Countries

Energy in Latvia, explained.

How electricity works in Latvia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Latvia: Not yet available.Olmack is not offered in Latvia yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Latvia.

Latvia electricity market 2026: prices, Sadales tīkls and AST, EIC object codes, smart meters, net settlement for solar, licensing, balancing markets and incentives.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Latvia energy at a glance.

Key figures for households in Latvia. Each one links to its source on the full overview below.

  • Electricity price.

    0.28 EUR per kWh for households, including taxes. Figures for 2025-H2.

  • Household use.

    2,136 kWh a year for a typical household. Figures for 2025.

  • Renewable share.

    57.6% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Latvia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Latvia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Latvia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Latvia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Latvia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Latvia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Latvia.

Full overview

The energy market in Latvia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Latvia has a fully opened electricity market: since 1 January 2015 every consumer, including every household, has chosen its own electricity trader. Wholesale power is traded in the Latvian bidding zone of Nord Pool, the high-voltage grid is run by the state-owned transmission system operator Augstsprieguma tīkls (AST), and almost the whole country is served by one distribution system operator, Sadales tīkls, a Latvenergo group company. The Public Utilities Commission (SPRK) regulates network tariffs and keeps the registers of traders, producers, storage operators and aggregators.

Electricity generation has long been dominated by the three Daugava hydropower plants and two gas-fired combined heat and power plants in Riga. Solar is now changing the mix quickly: installed solar capacity rose from about 920 MW at the end of 2025 to more than 1.5 GW by August 2026, and solar was the largest source of generation in several summer months of 2026. On 9 February 2025 the Baltic power systems disconnected from the Russian-controlled IPS/UPS system and synchronised with the Continental European grid.

Households paid on average 28.02 euro cents per kWh including taxes in the second half of 2025 (Eurostat, 1,000–2,500 kWh band). Practically every connection has a smart meter read remotely, and households with solar panels now settle their exports through a money-based net settlement system run by their trader, after the older kWh-based net metering scheme closed to new entrants on 1 May 2024.

Energy snapshot.

Headline figures for electricity in Latvia. Each shows its data year and links to its source.

Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Public Utilities Commission (Sabiedrisko pakalpojumu regulēšanas komisija, SPRK)
System operator
AS Augstsprieguma tīkls (AST)
Distribution networks
Eight licensed DSOs; Sadales tīkls covers 99% of the territory and about 774,000 users, the others are small local networks
Currency
Euro (EUR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Latvia.

Household price (EUR)
0.28 EUR/kWh (2025-H2)Source 6Eurostat average household price including all taxes and levies, consumption band 1,000–2,500 kWh/yr (the band closest to typical Latvian use). Excluding VAT the price was 0.2315 EUR/kWh; the 2,500–5,000 kWh band averaged 0.2452 EUR/kWh.
Typical annual electricity bill
599 EUR/yr (2025)Source 6Derived: Eurostat 2025-H2 all-inclusive price (0.2802 EUR/kWh, band 1,000–2,500 kWh) multiplied by average household consumption of 2,136 kWh (CSB survey). Actual bills vary with the trader’s price, connection size (the fixed network charge depends on amperes) and the network tariff plan.

Household price trend (EUR per kWh).Source 6

0.170.2470.3252020-H12025-H2
Latvia household electricity price, EUR per kWh
2020-H10.1815 EUR/kWh
2020-H20.1814 EUR/kWh
2021-H10.1702 EUR/kWh
2021-H20.1927 EUR/kWh
2022-H10.1798 EUR/kWh
2022-H20.3015 EUR/kWh
2023-H10.3247 EUR/kWh
2023-H20.3118 EUR/kWh
2024-H10.2288 EUR/kWh
2024-H20.2161 EUR/kWh
2025-H10.2743 EUR/kWh
2025-H20.2802 EUR/kWh

What makes up the bill

A Latvian electricity bill has three parts: the energy price from the freely chosen trader, the charge for distribution and transmission services, and VAT. VAT on household electricity is 21% (the Eurostat price with VAT is 1.21 times the price without VAT for 2025-H2). The trader collects the network charge and passes it to the system operator.

Network tariffs

Sadales tīkls tariffs have a fixed part, the monthly capacity maintenance charge based on the number of phases and the ampere rating of the connection, and a variable part per kWh delivered. The values approved by SPRK from 1 January 2024 remain unchanged in 2026. On the "Pamata-1" (basic) plan the variable charge is 0.03962 EUR/kWh and the fixed charge is, for example, 5.44 EUR a month for a single-phase 16 A connection and 13.12 EUR for a three-phase 16 A connection (both excluding VAT). The "Speciālais-1" plan has a lower fixed charge but 0.15848 EUR/kWh, and suits holiday homes and connections with very little use. Households and businesses pay the same rates for the same connection parameters, and there is one price at any time of day.

For 2024 and 2025 the fixed part was reduced for households with connections up to 25 A, with the difference paid from the state budget (11.2 million EUR in 2025 and 43 million EUR in 2024). That support has ended, so in 2026 some households pay more even though the approved tariff values have not changed. A new "Jaudīgais" plan for customers with high consumption relative to their connection capacity will be available from 1 January 2027.

Support for vulnerable households

Protected users, including low-income households, large families, families caring for a disabled child and people with Group I disability, receive an automatic monthly bill reduction of 20 EUR (25 EUR for large families) through participating traders. Six traders applied it automatically from February 2026.

Price trend

Household prices in the 1,000–2,500 kWh band were around 0.17–0.19 EUR/kWh in 2020–2022-H1, rose above 0.30 EUR/kWh from the second half of 2022 to 2023 during the energy crisis, fell to about 0.22 EUR/kWh in 2024 and rose again to 0.27–0.28 EUR/kWh in 2025. Latvia’s 2025-H2 price was above the EU average for the same band.

Tariff types.

Tariff types.
TariffAvailableDetail
FixedYesFixed-price contracts are the most common choice: about 75% of households had a fixed price in early 2026. Traders with more than 200,000 customers must offer a fixed-price contract by law.
DynamicYesExchange-linked contracts follow Nord Pool prices for the Latvian bidding zone in each trading interval (15 minutes since October 2025). About 15% of households used them in early 2026. Traders with more than 200,000 customers must offer a dynamic-price contract.
OtherYesUniversal service: every trader must include a universal service offer for households, under conditions set by the Cabinet of Ministers. About 10% of households used it in early 2026, also at a fixed price.
RegulatedNoThe energy price for households is not regulated. SPRK regulates the network part of the bill: the Sadales tīkls distribution tariff and the AST transmission tariff.
Time-of-useUnknownThe Sadales tīkls network tariff has one time zone, so there is no regulated day/night network rate. Time-varying prices for the energy part come through dynamic exchange-linked contracts; no reliable public source shows how widely fixed day/night energy products are offered.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
2,136 kWh/yr (2025)Source 5Derived: the Central Statistical Bureau household energy survey found average consumption of 178 kWh per household per month in 2025 (178 × 12). Eurostat energy-balance data give a similar figure: 1,740 GWh of household electricity in 2024 across 838,400 households is about 2,076 kWh per household.
Average daily use per household
5.85 kWh/day (2025)Source 5Derived: 178 kWh per month × 12 ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
931 kWh/person/yr (residential) (2024)Source 10Derived: household final electricity consumption of 1,740.4 GWh (Eurostat energy balance) divided by the average 2024 population (mean of 1,878,575 on 1 Jan 2024 and 1,860,565 on 1 Jan 2025, CSB).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
20,753 plug-in cars (end 2025)Source 12Derived: 13,916 battery-electric cars plus 6,837 plug-in hybrids (6,359 petrol and 478 diesel) out of 802,784 registered passenger cars.
Electric cooking
45.9 % of households (2025)Source 5Share of households mainly using electricity for cooking; 26.1% use natural gas and 16.7% LPG.

Latvian households use relatively little electricity by European standards, about 178 kWh a month on average in 2025. The main reason is heating: 56.8% of households receive heat from district heating or other external suppliers (82.2% in Riga), and wood remains common in rural homes, so electric space heating is limited. Heating and hot water account for 83.9% of household energy use, but most of that energy is not electricity.

Electricity demand is rising slowly. Electricity distributed by Sadales tīkls reached 6,293 GWh in 2025, 2.9% more than in 2024, and household consumption grew by 3.9%. Growth comes from heat pumps, electric cooking (now used by 45.9% of households) and a still small but fast-growing electric car fleet: battery-electric cars more than doubled between 2023 and 2025 to 13,916, although they are under 2% of the car fleet.

Consumption peaks in winter. The national system maximum in 2024 was 1,243 MW on 8 January, while summer minimum load was 459 MW, which is now often below solar output at midday.

Housing and households.

Dwellings
1,063,939 dwellings (2021)Source 4Conventional dwellings at the 2021 Population and Housing Census; 810,992 were occupied.
Owner-occupied
82.2 % of population (2025)Source 7EU-SILC: 67.9% own outright and 14.3% with a mortgage or loan.
Private rented
6.6 % of population (2025)Source 7Tenants paying market rent.
Social or public housing
11.3 % of population (2025)Source 7Tenants paying reduced rent or living rent-free. This includes municipal housing but also other reduced or free arrangements, so it overstates social housing in the strict sense.
Houses
34.1 % of population (2025)Source 8EU-SILC: 31.6% detached and 2.4% semi-detached or terraced.
Apartments and flats
65.1 % of population (2025)Source 857.2% live in buildings with ten or more flats.
Urban population
69.8 % of population (1 Jan 2026)Source 3Share living in cities (CSB definition).

Most Latvians live in flats: about 65% of the population lives in apartment buildings, mostly large Soviet-era blocks with ten or more flats. These buildings are usually connected to district heating, and each flat normally has its own electricity connection and meter. Rooftop solar on these blocks is a shared decision of the apartment owners and can cover only common areas or be shared through an energy community.

About a third of people live in houses, mostly detached homes in suburbs, small towns and the countryside. These homes carry most of the rooftop solar and heat pump installations, and are the main users of the microgenerator connection route.

Home ownership is very high: 82.2% of people live in owner-occupied homes, and most owners have no mortgage. Only 6.6% rent at market price. As rental is rare, the split between landlords and tenants is a smaller obstacle to solar or heat pump investment than in many Western European countries.

How the grid works in Latvia.

  1. TransmissionAS Augstsprieguma tīkls (AST)
  2. DistributionEight licensed DSOs; Sadales tīkls covers 99% of the territory and about 774,000 users, the others are small local networks
  3. MeteringStep data platform (operated by Sadales tīkls)
  4. Supply5 or more retail suppliers

Physical flow

Power from the Daugava hydro plants, the Riga CHP plants, large solar and wind parks and imports flows through AST’s 330 kV and 110 kV network to substations, where Sadales tīkls takes it into its 6–20 kV medium-voltage and 0.4 kV low-voltage network. Homes are connected at 0.4 kV with single-phase or three-phase connections. About 25,000 generators were connected to the distribution network at the end of 2025, with total capacity of 1,190 MW, of which more than 920 MW was solar.

Latvia sits in the middle of the Baltic system, with interconnections to Estonia and Lithuania, and reaches the Nordic and Polish markets through Estonian and Lithuanian links. Since 9 February 2025 the Baltic states operate synchronously with Continental Europe, and since the fourth quarter of 2025 they form one Baltic load-frequency control block in which each country is a separate control area.

Commercial flow

Traders buy power on Nord Pool or bilaterally, are responsible for balancing (directly or through a balance responsible party) and sell to consumers. The DSO measures consumption and generation at each object and sends data through the Step platform, which also processes switching: a new trader submits a StartSupply message and the switch takes effect from the start of the following month according to Cabinet Regulation No. 635. Settlement intervals became 15 minutes on 1 October 2025.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Climate and Energy (Klimata un enerģētikas ministrija, KEM)Prepares energy policy and legislation, the National Energy and Climate Plan and the 2050 energy strategy, and owns the household renewable equipment grant programme funded from emission-allowance auction revenue.
RegulatorPublic Utilities Commission (SPRK)Licenses transmission and distribution, approves network tariffs and their methodology, sets the Network Code, and keeps the registers of electricity traders, producers and storage operators above 1 MW, and aggregators.
TSOAS Augstsprieguma tīkls (AST)State-owned owner and operator of the 330 kV and 110 kV network and Latvia’s system operator. Runs balancing and reserve procurement with Elering and Litgrid, prequalifies balancing service providers, issues EIC codes for the Latvian market and keeps the guarantees-of-origin register.
DSOAS Sadales tīklsLargest of eight licensed DSOs, a Latvenergo group company covering 99% of the territory with 92,516 km of lines at 0.4 kV and 6–20 kV. Owns and reads the meters, connects microgenerators and power plants, and runs the e-st.lv customer portal. Its licence runs to 30 June 2027.
Data hub / registryStep data platform (operated by Sadales tīkls)Central electricity market data platform in use since 2023. Holds customer and object data and EIC codes, handles supplier switching and move-in/move-out messages, and distributes metering data to traders, system operators and aggregators. In 2025 it was used by 24 traders, all DSOs, AST and two aggregators.
SupplierElectricity traders (registered with SPRK)Household supply is competitive. Latvenergo’s Elektrum brand is the largest; other household traders include Enefit, Ignitis Latvija (households since February 2026), Tet and Virši. Traders must offer a universal service and a universal net settlement service.
ExchangeNord Pool (Latvian bidding zone)Day-ahead and intraday trading for the Latvian bidding zone. Dynamic retail contracts and the universal net settlement price are linked to the Latvian zone price, in 15-minute intervals.
Flexibility marketBaltic balancing market (AST, Elering, Litgrid)Common Baltic procurement of FCR, aFRR and mFRR capacity, with aFRR energy exchanged through the European PICASSO platform since April 2025.

Compared with the UK system.

Compared with the UK system.
UK conceptLatvia equivalentHow it works
DNOSadales sistēmas operators (DSO) – mainly Sadales tīklsLatvia has no regional patchwork of DNOs. Sadales tīkls serves 99% of the country; seven other licensed DSOs run small local networks, and they must agree technical conditions for microgenerators with Sadales tīkls where their networks hang off its grid.
National Grid/NESOAugstsprieguma tīkls (AST)AST combines the roles of transmission owner and system operator. It owns the 330/110 kV grid, balances the system as part of the Baltic load-frequency control block, and buys reserves.
MPANObjekta EIC kods (object EIC, Z-type code)Each electricity connection ("object") has a 16-character Energy Identification Code starting 43Z, issued from code ranges AST allocates to each system operator. It identifies the connection, not the meter, and is the key used in every market message on the Step platform.
MPRNNo electricity equivalent; gas handled separatelyElectricity uses only the object EIC. Customers also have a personal client EIC (X-type code). Natural gas connections are administered separately by the gas distribution operator and are not covered by the electricity Step platform.
Meter operatorThe DSOThere is no competitive metering market. The DSO owns, installs and reads the meter; Sadales tīkls completed its smart meter rollout in 2023 and provides the data to the Step platform.
SupplierElektroenerģijas tirgotājs (electricity trader)Traders must register with SPRK, have system use agreements with the TSO and relevant DSOs, and a balancing agreement. They bill both energy and network charges and administer net settlement for solar customers.
Smart-meter infrastructureSadales tīkls smart meters + Step data platformMeters communicate mainly over the power lines (G3-PLC). There is no separate national communications body like the DCC: the DSO collects the data and the Step platform shares it with traders and other authorised parties.

How a supply point is identified.

43Z-STO01234567K (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Objekta EIC kods (object Energy Identification Code) (EIC (Z-code))
Who issues it?The system operator to whose network the object is connected (in practice usually Sadales tīkls), using a code range assigned by AST, the national EIC issuing office
FormatENTSO-E Energy Identification Code: 2 characters for the issuing office ("43" = Latvia/AST), 1 character for the code type ("Z" = metering point/object), 12 freely assigned characters (letters, digits and hyphens; Sadales tīkls objects use a prefix such as "-STO" followed by digits), and 1 check character.
Length16 characters
Stays with the property when you switch supplier?Yes
Where to find itIn the Sadales tīkls customer portal e-st.lv, which lists the customer’s objects with their identifiers and technical data, and in the trader’s systems. Customers have a separate personal client EIC (43X-…) as well.
Electronic accessAll market participants work through the Step data platform (datuplatforma.lv) run by Sadales tīkls, by CSV upload in its portal or by SOAP/XML system-to-system messages. The GetCustomerAndObjectEIC message returns a customer’s client and object EICs; GetObjectData and GetObjectConsumption return technical and historical consumption data.
Third-party accessOnly registered market participants with a Step user agreement (traders, system operators and aggregators/flexibility service providers) can use the platform, and traders may request customer and object data only with the customer’s consent. Other third parties, such as installers, normally get the code and data from the customer, who can export consumption data from e-st.lv.
Who keeps the registerAST keeps the national EIC register and governance as Latvia’s EIC issuing authority. Object codes are generated in ranges assigned to each system operator, and the Step platform holds the national record of objects, customers and their traders.
Register scopeNational

What the object EIC identifies

In Latvia the basic unit is the "object" (objekts): the point where a customer’s installation is connected to a system operator’s network. Each object has one Z-type EIC. It is not the meter serial number, so it stays the same when the meter is replaced, and it stays with the connection when the occupant or trader changes. Because an object can only be in one operator’s network, each system operator issues Z-codes from its own range.

Client codes and objects

Latvia also gives every electricity customer a personal X-type EIC, separate for individuals and legal entities. A customer who has a flat and a summer cottage therefore has one client EIC and two object EICs. This matters for solar owners: net settlement can combine several objects of the same customer under one trader, for example using a summer house’s surplus to pay for a city flat.

How it is used

Almost every market process on the Step platform needs an EIC: starting or ending supply, a customer moving in or out, retrieving consumption data, adding an object to an aggregator’s portfolio, or including a new generating installation in a trader’s balancing area. Suppliers must keep the customer’s contact details up to date on the platform, and DSOs must send metering data and changes in object specifications.

Format in practice

Codes follow the ENTSO-E EIC scheme. The documentation published by Sadales tīkls shows an object code in the form 43Z-STO followed by eight digits and a check letter, and a client code in the form 43X-STJ followed by eight digits and a check letter. Data files exchanged on the platform use Windows-1257 (Baltic) encoding.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringLimited
Net billingYes
How exported electricity is paidMoney-based net settlement through the trader. Under the universal net settlement service (systems up to 50 kW) exports are valued at the Nord Pool Latvian zone price for each trading interval minus at most 20 EUR/MWh, never below zero; other offers are trader-defined. Legacy kWh net metering continues for existing users until 28 February 2029.
What sizes count as a microgenerator?Generation connected at up to 16 A per phase: 3.7 kW on a single-phase connection or 11.1 kW on a three-phase connection. Installations above 11.1 kW are power plants with a separate connection procedure.
Who can use net settlement?Households and businesses with renewable generation of less than 1 MW (up to 999.99 kW) at a connection that has DSO permission for parallel operation. All objects in the arrangement must have one trader and one system operator. It can be used without registering a business activity.
What is the universal net settlement service?An offer every trader must include for systems up to 50 kW. The purchase price is the Nord Pool Latvian zone price for each trading interval minus no more than 0.02 EUR/kWh, and never below zero. The minimum contract period is six months and the customer can leave early without a penalty.
Is there a limit on how much surplus can be exported?Yes, for the universal service there is a maximum surplus fed into the grid and not used on site over each 12-month period from 1 March to the end of February, depending on the permitted generating capacity. The trader monitors it.
Can a positive balance pay network charges?Yes. Net settlement does not apply to network charges by default, but a positive net value can be used to pay for Sadales tīkls services if the active user asks.
What happens to existing net metering users?No new participants have been accepted since 1 May 2024. Existing households can stay until 28 February 2029, when net metering ends. They have a one-off right to move to net settlement, and accumulated kWh are cancelled when they leave net metering or when the user at the property changes.
Which technical standard applies?Inverters must meet LVS EN 50549-1:2019 and Network Code requirements for type A generating modules, and be on the Sadales tīkls approved inverter list (based on a certificate from an accredited laboratory).

Connecting a home system.

  1. Check consumption data in e-st.lv and choose a system size; a microgenerator is up to 16 A per phase (3.7 kW single-phase, 11.1 kW three-phase). Larger systems are treated as power plants.
  2. Choose an inverter from the Sadales tīkls list of approved inverters, and check any municipal requirements for the site.
  3. Apply for microgenerator connection in the e-st.lv portal. With an approved inverter Sadales tīkls answers within three working days, saying whether the existing connection is sufficient or the network must be rebuilt (in which case it issues technical requirements and an indicative cost free of charge).
  4. Pay the connection assessment invoice in e-st.lv; the fee is not refunded if the application is withdrawn or lapses.
  5. Have a certified construction specialist install the system, set the inverter and sign the inverter settings protocol.
  6. Confirm readiness in e-st.lv, attaching the specialist’s certificate, the signed settings protocol, a photo of the inverter nameplate and a photo of the installed panels.
  7. Sadales tīkls checks the documents (and may inspect the site) and issues permission for parallel operation within three working days.
  8. Agree a settlement method with your electricity trader – net settlement or sale of surplus – before you start exporting, so that exported energy is paid for from the first kWh.

From net metering to net settlement

Until April 2024 households could join net metering, in which Sadales tīkls offset kWh exported against kWh imported within a year running from 1 March to the end of February. This scheme drove the first wave of household solar, but it treated a kWh exported at noon in June the same as a kWh imported on a January evening. Since 1 May 2024 new solar owners must use net settlement instead, administered by their trader in money terms rather than kWh.

Under net settlement the trader values both the electricity sent to the grid and the electricity taken from it, using market-linked prices. If exports are worth more than imports, the difference is carried forward as a credit (often called a "virtual wallet") or used against another of the customer’s connections. Owners gain most by using solar output at the time it is produced, which is one reason combined solar and battery installations are growing.

Effect on the market

The change slowed household installations. Microgenerator capacity added in 2025 was about 15 MW compared with 37 MW in 2024, while large solar parks drove overall growth. There were about 24,800 microgenerators with 210 MW at the end of 2025, 95% of them owned by private individuals, and about 220 MW by mid-2026. Owners can also sell surplus to a trader under an ordinary purchase agreement, or share electricity within an energy community.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityRegistration in the SPRK register of producers and storage operators for power plants (including cogeneration) above 1 MW installed capacity. Plants of 1 MW or less do not need SPRK registration, but every grid-connected installation needs a connection permit from the system operator.SPRK; DSO or AST for connectionProducers must comply with SPRK’s general authorisation conditions. Large projects may also need environmental and building approvals.
Store electricityRegistration in the SPRK register for storage facilities with generating capacity above 1 MW, from 1 January 2026. Storage owned by AST or a DSO is excluded. Smaller and home batteries need no registration.SPRKHome batteries connected to a microgenerator must meet Sadales tīkls technical requirements, including coordinated protection and safe island operation.
Export surplus from a home systemNo licence. DSO permission for parallel operation is required, plus a net settlement or purchase agreement with a trader. Net settlement can be used without registering a business activity.Sadales tīkls (or other DSO); traderAn active user may sell surplus as long as this is not its main commercial or professional activity.
Sell / supply electricity to end usersRegistration in the SPRK electricity traders register (any trade to any users is regulated). Traders also need system use agreements with AST and each DSO they operate in, a balancing agreement and a Step platform user agreement.SPRK; AST; DSOs; Sadales tīkls (Step)Traders must offer universal service and universal net settlement; traders with more than 200,000 customers must also offer fixed and dynamic price contracts. SPRK can remove a trader from the register for repeated breaches.
Aggregate / demand responseRegistration in the SPRK aggregator register before providing demand response services, plus a system use agreement with the operator of the customer’s network, a demand response agreement with the customer and a balancing contract.SPRK; system operatorAggregators must be registered on the Step platform to build portfolios of objects; two aggregators were active on it in 2025.
Wholesale tradingNo separate wholesale licence; trading on Nord Pool requires exchange membership and balance responsibility. Selling to end users additionally requires trader registration.Nord Pool; AST (balancing)Wholesale market integrity and transparency rules (REMIT) apply; SPRK monitors the wholesale market.
Balancing and grid servicesPrequalification as a balancing service provider by AST for FCR, aFRR or mFRR, under SPRK-approved terms and conditions. Minimum bid 1 MW.AST; SPRKAssets can be pooled into reserve-providing groups; storage and demand facilities are eligible.
Energy communities and electricity sharingNo licence. Energy communities and active users acting together can share electricity within the same trading interval through a contract with a trader.Trader; system operatorsObjects that share electricity cannot also be in net metering, net settlement or the guarantees-of-origin scheme. Network tariffs apply to shared electricity.
VPP / remote control of assetsNo specific licence identified. Controlling customers’ assets for market purposes is done through aggregator registration and, for balancing, AST prequalification.SPRK; ASTInverters must still meet DSO protection settings; the DSO is developing a local flexibility solution in a research project.
Transmission and distributionLicence from SPRK: transmission at 110 kV and above, distribution above 1 kV up to 110 kV, each for a defined service area.SPRKAST is the only transmission licensee; eight distribution licensees.

Latvia uses registration rather than individual licences for most competitive activities. The Electricity Market Law requires traders, aggregators, and producers and storage operators "whose activity needs to be regulated" to be entered in public registers kept by SPRK and to follow its general authorisation conditions. Which activities need regulating is set by Cabinet Regulation No. 1227: generation and cogeneration above 1 MW, all electricity trading, demand response services, transmission, distribution, and (from 2026) storage above 1 MW.

For households this means a rooftop solar system, a home battery or taking part in a flexibility programme through an aggregator needs no licence. What is needed is a connection permit from the DSO, an installer with the right certification, and a contract with a trader or aggregator.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency containment reserve (FCR)Yes1 MW bid, 1 MW granularityYesAST (Baltic balancing capacity market). Introduced with synchronisation to Continental Europe in 2025. Providers must be prequalified by AST; AST’s own 80 MW battery systems were built for FCR and aFRR.
Automatic frequency restoration reserve (aFRR)Yes1 MWYesAST; European PICASSO platform. The Baltic TSOs joined PICASSO in March–April 2025 and began buying aFRR balancing energy on 10 April and capacity on 15 April 2025.
Manual frequency restoration reserve (mFRR)Yes1 MWYesAST (common Baltic market). mFRR has been exchanged in a common Baltic balancing market since 2018 and is now procured as capacity and energy with 15-minute products.
Wholesale day-ahead and intradayYes—YesNord Pool. Distributed assets take part indirectly through dynamic retail contracts or a trader’s portfolio. 15-minute market time units apply.
DSO local flexibilityDeveloping—UnknownSadales tīkls. No market yet. Sadales tīkls and Tet are developing a data-driven flexibility solution for forecasting and managing grid congestion using customers’ demand response (ST FLEX research project).

Latvia’s balancing arrangements changed fundamentally in 2025. Before synchronisation the Baltic states depended on the Russian system for frequency control; now AST must keep its own reserves within the Baltic load-frequency control block. Reserves are bought in a common Baltic balancing capacity market for standard FCR, aFRR and mFRR products, with a minimum bid of 1 MW. Balancing service providers must be prequalified by AST, and a provider may combine several small assets into one group when they could not take part on their own.

The legal framework for independent aggregation is in place: aggregators register with SPRK, can contract directly with customers, and use the Step platform to manage portfolios and receive consumption data. In practice participation by household assets is at an early stage, with two aggregators using the platform in 2025, so flexibility from distributed resources is best described as developing.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Step data platformAggregators build their portfolios of customer objects here and receive interval consumption data for aggregation services.
PICASSOEuropean platform for the exchange of aFRR balancing energy, joined by AST in 2025.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutComplete since May 2023 – smart meters at 99% of Sadales tīkls connection points
Reading interval15 minutes (actual 15-minute data for all customers from 1 February 2026); hourly also available
Owner and operatorThe DSO (Sadales tīkls for 99% of the country)
Connection points read remotelyMore than 1 million
Main communicationsG3-PLC (data over the power lines)
Cost per connection pointEUR 40; programme total EUR 44.5 million
Customer accessFree, in e-st.lv and traders’ portals, by month, day, hour or 15 minutes
Data hubStep data platform, shared with traders and aggregators

Sadales tīkls completed its smart metering programme in May 2023, giving more than 1 million connection points remote, automated metering. It used mainly G3-PLC technology, sending data over its own power lines, which kept the cost to about 40 EUR per connection point. Network losses fell from 4.77% in 2014 to 3.67% in 2022, helped by the programme.

Because every home already has a smart meter that measures both import and export, Latvia did not need a separate export meter or a meter change when solar owners moved to net settlement or when the market moved to 15-minute settlement on 1 October 2025. Data were first provided in arithmetic 15-minute splits, and actual 15-minute data have been available for all customers since 1 February 2026.

Renewable electricity.

Electricity generation mix (2025).

  • Hydro: 50.8%
  • Natural gas: 27%
  • Solar: 11.7%
  • Biomass and biogas: 6.9%
  • Wind: 3.5%
  • Other: 0.1%
Source 9
Renewable electricity share
57.6% (2025)Source 11Share of gross electricity consumption from renewables (EU Renewable Energy Directive basis, Eurostat). Used instead of the generation share because a large part of supply is imported: of domestic net generation alone, 72.9% was renewable in 2025 (4,224 of 5,797 GWh).
Home solar
0.22 GW (mid-2026)Source 30Microgenerators of up to 11.1 kW, around 25,000 systems, most owned by households. At end-2025 there were about 24,800 microgenerators with 210 MW (pv magazine, February 2026).
Solar added each year
0.258 GW (2025)Source 29Capacity added to the distribution network in 2025, per Sadales tīkls data. The record year before that was 2024 with 319 MW; around 600 MW was added in the first seven months of 2026.
Solar
1.521 GW (Aug 2026)Source 30
Large hydro and Riga CHP (Latvenergo)
2.6 GW (1 Sep 2025)Source 26Latvenergo plants in AST’s list: Pļaviņas, Ķegums and Riga HPPs, Riga CHP-1 and CHP-2, Aiviekste HPP and Ainaži wind farm. The hydro and gas split is not given separately.
Biomass and biogas (above 1 MW)
0.159 GW (1 Sep 2025)Source 26
Wind (above 1 MW)
0.13 GW (1 Sep 2025)Source 26
Small hydro (above 1 MW)
0.03 GW (1 Sep 2025)Source 26

Targets.

  • The National Energy and Climate Plan 2021–2030 and the Latvian Energy Strategy 2050 (published 25 March 2025) guide development; AST’s planning assumes faster growth of onshore wind, solar and storage.
  • Offshore wind: the joint Latvian–Estonian ELWIND project of about 1,000 MW is assumed by AST to be completed around 2033–2035.

Hydropower is the backbone of Latvian renewable generation. Hydropower produced 2.94 TWh in 2025, about half of national generation and mostly from the three Daugava plants, but their output depends heavily on spring floods and rainfall, so Latvia’s renewable share and import needs swing from year to year. Gas-fired CHP in Riga covers much of the rest and provides controllable capacity in winter.

Solar has grown very quickly. Capacity on the distribution network roughly doubled in two years to 920 MW by the end of 2025, and five large transmission-connected parks added 519 MW in 2026. In June 2026 solar produced 274 GWh, 55% of Latvian generation, and in the first half of 2026 it covered about 23% of consumption. Wind is still small but growing: several new onshore wind farms, including the 108.8 MW Laflora Energy park in Kaigu bog, are due to start in 2026.

Measured as Eurostat’s share of renewable electricity in gross electricity consumption, Latvia reached 55.5% in 2024 and 57.6% in 2025. The share of renewables in domestic generation was higher, about 73% in 2025, because Latvia is a net importer and imported electricity does not count in domestic generation.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
0.16 GWh (2025)Source 26AST battery systems at Rēzekne (60 MW/120 MWh) and Tume (20 MW/40 MWh). Commercial battery projects, including hybrid solar-plus-storage parks, are being connected in 2026 but no consolidated total was identified.

Storage in Latvia started with the TSO itself. AST built 80 MW/160 MWh of batteries in 2025 to provide FCR and aFRR as the Baltic states took over their own frequency control. Since 1 January 2026, other storage facilities above 1 MW must register with SPRK, which creates a clear route for commercial projects.

Home batteries are encouraged by net settlement, which rewards using solar power on site, and by the household grant scheme, which now funds batteries of at least 10 kWh. Sadales tīkls treats a home battery with an inverter as part of the generating installation, and island operation during outages needs automatic switching and synchronisation equipment.

Storage projects.

  • AST Rēzekne and Tume battery systems: 80 MW/160 MWh owned by the transmission system operator to provide frequency reserves after synchronisation with Continental Europe.
  • Hybrid solar and storage parks: AST planned to connect four hybrid solar and battery parks, together with four wind farms, by the end of 2026 (913 MW combined).

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Elektrum (Latvenergo)—YesUnknownYesYes
Enefit—UnknownUnknownUnknownYes
Ignitis Latvija—UnknownUnknownUnknownYes
Tet—UnknownUnknownUnknownYes
Virši Renergy—UnknownUnknownUnknownYes

About 900,000 households have electricity contracts. Latvenergo’s Elektrum remains by far the largest household trader, but competition has grown and nearly 20% of residents switched trader in the two years to early 2026. Every trader must offer a universal service and a universal net settlement service for small solar systems, so "Yes" for export tariffs reflects this legal obligation. Smart meters are provided by the DSO, not by the trader, so they are available whichever trader a customer uses. Detailed product features other than those shown were not verified.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Climate and Energy (KEM)GovernmentEnergy and climate policy ministrySets energy policy and owns the household renewable equipment grant scheme.
Public Utilities Commission (SPRK)RegulatorEnergy regulatorApproves network tariffs and keeps the registers of traders, producers, storage operators and aggregators.
Augstsprieguma tīkls (AST)TransmissionTransmission and system operatorGrid connection of large plants, balancing market, EIC issuing office and guarantees of origin.
Sadales tīklsDistributionMain distribution system operatorConnects microgenerators and homes, owns smart meters and runs e-st.lv and the Step data platform.
Nord PoolMarketPower exchange for the Latvian bidding zoneSource of the zone price used in dynamic contracts and the universal net settlement price.
Step data platformMeteringNational electricity market data hubHolds EIC codes and metering data and processes switching for all market participants.
Central Statistical Bureau of Latvia (CSB)ConsumerNational statistics officePublishes population, household and household energy consumption statistics.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection of invertersLVS EN 50549-1:2019Latvian standards body (adopted CENELEC standard); required by Sadales tīklsRequirements for generating plants connected in parallel with low-voltage distribution networks, up to type B.
Network CodeNetwork Code for the electricity sector – type A generating modulesSPRKMicrogenerators must meet the Network Code requirements for type A power-generating modules.
Protection settingsSadales tīkls general technical requirements for microgeneratorsSadales tīklsOvervoltage 255 V (≤1.5 s); undervoltage 100–195.5 V (≤3 s); over-frequency ≥52 Hz and under-frequency ≤47.3 Hz (≤0.5 s); LFSM-O from 50.2 Hz with 5% droop; unbalanced voltage protection; breaker of no more than 16 A between inverter and meter.
Anti-islandingSadales tīkls technical requirementsSadales tīklsInverter protection must disconnect the generator and battery when the grid is de-energised and on inverter fault. Island operation with a battery needs voltage and frequency control switching and a sync-check function.
Inverter approvalSadales tīkls approved inverter listSadales tīkls laboratoryInverters not on the list need a certificate from an accredited laboratory, the technical specification and user manual; output must be limited to 16 A per phase.
Installer accreditationCertified construction specialist (LVS EN ISO/IEC 17024 certification bodies)BLEEA certification centre; Latvijas Elektriķu brālība (LEB)Microgenerators may only be installed, and the inverter settings protocol signed, by a specialist certified for electrical installation with a power-plant specialisation. Systems above 11.1 kW need a certificate in a regulated sphere (works management or supervision). An electrical safety group certificate is not enough.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DSO permission for parallel operationYesNationalEvery grid-connected microgenerator or power plant needs system operator permission before permanent operation; it may only be switched on briefly for setting up and testing beforehand. Off-grid systems need none.
Building permit for rooftop solarLimitedLocalSolar panels are classed as equipment, so placing them on a roof does not itself need building documentation, whatever the capacity. If structural reinforcement or new engineering networks are needed, building rules apply. Owners are advised to have the roof structure surveyed.
Municipal conditionsLimitedLocalSadales tīkls advises checking local municipal rules that may restrict installations in certain areas before buying a system.
SPRK registrationLimitedNationalOnly for generation or storage above 1 MW, and for traders and aggregators.

For a typical home system the permission process is digital and fast: an application in e-st.lv, a three-day answer from Sadales tīkls, installation by a certified specialist and a parallel-operation permit within three working days of the documents being submitted. Building permission is generally not needed for panels on an existing roof, according to Ministry of Economics clarifications from 2022 and 2023.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Household support for environmentally friendly energy equipmentActiveGrantGrants for solar panels, wind generators, batteries (minimum 10 kWh), heat pumps, pellet boilers, solar collectors and connection to district heating. Support covers 70% of eligible costs (85% for holders of the Latvian Honorary Family certificate, announced September 2026), up to 15,000 EUR per project. Total funding 85 million EUR, of which about 20 million EUR was available in September 2026. Administered by the Environmental Investment Fund (VIF) and funded from emission-allowance auction revenue; more than 15,000 applications and over 52 million EUR paid by December 2025.Mar 2022 – Dec 2029
Renewable equipment for apartment buildings, energy communities and public bodiesActiveGrantCompetition approved in February 2026 with 26.8 million EUR: 10 million EUR for apartment buildings, 9.2 million EUR for energy communities and 7.6 million EUR for state and municipal bodies, at up to 70% support (80% for public bodies; 65% for commercial activity). Buildings must be energy class D or better, except energy community buildings.From 2026
Universal net settlement serviceActiveNet billingGuaranteed export price for renewable systems up to 50 kW: Nord Pool Latvian zone price minus no more than 20 EUR/MWh, never below zero.—
Net metering (neto uzskaites sistēma)ClosedNet meteringClosed to new participants on 1 May 2024. Existing household users can continue until 28 February 2029.Until 28 Feb 2029 (existing users only)
Protected user bill reductionActiveBill discountMonthly electricity bill reduction of 20 EUR for low-income households, families caring for a disabled child and people with Group I disability, and 25 EUR for large families, applied automatically by participating traders.—
State support for household distribution chargesClosedTariff subsidyReduction of the fixed part of the Pamata distribution tariff for households with connections up to 25 A, paid from the state budget.Jan 2024 – Dec 2025

Data and connectivity.

Fixed broadband
94.1 % of households (2025)Source 13Households with internet access at home (Eurostat). Fixed very-high-capacity network coverage was 68.1% of households in 2024 and fibre-to-the-premises coverage 61.1%.
4G coverage
Not identified from a reliable public source.
5G coverage
71.1 % of populated areas (2024)Source 14Overall 5G coverage, Digital Decade 2025 report (EU average 94.3%).

Smart meters in Latvia do not depend on the mobile network: Sadales tīkls uses G3-PLC to send data over its power lines. Customer devices such as inverters, batteries and smart chargers usually rely on home broadband or mobile data for remote monitoring and for any aggregator control.

Fixed gigabit and 5G coverage are below the EU average, especially in sparsely populated rural areas where many detached houses with solar panels are located, although 5G coverage grew strongly in 2024.

Grid conditions.

National peak demand
1.243 GW (2024)Source 26Maximum load 1,243 MWh/h on 8 January 2024 at 11:00 (control measurement data); minimum load 459 MWh/h on 25 June 2024.
Annual electricity demand
6.98 TWh (2024)Source 26Net system consumption without losses, 6,979,836 MWh, 2% more than in 2023.
Generation capacity
3.804 GW (1 Sep 2025)Source 26Total of power plants above 1 MW listed by AST. Excludes microgenerators and the large solar and wind parks connected in 2026.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Latvia has generally been a net importer: according to AST, imports through the transmission network were between 4 and 5.3 TWh a year in 2022–2024, and the balance of exports minus imports was −1 TWh in 2024. With continued operation of the Riga CHP plants, AST’s adequacy assessment found no significant supply risks until 2035, but it stresses the need to keep controllable baseload capacity and to expand balancing resources as wind and solar grow.

Demand for new connections far exceeds current load. AST connected five solar parks (519 MW) and two wind farms (150 MW) in the first half of 2026 and planned another 913 MW of wind and hybrid solar-storage parks by the end of the year. Longer-term projects include a new Estonia–Latvia interconnection planned by 2035 linked to the ELWIND offshore wind project, and studies on Latvia–Sweden and Baltics–Germany links expected around 2040.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Synchronisation with Continental Europe and new balancing marketsCurrent9 Feb 2025The Baltic states left the IPS/UPS system and synchronised with Continental Europe. FCR, aFRR and mFRR are now procured in a common Baltic balancing capacity market, and aFRR energy has been exchanged through PICASSO since April 2025.
15-minute settlement and metering dataCurrent1 Oct 2025 (actual 15-minute data from 1 Feb 2026)The market moved to a 15-minute settlement period. Sadales tīkls provides actual 15-minute metering data for all customers from 1 February 2026.
Registration of storage above 1 MWCurrent1 Jan 2026Electricity storage facilities above 1 MW (other than TSO- or DSO-owned) became a regulated activity requiring entry in the SPRK register (Cabinet Regulation No. 647 of 4 November 2025 amending Regulation No. 1227).
End of state support for household distribution chargesCurrent1 Jan 2026The state-funded reduction of the fixed distribution charge for households with connections up to 25 A ended after 2025; approved tariff values are unchanged in 2026.
Changes to the household renewable equipment grantCurrentAnnounced 1 Sep 2026Higher support for Honorary Families (85%), wider choice of heating combinations, no requirement to remove existing heating, minimum battery size raised to 10 kWh and annual monitoring dropped, under new Cabinet rules.
New "Jaudīgais" distribution tariff planUpcoming1 Jan 2027Sadales tīkls tariff plan for households and businesses with high consumption relative to connection capacity, expected to lower costs for about 90,000 connections (8% of customers).
End of net meteringUpcoming28 Feb 2029The remaining kWh net metering users must move to net settlement or another arrangement with their trader.
ELWIND offshore wind and new Estonia–Latvia interconnectionUpcomingAround 2033–2035Joint Latvian–Estonian offshore wind project of about 1 GW with a new interconnection, currently at study and environmental assessment stage.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumAbout 24,800 microgenerators (210–220 MW) on roughly 842,000 households, but annual microgenerator additions fell from 37 MW in 2024 to 15 MW in 2025 after the move to net settlement.
Distributed energy marketMediumUniversal smart meters and growing solar-plus-battery installations (about 2,400 in 2025), but fewer than 14,000 battery-electric cars and no official heat pump count; district heating serves 56.8% of households.
Grid flexibility marketMediumAggregator registration, Step platform access and Baltic FCR/aFRR/mFRR markets with 1 MW minimum bids exist, but only two aggregators were active on the data platform in 2025 and there is no DSO flexibility market yet.
Energy storage adoptionMediumAST’s 80 MW/160 MWh batteries in operation from 2025, storage registration framework from 2026 and hybrid parks being connected; home battery numbers are still small.
Renewable growth environmentHighSolar capacity grew from about 920 MW at end-2025 to over 1.5 GW by August 2026; renewable share of gross electricity consumption rose from 55.5% (2024) to 57.6% (2025).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 39 sources
  1. IRS010. Population at the beginning of year, population change and key vital statistics. Central Statistical Bureau of Latvia, 2026. accessed 1 October 2026.
  2. MVS011. Total number and average size of private households at the beginning of year. Central Statistical Bureau of Latvia, 2026. accessed 1 October 2026.
  3. Latvia has a population of 1.845 million. Central Statistical Bureau of Latvia, 2026. accessed 1 October 2026.
  4. MAS070. Conventional dwellings and persons living in them by type of building and year of construction (2021 census). Central Statistical Bureau of Latvia, 2021. accessed 1 October 2026.
  5. Apkurei un ūdens uzsildīšanai izmanto 83,9% no kopējā mājsaimniecības energoresursu patēriņa (CSB household energy consumption survey 2025). Central Statistical Bureau of Latvia, via LV portāls, 2026. accessed 1 October 2026.
  6. Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2025. accessed 1 October 2026.
  7. Distribution of population by tenure status, type of household and income group (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
  8. Distribution of population by degree of urbanisation, dwelling type and income group (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
  9. Net electricity generation by type of fuel – monthly data (nrg_cb_pem). Eurostat, 2025. accessed 1 October 2026.
  10. Complete energy balances (nrg_bal_c) – electricity, final consumption, households. Eurostat, 2024. accessed 1 October 2026.
  11. Share of energy from renewable sources (nrg_ind_ren) – electricity. Eurostat, 2025. accessed 1 October 2026.
  12. Passenger cars, by type of motor energy (road_eqs_carpda). Eurostat, 2025. accessed 1 October 2026.
  13. Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
  14. Digital Decade 2025 country report: Latvia (Council document 10407/25 ADD 48). European Commission / Council of the EU, 2025. accessed 1 October 2026.
  15. Sadales sistēmas pakalpojumu tarifi. Sadales tīkls, 2026. accessed 1 October 2026.
  16. Mikroģeneratora pieslēgšana. Sadales tīkls, 2026. accessed 1 October 2026.
  17. Norēķinu veidi elektrības ražotājiem. Sadales tīkls, 2026. accessed 1 October 2026.
  18. Vispārējās tehniskās prasības mikroģeneratora pieslēgšanai. Sadales tīkls, 2026. accessed 1 October 2026.
  19. Sertifikācijas prasības elektroenerģijas ražošanas iekārtu uzstādītājiem. Sadales tīkls, 2026. accessed 1 October 2026.
  20. Sadales tīkla atzīto invertoru saraksts. Sadales tīkls, 2026. accessed 1 October 2026.
  21. Latvia’s smart electricity meter roll-out completed: metering of more than 1 million connection points happens remotely. Sadales tīkls, 2023. accessed 1 October 2026.
  22. AS "Sadales tīkls" 2025. gada pārskats (annual report 2025). Sadales tīkls, 2026. accessed 1 October 2026.
  23. Data Platform "Step" – Single Data Exchange Standard v1.4. Sadales tīkls, 2024. accessed 1 October 2026.
  24. Elektroenerģijas tirgus likums (Electricity Market Law), consolidated text. Likumi.lv (Latvijas Vēstnesis), 2025. accessed 1 October 2026.
  25. Cabinet Regulation No. 1227 – Noteikumi par regulējamiem sabiedrisko pakalpojumu veidiem. Likumi.lv (Latvijas Vēstnesis), 2025. accessed 1 October 2026.
  26. Transmission System Operator’s Annual Report 2025. AS Augstsprieguma tīkls, 2025. accessed 1 October 2026.
  27. Explanatory document for the Baltic proposal to the Baltic balancing capacity market rules (EBGL Articles 33(1) and 38(1)). AST, Elering, Litgrid. accessed 1 October 2026.
  28. Baltic TSOs join Europe’s PICASSO platform. Transformers Magazine, 2025. accessed 1 October 2026.
  29. Latvia deploys 258 MW of PV in 2025. pv magazine, 2026. accessed 1 October 2026.
  30. Latvia’s solar capacity surpasses 1.5 GW. pv magazine, 2026. accessed 1 October 2026.
  31. Solar remains Latvia’s largest electricity source in July. pv magazine, 2026. accessed 1 October 2026.
  32. Lithuania’s Ignitis enters the Latvian home energy market. LSM (Latvian Public Broadcasting), 2026. accessed 1 October 2026.
  33. No februāra elektroenerģijas tirgotājs Ignitis pievienojas aizsargātā lietotāja valsts atbalsta programmai. LV portāls, 2026. accessed 1 October 2026.
  34. KEM: paplašinām atbalstu mājsaimniecībām energoneatkarības stiprināšanai. Ministry of Climate and Energy, via LV portāls, 2026. accessed 1 October 2026.
  35. Iedzīvotāji varēs turpināt pieteikties valsts atbalstam saules paneļu un citu iekārtu iegādei līdz 2029. gada 31. decembrim. LV portāls, 2024. accessed 1 October 2026.
  36. Saņemti 15 tūkstoši iesniegumu videi draudzīgu enerģijas ražošanas iekārtu iegādei. LV portāls, 2025. accessed 1 October 2026.
  37. Apstiprināta atbalsta programma videi draudzīgas enerģijas ražošanas iekārtu iegādei. LV portāls, 2026. accessed 1 October 2026.
  38. Par saules paneļiem (clarification on building documentation for rooftop solar panels). Central Finance and Contracting Agency (CFLA). accessed 1 October 2026.
  39. Elektroenerģijas tirgus apskats Nr. 172, December 2025. Latvenergo, 2025. accessed 1 October 2026.

Questions about energy in Latvia.