How electricity works in Nicaragua.
Nicaragua electricity 2026: INE-regulated tariffs, DISNORTE-DISSUR distribution, CNDC-run wholesale market, geothermal, wind, biomass and hydro, ~21% imported via SIEPAC.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Nicaraguan córdoba (NIO) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Nicaragua energy at a glance.
Key figures for households in Nicaragua. Each one links to its source on the full overview below.
Electricity price.
6.473 NIO per kWh for households, including taxes. Figures for March 2026.
Renewable share.
52% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Nicaragua.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Nicaragua below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Nicaragua requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Nicaragua.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Nicaragua, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Nicaragua, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Nicaragua.
The energy market in Nicaragua, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Nicaragua’s power sector was restructured by the Electricity Industry Law (Ley 272 of 1998), which separated generation, transmission and distribution. Policy is set by the Ministry of Energy (the Ministerio de Energía y Minas, MEM, whose website now carries the name Ministerio de Energía), the Instituto Nicaragüense de Energía (INE) regulates and sets tariffs, the Centro Nacional de Despacho de Carga (CNDC) dispatches the national interconnected system and administers the wholesale market, and the state-owned Empresa Nacional de Transmisión Eléctrica (ENATREL) owns the transmission network. Distribution in the interconnected system is carried out by DISNORTE and DISSUR, two companies run jointly, in which the state holds a 16% stake.
Generation is a mix of private and state plant. ENATREL lists 1,179 MW of thermal (oil-fired) capacity alongside about 762 MW of renewables: biomass at sugar mills (224 MW), wind on the Rivas isthmus (186 MW), geothermal at Momotombo and San Jacinto-Tizate (165 MW), hydro (158 MW) and solar. Ember data put renewables at about 62% of domestic generation, and the Ministry says imports through the Central American regional market have met around 21% of demand in recent years.
The Government reports electricity coverage of 99.57% of the population at the end of 2024, a figure that differs markedly from the World Bank’s estimate of 88.7% access in 2024. Household self-generation from renewables up to 5 MW is allowed under a ministerial regulation of 2017, with exports to the grid paid only under a purchase contract with the distributor.
Energy snapshot.
Headline figures for electricity in Nicaragua. Each shows its data year and links to its source.
- Population7,007,502 peopleSource 12025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (NIO)6.473 NIO/kWhSource 4March 2026
- Household price (EUR)0.158 EUR/kWhSource 6March 2026
- Renewable electricity share52%Source 72024
- Solar capacity0.111 GWSource 112025
- Wind capacity0.186 GWSource 122025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Instituto Nicaragüense de Energía (INE)
- System operator
- Centro Nacional de Despacho de Carga (CNDC), which dispatches the national interconnected system and administers the wholesale market
- Distribution networks
- DISNORTE and DISSUR, two jointly run distribution companies covering the north and south of the national interconnected system; the state holds 16%
- Currency
- Nicaraguan córdoba (NIO)
- Voltage and frequency
- 120 V / 60 Hz (plug types A and B)
Electricity prices in Nicaragua.
- Household price (NIO)
- 6.473 NIO/kWh (March 2026)Source 4Household price including power, network charges and taxes as compiled by GlobalPetrolPrices from Banco Central de Nicaragua, DISNORTE-DISSUR and INE data. The regulator’s own tariff schedules (pliegos tarifarios) could not be read because the INE website was unreachable, so this is a secondary-source figure. Actual bills depend heavily on the consumption block and subsidies.
- Household price (EUR)
- 0.158 EUR/kWh (March 2026)Source 6Converted from NIO 6.473/kWh at the Banco Central de Nicaragua official rate of NIO 36.6243 per US dollar (22 September 2026) and the ECB reference rate of USD 1.1206 per euro (9 October 2026), i.e. NIO 41.04 per euro.
- Typical annual electricity bill
- Not identified from a reliable public source.
Retail electricity prices in Nicaragua are regulated. INE sets the tariffs that DISNORTE-DISSUR charge each customer class, passing through the cost of the energy and capacity the distributors buy from generators and imports, plus transmission and distribution charges. The Ministry also lists Ley 898 of 2015, the Law on the Variation of the Electricity Tariff to the Consumer, among the sector’s laws.
Price level
GlobalPetrolPrices puts the household price in March 2026 at NIO 6.473 per kWh (about US$0.18), including all taxes and fees, and the business price at NIO 7.770 per kWh. Because over a third of generation is oil-fired, the cost of supply is sensitive to world fuel prices.
Subsidies and VAT
Small residential consumers are cross-subsidised. Under changes announced in late 2020, households using up to 100 kWh a month retained a 50% subsidy while the subsidy for 101–150 kWh was reduced or removed, and VAT on higher-consumption households increased. These figures date from 2020 and the blocks applied in 2026 were not verified.
Exchange rate
The córdoba has been held at a fixed official rate against the US dollar: the Banco Central de Nicaragua quoted NIO 36.6243 per dollar in September 2026. Many generation contracts are priced in dollars, so the exchange-rate regime matters for tariffs.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Household tariffs are set by INE under the Normativa de Tarifas (INE Resolution 14-2000) and applied by DISNORTE-DISSUR. Residential tariffs are block tariffs, with prices depending on monthly consumption. The current tariff schedules could not be read from INE’s website. |
| Other | Yes | Low-consumption households have long received a subsidy financed through the tariff. In December 2020 Confidencial reported that about 900,000 customers (72.6% of legally connected users) were subsidised, and that from January 2021 households using up to 100 kWh a month would keep a 50% subsidy while the subsidy for higher blocks was cut back. The thresholds in force in 2026 could not be verified. |
| Time-of-use | Unknown | No residential time-of-use tariff could be verified from a current public source. |
| Dynamic | No | Households buy from their distributor at regulated prices; only large consumers can buy in the wholesale market. |
Household prices compared with neighbouring countries (EUR per kWh).
- Honduras€0.215
- Guatemala€0.209
- El Salvador€0.168
- Nicaragua€0.158
- Panama€0.157
- Costa Rica€0.114
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 784 kWh/person/yr (2024)Source 10All sectors (electricity demand per person, Ember via Our World in Data) — one of the lowest levels in Central America.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity use per person is low: about 784 kWh a year across all sectors in 2024 according to Ember. Total demand was about 5.4 TWh in 2024 (Ember), and the Ministry reports that energy on the national system reached 5,541.80 GWh in 2025, 4.18% more than in 2024. The maximum demand recorded on the national system by March 2026 was 893 MW.
Much of the recent growth in connections has come from rural electrification. The Ministry and ENATREL say coverage has risen since 2007 to above 99% by 2024–2026, with more than 11,000 electrification projects completed; the World Bank’s access estimate for 2024 is lower, at 88.7%.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 64.6% (2021–2022)Source 22Share of homes owned with a title deed (INIDE Continuous Household Survey housing report); homes owned without a title are additional.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 99.2% (2023–2024)Source 22Share of dwellings that are houses (INIDE Continuous Household Survey).
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 59.4% (2025)Source 2
Nicaragua’s housing stock is almost entirely made up of houses: INIDE’s household survey found 99.2% of dwellings were houses in 2023–2024, 94.9% had zinc roofs and 41.3% had block or concrete external walls. In 2021–2022, 64.6% of households owned their home with a title deed. About 59% of the population lives in urban areas.
For rooftop solar, this means most households have a roof of their own, although lightweight corrugated-metal roofs can limit what can be mounted on them.
How the grid works in Nicaragua.
- TransmissionCentro Nacional de Despacho de Carga (CNDC), Empresa Nacional de Transmisión Eléctrica (ENATREL)
- DistributionDISNORTE and DISSUR, two jointly run distribution companies covering the north and south of the national interconnected system; the state holds 16%
- MeteringDISNORTE-DISSUR
- Supply1 or more retail suppliers
Physically, Nicaragua has one national interconnected system (Sistema Interconectado Nacional, SIN). Generation from thermal plants, sugar-mill biomass plants, the Rivas wind farms, the Momotombo and San Jacinto-Tizate geothermal fields, hydro plants and newer solar parks feeds ENATREL’s 69–230 kV transmission network. Medium-voltage distribution runs at 13.8 and 24.9 kV over about 11,201 km of lines.
The wholesale market
Ley 272 created a wholesale market (Mercado Eléctrico de Nicaragua) administered by the CNDC, in which generators, distributors and large consumers trade. Much of the generating capacity is privately owned, but the state company ENEL runs hydro and thermal plants. Ley 272 was amended by Ley 1094 in November 2021.
Regional integration
Nicaragua is part of the SIEPAC 230 kV line linking the six Central American countries and the Regional Electricity Market (MER), regulated by the CRIE. The Ministry says permitted cross-border transactions have grown from 10 MW in 2007 to about 200 MW, and that a third regional interconnection — second circuits to Honduras (Aguas Calientes–Sandino) and Costa Rica (La Virgen–Cañas), costing US$45 million — would allow transactions above 400 MW. Imports have met about 21% of demand in recent years.
Ownership of distribution
Distribution was privatised to Spain’s Unión Fenosa. In 2013 the Spanish consortium TSK-Melfosur bought the majority stake for US$57.8 million; in 2020 it withdrew, transferring its shares to a company whose identity was not publicly disclosed. The Nicaraguan state keeps 16%.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio de Energía y Minas (MEM) / Ministerio de Energía | Sets energy policy and planning, grants generation concessions and licences, approves fiscal exemptions for renewable projects and issued the distributed generation regulation. Its Dirección General de Electricidad y Recursos Renovables (DGERR) covers the power sector. |
| Regulator | Instituto Nicaragüense de Energía (INE) | Regulates and supervises the electricity sector, sets tariffs and issues technical and commercial regulations, including a 2022 regulation on distributed renewable self-generation. |
| System operator | Centro Nacional de Despacho de Carga (CNDC) | Operates the Sistema Interconectado Nacional and administers the national wholesale market; it also acts as Nicaragua’s operator in the Central American regional market. Its domain moved to cndc.gob.ni in July 2026. |
| TSO | Empresa Nacional de Transmisión Eléctrica (ENATREL) | State-owned owner of the national transmission system: 3,790 km of 69, 138 and 230 kV lines and 114 substations (March 2026). It also runs national electrification programmes. |
| DSO | DISNORTE and DISSUR | Distribution companies for the north and south of the interconnected system, operating as one business. They own the medium- and low-voltage networks, connect customers, read meters and bill. |
| Supplier | DISNORTE-DISSUR | Regulated retail supplier to households and small businesses in their concession areas. |
| Metering | DISNORTE-DISSUR | Install, own and read customer meters in their areas. |
Compared with the UK system.
| UK concept | Nicaragua equivalent | How it works |
|---|---|---|
| DNO | DISNORTE and DISSUR | Two distribution concessions, north and south, run jointly, cover the interconnected system. Unlike a UK DNO they also sell electricity to the customers on their networks. |
| National Grid/NESO | ENATREL (transmission) and CNDC (dispatch and market) | ENATREL owns the high-voltage network and the CNDC dispatches generation and runs the wholesale market — a split similar to the UK’s separation of transmission ownership from system operation, but both are in the state sector. |
| MPAN | Número de Identificación de Suministro (NIS) | Each supply point has an NIS assigned by DISNORTE-DISSUR that uniquely identifies it in the distributor’s system. It is used for bill enquiries and payments rather than for switching supplier, because households cannot switch. |
| MPRN | None | No household piped-gas network or gas supply-point identifier was identified. |
| Meter operator | DISNORTE-DISSUR | The distributor installs and reads meters. There is no competitive metering market. |
| Supplier | DISNORTE-DISSUR (households); generators and the wholesale market (large consumers) | Households buy only from their distributor at INE tariffs. Large consumers above the regulatory threshold can contract with generators or buy in the wholesale market. |
| Smart-meter infrastructure | No national programme identified | There is no equivalent of the DCC. Any advanced metering is deployed by the distributor in its own systems. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Número de Identificación de Suministro (NIS) |
| Who issues it? | DISNORTE-DISSUR (the distributor) |
| Format | A numeric code assigned by the distributor to each supply (service connection). The digit structure is not publicly documented. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed in the top right-hand corner of the electricity bill, according to DISNORTE-DISSUR. |
| Electronic access | Customers can enter their NIS on DISNORTE-DISSUR’s website and virtual office to see consumption, amounts due and bill details. |
| Third-party access | No regulated third-party data-access framework was identified. Requests go through the distributor. |
| Who keeps the register | DISNORTE-DISSUR commercial (customer and billing) system |
| Register scope | Per DSO |
In Nicaragua the household connection is identified by its NIS, the Número de Identificación de Suministro. DISNORTE-DISSUR describe it as unique: it identifies one supply point unambiguously and is shown in the top right of the bill. It is the reference used to look up and pay bills online, at the distributor’s offices and at the more than 8,000 payment points in the country.
How it differs from an MPAN
The NIS is a commercial reference in the distributor’s own system rather than part of a national registry. Because households cannot choose their supplier, there is no switching process and no central register of supply points for suppliers to query. The NIS identifies the supply, while the customer contract records who is responsible for paying for it; whether the NIS is retained when a property changes hands is not set out in a public source.
Who keeps the register
DISNORTE-DISSUR keep the records of all supply points in their concession areas. INE supervises the distributors’ commercial service but does not run a separate national register.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Unknown |
| Net billing | Limited |
| How exported electricity is paid | Surplus energy injected into the distribution network is paid only where a purchase-and-sale contract (contrato de compraventa) has been signed between the distributor and the self-generator; the price basis could not be verified from the regulation itself. |
| Can a household export solar power to the grid? | Yes, within the distributed generation framework. The Normativa de Generación Distribuida Renovable para Autoconsumo (Ministerial Agreement 063-DGERR-002-2017, 18 December 2017) allows natural or legal persons to connect renewable self-generation to the low- or medium-voltage network. |
| What size limit applies? | The framework covers small renewable self-consumption installations of less than 5 MW, using solar, wind, biomass, hydro or solid waste. |
| How is exported energy paid for? | Only under a purchase-and-sale contract between the distributor and the generator. Without a contract, injected energy is not remunerated. |
| Which technical rules apply? | The technical annex approved by Ministerial Agreement 001-DGERR-001-2020 (13 February 2020). INE also published a distributed renewable generation regulation in October 2022 setting requirements and procedures for distributors and self-generators. |
Connecting a home system.
- Design a renewable installation for self-consumption below 5 MW, connected to the low- or medium-voltage distribution network.
- Apply to the distributor (DISNORTE-DISSUR) for interconnection under the Normativa de Generación Distribuida Renovable para Autoconsumo and its technical annex.
- The distributor checks the installation against the technical annex (Ministerial Agreement 001-DGERR-001-2020) before connection.
- To be paid for surplus energy, sign a purchase-and-sale contract with the distributor.
Nicaragua’s framework is designed primarily for self-consumption. Customers can install renewable generation behind their meter and connect it to the distribution network, but surplus energy is remunerated only if they have a purchase contract with DISNORTE-DISSUR. Whether surpluses are netted against consumption or sold at a set price depends on that contract and the INE regulation, whose full text could not be read for this profile.
Renewable projects can also benefit from the tax incentives of Ley 532 of 2005, applied under Ministerial Agreement 063-DGRER-012-2013, with the Ministry issuing the technical endorsements needed for exemptions.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate for own use and export (distributed generation) | No generation licence; connection under the distributed generation regulation for renewable systems below 5 MW, with a purchase contract to be paid for surplus | Ministry of Energy / INE; distributor for connection | Ministerial Agreement 063-DGERR-002-2017 and technical annex 001-DGERR-001-2020; INE regulation of October 2022. |
| Generate for sale on the national grid | Generation licence or concession granted by the Ministry under Ley 272 (as amended by Ley 1094 of 2021) | Ministerio de Energía y Minas | Generators sell under contracts with distributors or large consumers and in the CNDC-administered spot market. Size thresholds could not be verified from the law text. |
| Store electricity | No specific storage licensing regime identified | — | Storage is not separately addressed in the instruments listed by the Ministry. |
| Transmission | Reserved to the state transmission company | ENATREL | ENATREL owns the national transmission system. |
| Distribution and retail supply | Distribution concession under Ley 272 | Ministerio de Energía y Minas; regulated by INE | DISNORTE and DISSUR hold the concessions for the interconnected system. |
| Wholesale trading and regional trade | Registration as an agent of the national wholesale market; regional transactions through the MER | CNDC; CRIE for the regional market | Large consumers can buy directly in the wholesale market. |
| Aggregation, VPP, balancing and remote control of customer assets | No framework | — | No aggregator role or demand-response scheme was identified. |
Licensing follows Ley 272: the Ministry grants generation licences and distribution concessions, INE regulates tariffs and service quality, and the CNDC registers market agents. Ley 272 was amended by Ley 1094 of 25 November 2021. Small renewable self-generation under 5 MW is handled under the separate distributed generation regulation rather than through a generation licence.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| National wholesale (spot) market | Restricted | — | No | CNDC. Open to registered generators, distributors and large consumers. Households and small distributed generators do not participate. |
| Regional Electricity Market (MER) | Restricted | — | No | Regional market regulated by the CRIE; accessed via the CNDC. Cross-border trade among the six SIEPAC countries through national market agents. |
| Ancillary services and demand response | No | — | No | CNDC. No market for third-party flexibility or demand response was identified. |
Flexibility in Nicaragua comes from dispatchable thermal plant, hydro reservoirs and regional imports and exports, all managed by the CNDC. There is no route for household batteries, solar or flexible loads to be aggregated and paid for grid services.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| CNDC — Mercado Eléctrico de Nicaragua | Daily market reports, dispatch and generation-by-resource charts. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart meter programme identified |
| Reading interval | Not published |
| Meter owner | DISNORTE-DISSUR |
| Supply identifier | NIS (Número de Identificación de Suministro) |
| Online access | Bill and consumption look-up by NIS |
No public information on a smart meter rollout, penetration rate or data standards was identified. Meters are installed and read by DISNORTE-DISSUR, and customers can check their consumption and bills online using their NIS.
Renewable electricity.
Electricity generation mix (2023).
- Oil: 37.6%
- Bioenergy: 19.7%
- Geothermal: 15.3%
- Hydropower: 14.4%
- Wind: 12.4%
- Solar: 0.7%
- Renewable electricity share
- 52% (2024)Source 7Share of electricity demand, derived from Ember data: renewable share of domestic generation (62.4%: bioenergy 19.7%, geothermal 15.3%, hydro 14.4%, wind 12.4%, solar 0.7%) × generation of 4.52 TWh ÷ demand of 5.42 TWh. Nicaragua is a net importer (the Ministry says imports met about 21% of demand in recent years), so the domestic-generation share of 62.4% would overstate how renewable supply is. Ember’s 2024 source shares are identical to 2023.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0.069 GW (2025)Source 11Derived from IRENA capacity: 110.9 MW (2025) − 41.9 MW (2024).
- Biomass (sugar mills)
- 0.224 GWSource 19ENATREL: 224.3 MW at four sugar mills.
- Wind
- 0.186 GW (2025)Source 12Four wind farms on the Rivas isthmus (ENATREL).
- Geothermal
- 0.165 GWSource 19ENATREL: 164.5 MW at Momotombo and San Jacinto-Tizate.
- Hydropower
- 0.158 GWSource 19ENATREL: 157.78 MW, two historic plants plus nine small plants added since 2007.
- Solar PV
- 0.111 GW (2025)Source 11
- Thermal (oil)
- 1.179 GWSource 19ENATREL: 1,179 MW across 22 plants.
Targets.
- The Ministry publishes an indicative generation expansion plan for 2023–2035.
Nicaragua’s renewable generation is unusually diverse for its size. In 2023 sugar-cane bagasse burned at sugar mills supplied about 20% of domestic electricity, geothermal 15%, hydro 14%, wind 12% and solar less than 1%, with oil-fired plant supplying the remaining 38% (Ember). Biomass output follows the sugar harvest and hydro output follows the rainy season, so thermal plants and imports fill the gaps.
Solar has started to grow quickly: IRENA records capacity rising from 18.5 MW in 2023 to 41.9 MW in 2024 and 110.9 MW in 2025. Wind capacity has stayed at 186 MW since 2020.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No grid-scale battery projects or storage-specific regulation were identified. Some homes and businesses use batteries for backup or off-grid solar, but there is no published count and no scheme paying them for grid services.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| DISNORTE-DISSUR | Regulated supplier to households in the national interconnected system | No | Unknown | No | Limited |
Households cannot choose their supplier: DISNORTE-DISSUR supply all regulated customers in the interconnected system at INE tariffs. Large consumers can contract directly with generators or buy in the wholesale market.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministerio de Energía y Minas (MEM) | Government | Energy policy and planning | Sets policy, grants licences and concessions, and issued the distributed generation regulation and renewable tax-exemption rules. |
| Instituto Nicaragüense de Energía (INE) | Regulator | Energy regulator | Sets electricity tariffs and supervises the distributors. |
| Centro Nacional de Despacho de Carga (CNDC) | Market | System operator and wholesale market administrator | Dispatches the national system and runs the wholesale market. |
| Empresa Nacional de Transmisión Eléctrica (ENATREL) | Transmission | State transmission company | Owns the transmission grid and leads electrification programmes. |
| DISNORTE-DISSUR | Distribution | Distribution and retail supply | Connects, meters and bills households; handles distributed generation connections. |
| Empresa Nicaragüense de Electricidad (ENEL) | Renewable Energy | State generation company | Operates state hydro, geothermal and thermal generation. |
| Instituto Nacional de Información de Desarrollo (INIDE) | Government | National statistics office | Publishes household survey data on housing and living conditions. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Distributed generation | Normativa de Generación Distribuida Renovable para Autoconsumo (Ministerial Agreement 063-DGERR-002-2017) | Ministerio de Energía y Minas | Rules for renewable self-generation below 5 MW connected to the distribution network. |
| Grid connection (technical) | Anexo Técnico de la NGDRA (Ministerial Agreement 001-DGERR-001-2020) | Ministerio de Energía y Minas | Technical requirements for distributed generation interconnection. |
| Tariffs | Normativa de Tarifas (Resolution 14-2000) | INE | Framework for regulated tariffs. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distributor connection approval | Yes | National | A grid-connected self-generation system must be connected under the distributed generation regulation and its technical annex. |
| Purchase contract with distributor | Limited | National | Needed only to be paid for surplus energy exported to the network. |
| Planning permission | Unknown | Local | No specific planning rule for rooftop solar was found. |
The key permissions for a home solar system are national: connection by the distributor under the Ministry’s distributed generation regulation, and a purchase contract if the owner wants to be paid for exports. No separate municipal planning regime for rooftop solar was identified.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Ley 532 renewable generation tax incentives | Active | Tax exemption | Ley 532 (2005) on promoting electricity generation from renewable sources provides tax exemptions for renewable projects, applied under Ministerial Agreement 063-DGRER-012-2013 with technical endorsement by the Ministry. Current eligibility for small systems was not verified. | — |
| Electric mobility exemptions | Active | Tax exemption | Tax exemptions for electric vehicles and charging infrastructure introduced by Ley 1111 (reforming Ley 554), applied under Ministerial Agreement 011-2022 of 20 June 2022. | — |
| Residential consumption subsidy | Active | Tariff subsidy | Lower-consumption households receive subsidised tariffs; the blocks and percentages in force in 2026 could not be verified. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
No official connectivity figures were verified for this profile, and no information on smart meter communications was identified. ENATREL also provides telecommunications and data transport services over its network.
Grid conditions.
- National peak demand
- 0.893 GW (to March 2026)Source 13Maximum registered demand of 893 MW reported by the Ministry.
- Annual electricity demand
- 5.54 TWh (2025)Source 13Ministry figure of 5,541.80 GWh for 2025 (+4.18% on 2024). Ember gives demand of 5.42 TWh for 2024.
- Generation capacity
- 1.718 GW (March 2026)Source 13ENATREL’s technology-by-technology listing adds up to about 1.94 GW, on a different basis.
- Interconnection
- 0.2 GW (2026)Source 15Ministry figure for current regional transactions (about 200 MW), expected to exceed 400 MW once the third interconnection is in service.
- Curtailment
- Not identified from a reliable public source.
Installed capacity of 1,718 MW comfortably exceeds the 893 MW maximum demand, but much of it is oil-fired, biomass output is seasonal and hydro depends on rainfall, so imports through SIEPAC remain important. The Ministry says the national transmission system had 3,790 km of lines, 114 substations and 6,393 MVA of transformer capacity in March 2026.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Third regional interconnection | Upcoming | Approved August (year not stated by the Ministry) | Second circuits to Honduras and Costa Rica (US$45 million), expected to raise permitted regional transactions from about 200 MW to more than 400 MW. |
| Ley 1094 amending the Electricity Industry Law | Current | 25 Nov 2021 | Reforms and additions to Ley 272. |
| INE distributed renewable generation regulation | Current | Oct 2022 | Requirements, procedures and responsibilities for distributors and self-generators connecting renewable systems to distribution networks. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Self-generation is allowed below 5 MW, but exports are paid only under a contract with the distributor and no count of rooftop systems is published. |
| Distributed energy market | Low | A distributed generation regulation exists since 2017 with a 2020 technical annex, but uptake data are not published. |
| Grid flexibility market | Low | A wholesale market exists for large agents only; there is no aggregation or demand-response market. |
| Energy storage adoption | Low | No operational grid-scale battery or storage regulation identified. |
| Renewable growth environment | Medium | Solar capacity grew from 18.5 MW (2023) to 110.9 MW (2025) per IRENA; wind has been flat since 2020. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 29 sources
- Population, total — Nicaragua (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
- Urban population (% of total) — Nicaragua. World Bank, 2025. accessed 10 October 2026.
- Access to electricity (% of population) — Nicaragua. World Bank, 2024. accessed 10 October 2026.
- Nicaragua electricity prices. GlobalPetrolPrices.com, 2026. accessed 10 October 2026.
- Tipo de cambio oficial (indicadores económicos). Banco Central de Nicaragua, 2026. accessed 10 October 2026.
- ECB euro reference exchange rate: US dollar. European Central Bank, 2026. accessed 10 October 2026.
- Share of electricity production by source — Nicaragua (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity demand — Nicaragua (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity generation — Nicaragua (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Per capita electricity demand — Nicaragua (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Installed solar PV capacity — Nicaragua (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Cumulative installed wind capacity — Nicaragua (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Mapa interactivo del sector energético. Ministerio de Energía y Minas, 2026. accessed 10 October 2026.
- Nicaragua lidera cobertura eléctrica en Centroamérica. Ministerio de Energía y Minas. accessed 10 October 2026.
- Nicaragua contará con 3ra Interconexión regional. Ministerio de Energía y Minas. accessed 10 October 2026.
- Marco legal del sector energético. Ministerio de Energía y Minas. accessed 10 October 2026.
- Ley No. 272, Ley de la Industria Eléctrica, y Ley No. 1094. Ministerio de Energía y Minas. accessed 10 October 2026.
- Dirección General de Electricidad y Recursos Renovables. Ministerio de Energía y Minas. accessed 10 October 2026.
- Generación por tipo de fuente. ENATREL. accessed 10 October 2026.
- Cobertura eléctrica. ENATREL, 2026. accessed 10 October 2026.
- Centro Nacional de Despacho de Carga. CNDC, 2026. accessed 10 October 2026.
- Informe de Vivienda — Encuesta Continua de Hogares. INIDE, 2024. accessed 10 October 2026.
- Spanish Consortium TSK-Melfosur Withdraws from Disnorte-Dissur. Confidencial, 2020. accessed 10 October 2026.
- Reducción del subsidio eléctrico afectará a 900 000 familias. Confidencial, 2020. accessed 10 October 2026.
- Nicaragua: generación distribuida de energías renovables para autoconsumo y movilidad eléctrica. Consortium Legal, 2023. accessed 10 October 2026.
- Preguntas frecuentes (NIS). DISNORTE-DISSUR. accessed 10 October 2026.
- Plug, socket and voltage by country. WorldStandards. accessed 10 October 2026.
- Sector eléctrico en Nicaragua. Wikipedia (es). accessed 10 October 2026.
- Empresa Nicaragüense de Electricidad. ENEL. accessed 10 October 2026.
Questions about energy in Nicaragua.
GlobalPetrolPrices puts the household price at about NIO 6.47 per kWh (around US$0.18 or €0.16) in March 2026, including taxes. Tariffs are set by INE and depend on monthly consumption, with subsidies for small consumers.
DISNORTE-DISSUR distribute and sell electricity to households on the national grid. ENATREL owns the transmission network, the CNDC runs dispatch and the wholesale market, and INE regulates tariffs.
About 62% of domestic generation was renewable in 2023 (Ember) — biomass, geothermal, hydro, wind and some solar. Including imports, renewables met roughly half of demand.
Renewable self-generation below 5 MW can connect to the distribution network under the 2017 distributed generation regulation. Surplus energy is paid for only if you sign a purchase contract with the distributor.
The NIS (Número de Identificación de Suministro), a unique number assigned by DISNORTE-DISSUR to each supply and printed in the top right of the bill. It is held in the distributor’s own system, not a national register.
Yes. Through the SIEPAC regional line and market, imports have met about 21% of demand in recent years, according to the Ministry of Energy.