Energy-market overview

How electricity works in El Salvador.

El Salvador electricity market 2026: SIGET tariffs, frozen energy charge for most homes, UT wholesale market, AES and DELSUR distributors, NC account numbers and the new RELFUER self-consumption rules.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in US dollar (USD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

El Salvador energy at a glance.

Key figures for households in El Salvador. Each one links to its source on the full overview below.

  • Electricity price.

    0.188 USD per kWh for households, including taxes. Figures for Aug–Oct 2026.

  • Household use.

    1,357 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    68.3% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in El Salvador.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for El Salvador below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications El Salvador requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in El Salvador.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in El Salvador, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in El Salvador, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in El Salvador.

Full overview

The energy market in El Salvador, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

El Salvador opened its electricity sector with the General Electricity Law (Decree 843) of 1996. Generation and supply (comercialización) are competitive activities, the wholesale market and transmission system are operated by the Unidad de Transacciones (UT), the state company ETESAL owns the transmission network, and the Superintendencia General de Electricidad y Telecomunicaciones (SIGET) regulates tariffs, technical standards and service quality. Energy policy, and since 2024 the setting of the energy charge passed through to consumers, sits with the Dirección General de Energía, Hidrocarburos y Minas (DGEHM).

About 2.1 million customers are served by eight distribution companies. Four of them – CAESS, CLESA, EEO and DEUSEM – belong to AES El Salvador; DELSUR belongs to Colombia’s EPM group; EDESAL, B&D and the state-owned DEC (Abruzzo) serve smaller areas. Every end user must contract with a supplier, and the local distributor acts as supplier by default; no supplier may charge more than the tariff approved for the distributor whose network the customer uses.

Electricity prices for most homes have been held still since January 2024: households and small businesses that used on average 300 kWh a month or less in January–March 2024 – about 93% of users – still pay the energy charge that applied from 15 January 2024. In 2024 renewables supplied 68.3% of net generation, led by hydro (26.6%), geothermal (17.9%) and solar (15.2%), with a 388 MW liquefied natural gas (LNG) plant supplying a further 25.7%. In April 2026 a new regulation (RELFUER) under the Renewable Energy Use Promotion Law (LFUER) reset the rules for rooftop and other self-consumption systems, including remote self-consumption and tax exemptions.

Energy snapshot.

Headline figures for electricity in El Salvador. Each shows its data year and links to its source.

  • Population6,365,503 peopleSource 252025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per household1,357 kWh/yrSource 12024
  • Household price (USD)0.188 USD/kWhSource 5Aug–Oct 2026
  • Household price (EUR)0.168 EUR/kWhSource 22Aug–Oct 2026
  • Renewable electricity share68.3%Source 12024
  • Solar capacity0.734 GWSource 12024
  • Wind capacity0.054 GWSource 12024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Limited
Home equipment in grid services
Restricted
Regulator
SIGET (Superintendencia General de Electricidad y Telecomunicaciones); DGEHM sets policy and the energy charge passed to consumers
System operator
UT (Unidad de Transacciones), operator of the transmission system and wholesale market
Distribution networks
Eight distributors: AES (CAESS, CLESA, EEO, DEUSEM), DELSUR (EPM), EDESAL, B&D and state-owned DEC (Abruzzo)
Currency
US dollar (USD)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in El Salvador.

Household price (USD)
0.188 USD/kWh (Aug–Oct 2026)Source 5Derived for an AES CAESS residential customer using the 2024 average of 113 kWh a month, before VAT (IVA), municipal charges and any subsidy: fixed charge US$0.871126 + 99 kWh at US$0.180022 (frozen energy charge 0.147730 + 2026 distribution charge 0.032292) + 14 kWh at US$0.184422 (0.147789 + 0.036633) = US$21.28 a month. The frozen energy charges are from the SIGET pliego for users under 300 kWh (siget-pliego-300-2024); the distribution and fixed charges from the 2026 pliego (siget-pliego-may26). Users above 300 kWh pay an energy charge of about US$0.19/kWh.
Household price (EUR)
0.168 EUR/kWh (Aug–Oct 2026)Source 22Converted from US$0.1883/kWh at the ECB reference rate of USD 1.1206 per euro on 9 October 2026. El Salvador uses the US dollar.
Typical annual electricity bill
255 USD/yr (Aug–Oct 2026)Source 5Derived: 12 × US$21.28, the monthly CAESS charge for 113 kWh calculated under price. Excludes VAT, the municipal charges collected on the bill and the subsidy for qualifying low-consumption homes.

How the price is built

A household bill has three regulated parts: an energy charge (cargo de energía), which passes through the cost of the power the distributor buys; a distribution charge per kWh for use of the network; and a fixed monthly commercialisation charge for metering, billing and customer service. The residential tariff applies these per block: the first 99 kWh, the next 100 kWh and the remainder are each priced separately. The law requires bills to show network charges separately from energy charges. Tariff prices are published without VAT, and bills also collect municipal charges (tasas municipales) on behalf of the local council.

Who sets the charges

SIGET approves and publishes the tariff schedules (pliegos tarifarios), but under transitional provisions of Legislative Decree 997 the energy charge is now set through agreements of the DGEHM. Distribution and commercialisation charges for 2026 were also fixed by DGEHM agreements (45–52/2025/DE and 61–68/2025/DE) for 1 January to 31 December 2026, and differ by distributor: in 2026 the distribution charge for the first 99 kWh ranges from US$0.032/kWh at CAESS to US$0.082/kWh at DEUSEM.

The 2024 price freeze

In October 2023 the Legislative Assembly approved a transitional 14% cut in the electricity tariff. From April 2024 the energy charge for customers who used on average 300 kWh a month or less in January–March 2024 was frozen at the level in force from 15 January 2024; the DGEHM said this covered 93% of users. The freeze has been extended every quarter since: from 1 August 2026 these customers still pay the January 2024 energy charge (about US$0.148/kWh at CAESS), while larger users pay the current charge (US$0.191–0.193/kWh at CAESS for residential use, May–October 2026).

SIGET’s 2024 figures show how small most consumption is: of 1.96 million residential customers, 656,271 used less than 49 kWh a month and 614,941 between 50 and 99 kWh; only 91,355 used more than 300 kWh.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesResidential tariff for small demand (up to 10 kW) with three incremental blocks: the first 99 kWh, the next 100 kWh and the remainder. Each block has its own energy and distribution charge, plus a fixed monthly commercialisation charge (US$0.87 at CAESS, US$1.02 at DELSUR in 2026).
RegulatedYesFrozen energy charge: residential and general-use customers who averaged 300 kWh a month or less in January–March 2024 still pay the energy charge in force from 15 January 2024 (about US$0.148/kWh at CAESS), under the transitional provisions of Legislative Decree 997 and DGEHM agreements, most recently 97/2026/DE and 98/2026/DE for August 2026.
Time-of-useLimitedHourly-metered tariffs with peak (punta), shoulder (resto) and off-peak (valle) energy prices exist for medium (10–50 kW) and large (over 50 kW) demand customers. No time-of-use option for ordinary households was found.
DynamicNoHouseholds do not pay wholesale-linked prices. The regulated energy charge is reviewed quarterly, but for most homes it has been frozen since 2024.
OtherYesResidential subsidy: a government discount on the energy charge for qualifying low-income households (natural persons owning one dwelling, on the list provided by the Ministry of Economy). In 2024 the DGEHM said it applies to families consuming up to 105 kWh a month.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,357 kWh/yr (2024)Source 1Derived: residential consumption of 2,661.74 GWh divided by 1,961,053 residential customers (SIGET 2024 statistics bulletin, tables 19 and 20). This is per residential customer, about 113 kWh a month.
Average daily use per household
3.72 kWh/day (2024)Source 1Derived: 1,357 kWh a year per residential customer divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,013 kWh/person/yr (2024)Source 1Derived, all sectors: final consumption of distribution customers (6,421.55 GWh, SIGET) divided by the World Bank 2024 population of 6,338,193. Excludes about 449 GWh bought directly on the wholesale market by large users.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

An average Salvadoran residential customer used about 1,360 kWh in 2024, roughly 113 kWh a month. Consumption is very unevenly spread: about 65% of residential customers used less than 100 kWh a month, while the 91,355 using more than 300 kWh (under 5% of customers) accounted for 766 GWh, almost 29% of residential consumption.

Demand is growing quickly. Distributors’ final sales rose 11.8% in 2024 to 6,421.55 GWh, residential consumption rose from 2,469.82 GWh to 2,661.74 GWh, and peak demand on the national system reached 1,194.4 MW on 20 May 2024, 7.54% more than in 2023 (SIGET).

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
75.5 % of population (2025)Source 26

Three-quarters of Salvadorans live in urban areas, concentrated in and around San Salvador, which is split between AES CAESS to the north and DELSUR to the south. The World Bank reports that 98.7% of the population had access to electricity in 2024.

For a new supply, the law obliges the distributor to extend its network up to 100 metres at its own cost; the customer pays only for the service connection (acometida) and the meter, and can spread these and any longer extension over up to 12 interest-free monthly instalments. AES asks applicants for a description of the internal wiring signed by a graduate electrical engineer or a SIGET-accredited electrician, identity documents (DUI and NIT), proof of ownership or the owner’s notarised authorisation, and a guarantee deposit.

How the grid works in El Salvador.

  1. TransmissionUnidad de Transacciones (UT), Empresa Transmisora de El Salvador (ETESAL)
  2. DistributionEight distributors: AES (CAESS, CLESA, EEO, DEUSEM), DELSUR (EPM), EDESAL, B&D and state-owned DEC (Abruzzo)
  3. MeteringNot identified from a reliable public source.
  4. Supply6 or more retail suppliers

Physical flow

Power from CEL’s five hydro plants on the Lempa and Guajoyo rivers, LaGeo’s geothermal plants at Ahuachapán and Berlín, the Energía del Pacífico LNG plant, sugar-mill cogeneration, oil-fired engines and a growing fleet of solar farms flows over ETESAL’s transmission network to the distributors and to large users. In 2024 7,290.7 GWh was injected into the transmission system and 145.7 GWh (2.0%) was lost in it. The country is part of the Central American interconnected system (SIEPAC); in 2024 it imported 209.9 GWh and exported 253.6 GWh.

A large and growing share of generation is connected directly to distribution networks: 1,971 plants with 538.64 MW at the end of 2024, mostly solar (477.13 MW), which produced 864.4 GWh in the year. Distribution losses were 8.49%.

Commercial flow

Generators sell on the wholesale market, either under contracts (including long-term contracts awarded through competitive tenders supervised by SIGET) or on the short-term Mercado Regulador del Sistema, whose average price was US$111.39/MWh in 2024. Distributors buy energy there and from distributed generators under distribution supply contracts (CAD), and sell to customers at the regulated tariff. The April 2026 reform of the General Electricity Law defines a retail market (mercado minorista) on the distribution networks and gives the UT 18 months to prepare to operate it.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryDirección General de Energía, Hidrocarburos y Minas (DGEHM)Sets energy policy and planning, produces the national energy balance and, under the 2024–2026 reforms, sets the energy charge passed to consumers, the 2026 distribution and commercialisation charges and the rules for distributed generation. It is the technical authority that approves self-consumption systems under the RELFUER.
RegulatorSuperintendencia General de Electricidad y Telecomunicaciones (SIGET)Applies the electricity laws, approves and publishes tariff schedules, issues technical standards, supervises service quality, accredits electricians, keeps the register of qualified self-consumption suppliers and publishes electricity statistics.
System operatorUnidad de Transacciones (UT)Private company that operates the transmission system and the wholesale market (contract market and the short-term Mercado Regulador del Sistema, MRS). The April 2026 reform gives it 18 months to prepare to operate a retail market on the distribution networks.
TSOEmpresa Transmisora de El Salvador (ETESAL)State-owned owner of the transmission network (115 kV and above). It plans, builds and maintains the network under a five-year expansion plan approved by SIGET.
DSOAES El Salvador (CAESS, CLESA, EEO, DEUSEM)Four distribution companies with more than 1.56 million customers: CAESS (northern San Salvador, Chalatenango, Cuscatlán, Cabañas; 670,562 customers in 2024), CLESA (west; 490,432), EEO (east; 366,115) and DEUSEM (Usulután; 97,812).
DSODistribuidora de Electricidad DELSURPart of Colombia’s EPM group since 2011; serves 456,938 customers (2024) in La Libertad, San Salvador, La Paz, San Vicente and Cuscatlán.
DSOEDESAL, B&D Servicios Técnicos and DEC (Abruzzo)Smaller distributors. EDESAL had 34,812 customers in 2024; Distribuidora Eléctrica Cuscatlán (Abruzzo) is the only state-owned distributor.
ExchangeEnte Operador Regional (EOR) / Mercado Eléctrico Regional (MER)Coordinates the Central American regional system and market through which 42 Salvadoran trading companies imported and exported electricity in 2024.

Compared with the UK system.

Compared with the UK system.
UK conceptEl Salvador equivalentHow it works
DNOEmpresa distribuidora (CAESS, CLESA, EEO, DEUSEM, DELSUR, EDESAL, B&D, DEC)Each distributor owns and operates the low- and medium-voltage network in its area, connects new supplies, owns and reads meters, and also acts as the default supplier to customers there. Distribution charges are regulated and differ by company.
National Grid/NESOUT (system and market operator) and ETESAL (transmission owner)Network ownership and operation are separated: the state company ETESAL owns the 115 kV-and-above network, while the Unidad de Transacciones dispatches the system and runs the wholesale market and settlement.
MPANNC (Número de Cuenta Contrato), formerly NICEach supply contract is identified by an account-contract number printed on the bill. AES has replaced its old NIC with the NC; the DGEHM self-consumption form accepts an "NC, NIC or NIS" of 3 to 30 characters, reflecting different distributors’ systems. There is no national supply-point register or common format.
MPRNNo equivalentNo household gas supply-point identifier was identified; piped gas to homes was not found in the sources reviewed.
Meter operatorThe distributorThe distributor installs and owns the meter. When a self-consumption system is approved, the distributor replaces the meter within three working days of the customer paying the meter-change charge.
SupplierComercializador (the distributor by default; 42 trading companies registered)By law every end user contracts with a comercializador, cannot be charged for switching and cannot be charged more than the local distributor’s approved tariff. In practice households are supplied by their distributor at the regulated tariff.
Smart-meter infrastructureNo national programmeNo national smart-meter mandate or data hub was identified. Self-consumption customers must have bidirectional meters with hourly registers and at least 90 days of memory (RELFUER technical catalogue).

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Número de Cuenta Contrato (NC)
Who issues it?The local distributor (AES CAESS, CLESA, EEO or DEUSEM, DELSUR, EDESAL, B&D or DEC)
FormatAn account-contract number assigned by the distributor. AES replaced its former NIC (customer identification number) with the NC; other distributors may still use NIC or NIS numbers. No public specification of the structure was found; the DGEHM application form accepts an NC, NIC or NIS of between 3 and 30 characters.
LengthNot published (3–30 characters accepted by the DGEHM form)
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the bill (documento de cobro) next to the customer’s name and supply address, together with the meter number, tariff, route and the municipal charges.
Electronic accessDistributors offer online accounts and apps (for example AES’s digital services and the DELSUR app). The DGEHM’s online self-consumption application asks for the NC/NIC/NIS, the meter number and the most recent bill.
Third-party accessNo regulated third-party data-access scheme was identified. Qualified suppliers prepare self-consumption applications using the customer’s last 12 bills, which the customer provides.
Who keeps the registerEach distributor keeps its own customer and supply register. Under the RELFUER, SIGET integrates approved self-consumption metering points into its own supervision system, and distributors must send SIGET and the DGEHM a georeferenced database of their networks every six months.
Register scopePer DSO

In El Salvador the unit that is billed is the supply contract with the distributor, and its number is what customers quote for everything: reporting faults, payments, complaints, a change of name on the bill or an application for a self-consumption system. AES explains on its bill guide that the NIC has been replaced by the NC, which identifies the person as a customer of its distributors; its customer-service pages still ask callers to have their NIC to hand.

The NC appears on the bill alongside the meter number and a route sequence used for meter reading. Because each distributor runs its own system, there is no national meter-point register comparable to the UK’s, and the identifier format differs between companies; the DGEHM’s application form therefore accepts any of the three common labels (NC, NIC or NIS).

A change of name on the bill is a personal procedure at AES requiring the new holder’s DUI and NIT and a signed application. The pages consulted do not say whether the account number changes when the holder changes, so whether it stays with the property is not confirmed.

No public description of the NC format was found, so no example is given here.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringNo
Net billingYes
How exported electricity is paidExported energy credited at 50% of the customer’s own tariff, as a discount on the energy charge; credits last six billing periods
How is exported energy paid for?Under article 22 of the RELFUER, until the DGEHM issues its own methodology, reinjected energy is valued at 50% of the customer’s current tariff: the last consumption block for customers without hourly metering, or by time block for hourly-metered customers. The value is applied as a discount on that month’s energy charge and cannot exceed it.
What happens to surplus credits?They are kept for up to six consecutive billing periods, tracked by month of origin and used oldest first. Expired balances go into the quarterly tariff adjustment.
How big can a system be?For homes without demand metering, capacity in kW AC is the average monthly consumption divided by 720 hours and a load factor set per distributor and tariff (for example 0.66 for CAESS R1 customers), and expected generation may not exceed average consumption. Systems with batteries may have more inverter capacity, but export is capped at the limit for a system without storage.
Which technical studies are needed?Up to 50 kW: only the capacity study and mandatory anti-islanding protection. Above 50 kW: electrical studies by a qualified supplier (load flow, short circuit, protection coordination) and telemetry; from 500 kW also remote control; above 1 MW also quasi-dynamic, low-voltage ride-through and harmonic studies.
Can I offset consumption at another address?Yes, through remote self-consumption (planta virtual): a system at another property connected downstream of the same ETESAL substation, with consolidated metering administered by SIGET and no distribution, commercialisation or loss charges. For the first two years it is limited to individual users.
Do existing systems change?Yes. Systems installed or in process before the RELFUER took effect adopt the new remuneration immediately and have one year to meet the anti-islanding and documentation requirements.

Connecting a home system.

  1. Buy the system from a SIGET-certified qualified supplier (proveedor calificado), using equipment listed in the RELFUER technical catalogue; the supplier sizes it from the last 12 bills.
  2. Apply to SIGET (through the DGEHM online platform) with the technical report, signed single-line diagram, equipment data sheets and IEC/UL/IEEE certificates, the supplier’s declaration and the last 12 bills.
  3. SIGET checks completeness within two working days; for residential systems up to 50 kW it evaluates the capacity study within three working days, the DGEHM gives its approval within two, and SIGET issues the design approval certificate within three more.
  4. After installation, request commissioning with a sworn declaration by the qualified supplier; SIGET inspects (optionally with the DGEHM and the distributor) and issues the construction certificate within five working days.
  5. The distributor changes the meter, tariff category and contract within three working days of the customer paying the meter-change charge, and SIGET adds the metering point to its supervision system.

Until 2026, small renewable generators connected under SIGET’s standard for renewable end-user producers (Norma UPR, Agreement 367-E-2017), and SIGET counted 1,783 such end-user producers with 65.27 MW at the end of 2024, alongside 169 distributed renewable generators (GDR) selling their output.

The Renewable Energy Use Promotion Law (LFUER) and its regulation, the RELFUER (SIGET Agreement 072-E-2026, published in the Diario Oficial on 20 April 2026), replaced the UPR connection procedure for self-consumption. The RELFUER makes the DGEHM the technical authority and SIGET the supervisor, bars distributors from imposing extra requirements or charges, and requires systems to be used exclusively for self-consumption; selling energy is a separate generation activity.

Separately, the April 2026 reform of the General Electricity Law (Decree 548) puts new distributed generation contracts, renewals and interconnection charges under DGEHM guidelines, after the government concluded that distributed generation had grown in a disorderly way.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (solar, wind, biomass)No concession needed; plants trading on the wholesale market operate under the UT’s rulesSIGET / UTGeneral Electricity Law, article 5.
Generate electricity (hydro, geothermal)Concession approved by the Legislative Assembly; plants of 5 MW or less follow the small-scale concessions lawLegislative Assembly, on SIGET’s processingNot required for CEL or companies it controls.
Self-consumption (local or remote) with exportDesign approval and construction certificate for every system; installed by a qualified supplier; studies scale with size (≤50 kW capacity study only)SIGET with DGEHM approval (RELFUER)Exclusively for self-consumption; exports credited at 50% of the tariff.
Distributed generation for saleDistribution-network access approval; in the retail market energy may only be sold to the distributor under a distribution supply contract (CAD), now under DGEHM guidelines and pricesDGEHM; distributorA plant cannot take part in the wholesale and retail markets at the same time (article 32-A, added by Decree 548 in 2026).
Store energyStorage systems are defined in the law since 2026; behind-the-meter batteries are approved as part of a self-consumption systemSIGET / DGEHMDistributed generators with CAD contracts may install storage for their own frequency-regulation reserve (article 32-H).
Supply (comercialización)Registration as an operator; supply contracts with end users at no more than the distributor’s approved tariffSIGET / UT42 trading companies were active in 2024. No switching charges allowed.
DistributionOperator of distribution networks with SIGET-approved tariffs; must connect self-consumption systems without extra requirementsSIGET; DGEHM for 2026 chargesEight distributors.
Install self-consumption systemsQualified supplier certification (two years, renewable) to access tax exemptions and carry out approved installations; SIGET-accredited electricians for wiringSIGET with DGEHM approvalPublic register of qualified suppliers kept by SIGET.
Aggregate DER / VPP / remote control of assetsNo aggregation framework identified; remote control is mandatory for self-consumption systems of 500 kW or moreNot definedThe RELFUER’s “virtual plant” is remote self-consumption for one user, not aggregation.
Balancing and grid servicesProvided by wholesale market participants under the UT’s operating rules (ROBCP)UT / SIGETSIGET has amended the ROBCP on secondary frequency regulation by generators connected to distribution networks.

The General Electricity Law treats generation, supply and trading as open activities. Only hydro and geothermal generation needs a concession, because they use public water and geothermal resources. Transmission is concentrated in ETESAL and distribution is carried out by the eight existing companies under regulated charges.

Since 2026 the government has taken a closer hand in distributed generation: Decree 548 gives the DGEHM control over new distribution supply contracts, renewals and interconnection charges, and the RELFUER requires self-consumption systems to be designed and installed by qualified suppliers certified by SIGET with the DGEHM’s approval.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Mercado Regulador del Sistema (short-term market)Restricted—NoUT. Cost-based short-term market balancing supply and demand; the average price was US$111.39/MWh in 2024. Open to registered market operators only.
Frequency regulation and ancillary servicesRestricted—NoUT. Provided by generators under the ROBCP; distributed generators with CAD contracts may install storage for their own primary and secondary reserve.
Regional electricity market (MER)Restricted—NoEOR. Imports and exports by registered trading companies.

El Salvador’s wholesale market is cost-based and open only to registered operators. No framework for aggregating household batteries, demand response or self-consumption systems was identified; the RELFUER’s remote self-consumption allows a single customer to offset consumption with a system elsewhere, but not to pool resources or sell flexibility.

The 2026 reform asks the UT to prepare to operate a retail market on the distribution networks within 18 months, which may change how distributed resources are dispatched and settled.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national programme identified; meters are installed and owned by each distributor
Reading intervalHourly registers required for self-consumption meters; not published for other household meters
Self-consumption meterBidirectional, ANSI C12.1 accuracy, hourly register, 90 days’ memory
Meter change after approvalWithin 3 working days of paying the meter-change charge
Medium and large demand customersElectronic meters recording peak, shoulder and off-peak kWh

There is no national smart-meter mandate or data hub. Household customers have electromechanical or digital meters read by the distributor; AES’s guidance on reading meters covers dial and digital household meters and electronic time-of-use meters for medium and large customers. The RELFUER technical catalogue sets the minimum specification for the bidirectional meters fitted to self-consumption systems.

Renewable electricity.

Electricity generation mix (2024).

  • Hydro: 26.6%
  • Gas (LNG): 25.7%
  • Geothermal: 17.9%
  • Solar: 15.2%
  • Bioenergy (biomass and biogas): 6.8%
  • Oil and other fossil fuels: 6%
  • Wind: 1.8%
Source 1
Renewable electricity share
68.3% (2024)Source 1Share of national net generation (8,274.77 GWh) from renewable sources, as reported by SIGET. El Salvador was a small net exporter in 2024 (imports 209.9 GWh, exports 253.6 GWh). Ember data reproduced by Our World in Data show 86.5% for 2025 but list no gas generation, which conflicts with SIGET’s figures for the LNG plant.
Home solar
0.065 GW (2024)Source 1Capacity of the 1,783 renewable end-user producers (UPR) at the end of 2024 (65.27 MW). This category includes businesses as well as homes.
Solar added each year
0.101 GW (2024)Source 1Derived: 734.23 MW in 2024 minus 633.10 MW in 2023. SIGET reports 423 new solar end-user producer installations in 2024.
Total installed capacity
3.101 GW (2024)Source 13,101.24 MW at 31 December 2024, including distribution-connected plants.
Solar PV
0.734 GW (2024)Source 1
Hydro
0.638 GW (2024)Source 1
Gas (LNG)
0.388 GW (2024)Source 1
Biomass
0.295 GW (2024)Source 1
Geothermal
0.209 GW (2024)Source 1
Wind
0.054 GW (2024)Source 1

Targets.

  • The DGEHM states the aim of making the country’s energy matrix 100% clean in the short term; no dated statutory target was verified.
  • The 2026 LFUER and RELFUER promote renewable self-consumption with tax exemptions for qualified suppliers and end users.

El Salvador’s renewable electricity comes from three long-established sources – hydro on the Lempa river, geothermal at Ahuachapán and Berlín, and sugar-cane bagasse – plus rapidly growing solar. Hydro output varies strongly with rainfall: it rose 40% in 2024 after a dry 2023, which cut LNG and oil generation.

Solar capacity rose by 101 MW in 2024 to 734 MW and produced 1,260 GWh (15.2% of generation). Almost two-thirds of it (477 MW) is connected to the distribution networks rather than the transmission system. The 2024 mix above is SIGET’s net generation by source; geothermal is shown separately.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage systems were defined in the General Electricity Law by the 2026 reform, and the RELFUER sets specific sizing rules for self-consumption systems with batteries: inverter capacity may exceed the normal limit, but export power is capped and the system must have controls that enforce the cap. The technical catalogue lists accepted battery standards, including IEC 62619, UL 9540 and UL 9540A.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
AES CAESS670,562 customers (2024)NoLimitedNoLimited
AES CLESA490,432 customers (2024)NoLimitedNoLimited
DELSUR456,938 customers (2024)NoLimitedNoLimited
AES EEO366,115 customers (2024)NoLimitedNoLimited
AES DEUSEM97,812 customers (2024)NoLimitedNoLimited
EDESAL34,812 customers (2024)NoLimitedNoLimited

Households are in practice supplied by the distributor for their area at the regulated tariff, although the law allows any end user to contract with another comercializador at no more than that tariff. Customer numbers are SIGET’s for 31 December 2024; B&D and DEC (Abruzzo) did not report figures.

“Time-of-use: Limited” reflects hourly-metered tariffs for medium and large demand customers only. “Export tariff: Limited” reflects the RELFUER credit of 50% of the tariff, applied as a bill discount rather than a payment.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Dirección General de Energía, Hidrocarburos y Minas (DGEHM)GovernmentEnergy policy, tariff agreements and self-consumption approvalsSets the energy charge, 2026 network charges and distributed-generation rules, and runs the self-consumption application platform.
Superintendencia General de Electricidad y Telecomunicaciones (SIGET)RegulatorElectricity regulatorPublishes tariff schedules, technical standards, the qualified-supplier register and the annual electricity statistics bulletin.
Unidad de Transacciones (UT)MarketSystem and wholesale market operatorDispatches the national system and runs the wholesale market; due to operate a retail market.
ETESALTransmissionState transmission companyOwns and expands the 115 kV-and-above network.
Comisión Ejecutiva Hidroeléctrica del Río Lempa (CEL)Renewable EnergyState hydro generatorOwns the main hydro plants, including 3 de Febrero, inaugurated in 2023.
AES El SalvadorDistributionOwner of CAESS, CLESA, EEO and DEUSEMServes more than 1.56 million customers and publishes current tariffs for its four distributors.
DELSURDistributionDistributor in the centre-southSecond-largest single distributor; explains how its customers qualify for the residential subsidy.
Ente Operador Regional (EOR)MarketRegional system and market operatorRuns the Central American regional market used for El Salvador’s imports and exports.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Self-consumption connection and approvalRELFUER (SIGET Agreement 072-E-2026)SIGET with DGEHM approvalApproval process, sizing methodology (Annex I), storage and export limits (Annex II) and technical catalogue.
Electrical installationsNational Electrical Code (NEC / NFPA 70)Adopted by SIGETMandatory for all self-consumption installations; SIGET must adopt each new edition within three months.
Inverters and anti-islandingIEC 62109-1/-2 or UL 1741; IEC 62116; IEC 61683RELFUER technical catalogueAnti-islanding protection mandatory for all sizes; existing systems have one year to comply.
PV modulesIEC 61215; IEC 61730 or UL 61730RELFUER technical catalogueSalt-mist (IEC 61701) and ammonia (IEC 62716) tests for coastal and farm sites.
BatteriesIEC 62619 or UL 1642; UL 9540 / UL 9540A; IEC 62620RELFUER technical catalogueSafety and performance of lithium systems; IEC 60896-21/-22 for lead-acid.
MeteringANSI C12.1 accuracy; ANSI C57.13 instrument transformersRELFUER technical catalogueBidirectional meters with hourly registers and 90 days of memory.
ProtectionIEC 61008 / IEC 61009 (30 mA RCD); IEC 61643-11 (SPD)RELFUER technical catalogueType A or B residual-current devices; Type 2 surge protection on AC and DC sides.
Installer accreditationSIGET electrician accreditation; qualified supplier certificationSIGETAccredited electricians sign wiring declarations for new supplies; qualified suppliers (two-year certification) design and install self-consumption systems.

Permissions.

Permissions.
PermissionRequiredLevelDetail
SIGET design approval certificate (self-consumption)YesNationalRequired for every system; three working days for residential studies up to 50 kW, longer for larger plants, with DGEHM approval.
SIGET inspection and construction certificateYesNationalIssued within five working days of a satisfactory inspection; the distributor may attend but may not charge.
Distributor approvalNoNationalThe distributor must connect approved systems and may not demand extra studies or requirements; it only changes the meter and contract.
Concession (hydro or geothermal generation)LimitedNationalOnly for hydro and geothermal plants; not for solar, wind or biomass.

For a household rooftop system the formal steps are the SIGET design approval and the construction certificate after inspection, both coordinated with the DGEHM. Municipal permit requirements for small solar installations were not identified in the sources reviewed.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Self-consumption export credit (RELFUER)ActiveNet billingExported energy credited at 50% of the customer’s tariff as a discount on the energy charge, with credits kept for six billing periods, until the DGEHM issues a permanent methodology.Since April 2026
VAT exemption and income-tax deduction for self-consumption systemsActiveTax reliefEnd users pay no VAT on the purchase, installation or maintenance of self-consumption systems bought from a qualified supplier, and can deduct the cost from taxable income in the year of purchase. Qualified suppliers are exempt from import duties and VAT on equipment and from income tax on installation and maintenance income.Since April 2026
Frozen energy charge for small consumersActivePrice freezeResidential and general-use customers who averaged 300 kWh a month or less in January–March 2024 keep the energy charge of 15 January 2024; extended quarterly, most recently from 1 August 2026.Since 15 April 2024
Residential electricity subsidyActiveBill subsidyGovernment discount on the energy charge for qualifying low-income households on the Ministry of Economy’s list; the DGEHM said in 2024 it covers families using up to 105 kWh a month.—

Data and connectivity.

Fixed broadband
12.5 fixed subscriptions per 100 people (2024)Source 28
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband reached about 12.5 subscriptions per 100 people in 2024. The RELFUER requires telemetry for self-consumption systems above 50 kW and remote control from 500 kW, but sets no communications standard for household meters.

Grid conditions.

National peak demand
1.194 GW (2024)Source 11,194.4 MW net, 20 May 2024, up 7.54% on 2023. Minimum demand was 346 MW on 1 January 2024.
Annual electricity demand
7.56 TWh (2024)Source 1Energy traded in the retail market (7,560,065 MWh): wholesale purchases plus sales by distribution-connected generators. Final demand after distribution losses was 6.92 TWh.
Generation capacity
3.101 GW (2024)Source 1
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Demand is growing fast and peaks in the hot dry season before the rains, when hydro output is lowest: the 2024 peak came on 20 May. The LNG plant, geothermal and imports cover the dry months, while hydro surges in wet years.

With 538 MW of generation now connected to distribution networks, mostly solar, managing midday injections has become a regulatory issue: SIGET has consulted on rules for curtailing base-load generation and for distributed generators’ participation in frequency regulation, and the 2026 reform makes the DGEHM responsible for distributed-generation interconnection charges.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Energy charge for August–October 2026Current1 August 2026DGEHM agreements 97/2026/DE and 98/2026/DE keep the January 2024 energy charge for small consumers and the May–July 2026 charges for everyone else.
RELFUER self-consumption regulationCurrentApril 2026 (published 20 April 2026)New approval process, qualified suppliers, 50% export credit, remote self-consumption and tax exemptions under the LFUER.
Reform of the General Electricity Law (Decree 548)CurrentApril 2026 (published 13 April 2026)Defines distributed generation, distribution supply contracts, the retail market and storage; puts distributed-generation contracts and charges under DGEHM control.
Distributed-generation interconnection chargesUpcomingBy April 2027The DGEHM must set the methodology and approve interconnection charges within 12 months of Decree 548 taking effect.
Retail market operation by the UTUpcomingBy late 2027The UT has 18 months from the April 2026 reform to adapt its organisation and operating rules to run the retail market.
Permanent export remuneration methodologyUpcomingNot scheduledThe DGEHM is to issue the methodology that will replace the interim 50%-of-tariff credit.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMedium1,783 renewable end-user producers with 65.27 MW at the end of 2024, 423 more solar installations than in 2023 (SIGET).
Distributed energy marketHigh1,971 plants with 538.64 MW connected to distribution networks in 2024, about 17% of national capacity (SIGET); a new self-consumption regulation and tax exemptions took effect in 2026.
Grid flexibility marketLowCost-based wholesale market open only to registered operators; no aggregation framework identified.
Energy storage adoptionLowNo official storage statistics; storage only defined in law in 2026 and limited to individual projects such as AES Meanguera del Golfo.
Renewable growth environmentHighSolar capacity rose 16% in 2024 to 734 MW and renewables supplied 68.3% of generation (SIGET).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 28 sources
  1. Boletín de Estadísticas Eléctricas año 2024. SIGET, 2025. accessed 9 October 2026.
  2. Pliegos tarifarios del suministro de energía eléctrica al consumidor final, vigentes del 1 de mayo al 31 de julio de 2026. SIGET, 2026. accessed 9 October 2026.
  3. Pliego tarifario, residencial y uso general con consumo promedio menor a 300 kWh, vigente del 15 de abril al 14 de julio de 2024. SIGET, 2024. accessed 9 October 2026.
  4. Tarifas de Electricidad año 2026. SIGET, 2026. accessed 9 October 2026.
  5. Pliego tarifario del servicio eléctrico aplicable al usuario final, AES CAESS, 1 de agosto de 2026. AES El Salvador, 2026. accessed 9 October 2026.
  6. Tarifas vigentes. AES El Salvador, 2026. accessed 9 October 2026.
  7. Reglamento Especial de la Ley de Fomento para el Uso de la Energía Renovable (RELFUER), Anexo I del Acuerdo 072-E-2026. SIGET, 2026. accessed 9 October 2026.
  8. Ley General de Electricidad (Decreto 843, con reformas hasta el Decreto 548 de 2026). SIGET, 2026. accessed 9 October 2026.
  9. Solicitud de aprobación de sistema de autoconsumo renovable. DGEHM, 2026. accessed 9 October 2026.
  10. Generación distribuida: actualización de información de proyectos. DGEHM, 2026. accessed 9 October 2026.
  11. El precio de la energía eléctrica se mantiene para tercer trimestre del año. DGEHM, 2024. accessed 9 October 2026.
  12. Aprobación del decreto transitorio para reducir 14% el precio de la energía eléctrica. DGEHM, 2023. accessed 9 October 2026.
  13. Conoce el nuevo diseño de tu documento de cobro. AES El Salvador, 2025. accessed 9 October 2026.
  14. Nuevo suministro. AES El Salvador, 2026. accessed 9 October 2026.
  15. Sobre AES. AES El Salvador, 2026. accessed 9 October 2026.
  16. División Distribución. AES El Salvador, 2026. accessed 9 October 2026.
  17. Cómo leer su medidor. AES El Salvador, 2026. accessed 9 October 2026.
  18. Subsidio Residencial. DELSUR, 2026. accessed 9 October 2026.
  19. Quiénes somos. DELSUR, 2026. accessed 9 October 2026.
  20. Normativas de electricidad: recursos renovables y concesiones. SIGET, 2026. accessed 9 October 2026.
  21. Normativas de electricidad: mercado mayorista. SIGET, 2026. accessed 9 October 2026.
  22. ECB euro reference exchange rates, 9 October 2026. European Central Bank, 2026. accessed 9 October 2026.
  23. Installed solar capacity: El Salvador (IRENA). Our World in Data, 2025. accessed 9 October 2026.
  24. Share of electricity production by source: El Salvador (Ember). Our World in Data, 2025. accessed 9 October 2026.
  25. Population, total: El Salvador. World Bank, 2025. accessed 9 October 2026.
  26. Urban population (% of total population): El Salvador. World Bank, 2025. accessed 9 October 2026.
  27. Access to electricity (% of population): El Salvador. World Bank, 2024. accessed 9 October 2026.
  28. Fixed broadband subscriptions (per 100 people): El Salvador. World Bank, 2024. accessed 9 October 2026.

Questions about energy in El Salvador.

Talk to us about Olmack in El Salvador.Tell us about your home, housing portfolio or school estate in El Salvador. We'll explain what is possible there now.