Countries

Energy in Haiti, explained.

How electricity works in Haiti: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Haiti: Not yet available.Olmack is not offered in Haiti yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Haiti.

Haiti electricity 2026: state utility EDH, ANARSE regulator, 54% access, oil-fired supply (81% in 2024), regional grid concessions, mini-grids and new solar with storage.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Haitian gourde (HTG) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Haiti energy at a glance.

Key figures for households in Haiti. Each one links to its source on the full overview below.

  • Renewable share.

    18.6% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Haiti.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Haiti below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Haiti requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Haiti.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Haiti, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Haiti, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Haiti.

Full overview

The energy market in Haiti, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Haiti’s public electricity supply is built around Électricité d’Haïti (EDH), the state-owned utility, which runs the metropolitan network of Port-au-Prince. Outside the capital the country is served by separate regional networks that are not linked into a single national grid, by rural mini-grids, and by large numbers of private generators and solar systems. The sector has been regulated since 2016 by the Autorité Nationale de Régulation du Secteur de l’Énergie (ANARSE), created by a decree published in Le Moniteur on 3 February 2016. Energy policy and EDH oversight sit with the Ministry of Public Works, Transport and Communications (MTPTC) through its Energy Cell.

Access is among the lowest in Latin America and the Caribbean. World Bank data put access to electricity at 53.9% of the population in 2024, up from 47.2% in 2021, and the last national household survey (EMMUS-VI, 2016–17) found that 40.9% of households had electricity — 76.2% in towns but only 17.3% in rural areas. Supply is also rationed: a 2024 World Bank project document describes shortages of up to 12 hours a day on average and up to 22 hours a day for poor households, with aggregate technical and commercial losses above 60%.

Generation is dominated by imported oil. According to Ember data, oil-fired plants supplied 81.4% of Haiti’s 0.86 TWh of electricity in 2024 and hydropower — chiefly the Péligre dam — the remaining 18.6%. New solar capacity with battery storage is being built, notably a 13.4 MW plant at the Caracol industrial park in the North-East and a 4 MWp plant with 6 MWh of storage at Jacmel, and ANARSE has been tendering regional networks and mini-grids to private concessionaires.

Energy snapshot.

Headline figures for electricity in Haiti. Each shows its data year and links to its source.

  • Population11,906,095 peopleSource 72025
  • HouseholdsNot identified from a reliable public source.
  • Average household size4.3 people/householdSource 112016–17
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (HTG)Not identified from a reliable public source.
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share18.6%Source 12024
  • Solar capacity0.008 GWSource 52025
  • Wind capacity0 GWSource 62025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
Autorité Nationale de Régulation du Secteur de l’Énergie (ANARSE)
System operator
Électricité d’Haïti (EDH) on the Port-au-Prince metropolitan network; regional networks are operated separately
Distribution networks
EDH runs the Port-au-Prince metropolitan network and most regional networks; ANARSE has tendered regional networks and rural mini-grids to private concessionaires (e.g. Nord-Est, Grand’Anse mini-grids)
Currency
Haitian gourde (HTG)
Voltage and frequency
110 V / 60 Hz (plug types A and B)

Electricity prices in Haiti.

Household price (HTG)
Not identified from a reliable public source.
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

Electricity prices in Haiti are hard to pin down from public sources. EDH is the state utility and its tariffs are set administratively; ANARSE, created in 2016, is responsible for monitoring tariff application and connection conditions, but it has not published tariff decisions online and EDH’s website could not be reached. No reliable current price per kWh is therefore shown.

Why supply is costly

About four-fifths of generation burns imported oil products, and a large share of what is produced is never paid for: a 2024 World Bank project document reports aggregated technical and commercial losses of more than 60%. EDH depends on transfers from the state budget — about 1.9% of GDP in 2019, according to the same document.

What households actually pay for energy

Because grid supply is rationed — up to 12 hours a day without power on average and up to 22 hours a day for poor households — many homes and most businesses also pay for diesel or petrol generators, inverter batteries or solar systems. The real cost of electricity for a household is often a mix of an EDH bill and the cost of this back-up.

Mini-grid tariffs

In rural towns served by private mini-grids, tariffs are set under the concession arrangements agreed with ANARSE rather than by EDH. These are not published centrally.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesEDH customers pay tariffs set for the state utility. ANARSE’s mandate includes monitoring how tariffs and connection conditions are applied, but no current tariff schedule or tariff decision is published on its website.
PrepaymentLimitedEDH has been introducing prepaid meters: a 2020 international tender covered 240,000 prepaid meters in three lots for the metropolitan area, financed from the 2019–20 national budget, and ANARSE lists the prepaid system among current sector projects. Private mini-grid operators also use prepaid smart metering.
Time-of-useNoNo time-of-use tariff was found.
DynamicNoThere is no wholesale market or retail competition, so no price-indexed tariff exists.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
73 kWh/person/yr (2024)Source 4All sectors (electricity demand per person, Ember via Our World in Data), down from 95 kWh in 2019. Among the lowest in the world.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0.4 % of homes (2016–17)Source 11Households cooking mainly with electricity (0.9% urban, 0.2% rural). Biomass is the main household fuel.

Electricity use in Haiti is very low. Total demand was about 0.86 TWh in 2024, down from 1.06 TWh in 2019, and demand per person fell from about 95 kWh to 73 kWh over the same period (Ember).

Most household energy does not come from electricity at all. The MTPTC’s energy plan notes that biomass is the main source of energy, and in the 2016–17 household survey only 0.4% of households cooked mainly with electricity. Grid electricity is mostly used for lighting, phone charging, fans, refrigeration and small appliances, often alongside a generator or battery back-up.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
55.6% (2025)Source 9World Bank estimate of the urban share of population.

Just over half of Haitians live in urban areas, above all in the Port-au-Prince metropolitan area, with the rest in rural communes spread across mountainous terrain. This settlement pattern largely explains the access gap: the 2016–17 household survey found electricity in 76.2% of urban households but only 17.3% of rural ones.

ANARSE’s GIS rural electrification masterplan, financed by the Caribbean Development Bank and presented in 2025, maps more than 2 million buildings and assigns each area to grid extension, a mini-grid or solar home systems according to settlement density.

How the grid works in Haiti.

  1. TransmissionÉlectricité d’Haïti (EDH)
  2. DistributionEDH runs the Port-au-Prince metropolitan network and most regional networks; ANARSE has tendered regional networks and rural mini-grids to private concessionaires (e.g. Nord-Est, Grand’Anse mini-grids)
  3. MeteringÉlectricité d’Haïti (EDH)
  4. Supply2 or more retail suppliers

Physically, Haiti does not have a single interconnected grid. The largest system serves the Port-au-Prince metropolitan area, fed by thermal plants and by the Péligre hydropower plant on the Artibonite. Other towns are served by separate regional networks — ANARSE has listed Artibonite, Grand’Anse, Miragoâne, Nord-Est, Nord (Cap-Haïtien), Port-de-Paix and Sud (Les Cayes) — usually supplied by local diesel or heavy-fuel plants. In 2019 ANARSE’s planning split the country’s communes between regional networks (82 communes), mini-grids (63) and off-grid solutions (50).

Commercially, EDH is a state-owned, vertically integrated utility that generates or procures power and sells it to customers. There is no wholesale market. Since 2016 the law requires every activity in the sector to hold a licence, an operating right or a concession from ANARSE, which opened the way for private operators to take over regional networks and rural mini-grids.

Reliability and losses

Supply is intermittent. A 2024 World Bank document describes rationing of up to 12 hours a day on average, more than 60% aggregated technical and commercial losses, and EDH budget support of about 1.9% of GDP in 2019.

Concession programme

In 2019 ANARSE launched prequalification to transfer the operation of seven regional networks to private operators, covering production, transmission and distribution, with the aim of replacing old generating units with natural gas and solar plants, strengthening the networks and installing smart meters. The Port-au-Prince metropolitan network was to stay with EDH. In 2021 ANARSE also tendered 20-year concessions for mini-grids in Mont-Organisé, Vallières and Capotille in the Nord-Est.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Public Works, Transport and Communications (MTPTC) — Energy CellResponsible for energy policy and oversight of EDH; its Energy Cell provides technical support to electrification programmes such as AMACEH and the Nord-Est mini-grid concessions.
MinistryMinistry of Economy and Finance (MEF) — Technical Execution Unit (UTE)Executes donor-funded electricity programmes, including the IDB/USAID-funded AMACEH programme and the Caracol solar plants.
RegulatorAutorité Nationale de Régulation du Secteur de l’Énergie (ANARSE)Created by the decree published on 3 February 2016. Grants licences, operating rights and concessions for production, transmission, distribution and sale of electricity, monitors tariff application and connection conditions, and runs competitive tenders for regional networks and mini-grids.
System operatorÉlectricité d’Haïti (EDH)State-owned utility that dispatches generation on the Port-au-Prince metropolitan network and on the regional networks it still operates. Each regional network is balanced separately; there is no integrated national grid.
DSOÉlectricité d’Haïti (EDH)Owns and operates distribution in the Port-au-Prince metropolitan area, which ANARSE said in 2019 would remain with EDH, and in regional towns not yet under concession.
DSORegional and mini-grid concessionairesPrivate operators selected by ANARSE tender. Sigora Haïti (with JCM Power and FMO) was the provisional awardee for the Nord-Est regional network in April 2021; EarthSpark International was selected for mini-grids at Anse d’Hainault and Dame-Marie. The current operating status of each concession could not be verified.
SupplierÉlectricité d’Haïti (EDH)Sells electricity to all customers on the networks it operates.
MeteringÉlectricité d’Haïti (EDH)Owns and reads customer meters on its networks and is introducing prepaid meters. Mini-grid concessionaires meter their own customers.

Compared with the UK system.

Compared with the UK system.
UK conceptHaiti equivalentHow it works
DNOEDH, or a regional/mini-grid concessionaireThere are no regional distribution companies in the UK sense. EDH runs the networks it still operates end to end; elsewhere a private concessionaire selected by ANARSE generates, distributes and sells power within its concession area.
National Grid/NESOEDH (per network)Haiti has no national transmission grid or independent system operator. The Port-au-Prince metropolitan system and the regional networks are separate islands, each dispatched by its operator.
MPANEDH contract / account and meter numberNo standardised national supply-point number exists. A connection is identified in the utility’s own billing records by the customer contract and the meter installed.
MPRNNoneHaiti has no piped gas network.
Meter operatorEDH or the concessionaireThe network operator owns and maintains meters. There is no competitive metering market.
SupplierEDH or the concessionaireCustomers cannot choose a supplier: whoever operates the local network sells the electricity.
Smart-meter infrastructureEDH prepaid metering; operator-run smart meters on mini-gridsThere is no central data hub like the DCC. EDH is rolling out prepaid meters in the capital, and some private mini-grid operators use their own remotely read prepaid smart meters.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?EDH customer contract (account) number and meter number
Who issues it?Électricité d’Haïti (EDH), or the concessionaire operating the local network
FormatNot publicly documented. Each connection is recorded against a customer contract in the operator’s billing system and the serial number of the meter (or prepaid meter) installed.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the EDH bill or contract; for prepaid customers, the meter number is used when buying credit.
Electronic accessNo public online data-access service was identified for EDH customers. Mini-grid operators with smart meters can read consumption remotely.
Third-party accessNo regulated framework for third-party access to metering data exists.
Who keeps the registerEDH or concessionaire customer and billing systems
Register scopePer DSO

Haiti has no standardised supply-point identifier comparable to an MPAN or an EAN code, and no central register of connections. Because each network has a single operator and customers cannot switch supplier, there has been no need for one. A connection exists in the records of whoever runs the local network: EDH in Port-au-Prince and the networks it still operates, or a concessionaire on a regional network or mini-grid.

The format of EDH contract and account numbers is not published, so no example is given here. In practice a household identifies its supply by the contract or account number printed on its bill and, increasingly, by the number of its prepaid meter, which is needed to buy credit.

Informal connections

A large share of electricity on EDH’s networks is consumed through unmetered or irregular connections; the World Bank puts aggregated technical and commercial losses above 60%. Replacing these with metered, prepaid connections is one of the main aims of EDH’s prepaid-meter programme, which in 2020 targeted 240,000 meters across substations in the metropolitan area.

Who keeps the records

Each operator keeps its own customer database. ANARSE regulates operators’ licences, concessions and connection conditions but does not maintain a separate national register of supply points.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Unknown
Net meteringNo
Net billingNo
How exported electricity is paidNo published scheme for paying households for electricity exported to the grid was identified.
Can a household sell solar power back to the grid?No net-metering, net-billing or feed-in rules for households have been published by ANARSE. Rooftop solar in Haiti is overwhelmingly used for self-consumption and back-up, often with batteries, rather than for export.
Is there a size threshold below which no authorisation is needed?No exemption threshold could be verified. ANARSE’s 2018 communiqué states that every activity of production, transmission, distribution or sale requires a licence, operating right or concession.
How do larger solar projects connect?Through public tenders and contracts with EDH or a concessionaire, as with the 13.4 MW Caracol and 4 MWp Jacmel plants, whose grid integration ANARSE monitors.

Connecting a home system.

  1. Any electricity activity requires prior authorisation from ANARSE — a licence, an operating right or a concession — under the decree of 3 February 2016.
  2. Projects selling power to a network do so under a contract with EDH or the local concessionaire, reviewed by ANARSE.
  3. Connection must meet the technical requirements of the network operator; ANARSE monitors integration of new plants into the network.

Haiti has no established framework for small-scale export. With rationed supply, grid electricity is scarce rather than in surplus, and households and businesses install solar mainly to keep power on when the grid is down. Larger renewable projects are procured by the state or donors and connected under contracts with the network operator.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityProduction licence from ANARSE; no published exemption thresholdANARSECriteria include the energy source, site, energy efficiency and financial capacity (ANARSE communiqué, 2018).
Generate for own use (self-generation)Not specifically defined in published ANARSE material; the general rule requires authorisation for any production activityANARSEPrivate generators and solar systems for own use are widespread; how the rule is applied to small systems could not be verified.
Export / sell to the gridContract with EDH or the local concessionaire plus ANARSE authorisationANARSENo household export scheme exists.
TransmissionTransmission licence from ANARSEANARSERequires technical and financial capacity.
Distribution and retail saleDistribution licence or concession from ANARSE for a defined geographic zoneANARSEConcessions for regional networks and mini-grids are awarded by competitive tender; Nord-Est mini-grid concessions were tendered for 20 years.
Integrated operation (production to sale)Operating right (droit d’exploitation) from ANARSEANARSECovers production, transmission, distribution and sale together, as used for mini-grids.
Store electricityNo specific storage licence identifiedANARSEStorage is procured as part of generation projects (Caracol, Jacmel, mini-grids).
Aggregation, VPP, balancing and grid servicesNo framework; no market exists—Balancing is done by the network operator.
Wholesale tradingNo wholesale market; bilateral contracts with EDH onlyANARSENo cross-border electricity trade appears in Ember data; no interconnection capacity is published.
Remote control of customer assetsNo framework—No demand-response programme was found.

The 2016 decree that created ANARSE made every activity in the electricity sector — production, transmission, distribution and sale — subject to prior authorisation in one of three forms: a licence, an operating right (droit d’exploitation) or a concession. Operating without one exposes the operator to the sanctions in article 69 of the decree.

ANARSE’s published material does not set out capacity thresholds or exemptions for small installations, nor specific rules for storage, aggregation or demand response. In practice the authorisation regime has been used mainly to award concessions for regional networks and rural mini-grids through competitive tenders.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Balancing and reservesNo—NoEDH / network operators. Each network is balanced by its operator using its own and contracted plant. No market for third-party balancing services exists.
Demand responseNo—NoNo demand-response programme was found.

There is no market in which household batteries, solar or flexible loads can be paid for flexibility. Supply shortfalls are managed by load shedding. Batteries being installed with the Caracol and Jacmel solar plants — the Jacmel system is designed to run in grid-forming mode — are owned with the generating assets rather than aggregated from customers.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepaid meter programme on EDH’s metropolitan network (240,000 meters tendered in 2020); smart prepaid meters on some private mini-grids
Reading intervalNot published
EDH tender240,000 prepaid meters for the Port-au-Prince metropolitan area (2020)
Lots62,213, 99,719 and 78,068 meters across ten substations
FinancingNational budget, fiscal year 2019–20
Installed to dateNot published
Mini-gridsOperators such as EarthSpark use their own smart prepaid metering

EDH’s metering effort focuses on prepayment, primarily to reduce non-payment and losses. Its 2020 international tender covered supply, installation and commercial management of 240,000 prepaid meters in three lots across substations of the metropolitan area. The tender documents describe prepaid functionality rather than full smart metering, and no figure for the number installed has been published.

On rural mini-grids, smart metering is more advanced. EarthSpark International, which has built mini-grids in Haiti since 2008, developed its own smart metering technology before spinning it off as SparkMeter. ANARSE’s 2019 regional-network concession plans also called for smart meter installation.

Renewable electricity.

Electricity generation mix (2024).

  • Oil: 81.4%
  • Hydropower: 18.6%
Source 1
Renewable electricity share
18.6% (2024)Source 1Share of electricity generation (Ember via Our World in Data): hydropower 18.6%, oil 81.4%. Haiti does not import electricity. The share was 22.4% in 2023 and over 47% in the early 2000s, before oil-fired generation expanded.
Home solar
Not identified from a reliable public source.
Solar added each year
3.99 MW (2025)Source 5Derived from IRENA capacity: 7.87 MW (2025) minus 3.88 MW (2024).
Solar PV
0.008 GW (2025)Source 5
Wind
0 GW (2025)Source 6
Hydropower
Not identified from a reliable public source.

Targets.

  • Minimum electricity service of 12 hours a day in Port-au-Prince and across the country (MTPTC national energy development plan, 2007–2032).
  • Renewable Energy for All (World Bank): scale up renewable investment to expand access for households, businesses and community services; further financing approved in October 2024 (US$20 million) and October 2025.

Haiti’s only significant renewable source on the grid is hydropower, which supplied 18.6% of generation in 2024 (Ember). Its share has fallen from around half in the early 2000s as oil-fired generation grew, and output varies with rainfall.

Solar is growing from a very low base. IRENA records 7.87 MW in 2025, roughly double the 2024 figure, much of it off-grid or on hospitals, businesses and mini-grids. Larger grid-connected projects are under way: the 13.4 MW Caracol plant with battery storage, funded under the IDB/USAID AMACEH programme, had more than 20,000 of its 21,300 panels installed by July 2026; and a 4 MWp plant with 6 MWh of storage at Jacmel, financed by the World Bank (US$17.5 million contract signed in January 2026), is due to take about 13 months to build.

Rural mini-grids are mostly solar with batteries. In 2019 ANARSE listed nine communes with operating mini-grids and three under construction, and later programmes (PHARES, Nord-Est and Grand’Anse concessions) added more, such as the 436 kW / 900 kWh Génipailler mini-grid in Milot, under construction in 2026.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage in Haiti is mostly paired with solar to provide power when the grid fails. At utility scale, batteries are being built into the Caracol and Jacmel solar plants, and the World Bank’s Renewable Energy for All project has financed 1 MWh battery systems at five priority hospitals. Behind the meter, inverter batteries are common in homes and businesses with grid access, but there is no published count.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Électricité d’Haïti (EDH)All customers on the networks it operatesNoNoNoNo
EarthSpark International (mini-grids)Mini-grid towns in the southern peninsulaYesUnknownNoNo

EDH supplies customers on the networks it runs; there is no supplier choice. In concession areas the concessionaire generates and sells electricity directly — for example Sigora Haïti, provisional awardee for the Nord-Est regional network in 2021, and EarthSpark International, which operates solar mini-grids in the southern peninsula and was selected for Anse d’Hainault and Dame-Marie. EDH’s own website could not be reached, so the regulator’s site is linked.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Autorité Nationale de Régulation du Secteur de l’Énergie (ANARSE)RegulatorEnergy regulatorIssues licences, operating rights and concessions, runs mini-grid and network tenders and monitors tariffs and connections.
Ministry of Public Works, Transport and Communications (MTPTC)GovernmentMinistry responsible for energySets energy policy, oversees EDH and hosts the Energy Cell.
Électricité d’Haïti (EDH)DistributionState utilityOperates the Port-au-Prince network and most regional networks and supplies their customers.
EarthSpark InternationalRenewable EnergyMini-grid developer and operatorBuilds and runs solar mini-grids in Haiti and developed smart prepaid metering.
Banque de la République d’Haïti (BRH)GovernmentCentral bankPublishes the gourde reference exchange rate used to compare prices.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Authorisation of electricity activitiesDecree creating ANARSE (Le Moniteur No. 23, 3 February 2016)Government of Haiti / ANARSELicence, operating right or concession required for production, transmission, distribution and sale.
Grid connectionEDH technical standardsEDHThe Jacmel solar plant is specified to comply with EDH standards and international specifications; EDH’s standards are not published online.
Supply voltage110 V, 60 Hz; plug types A and B—North American-style low-voltage supply.

Permissions.

Permissions.
PermissionRequiredLevelDetail
ANARSE authorisationYesNationalRequired for any production, transmission, distribution or sale of electricity; no small-system exemption has been published.
Network operator connection approvalLimitedNationalNeeded only where a system is connected to an EDH or concession network; most home solar operates as back-up or off-grid.
Planning permissionUnknownLocalNo specific planning rule for rooftop solar was found.

For a household installing solar for its own use, there is no published, specific permitting route. The 2016 decree subjects all production of electricity to ANARSE authorisation, but ANARSE has not published thresholds for small systems, and grid export is not offered.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Renewable Energy for All (World Bank)ActiveDonor-funded programmeFinances grid-connected renewables (such as Jacmel solar + storage), off-grid solar for households, businesses and community services, and hospital battery systems. Original 2017 project plus additional financing in 2020, 2024 (US$20 million) and 2025.2017 –
AMACEH — Improving access to electricity in Haiti (IDB / USAID)ActiveDonor-funded programmeUS$38 million in grants (IDB US$31.5 million, USAID US$6.5 million), including solar plants with storage at the Caracol industrial park.—
PHARES mini-grid programmeActiveMini-grid tender programmePrivate-sector solar mini-grids for rural and peri-urban communities, supported by the IDB (AMACEH) and the World Bank (SREP); launched 2020.—

Data and connectivity.

Fixed broadband
47.9 % of population (2024)Source 10Individuals using the internet (ITU via World Bank), not fixed broadband.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Just under half of Haitians used the internet in 2024. Mobile networks carry most connectivity, and mini-grid operators use their own communications for remotely read prepaid meters.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
0.86 TWh (2024)Source 3Ember. Down from 1.06 TWh in 2019.
Generation capacity
Not identified from a reliable public source.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The binding constraint in Haiti is not grid capacity for new generation but the supply of affordable, reliable power at all. Rationing of up to 12 hours a day on average, losses above 60% and dependence on imported fuel shape the system. Separate regional networks mean that a plant can only serve the area of the network it is connected to, which is why new solar projects are paired with storage and sited for specific networks such as Caracol and Jacmel.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Caracol 13.4 MW solar plant with storageUpcomingProgressive commissioning from 2026More than 20,000 of 21,300 panels installed by July 2026; to supply the Caracol industrial park and neighbouring communes.
Jacmel solar + storageUpcomingAbout 13 months from contract effectiveness (contract signed 12 Jan 2026)4 MWp solar with a 6 MWh / 2.25 MW battery in grid-forming mode.
Mini-grid concessionsCurrent2021–2026Concessions for mini-grids in the Nord-Est and Grand’Anse (Anse d’Hainault, Dame-Marie) and new sites such as Génipailler (Milot); some delayed by financing constraints.
Renewable Energy for All — further World Bank financingCurrentApproved 30 Oct 2025New phase to scale up renewable investment for households, businesses and community services.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowIRENA records 7.87 MW of solar in total (2025) and no grid-export scheme exists, although off-grid and back-up solar is widespread.
Distributed energy marketLowNo net-metering or net-billing rules; distributed energy is limited to self-consumption, back-up and mini-grids.
Grid flexibility marketLowNo wholesale, balancing or demand-response market; supply shortfalls are managed by load shedding.
Energy storage adoptionLowUtility-scale storage limited to projects under construction (Jacmel 6 MWh, Caracol, mini-grids); no published behind-the-meter figures.
Renewable growth environmentLowRenewable share of generation 18.6% in 2024, down from 22.4% in 2023; solar doubled to 7.87 MW in 2025 with about 17 MW of plants under construction.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 32 sources
  1. Share of electricity production by source — Haiti (CSV). Our World in Data (Ember; Energy Institute), 2024. accessed 10 October 2026.
  2. Electricity production by source — Haiti (CSV). Our World in Data (Ember; Energy Institute), 2024. accessed 10 October 2026.
  3. Electricity demand — Haiti (CSV). Our World in Data (Ember), 2024. accessed 10 October 2026.
  4. Per capita electricity demand — Haiti (CSV). Our World in Data (Ember), 2024. accessed 10 October 2026.
  5. Installed solar PV capacity — Haiti (CSV). Our World in Data (IRENA), 2025. accessed 10 October 2026.
  6. Cumulative installed wind capacity — Haiti (CSV). Our World in Data (IRENA), 2025. accessed 10 October 2026.
  7. Population, total — Haiti (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  8. Access to electricity (% of population) — Haiti (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 10 October 2026.
  9. Urban population (% of total) — Haiti (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 10 October 2026.
  10. Individuals using the Internet (% of population) — Haiti (IT.NET.USER.ZS). World Bank / ITU, 2024. accessed 10 October 2026.
  11. Haiti EMMUS-VI 2016–17: household electricity, cooking fuel and household size. The DHS Program (ICF) / MSPP / IHE, 2016–17. accessed 10 October 2026.
  12. World Bank projects in Haiti — energy (project list). World Bank, 2025. accessed 10 October 2026.
  13. Project Information Document — Additional Financing: Haiti Renewable Energy For All (P181584). World Bank, 2024. accessed 10 October 2026.
  14. ANARSE — Autorité Nationale de Régulation du Secteur de l’Énergie. ANARSE. accessed 10 October 2026.
  15. Publication du décret créant l’ANARSE. ANARSE, 2016. accessed 10 October 2026.
  16. Communiqué : informations relatives à l’exercice des activités dans le secteur de l’énergie électrique. ANARSE, 2018. accessed 10 October 2026.
  17. Avis de pré-qualification de promoteurs (réseaux régionaux). ANARSE, 2019. accessed 10 October 2026.
  18. Répartition des réseaux régionaux et des micro-réseaux. ANARSE, 2019. accessed 10 October 2026.
  19. Avis d’attribution provisoire — concession du service public d’électricité dans le réseau du Nord-Est. ANARSE, 2021. accessed 10 October 2026.
  20. Mise en concession de trois (3) mini-réseaux dans le département du Nord’Est. ANARSE, 2021. accessed 10 October 2026.
  21. Lancement imminent des travaux pour les mini-réseaux d’Anse d’Hainault et Dame-Marie. ANARSE, 2025. accessed 10 October 2026.
  22. EDH : Appel d’offres ouvert international (compteurs à prépaiement). ANARSE / EDH, 2020. accessed 10 October 2026.
  23. MEF — Programme « Amélioration de l’accès à l’électricité en Haïti » (AMACEH). ANARSE, 2020. accessed 10 October 2026.
  24. Lancement du programme PHARES. ANARSE, 2020. accessed 10 October 2026.
  25. Caracol : une centrale solaire de grande capacité pour sécuriser l’approvisionnement énergétique du Nord et du Nord-Est. ANARSE, 2026. accessed 10 October 2026.
  26. Le Directeur Général de l’ANARSE effectue une visite de deux jours sur deux chantiers énergétiques dans le Nord. ANARSE, 2026. accessed 10 October 2026.
  27. Jacmel : signature du contrat pour la construction d’une centrale solaire avec stockage. ANARSE, 2026. accessed 10 October 2026.
  28. The Haiti GIS Rural Electrification Masterplan. ANARSE, 2025. accessed 10 October 2026.
  29. Les défis — Mines et énergie. Ministère des Travaux Publics, Transports et Communications (MTPTC). accessed 10 October 2026.
  30. Marché des changes — taux de référence. Banque de la République d’Haïti, 2026. accessed 10 October 2026.
  31. EarthSpark International. EarthSpark International. accessed 10 October 2026.
  32. Plug, socket & voltage by country. World Standards. accessed 10 October 2026.

Questions about energy in Haiti.

Talk to us about Olmack in Haiti.Tell us about your home, housing portfolio or school estate in Haiti. We'll explain what is possible there now.