Countries

Energy in Lithuania, explained.

How electricity works in Lithuania: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Lithuania: Not yet available.Olmack is not offered in Lithuania yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Lithuania.

Lithuania electricity market 2026: prices, ESO and Litgrid, 8-digit object numbers, smart meters, prosumer net metering, licensing, balancing markets and incentives.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Lithuania energy at a glance.

Key figures for households in Lithuania. Each one links to its source on the full overview below.

  • Electricity price.

    0.226 EUR per kWh for households, including taxes. Figures for 2025-H2.

  • Household use.

    1,800 kWh a year for a typical household. Figures for 2026.

  • Renewable share.

    49% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Lithuania.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Lithuania below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Lithuania requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Lithuania.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Lithuania, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Lithuania, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Lithuania.

Full overview

The energy market in Lithuania, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Lithuania has a liberalised electricity market in which almost every household now buys power from one of three independent suppliers: Ignitis, Elektrum and Enefit. Wholesale power is traded in the Lithuanian bidding zone of Nord Pool, the high-voltage grid is run by the state-owned transmission system operator Litgrid, and almost the whole country is served by one distribution system operator, Energijos skirstymo operatorius (ESO), part of the Ignitis group. The National Energy Regulatory Council (Valstybinė energetikos reguliavimo taryba, VERT) sets network prices and issues the permits needed to generate, store, supply or aggregate electricity.

For years Lithuania imported most of its electricity. That has changed quickly: Litgrid reports that wind and solar capacity reached 5.5 GW at the end of 2025 after 1.7 GW was added in a single year, and that domestic generation covered 74% of demand in 2025, compared with 33% in 2022. In February 2025 Lithuania, Latvia and Estonia disconnected from the BRELL ring and synchronised with the Continental European grid.

Household solar is unusually widespread. About 170,000 prosumers were active in January 2026, many of them owning a share of a remote solar park rather than panels on their own roof. Households can still use a kWh-based net metering scheme with a two-year accumulation period, paying the DSO a regulated fee for using the grid as storage. ESO completed the first phase of its smart meter rollout at the end of 2025 with about 1.3 million meters recording consumption every 15 minutes.

Energy snapshot.

Headline figures for electricity in Lithuania. Each shows its data year and links to its source.

Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
National Energy Regulatory Council (Valstybinė energetikos reguliavimo taryba, VERT)
System operator
AB Litgrid
Distribution networks
ESO (Ignitis group) serves almost the whole country (1.89 million electricity customers); a few small local DSOs, such as UAB Dainavos elektra, have their own VERT-approved tariffs
Currency
Euro (EUR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Lithuania.

Household price (EUR)
0.226 EUR/kWh (2025-H2)Source 3Eurostat average household price including all taxes and levies, consumption band 1,000–2,500 kWh/yr (closest to typical Lithuanian use). Excluding VAT the price was 0.1875 EUR/kWh; the 2,500–5,000 kWh band averaged 0.1955 EUR/kWh.
Typical annual electricity bill
407 EUR/yr (2025)Source 3Derived: Eurostat 2025-H2 all-inclusive price (0.2263 EUR/kWh, band 1,000–2,500 kWh) multiplied by the Lithuanian Energy Agency’s statistical average consumption of 1,800 kWh a year. Actual bills depend on the supplier plan, the ESO network plan chosen and consumption.

Household price trend (EUR per kWh).Source 3

0.1340.2150.2952020-H12025-H2
Lithuania household electricity price, EUR per kWh
2020-H10.1451 EUR/kWh
2020-H20.1342 EUR/kWh
2021-H10.1377 EUR/kWh
2021-H20.1504 EUR/kWh
2022-H10.153 EUR/kWh
2022-H20.2716 EUR/kWh
2023-H10.2948 EUR/kWh
2023-H20.2339 EUR/kWh
2024-H10.25 EUR/kWh
2024-H20.2415 EUR/kWh
2025-H10.2355 EUR/kWh
2025-H20.2263 EUR/kWh

What makes up the bill

A Lithuanian household bill combines the supplier’s energy price, the ESO network charge (distribution and transmission, called “persiuntimas”), the public service obligation charge (VIAP) and VAT at 21% (the Eurostat price with VAT is 1.21 times the price without VAT for 2025-H2). Suppliers usually quote a single all-in price per kWh. ESO is responsible for metering; if a customer without a smart meter does not declare readings, the bill is based on average consumption.

ESO network plans in 2026

VERT approved ESO’s 2026 low-voltage household tariffs on 12 November 2025. Customers choose one of three plans. “Standartinis” has no fixed charge and costs 0.11132 EUR/kWh including VAT for one time zone. “Efektyvus” charges 1.00 EUR per kW of permitted capacity a month plus 0.08833 EUR/kWh, and “Namai” charges 3.00 EUR a month plus 0.09559 EUR/kWh; ESO says Namai is cheaper above about 2,289 kWh a year. Two-zone and four-zone versions are available: on Standartinis the four-zone night rate is 0.06292 EUR/kWh and the evening peak (17:00–22:00 on weekdays) is 0.14641 EUR/kWh. The plan can be changed with a minimum period of one month.

The PSO (VIAP) component for 2026 is slightly negative at −0.00044 EUR/kWh before VAT, so it currently reduces bills marginally.

Phasing out regulated public supply

Household supply has been opened to competition in stages. Under the Electricity Law the public supplier stops supplying households that used at least 1,000 kWh in the previous year on fixed dates (1 January 2026, 1 July 2026, 1 July 2027 and 1 July 2028), and all remaining public supply ends on 1 January 2030. Customers who do not choose a supplier move to guaranteed supply, which is priced at the average market price with a mark-up coefficient of 1.15 for households.

Price trend

Household prices in the 1,000–2,500 kWh band were 0.13–0.15 EUR/kWh in 2020–2022-H1, nearly doubled to 0.27–0.29 EUR/kWh in the second half of 2022 and first half of 2023, and have eased since to 0.2263 EUR/kWh in 2025-H2. The Lithuanian Energy Agency’s index shows the average independent-supplier price at about 27.4 euro cents per kWh in mid-2026, compared with 20.4 cents in 2022.

Tariff types.

Tariff types.
TariffAvailableDetail
FixedYesAll three household suppliers offer 12-month fixed prices, two offer 24 months and single suppliers offer 5, 10, 14 or 15 months. Suppliers with more than 200,000 customers must offer households 12- and 24-month fixed contracts by law. In early August 2026 the average 12-month fixed price (energy plus network, one time zone) was 0.292 EUR/kWh.
VariableYesNon-fixed plans linked to the monthly or weekly average Nord Pool price for Lithuania. The average price of these plans was 0.245 EUR/kWh in July 2026 (0.267 in June).
Time-of-useYesSuppliers offer one-zone and two-zone (day/night) prices, and ESO network plans have one, two or four time zones. On the two-zone plan the night rate applies on weekdays from 23:00 to 07:00 in winter (24:00 to 08:00 in summer) and all weekend. The four-zone plan splits the day into night, morning, day and evening periods and suits prosumers and households with storage.
RegulatedLimitedRegulated public supply remains only for vulnerable customers who have not chosen a supplier, households using less than 1,000 kWh a year and some new connections, and is being phased out in steps until 1 January 2030. The DSO acts as public supplier where no separate public supply licence has been issued.
OtherYesGuaranteed supply by ESO is a temporary service for customers whose supplier stops trading or ends the contract, or who did not choose a supplier in time. In July 2026 the “Standartinis” guaranteed supply price was 0.216 EUR/kWh (one zone).

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,800 kWh/yr (2026)Source 12Derived: the Lithuanian Energy Agency compares supplier offers using a statistical average dwelling consumption of 150 kWh per month (150 × 12). Eurostat energy-balance data give a higher whole-sector figure: 3,259 GWh of household electricity in 2024, about 2,680 kWh per census household, which includes detached houses with electric heating.
Average daily use per household
4.93 kWh/day (2026)Source 12Derived: 150 kWh per month × 12 ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,129 kWh/person/yr (residential) (2024)Source 6Derived: household final electricity consumption of 3,259.2 GWh (Eurostat energy balance, 2024) divided by the population on 1 January 2024 (2,885,891).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
44,355 plug-in cars (31 Dec 2025)Source 1323,257 battery-electric and 21,098 plug-in hybrid cars registered (Regitra data), up 16,081 (57%) during 2025. Eurostat counted 1.82 million passenger cars in 2025.
Electric cooking
Not identified from a reliable public source.

A typical Lithuanian home uses relatively little electricity by European standards. The Lithuanian Energy Agency uses 150 kWh a month as the statistical average for a dwelling when comparing supplier offers, and a large share of the population lives in flats connected to district heating. Detached houses with electric heating, heat pumps or electric vehicles use several times more; ESO’s “Namai” network plan, for example, is designed for households using more than about 2,300 kWh a year.

Total household electricity consumption was 3,259 GWh in 2024 (Eurostat), and ESO distributed 3.40 TWh to private customers in 2025, 4.3% more than in 2024. Self-consumption by prosumers is not included in national consumption statistics, so the electricity actually used in homes with solar panels is higher than metered figures suggest.

Electrification of transport is growing from a low base: the plug-in car fleet rose by 57% in 2025 to about 44,400 vehicles, roughly 2.4% of passenger cars.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
86.5 % of population (2025)Source 9EU-SILC: 69.7% own outright and 16.8% have a mortgage or loan.
Private rented
3.6 % of population (2025)Source 9Tenants paying a market-price rent.
Social or public housing
9.9 % of population (2025)Source 9Tenants paying a reduced rent or occupying free of charge (EU-SILC category; not limited to municipal social housing).
Houses
40.3 % of population (2025)Source 10Detached 35.9%, semi-detached 4.4%.
Apartments and flats
58.9 % of population (2025)Source 1050.7% live in buildings with ten or more flats and 8.3% in smaller blocks.
Urban population
Not identified from a reliable public source.

Lithuania is a nation of owner-occupiers: 86.5% of people live in a home they own, most of them (69.7% of the population) without a mortgage. Renting at market prices is rare (3.6% of the population).

Most people (58.9%) live in flats, and half the population lives in large blocks of ten or more flats. Flat dwellers have little roof space, which is one reason Lithuania allows prosumers to buy or lease part of a remote solar park and offset its output against their own meter. The 40% who live in houses, mostly detached, are the main market for rooftop solar, home batteries and heat pumps.

How the grid works in Lithuania.

  1. TransmissionAB Litgrid
  2. DistributionESO (Ignitis group) serves almost the whole country (1.89 million electricity customers); a few small local DSOs, such as UAB Dainavos elektra, have their own VERT-approved tariffs
  3. MeteringESO (metering), ESO Data Hub (datahub.eso.lt)
  4. Supply3 or more retail suppliers

Physical flow

Power from wind and solar parks, pumped-storage and thermal plants and imports flows through Litgrid’s 330 kV and 110 kV network to substations, where ESO takes it into its medium- and low-voltage network. Homes are connected at 0.4 kV, single- or three-phase. Since February 2025 Lithuania has operated synchronously with Continental Europe.

Lithuania is linked to Latvia (1,250 MW, rising to 2,250 MW by 2035), to Sweden by the 700 MW NordBalt HVDC cable, and to Poland through LitPol Link, which Litgrid plans to run at 350 MW from the end of 2026 and 500 MW in 2027. A further 1,200 MW subsea link to Poland, Harmony Link, is planned.

Commercial flow

Suppliers buy on Nord Pool or bilaterally and are responsible for balancing, including the imbalance caused by small prosumer plants. ESO measures consumption and generation at each object and makes data available to suppliers and other authorised parties through its data hub. A new supplier registers the contract on the hub with the customer’s consent; the switch can only start on the first day of a month, and the request must be submitted by the penultimate day of the previous month.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy (Energetikos ministerija)Sets energy policy and the National Energy Independence Strategy, drafts legislation and funds support schemes administered by the Environmental Projects Management Agency (APVA).
RegulatorNational Energy Regulatory Council (VERT)Approves transmission and distribution tariffs and prosumer network-use prices, issues permits to generate, develop capacity, store, supply and aggregate electricity, and licenses transmission, distribution and public supply.
TSOAB LitgridOperator of the 330 kV and 110 kV grid, responsible for system balance, frequency control and interconnectors. Procures FCR, aFRR and mFRR through the common Baltic balancing market.
DSOAB Energijos skirstymo operatorius (ESO)Ignitis group company operating about 133,000 km of distribution lines and serving 1.894 million electricity customers (end-2025). Connects prosumers, owns and reads meters, provides guaranteed supply and runs the market data hub.
DSOSmall local DSOs (e.g. UAB Dainavos elektra)A few small operators run local networks with their own VERT-approved tariffs. Their customers deal with them, not ESO, for connections and metering.
SupplierIndependent suppliers (Ignitis, Elektrum Lietuva, Enefit)The three independent suppliers serving households. They buy power wholesale, bill customers for energy and network services and settle prosumer net metering and net billing.
MeteringESO (metering)Network operators are legally responsible for metering. ESO installs and reads all household meters and is rolling out smart meters to the remaining customers from 2026.
Data hub / registryESO Data Hub (datahub.eso.lt)Platform used by guaranteed, public and independent suppliers, the TSO, aggregators and authorised third parties to view customer-shared consumption history and record supply contracts.
ExchangeNord Pool (Lithuanian bidding zone)Day-ahead and intraday trading for the LT bidding zone. Dynamic and variable household prices are linked to these prices.
Flexibility marketBaltic balancing capacity marketCommon market of Litgrid, AST and Elering for FCR, aFRR and mFRR capacity, launched on 5 February 2025.

Compared with the UK system.

Compared with the UK system.
UK conceptLithuania equivalentHow it works
DNOSkirstomųjų tinklų operatorius (ESO)Instead of 14 regional DNO areas, one company, ESO, distributes electricity to almost the whole country. It also owns the meters and handles all connection applications, including solar, through its online self-service portal.
National Grid/NESOLitgridLitgrid combines the roles of transmission owner and system operator: it owns the high-voltage grid and interconnectors and balances the system in real time, in a common Baltic balancing area with Latvia and Estonia.
MPANObjekto numeris (object number)An 8-digit number assigned by ESO to each point of consumption (the “object”). It identifies the connection, not the person or meter, and is needed to declare readings, switch supplier, check solar capacity or apply for a connection change.
MPRNSeparate gas object number (ESO)ESO is also the main gas distribution operator, so gas connections are identified in ESO’s systems in a similar way, separately from electricity.
Meter operatorESOThere is no competitive meter operator market. The network operator owns, installs, verifies and reads meters, and the costs are recovered through regulated tariffs.
SupplierNepriklausomas tiekėjas (independent supplier)Households choose an independent supplier, which bills both energy and network charges. Switching takes effect only from the first day of a month.
Smart-meter infrastructureESO smart metering systemThere is no separate national body like the DCC. ESO runs the smart metering system (meters and system supplied under a contract with Sagemcom), collects 15-minute data and shares it through its self-service portal, an API and the data hub.

How a supply point is identified.

48207315 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Objekto numeris (electricity consumption object number) (Objekto Nr.)
Who issues it?The distribution system operator to whose network the object is connected – in practice almost always ESO
FormatA numeric code identifying the object (the property’s point of consumption). ESO describes it as an 8-digit number. It is separate from the supplier’s customer code (kliento kodas) and from the meter’s factory serial number.
Length8 digits
Stays with the property when you switch supplier?Yes
Where to find itOn every electricity bill, next to the address where electricity is used, and in the ESO self-service portal under “Objektai” (Objects). ESO’s online tool for checking free solar connection capacity asks for this number.
Electronic accessCustomers see their objects and consumption (15-minute data, available the next day for smart meters) in ESO self-service. Organisations can get object details and hourly or 15-minute consumption data through ESO’s paid Web Service API (one-off fee 35 EUR, 25 EUR a month plus 0.0058 EUR per query, excluding VAT), and market participants use the ESO data hub.
Third-party accessSuppliers, aggregators and authorised third parties use the data hub, which lists them as user groups. A supplier can view a customer’s objects and consumption history only after confirming it has the customer’s consent, and can register a contract only once the customer has signed. Installers and others normally get the number from the customer.
Who keeps the registerESO keeps the register of objects, meters and customers for its network and runs the data hub on which supply contracts are recorded.
Register scopePer DSO

What the object number identifies

In Lithuania the unit that is metered and supplied is the “object” (objektas): the point where an installation – a flat, a house, a garage or a farm building – is connected to the distribution network. ESO gives each object its own number. Because it belongs to the connection, it stays the same when the meter is replaced or the property is sold; the new owner simply signs a contract with a supplier for the same object.

Three codes on a bill

Lithuanian bills and processes use three different identifiers, which are easily confused. The object number identifies the place of consumption. The customer code (kliento kodas, 8 digits on Ignitis bills) identifies the contract holder with the supplier and is used for payments. The meter number (skaitiklio numeris) is the manufacturer’s serial number printed below the barcode on the meter. To declare readings, ESO asks for the customer code and the object number.

How it is used

The object number is the key for almost every process: switching supplier on the data hub (which accepts the customer code, object number, meter number or personal/company code to find the object), checking the free capacity for a solar plant, applying for a connection or capacity increase, and assigning a remote solar park to a home. A prosumer who owns several objects can link remote solar capacity to each of them in ESO self-service.

Register scope

There is no separate national register run by a government body. Each DSO numbers the objects on its own network, but because ESO serves almost every household, ESO’s register is in practice the national one. Small DSOs keep their own records for their customers.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidHouseholds normally use kWh net metering: surplus is banked over a two-year period and the household pays the DSO a VERT-regulated grid-use price. Surplus left at the end of the period is paid by the supplier at no less than the weighted Nord Pool LT price at the times it was exported. Net billing (a money-based virtual account) is optional for households and compulsory for businesses and household wind owners.
How big can a household system be?For a plant at the home, the permitted generation power may not exceed the permitted consumption power of the object. Remote plants are not limited by the size of the home’s connection. Prosumers do not need a generation permit or a capacity-development permit from VERT, whatever the size.
How does net metering work?Monthly surplus is carried forward and accumulated over a two-year period running from 1 April; monthly deficits are taken from the stock, and any remaining shortfall is bought at the supply contract price. Surplus not used by the end of the period is not carried over: the supplier pays for it at no less than the weighted Nord Pool LT price at the times the electricity was exported.
What does a household pay for using the grid as storage?For 2026 VERT approved four options for ESO’s low-voltage customers: 0.0726 EUR per kWh taken back from the grid; 5.0336 EUR per kW of permitted generation power a month; leaving 37% of exported energy to the DSO (the household keeps 63%); or paying the normal network tariff. The method can be changed once in 12 months, or within a month after VERT sets new prices.
Who must use net billing?Business prosumers (except non-profit organisations and managers of state property) and households owning a wind plant or part of one. Households with solar, non-profits, energy communities and active customers may choose it, and households can switch model once per accounting period.
How does net billing work?The supplier keeps a virtual account over a two-year accounting period from 1 April. Exported kWh are credited at the agreed fixed or variable price and consumption is debited at the supply price. A positive balance is paid out on request within 10 days at the end of the period, on switching supplier, or when the plant is sold, and counts as income.
Are prosumers responsible for imbalance?Not if the plant is smaller than 400 kW, or smaller than 200 kW for plants commissioned after 1 January 2026. Their supplier bears the financial responsibility for the imbalance.
Who pays for the connection?When consumption and generation equipment are connected, vulnerable consumers pay 20% of the DSO’s connection costs and other consumers 50%.

Connecting a home system.

  1. Find your 8-digit object number in ESO self-service and use ESO’s online tool to get a preliminary estimate of the free capacity for solar at your connection.
  2. Decide between rooftop panels (permitted generation power up to the permitted consumption power of the object) and a share of a remote solar park, which is not limited by your connection size.
  3. Apply to ESO through its self-service portal; ESO assesses the network and issues connection conditions, stating whether network reinforcement is needed.
  4. Have the system installed by a contractor certified to install electrical equipment, using inverters that meet LST EN 50549-1 and the RfG requirements.
  5. Submit the contractor’s declaration and the other documents to ESO. Plants of 0.8 kW or less connected into an existing internal network only need to be notified to ESO.
  6. ESO completes the connection; when generation first starts, choose how to pay for using the grid (per kWh taken back, per kW of permitted generation, a percentage of exported energy, or the normal network tariff).
  7. Agree net metering or net billing terms with your independent supplier.

Remote solar parks

Lithuanian law lets a prosumer own or lease part of a solar plant anywhere in the country and treat its output as if it had been exported from their own meter. All energy from a remote plant is counted as fed into the grid, and only plants or shares owned by the same person can be linked to that person’s place of consumption. Developers that build remote parks for prosumers need generation and development permits and must meet conditions set in the Renewable Energy Law, such as a reservation fee of no more than 10%. In its 2025 results ESO reported more than 20,000 prosumers as clients of remote parks and more than 30,000 who had installed plants at their own premises.

Scale

ESO connected more than 53,000 new prosumers in 2025, its largest annual increase, taking the total above 170,000. Prosumer installed capacity exceeded 2.2 GW, of which 1.8 GW was permitted generation power. ESO sent more than 100,000 prosumers individual solar performance reports in November 2025, with recommendations on battery size and the most suitable payment method.

Grid limits

Prosumer development follows network capacity allocation proportions set by the Government. Where the network is congested, ESO may offer a connection with limited export. In 2025 the number of small plants with permitted feed-in of up to 1 kW rose from about 300 to 1,700, and home batteries connected with them from 17 to 822, after ESO simplified procedures and the state funded solar-plus-storage systems for constrained connections.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityVERT permit to generate (leidimas gaminti) and, for new plants, a permit to develop generation capacity. Not needed for prosumers, for plants up to 100 kW with zero permitted feed-in, or for renewable plants up to 100 kW that feed in (except plants built by third parties for prosumers). Non-renewable plants up to 10 kW get a permit by a simplified procedure.VERT; ESO or Litgrid for connectionExempt installations must still apply to the network operator for connection conditions. Permits to develop solar or storage capacity below 6 MW permitted feed-in are issued for 36 months.
Store electricityVERT permits to develop storage capacity and to generate from storage. Not needed if the battery is only for own use with zero permitted feed-in, or if it stores energy from a renewable plant of up to 100 kW and the battery itself is up to 100 kW.VERT; network operatorHybrid plants (several renewable sources and/or storage at one connection point) are permitted; their installed capacity is the sum of the units.
Export surplus from a home systemNo licence or permit. ESO connection conditions and completion documents, plus a supply contract covering net metering or net billing.ESO (or local DSO); supplierHousehold prosumers choose and pay a VERT-approved network-use price.
Sell / supply electricity to end usersVERT permit for independent supply (nepriklausomo elektros energijos tiekimo veikla). Not needed for active customers generating renewable electricity, for citizen energy communities selling to members, or for selling output of production units up to 10 MW to a group active customer.VERTSuppliers with more than 200,000 customers must offer households 12- and 24-month fixed-price contracts.
Public supply, distribution, transmissionLicence (not permit) issued for an exclusive territory, for an unlimited term.VERTPublic supply is being phased out; all remaining public supply ends on 1 January 2030.
Aggregate / demand responseVERT permit for independent demand aggregation. A supplier may aggregate its own supply customers without this permit under a separate contract, but needs the permit to aggregate other suppliers’ customers.VERTCustomers can leave an aggregation contract unilaterally; suppliers must keep separate accounts for supply and aggregation. Aggregators are a user group on the ESO data hub.
Wholesale tradingNo separate wholesale licence. Exchange membership (Nord Pool) and balance responsibility are required; import or export to non-EU countries needs a VERT permit.Nord Pool; Litgrid; VERTREMIT market integrity rules apply.
Balancing and grid servicesBalancing services agreement with Litgrid and a valid prequalification certificate; applicants must hold a generation, supply, aggregation or storage permit and an imbalance settlement agreement.LitgridBaltic standard aFRR and mFRR products have a minimum bid of 1 MW.
VPP / remote control of assetsNo specific VPP licence; market access is through aggregation and balancing rules. For plants, hybrid plants and storage above 100 kW, control systems must not allow remote access by entities of states that threaten national security, and the owner must file a declaration and keep annual cyber-security audits.VERT; network operatorsIf the requirement is not met VERT can suspend the development permit or issue a binding order. The rule was last amended on 7 July 2026.

Lithuania distinguishes licences, used only for natural monopolies and public supply (transmission, distribution and public supply), from permits issued by VERT for competitive activities: generating, developing generation or storage capacity, generating from storage, independent supply, independent demand aggregation, building a direct line, modernising renewable plants and trading with non-EU countries.

Small-scale and household activity is largely exempt. A household prosumer needs no VERT permit at all, only ESO’s connection process, and batteries used only behind the meter or paired with small renewable plants are also exempt. The 100 kW threshold recurs across the rules: below it, renewable plants and paired storage generally need only connection conditions and a contractor’s declaration; above it, permits, imbalance responsibility (from 200 kW or 400 kW for prosumers) and cyber-security obligations apply.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency Containment Reserve (FCR)Yes—YesLitgrid (Baltic balancing capacity market). Procured through the common Baltic market since February 2025. Providers need prequalification with Litgrid.
Automatic Frequency Restoration Reserve (aFRR)Yes1 MWYesLitgrid. Baltic standard product with a minimum quantity of 1 MW. Litgrid also procured up to 40 MW of aFRR from UAB Energy Cells from February 2025, reduced to 30 MW from 1 May 2026 and ending at the end of 2026.
Manual Frequency Restoration Reserve (mFRR)Yes1 MWYesLitgrid. Baltic standard product with a minimum quantity of 1 MW and 15-minute market time units.
Day-ahead and intraday wholesaleYes—YesNord Pool. Distributed assets reach the wholesale market through a supplier or an aggregator holding a VERT permit.
Flexible (variable-capacity) DSO connectionRestricted1 MWNoESO. Since 1 May 2025 ESO offers business customers connecting storage of at least 1 MW the right to use or generate spare substation capacity when other users are not using it, as an alternative to grid reinforcement.

Lithuania’s legal framework allows independent demand aggregation, and aggregators, storage owners and producers can become balancing service providers after prequalification with Litgrid. Since synchronisation with Continental Europe in February 2025, frequency reserves have been bought in a common Baltic balancing capacity market, which has created a market for fast-responding batteries.

For households the practical routes to flexibility are price-based: four-zone ESO network tariffs, two-zone supplier prices and exchange-linked plans. There is no residential flexibility market run by ESO; the DSO’s main flexibility product so far is a variable-capacity connection for large storage.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Baltic balancing capacity marketCommon FCR, aFRR and mFRR procurement by Litgrid, AST and Elering since 5 February 2025.
ESO Data HubData exchange used by suppliers and aggregators for customer consumption data and contracts.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPhase I completed 31 December 2025 (about 1.3 million meters, more than 68% of consumers); Phase II from 2026 targets 98% of meters by end-2030
Reading interval15 minutes
InstalledAbout 1,302,000 smart meters (end-2025)
Installed in 2025About 270,000
CoverageMore than 68% of consumers and over 90% of consumption
Data accessNext day in ESO self-service; API and data hub for third parties
Meter supplierSagemcom (contract for about 1.2 million meters)
Target98% of all meters smart by the end of 2030

Smart metering in Lithuania is run by the DSO. The Electricity Law requires a DSO with more than 100,000 customers to deploy smart meters in two phases without needing each customer’s consent. ESO started mass installation in July 2022, first for households and businesses using more than 1,000 kWh a year, prosumers and faulty meters. It reached the end of Phase I on 31 December 2025, ahead of its goal of 1.2 million meters, and began Phase II in 2026 for all remaining customers, generally when their old meters’ metrological approval expires.

Customers who want a smart meter earlier can ask for one after Phase I, paying at least 50% of the cost set by VERT (vulnerable customers pay nothing), and ESO must install it within four months. Smart meters record consumption every 15 minutes, the data appear in ESO self-service the next day, and households with a smart meter no longer need to declare readings. By law, customers and people they authorise must be able to get their metering data free of charge through a standardised interface.

Renewable electricity.

Electricity generation mix (2024).

  • Wind: 42.6%
  • Solar: 17.3%
  • Biomass & renewable waste: 12.1%
  • Natural gas: 10.4%
  • Pumped storage: 7.1%
  • Hydro: 5.4%
  • Non-renewable waste: 2.3%
  • Oil: 1.7%
  • Other: 1.1%
Source 4
Renewable electricity share
49% (2024)Source 5Share of gross electricity consumption from renewables (EU Renewable Energy Directive basis, Eurostat). Used instead of the generation share because a large part of supply is imported: of domestic gross production alone, 77.4% was renewable in 2024 (6,261 of 8,092 GWh, excluding pumped-storage output).
Home solar
170,000 prosumers (Jan 2026)Source 13About 170,000 active prosumers (145,400 private and 22,200 commercial at the end of 2025), including owners of remote solar park shares. ESO put prosumer installed capacity above 2.2 GW.
Solar added each year
0.996 GW (2025)Source 13
Solar
3.066 GW (Jan 2026)Source 13
Onshore wind
2.613 GW (Jan 2026)Source 13
Hydro (incl. pumped storage)
0.877 GW (2024)Source 8Natural-flow hydro 117 MW and pumped storage 760 MW.
Battery storage
0.535 GW (early 2026)Source 15

Targets.

  • Renewables to supply 100% of electricity consumption by 2030 (forecast 106%).
  • 4,100 MW of solar and 4,500 MW of wind by 2030.
  • 300,000 prosumers by 2030.
  • Offshore wind delayed to 2033–2035.

Lithuania’s generation mix has been transformed in five years. Wind was the largest source in 2024 (42.6% of gross production), solar supplied 17.3% and biomass 12.1%, while natural gas fell to about a tenth. In 2025 wind produced 4.2 TWh and solar 1.78 TWh, and domestic generation covered 77% of consumption according to the Lithuanian Energy Agency, reaching 99% in April 2025.

Solar growth has been driven by prosumers, who account for most solar output, and increasingly by utility-scale parks. Annual additions reached about 1 GW in 2025. Litgrid’s figures show 5.5 GW of wind and solar at the end of 2025, and around 1.7 GW added in that year alone, more than the country’s entire renewable capacity at the end of 2022.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
0.535 GW (early 2026)Source 15Battery systems connected to transmission and distribution networks. Two private systems were connected to the transmission grid in 2025 and Litgrid expected at least ten more in 2026.

Batteries have become a significant part of the system since synchronisation, when fast frequency reserves became valuable. Litgrid counted 535 MW of battery systems on the transmission and distribution networks at the start of 2026, and the Lithuanian Energy Agency reports that the first commercial storage park was connected to the transmission grid in 2025.

At household level, batteries are encouraged by the grid-use fee on net metering (self-consumption avoids it) and by state support for solar-plus-storage systems on constrained connections. Small batteries charged from a renewable plant of up to 100 kW need no VERT permit.

Storage projects.

  • Pumped-storage hydro: Eurostat lists 760 MW of pumped-storage capacity in Lithuania.
  • Energy Cells: Battery operator UAB Energy Cells provided aFRR to Litgrid: up to 40 MW from February 2025, 30 MW from May 2026, ending at the end of 2026.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Ignitis842,398 household customers (14 July 2026)UnknownYesUnknownYes
Elektrum Lietuva246,631 household customers (14 July 2026)UnknownYesUnknownYes
Enefit112,166 household customers (14 July 2026)UnknownYesUnknownYes

Three independent suppliers serve households: Ignitis, Elektrum Lietuva and Enefit. On 14 July 2026 they had about 1.2 million household customers between them, 70% with Ignitis. All three offer one- and two-zone fixed-price plans; Ignitis and Elektrum also offer plans linked to the monthly or weekly Nord Pool average. Suppliers settle prosumer net metering and net billing, and are financially responsible for the imbalance caused by small prosumer plants. Meters are the DSO’s responsibility, so suppliers do not install smart meters.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of EnergyGovernmentEnergy policy and legislationSets the National Energy Independence Strategy targets and designs support schemes for solar, storage and heat pumps.
Lithuanian Energy Agency (LEA)GovernmentState energy information and analysis agencyPublishes regular reviews of supplier offers, solar installation costs and energy statistics.
Environmental Projects Management Agency (APVA)GovernmentAdministers grant schemesRuns the application process for household solar, storage and heat pump grants.
National Energy Regulatory Council (VERT)RegulatorEnergy regulatorApproves tariffs and prosumer grid-use prices and issues generation, storage, supply and aggregation permits.
LitgridTransmissionTransmission system operatorRuns the high-voltage grid, interconnectors and balancing services.
Energijos skirstymo operatorius (ESO)DistributionMain distribution system operator and meteringHandles all household connections, prosumer applications, smart meters and data access.
Nord PoolMarketPower exchangeSets the Lithuanian day-ahead price used for variable plans and prosumer compensation.
State Consumer Rights Protection Authority (VVTAT)ConsumerConsumer protectionHandles consumer complaints, including those about energy contracts.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (generators)Regulation (EU) 2016/631 (RfG) with VERT parameters (decision O3E-1467, 2022)European Commission; VERTESO classifies plants as A0 (up to 10 kW), A1 (10–100 kW), A2 (100–250 kW), B (250 kW–5 MW) and C (5–15 MW).
Inverters – low voltageLST EN 50549-1:2019Lithuanian Standards Board (CENELEC standard)Required for generators connected to the low-voltage distribution network up to type B.
Inverters – medium voltageLST EN 50549-2:2019Lithuanian Standards Board (CENELEC standard)For generators connected to the medium-voltage network.
Demand connectionRegulation (EU) 2016/1388 (DCC)European CommissionGeneral technical requirements applied through ESO’s network access rules.
Voltage qualityLST EN 50160:2010Lithuanian Standards BoardDefines the voltage characteristics of public networks referenced by ESO.
Distribution network access rulesESO “Pasinaudojimo elektros skirstomaisiais tinklais tvarkos aprašas” (2024)ESO, approved by VERT (O3E-828)Sets connection steps for generators and storage, including the contractor’s declaration and the simplified route for plants up to 0.8 kW.
Cyber security of control systemsElectricity Law art. 73³Seimas; network operatorsPlants and storage above 100 kW must block remote control by entities of states threatening national security and undergo annual cyber-security audits.
Installer qualificationCertified electrical contractor declarationESO / national electrical installation rulesSolar and storage must be installed by a contractor certified to install or operate electrical equipment, who submits a declaration to the network operator.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DSO connection conditionsYesNationalEvery grid-connected plant above 0.8 kW needs ESO connection conditions and completion documents; plants of 0.8 kW or less connected into the internal network only need to be notified.
VERT generation / development permitLimitedNationalNot needed for prosumers or renewable plants up to 100 kW; required for larger non-prosumer plants.
Storage permitLimitedNationalNot needed for behind-the-meter batteries with no feed-in or batteries up to 100 kW paired with renewable plants up to 100 kW.
Building permission for rooftop solarUnknownLocalBuilding rules depend on the building type and heritage protection; the permit procedure for solar up to 100 kW is legally limited to one month.

The Renewable Energy Law caps the duration of permit procedures for renewable and storage projects: one month for solar plants up to 100 kW, three months for solar on artificial structures, and longer periods for larger projects inside and outside accelerated renewable development zones.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Household solar grant (per kW)ActiveGrantState funding for households installing solar, administered by APVA for the Ministry of Energy. From June 2026 support is 221 EUR/kW or 170 EUR/kW depending on whether the funding conditions are met, calculated from a fixed eligible cost of 1,694.52 EUR/kW including VAT (13.04% or 10.03%). Support was 323 EUR/kW in 2022 and 255 EUR/kW from May 2024.Rate in force from June 2026
2025 solar call for households and remote solar parksClosedGrantEUR 50 million for new rooftop systems and remote solar park shares plus EUR 35 million for households that installed systems from February 2022; 255 EUR/kW for new installations and 191 EUR/kW for expansions, up to 10 kW. The call was extended to the end of January 2026.2025 – Jan 2026
Solar-plus-storage support for constrained connectionsClosedGrantPilot for households where ESO limited feed-in to 1 kW: a 5 kW solar plant with a 10 kWh battery, with support of about 5,012 EUR (LFP battery) or 4,572 EUR (lithium-ion). An additional EUR 10.13 million was allocated in 2026, with applications accepted until 30 June 2026 or until funds ran out.Until 30 Jun 2026
Prosumer net meteringActiveNet meteringkWh banking over a two-year period with a VERT-regulated grid-use fee; end-of-period surplus is paid at no less than the weighted Nord Pool LT price.—
Prosumer net billingActiveNet billingMoney-based virtual account kept by the supplier; optional for households with solar, compulsory for business prosumers and household wind owners.—

Data and connectivity.

Fixed broadband
89.4 % of households with internet access (2025)Source 11
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Smart meters communicate with ESO’s head-end system, and data reach customers and market participants through ESO self-service, a paid Web Service API (hourly or 15-minute data from the previous day) and the data hub. Near-universal 5G coverage makes mobile connectivity for inverters and batteries straightforward, although fixed very-high-capacity broadband is less developed in rural areas.

Grid conditions.

National peak demand
2.5 GW (Jan 2026)Source 15Record reached in January 2026; Litgrid says peak demand is typically about 2 GW.
Annual electricity demand
12.5 TWh (2025)Source 7Eurostat inland demand. Gross production was 9.86 TWh, imports 6.39 TWh and exports 2.79 TWh.
Generation capacity
7.069 GW (2024)Source 8Net maximum electrical capacity at the end of 2024. Wind and solar additions of about 1.7 GW in 2025 have raised it further.
Interconnection
1.95 GW (2026)Source 15Derived: Lithuania–Latvia 1,250 MW (Litgrid) plus NordBalt to Sweden 700 MW (Litgrid NordBalt page). LitPol Link to Poland is planned to operate at 350 MW from the end of 2026 and 500 MW in 2027.
Curtailment
Not identified from a reliable public source.

Lithuania has moved from importing most of its electricity to covering about three-quarters of demand from domestic generation. Imports still exceed exports on an annual basis, but in sunny and windy periods the country exports through its interconnectors. Inland demand was 12.5 TWh in 2025, and ESO distributed 10.34 TWh, 2.7% more than in 2024.

Network capacity is now the main constraint on new generation. ESO’s 2024–2033 investment plan was raised by 40% to EUR 3.5 billion, it offers variable-capacity connections for large storage, and it was replacing 2,000 km of forest overhead lines with underground cable in 2025–2028 to improve reliability. Average interruption duration (SAIDI) was 74.7 minutes in 2025, down from 399 minutes in the storm-hit year 2024.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Smart meter rollout Phase IICurrent2026–2030After completing Phase I at the end of 2025, ESO is installing smart meters for all remaining customers, aiming for 98% of meters to be smart by the end of 2030.
Renewable Energy Law amendments (XV-1152)Current16 July 2026Amendments adopted on 7 July 2026 revised prosumer and net billing provisions of the Renewable Energy Law. Industry press reported that the framework keeps net metering available for existing and new residential prosumers.
Imbalance responsibility for new prosumer plantsCurrent1 January 2026Prosumer plants commissioned after 1 January 2026 are exempt from imbalance responsibility only below 200 kW (400 kW for earlier plants); larger plants bear their own imbalance.
Remote-control security requirement extendedCurrent7 July 2026Electricity Law art. 73³, amended in July 2026, bars remote control of plants and storage above 100 kW by entities of states threatening national security.
End of regulated public supplyUpcoming1 Jul 2027 – 1 Jan 2030Households using at least 1,000 kWh leave public supply on 1 July 2027 and 1 July 2028 (based on the previous year’s use); all remaining public supply ends on 1 January 2030.
LitPol Link and Harmony LinkUpcomingEnd 2026 – 2027 and laterLitgrid plans to run LitPol Link at 350 MW from the end of 2026 and 500 MW in 2027; the 1,200 MW Harmony Link subsea cable to Poland is planned.
Energy Cells aFRR provision endsUpcomingEnd of 2026Litgrid’s procurement of aFRR from UAB Energy Cells ends, leaving reserves to the competitive Baltic market.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionMediumLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHighAbout 170,000 prosumers in January 2026 (roughly one in seven households), with more than 53,000 added in 2025 and prosumer capacity above 2.2 GW.
Distributed energy marketHighProsumers provide most solar output, remote solar park shares are widespread, and smart meters cover over 90% of consumption; EV adoption is still modest at about 44,400 plug-in cars.
Grid flexibility marketMediumIndependent aggregation is permitted and a Baltic balancing capacity market for FCR, aFRR and mFRR has operated since February 2025 with 1 MW minimum bids, but there is no residential DSO flexibility market.
Energy storage adoptionMedium535 MW of grid-connected batteries in early 2026 plus 760 MW of pumped storage; home batteries are growing but not counted nationally.
Renewable growth environmentHighAbout 1.7 GW of wind and solar added in 2025; renewables 77.4% of gross generation in 2024 and RED electricity share up from 20% in 2020 to 49% in 2024.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 33 sources
  1. Population on 1 January (tps00001). Eurostat, 2026. accessed 1 October 2026.
  2. 2021 Population and Housing Census results: households and families. State Data Agency (Statistics Lithuania), 2021. accessed 1 October 2026.
  3. Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2025. accessed 1 October 2026.
  4. Gross and net production of electricity and derived heat by type of plant and operator (nrg_bal_peh). Eurostat, 2024. accessed 1 October 2026.
  5. Share of energy from renewable sources (nrg_ind_ren). Eurostat, 2024. accessed 1 October 2026.
  6. Complete energy balances (nrg_bal_c). Eurostat, 2024. accessed 1 October 2026.
  7. Supply, transformation and consumption of electricity (nrg_cb_e). Eurostat, 2025. accessed 1 October 2026.
  8. Electricity production capacities by main fuel groups and operator (nrg_inf_epc). Eurostat, 2024. accessed 1 October 2026.
  9. Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
  10. Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
  11. Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
  12. Nepriklausomų elektros energijos tiekėjų pasiūlymai (weekly review, 4 August 2026). Lithuanian Energy Agency (LEA), 2026. accessed 1 October 2026.
  13. Lithuania’s Energy Review (30 January 2026). Lithuanian Energy Agency (LEA), 2026. accessed 1 October 2026.
  14. Saulės elektrinių ir jų modulių kainos, 2026 m. II ketvirtis. Lithuanian Energy Agency (LEA), 2026. accessed 1 October 2026.
  15. Record breakthrough in renewable electricity generation. Litgrid, 2026. accessed 1 October 2026.
  16. NordBalt. Litgrid. accessed 1 October 2026.
  17. Balancing services. Litgrid, 2026. accessed 1 October 2026.
  18. AB „Energijos skirstymo operatorius“ 2025 m. metinis pranešimas. ESO / Ignitis grupė, 2026. accessed 1 October 2026.
  19. ESO has installed the millionth smart electricity meter. Ignitis grupė, 2024. accessed 1 October 2026.
  20. ESO is going to install over a million smart meters: supplier selected. ESO. accessed 1 October 2026.
  21. Tarifų planai ir kainos 2026 metais. ESO, 2026. accessed 1 October 2026.
  22. Gaminančių vartotojų atsiskaitymo būdai 2026 metais. ESO, 2026. accessed 1 October 2026.
  23. Laisvos galios pasitikrinimas (free capacity check). ESO. accessed 1 October 2026.
  24. DUK: rodmenų deklaravimas. ESO. accessed 1 October 2026.
  25. Web Service (API) – elektros duomenų automatinis pateikimas. ESO. accessed 1 October 2026.
  26. DH-510 Tiekėjo keitimas (supplier switching). ESO Data Hub. accessed 1 October 2026.
  27. Pasinaudojimo elektros skirstomaisiais tinklais tvarkos aprašas. ESO (approved by VERT), 2024. accessed 1 October 2026.
  28. Nepriklausomo tiekimo elektros sąskaitos paaiškinimas. Ignitis. accessed 1 October 2026.
  29. Atsinaujinančių išteklių energetikos įstatymas Nr. XI-1375 (consolidated version from 16 July 2026). Seimas of the Republic of Lithuania (e-seimas), 2026. accessed 1 October 2026.
  30. Elektros energetikos įstatymas Nr. VIII-1881 (consolidated version from 15 September 2026). Seimas of the Republic of Lithuania (e-seimas), 2026. accessed 1 October 2026.
  31. Solar energy support scheme for households and remote solar parks. IEA, 2025. accessed 1 October 2026.
  32. Lithuania 2025 Digital Decade Country Report. European Commission, 2025. accessed 1 October 2026.
  33. Lithuania’s outgoing deputy energy minister marks renewable milestones as capacity nears 7 GW. Baltic Wind, 2026. accessed 1 October 2026.

Questions about energy in Lithuania.

Talk to us about Olmack in Lithuania.Tell us about your home, housing portfolio or school estate in Lithuania. We'll explain what is possible there now.