Energy in Cayman Islands, explained.

How electricity works in Cayman Islands: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Cayman Islands: Not yet available.Olmack is not offered in Cayman Islands yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Cayman Islands.

Cayman Islands electricity 2026: CUC and Island Energy, OfReg regulation, fuel pass-through tariffs, CORE and DER solar export, self-consumption rules and 2045 targets.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Cayman Islands dollar (KYD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Cayman Islands energy at a glance.

Key figures for households in Cayman Islands. Each one links to its source on the full overview below.

  • Household use.

    11,080 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    4.2% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Cayman Islands.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Cayman Islands below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Cayman Islands requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Cayman Islands.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Cayman Islands, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Cayman Islands, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Cayman Islands.

Full overview

The energy market in Cayman Islands, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

The Cayman Islands is a British Overseas Territory of three islands with no grid link to any other country. Grand Cayman, home to about 96% of the population, is served by Caribbean Utilities Company, Ltd (CUC), which holds an exclusive Transmission and Distribution Licence dated 3 April 2008 and a Generation Licence from November 2014. Cayman Brac and Little Cayman, the Sister Islands, are supplied by Island Energy Limited, the former Cayman Brac Power & Light, whose licences were transferred with the consent of the regulator in 2025.

Electricity is regulated by the Utility Regulation and Competition Office (OfReg, also styled URCO) under the Electricity Sector Regulation Act (2019 Revision) and the Utility Regulation and Competition Act. Almost all power is generated from imported diesel and heavy fuel oil: Ember data put renewables at about 4.2% of generation in 2024, almost all of it solar. The National Energy Policy 2024–2045, adopted by Cabinet in April 2024, targets 30% renewable penetration by 2030, 70% by 2037 and 100% by 2045.

Household bills combine a regulated base rate with per-kWh pass-through charges for fuel, fuel duty, renewables purchases and, for larger users, a regulatory fee. Homeowners can export solar to CUC through the Consumer Owned Renewable Energy (CORE) feed-in programme or the Distributed Energy Resources (DER) programme, both capped in capacity. In June 2026 OfReg confirmed that households may also install solar and batteries for their own use without exporting, and without a licence or enrolment in either programme.

Energy snapshot.

Headline figures for electricity in Cayman Islands. Each shows its data year and links to its source.

  • Population88,833 peopleSource 12024
  • Households38,377 householdsSource 12024
  • Average household size2.3 people/householdSource 12024
  • Electricity use per household11,080 kWh/yrSource 12024
  • Household price (KYD)Not identified from a reliable public source.
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share4.23%Source 32024
  • Solar capacityNot identified from a reliable public source.
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Utility Regulation and Competition Office (OfReg / URCO)
System operator
Caribbean Utilities Company (Grand Cayman); Island Energy Limited (Cayman Brac and Little Cayman)
Distribution networks
No separate DSOs: CUC holds the exclusive T&D licence for Grand Cayman and Island Energy the T&D licence for the Sister Islands.
Currency
Cayman Islands dollar (KYD)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in Cayman Islands.

Household price (KYD)
Not identified from a reliable public source.
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

A Grand Cayman electricity bill has several parts. The base rate, made up of a fixed facilities charge and a per-kWh energy charge, covers CUC’s non-fuel costs and return. OfReg adjusts it once a year under the Rate Cap and Adjustment Mechanism in CUC’s licence. Fuel and lubricating oil, the purchase of renewable energy and the regulatory fee are passed through to customers per kWh without mark-up, and the government’s duty on fuel appears as its own line, which RMI’s 2022 review for OfReg described as unusual in the region.

Why prices follow oil

RMI found that diesel-fired plant accounted for 87% of installed capacity and more than 90% of generation, so the fuel cost charge, which moves with oil prices, is the largest and most volatile part of the bill. CUC hedges part of its fuel exposure, but costs still pass through. OfReg’s June 2026 statement notes that, because fuel is charged per kWh, customers who reduce their consumption pay less fuel cost without shifting it to others.

Tariff reform

The Value of Solar study recommended a full tariff modernisation, including time-of-use and service-based charges, because a structure based on return on rate base suits a high-renewables system poorly. OfReg has said that any claim that self-generators under-pay fixed costs must be handled through a cost-of-service study and class-wide rate design approved by the regulator, not by special charges.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesCUC residential service: a monthly facilities charge plus a per-kWh base energy charge. Base rates are reviewed each year under the Rate Cap and Adjustment Mechanism, which links them to a return on rate base and to US and Cayman consumer price indices.
VariableYesFuel cost charge per kWh, recalculated monthly and passed through without mark-up, plus a separate fuel duty line and a renewables cost charge that recovers what CUC pays CORE, DER and independent solar producers.
OtherLimitedRegulatory fee per kWh, applied only to customers using more than 1,000 kWh in a billing period.
Time-of-useNoNo household time-of-use tariff identified. The National Energy Policy implementation plan calls for tariff structures that encourage efficiency and for programmes rewarding export of stored energy at peak times.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
11,080 kWh/yr (2024)Source 1Derived: CUC residential consumption on Grand Cayman of 406,886 MWh (ESO Table 20.01) divided by 36,724 Grand Cayman households (Table 1.14). Approximate, as residential accounts and households are not identical. Year-round air-conditioning drives high use.
Average daily use per household
30.4 kWh/day (2024)Source 1Derived: 11,080 kWh a year ÷ 365 (Grand Cayman). Approximate.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
4,766 kWh/person/yr (residential) (2024)Source 1Derived: Grand Cayman residential consumption of 406,886 MWh ÷ 85,372 residents. Including commercial and public lighting, consumption was about 8,780 kWh per resident.
Heat pumps
7 households (geothermal heat pumps) (2021)Source 22021 Census: 7 households (0.02%) reported geothermal heat pumps. Space heating is not needed.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
55 % of homes (2021)Source 12021 Census: electricity is the main cooking fuel in 55.0% of households; gas/propane in 42.2% (ESO Table 20.04).

CUC’s Grand Cayman customers consumed 749,337 MWh in 2024, 3.1% more than in 2023. Homes used 406,886 MWh (54%), industrial and commercial customers 338,192 MWh and public lighting 4,259 MWh. Consumption has risen by about 20% since 2017 (621,786 MWh) as the population and housing stock have grown. CUC produced 760,200 MWh in 2024.

Average use per home is high because air-conditioning runs all year in a hot, humid climate. Electricity is the main lighting source for 96.7% of households, and 10.2% of households own a generator, mostly as hurricane back-up. The Sister Islands are far smaller: Cayman Brac and Little Cayman together used about 19.6 GWh in 2016, the last year in the ESO series.

Housing and households.

Dwellings
29,699 occupied dwellings (households) (2021)Source 2Households counted in the 2021 Census; the census reports dwelling type and tenure per household.
Owner-occupied
43.2% (2021)Source 2Derived: owned without mortgage 20.4% plus with mortgage 22.9%.
Private rented
51.3% (2021)Source 2Derived: furnished rented 49.4% plus unfurnished rented 1.9%. A further 2.3% live rent-free and 0.4% at subsidised rent provided by employers, relatives or friends.
Social or public housing
Not identified from a reliable public source.
Houses
46.7% (2021)Source 2Derived: detached houses 37.1%, semi-detached 3.2% and duplexes 6.4%. Condominiums/townhouses are a further 11.9%.
Apartments and flats
32.7% (2021)Source 2Apartments only; studios (2.8%) and one-room units (5.2%) are counted separately.
Urban population
Not identified from a reliable public source.

Renting is the norm: in 2021 almost half of households lived in furnished rented homes, reflecting a large expatriate workforce, and 43% owned their home. Detached houses (37%) and apartments (33%) are the main dwelling types; apartments dominate in George Town and detached houses elsewhere. Because most tenants do not own the roof, the CORE programme, which is open to property owners, reaches a limited share of households, and the National Energy Policy calls for community solar and programmes for condominium and apartment residents.

The census found 659 households (2.2%) producing solar electricity in 2021, 462 of them selling to the grid and 197 for their own use only; a further 47 had solar water heating.

How the grid works in Cayman Islands.

  1. TransmissionCaribbean Utilities Company, Ltd (CUC)
  2. DistributionNo separate DSOs: CUC holds the exclusive T&D licence for Grand Cayman and Island Energy the T&D licence for the Sister Islands.
  3. MeteringNot identified from a reliable public source.
  4. Supply2 or more retail suppliers

Electricity on Grand Cayman is generated, transmitted, distributed and sold by CUC. Independent generators can sell to CUC only under a generation licence, normally won through an OfReg-run solicitation.

Cayman Brac and Little Cayman have their own small diesel system run by Island Energy, which CUC has no part in. OfReg consented in March 2025 to the transfer of Cayman Brac Power & Light’s generation and T&D licences to Island Energy Limited.

Under CUC’s licence, OfReg sets base rates, approves CUC’s capital expenditure plan and oversees the Integrated Resource Plan; the implementation plan for the National Energy Policy asks for clearer IRP guidelines and more government oversight of resource planning.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry responsible for Energy (Ministry of Sustainability and Climate Resiliency at adoption of the NEP)Owns the National Energy Policy 2024–2045 and its implementation plan, supported by the Energy Policy Council.
RegulatorUtility Regulation and Competition Office (OfReg / URCO)Licenses generation and T&D, sets and adjusts rates, approves capital plans and renewable programmes, runs generation solicitations and resolves consumer disputes.
System operatorCaribbean Utilities Company, Ltd (CUC)Exclusive T&D licensee for Grand Cayman and its main generator; dispatches the island system, owns the meters and bills customers.
DSOIsland Energy Limited (formerly Cayman Brac Power & Light)Generates, distributes and supplies electricity on Cayman Brac and Little Cayman; T&D licence runs to 31 December 2039.
SupplierEntropyIndependent generation licensee operating the 5 MW Bodden Town solar farm, selling output to CUC.

Compared with the UK system.

Compared with the UK system.
UK conceptCayman Islands equivalentHow it works
DNOCUC (Grand Cayman) / Island Energy (Sister Islands)There are no separate distribution companies. Each utility owns the poles, wires, transformers and meters in its licence area under an exclusive T&D licence.
National Grid/NESOCUC system controlEach island group is a separate system. CUC dispatches its own plant and independent producers on Grand Cayman; there is no national grid or independent system operator.
MPANUtility account number and meter numberNo national supply-point number exists. A supply is identified by the utility’s customer account and the meter installed at the premises.
MPRNNo equivalentThere is no piped gas network; 42% of households cook with bottled propane.
Meter operatorThe utilityCUC and Island Energy own, install and read their revenue meters. There is no competitive metering market.
SupplierExclusive T&D licenseeCustomers cannot switch supplier; the licensee for the island is the only retail supplier.
Smart-meter infrastructureUtility-owned meteringNo national smart-meter programme, data hub or data-access rights. Metering technology is chosen by each utility.

How a supply point is identified.

Account 0123456 / Meter 98765432 (fictional; illustrative only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Utility account number
Who issues it?Caribbean Utilities Company (Grand Cayman) or Island Energy (Sister Islands)
FormatUtility-specific numeric customer account reference shown with the meter number on the bill. The utilities do not publish a format specification.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the monthly electricity bill and shown in the utility’s online customer portal or e-bill.
Electronic accessThrough the utility’s customer portal and e-billing; no national data platform.
Third-party accessNo regulated third-party data access. Installers use the customer’s account and meter details when applying to CORE or DER or notifying CUC of a self-consumption system.
Who keeps the registerEach utility’s customer billing and metering system
Register scopePer DSO

There is no national supply-point identifier like the UK MPAN. With one exclusive licensee per island group and no supplier switching, nobody needs a central register of supply points. Each utility identifies a connection by the customer account on its billing system and the meter serial number at the premises.

The account matters most when a homeowner adds generation. CORE and DER applications are made against the account and meter, and the utility changes or reprograms the meter to record exports. Since June 2026 OfReg’s guidance also requires customers to notify CUC of any non-export self-consumption system, giving the service address, the configuration (off-grid, air-gap transfer switch or parallel non-export), the inverter capacity in kW AC, battery capacity in kWh, equipment make and model and, for parallel systems, the Permission to Operate date. CUC keeps these notifications as its own record and reports them to OfReg in aggregate by feeder.

How an account passes between occupants is set by utility procedures, not published regulation; a new tenant or owner normally opens a new account at the same metered premises.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringNo
Net billingYes
How exported electricity is paidCORE: fixed feed-in credit per kWh for all output by size band. DER: self-consumption with surplus credited at a rate linked to CUC’s avoided cost. Both are capacity-capped.
CORE feed-in ratesRMI’s 2022 study recorded CORE credit rates of US$0.210/kWh for 0–5 kW, US$0.180/kWh for 5–10 kW, US$0.336/kWh for 0–5 kW systems in the National Housing Development Trust and US$0.252/kWh for a 0–100 kW category. Current rates are set by CUC under OfReg approval.
DER programmeIntroduced in January 2018 with 3 MW of capacity: customers consume their own solar output and sell surplus at market-driven rates, without subsidy. DER customers pay demand charges. A further 12 MW was linked to a utility-scale battery.
Non-export systemsAllowed without CORE or DER enrolment (OfReg statement, June 2026). Parallel non-export systems must meet the 2025 T&D Code and obtain Permission to Operate; a reverse-power relay is not mandatory if certified equipment is locked to zero export.
Grounds for refusalCUC may refuse a parallel interconnection only for insufficient capacity, safety or security, or technical infeasibility, with written reasons (ESRA s.60).
Self-consumption rightThe National Energy Policy (3.3.1.13) states that customer self-consumption up to 20 kW AC shall be a right.

Connecting a home system.

  1. Confirm programme capacity is available (CORE and DER allocations are capped and published by CUC).
  2. Apply to CUC as the property owner with system design and equipment details.
  3. Obtain planning/building permits and electrical inspection through the Building Control Unit and Electrical Inspectorate.
  4. Install using equipment certified to UL 1741 and IEEE 1547 anti-islanding standards, with a visible lockable disconnect.
  5. Pass commissioning and receive Permission to Operate from CUC; CUC installs or reprograms the meter.
  6. Export credits appear on the monthly bill.

Grand Cayman has two export routes. CORE, launched as a limited programme in 2011, pays a fixed feed-in credit for every kWh a small solar or wind system produces, by size band, and is recovered from all customers through the renewables cost charge. DER, launched in 2018 after OfReg approval, lets customers use their own solar first and credits surplus at an unsubsidised rate. Both have fixed capacity allocations that fill up, which has left many homeowners waiting.

RMI’s 2022 Value of Solar study for OfReg valued distributed solar at about US$0.291/kWh and utility-scale solar at US$0.257/kWh, mostly from avoided diesel fuel. The policy implementation plan asks for feed-in rates to be updated from that study, for a “CORE+” programme for agriculture and larger DER systems under 5 MW, and for programmes rewarding export of stored energy at peak times.

In May 2026, after a public petition, OfReg said it was examining CUC letters to customers about unauthorised solar installations. In June 2026 it published a statement that non-export solar and battery systems are lawful without a licence, need no programme enrolment and attract no standby charge, though they must be notified to CUC and meet safety codes.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for sale to the gridGeneration licence from OfReg (ESRA s.23); new utility-scale capacity is normally procured through an OfReg generation solicitation.OfRegLicensees: CUC, Entropy (solar), Cayman Brac Power & Light/Island Energy.
Self-generate for own use (solar, solar plus battery)No licence: ESRA requires licensing only for activities “for reward”, and self-supply generation is exempt. Must notify CUC; parallel systems need Permission to Operate.OfReg (guidance) / CUC / Building ControlConfirmed by OfReg Regulatory Statement, 19 June 2026.
Export surplus to the gridOnly through an approved CUC programme (CORE or DER) or a generation licence.OfReg / CUCProgramme capacity is capped.
Store electricityNo separate storage licence. Behind-the-meter batteries follow the self-consumption or export programme rules; grid-scale storage is procured by the licensee or through solicitation.OfRegBattery back-up must disconnect from the grid before islanding.
Transmit, distribute or supply electricityT&D licence; CUC’s licence for Grand Cayman is exclusive. Island Energy holds the Sister Islands licence.OfRegNo retail competition.
Install electrical systemsWork must comply with the Building Code and be inspected; installers deal with the Electrical Inspectorate and the Electrical Board of Examiners.Building Control Unit / Electrical Inspectorate / Electrical Board of ExaminersInspection confirms technical compliance only.
Aggregate, trade, balancing, VPP or remote control of assetsNo framework: there is no wholesale or flexibility market. The NEP implementation plan asks OfReg to develop rules for VPPs, microgrids and community solar.OfRegWould require new rules or programmes.

Under section 23 of the Electricity Sector Regulation Act, generation, transmission, distribution and delivery of electricity “for reward” need an OfReg licence. CUC’s Grand Cayman T&D licence of 2008 is exclusive, and only licensed generators can sell power into it. Self-supply is expressly exempt.

Because there is no market beyond the single utility, activities such as aggregation, trading and balancing services have no licence category.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoNone; CUC dispatches its own plant and licensed independent producers.
Ancillary servicesNo—NoCUC. Provided by CUC plant and utility storage.
Demand response / VPPDeveloping—NoThe NEP implementation plan (2024–2028) calls for rules for VPPs and utility demand-response programmes, but none was in operation.

Home batteries cannot be paid for grid services. Their value lies in self-consumption, which OfReg confirmed is lawful in 2026, and in back-up during hurricanes and outages. Policy aims at VPPs, peak-time export of stored energy and periodic storage studies, so a framework may follow.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutUtility-led; no national programme or published penetration
Reading intervalNot published
Meter ownershipCUC and Island Energy
Island EnergySmart meters described as an upcoming improvement
Data accessVia utility customer portals only

Meters are owned, installed and read by each utility. There is no regulatory smart-meter mandate, interval-data standard or consumer data-access right, and no published penetration figure. Island Energy’s website says smart meters will allow two-way communication and faster service.

Renewable electricity.

Electricity generation mix (2024).

  • Oil: 95.8%
  • Solar: 4.2%
Source 3
Renewable electricity share
4.23% (2024)Source 3Ember data via Our World in Data: about 0.03 TWh of solar against 0.68 TWh of oil-fired generation. There is no interconnection, so generation and consumption shares are the same. The share was about 2.9% in 2020–2023.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Solar PV (Entropy utility-scale farm)
0.005 GW (2017)Source 13
Conventional generation (CUC, Grand Cayman)
0.166 GW (2024)Source 1

Targets.

  • 30% renewable energy penetration by 2030, 70% by 2037 and 100% by 2045 (National Energy Policy 2024–2045).
  • Electricity supply greenhouse-gas emissions 30% below 2019 by 2030 and 100% lower by 2045.
  • 30% of new vehicle sales and imports electric by 2030; 100% by 2045.

Solar is the only renewable source in use. The 5 MW Entropy farm in Bodden Town, the first utility-scale plant, came online in 2017; the rest is rooftop systems under CORE and DER and non-export self-consumption systems. Ember data show solar output rising from about 0.02 TWh in 2023 to 0.03 TWh in 2024.

The 2017 National Energy Policy set a 70%-by-2037 goal; the 2024 review added interim and final targets of 30% by 2030 and 100% by 2045. Land is a constraint: RMI estimated around 3.5 acres per MW for utility-scale solar and pointed to rooftops, carports, canopies and previously developed land. Import duty on renewable energy equipment is set at zero for 2024–2028.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Batteries are increasingly paired with rooftop solar for self-consumption and hurricane back-up. OfReg’s June 2026 guidance explains that a battery system with islanding capability can power a home during an outage because it first disconnects from CUC’s network. Policy calls for periodic storage studies and for utility-scale solar solicitations that include storage and dispatchable capability.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Caribbean Utilities Company, Ltd (CUC)Exclusive on Grand Cayman; >33,000 customersNoNoNoLimited
Island Energy LimitedCayman Brac and Little CaymanNoNoNoUnknown

Customers cannot choose a supplier. CUC supplies all of Grand Cayman and Island Energy the Sister Islands.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Utility Regulation and Competition Office (OfReg)RegulatorElectricity, water, fuel and ICT regulatorLicences, rate decisions, renewable programmes, self-consumption guidance and complaints.
Caribbean Utilities CompanyDistributionGrand Cayman utilityTariffs, fuel cost charge, CORE and DER applications and Permission to Operate.
Island EnergyDistributionSister Islands utilitySupply on Cayman Brac and Little Cayman.
Economics and Statistics OfficeGovernmentNational statisticsElectricity production and consumption series and census housing data.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionCUC T&D Code (2025) with appendicesCUC / OfRegSets interconnection and anti-islanding requirements for parallel systems.
Inverters / anti-islandingUL 1741 (SB); IEEE 1547(-2018); IEEE 929UL / IEEECertified non-islanding equipment, settings locked after certification, visible lockable disconnect, commissioning test.
Non-export controlPower Control System set and locked at 0 kWOfReg guidanceReverse-power relay optional; referenced only above 300 kVA.
Electrical safetyCayman Islands Building CodeBuilding Control Unit / Electrical InspectorateInspection of consumer generating equipment.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Building permit and electrical inspectionYesNationalThrough the Building Control Unit and Electrical Inspectorate.
Utility Permission to OperateLimitedNationalRequired for systems that operate in parallel with the grid (CORE, DER and Track 2 non-export); not for off-grid or air-gap systems.
Notification to CUCYesNationalAll self-consumption systems, including off-grid, must be notified.
Generation licenceNoNationalNot needed for self-supply; only for selling electricity.

Rooftop systems need building and electrical approval and, if connected in parallel, Permission to Operate after a pre-energisation inspection at a fee approved by OfReg. OfReg has stated that these powers exist only to enforce safety and technical standards.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
CORE (Consumer Owned Renewable Energy)ActiveFeed-in tariffFixed credit per kWh by size band; capacity-capped allocations.Since 2011
DER programmeActiveNet billingSelf-consumption with surplus at market-driven rates; capacity-capped.Since January 2018
Zero import duty on renewable energy equipmentActiveDuty reliefDuty rate held at 0% for renewable energy systems.2024–2028
Zero import duty on electric vehiclesActiveDuty reliefEV duty reduced to 0% for some EVs on a tiered system.2024–2028

Data and connectivity.

Fixed broadband
91 % of households (internet access) (2021)Source 2
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Internet access is near-universal (91% of households in 2021) and 94.8% of households have a mobile phone, so inverter and battery monitoring over home internet is straightforward. No national smart-meter communications standard exists.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
0.749 TWh (2024)Source 1CUC customer consumption on Grand Cayman; excludes the Sister Islands and private generators. Production was 0.760 TWh.
Generation capacity
0.166 GW (2024)Source 1CUC Grand Cayman capacity; excludes independent solar and the Sister Islands.
Interconnection
0 GWNo international interconnection; Grand Cayman and the Sister Islands are separate systems.
Curtailment
Not identified from a reliable public source.

Grand Cayman’s system is small, isolated and exposed to hurricanes; Hurricane Ivan cut generating capacity sharply in 2004. Demand grew 7.5% in 2023 and 3.1% in 2024, putting pressure on capacity planning through the Integrated Resource Plan.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
National Energy Policy 2024–2045CurrentAdopted 16 April 2024; published by OfReg August 2025Targets 30% renewables by 2030, 70% by 2037 and 100% by 2045, plus EV and emissions targets.
Island Energy takes over Sister Islands licencesCurrentMarch 2025OfReg consented to transfer of Cayman Brac Power & Light’s generation and T&D licences to Island Energy Ltd.
OfReg statement on customer self-consumptionCurrent19 June 2026Confirms non-export solar and battery systems are lawful without a licence, programme enrolment or standby charge; clarification note of 23 June 2026 on equipment.
Renewable programme reforms (CORE+, community solar, VPPs, updated feed-in rates)Upcoming2024–2028 implementation periodPriority actions in the NEP implementation plan, led by OfReg with the ministry and utilities.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow659 households (2.2%) produced solar electricity in the 2021 Census.
Distributed energy marketLowCapped CORE and DER allocations; renewables 4.2% of generation in 2024.
Grid flexibility marketLowNo wholesale, ancillary-service or aggregation market.
Energy storage adoptionLowNo published storage figures; batteries mainly for self-consumption and back-up.
Renewable growth environmentLowRenewable share rose from 2.9% (2023) to 4.2% (2024) against a 30%-by-2030 target; self-consumption clarified in 2026.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 16 sources
  1. The Cayman Islands Compendium of Statistics 2024 (Tables 1.14, 20.01–20.04). Economics and Statistics Office, 2024. accessed 10 October 2026.
  2. 2021 Census Report, Section 1.8 Household and Housing Characteristics. Economics and Statistics Office, 2022. accessed 10 October 2026.
  3. Share of electricity from renewables and electricity production by source – Cayman Islands (Ember data). Our World in Data / Ember, 2024. accessed 10 October 2026.
  4. Electricity production by source – Cayman Islands (Ember data). Our World in Data / Ember, 2024. accessed 10 October 2026.
  5. National Energy Policy 2024–2045 Implementation and Monitoring Plan. Cayman Islands Government (hosted by OfReg), 2024. accessed 10 October 2026.
  6. Cayman Islands Value of Solar Study – Final Report (RMI). OfReg / RMI, 2022. accessed 10 October 2026.
  7. Regulatory Statement and Consumer Guide: Customer Self-Consumption (Non-Export). OfReg, 2026. accessed 10 October 2026.
  8. Clarification Note – Non-Export Solar and Battery Systems (Track 2). OfReg, 2026. accessed 10 October 2026.
  9. Utility Regulator Assessing Concerns Relating to Homeowner Solar Participation. OfReg, 2026. accessed 10 October 2026.
  10. Renewable Energy (CORE and DER). OfReg. accessed 10 October 2026.
  11. Energy Register of Licensees. OfReg. accessed 10 October 2026.
  12. Energy Licensing. OfReg. accessed 10 October 2026.
  13. Energy Publications (Entropy 5 MW review; CBP&L licence transfers). OfReg. accessed 10 October 2026.
  14. About CUC. Caribbean Utilities Company. accessed 10 October 2026.
  15. Island Energy. Island Energy Ltd. accessed 10 October 2026.
  16. Population, total – Cayman Islands (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.

Questions about energy in Cayman Islands.