How electricity works in Rwanda.
Rwanda electricity market 2026: RURA block tariffs, REG/EUCL single utility, Cash Power prepaid meters, licensing, off-grid solar and planned net metering.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Rwandan franc (RWF) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Rwanda energy at a glance.
Key figures for households in Rwanda. Each one links to its source on the full overview below.
Electricity price.
435.42 RWF per kWh for households, including taxes. Figures for From 1 October 2025.
Household use.
133 kWh a year for a typical household. Figures for Jul 2023 – Jun 2024.
Renewable share.
49.6% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Rwanda.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Rwanda below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Rwanda requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Rwanda.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Rwanda, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Rwanda, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Rwanda.
The energy market in Rwanda, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Rwanda’s grid is run by one state-owned group. Rwanda Energy Group (REG) works through two subsidiaries: the Energy Utility Corporation Limited (EUCL), which operates the power plants, the transmission grid and the distribution network and sells electricity to every grid customer, and the Energy Development Corporation Limited (EDCL), which plans and builds new generation, transmission and access projects. Independent power producers sell their output to EUCL under power purchase agreements. The Rwanda Utilities Regulatory Authority (RURA) licenses the sector and sets end-user tariffs, and the Ministry of Infrastructure (MININFRA) sets energy policy.
Generation is small but diverse: hydro plants, methane gas extracted from Lake Kivu, peat, a small amount of solar, oil-fired standby plants, and imports from Uganda and the Democratic Republic of Congo together with shares of regional hydro plants. Installed capacity reached 467 MW by the end of 2025, roughly double the 238 MW of 2020/21, against a system peak of 242 MW in 2024. Hydro and solar supplied about half of domestic generation in 2024.
Electrification has moved fast. REG reports that 85.4% of households had access to electricity at the end of 2025: 60.1% through the grid and 25.3% through off-grid systems, mainly solar home systems. Households pay a three-block regulated tariff that RURA revised on 1 October 2025 for the first time since 2020 (FRW 89, 310 and 369 per kWh before VAT). Households cannot yet sell power to the grid: in July 2026 the government announced it is studying net metering, but RURA has not yet published rules.
Energy snapshot.
Headline figures for electricity in Rwanda. Each shows its data year and links to its source.
- Population13,246,394 peopleSource 4August 2022 census
- Households3,312,743 householdsSource 4August 2022 census
- Average household size3.95 people/householdSource 4August 2022 census
- Electricity use per household133 kWh/yrSource 3Jul 2023 – Jun 2024
- Household price (RWF)435.4 RWF/kWhSource 1From 1 October 2025
- Household price (EUR)0.261 EUR/kWhSource 27From 1 October 2025
- Renewable electricity share49.6%Source 72024
- Solar capacity0.012 GWSource 82024
- Wind capacity0 GWSource 82024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Rwanda Utilities Regulatory Authority (RURA)
- System operator
- Energy Utility Corporation Limited (EUCL), REG subsidiary that owns and operates generation, transmission and distribution
- Distribution networks
- One national grid distributor and retailer, EUCL; licensed private mini-grid operators and off-grid solar companies serve areas beyond the grid
- Currency
- Rwandan franc (RWF)
- Voltage and frequency
- 230 V single-phase / 400 V three-phase, 50 Hz
Electricity prices in Rwanda.
- Household price (RWF)
- 435.4 RWF/kWh (From 1 October 2025)Source 1Derived: residential rate for consumption above 50 kWh a month (FRW 369/kWh) plus 18% VAT. The published tariff excludes VAT and a regulatory fee; the fee is not included here. The first 20 kWh each month cost FRW 89/kWh and units 21–50 cost FRW 310/kWh before VAT, so most low-use households pay much less per unit.
- Household price (EUR)
- 0.261 EUR/kWh (From 1 October 2025)Source 27FRW 435.42 converted at the National Bank of Rwanda official average rate of FRW 1,669.94 per euro on 30 September 2026 (435.42 ÷ 1,669.94 = 0.261). The lowest block (FRW 89 + VAT = FRW 105.02) converts to about EUR 0.063/kWh.
- Typical annual electricity bill
- 14,003 RWF/yr (Tariff from 1 October 2025)Source 1Derived illustration for a grid household using the average 133 kWh a year (about 11 kWh a month, all within the 0–20 kWh block): 133.3 kWh × FRW 89 × 1.18 VAT. Excludes the regulatory fee. A household using 60 kWh a month would pay (20 × 89 + 30 × 310 + 10 × 369) × 1.18 = FRW 17,429 a month. No official average bill is published.
Household price trend (RWF per kWh).Source 2
| 2020 | 249 RWF/kWh |
|---|---|
| 2021 | 249 RWF/kWh |
| 2022 | 249 RWF/kWh |
| 2023 | 249 RWF/kWh |
| 2024 | 249 RWF/kWh |
| Jan–Sep 2025 | 249 RWF/kWh |
| Oct–Dec 2025 | 369 RWF/kWh |
| 2026 | 369 RWF/kWh |
How tariffs are set
RURA approves end-user tariffs for EUCL under the electricity law and its 2013 founding law, after consulting the government on the size of the state subsidy and how it is shared between customer categories. The 2020 board decision provided for quarterly adjustment under a tariff methodology approved by RURA’s director general, but in practice the tariffs set in January 2020 stayed unchanged until 30 September 2025.
The October 2025 revision
The revision that took effect on 1 October 2025 was the first since 2020. It widened the lowest residential block from 15 to 20 kWh a month while keeping its price at FRW 89/kWh, but raised the middle block from FRW 212 to 310/kWh and the top block from FRW 249 to 369/kWh. Non-residential, hotel, telecom, health and industrial rates also rose, while new categories were introduced for schools, public EV charging and heavy industry (steel, mining and cement at FRW 97/kWh).
What a household pays
A prepaid household pays for units as it buys them; the first 20 kWh bought in a month are charged at the lifeline rate, so a household that uses little electricity, which is most grid households, pays close to FRW 105/kWh including VAT. VAT of 18% is added to the published prices, as is a regulatory fee whose level is not stated on the tariff schedule. There is one national tariff, so prices do not vary by region.
Price trend
The chart shows the residential rate for consumption above 50 kWh a month, before VAT. It was FRW 249/kWh from 21 January 2020 to 30 September 2025 and FRW 369/kWh from 1 October 2025.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Residential block tariff approved by RURA, effective 1 October 2025: FRW 89/kWh for the first 20 kWh in a month, FRW 310/kWh for 21–50 kWh and FRW 369/kWh above 50 kWh. Prices exclude 18% VAT and the regulatory fee. |
| Prepayment | Yes | Almost all households use prepaid “Cash Power” meters. Units are bought with MTN or Airtel mobile money (USSD codes *182#, *720#, *508#, *662*1# and *500#), at agents or banks; the block prices apply to units bought in each calendar month. |
| Time-of-use | Limited | Only industrial customers with smart meters are billed postpaid with peak (18:00–23:00), shoulder (08:00–18:00) and off-peak (23:00–08:00) periods and a monthly maximum-demand charge (FRW 7,184–11,017 per kVA). Households have no time-of-use option. |
| Other | Limited | Non-residential customers pay FRW 355/kWh for the first 100 kWh and FRW 376/kWh above. Separate flat rates apply to telecom towers (289), hotels (239 or 175), health facilities and schools (214), water pumping and treatment (133) and public EV charging (110). |
| Dynamic | No | There is no wholesale market and no dynamic retail tariff. |
| Fixed | No | There is no competitive retail offer; every grid customer pays the regulated EUCL tariff. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 133 kWh/yr (Jul 2023 – Jun 2024)Source 3Derived: residential sales over four quarters (Q3 2023–Q2 2024) of 232.05 GWh (RURA statistics) ÷ 1,740,316 grid-connected households in the 2022 census. Because grid connections have grown since 2022, the true average per connected household is probably lower. Off-grid solar households are not included.
- Average daily use per household
- 0.37 kWh/day (Jul 2023 – Jun 2024)Source 3Derived: 133 kWh a year per grid-connected household ÷ 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 90 kWh/person/yr (all sectors) (2024)Source 7Ember electricity demand per capita (0.09 MWh), all sectors.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 0.03 % of homes (August 2022 census)Source 4Derived: 993 of 3,312,743 private households used electricity as their main cooking fuel. 76.1% cooked mainly with firewood, 17.3% with charcoal and 4.6% with gas.
A very low-consumption grid
Rwandan households use very little grid electricity. Residential customers bought 61.2 GWh in April–June 2024, only 20.6% of all electricity sold; industry took 31.5% and non-residential customers 23.1%. Spread over the 1.74 million households connected to the grid in 2022, that is roughly 11 kWh a month, consistent with use mainly for lighting, phone charging and small appliances, and within the 20 kWh lifeline block.
What electricity is used for
Electricity is used mainly for lighting and small appliances. In the 2022 census 61% of households used electricity as their main source of lighting (47.1% from the grid or another private network and 13.9% from solar), while cooking was almost entirely biomass: 93% of households cooked with firewood or charcoal and only about a thousand households cooked mainly with electricity. Space heating and air conditioning are rare in Rwanda’s highland climate.
Demand growth
National demand is growing quickly as connections and industry expand. REG’s 2024 Least Cost Power Development Plan records total demand rising from 0.690 TWh in 2016 to 1.477 TWh in 2024, and system peak demand from 119 MW to 242 MW. Government sources reported a 15% jump in demand in 2025, against a long-run trend of about 10% a year.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 71.6% (August 2022 census)Source 4% of private households: 44.7% in urban areas and 82.7% in rural areas.
- Private rented
- 22.2% (August 2022 census)Source 4Tenant households (49.9% urban, 10.9% rural). The census does not separate private and public landlords. A further 4.4% lodged free and 0.8% lived in staff housing.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 98.6% (August 2022 census)Source 4Households living in a house occupied by one household (88.7%) or by several households (9.9%). A further 1.1% lived in multi-building compounds.
- Apartments and flats
- 0.2% (August 2022 census)Source 4Households in storey (multi-floor) buildings: 0.5% in urban areas.
- Urban population
- 27.5 % of population (August 2022 census)Source 4Derived: 3,608,527 urban residents of private households ÷ 13,100,600 (the census table rounds this to 28.0%).
Single-storey homes, mostly owner-occupied
Rwanda’s housing is overwhelmingly single-storey: almost 99% of households live in houses, and storey buildings house only 0.2% of households. About 72% own their home, but ownership has been falling since 1978 and half of urban households are tenants. In Kigali, a third of households share a house with other households.
Implications for electricity
Because most homes are detached or semi-detached single-storey buildings, roof space is not a constraint for small solar systems; the constraints are income and roof quality (74% of households have iron-sheet roofs). Tenants in shared houses often depend on the landlord’s meter: REG advises tenants who want separate metering to ask the property owner to request a supplementary meter.
Grid reach
In 2022, 52.5% of households were connected to the national grid: 82.9% in urban areas and 40.1% in rural areas, ranging from about 89% in Kigali to 44% in the Southern Province. By the end of 2025 REG reported 60.1% grid access and 25.3% off-grid access.
How the grid works in Rwanda.
- TransmissionEnergy Utility Corporation Limited (EUCL), Energy Development Corporation Limited (EDCL)
- DistributionOne national grid distributor and retailer, EUCL; licensed private mini-grid operators and off-grid solar companies serve areas beyond the grid
- MeteringEUCL (REG)
- Supply1 or more retail suppliers
Physical flow
Power from hydro plants such as Nyabarongo I, Mukungwa and Rukarara, methane-gas plants on Lake Kivu (KivuWatt and Shema Power Lake Kivu), the Hakan and Gishoma peat plants, solar farms and imports is carried on 220 kV and 110 kV transmission lines to substations, stepped down to 30 kV and 15 kV medium voltage and then to 400 V three-phase or 230 V single-phase for homes. The grid code allows ±10% voltage tolerance and ±1% frequency tolerance around 50 Hz.
Imports and shared plants
REG’s plant list includes imports from Uganda’s transmission company UETCL (Mirama, 100 MW, and Gatuna, 2 MW) and from the Congolese utility SNEL (Mururu I), a 12 MW share of the regionally shared Mururu II plant operated by SINELAC, and Rwanda’s 26.7 MW share of the regional Rusumo Falls hydropower plant. In April–June 2024 regionally shared plants supplied 11.6% and imports 7.1% of electricity.
Commercial flow
There is no wholesale market. EUCL buys from independent producers and neighbouring utilities under bilateral power purchase agreements, runs its own plants, and sells to all grid customers at regulated tariffs, with the government subsidising part of the cost of supply. Industrial customers registered with the Rwanda Development Board get lower tariffs; everyone else is on the residential or non-residential schedule.
Reliability
Capacity has risen quickly, but reserve margins remain thin. When rented diesel generators were retired in 2023, government sources acknowledged a gap of about 30 MW, and in 2025 demand rose about 15%. REG’s 2024 plan recommends adding standby thermal capacity, extra imports and new hydro, methane and solar-plus-storage plants.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Infrastructure (MININFRA) | Sets energy policy and strategy and coordinates the electricity sub-sector, including the National Electrification Plan and access targets. |
| Regulator | Rwanda Utilities Regulatory Authority (RURA) | Multi-sector regulator. Licenses generation, transmission, distribution and trade, sets end-user tariffs, issues electrical installation permits to technicians and firms, and handles disputes that customers cannot resolve with REG. |
| TSO | Energy Utility Corporation Limited (EUCL) | REG subsidiary that operates and maintains the existing power plants, the 220 kV and 110 kV transmission grid and system operation, and buys power from independent producers and neighbouring utilities. |
| DSO | Energy Utility Corporation Limited (EUCL) | Operates the 30 kV and 15 kV medium-voltage and 400/230 V low-voltage networks nationally (38,359 km of distribution lines by the end of 2025). All network extensions are done by REG, and the networks remain REG property even when a customer pays for them. |
| Supplier | Energy Utility Corporation Limited (EUCL) | The only retailer to grid customers. Sells prepaid Cash Power units and postpaid supply at RURA-approved tariffs. |
| Metering | EUCL (REG) | Provides, installs, owns and maintains all meters at customers’ premises and runs the prepaid vending system. |
| TSO | Energy Development Corporation Limited (EDCL) | REG subsidiary responsible for developing new generation and transmission projects and for energy access, including the off-grid solar subsidy programme run with the Development Bank of Rwanda. |
Compared with the UK system.
| UK concept | Rwanda equivalent | How it works |
|---|---|---|
| DNO | EUCL (one national network) | There are no regional distribution companies. EUCL owns and operates every medium- and low-voltage line on the national grid and is also the retailer. Private mini-grid operators licensed by RURA run isolated networks in areas the grid has not reached. |
| National Grid/NESO | EUCL transmission and dispatch | The same company runs the 220 kV/110 kV transmission grid, dispatches power plants and imports, and buys all power from independent producers. Planning of new transmission and generation sits with its sister company EDCL. |
| MPAN | Cash Power meter number | The 11-digit prepaid meter number written on the meter is the de facto supply-point identifier: it is what customers enter to buy electricity and what each token is generated for. It identifies the meter, not a registered supply point, and changes if the meter is replaced. Postpaid customers have a customer account number. |
| MPRN | No equivalent | There is no piped natural gas network for homes. Households cook with firewood, charcoal or bottled LPG, which is licensed separately by RURA. |
| Meter operator | EUCL | REG’s customer charter states that REG provides, installs, owns and maintains all meters; customers may not alter them and must return them when vacating premises. There is no competitive metering market. |
| Supplier | EUCL (no choice) | Households cannot switch supplier. EUCL is the sole grid retailer and tariffs are set by RURA; outside the grid, households buy solar home systems from private off-grid companies. |
| Smart-meter infrastructure | Prepaid STS-type meters; industrial smart meters | There is no DCC-style national data network. Household meters are keypad prepaid meters that accept 20-digit tokens. Communicating smart meters are installed for industrial and large customers on time-of-use tariffs, and EDCL tendered a national smart metering rollout strategy in 2026. |
How a supply point is identified.
04123456789 (fictional 11-digit Cash Power meter number)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Cash Power meter number (prepaid) / customer account number (postpaid) (Meter No.) |
| Who issues it? | Prepaid meter numbers are assigned by the meter manufacturer and registered by EUCL in its vending system when the meter is installed; postpaid customer account numbers are created by EUCL when a supply contract is opened |
| Format | Prepaid: a numeric meter number printed on the meter (manufacturer-assigned, used for STS-type token generation). Postpaid: a numeric EUCL customer account number. EUCL does not publish the internal structure of either. |
| Length | Prepaid meter number: 11 digits. Tokens bought for the meter are 20 digits. Postpaid account number length is not published. |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Written on the meter and its box, and shown on the meter display when the brand-specific code is keyed in (for example 08 + Enter on EDMI meters or 075 + Enter on Star meters, according to REG). It is also quoted in every token SMS. Postpaid customers find the account number on the monthly bill. |
| Electronic access | Customers enter the meter number to buy units by mobile money (MTN *182#, *720#, *508#, *662*1#; Airtel *500#) or through agents and banks and receive the token by SMS. Postpaid bills are sent by paper, e-mail, SMS or the REG website. Queries go to REG branches or the toll-free line 2727. |
| Third-party access | There is no public look-up and no consumer data-sharing scheme. Anyone can buy units for a meter if they know its number, which is how tenants and relatives top up. Installers and solar companies obtain the meter number from the customer. |
| Who keeps the register | EUCL’s customer information and prepaid vending systems. RURA receives aggregate statistics but keeps no public register of supply points. |
| Register scope | National |
What identifies a connection
Rwanda has no regulator-issued supply-point number. A grid connection is identified by what EUCL bills against: for the great majority of households this is the prepaid Cash Power meter, whose 11-digit number appears on the meter box. When a customer pays by mobile money, the vending system generates a 20-digit token for that specific meter, which the customer keys in. If the vending system does not recognise a number, the customer receives a message that the Cash Power meter is not registered and must contact the branch.
Ownership and change of occupier
REG’s customer charter states that REG provides, installs, owns and maintains all meters, and that a customer vacating premises must return the meter or face penalties. In practice the meter stays wired to the building and a new occupier keeps buying units with the same number. The contract, however, is in a named person’s name: to transfer the title of a connection, REG asks for a letter, a copy of the current land title and a copy of the ID. Tenants in shared houses usually buy units for the landlord’s meter or ask the owner to request a supplementary meter.
Getting a new connection
An applicant fills in REG’s service application form and provides an ID card or passport and proof of ownership or land title. The process is application, survey, quotation, payment (in full or in instalments) and connection; REG states that residential connections take 4–10 working days. REG will not connect premises whose wiring does not meet the grid code and good practice, and it is not liable for damage where internal wiring was not certified by a RURA-permitted firm or technician.
Postpaid and smart meters
Large users can move from prepaid to postpaid metering, in which case they are identified by a customer account number and billed monthly from meter readings. Industrial customers on time-of-use tariffs have smart meters read remotely. A national strategy for 100% smart-meter coverage was put out to tender by EDCL in 2026.
Data caveat
REG does not publish the structure of meter or account numbers. The example above is fictional and shows only the length of a Cash Power meter number.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | No |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | None for households or businesses at present. Independent power producers sell to EUCL under individually negotiated power purchase agreements. |
| Can households sell surplus solar power to the grid? | Not yet. There is no legal framework allowing private consumers to sell electricity to the national grid. On 29–30 July 2026 Prime Minister Justin Nsengiyumva announced that the government is studying net metering, under which customers with solar panels and suitable meters would first supply themselves and then receive bill credits or payment for surplus. RURA has not published rules on eligibility, compensation, metering or technical standards. |
| Is a licence needed for a rooftop system? | Auto-production (self-supply) of less than 50 kW does not need a licence and is exempt from prior notification. Generation above that, including commercial and industrial self-supply, may need a generation licence from RURA. RURA has drafted dedicated solar PV regulations that would license importers, vendors, contractors and technicians separately. |
| What technical rules apply to grid-connected solar? | All grid-connected solar PV systems must comply with the Rwanda Grid Code (2013), and internal wiring must be installed by firms or technicians holding a RURA electrical installation permit. |
| Is there a feed-in tariff? | Renewable Energy Feed-in Tariff Regulations were adopted in 2012, but power producers now contract with EUCL through negotiated power purchase agreements and there is no feed-in tariff for small systems. |
Connecting a home system.
- Self-consumption systems below 50 kW can be installed without a generation licence (larger systems may need a RURA generation licence).
- Use a RURA-permitted electrical installer (Class D covers solar systems) and comply with the Rwanda Grid Code and electrical installation regulations.
- Do not export: there is no legal framework yet for paying or crediting customers for power fed into the grid.
- Watch for RURA net-metering rules: in July 2026 the Prime Minister announced that a scheme allowing surplus solar power to be credited is being studied.
Current position
Rwanda allows self-generation but not export. A household or business can install solar to cover its own needs, either off-grid or behind the meter, but cannot be paid for electricity that flows back into the EUCL network. Most solar in Rwanda is therefore off-grid: in 2022 almost 14% of households used solar as their main source of lighting, and REG counted 25.3% of households with off-grid access at the end of 2025.
Net metering under study
In late July 2026 the Prime Minister said the government is studying net metering so that households, businesses and institutions with rooftop solar can feed surplus electricity into the grid in exchange for bill credits. RURA will need to define eligibility, application procedures, metering, compensation rates and equipment standards before the scheme can start. REG said the initiative was not yet under its management.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (self-supply) | No licence and no prior notification for auto-production below 50 kW; above that a generation licence may be required | RURA | Electricity law (Law No 21/2011 as amended by Law No 52/2018) covers self-supply production. Dedicated solar PV regulations are in draft. |
| Generate electricity (for sale) | Generation licence from RURA; a provisional licence (up to 12 months) is available for studies and assessments | RURA | Producers sell to EUCL under a power purchase agreement. Small Power Producers are defined as licensed generators below 5 MW. |
| Isolated mini-grid (generation, distribution and sale) | Below 50 kW: exempt from licensing but must notify RURA (very small isolated grid registration). 50–100 kW and 100 kW–1 MW: simplified licence. Above 1 MW: standard licences | RURA | Small isolated grid simplified licence: FRW 200,000 application fee and FRW 1,000,000 licence fee, valid 15 years, decided within 22 days. Requires an EIA certificate, a concession or MoU with the government and district authorisation. |
| Store electricity | No storage-specific licence or regulation; batteries in homes and solar home systems need no licence | RURA | Grid-scale storage would be developed through EDCL/EUCL or an independent producer contract. |
| Export to the grid | Not permitted for consumers; no net-metering framework yet | RURA / EUCL | Net metering announced as under study in July 2026. |
| Distribute and sell (supply) | Distribution licence in five size bands from very small (<1 MW) to very large (>100 MW); small rural power distribution (<1 MW, <20,000 customers) under the simplified regime | RURA | First-time fee US$500 plus US$5,000–30,000 depending on size; decided within 27 days. EUCL is the only grid distributor. |
| Trade electricity | Domestic trade licence or international trade licence | RURA | Cross-border imports and shared regional plants are contracted by EUCL. |
| Wholesale market participation | Not applicable: there is no wholesale market | — | EUCL is the single buyer from all producers. |
| Aggregate, VPP, balancing and grid services | No framework: these activities are not defined in regulation | RURA | Balancing and reserves are provided by EUCL’s own plants, contracted producers and imports. |
| Remote control of customer assets | No specific rules identified | — | No regulation of aggregator or utility control of customer-owned generation or storage. |
| Install electrical and solar systems | Electrical installation permit from RURA, in classes A–Z; Class D covers specialised installations including solar systems | RURA | Permit valid three years after written or oral examination; application fee FRW 25,000; licence fees from FRW 30,000 (Class A individual) to FRW 800,000 (Class Z company). |
The legal basis
All production, transmission, distribution and trade of electricity requires a RURA licence under Law No 21/2011 governing electricity, as amended by Law No 52/2018, and the Electricity Licensing Regulations of 2013. The law’s definition of production includes self-supply, but auto-production below 50 kW is exempt. RURA issues generation, transmission, distribution, international trade and domestic trade licences through its online licensing portal.
Rural electrification
A separate simplified regime applies to isolated mini-grids and small rural distributors. Regulation No 01/R/EL-EWS/RURA/2015, later revised, exempts isolated grids below 50 kW from licensing (they must notify RURA), requires a simplified licence for 50 kW–1 MW, and sets rules for what happens when the main grid reaches a mini-grid, including asset purchase and tariffs.
Installers
Electrical work is regulated through RURA’s installation permits. REG will not compensate customers whose internal wiring was done without an installation certificate from a RURA-certified firm or technician, and the planned solar PV regulations would add separate licences for solar importers, vendors, contractors and technicians.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Reserves and frequency control | No | — | No | EUCL. Provided by EUCL’s hydro and thermal plants, contracted producers and imports. Since 2023 the Jabana oil-fired plants have been used only for peak balancing and emergencies. There is no ancillary services market. |
| Time-of-use tariffs | Restricted | — | No | RURA / EUCL. Peak, shoulder and off-peak maximum-demand charges for industrial customers with smart meters. Not offered to households or other customers. |
| Cross-border imports and shared regional plants | Restricted | — | No | EUCL. Bilateral imports and exports with neighbouring utilities (UETCL, SNEL) and shared plants (Mururu II, Rusumo). Only the national utility takes part. |
No flexibility market
Rwanda has no wholesale market, balancing market or demand-response programme, and no regulatory definition of aggregators or virtual power plants. EUCL balances the system centrally, using hydro, methane, peat, oil-fired standby units and imports.
Demand-side management
REG’s 2024 power plan highlights the cost of meeting the evening peak, especially in dry seasons when hydro output falls, and promotes demand-side management, minimum energy performance standards for appliances and energy efficiency in industry. The only price signal for shifting demand is the industrial time-of-use tariff.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No household rollout; smart meters for industrial and large customers; national strategy tendered in 2026 |
| Reading interval | Not published |
| Household meters | Prepaid keypad (“Cash Power”) meters, 20-digit tokens |
| Meter owner | REG / EUCL |
| Meter brands listed by REG | EDMI, Star, Landis, Conlog, Actaris, Positivo, Ningbo, Sunrise, Hexing |
| Smart meters | Industrial and large customers on time-of-use tariffs |
| National strategy | EDCL consultancy for a National Smart Metering Rollout Strategy (RFP 2026) |
Prepaid metering
Most households and small businesses use prepaid meters from several manufacturers. Customers buy units by mobile money and enter the token on the meter keypad; REG lists codes to display the meter number for each brand. Meters do not communicate consumption data back to EUCL.
Smart meters for large users
Smart meters are used for industrial customers billed on time-of-use tariffs; industrial customers without them pay flat prepaid rates until one is installed. Under the World Bank-financed Rwanda Electricity Sector Strengthening Project, EUCL tendered 1,000 smart meters for big customers (600 three-phase four-wire electronic meters and 400 three-phase 100 A direct-connected meters).
National strategy
In 2026 EDCL sought consultants to prepare a National Smart Metering Rollout Strategy aiming at 100% smart-meter coverage, covering communication options (power-line carrier versus GPRS), meter and meter-data-management specifications, consumer financing and a pilot with 5,000 industrial customers. Smart meters would also be needed for the net-metering scheme under study.
Renewable electricity.
Electricity generation mix (2024).
- Hydro: 46%
- Methane gas (Lake Kivu): 26.6%
- Peat: 15%
- Oil: 8.8%
- Solar: 3.5%
- Renewable electricity share
- 49.6% (2024)Source 7Hydro 46.0% plus solar 3.5% of domestic generation (Ember, from national data). RURA’s quarterly statistics give 50.7% renewable for April–June 2024; REG’s Least Cost Power Development Plan quotes 56.21% when imports and regionally shared hydro are counted as renewable.
- Home solar
- 13.9 % of households (main lighting source) (August 2022 census)Source 4460,424 households used solar power as their main source of lighting (18.3% in rural areas). REG reported 25.3% of households with off-grid access, mainly solar, at the end of 2025.
- Solar added each year
- Not identified from a reliable public source.
- Hydro (domestic)
- 109.8 MW (2024)Source 8Nyabarongo I, Rukarara, Mukungwa, Ntaruka, Giciye and about 30 small and micro plants.
- Methane gas
- 85.8 MW (2024)Source 8KivuWatt (26.19 MW), Shema Power Lake Kivu (56 MW) and KP1 (3.6 MW).
- Peat
- 85 MW (2024)Source 8Hakan (70 MW) and Gishoma (15 MW).
- Oil (diesel/HFO)
- 28.8 MW (2024)Source 8Jabana 1 and 2, used for peak and emergency supply.
- Solar PV
- 12.1 MW (2024)Source 8
- Imports and regionally shared hydro
- 144.8 MW (2024)Source 8UETCL Mirama (100 MW) and Gatuna (2 MW), SNEL Mururu I (4.1 MW), SINELAC Mururu II share (12 MW) and Rusumo share (26.7 MW).
Targets.
- Universal (100%) household access to electricity by 2029 (REG, National Strategy for Transformation).
- Installed capacity of 1,066 MW by 2034 (REG).
- Renewable share of electricity above 60% by 2030 (cited in GIZ 2025 sector analysis from IRENA).
- Least Cost Power Development Plan: develop Nyabarongo II (43.5 MW), Rusizi III (206 MW regional), 100 MW of solar with storage and a solar park of up to 128 MW.
A mixed system
Unlike its hydro-dominated neighbours, Rwanda generates a large share of its electricity from local fossil resources: methane extracted from the deep waters of Lake Kivu and peat from southern wetlands. In 2024 hydro supplied 46% of domestic generation, methane 27%, peat 15%, oil 9% and solar 3.5% (Ember). Quarterly RURA statistics show methane’s share rising quickly after Shema Power Lake Kivu came online: in April–June 2024 hydro supplied 49.4%, methane 38.5%, peat 3.0%, oil 0.7%, solar 1.3% and imports 7.1%.
Off-grid solar
Solar matters far more for access than for grid supply. Rwanda’s electrification plan relies on solar home systems for households that the grid will not reach soon, supported by results-based subsidies, VAT exemptions and minimum quality standards. By the end of 2025 a quarter of households had off-grid access.
Pipeline
REG’s plans include Nyabarongo II (43.5 MW, 57% complete at the end of 2025), Rukarara VI (9.7 MW), the 206 MW regional Rusizi III plant, more methane capacity, utility-scale solar with storage and feasibility work on nuclear small modular reactors.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Energy storage in Rwanda today is almost entirely the batteries inside off-grid solar home systems. On the grid, flexibility comes from hydro reservoirs, methane plants and oil-fired standby units. Storage features in REG’s long-term planning as a way to integrate more solar and to cover the evening peak, but no project has reached construction, and RURA has not issued storage-specific rules.
Storage projects.
- Nyabarongo II solar PV with storage: REG’s December 2024 Least Cost Power Development Plan recommends 100 MW of solar integrated with storage at the Nyabarongo II hydropower site, with possible expansion.
- Battery and pumped storage studies: The same plan calls for feasibility studies on utility-scale battery storage, hydro pumped storage and consumer-sized battery storage services.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Energy Utility Corporation Limited (EUCL), Rwanda Energy Group | All grid customers | No | Limited | No | No |
EUCL is the only retailer on the national grid. Outside the grid, households buy solar home systems from private off-grid solar companies that have signed a memorandum of understanding with EDCL to sell subsidised systems, and RURA-licensed operators run isolated mini-grids.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Infrastructure (MININFRA) | Government | Energy policy and planning | Sets energy policy, the National Electrification Plan and access targets. |
| Rwanda Utilities Regulatory Authority (RURA) | Regulator | Licensing, tariffs, installation permits, consumer disputes | Approves tariffs, licenses generators, mini-grids and installers, and is expected to write the net-metering rules. |
| Rwanda Energy Group (REG) / EUCL | Transmission | Generation, transmission, distribution and retail | Runs the whole grid and is the counterparty for every grid connection and power purchase agreement. |
| Energy Development Corporation Limited (EDCL) | Distribution | Generation, transmission and access project development | Manages the electrification programme, off-grid solar partnerships and the 2026 smart metering strategy. |
| Development Bank of Rwanda (BRD) – Renewable Energy Fund | Renewable Energy | Finances off-grid solar and results-based subsidies | Runs the application portal for the RBF Window 5 solar home system subsidy. |
| Energy Private Developers (EPD) | Solar | Trade association of private energy companies | Represents on-grid and off-grid private energy firms within the Private Sector Federation; more than 100 members. |
| Rwanda Standards Board (RSB) | Government | National standards body | Technical committee RSB/TC 049 covers solar energy systems, storage, installation and solar home systems. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Rwanda Grid Code (2013) | RURA | Rules for generators, networks and customers using the interconnected power system; all grid-connected solar PV must comply. |
| Electrical installations | Regulations 002/EL/ENERGY/RURA/2012 on electrical installations; Electricity Safety Regulations 2013 | RURA | Apply to installations in all residential, commercial, public and industrial premises. |
| Installer accreditation | RURA electrical installation permits (classes A–Z; Class D includes solar) | RURA | Examination-based, valid three years. |
| Solar home systems | Ministerial Guidelines on Minimum Standards Requirements for Solar Home Systems (June 2019) | MININFRA | Based on IEC TS 62257-9-5; define minimum service levels and requirements for panels, batteries, charge controllers, lamps, cables and installation. Compliance is required for subsidy eligibility. |
| Mini-grids | Guidelines No 02/GL/EL-EWS/RURA/2019 on minimum technical requirements for mini-grids | RURA | Safety and reliability specifications for mini-grid plants. |
| Distribution networks | Distribution Reticulation Standards (Version VII) | REG | Construction standards for medium- and low-voltage networks. |
| Solar products | RSB/TC 049 Solar energy systems and accessories | Rwanda Standards Board | National standards work on PV, solar storage, installation and grid-connected and off-grid systems. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| RURA generation licence | Limited | National | Not needed for self-supply below 50 kW; needed for larger generation and for selling power. |
| Mini-grid licence or registration | Yes | National | Registration (notification) below 50 kW, simplified licence for 50 kW–1 MW, with an EIA certificate, concession/MoU and district authorisation. |
| Certified installer | Yes | National | Wiring must be done by a RURA-permitted firm or technician for REG to connect and to accept liability. |
| Grid export approval | No | National | No route exists yet; export is not permitted. |
| District authorisation | Limited | Local | Required for mini-grid licences; requirements for rooftop systems on homes are not specified. |
For a household installing a small solar system for its own use there is no licence to obtain: the practical requirements are buying equipment that meets national standards (for subsidised solar home systems, the 2019 ministerial guidelines) and using a RURA-permitted installer. Mini-grid developers face a fuller process involving RURA, an environmental impact assessment and district approval.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| RBF Window 5 solar home system subsidy | Active | Grant | Results-based subsidy of FRW 29.24 billion (US$30 million, World Bank-funded) under the Renewable Energy Fund and the Energy Access and Quality Improvement Project, run by the Development Bank of Rwanda and EDCL. It cuts the price of qualifying solar home systems by 90% for Ubudehe category 1 households, 70% for category 2 and 45% for category 3, sold by off-grid companies with an EDCL memorandum of understanding. Target: at least 370,000 off-grid connections. | — |
| VAT exemption on energy supply equipment | Active | VAT relief | Energy supply equipment is exempt from VAT, as are imported fully electric vehicles and charging station equipment, under tax changes gazetted on 29 May 2025. | Until 30 June 2028 |
| AfDB/AIIB energy sector results-based financing programme | Active | Grant | US$300 million five-year programme co-financed by the African Development Bank (approved July 2025) and the Asian Infrastructure Investment Bank: about 50,000 solar home systems, over 200,000 new grid connections, over 100,000 clean cooking solutions and 2,000 solar water heaters. | — |
| Lifeline residential block | Active | Social tariff | The first 20 kWh bought each month cost FRW 89/kWh before VAT, well below the cost-reflective blocks. | From 1 October 2025 (15 kWh before) |
Data and connectivity.
- Fixed broadband
- 22 % of households with internet access (any type) (August 2022 census)Source 4Census measure of household internet access, up from 7% in 2012; not a fixed-broadband figure. Fixed broadband penetration is not published in a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Mobile networks are central to how Rwandans pay for electricity: prepaid units are bought almost entirely by mobile money, and token SMS messages are delivered over mobile networks. Household meters are not communicating devices. The smart metering strategy tendered in 2026 compares power-line carrier and GPRS (cellular) communications for a future national rollout.
Grid conditions.
- National peak demand
- 0.242 GW (2024)Source 8System peak demand of 242 MW, up from 119 MW in 2016. RURA recorded 233.74 MW in April–June 2024.
- Annual electricity demand
- 1.477 TWh (2024)Source 8Total electricity demand in REG’s planning base year. Ember reports 1.22 TWh for 2024.
- Generation capacity
- 0.467 GW (End of 2025)Source 5467.142 MW installed, including imports and shared regional plants, up from 238.36 MW in 2020/21. REG’s 2024 plan lists 466.2 MW installed but only 314.8 MW available.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
A small, fast-growing system
Rwanda’s peak demand roughly doubled between 2016 and 2024, and REG’s plan projects a peak of 320 MW in 2026 in its high-growth scenario. Capacity has kept pace on paper, but available capacity is well below installed capacity because of seasonal hydro, peat plant availability and import limits.
Network expansion
By the end of 2025 REG had built 12,645 km of medium-voltage and 25,713 km of low-voltage lines and 37 substations. The government aims to connect every remaining household, on or off the grid, by 2029.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Residential tariff revision | Current | 1 October 2025 | First tariff revision since 2020: lifeline block widened to 20 kWh at FRW 89/kWh, middle block raised to FRW 310 and top block to FRW 369/kWh; new categories for schools, EV charging and heavy industry. |
| VAT exemptions for energy equipment and EVs | Current | 29 May 2025 – 30 June 2028 | Energy supply equipment, fully electric vehicles and charging equipment exempt from VAT. |
| Net metering for rooftop solar | Upcoming | Under study (announced 30 July 2026) | The government is studying a framework under which customers with solar panels and suitable meters could feed surplus power into the grid for bill credits or payment. RURA must publish rules on eligibility, compensation and technical standards; no date has been set. |
| National smart metering rollout strategy | Upcoming | 2026 | EDCL tendered a consultancy to plan 100% smart-meter coverage, including meter and data-management specifications and an industrial pilot. |
| Solar PV regulations | Upcoming | Not yet in force | Draft RURA regulations would license solar importers, vendors, contractors, technicians and system owners separately and set rules on design, installation certificates and warranties. |
| Universal access target | Upcoming | 2029 | Government target of electricity access for 100% of households, from 85.4% at the end of 2025. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | 25.3% of households had off-grid access, mainly solar home systems, at the end of 2025 (REG) and 13.9% used solar as their main lighting source in 2022 (census); grid-tied export is not yet allowed. |
| Distributed energy market | Medium | A quarter of households rely on off-grid systems and licensed mini-grids serve isolated areas, supported by results-based subsidies; there is no framework for grid-connected DERs to export or be aggregated. |
| Grid flexibility market | Low | No wholesale, balancing, ancillary-services or demand-response market and no aggregation rules; EUCL balances the system centrally. |
| Energy storage adoption | Low | No grid-scale storage in operation; solar-plus-storage and battery studies are recommendations in REG’s 2024 plan. |
| Renewable growth environment | Medium | Installed capacity roughly doubled from 238 MW (2020/21) to 467 MW (2025), but much of the growth was methane, peat and imports; renewables supplied about half of domestic generation in 2024. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 33 sources
- Electricity tariffs effective from 1 October 2025. Rwanda Energy Group (REG), 2025. accessed 1 October 2026.
- Decision N°01/BD/ER-EWS/RURA/2020 of 17/01/2020 reviewing the end user electricity tariffs in Rwanda. Rwanda Utilities Regulatory Authority (RURA), 2020. accessed 1 October 2026.
- Electricity statistics report as of the second quarter (April–June) 2024. Rwanda Utilities Regulatory Authority (RURA), 2024. accessed 1 October 2026.
- Fifth Rwanda Population and Housing Census (RPHC5) thematic report: characteristics of households and housing. National Institute of Statistics of Rwanda (NISR), 2023. accessed 1 October 2026.
- Electricity access reaches 85.4%, up from 64.53% five years ago. Rwanda Energy Group (REG), 2026. accessed 1 October 2026.
- Electricity access (national and district connectivity rates). Rwanda Energy Group (REG), 2025. accessed 1 October 2026.
- Yearly electricity data (full release, long format) – Rwanda. Ember, 2024. accessed 1 October 2026.
- Least Cost Power Development Plan, December 2024. Rwanda Energy Group (REG), 2024. accessed 1 October 2026.
- Regulatory guide for commercial and industrial solar projects in Rwanda. GIZ Project Development Programme, 2024. accessed 1 October 2026.
- Rwanda sector analysis: energy efficiency in commercial and industrial sectors. GIZ Project Development Programme, 2025. accessed 1 October 2026.
- Inside plan to buy solar power from households. The New Times, 2026. accessed 1 October 2026.
- Rwanda weighs net metering policy to unlock household solar power. Africa Sustainability Matters, 2026. accessed 1 October 2026.
- Frequently asked questions. Rwanda Energy Group (REG), 2025. accessed 1 October 2026.
- Customer service charter. Rwanda Energy Group (REG), 2017. accessed 1 October 2026.
- Utilising utilities in Kigali (Cash Power meter number and tokens). Living in Kigali, 2023. accessed 1 October 2026.
- Energy sector FAQs (licences and electrical installation permits). Rwanda Utilities Regulatory Authority (RURA), 2026. accessed 1 October 2026.
- Electricity sub-sector: laws and regulatory instruments. Rwanda Utilities Regulatory Authority (RURA), 2026. accessed 1 October 2026.
- Small isolated grid simplified licence (50–100 kW). RURA licensing portal, 2026. accessed 1 October 2026.
- Application for licence for electricity distribution. RURA licensing portal, 2026. accessed 1 October 2026.
- Regulation No 01/R/EL-EWS/RURA/2015 governing the simplified licensing framework for rural electrification. Rwanda Utilities Regulatory Authority (RURA), 2015. accessed 1 October 2026.
- Policies and regulations. Rwanda Energy Group (REG), 2025. accessed 1 October 2026.
- RSB/TC 049 Solar energy systems and accessories. Rwanda Standards Board, 2026. accessed 1 October 2026.
- RBF Window 5. Rwanda Energy Group (REG), 2026. accessed 1 October 2026.
- RBF Window 5: a new subsidy to enable 370,000 households get solar home systems. Rwanda Energy Group (REG). accessed 1 October 2026.
- Rwanda secures $300 million boost to expand solar access, clean cooking and grid connections. SolarQuarter, 2026. accessed 1 October 2026.
- Rwanda introduces numerous tax changes. EY Global Tax News, 2025. accessed 1 October 2026.
- Official exchange rate history: EUR, 25 September – 1 October 2026. National Bank of Rwanda, 2026. accessed 1 October 2026.
- Consultancy for National Smart Metering Rollout Strategy (RFP/RWA/EDCL/2026/012). AllBusiness.Africa (tender listing for EDCL), 2026. accessed 1 October 2026.
- Invitation for bids: supply of 1,000 smart meters for EUCL’s big customers. Rwanda Energy Group (REG). accessed 1 October 2026.
- Energy Private Developers (EPD) – member profile. GOGLA. accessed 1 October 2026.
- Rwanda sees unprecedented growth in 4G users. ITWeb Africa, 2025. accessed 1 October 2026.
- MTN Rwanda launches 5G in Kigali with eye on industrial use cases. Developing Telecoms, 2025. accessed 1 October 2026.
- No power blackouts during UCI championships despite 30MW supply gap. KT Press, 2025. accessed 1 October 2026.
Questions about energy in Rwanda.
Since 1 October 2025 households pay FRW 89 per kWh for the first 20 kWh each month, FRW 310 for 21–50 kWh and FRW 369 above 50 kWh, plus 18% VAT and a regulatory fee. The top block is about FRW 435 including VAT, roughly €0.26 per kWh; the first block is about €0.06.
The state-owned Energy Utility Corporation Limited (EUCL), part of Rwanda Energy Group (REG), runs the transmission and distribution networks and sells electricity to every grid customer. Households cannot choose their supplier. RURA regulates the sector.
Not yet. There is no legal framework for consumers to sell electricity to the grid. In July 2026 the government announced it is studying net metering, but RURA has not published rules. You can install solar for your own use; systems below 50 kW need no generation licence.
There is no central supply-point number. Households are identified by the 11-digit number of their prepaid Cash Power meter, written on the meter box and used to buy electricity tokens by mobile money; postpaid customers have an EUCL customer account number.
Most homes have prepaid Cash Power meters. Dial an MTN code such as *182# or Airtel *500#, enter the meter number and amount, and type the 20-digit token you receive by SMS into the meter.
REG reported 85.4% at the end of 2025: 60.1% connected to the national grid and 25.3% using off-grid systems, mainly solar home systems. The government aims for universal access by 2029.
In 2024 hydro supplied about 46% of domestic generation, methane gas from Lake Kivu about 27%, peat 15%, oil 9% and solar 3.5%. Rwanda also imports power from Uganda and the DRC and takes a share of regional hydro plants.