How electricity works in Papua New Guinea: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Papua New Guinea: Not yet available.Olmack is not offered in Papua New Guinea yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Papua New Guinea.

Papua New Guinea electricity 2026: PNG Power tariffs and Easipay prepaid meters, NEA licensing, hydro and diesel grids, rooftop solar for self-use only.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Papua New Guinean kina (PGK) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Papua New Guinea energy at a glance.

Key figures for households in Papua New Guinea. Each one links to its source on the full overview below.

  • Electricity price.

    0.76 PGK per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    34% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Papua New Guinea.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Papua New Guinea below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Papua New Guinea requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Papua New Guinea.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Papua New Guinea, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Papua New Guinea, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Papua New Guinea.

Full overview

The energy market in Papua New Guinea, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Papua New Guinea’s public electricity supply is run by PNG Power Ltd (PPL), a state-owned, vertically integrated utility held through Kumul Consolidated Holdings. PPL operates three main grids — Port Moresby, Ramu (serving Lae, Madang and the Highlands) and Gazelle (East New Britain) — plus a set of isolated provincial mini-grids that mostly run on diesel. Independent power producers sell to PPL under long-term power purchase agreements, so the sector works as a single-buyer system, and large mines and industrial sites generate much of their own power.

Since 6 July 2021 the National Energy Authority (NEA), created by the National Energy Authority Act and the Electricity Industry (Amendment) Act, has been the electricity regulator. It took over licensing and economic regulation from the Independent Consumer and Competition Commission (ICCC) and the technical and safety functions that PPL had previously exercised, including the licensing of electricians.

Grid access is low. The census of 2024 counted 10.19 million people, and the World Bank estimates that 43.3% of the population had access to electricity in 2024, against a government target of 70% of households by 2030. In 2023 about a third of electricity generated came from renewable sources, mainly hydro and geothermal. Household tariffs rose in March 2025 and again in June 2026 after a long freeze, and in August 2026 the government confirmed that homes and businesses on PPL grids may install rooftop solar for their own use, but without exporting to the grid.

Energy snapshot.

Headline figures for electricity in Papua New Guinea. Each shows its data year and links to its source.

  • Population10,185,363 peopleSource 12024
  • HouseholdsNot identified from a reliable public source.
  • Average household size5 people/householdSource 12024
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (PGK)0.76 PGK/kWhSource 52026
  • Household price (EUR)0.152 EUR/kWhSource 252026
  • Renewable electricity share34%Source 42023
  • Solar capacity0.005 GWSource 42024
  • Wind capacity0 GWSource 42024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
National Energy Authority (NEA)
System operator
PNG Power Ltd (PPL) — operates each of its grids
Distribution networks
PNG Power Ltd distributes on its three main grids and provincial mini-grids; mines and some industrial sites run private networks
Currency
Papua New Guinean kina (PGK)
Voltage and frequency
240 V / 50 Hz

Electricity prices in Papua New Guinea.

Household price (PGK)
0.76 PGK/kWh (2026)Source 5Easipay (prepaid) rate of 76 toea per kWh after the 5% increase announced in June 2026 (previously 73 toea). Excludes GST, which is charged on top; scheduled service charges are separate.
Household price (EUR)
0.152 EUR/kWh (2026)Source 25Derived: 0.76 PGK/kWh divided by 5.01186 PGK per euro, the mid-market rate shown for 10 October 2026. Excludes GST.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (PGK per kWh).Source 5

0.730.7450.7620252026
Papua New Guinea household electricity price, PGK per kWh
20250.73 PGK/kWh
20260.76 PGK/kWh

PPL is the only supplier on its grids, and its prices are regulated. Under the original 2002 framework a regulatory contract between the ICCC and PPL set maximum tariffs on a cost-recovery basis with five-year price paths, but tariffs were frozen by government decision in 2013 and not reviewed for over a decade. Since 2021 the National Energy Authority has been responsible for the tariff system.

The 2025 and 2026 increases

In 2022 the NEA approved a 10% increase. PPL applied half of it, 5%, from March 2025, describing it as a partial implementation that would apply to all customer categories. In June 2026 PPL announced a further 5% increase, linked to the consumer price index, as the second and final step out of the 12-year freeze. The Easipay rate went from 73 to 76 toea per kWh; scheduled service charges stayed largely unchanged, and all prices are quoted excluding GST.

Cost pressures

Tariffs have not kept pace with costs. A 2025 discussion paper from the PNG National Research Institute describes PPL as financially unsustainable, citing debts of more than US$130 million and losses from illegal connections and unpaid bills of about US$7 million a month. In 2026 the Prime Minister said that in some Highlands areas about 80% of customers did not pay. Isolated provincial centres rely on costly diesel generation, which is supplied at the same national tariff as the hydro-based main grids.

Tariff types.

Tariff types.
TariffAvailableDetail
PrepaymentYesEasipay prepaid supply: 76 toea per kWh from June 2026 (73 toea before), excluding GST. Customers buy credit and enter a token into the meter.
RegulatedYesCredit-metered (postpaid) supply at regulated rates for domestic, commercial, industrial and public-lighting customers. All categories rose by 5% in March 2025 and by a further 5% in June 2026. Rates for credit meters were not published in the sources consulted.
Time-of-useNoNo time-of-use household tariff was identified.
DynamicNoThere is no wholesale market and no dynamic retail pricing.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
274 kWh/person/yr (2023)Source 4Derived: 2,842 GWh of total generation in 2023 (IRENA) divided by the World Bank 2023 population estimate of 10,389,635. All sectors, including mines’ self-generation.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Most Papua New Guineans live in rural areas beyond the reach of the three main grids. The World Bank estimates electricity access at 43.3% of the population in 2024 (66.8% in urban and 39% in rural areas), well above its estimate of 20.5% for 2023. The jump reflects a change in the underlying data, not a sudden expansion of the grid, and grid connections remain far lower. When it approved its National Energy Access Transformation project in November 2024, the World Bank put access at 20% of the population and under 15% in rural areas.

Off-grid solar has a large role in rural areas. The World Bank project is expected to bring power to 194,000 people through grid expansion and densification and to 232,000 people in remote areas through mini-grids and solar home systems.

Overall electricity use per person is low, at about 274 kWh a year including industry. No reliable national figures were identified for household consumption, air-conditioner ownership, electric cooking or electric vehicles.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
15.8 % of population (2025)Source 2World Bank estimate.

Papua New Guinea is one of the least urbanised countries in the world: the World Bank estimates that 15.8% of the population lived in urban areas in 2025. The 2024 census counted 756,754 people in the National Capital District (Port Moresby) and 997,545 in Morobe Province, which includes Lae; the Highlands region holds 35.7% of the population.

Most rural housing is self-built on customary land. The census final-figures booklet does not report tenure or dwelling type, so those fields are left blank.

How the grid works in Papua New Guinea.

  1. TransmissionPNG Power Ltd (PPL)
  2. DistributionPNG Power Ltd distributes on its three main grids and provincial mini-grids; mines and some industrial sites run private networks
  3. MeteringPNG Power Ltd (PPL)
  4. Supply1 or more retail suppliers

Three separate grids

The NRI estimates on-grid generating capacity at 580–600 MW. About 300–320 MW of this is managed by PPL on the three main grids, which serve the main urban centres: Port Moresby, Ramu (Morobe, Madang and the Highlands) and Gazelle. PPL also runs about 100 MW across 19 geographically isolated mini-grids serving 26 smaller provincial centres, mostly with diesel. The remaining 280–300 MW belongs to independent power producers and to self-generating industrial users such as mines. Long-distance transmission exists only within the three main grids.

Single buyer

Independent producers such as the 50 MW Edevu hydro plant near Port Moresby, which came online in late 2023, sell to PPL under power purchase agreements. They have no access to PPL’s customers. A producer can apply for a licence to sell directly only to customers outside PPL’s exclusive zone or with a load greater than 10 MW, using its own network or third-party access to PPL’s grid.

Reliability and investment

Supply is unreliable on all three grids. In 2025 PPL set out seven turnaround projects, including transmission upgrades between Yonki, Lae and Tari, new turbines at the Ramu 1 and Rouna hydro stations and a substation connection at Pauanda–Kaupena. By August 2026 the government had invested about K1.5 billion in new infrastructure, including a 132 kV transmission line adding 54 MW to Port Moresby’s supply. A strong El Niño forecast for late 2026 is already reducing hydro output, and businesses in Port Moresby, Lae and the Highlands have reported outages.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinister for EnergySets energy policy and grants electricity licences under the National Energy Authority Act. In August 2026 the Energy Minister announced the arrangements for grid-connected rooftop solar for self-consumption.
RegulatorNational Energy Authority (NEA)Electricity regulator since 6 July 2021. Administers generation, network and retail licences, collects the generation levy, sets the tariff system, sets technical and safety requirements, licenses electricians and electrical contractors, and implements the national electrification roll-out plan.
TSOPNG Power Ltd (PPL)Owns and operates transmission on the Port Moresby, Ramu and Gazelle grids. There is no independent system operator; PPL dispatches its own and independent producers’ plant on each grid.
DSOPNG Power Ltd (PPL)Distributes electricity on the three main grids and on isolated mini-grids in provincial centres, most of them diesel-powered.
SupplierPNG Power Ltd (PPL)Sole retailer on its grids and single buyer of power from independent producers. State-owned through Kumul Consolidated Holdings; a 51/49 partial privatisation is in preparation.
MeteringPNG Power Ltd (PPL)Installs and owns customer meters, runs the Easipay prepaid vending system and reads credit meters.

Compared with the UK system.

Compared with the UK system.
UK conceptPapua New Guinea equivalentHow it works
DNOPNG Power LtdThere are no regional distribution companies. PPL owns and runs the low- and medium-voltage networks on all its grids. Outside PPL’s service areas there is no public network, and mines run their own systems.
National Grid/NESOPNG Power Ltd (per grid)There is no national grid. The Port Moresby, Ramu and Gazelle grids are separate and are not connected to each other, and PPL operates each one itself. The National Energy Policy aims for an independent system operator, but none has been created.
MPANPPL account number and meter numberThere is no national supply-point number. A connection is identified within PPL’s customer system by the customer account and the meter installed at the premises, and for Easipay customers by the prepaid meter number used to buy tokens.
MPRNNo national equivalentThere is no domestic piped-gas network for households, so there is no gas supply-point identifier.
Meter operatorPNG Power LtdPPL supplies, installs and reads meters. There is no competitive metering market.
SupplierPNG Power LtdHouseholds cannot choose a supplier. PPL is the only retailer on its grids. Other licensed retailers can in principle supply customers outside PPL’s exclusive zone or with loads above 10 MW.
Smart-meter infrastructureEasipay prepaid vendingThere is no smart-meter programme and no central data and communications company. The equivalent shared system is the Easipay prepaid vending platform, through which customers buy credit at PPL offices, from mobile networks and at retail outlets.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?PNG Power customer account and meter number
Who issues it?PNG Power Ltd
FormatAn internal PPL customer account number for credit-metered customers and the meter’s own number for Easipay prepaid customers. The structure and length are not published.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the PPL bill for credit-metered customers; on the Easipay meter and on Easipay purchase receipts for prepaid customers.
Electronic accessEasipay credit can be bought electronically through mobile networks and other vending channels by quoting the meter number. No customer data portal or downloadable consumption data was identified.
Third-party accessNone. With a single retailer and no switching, there is no regime giving third parties access to metering data.
Who keeps the registerPNG Power Ltd customer and Easipay vending systems
Register scopeNational

Papua New Guinea has no national supply-point register like Britain’s MPAN system. Because PPL is the only distributor and retailer on its grids, a connection only needs to be identified inside PPL’s own systems. For prepaid households that means the Easipay meter: the customer quotes the meter number when buying credit and receives a numeric token that is typed into the meter to load kilowatt-hours.

Getting connected

New connections are applied for at PPL customer offices. Electrical installation work must be done by a licensed electrician; since 2021 those licences are issued by the NEA rather than PPL. PPL’s detailed connection requirements, such as documents and deposits, could not be verified from its website for this profile.

Easipay

PPL has moved customers from credit meters to Easipay since the 2010s, partly to reduce unpaid bills. When Manus Province was converted in 2016, credit was sold at the PPL office, through the Digicel and bmobile-Vodafone networks and at a supermarket vending machine. In 2021 a programme with NiuPower aimed to move 70% of Port Moresby’s customers, including government bodies, to Easipay. In May 2026 PPL took the platform offline for about 24 hours for an upgrade, citing large growth in use.

What is not identified

PPL does not publish the format of its account or meter numbers, so no example is given here. No public source was found saying whether the identifier stays with the property when the occupant changes.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?No
Net meteringNo
Net billingNo
How exported electricity is paidNone. Grid-connected rooftop systems are allowed only for self-consumption and must not export.
Can households sell surplus solar power?No. The arrangement announced in August 2026 is for self-consumption and does not authorise the sale or export of surplus electricity to the grid.
Who can install grid-connected solar?Households, businesses, schools, churches and public institutions in areas served by PNG Power, provided the system meets NEA registration, safety and technical requirements.
Is there a size limit?No published size limit for self-consumption systems was identified.
Are batteries allowed?No specific rule on batteries was identified. A zero-export system with batteries is consistent with the self-consumption rules, but must meet the same NEA requirements.

Connecting a home system.

  1. Engage an NEA-licensed electrician to design and install the system with approved equipment.
  2. Make sure the system has automatic anti-islanding protection and is configured so that no electricity is exported to the PPL grid.
  3. Have the installation certified by the licensed electrician against the NEA’s technical and safety requirements.
  4. Register the system with the National Energy Authority; existing systems connected to PPL’s network must also be registered and brought into compliance.

Rooftop solar on PPL’s grids is allowed only behind the meter. In August 2026 the Energy Minister announced that households and businesses can run their premises on solar to reduce dependence on the grid and on diesel generators, but said that systems must be configured so that electricity is not exported. There is no feed-in tariff, net metering or net billing.

The national solar industry association pointed out as early as 2020 that the lack of net metering or a feed-in tariff held back the residential market. The current arrangement legalises self-consumption systems but does not change that.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityGeneration licence required to operate in the electricity supply industry. Annual fees rise with installed capacity above 1 MW. Projects of up to 10 MW are reserved for PNG citizen companies; larger ones need a joint venture with PNG firms.Minister for Energy / National Energy AuthorityGenerators pay an administration levy of K0.009 per kWh. National-content obligations (landowner royalties, equity options, local jobs) apply to newly licensed projects.
Self-consumption rooftop solarNo generation licence identified for behind-the-meter systems on PPL grids, but the system must be registered with the NEA and installed by a licensed electrician with zero export.National Energy AuthorityAnnounced August 2026.
Store electricityNo separate storage licence category identified. Grid-scale storage would fall under the generation or network licence regime.National Energy AuthorityNo specific storage rules found.
Export to the gridNot permitted for self-consumption systems. Producers sell to PPL only under a licence and a power purchase agreement.National Energy Authority / PNG Power LtdThere is no small-scale export scheme.
Operate a transmission or distribution networkTransmission or distribution licence required. Mini-grid operators also need a licence.Minister for Energy / National Energy AuthorityLicences are granted under the National Energy Authority Act; existing licences were preserved when the NEA took over from the ICCC.
Sell / supply electricity to customersRetail licence required. Outside PPL’s exclusive zone, or to customers with loads above 10 MW, a licensed producer can supply directly.National Energy AuthorityHouseholds on PPL grids cannot choose another supplier.
Aggregate, trade, wholesale, balancing or grid servicesNot applicable. There is no wholesale market, balancing market or aggregator role.—The National Energy Policy envisages a competitive market in future.
Virtual power plant / remote control of assetsNo framework exists; with export prohibited for small systems, there is no route for aggregated distributed assets.—
Electrical installation workElectrician or electrical-contractor licence required, issued by the NEA after a competency examination. Electricians previously licensed by PPL must convert to NEA licences.National Energy AuthorityThe NEA keeps a database of licensed electricians and contractors and is preparing a solar-technician certification.

The National Energy Authority Act makes it an offence to carry out generation, network or retail operations without a licence. Regulations may exempt some activities from licensing, but no general exemption for small generators was identified apart from the self-consumption arrangement for rooftop solar.

Licensing goes with a strong national-content policy. Generation of up to 10 MW is reserved for PNG citizen companies, and new projects must offer royalty and equity benefits to landowners and provincial governments.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy marketNo—NoThere is no wholesale market. PPL buys power from independent producers under bilateral power purchase agreements.
Frequency control and reservesNo—NoPNG Power Ltd. PPL balances each grid with its own and contracted plant; there is no market for ancillary services.
Demand responseNo—NoNo demand-response programme for households was identified.

Papua New Guinea has no flexibility or ancillary-services market. Each of PPL’s grids is balanced by PPL itself, mainly with hydro and diesel plant, and small distributed systems may not export. The National Energy Policy aims to separate generation, transmission, distribution and retail, create an independent system operator and introduce competitive tendering, but these reforms have not been implemented.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo smart-meter programme; Easipay prepaid meters widely used
Reading intervalNot applicable
Meter ownerPNG Power Ltd
Main meter typeEasipay prepaid (token) meters
Ways to buy creditPPL offices, mobile networks (Digicel, bmobile-Vodafone), retail vending
Smart-meter penetrationNot published

Papua New Guinea has no smart-meter rollout and no national metering-data system. PPL’s metering focus has been converting credit meters to Easipay prepaid meters, which protect revenue because customers pay before using electricity. Prepaid meters store credit locally and do not provide remote half-hourly data, so they cannot support time-of-use pricing or export settlement.

Renewable electricity.

Electricity generation mix (2023).

  • Fossil fuels (oil and gas): 66.5%
  • Hydro: 28.8%
  • Geothermal: 3.4%
  • Bioenergy: 1.1%
  • Solar: 0.2%
Source 4
Renewable electricity share
34% (2023)Source 4Share of total electricity generation (953 of 2,842 GWh), including self-generation by mines and industry. Papua New Guinea has no electricity imports.
Home solar
Not identified from a reliable public source.
Solar added each year
0.001 GW (2024)Source 4IRENA records a net addition of about 1 MW of solar in 2024.
Fossil fuels
0.752 GW (2024)Source 4
Hydro
0.309 GW (2024)Source 4
Geothermal
0.051 GW (2024)Source 4
Bioenergy
0.018 GW (2024)Source 4
Solar
0.005 GW (2024)Source 4
Wind
0 GW (2024)Source 4

Targets.

  • 70% of households with electricity access by 2030 (National Electrification Roll-Out Plan).
  • 78% renewable electricity by 2030, as stated in the updated NDC (reported by Global Energy Monitor).

Fossil fuels produced two-thirds of Papua New Guinea’s electricity in 2023, much of it from diesel and gas plant at mines and in the isolated provincial centres. Hydro is the main renewable source and the backbone of the Ramu and Port Moresby grids; the Edevu plant added 50 MW near Port Moresby from late 2023. IRENA records 51 MW of geothermal capacity.

Solar is very small on the grid, at 5 MW in 2024 according to IRENA, although off-grid solar lanterns and solar home systems are widespread in rural areas. Solar equipment can be imported duty-free. Hydro output depends on rainfall, and drought linked to El Niño in 2026 has reduced generation and increased reliance on diesel.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No grid-scale battery projects or official figures on behind-the-meter storage were identified. Batteries are used widely in off-grid solar home systems and mini-grids, and the national solar association has pointed to falling battery prices as the next stage for solar in the country. On PPL’s grids, home batteries are only relevant to self-consumption, as export is not permitted.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
PNG Power LtdSole retailer on its gridsNoNoNoNo

PPL is the only electricity retailer for households. Its revenue was K1.05 billion in 2025. The state plans to sell a 49% stake while keeping 51%, using the Public-Private Partnership Act 2022; the National Executive Council approved the process in 2024, and the government aims to complete it before the 2027 elections. The Prime Minister has also proposed transferring loss-making provincial centres to provincial governments under regulated licences.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Kumul Consolidated HoldingsGovernmentState holding company for PNG Power and other state-owned enterprisesLeads the partial privatisation of PNG Power.
National Energy AuthorityRegulatorElectricity regulator and licensing bodyIssues electricity and electrician licences, approves tariffs and registers rooftop solar systems.
Independent Consumer and Competition Commission (ICCC)ConsumerCompetition and consumer-protection regulatorFormer electricity price regulator; works with the NEA on electrical product imports.
PNG Power LtdDistributionState-owned vertically integrated utilityOperates the grids, buys from independent producers and supplies households.
Solar Energy Association of PNGSolarSolar industry associationRepresents solar businesses and works with PPL on solar integration.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid-connected solarNEA technical and safety requirements for grid-connected solar systemsNational Energy AuthoritySystems must use approved equipment, include automatic anti-islanding protection and be configured for zero export.
Installer licensingNEA electrician and electrical-contractor licenceNational Energy AuthorityIssued after a competency-based examination; replaces licences formerly issued by PPL.
Product importsImport controls on electrical and electronic productsNEA with Customs, NISIT and the ICCCAgencies coordinate oversight of electrical products entering the country.

Permissions.

Permissions.
PermissionRequiredLevelDetail
NEA registration of grid-connected solarYesNationalAll grid-connected systems, including existing ones, must be registered and meet NEA requirements.
Licensed electrician certificationYesNationalInstallation and certification by an NEA-licensed electrician.
Export approval from PPLNoNationalExport is not permitted under current rules, so there is no export approval process.
Generation licenceLimitedNationalNeeded for generation in the electricity supply industry; not identified as required for self-consumption rooftop systems.
Land and landowner consentLimitedLocalNewly licensed generation projects must offer royalty and equity benefits to affected landowners under national-content rules.

For a household on a PPL grid, the practical steps for solar are using a licensed electrician, approved equipment and anti-islanding protection, configuring the system for zero export and registering it with the NEA. No separate planning permission rule for rooftop solar was identified.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Duty-free import of solar equipmentActiveImport duty exemptionSolar equipment can be imported free of duty, as reported by the solar industry in 2020. No current official confirmation was found.—
National Energy Access Transformation (NEAT) projectActiveDevelopment finance / results-based financingWorld Bank project of US$204 million, approved in November 2024, for grid densification, renewable mini-grids and private off-grid solar markets, with a US$4.2 million results-based grant for last-mile access.Approved Nov 2024

Data and connectivity.

Fixed broadband
18.8 % of population using the internet (2024)Source 3World Bank indicator for individuals using the internet.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About 19% of Papua New Guineans used the internet in 2024, according to the World Bank. Mobile networks are already part of the electricity system: Easipay credit can be bought through mobile operators such as Digicel and bmobile-Vodafone. No smart-meter communications network exists.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
2.842 TWh (2023)Source 4Total electricity generation, including self-generation by mines and industry, used as a proxy for demand because there are no imports or exports.
Generation capacity
1.136 GW (2024)Source 4All installed capacity including off-grid and industrial self-generation. On-grid capacity is about 580–600 MW according to the PNG National Research Institute.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The three main PPL grids are not connected to each other, which limits the sharing of reserves. Hydro dominates the Ramu grid and a large part of Port Moresby’s supply, so dry seasons and El Niño years bring shortages and more diesel use. The PNG National Research Institute, citing World Bank data, reports an average of more than 40 blackouts a month in 2015, the third highest in the world.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Partial privatisation of PNG PowerUpcomingBefore the 2027 national elections (target)The state plans a 51/49 sale under the Public-Private Partnership Act 2022. The process is at the scheme-of-arrangement stage, with court cases still to be resolved. The ADB is supporting reform with a US$100 million policy loan.
Transfer of loss-making provincial centresUpcomingProposed 2026The Prime Minister has proposed handing unprofitable regional “C centres” to provincial governments under regulated licences, with partnerships being examined in East and West Sepik.
Rooftop solar for self-consumptionCurrentAugust 2026Grid-connected solar allowed for self-consumption on PPL grids, subject to NEA registration and zero export. Existing systems must register.
Second tariff increaseCurrentJune 20265% increase across all customer categories; Easipay rate from 73 to 76 toea per kWh, excluding GST.
National Energy Authority takes over regulationCurrent6 July 2021The NEA Act and Electricity Industry (Amendment) Act moved licensing and economic regulation from the ICCC, and technical regulation from PPL, to the NEA.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowIRENA records 5 MW of solar in total (2024); grid-connected rooftop solar only allowed for self-consumption since the August 2026 announcement.
Distributed energy marketLowExport from small systems is prohibited and there is no net metering, feed-in tariff or aggregation framework.
Grid flexibility marketLowNo wholesale, balancing or ancillary-services market; PPL balances each grid itself.
Energy storage adoptionLowNo grid-scale battery projects or official storage figures identified.
Renewable growth environmentLowIRENA records renewable net additions of 2 MW in 2024 after 66 MW in 2023, with the renewable share of generation at 34% in 2023.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 25 sources
  1. 2024 National Population Census — Final Figures. National Statistical Office of Papua New Guinea (hosted by UNFPA), 2025. accessed 10 October 2026.
  2. World Development Indicators: population, urban population, access to electricity — Papua New Guinea. World Bank, 2025. accessed 10 October 2026.
  3. Individuals using the Internet (% of population) — Papua New Guinea. World Bank, 2024. accessed 10 October 2026.
  4. Energy Profile: Papua New Guinea. IRENA, 2025. accessed 10 October 2026.
  5. Easipay rates to go up: PPL. The National, 2026. accessed 10 October 2026.
  6. PNG Power increases electricity tariff by 5 per cent. The National, 2025. accessed 10 October 2026.
  7. Use solar energy to power households and businesses, says minister. The National, 2026. accessed 10 October 2026.
  8. NEA tightens up guidelines to benefit industry. The National. accessed 10 October 2026.
  9. NiuPower, PPL enhancing revenue collection. The National, 2021. accessed 10 October 2026.
  10. PPL converts credit meters to easipay meters. The National, 2016. accessed 10 October 2026.
  11. PNG Power announces scheduled Easipay system upgrade to improve customer experience. EMTV, 2026. accessed 10 October 2026.
  12. PNG Power’s sale advances as El Niño tests the grid. Business Advantage PNG, 2026. accessed 10 October 2026.
  13. PNG Power: the road towards privatisation. Business Advantage PNG, 2025. accessed 10 October 2026.
  14. PNG Power faces crisis as government weighs provincial partnerships, privatisation. Islands Business, 2026. accessed 10 October 2026.
  15. PNG Power CEO reveals seven critical turnaround projects. Business Advantage PNG, 2025. accessed 10 October 2026.
  16. Hydro project aims to bring stability to Port Moresby’s grid. Business Advantage PNG, 2024. accessed 10 October 2026.
  17. In brief: PNG Power’s tariffs rise for the first time in a decade and other stories. Business Advantage PNG, 2023. accessed 10 October 2026.
  18. Solar for everyone: a glimpse into Papua New Guinea’s solar market today. Business Advantage PNG, 2020. accessed 10 October 2026.
  19. Shake-up of the Papua New Guinea electricity supply industry. Business Advantage PNG, 2021. accessed 10 October 2026.
  20. Changes in PNG’s energy laws. Allens, 2021. accessed 10 October 2026.
  21. New PNG energy laws commence. Allens, 2021. accessed 10 October 2026.
  22. Review of electricity reform experiences in Small Island Developing States – lessons for Papua New Guinea (Discussion Paper 215). PNG National Research Institute, 2025. accessed 10 October 2026.
  23. World Bank announces transformative energy access project to benefit 400,000 Papua New Guineans. World Bank, 2024. accessed 10 October 2026.
  24. Power Sector Transition in Papua New Guinea. Global Energy Monitor. accessed 10 October 2026.
  25. Euro to Papua New Guinean kina historical exchange rates. Wise, 2026. accessed 10 October 2026.

Questions about energy in Papua New Guinea.

Talk to us about Olmack in Papua New Guinea.Tell us about your home, housing portfolio or school estate in Papua New Guinea. We'll explain what is possible there now.