Countries

Energy in Martinique, explained.

How electricity works in Martinique: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Martinique: Not yet available.Olmack is not offered in Martinique yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Martinique.

Martinique electricity 2026: EDF as sole island grid operator and supplier, regulated Tarif Bleu at mainland prices, S24 solar feed-in tariffs, PRM and EDL identifiers.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Martinique energy at a glance.

Key figures for households in Martinique. Each one links to its source on the full overview below.

  • Electricity price.

    0.19 EUR per kWh for households, including taxes. Figures for From 1 Aug 2026.

  • Renewable share.

    26.5% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Martinique.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Martinique below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Martinique requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Martinique.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Martinique, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Martinique, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Martinique.

Full overview

The energy market in Martinique, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Martinique is a French overseas region in the Lesser Antilles, governed by a single Collectivité Territoriale de Martinique (CTM). Its electricity system is a “zone non interconnectée” (ZNI): there is no cable to mainland France or to the neighbouring islands of Dominica and Saint Lucia, so every kilowatt-hour used on the island is generated there. In 2023 about 1.5 TWh was fed into the grid and demand peaked at 232 MW.

French energy law applies, adapted for small isolated systems. EDF, through its island systems division EDF SEI (EDF en Martinique), owns and runs the 63 kV transmission network, runs the distribution network under a concession from the Syndicat Mixte d’Électricité de la Martinique (SMEM), balances the system in real time, buys the output of independent producers and is the only electricity supplier. The Commission de régulation de l’énergie (CRE) regulates it.

Households pay the national regulated tariff (Tarif Bleu). Under “péréquation tarifaire”, the price before taxes is the same as in mainland France, although island generation costs far more; the difference is compensated as a public-service charge. The system still relies heavily on oil: in 2023 the diesel plants at Bellefontaine and Pointe des Carrières and a set of combustion turbines supplied about three-quarters of the electricity. The rest came mainly from the Galion bagasse-biomass plant, solar PV, wind with storage and waste incineration.

Energy snapshot.

Headline figures for electricity in Martinique. Each shows its data year and links to its source.

  • Population360,630 peopleSource 292023
  • Households172,093 householdsSource 292023
  • Average household size2.06 people/householdSource 292023
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (EUR)0.19 EUR/kWhSource 1From 1 Aug 2026
  • Renewable electricity share26.5%Source 72023
  • Solar capacity0.096 GWSource 7end-2023
  • Wind capacity0.012 GWSource 7end-2023
  • Energy storage capacity0.017 GWSource 7end-2023
  • Smart-meter share90%Source 52026
Market structure
Vertically integrated
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
Commission de régulation de l’énergie (CRE)
System operator
EDF SEI (EDF en Martinique), which owns and runs the 63 kV transmission network and balances the system
Distribution networks
Single network operator: EDF runs the HTA/BT distribution network under a concession contract with the Syndicat Mixte d’Électricité de la Martinique (SMEM).
Currency
Euro (EUR)
Voltage and frequency
230/400 V / 50 Hz

Electricity prices in Martinique.

Household price (EUR)
0.19 EUR/kWh (From 1 Aug 2026)Source 1Tarif Bleu Résidentiel, Base option, 3 and 6 kVA: unit energy price including taxes (OMR 1.5%, accise 3.062 c€/kWh, VAT 8.5%). Excludes the standing charge of €175.56 a year at 6 kVA. Peak/off-peak option: 20.25 c€ peak, 15.18 c€ off-peak.
Typical annual electricity bill
Not identified from a reliable public source.

The household price is the national regulated tariff (tarif réglementé de vente, TRV). The State sets it on the CRE’s proposal, usually on 1 February and 1 August. It was stable on average on 1 February 2026 and rose by an average of 2.5% for residential customers on 1 August 2026. For residential customers up to 36 kVA, the pre-tax tariff is the same as in mainland France, apart from a small “rémanence d’octroi de mer” (0.6026 c€/kWh in the August 2026 grid). This recovers the regional sea-dock tax that EDF pays on its own purchases and is recalculated each year.

Price equalisation and who pays the extra cost

Generating electricity in France’s non-interconnected zones cost an average of €369/MWh in 2025, according to the CRE, well above what the tariff recovers. The gap is a public-service charge (charges de service public de l’énergie, SPE) that the CRE calculates each year and pays to EDF. Since August 2025 it has been funded by a surcharge on the excise duties on electricity and fossil fuels, set at €5.66/MWh from 1 February 2026.

Taxes on a Martinique bill

The tax-inclusive price includes four items. The excise duty on electricity (accise, formerly CSPE) is 3.062 c€/kWh. The CTA is a 15% contribution on the fixed network part of the standing charge. The regional sea-dock tax (octroi de mer régional, OMR) is 1.5%; its rate is set by the CTM. VAT is 8.5%, the reduced overseas rate, applied to the standing charge and consumption including the accise and CTA. Because VAT is lower than on the mainland, the tax-inclusive price per kWh is also lower, even though the pre-tax tariff is the same.

Tariff structure is being reshaped

To move demand into off-peak hours, the State and CRE have changed the Base option in the overseas regions and Corsica. Since February 2026, new contracts at 9 kVA or more must use peak/off-peak pricing. Base contracts at 18–36 kVA are already closed and are due to be withdrawn on 1 February 2027. Low-income households receive the State’s chèque énergie, sent from 1 April each year. EDF says 49,600 of its Martinique customers used it in 2023.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesTarif Bleu Résidentiel, Base option (from 1 Aug 2026, incl. taxes): 18.96 c€/kWh at 3–6 kVA and 18.81 c€/kWh above. Standing charges are €133.59 a year at 3 kVA, €175.56 at 6 kVA and €220.69 at 9 kVA. Base contracts at 9–15 kVA have been closed to new customers since 1 February 2026.
Off-peakYesHeures Pleines / Heures Creuses option: 20.25 c€/kWh peak and 15.18 c€/kWh off-peak (incl. taxes), with the same standing charges as Base. Off-peak hours are 22:00 to 06:00 every day. The option has been open to 3 kVA customers since 1 August 2026.
Time-of-useLimitedOnly the two-period peak/off-peak option is offered to households. There is no multi-period, seasonal or critical-peak tariff.
DynamicNoEDF is the only supplier and there is no wholesale market, so no market-indexed or dynamic offer exists.
FixedNoThere are no competing fixed-price offers. The regulated tariff is set by the State on the CRE’s proposal and normally changes on 1 February and 1 August.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
3,838 kWh/person/yr (2023)Source 7All sectors. Derived: 1,511 GWh delivered to the grid minus 127 GWh of network losses (1,384 GWh delivered to customers), divided by the INSEE RP2023 population of 360,630.
Heat pumps
Not identified from a reliable public source.
Air conditioning
33.8 % of homes (2023)Source 29INSEE: principal residences with at least one air-conditioned room (22.5% in 2012).
Electric vehicles
3,800 vehicles (end-2023)Source 7More than 3,800 battery-electric and plug-in hybrid light vehicles, about 2% of the light-vehicle fleet.
Electric cooking
Not identified from a reliable public source.

About 1,511 GWh was delivered to the grid in 2023, 4% less than ten years earlier. Network losses were 127 GWh (8.4%). Consumption had drifted down since 2016 before rising by 1.4% in 2023. EDF says that year was the second hottest since 1965, so air-conditioners ran more, while energy-saving work offset much of the rise. By value, 62% of billed energy was sold on the Tarif Bleu (households and small businesses) and 38% on the Tarif Bleu+ and Tarif Vert (medium and large businesses, industry and local authorities).

The climate is warm all year, so demand varies little by season and is slightly lower in the cooler months. The daily curve has a daytime peak driven by air-conditioning in offices and shops and an evening peak driven by households, mainly lighting and appliances. Solar output now lowers the midday demand that conventional plants must meet, so the hardest hours for the system are early evening. Demand is concentrated around Fort-de-France and Le Lamentin.

INSEE’s 2023 census found that 34% of homes have at least one air-conditioned room and 39% have a solar water heater, up from 15% in 2012. Solar water heating has long been subsidised to keep this load off the grid. Electric vehicles are a small but growing load: more than 3,800 were on the road at the end of 2023. EDF’s outlook assumes that at least part of their charging will be steered away from the evening peak.

Housing and households.

Dwellings
221,736 dwellings (2023)Source 2977.5% principal residences, 7.5% second or occasional homes and 15.0% vacant (33,338 dwellings).
Owner-occupied
53.5% (2023)Source 29Share of principal residences.
Private rented
21.7% (2023)Source 29Derived: all tenants (38.8%) minus tenants of unfurnished social (HLM) housing (17.1%). A further 7.7% of households are housed free of charge.
Social or public housing
17.1% (2023)Source 29Principal residences rented unfurnished from an HLM social landlord.
Houses
60% (2023)Source 29Share of all dwellings that are houses (63.8% in 2012).
Apartments and flats
39.3% (2023)Source 29
Urban population
Not identified from a reliable public source.

Six in ten dwellings are houses and just over half of households own their home, so rooftop solar and solar water heaters are practical for a large part of the housing stock. Apartments are a growing share: 39% of dwellings in 2023, up from 36% in 2012.

The number of households keeps rising even though the population is falling, because households are getting smaller: 2.06 people per home in 2023, and 41% of households are one person living alone. One dwelling in seven is vacant. Social (HLM) housing makes up 17% of principal residences.

How the grid works in Martinique.

  1. TransmissionEDF SEI – EDF en Martinique, EDF SEI – EDF en Martinique
  2. DistributionSingle network operator: EDF runs the HTA/BT distribution network under a concession contract with the Syndicat Mixte d’Électricité de la Martinique (SMEM).
  3. MeteringEDF SEI
  4. Supply1 or more retail suppliers

Generation is dominated by a few large oil-fired plants. The largest is EDF PEI’s Bellefontaine diesel plant (twelve 17.6 MW engines, 211 MW), which entered service in the mid-2010s and produced 765 GWh in 2023. EDF’s Pointe des Carrières plant in Fort-de-France has two diesel units (305 GWh) and two combustion turbines. Further turbines are at Bellefontaine, at the SARA refinery and at Albioma’s Galion site. Albioma’s Galion plant (34–36.5 MW) burns bagasse during the sugar season and imported biomass the rest of the year, and is the largest renewable source. There is also 96 MW of solar, a 12 MW wind farm with storage at Grand-Rivière, a 5 MW waste-to-energy plant in Fort-de-France and 1.4 MW of biogas.

Power flows over EDF’s 63 kV network to source substations, then through 20 kV feeders to MV/LV substations and the 230/400 V network. Most solar is connected to distribution feeders that also serve consumers. The north Atlantic and north Caribbean coasts, where many wind and solar projects are planned, are now short of connection capacity. A new underground link between the Trinité and Lamentin substations is due by the end of 2027.

Commercially, the chain is short. EDF SEI buys power from independent producers under feed-in tariffs, CRE tenders or CRE-approved negotiated contracts, runs its own plants, and EDF supplies every customer at the regulated tariff. The CRE reimburses EDF for the gap between generation costs and tariff revenue through public-service charges. Because the system is small and isolated, EDF can order wind and solar plants to disconnect (rule SEI REF 03) to keep enough reserve and inertia online.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry in charge of energy (State, through the Préfet and DEAL) and Collectivité Territoriale de MartiniqueThe State and the CTM jointly draw up the Programmation pluriannuelle de l’énergie (PPE). The current PPE dates from 2018 and was revised in 2021; a 2024–2033 revision went through public consultation in 2022–2023 but has not yet been adopted by decree. The Préfet fixes the target capacity of the renewable connection scheme (S2REnR).
RegulatorCommission de régulation de l’énergie (CRE)Proposes regulated tariffs, calculates the public-service charges that compensate EDF SEI, assesses negotiated power-purchase contracts, runs storage selection windows and ZNI renewable tenders, and publishes the quarterly solar feed-in tariffs.
TSOEDF SEI – EDF en MartiniqueOperates and develops the HTB (63 kV) transmission network, about 238 km of high-voltage lines. RTE, the mainland TSO, has no role here, although its technical rules apply where EDF SEI has not adapted them.
System operatorEDF SEI – EDF en MartiniqueDispatches all plants, balances supply and demand in real time and publishes the annual supply-demand outlook (Bilan prévisionnel). It can also disconnect wind and solar plants when needed to keep the system secure.
DSOEDF SEI under concession from SMEMOperates the HTA (20 kV) and low-voltage (230/400 V) networks under a concession contract with the Syndicat Mixte d’Électricité de la Martinique. About 70% of the 20 kV network was underground in 2021. EDF invested €56 million in its network and plant in 2023.
SupplierEDF (sole supplier)EDF is the only electricity supplier in the overseas regions and Corsica and must offer the regulated tariffs to every customer.
MeteringEDF SEIOwns, installs and reads all meters, including the “compteur numérique” smart meter. There is no separate meter operator.

Compared with the UK system.

Compared with the UK system.
UK conceptMartinique equivalentHow it works
DNOEDF SEI (gestionnaire du réseau de distribution)One network operator for the whole island, working under a concession from SMEM, the local authorities’ electricity syndicate. EDF plans, builds and repairs the network and connects customers and generators. Enedis, the mainland DSO, does not operate here, but its technical reference documents apply where EDF SEI has not published its own.
National Grid/NESOEDF SEI as transmission and system operatorThe same company runs the 63 kV transmission network and dispatches every plant. There is no independent system operator, balancing market or capacity market. EDF schedules generation for economy and security and publishes a 15-year Bilan prévisionnel to the security standard set in the PPE (three hours of shortfall a year on average).
MPANPRM / PDL (14 digits) and the 6-digit EDL number on the billTechnically, each connection is a Point de Livraison, also called a Point de Référence et Mesure (PRM), with a unique 14-digit number shown on one of the smart meter’s screens. For customer purposes, EDF’s overseas bills use a 6-digit “Espace de Livraison” (EDL) reference. This is the number asked for in place of the PDL, for example when applying for the chèque énergie.
MPRNNo equivalentThere is no mains gas network, so there is no gas supply-point identifier.
Meter operatorEDF SEIEDF owns and maintains the meter as part of its network role and replaces old meters free of charge. Customers whose meter has not been replaced may be charged for manual reading visits.
SupplierEDF (regulated tariff only)Households cannot switch supplier. Under the small-isolated-system derogation, EDF is both the network operator and the sole supplier at the regulated Tarif Bleu.
Smart-meter infrastructureEDF compteur numérique, read remotely by EDFMeters are read remotely and data goes directly into EDF’s own systems. There is no DCC-style central data company. Customers see their consumption in the EDF DOM & Corse app, their online account or EDF’s e.quilibre service.

How a supply point is identified.

25184639027154 (fictional PRM); 482917 (fictional EDL)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Point de Livraison / Point de Référence et Mesure (on bills: Espace de Livraison) (PDL / PRM; EDL)
Who issues it?EDF SEI, as network operator, when the connection is created. First energisation requires a Consuel conformity certificate.
FormatPRM: 14 digits, unique to the delivery point and viewable on one of the smart meter’s screens. EDL: a 6-digit reference printed on EDF bills in Corsica and the overseas territories.
Length14 digits (PRM); 6 digits (EDL)
Stays with the property when you switch supplier?Yes
Where to find itThe EDL number is printed on the EDF bill. The 14-digit PRM can be found by scrolling through the smart meter’s screens with the + and – keys. The bill also shows the customer reference (« pour tout contact ») and the meter serial number, which is also printed on the meter.
Electronic accessCustomers see their consumption by month, by day or in finer detail in the EDF DOM & Corse app, their online account (sei-ael-martinique.edf.com) or the e.quilibre service. The meter also has a Télé-Information Client output for home energy-management devices.
Third-party accessNo public third-party data platform for consumers was identified. EDF holds the data, and customers exercise their GDPR rights through EDF, including asking it to stop recording the load curve in the meter. EDF publishes aggregated system data (production mix, connection queue, hosting capacity, consumption by area) on its Martinique open-data portal.
Who keeps the registerHeld in EDF SEI’s own customer and network systems. EDF SEI, not Enedis, operates the network in Martinique.
Register scopeRegional

Martinique uses the same 14-digit PRM concept as mainland France, but in an integrated system. EDF SEI’s connection procedure for consumers up to 36 kVA (SEI REF 51, in force since 9 January 2026) defines the Point de Livraison as the boundary between the public network and the customer’s installation. It sits at the downstream terminals of the main switch-breaker (AGCP) of the service connection. The procedure says this point is also called a PRM and has a unique 14-digit number that can be displayed on the meter. Everything upstream belongs to the public network and is maintained by EDF; everything downstream must comply with NF C 15-100 and is the customer’s responsibility.

In everyday use the bill carries a different reference. EDF explains that the 14-digit PDL is the identifier used in mainland France, while in Corsica and the overseas territories the 6-digit EDL (Espace de Livraison) is used instead. The chèque énergie application asks for the EDL. Because EDF is also the only supplier, neither identifier is used to switch supplier. They are used for connection work, meter interventions, social schemes and EDF’s billing.

Moving home or a new connection

A new occupant opens a contract with EDF by giving their contact details, the new address, a meter reading, bank details and, if possible, the previous occupant’s name. A departing occupant quotes the « pour tout contact » reference on their bill. In a home with a compteur numérique, supply can be switched on in under 24 hours without a technician. A brand-new connection is requested through EDF’s Portail Raccordement. The quote is accepted, EDF carries out the work and the home must pass a Consuel inspection before the delivery point is energised.

Meter and point identifiers are different

The meter has its own serial number, printed on the meter and on the back of the bill. If the meter is replaced, its number changes but the delivery point does not. The PRM identifies the connection at the property, not the customer or the device.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingNo
How exported electricity is paidRegulated feed-in tariff under the 5 January 2024 “S24 PV ZNI” order, paid by EDF as obligated buyer. Surplus can be sold, or the whole output sold. Installations under 3 kWc may instead give their surplus to the network operator free of charge. Larger projects can sell through CRE tenders.
What does surplus solar earn?For complete connection requests made between 1 August and 31 October 2026, surplus from Martinique installations up to 9 kWc is bought at 18.22 c€/kWh, and from 9 to 100 kWc at 7.19 c€/kWh. A one-off investment premium is also paid: €1.71/Wc up to 3 kWc, €1.04/Wc for 3–9 kWc, €0.78/Wc for 9–36 kWc and €0.53/Wc for 36–100 kWc. The CRE revises these values every quarter.
What if all output is sold?For requests made 1 Aug–31 Oct 2026, sale of all output earns 28.22 c€/kWh up to 3 kWc, 24.04 for 3–9 kWc, 17.17 for 9–36 kWc, 14.93 for 36–100 kWc and 16.02 for 100–500 kWc. The order covers PV on buildings, hangars and shade structures up to 500 kWc.
Can I self-consume without exporting?Yes, but the system must be declared to EDF before it is switched on. Up to 36 kVA, EDF uses a simplified no-export agreement (SEI REF 14) and aims to return it signed within 15 working days; the meter must be electronic or digital. Above 36 kVA, EDF first studies the impact on the network free of charge.
Can I store solar power in a battery?A home battery can sit behind the meter as part of the customer’s installation, and EDF’s self-consumption guidance treats energy not consumed (or stored) on site as surplus that can be exported under partial self-consumption. The S24 tariff does not pay anything extra for storage.
Can EDF curtail my system?Yes. Intermittent generation in the ZNI can be disconnected under SEI REF 03 to protect system security. EDF publishes the maximum PV disconnection level on its open-data portal.
Is collective self-consumption possible?Yes, under a framework EDF describes as still being refined. All participants need communicating digital meters, the furthest apart must be within 2 km, and a legal entity organises the operation. PV producers can use the S24 contract, while other renewable sources need CRE-assessed bespoke contracts.

Connecting a home system.

  1. Choose the mode: total self-consumption (no export), self-consumption with surplus export, or sale of all output.
  2. For export, submit a connection request on EDF’s Portail Raccordement with the required documents. For PV, this request also counts as the request for a purchase contract.
  3. Sign the quote and the Contrat de Raccordement, d’Accès et d’Exploitation (CRAE) electronically and pay. The CRAE records how the surplus will be paid for.
  4. EDF carries out the connection works, and the producer completes any works that fall to it and uploads the end-of-works certificate.
  5. Have the installation inspected by Consuel and send the certificate of conformity to EDF.
  6. EDF commissions the installation. An EDF energy-purchase agent then arranges signature of the purchase contract, after which the producer invoices EDF using its templates.

Households can sell solar power in Martinique, but not through net metering. A home that keeps part of its output signs a connection and access contract (CRAE) with EDF. The exported surplus is bought under a purchase contract at a tariff set by ministerial order and indexed every quarter by the CRE. On top of that, a one-off investment premium is paid per watt-peak installed. Because installation costs and the cost of the oil-fired generation that solar displaces are both high, the tariffs are higher than on the mainland.

Connection capacity is becoming the main constraint. The 2020 renewable connection scheme (S2REnR) for Martinique has reached its reserved-capacity threshold because of strong demand from solar and wind projects. In March 2026 the Préfet set a target capacity of 175 MW for the revised scheme, which EDF began preparing in July 2026. EDF publishes indicative hosting capacity for each source substation.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (rooftop solar, ≤500 kWc)No generation licence. Requires a connection request to EDF SEI (or a no-export declaration), a Consuel certificate and, for export, a purchase contract under the S24 order. Installers must hold a qualification matching the installation type and size to qualify for the tariff.EDF SEI (connection, purchase); CRE (tariffs)Town-planning rules still apply. Plants above 500 kWc go through CRE tenders or negotiated contracts.
Generate electricity (ground-mounted PV, wind, biomass)Planning permission and environmental procedures under national law; connection through EDF SEI’s procedure for installations above 36 kVA (SEI REF 07). Revenue comes from CRE tenders or CRE-assessed negotiated contracts.State (Préfet, DEAL); CRE; EDF SEIProjects must fit within the S2REnR capacity reserved at each substation, which is currently being revised.
Store electricity (household battery)No licence. A battery behind the meter is treated as part of the customer’s installation and must meet EDF SEI’s connection and decoupling rules.EDF SEINo specific support or remuneration for home storage.
Store electricity (grid-scale)Projects are selected in CRE storage windows (guichets) and contracted with EDF SEI as system operator. They must meet the SEI REF 46 technical specification.CRE; EDF SEIThe 2024 window for Martinique and La Réunion selected three Martinique projects of about 15 MW in total.
Export / sell to the gridOnly to EDF as obligated buyer: through the feed-in tariff, a CRE tender or a CRE-assessed negotiated contract. Below 3 kWc, surplus may be given to the network operator free of charge.EDF SEI; CREThere is no route to sell to third parties or into a market.
Supply electricity to consumersNot open to competitors in practice. EDF is the sole supplier and must apply the regulated tariffs.State (tariff orders); CRECollective self-consumption allows local sharing between participants without becoming a supplier.
Aggregate / operate a VPPNo framework. There is no market in which an aggregator could sell flexibility.—Flexibility comes from EDF’s plants, contracted producers and storage dispatched by EDF SEI.
Trade / wholesaleNo wholesale market exists in Martinique.—EDF SEI is the single buyer, and the CRE assesses its purchase costs.
Balancing and ancillary servicesProvided by plants and storage dispatched by EDF SEI under its technical rules (SEI REF 01, 02, 05) and contracts. There is no open procurement.EDF SEI; CREEDF’s outlook expects about 40 MW of primary and 50 MW of secondary reserve to be needed by 2033, largely from storage.
Remote control of customer assetsNo retail demand-response scheme was identified. The smart meter’s dry contact can switch loads such as water heaters at off-peak times, and EDF’s subsidised Éco-recharge points schedule EV charging into off-peak hours.EDF SEIEDF has tested steering public EV chargers with an open-data grid signal (Madin’Drive).

Licensing in Martinique follows the French energy code, adapted for small isolated systems. Because one company is network operator, system operator, buyer and supplier, many mainland roles do not exist here, including competing suppliers, balance-responsible parties, aggregators and traders. For a small installation, what matters is EDF SEI’s connection procedure, the Consuel certificate and, for export, the purchase contract.

Large plants are planned through the PPE and contracted through CRE tenders or negotiated contracts, which the CRE assesses on a “normal and complete cost” basis. Grid-scale storage is procured through CRE windows. The Préfet sets the capacity of the S2REnR, which determines how much renewable generation each substation can accept and how network reinforcement costs are shared among producers.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Balancing / frequency reservesNo—NoEDF SEI. Reserves come from EDF’s plants, contracted producers and storage dispatched by EDF, such as the 5 MW Novagrid battery dedicated to primary reserve. There is no market for distributed assets.
Centralised storage windows (guichets)RestrictedGrid-scale (HTA/HTB connection)NoCRE / EDF SEI. Storage owners are selected by the CRE and paid through public-service charges, with the storage dispatched by EDF SEI. The 2024 window selected three Martinique projects totalling about 15 MW.
Demand-side management (MDE)Restricted—NoEDF / regional MDE committee. Energy-efficiency subsidies (insulation, efficient air-conditioning, solar water heaters, controlled EV charging) are funded through the CRE’s territorial compensation framework, not flexibility payments.

Martinique has no flexibility market. EDF SEI keeps the small isolated system secure by dispatching its own plants, contracted producers and centralised storage, and by disconnecting intermittent generation when needed. Its 2024 outlook says growing wind and solar will increase the need for flexibility. It names storage controlled by the system operator, synchronous condensers for inertia, and controlled EV charging as the main levers.

Household assets therefore earn no flexibility revenue. A home interacts with the system through the peak/off-peak tariff (off-peak 22:00–06:00), the meter’s dry contact for water heaters and energy-efficiency subsidies under the Agir Plus programme. EDF reports that energy-saving actions avoided about 66 GWh of consumption in 2023.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
EDF Martinique open dataReal-time and consolidated production mix, CO2 emissions, connection queue, maximum PV disconnection, register of generation and storage, network maps, hosting capacity and an EV-charging signal.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutLargely complete: about 9 in 10 customers have EDF’s compteur numérique
Reading intervalDaily data and finer load-curve data are available in the customer account. The recording interval is not stated on EDF’s Martinique pages.
Meter nameCompteur numérique (EDF)
Owner / operatorEDF SEI
Installed113,308 by end-August 2021; 86% of households (March 2024); ~90% of customers (2026)
Cost to customerFree (meter and installation)
Customer interfacesEDF DOM & Corse app, online account, e.quilibre, Télé-Information Client port, dry contact
Remote servicesRemote reading, power changes and switch-on when moving in

EDF SEI has replaced most meters with its compteur numérique. Bills are based on actual readings, power changes and moving-in switch-ons are done remotely, and faults are found faster. The meter limits power to the subscribed level with the same tolerance as the old breaker. Its display shows the tariff option, subscribed power, current apparent power and the day’s maximum demand.

Customers whose meter has not yet been replaced are urged to book an appointment, because EDF may charge for manual reading visits. The meter has a Télé-Information Client output for home energy-management devices and a dry contact that can switch a water heater in off-peak hours. Customers can ask EDF to stop recording the load curve in the meter.

Renewable electricity.

Electricity generation mix (2023).

  • Diesel (Bellefontaine): 50.8%
  • Diesel (Pointe des Carrières): 20.3%
  • Bagasse and biomass: 15.9%
  • Solar PV: 6.6%
  • Fuel-oil combustion turbines: 2.4%
  • Wind (with storage): 2.3%
  • Waste incineration: 1.7%
Source 7
Renewable electricity share
26.5% (2023)Source 7Derived from EDF’s 2024 Bilan prévisionnel: 399 GWh renewable (134 GWh solar and wind, 265 GWh bagasse-biomass, waste incineration and biogas) out of about 1,506 GWh generated. EDF rounds this to 27% in the Bilan and 26% on its website. No imports, so generation and consumption shares are the same.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Solar PV
96 MW (end-2023)Source 7Of which 13 MW PV with storage.
Wind (with storage)
12 MW (end-2023)Source 7
Bagasse/biomass (Albioma Galion)
36.5 MW (end-2023)Source 734 MW during the sugar season, when part of the steam goes to the sugar mill.
Waste incineration
5 MW (end-2023)Source 7
Biogas
1.4 MW (end-2023)Source 7

Targets.

  • PPE objective: 100% renewable electricity in Martinique by 2030.
  • PPE 2018–2023 adopted by decree on 4 October 2018, with a simplified revision on 30 June 2021.
  • PPE 2024–2033 revision: public consultation held in 2022–2023; no decree adopting it had been published as of the CRE’s 2026 update.
  • Revised S2REnR: target connection capacity of 175 MW set by the Préfet in March 2026.

Martinique’s renewable share has hovered around a quarter of generation since 2019, when the Galion bagasse-biomass plant (commissioned in September 2018) became the island’s largest renewable source. In 2023 renewables supplied about 27%: 239 GWh from bagasse and biomass, 100 GWh from solar, 34 GWh from wind and 26 GWh from waste incineration. Wind and biomass output fell that year because of technical outages, while solar output rose by 18%.

Solar has grown through many small rooftop systems and through PV-plus-storage plants selected in CRE tenders for the ZNI. Wind is limited to the 12 MW Grand-Rivière farm with storage, but more projects of the same kind are planned on the north Atlantic coast, and EDF’s outlook assumes up to 165 MW of wind and 240 MW of solar by 2040 in its most ambitious scenario.

The biggest step would come from fuel switching. In that scenario, Bellefontaine, Pointe des Carrières and the combustion turbines would convert to bioliquids by 2028, which would make the mix largely renewable. The outlook also considers 10–50 MW of geothermal power, more waste-to-energy, small hydro and a 7 MW pumped-storage scheme.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
17 MW (end-2023)Source 7Madinina 1 (12 MW / 12 MWh) and Novagrid (5 MW). Storage built into wind and PV plants is not reported separately. About 15 MW more was selected in the CRE’s 2024 window.

In the ZNI, storage is mainly centralised and controlled by the system operator rather than installed in homes. The CRE assesses each project against the extra generation costs it avoids and compensates it through public-service charges. EDF’s outlook says such storage should provide several services: primary and secondary reserve, shifting solar output into the evening peak, and partly replacing the stabilising role of retiring thermal plants.

Home batteries are allowed behind the meter but receive no specific support. EDF’s self-consumption guidance treats stored energy that is later exported as part of the surplus under the purchase contract.

Storage projects.

  • Novagrid: EDF’s 5 MW battery at Petit Morne, Le Lamentin, supplied by a GE–Samsung consortium. It was commissioned in October 2021 and provides primary frequency reserve.
  • Madinina 1: A 12 MW / 12 MWh battery operated for Akuo (FPV Labroue), commissioned in 2021 after winning the “arbitrage” category of the 2017 CRE storage window.
  • CRE storage window 2024 (Martinique): Three centralised storage projects totalling about 15 MW, to be dispatched by EDF SEI and compensated through public-service charges.
  • Wind- and PV-plus-storage plants: The 12 MW Grand-Rivière wind farm and 13 MW of PV plants operate with integrated storage, mainly from earlier CRE tenders for the ZNI.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EDF (EDF en Martinique)100%: sole supplier in the overseas regionsNoYesNoYes

There is no supplier competition. EDF supplies every customer at the regulated tariffs: Tarif Bleu for supplies up to 36 kVA and Tarif Bleu+ or Tarif Vert for larger business and public customers. EDF also buys the output of solar producers at the regulated feed-in tariffs. EDF employs 538 people in Martinique.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Commission de régulation de l’énergie (CRE)RegulatorNational energy regulatorSets tariff proposals and public-service compensation for the ZNI, runs storage windows and publishes solar feed-in tariffs.
EDF en Martinique (EDF SEI)DistributionIntegrated network operator, system operator, buyer and supplierHandles every connection, export contract, meter and bill in Martinique.
DEAL de la MartiniqueGovernmentState regional energy and environment directorateLeads the PPE revision with the CTM and oversees the renewable connection scheme for the Préfet.
Collectivité Territoriale de Martinique (CTM)GovernmentTerritorial authority; co-author of the PPE; sets the OMR rateShares responsibility for energy planning and funds home-improvement aid.
Syndicat Mixte d’Électricité de la Martinique (SMEM)DistributionDistribution concession authorityGrants EDF its distribution concession and sits on the energy-efficiency committee.
ConsuelMeteringElectrical-installation conformity certificationA Consuel certificate is required before a new consumption or generation installation is energised.
Albioma (Galion)Renewable EnergyIndependent producer: bagasse-biomass plant and combustion turbineOperates the island’s largest renewable plant.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (LV/MV)Enedis technical reference, adapted by SEI REF 02, SEI REF 50 (≤36 kVA producers), SEI REF 07 (>36 kVA) and SEI REF 51 (≤36 kVA consumers)EDF SEI (under CRE decision of 7 April 2004)The mainland reference documents apply except where EDF SEI’s island documents differ.
Grid connection (HTB)RTE technical reference, adapted by SEI REF 01, 05, 08 and 82EDF SEICovers large generation, storage and consumption on the 63 kV network.
Anti-islanding / decoupling protectionSEI REF 04EDF SEIIsland-specific decoupling settings for generators.
Intermittent generationSEI REF 03EDF SEIRules for disconnecting wind and PV in the ZNI to protect system security.
Storage (grid-scale)SEI REF 46 technical specificationEDF SEIVersion for the 2024 La Réunion and Martinique storage window.
Wiring and service connectionNF C 15-100, NF C 14-100 (NF C 17-200 for outdoor installations)AFNORInstallations downstream of the delivery point must comply.
Installation conformityConsuel certificate of conformityConsuelRequired for first energisation of a delivery point and for PV commissioning.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Network operator approval (export)YesRegionalConnection request, quote and CRAE through EDF’s Portail Raccordement. Requests above 36 kVA are handled by EDF SEI’s large-producer connection desk.
Declaration of no-export systemYesRegionalTotal self-consumption must be declared to EDF before it is switched on. A simplified agreement (SEI REF 14) applies up to 36 kVA.
Consuel conformity certificateYesNationalMust be sent to EDF before commissioning.
Planning / building permissionLimitedLocalUnder the national town-planning code, depending on the size and location of the project. Ground-mounted plants also need environmental procedures.
Network capacity (S2REnR)LimitedRegionalLarger projects must fit within the capacity reserved at each source substation under the renewable connection scheme and pay the scheme’s cost-sharing contribution.

For a rooftop system, the essential steps are EDF’s connection procedure and the Consuel inspection. Larger plants also need planning and environmental consents and must find capacity on the network. Reserved capacity under the 2020 S2REnR has largely been allocated, and the scheme is being revised. EDF publishes indicative hosting capacity by substation, which it must confirm when processing each request.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
S24 PV ZNI feed-in tariff and investment premiumActiveFeed-in tariffPurchase contract for rooftop, hangar and shade-structure PV up to 500 kWc. For requests made 1 Aug–31 Oct 2026 in Martinique: surplus at 18.22 c€/kWh up to 9 kWc, plus a premium of €1.71/Wc up to 3 kWc or €1.04/Wc for 3–9 kWc. Sale of all output earns 24.04–28.22 c€/kWh for systems up to 9 kWc.Order of 5 January 2024; values revised quarterly
EDF Agir Plus energy-saving premiumsActiveGrantDeducted from partner installers’ quotes or at purchase: up to 100% of insulation work, up to €1,000 for a solar water heater, up to €350 for an A+++ air-conditioner, up to €150 for A++/A+++ appliances and LED bulbs for €4. Also subsidises controlled home EV charging (Éco-recharge). Funded through the CRE’s territorial energy-efficiency compensation framework.—
Chèque énergieActiveBill supportA State payment towards energy bills for low-income households, sent from 1 April 2026. It is worth €48–€277, with an average of €169 for EDF customers in Martinique. Since 2025 the recipient must hold the electricity contract.2026 campaign (claims until 31 Dec 2026)
National price equalisation (péréquation tarifaire)ActiveTariff supportHouseholds pay the same pre-tax regulated tariff as in mainland France. Higher local costs are compensated through public-service charges.—

Data and connectivity.

Fixed broadband
Not identified from a reliable public source.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Smart meters communicate with EDF’s own systems, and customers reach their data through EDF’s app, online account and e.quilibre. The meter’s Télé-Information Client port and dry contact are the standard local interfaces for home energy-management devices and water-heater switching. EDF also publishes an open-data signal showing when EV charging has the least impact on the grid.

Grid conditions.

National peak demand
0.232 GW (2023)Source 7Maximum hourly-average power, reached on a September day; 5% lower than ten years earlier.
Annual electricity demand
1.511 TWh (2023)Source 7Energy delivered to the grid, including 127 GWh of network losses.
Generation capacity
0.53 GW (end-2023)Source 7Derived by summing the connected capacity of the plants in EDF’s table of installed capacity at 31/12/2023 (about 530 MW), excluding the 17 MW of standalone storage.
Interconnection
0 GWSource 30Non-interconnected zone: no link to mainland France or neighbouring islands.
Curtailment
Not identified from a reliable public source.

The system is small (a peak of about 232 MW) and isolated, so security depends on keeping enough synchronous plant, reserve and inertia online. EDF’s 2024 outlook finds the PPE security standard met until 2033. After that, the end of the Bellefontaine contract in 2035 and the ageing of Pointe des Carrières open a need for 100–220 MW of new firm capacity by 2040, unless the contracts are extended or storage fills part of the gap.

The outlook also warns that more inverter-based wind and solar will require synchronous condensers, multi-service storage and strict compliance with EDF’s technical rules. The network is being strengthened against hurricanes and to unlock connection capacity in the north. EDF invested €56 million in 2023, and the Trinité–Lamentin underground link is due at the end of 2027.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Removal of 18–36 kVA Base tariffsUpcoming1 February 2027Residential Base option contracts at 18–36 kVA, already closed to new customers, are due to be withdrawn. Customers must move to peak/off-peak.
Peak/off-peak required for 9 kVA and aboveCurrent1 February 2026New residential customers at 9 kVA or more can no longer take the Base option. Since 1 August 2026, 3 kVA customers may choose peak/off-peak.
ZNI public-service charges funded by excise surchargeCurrentAugust 2025 (€5.66/MWh from 1 Feb 2026)Price equalisation in the ZNI is now funded through a surcharge on electricity and fossil-fuel excise duties rather than the general State budget.
New connection procedure for consumers up to 36 kVACurrent9 January 2026EDF SEI’s SEI REF 51 sets out how low-voltage consumption connection requests up to 36 kVA are handled.
Revision of the renewable connection scheme (S2REnR)UpcomingLaunched July 2026; approval date not setThe 2020 scheme has reached its reserved-capacity threshold. The Préfet set a 175 MW target capacity in March 2026. The draft will undergo environmental assessment and public consultation.
PPE 2024–2033UpcomingDecree pendingPublic consultation took place in 2022–2023. As of the CRE’s 2026 update, no new PPE had been published for Martinique.
Centralised storage from the 2024 CRE windowUpcomingCommissioning dates not publishedThree projects totalling about 15 MW were selected for Martinique.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumS24 feed-in tariffs and premiums are active for systems up to 500 kWc. 96 MW of mostly distributed PV was connected by end-2023 and 60% of dwellings are houses, but residential capacity is not published separately.
Distributed energy marketMediumSolar and wind supplied about 9% of generation in 2023. Total, partial and collective self-consumption are provided for, but distributed assets have no market routes.
Grid flexibility marketLowThere is no balancing, capacity or flexibility market and no aggregator framework. Flexibility is dispatched by the integrated operator EDF SEI.
Energy storage adoptionMedium17 MW of standalone batteries (Novagrid, Madinina 1), wind- and PV-plus-storage plants, and about 15 MW selected in the 2024 CRE window. Home storage receives no support.
Renewable growth environmentLowThe renewable share has stayed around 25–27% since 2019, far from the 100% objective for 2030, although solar output rose 18% in 2023 and the connection scheme is being expanded.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 32 sources
  1. Grilles de prix du Tarif Bleu « Résidentiel » – tarifs TTC en Martinique applicables au 1er août 2026. EDF en Martinique, 2026. accessed 9 October 2026.
  2. Grille de prix Tarif Bleu Résidentiel – tarifs HT applicables au 1er août 2026 (Martinique). EDF en Martinique, 2026. accessed 9 October 2026.
  3. Tout comprendre sur le tarif de l’électricité en DROM et en Corse. EDF en Martinique, 2026. accessed 9 October 2026.
  4. Le chèque énergie. EDF en Martinique, 2026. accessed 9 October 2026.
  5. Tout savoir sur le compteur numérique. EDF en Martinique. accessed 9 October 2026.
  6. Les réseaux électriques : transport et distribution. EDF en Martinique. accessed 9 October 2026.
  7. Bilan prévisionnel 2024 de la Martinique. EDF Systèmes Énergétiques Insulaires, 2024. accessed 9 October 2026.
  8. Transition énergétique en Martinique. EDF en Martinique. accessed 9 October 2026.
  9. Bilan 2023 et perspectives 2024. EDF en Martinique, 2024. accessed 9 October 2026.
  10. Autoconsommation d’électricité : comment ça marche. EDF en Martinique. accessed 9 October 2026.
  11. Consommer toute votre production d’électricité. EDF en Martinique. accessed 9 October 2026.
  12. Autoconsommation partielle – les étapes à suivre. EDF en Martinique. accessed 9 October 2026.
  13. Autoconsommation collective d’énergie. EDF en Martinique. accessed 9 October 2026.
  14. Votre raccordement : les étapes à suivre. EDF en Martinique. accessed 9 October 2026.
  15. Les référentiels techniques applicables. EDF en Martinique. accessed 9 October 2026.
  16. Achat d’énergie : les étapes à suivre. EDF en Martinique. accessed 9 October 2026.
  17. Je demande un raccordement. EDF en Martinique. accessed 9 October 2026.
  18. SEI REF 51 – Traitement des demandes de raccordement d’installations de consommation ≤36 kVA. EDF SEI, 2026. accessed 9 October 2026.
  19. EDF en Martinique lance la révision du schéma de raccordement des énergies renouvelables. EDF en Martinique, 2026. accessed 9 October 2026.
  20. Révision du S2REnR de la Martinique – Déclaration d’intention (juin 2026). EDF SEI, 2026. accessed 9 October 2026.
  21. La capacité d’accueil en production. EDF en Martinique. accessed 9 October 2026.
  22. NOVAGRID : une nouvelle batterie de stockage d’électricité en Martinique. EDF en Martinique, 2025. accessed 9 October 2026.
  23. Calculer mon aide financière. EDF en Martinique. accessed 9 October 2026.
  24. L’offre Éco-recharge. EDF en Martinique. accessed 9 October 2026.
  25. La Martinique, territoire d’expérimentation de smart grids. EDF en Martinique. accessed 9 October 2026.
  26. Devenir client EDF en Martinique. EDF en Martinique. accessed 9 October 2026.
  27. Mes droits sur mes données en Martinique. EDF en Martinique. accessed 9 October 2026.
  28. 50 ans au service du territoire. EDF en Martinique. accessed 9 October 2026.
  29. Dossier complet – Département de la Martinique (972). INSEE, 2023. accessed 9 October 2026.
  30. Transition énergétique dans les ZNI. Commission de régulation de l’énergie, 2026. accessed 9 October 2026.
  31. Arrêtés tarifaires photovoltaïques en ZNI (open data, Tarifs S24 ZNI T10). Commission de régulation de l’énergie, 2026. accessed 9 October 2026.
  32. Programmation Pluriannuelle de l’Énergie (PPE). DEAL de la Martinique. accessed 9 October 2026.

Questions about energy in Martinique.

Talk to us about Olmack in Martinique.Tell us about your home, housing portfolio or school estate in Martinique. We'll explain what is possible there now.