Energy in Fiji, explained.

How electricity works in Fiji: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Fiji: Not yet available.Olmack is not offered in Fiji yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Fiji.

Fiji electricity 2026: EFL as sole utility, FCCC-regulated tariffs and fuel surcharge, the lifeline subsidy, generation licences for solar, hydro-led mix and grid plans.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Fijian dollar (FJD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Fiji energy at a glance.

Key figures for households in Fiji. Each one links to its source on the full overview below.

  • Electricity price.

    0.449 FJD per kWh for households, including taxes. Figures for From 26 May 2026.

  • Renewable share.

    52% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Fiji.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Fiji below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Fiji requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Fiji.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Fiji, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Fiji, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Fiji.

Full overview

The energy market in Fiji, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Fiji’s public electricity supply is run by Energy Fiji Limited (EFL), the successor to the Fiji Electricity Authority, which generates, transmits, distributes and sells power on the four main grid-connected islands: Viti Levu, Vanua Levu, Ovalau and Taveuni. EFL says it supplies about 90% of the population. The largest system by far is the Viti Levu Interconnected System, which carried about 1,086 GWh of EFL’s 1,219 GWh of generation in 2024. There is no international interconnection, and each island grid runs on its own.

The Electricity Act 2017 came into force on 30 September 2019, when the Fijian Competition and Consumer Commission (FCCC) was appointed as the electricity regulator. The FCCC sets EFL’s tariffs and is the sole authority for generation and installation licensing; it licenses generating systems above 5 kW. EFL was corporatised in April 2018, and in March 2021 Sevens Pacific Pte Ltd, a consortium of The Chugoku Electric Power Company and the Japan Bank for International Cooperation, acquired a 44% shareholding.

Hydropower is the backbone of the system. IRENA counts 52% of 2023 generation as renewable: 42% from hydro (mainly the Monasavu scheme feeding Wailoa power station) and 9% from biomass, with the rest from diesel and heavy fuel oil. Solar and wind remain marginal. The government’s National Development Plan 2025–2029 and Vision 2050 target 100% renewable electricity, while EFL is aiming for more than 90% by 2035 and has the Asian Development Bank advising on 165 MW of solar with battery storage.

Energy snapshot.

Headline figures for electricity in Fiji. Each shows its data year and links to its source.

  • Population884,887 peopleSource 152017 (census, 17 September)
  • Households191,910 householdsSource 152017
  • Average household size4.6 people/householdSource 152017
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (FJD)0.449 FJD/kWhSource 1From 26 May 2026
  • Household price (EUR)0.177 EUR/kWhSource 16From 26 May 2026
  • Renewable electricity share52%Source 142023
  • Solar capacity0.011 GWSource 142024
  • Wind capacity0.01 GWSource 142024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Fijian Competition and Consumer Commission (FCCC)
System operator
Energy Fiji Limited (EFL)
Distribution networks
EFL is the only public distribution network operator and retailer, serving the grids on Viti Levu, Vanua Levu, Ovalau and Taveuni
Currency
Fijian dollar (FJD)
Voltage and frequency
240 V / 50 Hz

Electricity prices in Fiji.

Household price (FJD)
0.449 FJD/kWh (From 26 May 2026)Source 1Derived: interim domestic rate of FJD 0.3992/kWh VAT-exclusive (base tariff 0.3401 plus 0.0591 interim fuel surcharge, FCCC, effective 26 May 2026) plus VAT at 12.5% as applied on EFL bills (0.3992 × 1.125). Households with income of FJD 30,000 or less pay less for their first 100 kWh a month. Whether the step tariff authorised for 2026 has since replaced the flat rate was not confirmed from a published source.
Household price (EUR)
0.177 EUR/kWh (From 26 May 2026)Source 16Converted at the Reserve Bank of Fiji rate of FJD 1 = EUR 0.3939 on 9 October 2026 (0.4491 × 0.3939 = 0.177).
Typical annual electricity bill
Not identified from a reliable public source.

How prices are set

Under the Electricity Act 2017 the FCCC regulates EFL’s tariffs on application by EFL. Fiji charges one uniform tariff for each customer group across the country, regardless of island or the cost of supply. The domestic rate of 34.01 cents per kWh (VAT-exclusive) has applied since 1 October 2019. Bills are monthly and VAT at 12.5% is added; EFL’s worked example shows no fixed or standing charge.

The 2026 tariff review

In December 2025 the FCCC authorised a new tariff structure from 1 January 2026, with three domestic blocks (34.01 cents for 0–100 kWh, 35.03 cents for 101–300 kWh and 36.05 cents above 300 kWh) and an average 34.7% rise for commercial customers, linked to a FJD 1.57 billion investment programme. After public consultation, the FCCC announced on 1 May 2026 that implementation was deferred to 31 July 2026 and the 2019 structure remained in place. Whether the new structure took effect after that date was not confirmed from a published source.

Fuel surcharge

Following a sharp rise in fuel prices from March 2026, the FCCC approved an interim fuel surcharge of 5.91 cents per kWh on all energy rates from 26 May 2026. Domestic customers now pay 39.92 cents/kWh before VAT; commercial customers pay 46.90 cents up to 14,999 kWh a month and 48.86 cents above; industrial customers pay 33.72–38.61 cents/kWh plus demand charges of FJD 35.33–39.24 per kW. Customers taking supply at high voltage receive a 4% discount. The FCCC says it will reconcile the surcharge against EFL’s actual fuel costs and review it periodically.

Why fuel matters

Hydro output depends on rainfall at the Monasavu dam. EFL hired about 65 MW of diesel generating sets from June 2023 to cover low rainfall, costing about FJD 31 million in 2024, and its fuel bill reached FJD 211.07 million that year, the highest in its history.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesSingle flat domestic energy rate set by the FCCC: FJD 0.3401/kWh VAT-exclusive since 1 October 2019, plus an interim fuel surcharge of FJD 0.0591/kWh from 26 May 2026, giving FJD 0.3992/kWh. The same rate applies to institutions, places of worship and streetlights. VAT at 12.5% is added on the bill.
OtherLimitedLifeline subsidy: households with combined income of FJD 30,000 a year or less have the first 100 kWh each month subsidised (government pays 16.34 cents and the customer 17.67 cents of the 34.01-cent base rate). EFL reported 58,920 subsidised households in 2024. The government said it would also subsidise these customers for the 2026 fuel surcharge.
PrepaymentYesEFL had 57,146 prepay customers at the end of 2024, mainly in rural areas. Tokens can be bought from local vendors or digitally through the Vodafone M-PAiSA and Digicel mobile wallets, and are entered on an EFL-installed prepay meter.
Time-of-useNoNo domestic time-of-use tariff is published.
FixedNoEFL is the only supplier, so there are no competing fixed-price contracts.
DynamicNoThere is no wholesale market, so no wholesale-indexed tariffs.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Demand on the EFL grids is growing quickly. EFL sold 1,089 GWh in 2024, 8.9% more than the 1,000.4 GWh sold in 2023, and expects demand to rise by about 50% by 2035. Commercial and industrial customers account for most sales and revenue: at the end of 2024 EFL had 201,784 domestic customers (a class that also covers places of worship, institutions and streetlights), 21,647 commercial customers and 108 large industrial customers.

Households are a modest share of national energy use. IRENA’s energy balance shows households consuming 1,024 TJ of final energy in 2022, against 4,184 TJ in industry. In 2024, 58,920 households received the lifeline subsidy on their first 100 kWh a month and about a quarter of EFL customers were on prepay meters, but EFL does not publish the distribution of household consumption.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
55.9 % of population (2017)Source 15

Fiji is becoming steadily more urban: 55.9% of the population lived in urban areas in 2017, up from 50.7% in 2007, partly because urban boundaries were extended around Nadi, Lautoka and parts of Taveuni. Ba province, on Viti Levu’s western side, had the largest population (247,708), followed by Naitasiri (177,678), which includes much of greater Suva.

Land tenure shapes how homes get connected. EFL asks for proof of the right to occupy before it connects a new supply: a title deed, a landlord’s consent letter, a letter from the village chief or special forms for Crown and iTaukei (native) land. FCCC generation licence applications likewise need certified copies of the land title or rental agreement.

How the grid works in Fiji.

  1. TransmissionEnergy Fiji Limited (EFL), EFL National Control Centre (Vuda)
  2. DistributionEFL is the only public distribution network operator and retailer, serving the grids on Viti Levu, Vanua Levu, Ovalau and Taveuni
  3. MeteringEnergy Fiji Limited (EFL)
  4. Supply1 or more retail suppliers

Physical flow

Fiji’s largest power source is the Monasavu hydro scheme, commissioned in 1983, which feeds Wailoa power station in the interior of Viti Levu. Wailoa produced a record 504.9 GWh in 2024, against a typical 400 GWh. Other hydro stations are Nadarivatu (96.6 GWh in 2024), Wainikasou and Wainiqeu on Viti Levu and Somosomo on Taveuni. Thermal stations at Kinoya (Suva) and Vuda burn heavy fuel oil, and diesel sets run across the grids. IRENA put installed capacity at 463 MW in 2024: 237 MW fossil fuel, 138 MW hydro, 66 MW bioenergy, 11 MW solar and 10 MW wind. Fossil capacity rose by 65 MW in 2024 as EFL added diesel sets to cover low hydro output.

Power on Viti Levu flows from Wailoa over the 132 kV line to Vuda in the west and to Suva in the east, and on 33 kV lines and underground cables to zone substations, then on 11 kV feeders to local transformers. Vanua Levu, Ovalau and Taveuni have separate, smaller grids. EFL’s power line route totalled 11,871 km at the end of 2024.

Commercial flow

There is no wholesale market. EFL generates most power itself and buys the rest from independent power producers under power purchase agreements; in 2024 IPPs supplied 63.8 GWh, 5.2% of the total. New renewable projects are being procured through public-private partnerships, with the Asian Development Bank appointed in 2024 as transaction adviser for 165 MW of solar with battery storage. Every household and business buys from EFL at FCCC-regulated prices.

Who does what.

Who does what.
RoleOrganisationWhat it does
RegulatorFijian Competition and Consumer Commission (FCCC)Appointed electricity regulator under the Electricity Act 2017 from 30 September 2019. Sets EFL’s tariffs and surcharges, and is the sole authority for generation and installation licensing. EFL continues to carry out some regulatory functions, such as inspections, under a memorandum of agreement with the FCCC.
TSOEnergy Fiji Limited (EFL)Owns the 132 kV and 33 kV transmission networks. Viti Levu relies on a single 147.2 km 132 kV line from the Monasavu scheme to Vuda and the Cunningham Road switchyard in Suva; EFL plans more than 300 km of new 132 kV lines over the next decade.
System operatorEFL National Control Centre (Vuda)Dispatches EFL’s hydro, heavy-fuel-oil and diesel plant, the Butoni wind farm and independent power producers, and handles emergency calls.
DSOEnergy Fiji Limited (EFL)Runs the 11 kV and low-voltage networks in the Central, Western and Northern divisions and on Ovalau and Taveuni, and connects new supplies.
SupplierEnergy Fiji Limited (EFL)Sole retailer, billing post-pay and prepay customers at FCCC-approved tariffs.
MeteringEnergy Fiji Limited (EFL)Installs and maintains meters, including prepay meters and AMR meters, and has meter models certified annually under the National Trade Measurement Act 1989.
SettlementEFL as sole buyerBuys output from independent power producers under power purchase agreements, including the biomass generators Tropik Wood Industries, Fiji Sugar Corporation and Nabou Green Energy.

Compared with the UK system.

Compared with the UK system.
UK conceptFiji equivalentHow it works
DNOEFL (single network operator)There are no regional network companies. EFL owns and runs the distribution networks on every grid-connected island and is also the retailer, so the network operator and the supplier are the same company.
National Grid/NESOEFLEFL owns most generation and all transmission, and its National Control Centre at Vuda dispatches the system. The FCCC regulates it from outside; there is no independent system operator.
MPANEFL account numberA supply is identified by the account number in EFL’s billing system, printed on the bill and used to check balances, pay and use the Noqu EFL app. There is no separate national supply-point number.
MPRNNo equivalentThere is no piped natural-gas network for homes, so there is no gas supply-point register.
Meter operatorEFLEFL supplies, installs, tests and maintains meters, with meter models certified under the National Trade Measurement Act 1989 under the supervision of the Department of National Trade Measurements and Standards.
SupplierEFL (single supplier)Households cannot change supplier. Tariffs are set by the FCCC and are the same throughout the country.
Smart-meter infrastructureAMR rollout (pilot plus 50,000 meters)There is no DCC-style national data network. EFL piloted 2,500 automatic meter reading meters in the Central and Western divisions in 2023, allowing remote reading, disconnection and reconnection, and approved 50,000 more over five years from 2024.

How a supply point is identified.

Account No. 1234567 (fictional; illustrative only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?EFL account number (Account No.)
Who issues it?Energy Fiji Limited, when a new supply application is approved
FormatNumeric account number in EFL’s billing system, printed on the bill and on the barcoded Bill Care Card. EFL does not publish its length or structure; the meter has its own serial number.
LengthNot published by EFL
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the EFL bill and the wallet-sized Bill Care Card; also shown in the Noqu EFL app and portal.
Electronic accessEntering the account number in EFL’s online bill check shows the balance and due date. The Noqu EFL app and portal let customers view bills and monitor month-to-month usage, and 72% of post-pay customers were on e-billing at the end of 2024. Balances can also be checked by dialling *1333#.
Third-party accessNo regulated scheme gives installers or other third parties access to consumption data. Anyone with the account number can pay through cashiers, EFTPOS, M-PAiSA, MyCash, bank transfer and agents.
Who keeps the registerEFL’s customer and billing system
Register scopeNational

How a home is identified

In Fiji a household supply is identified by the account number EFL assigns to the customer’s account. It is printed on every bill and on the Bill Care Card, whose barcode can be scanned at EFL and third-party cashiers, and it is the key to EFL’s online bill check and the Noqu EFL app. Because EFL is the only network operator and supplier, there is no separate national supply-point register: EFL’s billing system is the register.

EFL does not publish the length or structure of the account number, so the example above is illustrative only. Prepay customers instead buy electricity tokens, from local vendors or by SMS through mobile wallets, and enter them on the prepay meter installed at the premises.

Connecting a new supply

A new connection starts with an EFL-licensed electrical contractor, who wires the premises with EFL’s permission and obtains a completion notice from an EFL inspector. The applicant then provides proof of ownership or occupation (title deed, landlord’s consent, village chief’s letter or Crown/iTaukei land forms), a tax identification number letter from the Fiji Revenue and Customs Service and photo identification, and pays a deposit set by EFL’s design and planning team according to maximum demand. EFL says processing takes 7–10 working days and installation about 14 working days after the deposit and completion certificate are received.

Who keeps the register

EFL keeps customer, account and meter records for all its grids. Security deposits are reviewed periodically and earn interest, credited quarterly to the bill, under section 20(3) of the Electricity Act 2017. EFL does not say whether the account number is reissued when a tenant changes, so it is not stated here whether the identifier stays with the property; the meter does.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidThe FCCC regulates the prices of feed-in tariffs under the Electricity Act 2017, and grid-connected solar is a licensed installation category. A current published export rate for households was not identified.
Is there a size threshold?The FCCC issues generation licences for systems rated above 5 kW, in three fee bands: 5–100 kW (FJD 109 issue, FJD 24.65 a year), 100–500 kW (FJD 218 and FJD 49.30) and above 500 kW (FJD 327 and FJD 123.20). Licences are valid for five years.
Are households paid for exported power?The FCCC has power to regulate feed-in tariff prices, but no current household export tariff or net-metering scheme was identified on the FCCC or EFL websites.
Which standards apply?AS/NZS 3000:2018 (the Wiring Rules adopted by the Electricity Regulations 2019), CEC listing or ISO certificates for solar equipment, and any codes of practice issued by EFL as the public electricity supplier.
Can batteries be included?Yes. The FCCC application requires battery specifications to be shown on the electrical drawings alongside the inverter and panels.
Who inspects the system?EFL inspectors inspect and test licensed installations during and after construction and issue a certificate of compliance and registration before connection.

Connecting a home system.

  1. Engage an electrical contractor and licensed wiring person; the installation must follow the AS/NZS 3000:2018 Wiring Rules and the Electricity Regulations 2019.
  2. For a generating system above 5 kW, the contractor applies to the FCCC for a generation licence, with JP-certified land title or rental agreement, contractor and wireman licences, and electrical drawings showing cable sizes, the MEN system, protection ratings and inverter, panel and battery specifications.
  3. Provide equipment certification: Clean Energy Council (CEC) listing or ISO certificates for solar equipment, and a supplier declaration of safety for equipment imported into Fiji.
  4. Pay the licence issue fee (FJD 109 for 5–100 kW) and then the annual fee (FJD 24.65).
  5. Inform the EFL inspector in writing before the installation is connected; EFL inspects and tests it and issues a certificate of compliance and registration.

Fiji has had a solar market for more than two decades, but solar’s contribution to generation remains about 1%. The FCCC, which has been the sole authority for generation and installation licensing since 30 September 2019, has acknowledged that licensing and installation approval are barriers. Research by Australia’s Market Development Facility and Solar Hub Fiji found that nearly 70% of surveyed urban households would invest in solar with their own funds, and 50% were interested in loans or subscription models.

In August 2026 the FCCC soft-launched an online Electronic Generation Licence (EGL) portal, built with the Market Development Facility, so that electrical contractors can register and submit generation licence applications digitally rather than on paper. The FCCC said the portal would move fully online after a testing phase of a few weeks. The rules on how exported power is credited were not published on the FCCC or EFL websites at the time of research, so export is shown here as limited.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (above 5 kW)Generation licence from the FCCC, valid for five years, with an issue fee and an annual fee (FJD 109/24.65 for 5–100 kW, 218/49.30 for 100–500 kW, 327/123.20 above 500 kW).Fijian Competition and Consumer CommissionElectricity Act 2017 and Electricity Regulations 2019, Schedule 1. Applications by electrical contractors, moving to the online EGL portal from August 2026.
Generate on own premises (up to 5 kW)The FCCC states that it issues generation licences for systems above 5 kW. The installation must still be wired by a licensed contractor to AS/NZS 3000 and inspected by EFL before connection.FCCC; EFL (inspection)A formal exemption order for small systems was not identified.
Operate a standby or standalone generatorCovered by the FCCC licensing categories for standalone and backup generators, with the same capacity-based fee bands above 5 kW.Fijian Competition and Consumer CommissionListed on the FCCC Electrical Technical Regulations page.
Store electricityNo separate storage licence identified; batteries are declared as part of a generation licence application.Fijian Competition and Consumer CommissionBattery specifications must appear on the electrical drawings.
Export to the gridOnly from a licensed, EFL-inspected installation; compensation arrangements not published.FCCC; EFLThe FCCC regulates feed-in tariff prices.
Independent power production (utility scale)FCCC generation licence plus a power purchase agreement with EFL, increasingly awarded through public-private partnership tenders.FCCC; EFLExamples: Sunergise Dratabu 5 MW solar (PPA 2021) and Ovalau Agro-Solar 4 MW (PPA November 2023).
Supply / retail to third partiesSupply licence from the FCCC; EFL is the only public electricity supplier.Fijian Competition and Consumer CommissionA licensee may not charge consumers more than the maximum set in its licence.
Transmission and distributionTransmission licence from the FCCC; carried out by EFL.Fijian Competition and Consumer CommissionElectricity Act 2017.
Wholesale tradingNot applicable: there is no wholesale market or exchange.—Bulk purchases are bilateral PPAs with EFL.
Aggregation / virtual power plantNo licence category for aggregators identified.—No market exists for aggregated distributed resources.
Balancing and grid servicesProvided by EFL with its own plant; no third-party procurement published.EFLEFL as public electricity supplier may issue directions to licensees to protect reliability, security and voltage.
Remote control of customer assetsNo dispatch or control right over household systems identified.—EFL’s AMR meters allow remote disconnection and reconnection of supply.
Electrical installation workElectrical contractor’s licence and wiring person’s licence under Part 5 of the Electricity Regulations 2019; the contractor must obtain permission before wiring premises.Licences under the Electricity Regulations 2019; EFL contractor licensing teamEFL publishes a quarterly list of valid licensed contractors.

The Electricity Act 2017 and the Electricity Regulations 2019 took effect on 30 September 2019. They transferred regulation from the old Fiji Electricity Authority, which had both supplied power and licensed electricians, to the FCCC. The FCCC now issues generation, transmission and supply licences, while EFL, as the “public electricity supplier”, still inspects installations and registers new ones under a memorandum of agreement.

For distributed solar the practical gateway is the generation licence for systems above 5 kW, applied for by the installing contractor. Licence conditions oblige the licensee to follow the Act, the regulations, the AS/NZS Wiring Rules, EFL’s safety manual and any codes of practice EFL issues, and to notify EFL’s inspector before the system is connected to supply.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency and reserveNo—NoEFL. Provided by EFL’s hydro, thermal and hired diesel plant; no market is open to distributed assets.
Renewable IPP procurementRestricted—NoEFL (ADB as transaction adviser). Utility-scale solar, wind and battery projects are being tendered as public-private partnerships, including 21 MW of solar at Ba, Tavua and Nadi and a planned 165 MW of solar with storage.
Demand responseNo—NoNo household demand-response programme or time-of-use tariff is published. EFL’s strategy refers to future demand-side management enabled by smart metering.

Fiji has no flexibility market and no legal role for aggregators. EFL balances each island grid with its own plant, relying on Monasavu’s reservoir for storage and on diesel and heavy-fuel-oil engines when rainfall is low.

The main flexibility challenge is integrating variable renewables into small grids. EFL began a review of its Grid Operating Code in 2024 to cover new renewable generation from independent producers, and says modern substations, SCADA and grid analytics will help it balance solar and wind. It is also exploring pumped hydro at its existing dams.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Noqu EFLEFL’s customer app and portal for bills and usage. It is not a flexibility platform.
FCCC Electronic Generation Licence (EGL) portalOnline licence applications for contractors installing generating systems, soft-launched in August 2026.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutAMR rollout under way: 2,500-meter pilot in 2023, 50,000 more approved over five years from 2024
Reading intervalMonthly billing reads
Meter ownershipEFL installs, maintains and tests all meters
AMR pilot2,500 meters in the Central and Western divisions (2023): remote reading, disconnection and reconnection
Planned AMR deployment50,000 meters over five years from 2024
Prepay customers57,146 at the end of 2024, mainly rural
Meter certificationAnnual certification of meter models under the National Trade Measurement Act 1989
Online accessNoqu EFL app and portal; online bill check by account number

Most EFL customers have post-pay meters read for monthly bills, and just over a quarter use prepay meters. EFL’s 2024 annual report describes an automatic meter reading pilot of 2,500 meters in 2023, which allowed remote reading, disconnection and reconnection; after its success the board approved 50,000 more meters to be deployed over five years. EFL also tests meters for accuracy: each year random samples of each meter model are tested under the supervision of the Department of National Trade Measurements and Standards, and models that fail are phased out.

Renewable electricity.

Electricity generation mix (2023).

  • Oil (heavy fuel oil & diesel): 48%
  • Hydro: 42%
  • Bioenergy: 9%
  • Solar: 1%
Source 14
Renewable electricity share
52% (2023)Source 14IRENA: 670 GWh renewable of 1,285 GWh generated (hydro 540, bioenergy 116, solar 14). EFL’s own 2024 generation statistics show hydro at 51.7% and independent (biomass) producers at 5.2% of its 1,219 GWh, a renewable share of about 57%.
Home solar
Not identified from a reliable public source.
Solar added each year
0 MW (2024)Source 14IRENA records essentially no change in solar capacity in 2024 (+0.1%); solar capacity grew 24% between 2019 and 2024.
Hydro
138 MW (2024)Source 14
Bioenergy
66 MW (2024)Source 14
Solar PV
11 MW (2024)Source 14
Wind
10 MW (2024)Source 14
Fossil fuel (oil-fired)
237 MW (2024)Source 14Includes 65 MW added in 2024.

Targets.

  • 100% renewable electricity generation by 2050 (National Development Plan 2025–2029 and Vision 2050)
  • 93% rural electricity access (National Development Plan 2025–2029)
  • EFL: more than 90% of its electricity from renewables by 2035
  • NDC: 30% reduction in carbon emissions through moving electricity production to renewables

Fiji’s renewable electricity is mostly hydro. The Monasavu scheme and Wailoa station are the core, supplemented by Nadarivatu (commissioned 2012), smaller stations and biomass from sugar mills and timber processing, sold to EFL by Fiji Sugar Corporation, Tropik Wood Industries and Nabou Green Energy. Hydro output swings with rainfall: EFL’s hydro generation fell 9.8% in 2023 and rose 16.9% in 2024.

Solar is still small. EFL’s first solar farm, a 1 MW plant with battery storage at Mua on Taveuni, began operating in March 2024. Larger projects are at the agreement or tender stage: the 5 MW Dratabu solar plant (Sunergise, PPA 2021), the 4 MW Bureta agro-photovoltaic plant on Ovalau (PPA November 2023, with a battery funded by KOICA), 21 MW of solar at Ba, Tavua and Nadi prepared with the IFC, and a planned 165 MW of solar with storage under ADB advice. The FCCC’s December 2025 tariff decision listed the 28 MW Lower Ba and 21 MW Qaliwana hydro schemes among planned investments, with a goal of 60% renewables by 2029.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Battery storage in Fiji is at an early stage, tied to new solar plants on the smaller grids. The FCCC’s December 2025 tariff decision included 10 MW of battery storage alongside 165 MW of solar from independent producers. EFL is also looking at pumped hydro using its existing dams and at hydrogen for long-term storage.

Storage projects.

  • Mua solar farm and battery, Taveuni: 1 MW grid-connected solar with battery storage, commissioned March 2024 and built by Clay Energy; supplied 3.5% of Taveuni’s 2024 energy alongside hydro and diesel.
  • Bureta agro-photovoltaic plant, Ovalau: 4 MW solar plant under a November 2023 PPA with Ovalau Agro-Solar; KOICA has committed to provide the battery system.
  • ADB-advised solar and battery programme: 165 MW of solar integrated with battery storage on EFL’s grid, with concessional finance from the Climate Investment Funds’ Renewable Energy Integration programme.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Energy Fiji Limited (EFL)Sole public supplier; 223,539 customers at end of 2024NoNoNoUnknown

EFL is the only public electricity supplier. Households cannot switch, and every customer group pays one national tariff set by the FCCC. Bills can be paid at nine customer care centres, through EFTPOS and Carpenters Max Val-u agents, by bank transfer and through M-PAiSA and MyCash mobile wallets. Since 2018 EFL has also given 5% non-voting shares to qualifying domestic account holders.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Fijian Competition and Consumer Commission (FCCC)RegulatorElectricity regulator under the Electricity Act 2017Sets tariffs and surcharges and issues generation, transmission and supply licences, including for grid-connected solar.
Energy Fiji Limited (EFL)DistributionGeneration, transmission, distribution, supply and meteringRuns every public grid, connects and inspects installations and buys power from independent producers.
Market Development Facility (MDF)SolarAustralian-funded programme working with the FCCC on solar licensingCo-developed the online generation licence portal and commissioned household solar demand research.
Fiji Bureau of StatisticsGovernmentNational statistics officePublishes the census data on population, households and urbanisation.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Electrical installationAS/NZS 3000:2018 (Wiring Rules)Adopted by the Electricity Regulations 2019As amended from time to time, including by the Regulator or by EFL with the Regulator’s approval.
Solar equipmentClean Energy Council (CEC) listing or ISO certificatesFCCC licensing requirementsRequired with generation licence applications, with inverter, panel and battery specifications on the drawings.
Product safetySupplier DeclarationFCCC licence application (Schedule 8)The supplier or importer declares that equipment supplied into Fiji is safe and accepts responsibility for it.
Supply voltage and frequencyElectricity Regulations 2019, regulations 5–6Government of Fiji240 V single-phase, 415/240 V three-phase, 50 Hz; voltage within ±6% and frequency within ±2%.
Grid connectionEFL Grid Operating Code and codes of practiceEnergy Fiji LimitedUnder review since 2024 to accommodate renewable generation from independent producers; a published copy was not identified.
MeteringNational Trade Measurement Act 1989, section 15(1)Department of National Trade Measurements and StandardsAnnual certification of meter models used by EFL.

Permissions.

Permissions.
PermissionRequiredLevelDetail
FCCC generation licenceLimitedNationalRequired for generating systems rated above 5 kW; applied for by the electrical contractor.
EFL inspection and certificate of complianceYesNationalEFL must be told in writing before an installation is connected; its inspector tests the work and registers the installation.
Permission to carry out wiringYesNationalA licensed contractor must obtain permission before wiring premises; contractors can lodge permits with EFL electronically.
Proof of land tenureYesNationalJP-certified land title or rental agreement for licence applications; title, landlord’s consent or village chief’s letter for new EFL connections.
Planning permissionUnknownLocalA specific planning rule for rooftop solar was not identified.

Permission for a solar system involves two bodies: the FCCC, which licenses generating systems above 5 kW, and EFL, whose inspectors check and register the installation before it is connected. In 2025 the FCCC and the Market Development Facility identified this licensing and approval process as a barrier to solar uptake, and the online licence portal launched in August 2026 is the first result.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Government electricity subsidy (lifeline)ActiveBill subsidyHouseholds with combined income of FJD 30,000 a year or less have their first 100 kWh a month subsidised: the government pays 16.34 cents and the customer 17.67 cents per kWh. 58,920 households benefited in 2024. The government also undertook to subsidise lifeline customers for the May 2026 fuel surcharge.From 1 April 2020 (current rates)
School electricity subsidyActiveBill subsidyThe government pays 37.78% of the cost of the first 200 kWh a month for primary and secondary schools; 1,039 schools benefited in 2024.—

Data and connectivity.

Fixed broadband
Not identified from a reliable public source.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Mobile networks underpin much of Fiji’s electricity customer service. Prepay customers buy tokens by SMS through Vodafone M-PAiSA and Digicel MyCash, balances can be checked by USSD (*1333#), and EFL’s 5333 short code works on the Vodafone, Digicel and Inkk networks. EFL’s AMR meters communicate remotely for billing reads and disconnections.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
1.089 TWh (2024)Source 9EFL electricity sales (1,089 GWh). Total generation was 1,219 GWh.
Generation capacity
0.463 GW (2024)Source 14
Interconnection
0 GWSource 9Isolated island grids with no international interconnection.
Curtailment
Not identified from a reliable public source.

The Viti Levu grid depends on a single 132 kV line from Monasavu, so EFL is building a 30 km 132 kV line from Virara to Koronubu in Ba, with a switching station and a 132/33 kV substation, to strengthen supply to the north-west and carry power from future hydro and solar projects; it was due for completion at the end of 2025. EFL is also building 20 MW of thermal capacity at Kinoya and 30 MW at Vuda.

Reliability is measured by EFL: in 2024 the average customer saw 3.08 interruptions (SAIFI) and 218 minutes without supply from controllable outages (SAIDI). Tropical cyclones are a major risk, and EFL plans stronger towers, more underground lines and redundant routes.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Electricity Act 2017 in force; FCCC appointed regulatorCurrent30 September 2019Regulation of tariffs and licensing moved from the former Fiji Electricity Authority to the FCCC; the Electricity Regulations 2019 took effect the same day.
Interim fuel surchargeCurrent26 May 20265.91 cents/kWh added to all energy rates, taking the domestic rate to 39.92 cents/kWh before VAT; subject to FCCC reconciliation and periodic review.
Online generation licence portalCurrentSoft launch 28 August 2026Contractors can register and submit generation licence applications online; full transition after a testing phase.
New step tariff structureUpcomingAuthorised from 1 January 2026; deferred to 31 July 2026; later status not confirmedThree domestic blocks (34.01, 35.03 and 36.05 cents/kWh) and an average 34.7% rise for commercial customers, linked to a FJD 1.57 billion investment plan.
Generation capacity reinforcement on Viti LevuUpcomingUnder construction (2024–)20 MW thermal plant at Kinoya and 30 MW at Vuda, built by Pernix Fiji, about FJD 220 million.
Utility-scale solar and storage procurementUpcomingTendering from 2024165 MW of solar with battery storage under ADB advice, plus 21 MW at Ba, Tavua and Nadi through PPPs.
Grid Operating Code reviewUpcomingCommenced 2024Update of grid rules to integrate new renewable generation from independent producers.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowTotal solar capacity was 11 MW in 2024 (IRENA) and solar supplied about 1% of generation; no residential capacity figure or household export tariff is published.
Distributed energy marketLowSystems above 5 kW need an FCCC licence and EFL inspection; the FCCC identified licensing as a barrier and only moved applications online in August 2026.
Grid flexibility marketLowNo flexibility or balancing market and no aggregator licence; EFL balances the system with its own plant.
Energy storage adoptionLowOne small battery at the 1 MW Mua solar farm; further batteries are planned with new solar projects but none of scale is operating.
Renewable growth environmentLowRenewable capacity grew 5% between 2019 and 2024 and not at all in 2024, while 65 MW of fossil capacity was added; a large solar and hydro pipeline is still at the tender or study stage.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 16 sources
  1. Media release: FCCC concludes review of Energy Fiji Limited surcharge application and bus fares. Fijian Competition and Consumer Commission, 2026. accessed 10 October 2026.
  2. Media release: FCCC announces new electricity tariffs. Fijian Competition and Consumer Commission, 2025. accessed 10 October 2026.
  3. Media release: Electricity tariff review update. Fijian Competition and Consumer Commission, 2026. accessed 10 October 2026.
  4. Media release: FCCC takes energy generation licence applications online. Fijian Competition and Consumer Commission, 2026. accessed 10 October 2026.
  5. FCCC and Australia’s MDF partner to boost use of solar energy in Fiji. Fijian Competition and Consumer Commission / Market Development Facility, 2025. accessed 10 October 2026.
  6. New electrical licence for installation and generation (Electrical Technical Regulations). Fijian Competition and Consumer Commission, 2026. accessed 10 October 2026.
  7. Licences application form (Schedule 8), updated 16 April 2026. Fijian Competition and Consumer Commission, 2026. accessed 10 October 2026.
  8. Electricity Act 2017 commencement, appointment of Regulator and Electricity Regulations 2019 (Legal Notices 88–90). Government of Fiji Gazette, 2019. accessed 10 October 2026.
  9. Energy Fiji Limited 2024 Annual Report. Energy Fiji Limited, 2025. accessed 10 October 2026.
  10. Electricity tariffs and rates (home). Energy Fiji Limited. accessed 10 October 2026.
  11. Calculating your bill. Energy Fiji Limited. accessed 10 October 2026.
  12. New connections. Energy Fiji Limited. accessed 10 October 2026.
  13. Electrical contractors. Energy Fiji Limited. accessed 10 October 2026.
  14. Energy Profile: Fiji. IRENA, 2025. accessed 10 October 2026.
  15. 2017 Population and Housing Census, Release 1: Age, Sex, Geography and Economic Activity. Fiji Bureau of Statistics, 2018. accessed 10 October 2026.
  16. Exchange rates (9 October 2026), as displayed on the Reserve Bank of Fiji website. Reserve Bank of Fiji, 2026. accessed 10 October 2026.