How electricity works in Guadeloupe.
Guadeloupe electricity 2026: EDF as integrated island operator, regulated Tarif Bleu with national price equalisation, S24 solar feed-in tariffs, PRM/EDL identifiers.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Guadeloupe energy at a glance.
Key figures for households in Guadeloupe. Each one links to its source on the full overview below.
Electricity price.
0.189 EUR per kWh for households, including taxes. Figures for From 1 Aug 2026.
Renewable share.
35.3% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Guadeloupe.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Guadeloupe below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Guadeloupe requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Guadeloupe.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Guadeloupe, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Guadeloupe, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Guadeloupe.
The energy market in Guadeloupe, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Guadeloupe is a French overseas region and department in the Lesser Antilles. Its electricity system is a "zone non interconnectée" (ZNI): it has no link to mainland France or to any neighbouring island state, so all the electricity it uses is produced locally. The main island pair (Basse-Terre and Grande-Terre) feeds Marie-Galante and La Désirade through submarine cables, while Saint-Martin and Saint-Barthélemy run separate systems.
French energy law applies, but with the derogation that EU and French law allow for small isolated networks. EDF, through its island systems division EDF SEI (trading locally as EDF Archipel Guadeloupe), is at once the transmission and distribution network operator, the system operator that balances supply and demand in real time, the single buyer of power from independent producers, and the only electricity supplier. The Commission de régulation de l’énergie (CRE) regulates it as it does EDF on the mainland.
Households pay the national regulated tariff (Tarif Bleu). Under “péréquation tarifaire”, the price before taxes is the same as in mainland France even though local production costs are far higher. The difference is compensated as a public-service charge, funded since August 2025 by a surcharge on the excise duty on electricity and fossil fuels. In 2023 about 35% of electricity came from renewable sources, mainly biomass, geothermal, solar and wind. The rest came from the diesel plant at Pointe Jarry, coal and fuel-oil turbines.
Energy snapshot.
Headline figures for electricity in Guadeloupe. Each shows its data year and links to its source.
- Population384,160 peopleSource 192023
- Households180,320 householdsSource 192023
- Average household size2.11 people/householdSource 192023
- Electricity use per householdNot identified from a reliable public source.
- Household price (EUR)0.189 EUR/kWhSource 1From 1 Aug 2026
- Renewable electricity share35.3%Source 92023
- Solar capacity0.095 GWSource 9end-2023
- Wind capacity0.057 GWSource 9end-2023
- Energy storage capacity0.005 GWSource 62026
- Smart-meter share90%Source 42026
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Commission de régulation de l’énergie (CRE)
- System operator
- EDF SEI (EDF Archipel Guadeloupe), which runs the 63 kV transmission network and balances the system
- Distribution networks
- Single network operator: EDF runs the HTA/BT distribution network under a concession from the Syndicat Mixte d’Électricité de la Guadeloupe (SyMEG).
- Currency
- Euro (EUR)
- Voltage and frequency
- 230/400 V / 50 Hz
Electricity prices in Guadeloupe.
- Household price (EUR)
- 0.189 EUR/kWh (From 1 Aug 2026)Source 1Tarif Bleu Résidentiel, Base option, 3 and 6 kVA: unit energy price including taxes (OMR 1.5%, accise 3.062 c€/kWh, VAT 8.5%). Excludes the standing charge: €175.56 a year at 6 kVA. The off-peak option is 20.18 c€ peak and 15.11 c€ off-peak.
- Typical annual electricity bill
- Not identified from a reliable public source.
The household price is the national regulated tariff (tarif réglementé de vente, TRV). The State sets it on the CRE’s proposal and it usually changes twice a year, on 1 February and 1 August. It rose by an average of 2.5% for residential customers on 1 August 2026. For low-voltage customers below 36 kVA, the pre-tax TRV is identical in Guadeloupe and mainland France. The exception is a small “rémanence d’octroi de mer” (0.5383 c€/kWh in 2026), which recovers sea-dock tax that EDF pays on its own purchases.
Price equalisation and who pays the extra cost
Producing electricity in France’s non-interconnected zones cost an average of €369/MWh in 2025, according to the CRE, far more than the tariff recovers. The gap is a public-service charge (charges de service public de l’énergie, SPE). The CRE calculates it each year and compensates EDF SEI for it. Between 2015 and July 2025 the State budget paid this charge (about €2.5 billion for all ZNI in 2024). Since August 2025 it has been funded by a surcharge on the excise duties on electricity and fossil fuels, set at €5.66/MWh from 1 February 2026.
Taxes on a Guadeloupe bill
The tax-inclusive price includes four main items. The excise duty on electricity (accise, formerly CSPE) is 3.062 c€/kWh. The CTA is a 15% contribution on the fixed network part of the standing charge. The regional sea-dock tax (octroi de mer régional, OMR) is 1.5%. VAT is 8.5%, the reduced overseas rate, compared with the mainland rate. This is why the tax-inclusive kWh price is lower than in mainland France even though the pre-tax tariff is the same. Saint-Martin and Saint-Barthélemy have different tax rules and their own tariff sheets.
Tariff structure is being reshaped
To shift demand towards off-peak hours, the State and CRE have changed the Base option in the overseas regions and Corsica. Since February 2026, new contracts at 9 kVA or more must use peak/off-peak pricing. Base contracts at 18–36 kVA are being withdrawn and are due to disappear on 1 February 2027. Low-income households receive the State’s chèque énergie, sent from 1 April each year.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Tarif Bleu Résidentiel, Base option (from 1 Aug 2026, incl. taxes): 18.89 c€/kWh at 3–6 kVA and 18.74 c€/kWh above. Standing charges are €133.59 a year at 3 kVA, €175.56 at 6 kVA and €220.69 at 9 kVA. Since 1 Feb 2026, new customers at 9 kVA or more cannot choose Base. |
| Off-peak | Yes | Heures Pleines / Heures Creuses option: 20.18 c€/kWh peak and 15.11 c€/kWh off-peak (incl. taxes). Off-peak runs from 22:00 to 06:00 across the territory. It has been open to 3 kVA customers since 1 Aug 2026. |
| Time-of-use | Limited | Only the two-period peak/off-peak option is offered to households. There is no multi-period or seasonal tariff. |
| Dynamic | No | EDF is the only supplier, and no market-indexed or dynamic offer exists. |
| Fixed | No | There are no competing fixed-price offers. The regulated tariff is set by the State on the CRE’s proposal and normally changes on 1 February and 1 August. |
Household prices compared with neighbouring countries (EUR per kWh).
- Dominica€0.295
- France€0.2
- Martinique€0.19
- Guadeloupe€0.189
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 3,806 kWh/person/yr (2023)Source 9All sectors. Derived: 1,670 GWh delivered to the grid minus 208 GWh of network losses (1,462 GWh supplied to customers), divided by 384,160 residents (INSEE). The OREC gave 3.75 MWh net per inhabitant for 2021.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 55.2 % of homes (2023)Source 19INSEE: principal residences with at least one air-conditioned room (41.0% in 2012).
- Electric vehicles
- 4,300 vehicles (end-2023)Source 9More than 4,300 battery-electric and plug-in hybrid light vehicles, about 2% of the fleet.
- Electric cooking
- Not identified from a reliable public source.
About 1,670 GWh was delivered to the grid in 2023. Network losses were 208 GWh (12.4%). Consumption fell by 9% between 2016 and 2022, then rose by 2% in 2023. By value, 77% of billed energy was sold on the Tarif Bleu (households and small businesses) and 23% on the Tarif Vert (larger businesses, industry and local authorities). Peak demand on the grid reached 256 MW in 2023, averaged over one hour.
The climate is warm all year, so demand varies little by season. The daily curve has a daytime plateau driven mainly by air-conditioning in offices and shops, and an evening peak driven by households (lighting and appliances). Solar output now covers much of the daytime load, so the hardest hours for the system are early evening. INSEE’s 2023 census found that 55% of homes have at least one air-conditioned room and 51% have a solar water heater. Solar water heating has long been promoted to keep this load off the grid.
Electric vehicles are a growing new load: more than 4,300 were on the road at the end of 2023. EDF’s outlook warns that uncontrolled evening charging would add to the peak. It recommends charging in the middle of the day, and it piloted an open-data charging signal for that purpose.
Housing and households.
- Dwellings
- 239,695 dwellings (2023)Source 1975.0% principal residences, 10.8% second or occasional homes and 14.2% vacant.
- Owner-occupied
- 58.8% (2023)Source 19Share of principal residences.
- Private rented
- 20.3% (2023)Source 19Derived: all tenants (35.4%) minus tenants of social (HLM) housing (15.1%). A further 5.8% are housed free of charge.
- Social or public housing
- 15.1% (2023)Source 19Principal residences rented unfurnished from an HLM social landlord.
- Houses
- 74.3% (2023)Source 19Share of all dwellings that are houses.
- Apartments and flats
- 24.8% (2023)Source 19
- Urban population
- Not identified from a reliable public source.
Housing is dominated by owner-occupied single-family houses. Three-quarters of dwellings are houses, and almost 59% of households own their home. This makes rooftop solar and solar water heaters practical for many households.
The number of households keeps rising even though the population is falling, because households are getting smaller. The average was 2.11 people per home in 2023. There is a large stock of vacant dwellings (about 34,000) and second homes. Construction follows a regional thermal regulation (RTG) and energy-performance rules adopted by the Région under its legislative powers.
How the grid works in Guadeloupe.
- TransmissionEDF SEI – EDF Archipel Guadeloupe, EDF SEI – EDF Archipel Guadeloupe
- DistributionSingle network operator: EDF runs the HTA/BT distribution network under a concession from the Syndicat Mixte d’Électricité de la Guadeloupe (SyMEG).
- MeteringEDF SEI
- Supply1 or more retail suppliers
Power comes from a few large plants and many small ones. The largest is EDF PEI’s 211 MW diesel plant at Pointe Jarry, backed by about 81 MW of EDF combustion turbines at Jarry Sud. Albioma at Le Moule runs a coal/bagasse unit (57 MW) and a biomass unit (33 MW). Ormat runs the Bouillante geothermal plant (15 MW). There are also about 95 MW of solar, 57 MW of wind, 11 MW of small hydro and 4 MW of biogas. In 2025, independent producers supplied 73% of output across all French ZNI. They sell their output to EDF SEI under feed-in tariffs, CRE tenders or negotiated contracts approved by the CRE.
EDF SEI carries the power over its 63 kV transmission network to source substations. From there, HTA feeders at 15–30 kV run to MV/LV substations and 230/400 V distribution. Marie-Galante and La Désirade are fed by submarine cables, with standby diesel units on each island in case a cable fails. The other southern islands also have standby diesel units.
Commercially, the chain is short. EDF SEI buys power from independent producers and runs its own plants, and EDF supplies every customer at the regulated tariff. The CRE reimburses EDF for the gap between the cost of generation and tariff revenue through public-service charges. Because the system is small and has no interconnection, EDF can order intermittent plants to disconnect (rule SEI REF 03) to keep enough rotating reserve and inertia online.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry in charge of energy (State) and Région Guadeloupe | The State and the Région jointly draw up the Programmation pluriannuelle de l’énergie (PPE), the territory’s energy plan. The Région also holds a delegated power to adopt local energy rules. It uses this, for example, to approve ground-mounted solar and wind projects through its Commission Photovoltaïque-Éolien. |
| Regulator | Commission de régulation de l’énergie (CRE) | Proposes regulated tariffs and calculates the public-service charges that compensate EDF SEI. It assesses negotiated power-purchase contracts and runs storage selection windows and ZNI renewable tenders. It also publishes the quarterly solar feed-in tariffs. |
| TSO | EDF SEI – EDF Archipel Guadeloupe | Owns and operates the HTB (63 kV) transmission network. RTE, the mainland TSO, has no role here. |
| System operator | EDF SEI – EDF Archipel Guadeloupe | Dispatches all plants, keeps supply and demand in balance in real time and publishes the annual supply-demand outlook (Bilan prévisionnel). It can also disconnect intermittent generation when needed to keep the system safe. |
| DSO | EDF SEI under concession from SyMEG | Operates the HTA (15, 20, 30 kV) and low-voltage (230/400 V) networks under a concession contract with the Syndicat Mixte d’Électricité de la Guadeloupe. It invested €43 million in the network in 2022, and 76% of the HTA network is underground. |
| Supplier | EDF (sole supplier) | EDF is the only electricity supplier in the overseas regions and Corsica. It must offer the regulated tariffs to every customer. |
| Metering | EDF SEI | Owns, installs and reads all meters, including the “compteur numérique” smart meter. There is no separate meter operator. |
Compared with the UK system.
| UK concept | Guadeloupe equivalent | How it works |
|---|---|---|
| DNO | EDF SEI (gestionnaire du réseau de distribution) | One network operator for the whole archipelago, working under a concession from SyMEG, the local authorities’ electricity syndicate. EDF plans, builds and repairs the network and connects customers and generators. Enedis, the mainland DSO, does not operate here, although its technical rules apply where EDF SEI has not adapted them. |
| National Grid/NESO | EDF SEI as transmission and system operator | The same company also runs the 63 kV transmission network and dispatches every plant. There is no independent system operator, balancing market or capacity market. EDF schedules generation on an economic and security basis and publishes a 15-year Bilan prévisionnel. |
| MPAN | PRM / PDL (14-digit) and the EDL number on the bill | Technically, each connection is a Point de Livraison, also called a Point de Référence Mesure (PRM). It has a unique 14-digit number that can be scrolled to on the meter display. For customer purposes, EDF’s overseas bills show an “Espace de Livraison” (EDL) number. This is the reference asked for in place of the PDL when applying for the chèque énergie. |
| MPRN | No equivalent | There is no mains gas network. Bottled butane is used for cooking, so there is no gas supply-point identifier. |
| Meter operator | EDF SEI | EDF owns and maintains the meter as part of its network role. It replaces old meters free of charge. Customers who keep an old meter may be charged for manual reading visits. |
| Supplier | EDF (regulated tariff only) | Households cannot switch supplier. Because of the small-isolated-system derogation, EDF is both network operator and sole supplier at the regulated Tarif Bleu. |
| Smart-meter infrastructure | EDF compteur numérique, read remotely by EDF | Meters are read remotely and data goes straight to EDF’s own systems. There is no DCC-style central data company. Customers see daily data in the EDF DOM & Corse app or their online account. |
How a supply point is identified.
30097154826013 (fictional PRM)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Point de Livraison / Point de Référence Mesure (on bills: Espace de Livraison) (PDL / PRM; EDL) |
| Who issues it? | EDF SEI, as network operator, when the connection is created (first energisation requires a Consuel conformity certificate) |
| Format | PRM: 14 digits, unique per delivery point, shown on a screen of the smart meter. The format of the EDL number printed on bills is not published on the pages consulted. |
| Length | 14 digits (PRM) |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Scroll through the screens of the compteur numérique with the + and – keys to find the 14-digit PRM. The EDL number is printed on the EDF bill. The customer number (référence « pour tout contact ») and the meter number are also on the bill. |
| Electronic access | Customers see their consumption by month and day, or in more detail, in their EDF online account (sei-ael-guadeloupe.edf.com) and the EDF DOM & Corse app. The meter also has a Télé-Information Client output for energy-management devices. |
| Third-party access | No public third-party data platform for consumers was identified. Data is held by EDF, and customers exercise their GDPR rights through EDF, including stopping load-curve recording in the meter. EDF publishes aggregated system data (production mix, connection queues, hosting capacity) on its Guadeloupe open-data portal. |
| Who keeps the register | Held in EDF SEI’s own customer and network systems. EDF SEI, not Enedis, operates the network in Guadeloupe. |
| Register scope | Regional |
Guadeloupe uses the same 14-digit PRM concept as mainland France, but organised differently. EDF SEI’s 2026 connection procedure (SEI REF 51) defines the Point de Livraison as the boundary between the public network and the customer’s installation. It sits at the downstream terminals of the main switch-breaker (AGCP) of the service connection. The procedure says the point is also called a PRM and carries a unique 14-digit number that can be displayed on the meter.
In practice the bill uses another reference. EDF’s guidance on the chèque énergie says that in the overseas regions and Corsica, the number required is the EDL (Espace de Livraison) printed on the bill, not the PDL. Because EDF is also the only supplier, the identifier is never used to switch supplier. It is used for connection work, meter interventions, social schemes and EDF’s own billing.
Moving home or a new connection
A new occupant opens a contract with EDF. They give their identity, the new address, a meter reading and bank details, and if possible the name of the previous occupant. In homes with a compteur numérique, supply can be switched on within 24 hours without a visit. A brand-new connection goes through EDF’s Portail Raccordement. The home must pass a Consuel inspection before the delivery point is energised for the first time.
Meter and point identifiers are different
The meter has its own serial number, printed on the meter and shown on the bill. If the meter is replaced, the meter number changes but the delivery point does not. The PRM identifies the connection at the property, not the customer or the device.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Regulated feed-in tariff under the 5 January 2024 “S24 PV ZNI” order, paid by EDF as obligated buyer for 20 years. Surplus can be sold, or the whole output sold. Installations under 3 kWc may instead give surplus to the network operator free of charge. |
| What does surplus solar earn? | For connection requests made between 1 August and 31 October 2026, surplus from Guadeloupe installations up to 9 kWc is bought at 18.22 c€/kWh. From 9 to 100 kWc the rate is 7.19 c€/kWh. A one-off investment premium is also paid per watt-peak: €1.80/Wc up to 3 kWc, €1.09/Wc for 3–9 kWc, €0.82/Wc for 9–36 kWc and €0.56/Wc for 36–100 kWc. The CRE revises these values every quarter. |
| What if all output is sold? | Sale of all output earns 29.58 c€/kWh up to 3 kWc, 25.20 c€/kWh for 3–9 kWc, 18.00 for 9–36 kWc, 15.65 for 36–100 kWc and 14.32 for 100–500 kWc (requests made 1 Aug–31 Oct 2026). The order covers installations on buildings, hangars and shade structures. |
| Can I self-consume without exporting? | Yes, but the system must still be declared to EDF before it is switched on. Up to 36 kVA, EDF uses a simplified no-injection agreement (SEI REF 14), and the meter must be electronic or digital. Above 36 kVA, EDF studies the impact on the network free of charge first. |
| Is batteries’ output paid for? | The order does not support storage. A home battery is allowed, but devices must ensure that stored energy comes only from the solar installation. |
| Can EDF curtail my system? | Intermittent generation in the ZNI can be disconnected under SEI REF 03 to protect system security. The S24 order requires the network operator to compensate the producer for hours of active-power limitation where that applies. |
| Is collective self-consumption possible? | Yes. Participants must have communicating digital meters and be within 2 km of each other, and a legal entity organises the operation. PV producers in such schemes can use the S24 contract. EDF describes the framework as still being developed. |
Connecting a home system.
- Choose the mode: total self-consumption (no export), self-consumption with surplus sale, or sale of all output.
- For export, submit a connection request on EDF’s Portail Raccordement with the required documents. For PV, this request also counts as the request for a purchase contract.
- Sign the quote and the Contrat de Raccordement, d’Accès et d’Exploitation (CRAE) electronically and pay. The CRAE records how surplus will be paid for.
- EDF carries out the connection works, and the producer carries out any works for which it is responsible.
- Have the installation inspected by Consuel and send the certificate of conformity to EDF.
- EDF commissions the installation, after which an EDF energy-purchase agent arranges signature of the purchase contract.
- The producer sends periodic invoices to the local EDF centre using EDF SEI’s template, not the mainland EDF OA portal.
Households can sell solar power in Guadeloupe, but not through net metering. A home that keeps part of its output signs a connection and access contract with EDF. The exported surplus is bought under a 20-year feed-in contract at a tariff set by ministerial order and indexed every quarter by the CRE. On top of that, a one-off investment premium is paid per watt-peak installed. The tariffs are higher than on the mainland, reflecting higher installation costs and the high cost of the generation that solar replaces.
Ground-mounted solar and onshore wind follow a regional rule. Under a regional decision published in the Journal officiel in March 2020, a project can only receive a connection offer if the Conseil régional has given a favourable decision after review by its Commission Photovoltaïque-Éolien. Larger projects also compete in CRE tenders for the ZNI.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (rooftop solar, ≤500 kWc) | No generation licence. You need a connection request to EDF SEI, a Consuel certificate and a purchase contract under the S24 order. Installers must hold a qualification matching the installation type and size. | EDF SEI (connection, purchase); CRE (tariffs) | Planning and building rules still apply under the town-planning code. Plants above 500 kWc go through CRE tenders or negotiated contracts. |
| Generate electricity (ground-mounted PV, onshore wind) | Favourable decision of the Conseil régional after review by the Commission Photovoltaïque-Éolien before EDF will issue a connection offer. The project also needs a planning or building permit and environmental studies. | Région Guadeloupe; State planning services; CRE (tenders) | Regional rules give priority to rooftop PV. Ground-mounted farms above 1.5 MW without storage were prohibited under the Région’s earlier PV rules. |
| Store electricity (household battery) | No licence. A battery behind the meter is treated as part of the customer’s installation and must meet connection and decoupling rules. | EDF SEI | Stored energy does not earn the S24 tariff, and the order requires stored energy to come only from the PV system. |
| Store electricity (grid-scale) | Projects are selected in CRE storage windows (guichets) and contracted with EDF SEI as the operator of the system. They must meet the SEI REF 46 technical specification. | CRE; EDF SEI | The 2025 Guadeloupe window selected five projects totalling 32 MW. |
| Export / sell to the grid | Only to EDF as obligated buyer: through the feed-in tariff, a CRE tender or a CRE-assessed negotiated contract. Below 3 kWc, surplus may be given to the network operator free of charge. | EDF SEI; CRE | There is no route to sell to third parties or into a market. |
| Supply electricity to consumers | Not open to competitors in practice. EDF is the sole supplier and must apply the regulated tariffs. | State (tariff orders); CRE | Collective self-consumption allows local sharing between participants without becoming a supplier. |
| Aggregate / operate a VPP | No framework. There is no market in which an aggregator could sell flexibility. | — | Flexibility comes from EDF’s own plants, centralised storage it controls and contracted producers. |
| Trade / wholesale | No wholesale market exists in Guadeloupe. | — | EDF SEI is the single buyer, and its purchase costs are assessed by the CRE. |
| Balancing and ancillary services | Provided by plants and storage dispatched by EDF SEI under connection rules (SEI REF 01, 02, 05) and contracts. There is no open procurement. | EDF SEI; CRE | EDF’s outlook calls for multi-service storage and synchronous condensers to provide reserves and inertia. |
| Remote control of customer assets | No retail demand-response scheme was identified. The smart meter’s dry contact can switch loads such as water heaters at off-peak times. | EDF SEI | EDF piloted an open-data signal to steer EV charging (2019–2021). |
Licensing in Guadeloupe follows the French energy code, adapted for small isolated systems. Because one company is network operator, system operator, buyer and supplier, the usual mainland roles do not exist here. These include competing suppliers, balance-responsible parties, aggregators and market traders. What matters for a small installation is the connection procedure with EDF SEI, the Consuel certificate and, for export, the purchase contract.
The Région has a delegated power (habilitation) to adapt some energy rules locally. It has used this to control where solar and wind farms are built and to set its own building thermal regulation (RTG) and energy-performance diagnostics. Large plants are planned through the PPE. They are then contracted through CRE tenders or negotiated contracts, which the CRE assesses on a “normal and complete cost” basis.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing / frequency reserves | No | — | No | EDF SEI. Reserves come from EDF’s plants, contracted producers and storage managed by EDF, such as the 5 MW KISS battery. There is no market for distributed assets. |
| Centralised storage windows (guichets) | Restricted | Grid-scale (HTA/HTB connection) | No | CRE / EDF SEI. Storage owners are selected by the CRE and paid through public-service charges, with the storage dispatched by EDF SEI. The 2025 window chose five projects (32 MW) in Guadeloupe. |
| Demand-side management (MDE) | Restricted | — | No | EDF / regional MDE committee. Energy-efficiency subsidies (insulation, efficient air-conditioning, solar water heaters) are funded through the CRE’s territorial compensation framework rather than flexibility payments. |
Guadeloupe has no flexibility market. The small, isolated system is run directly by EDF SEI. It keeps the system secure by dispatching its own plants, contracted producers and centralised storage, and by disconnecting intermittent generation when needed. EDF’s 2024 outlook says the system needs more flexibility. It names storage that is controlled by the system operator, steering of EV charging away from the evening peak, and stronger demand reduction as the main levers.
Household assets therefore do not earn flexibility revenue. The main ways a home interacts with the system are the peak/off-peak tariff, with off-peak from 22:00 to 06:00, and energy-efficiency subsidies under the Agir Plus programme. By 2022, cumulative savings from these actions had already reached 112% of the territory’s 2019–2023 target.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| EDF Guadeloupe open data | Real-time and consolidated production mix, connection queue, maximum PV disconnection, register of generation and storage, and hosting capacity by substation. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Largely complete: about 9 in 10 customers have EDF’s compteur numérique |
| Reading interval | Daily data and finer load-curve data are available in the customer account. The recording interval is not stated on EDF’s Guadeloupe pages. |
| Meter name | Compteur numérique (EDF) |
| Owner / operator | EDF SEI |
| Installed | 144,000 by March 2023; ~90% of customers (2026) |
| Cost to customer | Free (meter and installation) |
| Customer interfaces | EDF DOM & Corse app, online account, Télé-Information Client port, dry contact |
| Pilot | La Désirade fully equipped by July 2018 (first overseas island at 100%) |
EDF SEI has replaced most meters with its compteur numérique. The meter is read remotely, so bills are based on actual consumption. Power changes and moving-in switch-ons can be done without a visit, and faults are found faster. The meter limits power to the subscribed level in the same way as the old breaker. Its display shows the subscribed power, tariff option, apparent power and the day’s maximum demand.
Customers who have not yet had the meter installed are encouraged to book an appointment, because EDF may charge for manual reading visits. The meter has a Télé-Information Client output for home energy-management devices and a dry contact that can switch a water heater in off-peak hours. Customers can ask EDF to stop recording the load curve in the meter.
Renewable electricity.
Electricity generation mix (2023).
- Diesel (Pointe Jarry): 46.7%
- Coal: 13.4%
- Biomass: 11.9%
- Geothermal: 6.6%
- Solar PV: 6.5%
- Wind: 5.7%
- Fuel-oil turbines (TAC): 4.6%
- Bagasse: 2.7%
- Biogas: 1.1%
- Hydro: 0.7%
- Renewable electricity share
- 35.3% (2023)Source 9Derived from EDF’s 2024 Bilan prévisionnel: 589 GWh renewable (205 GWh solar and wind plus 384 GWh geothermal, hydro, biogas, biomass and bagasse) out of about 1,670 GWh. No imports, so generation and consumption shares are the same. EDF’s website rounds it to 35%.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV
- 95 MW (end-2023)Source 9Of which 13 MW PV with storage.
- Wind
- 57 MW (end-2023)Source 9Of which 45 MW wind with storage.
- Geothermal (Bouillante)
- 15 MW (end-2023)Source 9
- Biomass (Albioma Le Moule)
- 33 MW (end-2023)Source 9
- Hydro
- 11 MW (end-2023)Source 9
- Biogas
- 4 MW (end-2023)Source 9
Targets.
- Energy code objective for the ZNI: 100% renewable electricity and energy autonomy by 2030.
- Draft PPE 2023–2033 (approved by the Conseil régional on 25 October 2023): projected renewable share of about 50% for 2023 and 98% for 2028. The decree adopting it had not been published as of the CRE’s 2026 update.
- PPE 2018–2023 adopted by decree on 19 April 2017 and revised on 7 September 2023.
Guadeloupe’s renewable share of electricity rose from 17% in 2013 to about 35% in 2023. The biggest jump came between 2020 (23%) and 2021 (34%), when the OREC’s energy balance recorded 685 GWh of imported wood pellets alongside 275 GWh of local bagasse. The territory has a wider range of renewables than most islands. Bouillante is the only geothermal power plant in the Caribbean. There are also small hydro plants on Basse-Terre, biogas units, including methanisation of distillery effluent, and a large fleet of wind farms, many of them paired with storage to smooth their output.
Solar reached 95 MW in 2023. Most of it is spread across many small installations on the distribution network, along with plants above 100 kWc selected in CRE tenders. The Région gives priority to rooftop solar over ground-mounted farms to protect farmland and landscapes.
In EDF’s 2024 outlook, under its more ambitious scenario, the Pointe Jarry diesel units would switch to bioliquid in 2028. The outlook treats Albioma’s coal/bagasse unit as converted to biomass and bagasse, and drops its other coal unit from 2026. The CRE notes that converting plants to imported biomass and bioliquids is a transitional route to the 2030 targets.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 5 MW (2026)Source 6EDF’s KISS battery at Jarry Nord. Storage built into wind and PV plants is not reported separately. Five further projects (32 MW) were selected in the CRE’s 2025 window.
In the ZNI, storage is mainly centralised and controlled by the system operator, rather than in homes. The CRE assesses each project against the extra production costs it avoids. It then compensates the costs through public-service charges under a methodology revised in November 2024. EDF’s outlook says this storage should be multi-service: providing primary and secondary reserves, shifting solar output to the evening peak and replacing some of the synchronous plant that is being retired.
Home batteries are allowed behind the meter but earn no specific support. Under the S24 feed-in order, a battery cannot be used to export electricity that did not come from the PV system.
Storage projects.
- KISS – Karukera Intelligent Storage System: A 5 MW lithium-ion battery at EDF’s Jarry Nord site, used for frequency control.
- CRE storage window 2025 (Guadeloupe): Five centralised storage projects with a total of 32 MW, to be dispatched by EDF SEI and compensated through public-service charges.
- Wind- and PV-plus-storage plants: 45 MW of wind and 13 MW of solar operate with integrated storage, mainly from earlier CRE tenders for the ZNI.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EDF (EDF Archipel Guadeloupe) | 100%: sole supplier in the overseas regions; 262,477 customers in 2022 (EDF figure) | No | Yes | No | Yes |
There is no supplier competition. EDF supplies every customer at the regulated tariffs, both Tarif Bleu for small customers and the ZNI-specific “transition énergétique” tariffs for supplies above 36 kVA. EDF also buys power from producers at the regulated feed-in tariffs. EDF’s 262,477-customer figure for 2022 is presented on a page covering both the archipelago and the northern islands, so it may include Saint-Martin and Saint-Barthélemy.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Commission de régulation de l’énergie (CRE) | Regulator | National energy regulator | Sets tariff proposals and public-service compensation for the ZNI, runs storage windows and publishes solar feed-in tariffs. |
| EDF Archipel Guadeloupe (EDF SEI) | Distribution | Integrated network operator, system operator, buyer and supplier | Handles every connection, export contract, meter and bill in Guadeloupe. |
| Région Guadeloupe – Guadeloupe Énergie | Government | Regional energy policy, PPE, Commission Photovoltaïque-Éolien, thermal regulation | Approves ground-mounted PV and wind projects and co-writes the energy plan. |
| Observatoire Régional de l’Énergie et du Climat (OREC) | Government | Regional energy and climate statistics (run by Synergîle) | Publishes the territory’s energy balance and key figures. |
| Consuel | Metering | Electrical-installation conformity certification | A Consuel certificate is required before a new consumption or generation installation is energised. |
| Albioma (Le Moule) | Renewable Energy | Independent producer: biomass and bagasse/coal plants | The largest renewable producer on the island. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (LV/MV) | Enedis technical reference, adapted by SEI REF 02, SEI REF 50/51 (≤36 kVA) and SEI REF 07 (>36 kVA) | EDF SEI (under CRE decision of 7 April 2004) | The mainland reference documents apply except where EDF SEI’s island documents differ. |
| Anti-islanding / decoupling protection | SEI REF 04 | EDF SEI | Island-specific decoupling settings for generators. |
| Intermittent generation | SEI REF 03 | EDF SEI | Rules for disconnecting wind and PV in the ZNI to protect system security. |
| Storage (grid-scale) | SEI REF 46 technical specification | EDF SEI | Version for the 2025 Corsica and Guadeloupe storage window. |
| Wiring and service connection | NF C 15-100, NF C 14-100 (NF C 17-200 for outdoor installations) | AFNOR | Installations downstream of the delivery point must comply. |
| Installation conformity | Consuel certificate of conformity | Consuel | Required for first energisation of a delivery point and for PV commissioning. |
| Installer accreditation | Professional qualification or certification required by Annex 5 of the S24 order | Ministry in charge of energy | Needed for feed-in tariff eligibility. It must match the installation type and size. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Network operator approval (export) | Yes | Regional | Connection request, quote and CRAE through EDF’s Portail Raccordement. Studies for requests above 36 kVA are handled by EDF SEI’s producer connection desk. |
| Declaration of no-export system | Yes | Regional | Total self-consumption must be declared to EDF before it is switched on. A simplified agreement applies up to 36 kVA. |
| Consuel conformity certificate | Yes | National | Must be sent to EDF before commissioning. |
| Regional approval (ground PV, wind) | Limited | Regional | A favourable Conseil régional decision after CPV-E review is required before a connection offer. It does not apply to rooftop PV. |
| Planning / building permission | Limited | Local | Under the national town-planning code, depending on the project. Ground-mounted farms submitted to the CPV-E must include permits and environmental studies. |
For a rooftop system, the essential steps are EDF’s connection procedure and the Consuel inspection. Ground-mounted and wind projects also need the Région’s consent before EDF will offer a connection. EDF publishes hosting capacity by substation and the reserved capacity under the regional renewable connection scheme (S3REnR), so developers can see where the network can accept new generation.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| S24 PV ZNI feed-in tariff and investment premium | Active | Feed-in tariff | A 20-year purchase contract for rooftop, hangar and shade-structure PV up to 500 kWc. For requests made 1 Aug–31 Oct 2026 in Guadeloupe: surplus at 18.22 c€/kWh up to 9 kWc, plus a premium of €1.80/Wc up to 3 kWc or €1.09/Wc for 3–9 kWc. Sale of all output earns 25.20–29.58 c€/kWh for small systems. | Order of 5 January 2024; values revised quarterly |
| EDF Agir Plus energy-saving premiums | Active | Grant | Discounts deducted from partner installers’ quotes. They cover insulation (up to 100% of works), solar water heaters (up to €1,000), heat-pump water heaters (€1,000), A+++ air-conditioners (up to €300), ceiling fans (€120) and solar shading (up to €20/m²). Small energy-saving actions in the ZNI are compensated under the CRE’s territorial MDE frameworks, renewed for 2025–2028. | — |
| Chèque énergie | Active | Bill support | A State payment towards energy bills for low-income households, sent from 1 April 2026. It is worth €48–€277, with an average of €177 for EDF customers in Guadeloupe. | 2026 campaign (claims until 31 Dec 2026) |
| National price equalisation (péréquation tarifaire) | Active | Tariff support | Households pay the same pre-tax regulated tariff as in mainland France. Higher local costs are compensated through public-service charges. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters communicate with EDF’s own systems, and customers reach their data through EDF’s app and online account. The meter’s Télé-Information Client port and dry contact are the standard local interfaces for home energy-management devices and water-heater switching.
Grid conditions.
- National peak demand
- 0.256 GW (2023)Source 9Maximum hourly-average power delivered to the grid.
- Annual electricity demand
- 1.67 TWh (2023)Source 9Energy delivered to the grid, including 208 GWh of losses.
- Generation capacity
- 0.574 GW (end-2023)Source 9Derived by summing the plants listed in EDF’s schematic of the system at 31/12/2023, including standby units.
- Interconnection
- 0 GWSource 20Non-interconnected zone: no link to mainland France or neighbouring islands. Marie-Galante and La Désirade are connected by internal submarine cables.
- Curtailment
- Not identified from a reliable public source.
The system is small (a peak of about 256 MW) and isolated, so security rests on keeping enough synchronous plant, reserve and inertia online. The PPE sets the security standard at an average of three hours of supply shortfall a year. EDF’s 2024 outlook found that more firm or storage capacity is needed as old thermal units retire, especially after the Pointe Jarry diesel contract ends in 2037. It also flagged the need for synchronous condensers and storage to replace the stabilising services of thermal plants.
Network resilience to hurricanes is a priority. EDF has put 76% of its MV network underground and is building new 63 kV underground links, such as an €18.3 million cable between Jarry and Petit-Bourg.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Removal of 18–36 kVA Base tariffs | Upcoming | 1 February 2027 | Residential Base option contracts at 18–36 kVA, already closed to new customers, are due to be withdrawn. Customers must move to peak/off-peak. |
| Peak/off-peak required for 9 kVA and above | Current | 1 February 2026 | New residential customers at 9 kVA or more can no longer take the Base option. From 1 August 2026, 3 kVA customers may choose peak/off-peak. |
| ZNI public-service charges funded by excise surcharge | Current | August 2025 (5.66 €/MWh from 1 Feb 2026) | Price equalisation in the ZNI is now funded through a surcharge on electricity and fossil-fuel excise rather than the general State budget. The surcharge is revised each year. |
| New connection procedure for ≤36 kVA consumers | Current | 9 January 2026 | EDF SEI’s SEI REF 51 sets out how low-voltage consumption, and combined consumption and generation, connection requests up to 36 kVA are handled. |
| PPE 2023–2033 | Upcoming | Decree pending | Approved by the Conseil régional on 25 October 2023. As of the CRE’s 2026 update, no PPE for 2023–2033 had been published for Guadeloupe. |
| Centralised storage from 2025 CRE window | Upcoming | Commissioning dates not published | Five projects totalling 32 MW were selected for Guadeloupe. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | S24 feed-in tariffs and premiums are active for systems from 0 to 500 kWc. 95 MW of mostly distributed PV was connected by end-2023 and 74% of homes are houses, but residential capacity is not published separately. |
| Distributed energy market | Medium | Solar and wind supplied 12% of generation in 2023. Self-consumption (total, partial and collective) is provided for, but there are no market routes for distributed assets. |
| Grid flexibility market | Low | There is no balancing, capacity or flexibility market or aggregator framework. Flexibility is dispatched by the integrated operator EDF SEI. |
| Energy storage adoption | Medium | The 5 MW KISS battery, 58 MW of wind and PV plants with integrated storage, and 32 MW selected in the 2025 CRE window. Home storage receives no support. |
| Renewable growth environment | Medium | The renewable share rose from 23% (2020) to 35% (2023), mainly through biomass conversion. The 2030 target is 100%. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 27 sources
- Grilles de prix du Tarif Bleu « Résidentiel » – tarifs TTC en Guadeloupe applicables au 1er août 2026. EDF Archipel Guadeloupe, 2026. accessed 9 October 2026.
- Grille de prix Tarif Bleu Résidentiel – tarifs HT applicables au 1er août 2026 (Guadeloupe). EDF Archipel Guadeloupe, 2026. accessed 9 October 2026.
- Tout comprendre sur le tarif de l’électricité en DROM et en Corse. EDF Archipel Guadeloupe, 2026. accessed 9 October 2026.
- Tout savoir sur le compteur numérique. EDF Archipel Guadeloupe. accessed 9 October 2026.
- Les réseaux électriques. EDF Archipel Guadeloupe, 2023. accessed 9 October 2026.
- Nos moyens de production électrique en Guadeloupe. EDF Archipel Guadeloupe. accessed 9 October 2026.
- La transition énergétique de l’archipel Guadeloupe (mix électrique 2023). EDF Archipel Guadeloupe, 2023. accessed 9 October 2026.
- Acteur industriel au service du public. EDF Archipel Guadeloupe, 2022. accessed 9 October 2026.
- Bilan prévisionnel 2024 de l’équilibre offre-demande d’électricité – Guadeloupe. EDF SEI, 2024. accessed 9 October 2026.
- La Guadeloupe, territoire d’expérimentation de smart grids. EDF Archipel Guadeloupe. accessed 9 October 2026.
- L’autoconsommation (totale, partielle et collective). EDF Archipel Guadeloupe. accessed 9 October 2026.
- Autoconsommation partielle – CRAE et valorisation du surplus. EDF Archipel Guadeloupe. accessed 9 October 2026.
- Opération d’autoconsommation collective. EDF Archipel Guadeloupe. accessed 9 October 2026.
- Votre raccordement : les étapes à suivre (producteurs). EDF Archipel Guadeloupe. accessed 9 October 2026.
- Les référentiels techniques applicables. EDF Archipel Guadeloupe. accessed 9 October 2026.
- Le chèque énergie. EDF Archipel Guadeloupe, 2026. accessed 9 October 2026.
- Calculer mon aide financière (primes Agir Plus). EDF Archipel Guadeloupe. accessed 9 October 2026.
- SEI REF 51 – Procédure de traitement des demandes de raccordement d’une installation de consommation BT ≤ 36 kVA. EDF SEI, 2026. accessed 9 October 2026.
- Dossier complet – Département de la Guadeloupe (971). INSEE, 2023. accessed 9 October 2026.
- Transition énergétique dans les ZNI. Commission de régulation de l’énergie, 2026. accessed 9 October 2026.
- Arrêtés tarifaires photovoltaïques en ZNI – révision trimestrielle (Tarifs S24 ZNI T10). Commission de régulation de l’énergie, 2026. accessed 9 October 2026.
- Arrêté du 5 janvier 2024 fixant les conditions d’achat de l’électricité produite par les installations photovoltaïques sur bâtiment, hangar ou ombrière ≤ 500 kWc en ZNI. Légifrance, 2024. accessed 9 October 2026.
- Adoption par le Conseil régional du projet de PPE de Guadeloupe pour la période 2023-2033. Région Guadeloupe – Guadeloupe Énergie, 2024. accessed 9 October 2026.
- Appel à projet – Commission Photovoltaïque-Éolien décembre 2025 / janvier 2026. Région Guadeloupe – Guadeloupe Énergie, 2025. accessed 9 October 2026.
- Photovoltaïque – le cadre réglementaire. Région Guadeloupe – Guadeloupe Énergie. accessed 9 October 2026.
- Chiffres clés de l’énergie 2021 – synthèse. OREC Guadeloupe, 2022. accessed 9 October 2026.
- Consommation d’énergie en Guadeloupe. OREC Guadeloupe, 2020. accessed 9 October 2026.
Questions about energy in Guadeloupe.
From 1 August 2026, EDF’s regulated Tarif Bleu Base option costs 18.89 c€/kWh including taxes at 3–6 kVA. The standing charge is €175.56 a year at 6 kVA. With the peak/off-peak option, peak hours cost 20.18 c€/kWh and off-peak hours (22:00–06:00) cost 15.11 c€/kWh.
Under national price equalisation, households pay the same pre-tax regulated tariff as in mainland France. The extra cost of island generation (€369/MWh on average across the ZNI in 2025) is compensated to EDF through public-service charges. VAT is also lower, at 8.5%.
No. In the overseas regions EDF is the sole supplier and must offer the regulated tariffs. It also runs the grid and meters.
Yes. Rooftop systems up to 500 kWc can sell their surplus or all their output to EDF under a 20-year contract at tariffs set by the 5 January 2024 order. For requests made between August and October 2026, surplus from systems up to 9 kWc earns 18.22 c€/kWh plus an investment premium. There is no net metering.
Each connection has a Point de Livraison, also called a PRM, identified by a unique 14-digit number that can be shown on the smart meter’s display. EDF bills in the overseas regions show an “Espace de Livraison” (EDL) number. That is the reference to give when asked for a PDL, for example for the chèque énergie.
EDF SEI (EDF Archipel Guadeloupe) runs both the 63 kV transmission network and the distribution network, the latter under a concession from the Syndicat Mixte d’Électricité de la Guadeloupe. It also balances supply and demand. The CRE regulates it.
About 35% in 2023, from biomass and bagasse, geothermal (Bouillante), solar, wind, biogas and hydro. Most of the rest comes from the Pointe Jarry diesel plant, coal and fuel-oil turbines. French law sets a target of 100% renewable electricity in the ZNI by 2030.