grid solar matters far more to households. In 2023 about 3.3 million mainland households relied on solar alone for electricity. Rules for net metering have existed since 2018, but they are still being put into practice.

Energy snapshot.

Headline figures for electricity in Tanzania. Each shows its data year and links to its source.

  • Population61,741,120 peopleSource 102022
  • Households14,152,803 householdsSource 102022
  • Average household size4.3 people/householdSource 102022
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (TZS)292 TZS/kWhSource 1From 1 April 2016 (still in force June 2026)
  • Household price (EUR)0.099 EUR/kWhSource 12From 1 April 2016
  • Renewable electricity share64.6%Source 1FY 2025/26
  • Solar capacity0.082 GWSource 1FY 2025/26
  • Wind capacity0.002 GWSource 1FY 2025/26
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Energy and Water Utilities Regulatory Authority (EWURA) on the Mainland; Zanzibar Utilities Regulatory Authority (ZURA) in Zanzibar
System operator
TANESCO, which holds the only transmission licence and carries out system operation
Distribution networks
TANESCO distributes nationally on the Mainland (234,979.71 km of lines); Mwenga Power Services holds the only other distribution licence; mini-grid operators registered with EWURA supply villages; ZECO supplies Zanzibar.
Currency
Tanzanian shilling (TZS)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Tanzania.

Household price (TZS)
292 TZS/kWh (From 1 April 2016 (still in force June 2026))Source 1TANESCO T1 general-usage energy charge, with no monthly service charge, as listed in EWURA’s FY 2025/26 report (Annex 8). D1 lifeline customers pay TZS 100/kWh for 0–75 kWh and TZS 350/kWh above that. This is the approved tariff before VAT and any levies. The tax treatment of household bills was not confirmed on an official page, so it has not been added.
Household price (EUR)
0.099 EUR/kWh (From 1 April 2016)Source 12TZS 292/kWh (T1 energy charge, before VAT and levies) converted at the Bank of Tanzania mean rate for 9 October 2026 of TZS 2,945.2825 per euro (buying 2,930.6293, selling 2,959.9356): 292 ÷ 2,945.2825 = 0.0991. The D1 first-band rate of TZS 100/kWh converts to about EUR 0.034/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

Electricity prices on the Mainland are set by EWURA through tariff orders under section 23 of the Electricity Act. The tariff now in force for TANESCO comes from the Tariff Adjustment Order 2016 (GN 119 of 2016), which took effect on 1 April 2016. It was amended in 2020 (GN 1020) to require that every customer averaging under 75 kWh a month is put on the D1 lifeline tariff, and to fix single-phase connection charges. EWURA’s June 2026 performance report still lists the 2016 rates, so domestic prices have not changed for more than ten years.

Lifeline and general tariffs

The tariff has two levels for households. D1 is a lifeline tariff: TZS 100/kWh for the first 75 kWh a month and TZS 350/kWh after that, so customers who regularly use more are moved to T1. T1 is a flat TZS 292/kWh with no standing charge. Business customers metered at 400 V who use more than 7,500 kWh per reading period pay T2, at TZS 195/kWh plus a TZS 14,233 monthly service charge and TZS 15,004/kVA of maximum demand. Medium- and high-voltage customers pay T3, at TZS 157/kWh and TZS 152/kWh respectively, plus demand charges. Zanzibar’s utility, ZECO, buys power from TANESCO on the T3-HV tariff.

Connection charges

Connection charges differ greatly between towns and the countryside. A single-phase connection within 30 metres costs TZS 272,000 in urban areas, excluding VAT. In rural areas the rate is TZS 27,000 including VAT, whether the line is 30, 70 or 120 metres. Three-phase connections cost TZS 772,893 to TZS 1,389,115 in both rural and urban areas. Customers who pay to build a supply line themselves can recover the cost through deductions of 40% of their monthly electricity bills until it is repaid.

What households actually pay

Spending is low because use is low and many households share a meter. The 2023 Household Energy Consumption Survey found that 52.6% of mainland households using grid electricity were on D1, rising to 68.2% in rural areas. Almost 70% used 21–40 kWh a month, and only about 1.2% used more than 100 kWh. The survey counted about two-thirds more households on D1 and T1 than TANESCO had household contracts, which suggests that sharing one meter between several households is common.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesD1 domestic low-usage tariff, for customers who use less than 75 kWh a month on average: no service charge, TZS 100/kWh for 0–75 kWh and TZS 350/kWh above 75 kWh. Supplied at 230 V single-phase. The 2020 amendment order requires TANESCO to place every customer who averages under 75 kWh a month on D1.
RegulatedYesT1 general-usage tariff for residential, small commercial and light industrial customers, public lighting and billboards: no service charge, TZS 292/kWh flat. Supplied at 230 V single-phase or 400 V three-phase.
PrepaymentYesD1 and T1 customers are normally connected with prepaid LUKU meters and buy credit as tokens. TANESCO’s approved connection charges are set for LUKU meters, with AMR meters as the option for three-phase supplies.
Time-of-useNoThere is no time-of-use tariff for households. Larger customers on T2 and T3 pay a service charge and a maximum-demand charge (TZS/kVA a month) in addition to the energy charge.
DynamicNoThere is no wholesale market, so no tariff linked to wholesale prices is offered.
OtherLimitedMini-grid operators registered with EWURA charge their own approved tariffs. For example, residential rates of TZS 1,500/kWh (PowerGen), TZS 1,306/kWh for basic households (Watu na Umeme) and TZS 1,710/kWh in 2024 (Jumeme) are three to five times TANESCO’s T1 rate. Mwenga Hydro charges D1 customers TZS 60/kWh for 0–50 kWh.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
227.9 kWh/person/yr (FY 2025/26)Source 1All sectors: 15,530.98 GWh of generation and imports divided by a population of 68,153,004. EWURA says this probably understates use because some own-use generation is not fully captured. The Power System Master Plan 2024 Update projects 528 kWh a person by 2030.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
4.3 % of households (2022)Source 10Share of households whose main cooking fuel is electricity (4.2% Mainland, 7.5% Zanzibar). Firewood is 55.7%, charcoal 25.9% and gas 9.3%.

Tanzanian households use very little electricity by international standards. In the 2022 census, 37.4% of households used grid electricity (TANESCO or ZECO) as their main source of light, and 32.4% used solar. Only 8.0% owned a refrigerator or freezer. Grid lighting ranged from 15.9% of households in Simiyu Region to 88.9% in the highest region.

Cooking is the government’s main lever for raising household demand. The National Clean Cooking Strategy (2024–2034) aims for 80% of the population to use clean cooking by 2034, with electricity expected to play a large part. In 2022 only 4.3% of households cooked mainly with electricity. EWURA also expects electric mobility, the Standard Gauge Railway and LNG development to drive future demand.

Access is rising quickly. EWURA reports, citing the Ministry of Energy budget speech for 2026/27, that electricity accessibility (people living within reach of the network) reached 85.50% in FY 2025/26 and connectivity (people actually connected) reached 52.10%, up from 37.7% in FY 2019/20. Distribution customers rose by 15.28% in one year to 6,323,491.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
65% (2022)Source 10Main dwelling owned by the household. A further 5.9% live without paying rent.
Private rented
20% (2022)Source 10Rented privately. Another 2.7% rent from an employer, and 3.4% live in employer-owned housing (1.9% free, 1.5% paying rent).
Social or public housing
3% (2022)Source 10Rented from the government at a subsidised rent.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
34.9 % of population (2022)Source 1034.4% on the Mainland and 49.0% in Zanzibar. The World Bank estimates 36.9% for 2025.

Most Tanzanians own the homes they live in: 65.0% of households in the 2022 census, and 71.4% in Zanzibar. Private renting accounts for 20.0%, mainly in towns. Buildings are mostly simple: 84.8% of households have iron-sheet roofs, and walls are commonly of baked or sun-dried brick, cement block or poles and mud.

This matters for distributed energy in two ways. Owner-occupiers on their own plots can decide to install solar without a landlord, but many homes are lightly built, rural and far from the grid. That is why solar home systems and mini-grids, rather than rooftop systems connected to the grid, are the main form of household solar. The 2023 energy survey also found that several households often share one TANESCO meter, which makes metering of individual households and exporting power harder.

How the grid works in Tanzania.

  1. TransmissionTanzania Electric Supply Company Limited (TANESCO)
  2. DistributionTANESCO distributes nationally on the Mainland (234,979.71 km of lines); Mwenga Power Services holds the only other distribution licence; mini-grid operators registered with EWURA supply villages; ZECO supplies Zanzibar.
  3. MeteringTANESCO
  4. Supply2 or more retail suppliers

Power on the Mainland flows through one company. TANESCO owns 3,885.25 MW of generation, 83.58% of installed capacity in FY 2025/26, including the 2,115 MW Julius Nyerere hydropower station and the gas plants around Dar es Salaam. It buys the output of private producers, such as Songas (189 MW of gas) and about 20 small hydro, biomass and solar producers, under power purchase agreements approved by EWURA. It also imports 67 MW under contract from Zambia (Mbala, 66 kV), Uganda (Masaka, 132 kV, and Kikagati, 33 kV) and Kenya (Isinya, 400 kV). It then transmits, distributes and sells the power to 6.29 million customers.

TANESCO owns the transmission network: 1,524.75 km at 400 kV, 3,860.95 km at 220 kV, 2,335.17 km at 132 kV and 583.00 km at 66 kV. Transmission losses were 5.88% and distribution losses 8.40% in FY 2025/26, against a combined target of 14.88%. Reliability improved during the year: TANESCO’s SAIFI fell to 12.09 interruptions per customer and SAIDI to 1,044.77 minutes, but the average interruption still lasted 86.40 minutes, against a target of 59.

Competition is limited. The Electricity Act provides for "eligible customers" who can contract directly with a licensed generator. Only one has been designated: Lipton Teas and Infusions Tanzania Limited, which buys at least 2 MW from Mwenga Hydro in Mufindi for five years from November 2024. There is no wholesale market. Tanzania belongs to both the Eastern Africa Power Pool and the Southern African Power Pool, and TANESCO has a 4 MW power-exchange agreement with KETRACO in Kenya.

Zanzibar is administered separately under its own regulator, ZURA, and utility, ZECO. ZECO buys bulk power from TANESCO on the T3-HV tariff, and ZURA sets electricity rates in Zanzibar.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy (Wizara ya Nishati)Sets energy policy, publishes the Power System Master Plan, restructures the industry and, through REA, prepares the Rural Electrification Plan.
RegulatorEnergy and Water Utilities Regulatory Authority (EWURA)Mainland regulator: issues licences and registrations, approves tariffs, power purchase agreements and procurement of new plants, handles complaints and licenses electrical installers.
RegulatorZanzibar Utilities Regulatory Authority (ZURA)Multi-sector regulator for Zanzibar: licenses electricity activities, sets electricity rates and approves power purchase agreements.
TSOTanzania Electric Supply Company Limited (TANESCO)Only transmission licensee. Owns 8,303.87 km of 400, 220, 132 and 66 kV lines and 72 grid substations, and carries out system operation and cross-border trade.
DSOTANESCO (distribution)Distributes power across the Mainland over 234,979.71 km of lines, serving 6,294,416 customers in FY 2025/26.
DSOMwenga Power Services LimitedThe only other distribution licensee. It serves rural customers in the Mufindi area from the Mwenga hydro plant over 448.50 km of lines.
SupplierTANESCO (supply)The only supply licensee. It bills customers, sells prepaid tokens, connects new customers and buys power from IPPs and small power producers.
SupplierZanzibar Electricity Corporation (ZECO)Government-owned, vertically integrated utility supplying most electricity in Zanzibar. It buys bulk power from TANESCO on the T3-HV tariff.
MeteringTANESCOInstalls, owns and tests customer meters (LUKU prepaid, AMR and CT-operated meters). EWURA rules require meters to be calibrated and sealed, and post-paid meters to be read at least every three months.

Compared with the UK system.

Compared with the UK system.
UK conceptTanzania equivalentHow it works
DNOTANESCO (distribution licensee)There are no separate regional network companies. TANESCO owns and runs the distribution network across the whole Mainland. Mwenga Power Services is a small licensed exception, and village mini-grids are registered with EWURA rather than licensed as distributors.
National Grid/NESOTANESCO (transmission and system operation)TANESCO both owns the transmission grid and dispatches it. The 2016 System Operation Services and Market Operation Services Rules allow for an independent system and market operator, but none has been set up.
MPANTANESCO meter number and account numberA connection is identified by the number on its TANESCO meter (for prepaid LUKU meters, the number used to buy tokens) and the customer’s TANESCO account number. There is no national supply-point register separate from TANESCO’s own customer system.
MPRNNo national equivalentThere is no mains gas distribution to homes. Households cook mainly with firewood, charcoal or bottled LPG.
Meter operatorTANESCOThe distribution and supply licensee installs and maintains the meter. A customer cannot appoint an independent meter operator.
SupplierTANESCO (or a registered mini-grid operator)Grid customers cannot switch supplier. TANESCO holds the only supply licence. Customers of isolated mini-grids buy from the registered operator at an EWURA-approved tariff.
Smart-meter infrastructurePrepaid LUKU and AMR metersThere is no national smart-metering programme like the UK’s DCC. Households use keypad prepaid meters loaded with tokens, and larger and three-phase customers can have AMR meters read remotely by TANESCO.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?TANESCO meter number (LUKU prepaid meter) and customer account number (LUKU)
Who issues it?TANESCO, which installs the meter and opens the customer account when a connection is completed
FormatThe meter number is printed on the meter. Prepaid (LUKU) customers quote it to buy tokens, and each token is entered on the meter keypad. Separately, TANESCO gives every customer an account number for billing and service records. EWURA’s meter audit and inspection form records both the "Account No." and the "Meter No." with the meter type (single- or three-phase), the meter reading and the tokens downloaded.
LengthNot stated in EWURA’s published rules or TANESCO’s approved tariff schedule
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the front of the meter or its customer interface unit, on token purchase receipts and, for post-paid customers, on TANESCO bills.
Electronic accessCustomers use the meter number to buy prepaid tokens. Meter readings and token history are held in TANESCO’s systems. No public portal for downloading consumption data was identified.
Third-party accessNo regulated right for third parties, such as installers or energy-service companies, to access a customer’s meter data was identified. Data is held by TANESCO as the licensee.
Who keeps the registerTANESCO’s customer and metering records. EWURA sets TANESCO a performance target to record GPS coordinates for more than 60% of customers by feeder.
Register scopeNational

Tanzania has no separate, national supply-point number like the UK MPAN. A household connection exists in TANESCO’s systems as a customer account linked to a physical meter. For the great majority of households, that meter is a prepaid LUKU meter. When the meter is installed, its number becomes the reference the customer uses to buy credit: they quote it at a vendor or payment channel, receive a numeric token and type it into the meter keypad. Post-paid customers have their meters read at least once every three months under the Electricity (Supply Services) Rules 2019.

Who keeps the records

TANESCO is the only supply licensee and the dominant distributor, so its customer database is in effect the national register for the Mainland. EWURA does not keep a separate register. It regulates through TANESCO’s licence conditions: meters must be calibrated and sealed, large customers inspected every year and other meters at least every 24 months, and inspections recorded on a standard form that lists account number, meter number, meter type, readings and recent tokens. EWURA’s performance agreement with TANESCO also includes a target for recording the GPS coordinates of more than 60% of customers by feeder, as a way of improving network records.

Moving home and meter sharing

The meter is a fixed installation at the premises, but EWURA’s published rules do not say whether the account number passes to a new occupant. In practice the 2023 Household Energy Consumption Survey found that many households share one registered connection. One meter number can therefore serve several homes in a compound or rented building, which complicates any scheme that needs to identify individual households.

Mini-grids and Zanzibar

Customers of registered mini-grid operators, such as Jumeme, PowerGen or Watu na Umeme, are identified by the operator’s own metering and account systems. In Zanzibar, ZECO keeps its own customer records.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringLimited
Net billingNo
How exported electricity is paidNet metering under the Electricity (Net-Metering) Rules 2018: exported renewable energy earns credits that offset grid consumption. Generators of 100 kW to 10 MW sell to TANESCO under the Standardised Small Power Projects Tariff.
Is there a cap on net metering?Yes. EWURA states that the framework allows net-metered generation up to 5% of the utility’s maximum demand.
Is net metering operating at scale?No. EWURA’s FY 2024/25 report describes net metering as something that "will be promoted", and its FY 2025/26 report lists it under the future outlook. TANESCO’s performance agreement includes publishing and submitting the bi-directional net-metering meter specification as an outstanding target.
What do small grid-connected generators receive?Under the Standardised Small Power Projects Tariff (GN 464 of 2019), solar projects of 0.1–0.5 MW receive 10.54 US cents/kWh, 0.51–1 MW 9.84, 1.01–5 MW 9.24 and 5.01–10 MW 8.34. Hydro, wind, biomass and bagasse have their own rates.
Who counts as a small power producer?Since the 2025 amendment (GN 640), a small power producer generates 100 kW to 10 MW at one site from renewables, cogeneration or a hybrid with no more than 25% fossil capacity. It can have more than 10 MW installed if it exports no more than 10 MW at the interconnection point.
Where can small power projects be built?Since GN 640 of 2025, only in areas the distribution network operator declares to be strategic. The operator must publish the list each July. Mini-grid developers need an endorsement from the Rural Energy Agency.

Connecting a home system.

  1. Engage an EWURA-licensed electrical installer (a specialised S-class licence covers renewable-energy works).
  2. Apply to TANESCO, as the distribution and supply licensee, to connect the system under the Net-Metering Rules 2018.
  3. TANESCO assesses the connection against the 5% net-metering limit and the grid and distribution codes.
  4. A bi-directional meter is installed to measure imports and exports. TANESCO has an EWURA performance target to publish the specification for these meters.
  5. For projects of 100 kW to 10 MW selling to the grid, a separate small-power-producer route applies: a letter of intent, the standardised PPA and an EWURA registration (below 1 MW) or licence (above 1 MW).

Households and businesses on the Mainland have a legal basis to export solar power through the Electricity (Net-Metering) Rules 2018, which let customers offset grid consumption with credits for renewable energy they send to the grid. The total is capped at 5% of the utility’s maximum demand. On EWURA’s own account the scheme is still being put into practice. In 2025 and 2026 the regulator described net metering as part of the sector’s future outlook. It also set TANESCO a target to publish the technical specification for the bi-directional meters needed to measure imports and exports separately.

Larger generators have a clearer route. Projects of 100 kW to 10 MW can sell to TANESCO under the Electricity (Development of Small Power Projects) Rules 2020 and the standardised tariff of 2019. The rules were tightened in October 2025. Projects may now be built only in areas the network operator declares strategic. Developers must sign the standardised PPA without substantive changes and enter a performance agreement with EWURA. At the end of FY 2025/26, 20 private small power producers had 59.41 MW of capacity on the system.

Because grid tariffs are low and many households share a meter, most household solar in Tanzania is not connected to the grid. Solar home systems and mini-grids supply homes that the grid has not reached or where supply is unreliable.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (for sale or own use)EWURA generation licence above 1 MW; registration with EWURA below 1 MW (exempt from licensing under section 20 of the Electricity Act)EWURA49 generation licences were in force in FY 2025/26 (18 for sale, 31 for own use). 68 registered sites totalled 6,478.01 kW. Provisional licences cover projects under development.
Install a home solar systemNo generation licence or registration was identified for small household systems, but the wiring must be done by an EWURA-licensed electrical installerEWURA (installer licensing)Under the Electrical Installation Services Rules 2025 (GN 570), renewable-energy work is a specialised activity. Classes C, D and S3 are reserved for Tanzanian citizens.
Store electricityNo storage-specific licence or exemption identified; storage is not a separate licensed activity under section 9 of the Electricity ActEWURAEWURA’s 2026 e-mobility guidelines cover battery-swapping stations. A battery that generates for sale would probably fall under the generation rules, but this has not been confirmed.
Export to the gridNet-metering arrangement with TANESCO under the Net-Metering Rules 2018, or a standardised PPA as a small power producer (100 kW–10 MW)TANESCO / EWURANet metering is capped at 5% of the utility’s maximum demand. EWURA approves all PPAs before they are signed.
Sell electricity to third parties (retail)Supply licence above 1 MW. Small power producers below 1 MW may sell at retail to customers once registered, at an EWURA-approved tariffEWURATANESCO is the only supply licensee. Mini-grid operators such as Jumeme, PowerGen, Powercorner, Husk Power and Watu na Umeme sell under EWURA tariff orders.
Distribute electricityDistribution licence above 1 MW; registration below 1 MWEWURATwo licensees: TANESCO and Mwenga Power Services. Registered entities operate a further 617 km of distribution lines.
Aggregate distributed assetsNo aggregator role or licence exists—There is no market in which aggregated assets could take part.
Trade electricity (physical, financial, cross-border)Licence required under section 9 of the Electricity Act for physical and financial trading and for cross-border tradeEWURATANESCO holds the only cross-border trade licence. Power-exchange agreements, such as TANESCO’s 4 MW agreement with KETRACO, need EWURA approval.
Wholesale supply / direct contractsA generator may contract directly with a customer only if EWURA designates that customer an "eligible customer"EWURAOnly one eligible customer has been designated (Lipton Teas and Infusions, at least 2 MW from Mwenga Hydro, 2024–2029). There is no wholesale market.
Balancing and system operationSystem-operation licence under section 9EWURATANESCO performs system operation under the Electricity System Operation Services Rules 2016. There is no balancing market for third parties.
Provide grid services / operate a VPPNo framework identified—Neither demand response nor virtual power plants are covered by EWURA rules.
Remote control of customer assetsNo specific rules identified—No rules were found on remote control of inverters, batteries or loads by third parties.
Carry out electrical installation workEWURA electrical installation licence: Class A (all voltages), B (up to 33 kV), C (up to 1,000 V), D (up to 230 V); specialised S1 (all voltages), S2 (up to 33 kV), S3 (up to 1,000 V)EWURALicences are issued for five years. Holders of classes A–D need a specialised licence for specialised work, which includes renewable energy. There were 11,715 active installation licences in FY 2025/26.

Section 9 of the Electricity Act lists the activities that need a licence: generation, transmission, distribution, supply, system operation, cross-border trade, physical and financial trading, and electrical installation. The key threshold is 1 MW. Above it, EWURA issues a licence. Below it, the activity is exempt from licensing under section 20 but must be registered, and a registered project may not start commercial operation until it is registered. Licence and registration fees are set by the Electricity (Licensing and Registration Fees) Rules 2022, and applications go through EWURA’s online portal.

In practice this means a household or small business installing solar for its own use deals with two things: the installer’s EWURA licence and, if it wants to export, TANESCO’s net-metering process. Small power producers and mini-grid developers are registered or licensed depending on size, and they need EWURA approval for both their tariffs and their PPAs. Since October 2025 they also need a performance agreement with the regulator and, for mini-grids, REA endorsement.

Licensing of installers was rewritten in September 2025 (GN 570). The rules create four general classes by voltage and three specialised classes. Specialised work explicitly includes renewable energy, along with live-line work, cable jointing and motor rewinding. A committee evaluates applicants and may hold an oral or practical interview.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency control / reservesNo—NoTANESCO. Reserves are provided by TANESCO’s own hydro and gas plants. The reserve margin was 49.36% in FY 2025/26, against a minimum target of 15%. No procurement from distributed assets exists.
Energy trading (wholesale)No—NoThere is no wholesale market or exchange. TANESCO buys power under bilateral PPAs approved by EWURA, and only designated eligible customers may contract directly with generators.
Demand responseNo—NoTANESCO. No demand-response or load-management programme for households was identified. EWURA lists energy efficiency and demand-side management among future-outlook topics.
Regional power pools (EAPP / SAPP)Restricted—NoTANESCO. Tanzania is a member of both power pools. Only TANESCO, as the sole cross-border trade licensee, takes part.

Tanzania has no flexibility market. TANESCO balances the system with its own plants, mostly hydro (including the 2,115 MW Julius Nyerere station) and gas. In FY 2025/26 capacity was large relative to demand: the reserve margin was 49.36% and unserved energy 0.73%, so short-term need for flexibility from customers is low.

The 2016 market rules and the Market Re-Organisation and Promotion of Competition Regulations allow for an independent system operator and market operator in future. EWURA’s June 2026 report says that more competition, private investment and "investment in flexibility and system balancing resources" will be needed as the Power System Master Plan expands capacity towards 19,905 MW by 2050. Until then, distributed assets have no route to earn money from grid services.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national smart-meter programme; prepaid LUKU keypad meters for households and AMR meters for some three-phase customers
Reading intervalNot applicable for prepaid keypad meters; not published for AMR meters
Main household meterPrepaid LUKU meter (D1 and T1 tariffs)
Remote-read metersAMR meters offered for three-phase connections
Meter tampering charge (D1/T1)TZS 60,000 single-phase LUKU; TZS 200,000 three-phase LUKU; TZS 300,000 AMR
Post-paid meter readingAt least every 3 months (6 months for large customers)
Meter inspectionAt least every 24 months for ordinary customers; 12 months for large customers
Net-metering meterBi-directional meter specification still to be published by TANESCO

Metering in Tanzania is built around prepayment rather than smart meters. Domestic customers on D1 and T1 are connected with LUKU keypad meters. They buy tokens in advance, and TANESCO’s connection charges and meter-replacement fees are set for this meter type. Three-phase customers may instead have AMR meters, which TANESCO can read remotely. Large T2 and T3 customers use current-transformer-operated meters.

The Electricity (Supply Services) Rules 2019 make TANESCO responsible for installing, maintaining and checking the accuracy of every meter at every point where power is taken from its network. Meters must be calibrated and sealed by the certification authority, and inspections must be witnessed by the customer or a local leader. There is no published plan to replace prepaid meters with communicating smart meters, and no national data hub. The first step needed for net metering, the specification for a bi-directional import–export meter, was still an open item in TANESCO’s performance agreement with EWURA in 2026.

Renewable electricity.

Electricity generation mix (FY 2025/26 (July 2025 – June 2026), domestic generation excluding imports).

  • Hydro: 62.8%
  • Natural gas: 32%
  • Coal: 2%
  • Biomass: 1.6%
  • Oil (gas oil, HFO, diesel): 1.4%
  • Solar: 0.2%
  • Wind: 0%
Source 1
Renewable electricity share
64.6% (FY 2025/26)Source 1Derived from EWURA’s generation mix for FY 2025/26, excluding imports: hydro 62.82% + biomass 1.55% + solar 0.21% + wind 0.02% = 64.60%. Imports (573.34 GWh) were 3.69% of total generation plus imports (15,530.98 GWh). EWURA’s FY 2024/25 report cites a renewable share of 61.8% as the baseline for the national energy compact.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
2,726.3 MW (FY 2025/26)Source 1All on the main grid; includes the 2,115 MW Julius Nyerere station.
Natural gas
1,281.2 MW (FY 2025/26)Source 11,121.53 MW main grid, 77.90 MW off-grid, 81.76 MW own use.
Oil (gas oil, HFO, diesel)
272.7 MW (FY 2025/26)Source 1
Biomass
171.2 MW (FY 2025/26)Source 1Mostly own-use plants at sugar estates (140.79 MW).
Solar
82.4 MW (FY 2025/26)Source 1
Coal
45.4 MW (FY 2025/26)Source 1Own-use only.
Wind
2.4 MW (FY 2025/26)Source 1

Targets.

  • National energy compact: raise renewables from 61.8% to 75% of the generation mix and electricity connectivity to 75% by 2030, adding more than 1,800 MW of solar, wind, geothermal and hydro capacity (EWURA FY 2024/25 report).
  • Power System Master Plan 2024 Update: installed capacity of 11,822 MW by 2030 and 19,905 MW by 2050, with non-hydro renewables at 52% by 2050 on EWURA’s presentation.
  • National Clean Cooking Strategy 2024–2034: 80% of the population using clean cooking by 2034.

Tanzania’s electricity is mostly renewable because of hydropower. The 2,115 MW Julius Nyerere station is now the largest plant on the system, and in FY 2025/26 hydro supplied 62.82% of generation. Natural gas supplied 32.01%. The rest came from small amounts of coal, biomass, oil, solar and wind. On EWURA’s figures, renewable sources (hydro, biomass, solar and wind) produced about 64.6% of domestic generation.

Grid-connected solar and wind are only beginning. TANESCO’s 50 MW Kishapu solar plant in Shinyanga came into service during FY 2025/26 and lifted solar capacity to 82.44 MW. Wind is limited to a 2.4 MW licence held by Mwenga Hydro. New provisional generation licences in FY 2025/26 totalled 74.09 MW, of which 40.10 MW was solar, 29.04 MW hydro and 2.50 MW wind. EWURA approved procurement of seven projects totalling 1,136 MW.

Off the grid, solar is already a mass-market technology. In the 2022 census, 32.4% of households used solar as their main source of lighting, almost as many as used grid electricity (37.4%). The 2023 Household Energy Consumption Survey found 3.3 million mainland households relying on solar alone, mostly in rural regions such as Geita and Lindi.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No grid-scale battery storage operates on the Tanzanian grid, and none appears in EWURA’s capacity tables or its list of generation licences. Hydro reservoirs, especially at Julius Nyerere, provide the system’s storage and balancing. There is no specific licensing category for storage.

Batteries are common at household level as part of solar home systems, and in mini-grids. EWURA’s 2026 e-mobility guidelines also regulate battery-swapping stations for electric vehicles. As the Master Plan adds more solar and wind, EWURA has noted the need for "flexibility and system balancing resources".

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
TANESCO99.5% of distribution customers (6,294,416 of 6,323,491, FY 2025/26)NoNoNoLimited
Zanzibar Electricity Corporation (ZECO)Supplies most electricity in ZanzibarUnknownUnknownNoUnknown

Mainland households cannot choose their electricity supplier. TANESCO is the only supply licensee and serves 6.29 million customers. Distribution licensees other than TANESCO, chiefly Mwenga Power Services in the Mufindi area, had 29,075 customers between them in FY 2025/26. Mwenga’s own D1 rate is TZS 60/kWh for the first 50 kWh.

In villages beyond the grid, registered mini-grid operators sell power at EWURA-approved tariffs. These include Jumeme Rural Power Supply, PowerGen Renewable Energy, Powercorner Tanzania, Husk Power Systems and Watu na Umeme. Their residential tariffs of about TZS 1,100–1,700/kWh are far above TANESCO’s because they recover the cost of solar-and-battery systems serving small loads.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy (Wizara ya Nishati)GovernmentEnergy policy, Power System Master Plan, sector restructuringSets national electrification and generation policy and oversees TANESCO and REA.
Energy and Water Utilities Regulatory Authority (EWURA)RegulatorLicensing, tariffs, PPAs, installer licensing and consumer protection (Mainland)Issues the rules on net metering, small power projects and electrical installation, and publishes the sector performance reports.
Zanzibar Utilities Regulatory Authority (ZURA)RegulatorElectricity, petroleum, water and gas regulator for ZanzibarLicenses and sets tariffs for electricity activities in Zanzibar.
Tanzania Electric Supply Company Limited (TANESCO)TransmissionState utility: generation, transmission, system operation, distribution and supplyEvery grid connection, net-metering application and power purchase agreement on the Mainland goes through TANESCO.
Zanzibar Electricity Corporation (ZECO)DistributionVertically integrated utility for ZanzibarConnects and supplies customers on Unguja and Pemba.
Rural Energy Agency (REA)Renewable EnergyRural electrification planning and fundingFunds rural grid extension and mini-grids, and must endorse mini-grid developers under the 2025 small-power-project rules.
Tanzania Renewable Energy Association (TAREA)SolarMember-based renewable energy industry association (registered 2001)Represents solar and other renewable energy businesses and practitioners.
Tanzania Bureau of Standards (TBS)ConsumerNational standards bodyPublishes the TZS power-quality standards used by EWURA to measure supply quality and reliability.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionElectricity (Grid and Distribution Codes) Rules 2017 (GN 451)EWURAGives legal force to the grid code and distribution code that apply to every generator and customer connecting to TANESCO’s network.
Net meteringElectricity (Net-Metering) Rules 2018EWURARenewable generation offsetting grid consumption; total capped at 5% of the utility’s maximum demand; bi-directional meter specification pending.
Small power projectsElectricity (Development of Small Power Projects) Rules 2020 (GN 491), amended 2025 (GN 640); Standardised SPP Tariff Order 2019 (GN 464)EWURA100 kW–10 MW renewable, cogeneration or hybrid (no more than 25% fossil) projects; standardised PPA; strategic areas published by the network operator each July.
Power qualityTZS 1373:2011 Power quality – quality of supplyTanzania Bureau of StandardsLimits on supply quality. EWURA targets LV voltage within ±10% and MV within ±5%.
ReliabilityTZS 1374:2011 Power quality – quality of service and reliabilityTanzania Bureau of StandardsBasis for the SAIFI, SAIDI and CAIDI targets EWURA applies to distributors.
Installer accreditationElectricity (Electrical Installation Services) Rules 2025 (GN 570)EWURAClasses A, B, C and D by voltage, plus specialised classes S1–S3 covering renewable-energy work. Five-year licences.
Inverters / anti-islandingNo national inverter or anti-islanding standard identified—Technical requirements for net-metered systems are expected to follow TANESCO’s bi-directional metering specification and the distribution code.
EV chargingE-mobility Guidelines for Charging Stations and Battery Swapping (2026)EWURACovers charging stations and battery-swapping facilities.

Permissions.

Permissions.
PermissionRequiredLevelDetail
TANESCO connection (new supply)YesNationalApplication to TANESCO, with no application fee. Approved single-phase connection charges are TZS 272,000 (urban, within 30 m, excluding VAT) or TZS 27,000 (rural, including VAT). Testing and inspection of the installation costs TZS 20,000 for D1 and T1 customers.
Licensed electrical installerYesNationalElectrical installation work must be done by a holder of the right class of EWURA licence. Renewable-energy work is a specialised category.
Net-metering agreement with TANESCOLimitedNationalRequired only to export under the Net-Metering Rules 2018. In practice it depends on TANESCO’s bi-directional metering arrangements.
EWURA registration (below 1 MW) or licence (above 1 MW)LimitedNationalNeeded for generation, distribution or sale as a business, including mini-grids and small power producers. No requirement for small household systems was identified.
REA endorsementLimitedNationalRequired for mini-grid developers under the 2025 amendment to the small-power-project rules.
Building or planning consent for rooftop solarUnknownLocalNo national rule specific to rooftop solar was identified.

For a household, permissions are simple but depend on the utility. The home must have a TANESCO connection, any wiring must be done by an EWURA-licensed installer, and connecting a solar system to export requires TANESCO’s agreement under the 2018 net-metering rules. Off-grid solar home systems not connected to the grid need no utility approval.

Commercial projects go through EWURA. Generation, distribution or retail sale of electricity requires registration below 1 MW or a licence above it. EWURA must approve tariffs charged to customers and any PPA with TANESCO. Under the October 2025 amendments, small power projects must be in areas the network operator declares strategic, and mini-grids need REA endorsement.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
D1 lifeline tariffActiveSocial tariffTZS 100/kWh for the first 75 kWh a month for households averaging under 75 kWh, compared with TZS 292/kWh on T1.April 2016 – present
Rural connection chargeActiveConnection subsidySingle-phase rural connections cost a flat TZS 27,000 including VAT for service lines up to 120 metres, against TZS 272,000–590,398 in urban areas.Order of November 2020 – present
Standardised Small Power Projects TariffActiveFeed-in tariffFixed US-cent tariffs by technology and size for renewable projects of 100 kW–10 MW selling to TANESCO. Solar receives 8.34–10.54 US cents/kWh.June 2019 – present
Net meteringActiveNet meteringThe rules are in force, but EWURA describes the scheme as still being implemented. Credits for exported renewable energy offset consumption, with a 5% cap on total net-metered generation.2018 – present
Customer financing of supply linesActiveBill creditCustomers who finance construction of a supply line recover the cost through deductions of 40% of monthly electricity bills until repaid.Electricity (General) Regulations 2020 – present

Data and connectivity.

Fixed broadband
0.25 fixed subscriptions per 100 people (2024)Source 13World Bank (ITU) fixed broadband subscriptions per 100 people (0.246). Internet users were 31.2% of the population in 2024.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is rare: about 0.25 subscriptions per 100 people in 2024, according to the World Bank. Internet use is mostly over mobile networks, and 31.2% of the population used the internet in 2024. Any remote monitoring of household solar or batteries therefore relies on mobile data.

Prepaid LUKU meters do not need communications. Credit is moved by numeric tokens typed into the meter, which works without network coverage at the home. AMR meters for three-phase customers are read remotely by TANESCO. Mini-grid operators use their own metering and payment systems.

Grid conditions.

National peak demand
2.673 GW (FY 2025/26)Source 1Gross electricity demand (maximum demand) of 2,672.59 MW, up 13.34% from 2,357.97 MW in FY 2024/25.
Annual electricity demand
15.5 TWh (FY 2025/26)Source 1Total generation plus imports of 15,530.98 GWh, including 922.54 GWh of own-use generation and 573.34 GWh of imports.
Generation capacity
4.582 GW (FY 2025/26)Source 1Derived: 4,648.69 MW including contracted imports, minus 67.00 MW of imports. Of the domestic capacity, 4,053.00 MW is on the main grid for sale, 92.87 MW off-grid for sale and 435.83 MW for own use.
Interconnection
0.067 GW (FY 2025/26)Source 1Contracted import capacity: Zambia (Mbala, 66 kV) 20 MW, Uganda (Masaka, 132 kV) 36 MW and Kikagati (33 kV) 7 MW, Kenya (Isinya, 400 kV) 4 MW. The 400 kV Kenya link carried 304.90 GWh of imports in FY 2025/26.
Curtailment
Not identified from a reliable public source.

The 400 kV network links the Julius Nyerere hydro station (via Chalinze) with Dodoma, Singida, Shinyanga and Lemugur in the north, and imports from Kenya arrive over the 400 kV Isinya line. Isolated regions are still supplied by off-grid TANESCO diesel and gas stations (92.87 MW for sale). Many mines, cement works and sugar estates generate for their own use (435.83 MW).

With the Julius Nyerere station online, capacity comfortably exceeds demand. The reserve margin rose to 49.36% in FY 2025/26 and load shedding fell to 0.20% of energy. But plant availability averaged only about 77%, below the 88% target, and utilisation fell to 43.78%. Demand is growing quickly: gross demand rose 13.34% in a year, and the Master Plan projects peak demand of 6,571 MW and 40,933 GWh by 2030. A further 16,552 km of transmission lines are planned to 2048.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Small power projects rules amended (GN 640)Current31 October 2025Redefines small power producers (100 kW–10 MW, at most 25% fossil). Limits projects to strategic areas published each July by the network operator, requires REA endorsement for mini-grids, makes the standardised PPA non-negotiable and requires a performance agreement with EWURA.
New electrical installation licensing rules (GN 570)Current12 September 2025Replace the 2022 rules with classes A–D and specialised classes S1–S3 (including renewable energy), five-year licences, and classes C, D and S3 reserved for Tanzanians.
E-mobility guidelines for charging and battery swappingCurrent2026EWURA guidelines regulating EV charging stations and battery-swapping facilities as electricity-consuming activities.
Bi-directional meter specification for net meteringUpcomingNot fixed (target in TANESCO performance agreement)TANESCO must publish and submit to EWURA the specification for meters that measure the energy each net-metering customer imports and exports separately. This is a prerequisite for wider take-up of the 2018 net-metering rules.
Generation and transmission expansion under the Power System Master Plan 2024Upcoming2026–2050Capacity planned to reach 11,822 MW by 2030 and 19,905 MW by 2050, with 16,552 km of new transmission lines, at an estimated cost of about USD 40 billion by 2048.
Market reorganisation and competitionUpcomingNot fixedThe 2016 Market Re-Organisation and Promotion of Competition Regulations and the Electricity Supply Industry Reform Strategy and Roadmap provide for an independent system operator and market operator. EWURA’s 2026 report calls for more competition and private participation, but no date has been set.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumOff-grid solar is widespread (3.3 million mainland households used solar alone in 2023; 32.4% of households lit mainly by solar in the 2022 census), but grid-connected rooftop solar is minimal because net metering is not yet operating at scale.
Distributed energy marketLowRegistered sub-1 MW generation totals 6.48 MW across 68 sites, and 20 small power producers provide 59.41 MW; distributed assets are mainly isolated mini-grids.
Grid flexibility marketLowNo wholesale, balancing or flexibility market; TANESCO is the only system operator and cross-border trader; no aggregator role.
Energy storage adoptionLowNo grid-scale battery in EWURA’s capacity tables and no storage licensing category; batteries mainly in solar home systems and mini-grids.
Renewable growth environmentMediumThe 2,115 MW Julius Nyerere hydro station and the first 50 MW solar plant raised renewable output, and the energy compact targets 75% renewables, but grid solar (0.21%) and wind (0.02%) shares remain very small.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 16 sources
  1. The Electricity Sub-Sector Regulatory Performance Review Report up to June 2026 (FY 2025/26). Energy and Water Utilities Regulatory Authority (EWURA), 2026. accessed 9 October 2026.
  2. The Electricity Sub-Sector Regulatory Performance Report for the Financial Year 2024/25. Energy and Water Utilities Regulatory Authority (EWURA), 2026. accessed 9 October 2026.
  3. Electricity regulatory tools (acts, rules, tariff orders and guidelines). Energy and Water Utilities Regulatory Authority (EWURA), 2026. accessed 9 October 2026.
  4. Electricity licensing and registration. Energy and Water Utilities Regulatory Authority (EWURA). accessed 9 October 2026.
  5. Electricity infrastructure. Energy and Water Utilities Regulatory Authority (EWURA), 2026. accessed 9 October 2026.
  6. TANESCO Tariff Adjustment (Amendment) Order, 2020 (GN 1020). Energy and Water Utilities Regulatory Authority (EWURA), 2020. accessed 9 October 2026.
  7. The Electricity (Development of Small Power Projects) (Amendment) Rules, 2025 (GN 640). Energy and Water Utilities Regulatory Authority (EWURA), 2025. accessed 9 October 2026.
  8. The Electricity (Electrical Installation Services) Rules, 2025 (GN 570). Energy and Water Utilities Regulatory Authority (EWURA), 2025. accessed 9 October 2026.
  9. Electricity (Supply Services) Rules 2019 (GN 387). Energy and Water Utilities Regulatory Authority (EWURA), 2019. accessed 9 October 2026.
  10. 2022 Population and Housing Census: Basic Demographic and Socio-Economic Profile – Key Findings. National Bureau of Statistics (NBS), 2024. accessed 9 October 2026.
  11. 2023 Household Energy Consumption Survey Report, Mainland Tanzania. National Bureau of Statistics (NBS), 2025. accessed 9 October 2026.
  12. Exchange rates (TZS per foreign currency), 9 October 2026. Bank of Tanzania, 2026. accessed 9 October 2026.
  13. Fixed broadband subscriptions (per 100 people) – Tanzania. World Bank (ITU data), 2024. accessed 9 October 2026.
  14. Individuals using the Internet (% of population) – Tanzania. World Bank (ITU data), 2024. accessed 9 October 2026.
  15. Urban population (% of total population) – Tanzania. World Bank, 2025. accessed 9 October 2026.
  16. Electricity – regulatory services. Zanzibar Utilities Regulatory Authority (ZURA). accessed 9 October 2026.

Questions about energy in Tanzania.