How electricity works in New Caledonia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in New Caledonia: Not yet available.Olmack is not offered in New Caledonia yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in New Caledonia.

New Caledonia electricity 2026: Enercal single buyer and grid operator, EEC Engie and Enercal distribution, uniform regulated tariffs, rooftop solar self-consumption rules and STENC targets.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in CFP franc (franc Pacifique) (XPF) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

New Caledonia energy at a glance.

Key figures for households in New Caledonia. Each one links to its source on the full overview below.

  • Electricity price.

    46.58 XPF/kWh (excl. TGC) per kWh for households, including taxes. Figures for From 1 Oct 2026.

  • Renewable share.

    26.9% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in New Caledonia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for New Caledonia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications New Caledonia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in New Caledonia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in New Caledonia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in New Caledonia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in New Caledonia.

Full overview

The energy market in New Caledonia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

New Caledonia is a French overseas collectivity in the south-west Pacific, but energy is a local competence: under the Organic Law of 16 March 1999 the Congress and Government of New Caledonia set electricity policy, approve tariffs and license generation, not Paris. The Direction de l’Industrie, des Mines et de l’Énergie (DIMENC) is the government department that prepares and applies the rules.

The system has one transmission operator and buyer, Enercal, which owns the 1,203 km transmission network on Grande Terre, runs the central dispatch office and buys electricity from all producers on the public grid. Distribution is split between two concession holders chosen commune by commune: Enercal (25 of the 33 communes plus Tontouta airport) and EEC (Électricité et Eau de Calédonie, part of ENGIE), which serves Nouméa and the remaining communes. The retail price is the same everywhere in the territory.

Generation is dominated by the nickel industry. Of about 2,096 GWh produced a year, only about 738 GWh goes to public distribution; the rest supplies smelters and mines from their own coal- and oil-fired plants. Ember data put renewables at about 27% of all generation, but Enercal reports a 68% renewable share in the public-distribution mix, from hydro, solar and wind. Tariffs, held below cost for a decade, are being raised in stages under a 2024 decision, and will be indexed quarterly from January 2027.

Energy snapshot.

Headline figures for electricity in New Caledonia. Each shows its data year and links to its source.

  • Population264,596 peopleSource 12025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (XPF)46.6 XPF/kWh (excl. TGC)Source 2From 1 Oct 2026
  • Household price (EUR)0.39 EUR/kWh (excl. TGC)Source 3From 1 Oct 2026
  • Renewable electricity share26.9%Source 42025
  • Solar capacityNot identified from a reliable public source.
  • Wind capacity0.054 GWSource 62015
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Government of New Caledonia (tariffs, authorisations), with DIMENC as energy administration; no independent regulator
System operator
Enercal (transmission network manager and central dispatch)
Distribution networks
Two concession-based distributors chosen by the communes: EEC (ENGIE) in Nouméa and other communes, Enercal in 25 communes; uniform tariff with péréquation.
Currency
CFP franc (franc Pacifique) (XPF)
Voltage and frequency
220 V / 50 Hz

Electricity prices in New Caledonia.

Household price (XPF)
46.6 XPF/kWh (excl. TGC) (From 1 Oct 2026)Source 2Regulated domestic low-voltage energy rate for a subscribed power above 3.3 kVA, shown by EEC excluding tax (“hors taxes”). Homes at or below 3.3 kVA pay 41.81 XPF/kWh, and prepayment-meter customers 57.09 XPF/kWh. An annual power charge per kVA is added (5,782–10,320 XPF/kVA/yr by band). The rate applicable to electricity under the general consumption tax (TGC, rates 3/6/11/22%) was not verified.
Household price (EUR)
0.39 EUR/kWh (excl. TGC) (From 1 Oct 2026)Source 3Converted from 46.58 XPF/kWh at the fixed parity shown by IEOM, 1,000 XPF = 8.38 EUR (accessed 2026-10-10): 46.58 × 0.00838 = 0.390. The ≤3.3 kVA rate (41.81 XPF) equals about €0.35/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

Electricity prices are public tariffs fixed by the Government of New Caledonia. The framework dates from deliberation no. 195 of 5 March 2012 on the electricity system and government orders of July 2013 setting how tariffs are calculated and how producers’ purchase contracts and cost accounts are approved, with advice from the Commission des Coûts du Système Électrique (CCSE), on which EEC, Enercal, the government and the chamber of commerce sit. Transmission and distribution components are adjusted using indices linked to ISEE price and construction indices.

One price everywhere

A household in Nouméa, on the east coast of Grande Terre or on the Loyalty Islands pays the same tariff. Two equalisation flows make this possible: payments between the two distributors to even out their different costs, and an adjustment between the transmission level and the distributors to absorb differences in generation costs. Enercal, as sole buyer of all production for the public grid, sits at the centre of these flows.

A decade of under-recovery

Enercal states that electricity sold at about 39 XPF/kWh cost about 47 XPF/kWh including tax, and that successive governments postponed tariff rises after fuel price spikes. The gap was carried by Enercal, to which New Caledonia owes more than 20 billion XPF accumulated since 2013; advances of 6 billion XPF in 2024 and 4.9 billion in 2025 were made, with 2.8 billion forecast for 2026. Deliberation no. 431 of 22 August 2024 provides for prices to be brought into line with real costs over 2024–2026: a 10.13% increase excluding tax took effect on 1 October 2024 and a further increase on 1 October 2026, before quarterly automatic indexation from 2027.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesDomestic low-voltage tariff set by the Government, identical with EEC and Enercal. From 1 October 2026 (excl. tax): ≤3.3 kVA, 5,782 XPF/kVA/yr plus 41.81 XPF/kWh; 3.3–6.6 kVA, 8,051 XPF/kVA/yr plus 46.58 XPF/kWh; above 6.6 kVA, 10,320 XPF/kVA/yr plus 46.58 XPF/kWh.
PrepaymentYesSingle-phase prepayment meter option for small domestic supplies at 57.09 XPF/kWh (EEC, from 1 October 2026).
VariableYesUnder deliberation no. 431 of 22 August 2024, prices are being aligned with system costs over three years, after which, from 1 January 2027, tariffs move automatically each quarter, up or down, with the costs of the electricity system.
Time-of-useNoNo domestic peak/off-peak tariff. Peak and off-peak periods exist only in the irrigation tariff.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
7,922 kWh/person/yr (all generation, incl. industry) (2025–26)Source 13Derived: about 2,096 GWh produced a year (Enercal, 12 months to June 2026) ÷ 264,596 residents (2025 census). Dominated by nickel metallurgy; public distribution alone (738 GWh) is about 2,790 kWh per resident.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Two very different consumers share the system. The nickel industry, with its smelters and mines, accounts for most of the roughly 2,096 GWh produced each year, much of it from its own coal- and oil-fired plants. Public distribution, covering homes, businesses and public services, took about 738 GWh over the 12 months to June 2026, of which EEC distributes about 700 GWh a year to more than 80,000 customers and Enercal serves 42,145 contracts in the rest of the territory.

There are about 112,889 electricity contracts in total. STENC 2, adopted in 2023, aims to cut energy consumption in homes and the tertiary sector by at least 30% compared with 2019 by 2030.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
68.2 % of population (2025)Source 24World Bank (UN World Urbanization Prospects).

Population is concentrated in Greater Nouméa in the Southern Province, which lost residents between the 2019 and 2025 censuses (−4%), while the Northern and Loyalty Islands provinces grew slightly.

ISEE is running a dedicated housing survey (Enquête Logement Nouvelle-Calédonie) from 14 September to 18 December 2026, which should provide updated tenure and dwelling-type data.

How the grid works in New Caledonia.

  1. TransmissionEnercal, Enercal – Bureau Central de Conduite (BCC)
  2. DistributionTwo concession-based distributors chosen by the communes: EEC (ENGIE) in Nouméa and other communes, Enercal in 25 communes; uniform tariff with péréquation.
  3. MeteringNot identified from a reliable public source.
  4. Supply2 or more retail suppliers

The physical chain runs from power stations on Grande Terre (Enercal’s hydro and thermal plants, independent wind and solar farms, and industry-linked plants) over Enercal’s transmission lines to the two distributors’ networks. The Loyalty Islands, Île des Pins and Bélep have their own small networks supplied by Enercal.

Commercially, Enercal is the single buyer. Producers sell to Enercal under contracts approved by the government; Enercal sells to the distributors at a transmission tariff; and the distributors sell to end users at the public tariff. A government-approved Programmation Pluriannuelle des Investissements (PPI) decides which new capacity is authorised, so new solar and wind plants are selected through government processes rather than a market.

Under the organic law, transmission and distribution are New Caledonian competences. High-voltage (HTB) lines need prior government authorisation, while medium-voltage (HTA) lines must be declared within a month of installation.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryGovernment of New Caledonia (member responsible for energy)Sets public electricity tariffs, approves producers’ contracts and the multi-year investment programme (PPI), authorises generation plants and adopts concession specifications. The Congress adopts the STENC and framework deliberations.
RegulatorDIMENC – Direction de l’Industrie, des Mines et de l’Énergie (energy service)Government administration that prepares energy policy and regulation, processes solar and generation authorisations, and runs the Observatoire de l’énergie. There is no independent energy regulator.
TSOEnercalConcession holder for the public transmission network on Grande Terre (1,203 km). Prepares the 10–15-year network development scheme approved by the government.
System operatorEnercal – Bureau Central de Conduite (BCC)Balances supply and demand in real time and dispatches plants. As sole buyer of all production for the public grid, Enercal purchased and delivered 417 GWh to distributors in the 12 months to June 2026.
DSOEEC – Électricité et Eau de Calédonie (ENGIE)Distributes electricity under nine commune concessions, including Nouméa; more than 80,000 customers and about 700,000 MWh a year. Founded in 1929 (formerly Unelco).
DSOEnercal (distribution)Distribution concessions in 25 communes plus Tontouta airport, including the islands; 42,145 contracts and 4,921 km of distribution network (June 2026).

Compared with the UK system.

Compared with the UK system.
UK conceptNew Caledonia equivalentHow it works
DNOConcessionnaire de distribution (EEC or Enercal)Each commune, or group of communes, grants a distribution concession to EEC or Enercal on a government standard specification (arrêté 2019-355/GNC). The concession holder owns and operates the local network exclusively and also sells electricity to customers in that area.
National Grid/NESOEnercal (gestionnaire du réseau de transport et du système)Enercal owns the Grande Terre transmission network, dispatches production through its central control office and buys all production for the public grid. The islands have separate small networks.
MPANDistributor’s contract/customer reference and meter numberThere is no territory-wide supply-point number. Each distributor identifies a supply by its own contract and the meter installed at the premises.
MPRNNo equivalentNo residential gas-network identifier was identified; DIMENC publishes public gas tariffs alongside electricity and fuel tariffs.
Meter operatorThe distributorEEC and Enercal install, own and read the meters in their concession areas, including two-way meters for solar self-consumption.
SupplierThe distributor (no retail competition)Households cannot choose a supplier; the distribution concession holder for the commune is also the retailer, at the government tariff.
Smart-meter infrastructureDistributor-led meter programmesNo territorial smart-meter mandate or data hub. EEC is installing a powerline-communication meter with an app for consumption data.

How a supply point is identified.

Contrat 1234567 / Compteur 09876543 (fictional; illustrative only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Contract reference and meter number (référence contrat / numéro de compteur)
Who issues it?The distribution concession holder (EEC or Enercal)
FormatDistributor-specific numeric customer/contract reference printed with the meter serial number on the bill. Neither distributor publishes a format specification.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity bill and in the distributor’s online customer area (EEC online contract service; Enercal online agency).
Electronic accessThrough each distributor’s customer portal; EEC customers with the new meter can follow consumption in the EEC SMART app.
Third-party accessNo regulated third-party data access. Solar installers submit connection forms to the distributor on the customer’s behalf.
Who keeps the registerEach distributor’s customer and metering system
Register scopePer DSO

New Caledonia has no equivalent of the UK MPAN or the French PRM. Because the distributor in each commune is also the only retailer, there is no switching and no need for a central register of supply points. A connection is identified by the distributor’s contract and the meter at the address.

A new occupant opens a contract with the distributor serving the commune. EEC offers a fully online process: complete a form, sign the contract electronically and pay an advance on consumption (avance sur consommation). The subscribed power, in kVA, determines both the annual power charge and the energy rate band.

The identifier matters most when solar is added. A self-consumption installation needs a DIMENC authorisation receipt, a safety inspection certificate from COTSUEL and a connection request to the distributor (EEC form or Enercal procedure), after which the distributor fits a two-way meter recording imports and exports on the same supply.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringNo
Net billingNo
How exported electricity is paidSelf-consumption: surplus may be injected but receives no payment. The 15 XPF/kWh full-export (revente totale) quota for rooftop systems under 250 kWp is fully allocated.
Is surplus paid for?No. Under the self-consumption regime, electricity injected into the grid cannot be financially remunerated; imports are billed at the public tariff.
Can I sell all output?The full-export scheme at 15 XPF/kWh for rooftop systems under 250 kWp has no remaining quota (“reste à autoriser: 0 kWc”).
Larger systemsFor 250–750 kWp, 5,059 kWp remained available as of 26 September 2024. Ground-mounted and larger plants on Grande Terre are selected by comparative scoring under the PPI.
Legal basisArrêté 2020-2215/GNC of 29 December 2020 (amended 8 February 2023), within the PPI framework of arrêté 2016-1931/GNC.

Connecting a home system.

  1. Size the system for self-consumption; check whether the site is near an aerodrome (civil aviation review).
  2. For systems under 250 kWp, apply online to DIMENC; a receipt is issued and a one-month regulatory period applies.
  3. For 250–750 kWp, file a full dossier; works may start only after a government operating authorisation order.
  4. Install with an inverter set to the New Caledonia grid profile (Profil NC 2022) and obtain a COTSUEL safety conformity certificate.
  5. Submit the connection request to the distributor (EEC or Enercal) and sign the specific conditions; a two-way meter is fitted.

Rooftop solar is designed for self-consumption. Households may connect a system and use its output, but any surplus fed into the grid is unpaid, so systems are sized to on-site demand and batteries can raise self-consumption. All installations connected to a public network, whatever their size, need a government authorisation; for small systems this is a light online procedure with DIMENC.

Earlier schemes paid 15 XPF/kWh for total export from building-mounted systems, but that quota is used up. DIMENC reported that more than 700 private individuals, businesses and communes installed rooftop solar in the first years of the STENC.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity on the public gridGovernment operating authorisation for any installation connected to a public network, whatever its size; projects must fit the PPI capacity envelopes.Government of New Caledonia / DIMENCCriteria in arrêté 2012-1283/GNC; sale under a contract with Enercal approved by the government.
Rooftop solar self-consumption (<250 kWp)Online authorisation request to DIMENC; receipt issued, one-month period; no individual order.DIMENCCOTSUEL certificate and distributor connection required.
Self-consumption 250–750 kWpFull dossier and government operating authorisation order before works.Government of New CaledoniaWithin remaining quota.
Off-grid generation above 1 MWGovernment authorisation even when not connected to the public network.Government of New CaledoniaCaptive industrial plants fall here.
Export / sell electricityOnly to Enercal as single buyer under a government-approved contract; small self-consumers receive nothing for surplus.Government / EnercalFull-export rooftop quota exhausted.
Store electricityNo separate storage licence identified; grid-connected storage is developed by Enercal or through PPI-authorised projects.Government / DIMENCBehind-the-meter batteries follow the solar installation rules.
Transmit or distribute electricityConcession: transmission granted by New Caledonia to Enercal; distribution granted by communes to EEC or Enercal.Government / communesStandard distribution concession: arrêté 2019-355/GNC.
Supply, aggregate, trade, balancing, VPP or remote controlNo framework: no retail competition, wholesale market or flexibility market.Government of New CaledoniaBalancing is done by Enercal’s dispatch.

Licensing follows a single-buyer, concession model. Generation is authorised plant by plant against the PPI, transmission and distribution are concessions, and retail is bundled with distribution. Market activities such as aggregation or trading have no legal category.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energyNo—NoEnercal. Enercal buys all public-grid production under bilateral contracts and dispatches it.
Frequency and voltage regulationNo—NoEnercal. Provided by Enercal plants and utility batteries such as Népoui, Maré and Île des Pins.

There is no market in which home batteries or flexible demand could be paid for grid services. Flexibility is provided by Enercal’s hydro plants and batteries and planned pumped storage at Tontouta. For households, a battery adds value only by raising self-consumption, since exports are unpaid.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEEC deploying powerline-communication meters across its nine concessions; no territory-wide mandate
Reading intervalNot published (monthly billing on actual readings)
TechnologyPowerline communication (PLC)
First deploymentThio, since 2022
Cost to customerFree meter and installation (EEC)
Consumer accessEEC SMART app with alerts

EEC’s new-generation meter sends consumption, power and billing data over the network cables, enabling remote reading and billing on actual consumption. Customers can view daily, weekly and monthly consumption in the EEC SMART app and set SMS or e-mail alerts. No penetration figure is published, and no equivalent programme by Enercal was identified.

Renewable electricity.

Electricity generation mix (2024).

  • Coal: 36.5%
  • Oil: 36.5%
  • Hydro: 17.3%
  • Solar: 8.3%
  • Wind: 1.3%
Source 5
Renewable electricity share
26.9% (2025)Source 4Ember data via Our World in Data, share of all generation including the nickel industry’s captive coal and oil plants. There are no interconnectors. For public distribution only, Enercal reports a 68% renewable share (12 months to June 2026).
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro (storage), PPI baseline
0.068 GW (2015)Source 6
Wind, PPI baseline
0.054 GW (2015)Source 6
Solar PV, PPI baseline
0.022 GW (2015)Source 6

Targets.

  • Renewable production equal to 100% of public-distribution electricity consumption by 2030, and electricity autonomy for the islands (STENC, 2016).
  • At least 50% renewable energy in the mining and metallurgy energy mix by 2030, requiring about 1,000 MW of new renewable capacity (STENC 2, August 2023).
  • PPI 2016–2030: renewable capacity from 153.7 MW (2015) to 554.7 MW by 2030, including 315 MWp of solar.

Ember data show renewables at about 0.84 TWh of 3.12 TWh generated in 2024: hydro 0.54 TWh, solar 0.26 TWh and wind 0.04 TWh, with coal and oil each about 1.14 TWh. The 2022–2024 values in the series are identical, suggesting estimates rather than reported annual data. Most fossil generation serves the nickel industry, so the public-distribution mix is much greener: Enercal reports 68% renewable.

Solar has grown fastest since 2015, rising from about 0.01 TWh to 0.26 TWh. Enercal developments include the Ouatom solar farm with storage (10 MW, 7 MWh), an agrivoltaic plant of 1.7 MW and solar carports in Dumbéa.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is being deployed on the utility side to stabilise small grids with a high solar share. Behind-the-meter batteries are not specifically regulated or supported; they follow the solar self-consumption rules.

Storage projects.

  • Népoui battery (Enercal): First battery for voltage and frequency regulation on the Grande Terre grid.
  • Ouatom solar + storage (Enercal): 10 MW solar with 7 MWh of storage.
  • Maré and Île des Pins batteries (Enercal): Frequency regulation, inertia, energy shifting and black start on island grids.
  • Boulouparis battery (Akuo): Project stage.
  • Tontouta pumped storage (Enercal): Pumped hydro project under study.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EEC ENGIE (Électricité et Eau de Calédonie)80,000+ customers; ~700 GWh a yearNoNoNoNo
Enercal42,145 contracts in 25 communes (June 2026)NoNoNoNo

There is no supplier choice. The distribution concession holder for each commune is the retailer, at the single government tariff.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
DIMENC – energy serviceGovernmentEnergy administration of the Government of New CaledoniaSolar authorisations, tariffs, PPI and STENC.
EnercalTransmissionTransmission, dispatch, single buyer, generation and distributionSystem operation and supply in 25 communes.
EEC ENGIEDistributionDistributor and retailerSupply and connections in Nouméa and other communes.
Agence Calédonienne de l’Énergie (ACE)Renewable EnergyPublic energy agency created in 2017Promotes efficiency and renewables and implements the STENC.
ISEEGovernmentStatistics instituteCensus and electricity statistics.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Inverter grid profileProfil NC 2022 (decoupling settings)DIMENCInverter decoupling settings certificate required with the authorisation.
Electrical safetyCOTSUEL conformity certificateCOTSUELInspection before connection.
StructuralWind-resistance certificationDIMENC requirementRequired in the solar dossier (cyclone exposure).
Installer qualityCALPV quality charterCALPVVoluntary; signatories handle administrative steps. List updated May 2026.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DIMENC authorisation (<250 kWp)YesNationalOnline request; receipt; one-month period.
Government order (250–750 kWp)LimitedNationalOnly for larger systems.
COTSUEL safety certificateYesNationalBefore connection.
Distributor connection agreementYesLocalEEC or Enercal; two-way meter.
Civil aviation reviewLimitedNationalNear aerodromes (DAC-NC).

Permissions for rooftop solar are administered territorially by DIMENC, with safety checked by COTSUEL and connection handled by the distributor.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Full-export rooftop tariff (revente totale)ClosedFeed-in tariff15 XPF/kWh for building systems under 250 kWp; quota fully allocated.—

Data and connectivity.

Fixed broadband
Not identified from a reliable public source.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

EEC’s smart meters use powerline communication rather than mobile networks.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
2.096 TWh (12 months to June 2026)Source 13Annual production including industry; public distribution 0.738 TWh. Ember gives 3.12 TWh for 2024.
Generation capacity
Not identified from a reliable public source.
Interconnection
0 GWIsolated system.
Curtailment
Not identified from a reliable public source.

The Grande Terre grid is isolated and the islands run separate grids. Network operation was disrupted during the May 2024 civil unrest, which forced line shutdowns.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Tariff alignment with costsCurrent2024–2026Deliberation 431 of 22 August 2024; increases on 1 October 2024 (+10.13% excl. tax) and 1 October 2026.
Quarterly automatic tariff indexationUpcoming1 January 2027Tariffs to move each quarter with electricity system costs.
STENC 2CurrentAdopted 16 August 2023Targets for metallurgy renewables, EVs and consumption to 2030.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costHighLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowSelf-consumption only; surplus unpaid; full-export quota exhausted.
Distributed energy marketMediumPublic-distribution mix 68% renewable with growing solar farms.
Grid flexibility marketLowSingle buyer; no flexibility market.
Energy storage adoptionMediumSeveral utility batteries and a pumped-storage project.
Renewable growth environmentMediumSolar output rose from ~0.01 TWh (2015) to 0.26 TWh (2024).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 25 sources
  1. Recensement de la population. ISEE, 2025. accessed 10 October 2026.
  2. Tarifs EEC Nouvelle-Calédonie. EEC ENGIE, 2026. accessed 10 October 2026.
  3. IEOM home page (XPF/EUR rate). Institut d’émission d’outre-mer. accessed 10 October 2026.
  4. Share of electricity from renewables (Ember data). Our World in Data / Ember, 2025. accessed 10 October 2026.
  5. Electricity production by source – New Caledonia (Ember data). Our World in Data / Ember, 2024. accessed 10 October 2026.
  6. La programmation pluriannuelle des investissements de production. DIMENC. accessed 10 October 2026.
  7. L’énergie photovoltaïque : des dispositifs réglementaires. DIMENC. accessed 10 October 2026.
  8. Les tarifs publics de l’électricité. DIMENC. accessed 10 October 2026.
  9. La distribution d’électricité. DIMENC. accessed 10 October 2026.
  10. Le transport d’électricité. DIMENC. accessed 10 October 2026.
  11. Le schéma pour la transition énergétique (STENC). DIMENC. accessed 10 October 2026.
  12. Le STENC (STENC 2). Enercal. accessed 10 October 2026.
  13. L’électricité en Nouvelle-Calédonie. Enercal, 2026. accessed 10 October 2026.
  14. La gestion du transport et du système électrique. Enercal. accessed 10 October 2026.
  15. La distribution. Enercal, 2026. accessed 10 October 2026.
  16. FAQ – situation du système électrique. Enercal. accessed 10 October 2026.
  17. Les tarifs de l’électricité. Enercal. accessed 10 October 2026.
  18. Stocker. Enercal. accessed 10 October 2026.
  19. Le solaire. Enercal. accessed 10 October 2026.
  20. Les autorités compétentes. Enercal. accessed 10 October 2026.
  21. EEC ENGIE. EEC ENGIE. accessed 10 October 2026.
  22. Mon compteur nouvelle génération. EEC ENGIE. accessed 10 October 2026.
  23. Mon contrat d’électricité 100% en ligne. EEC ENGIE. accessed 10 October 2026.
  24. Urban population (% of total) – New Caledonia. World Bank, 2025. accessed 10 October 2026.
  25. La taxe générale sur la consommation (TGC). Direction des Services Fiscaux. accessed 10 October 2026.

Questions about energy in New Caledonia.

Talk to us about Olmack in New Caledonia.Tell us about your home, housing portfolio or school estate in New Caledonia. We'll explain what is possible there now.