How electricity works in Tunisia.
Tunisia electricity market 2026: STEG block tariffs, the 9-digit STEG reference, Prosol Elec rooftop solar, Law 2015-12 self-production, licensing and grid.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Tunisian dinar (TND) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Tunisia energy at a glance.
Key figures for households in Tunisia. Each one links to its source on the full overview below.
Electricity price.
0.198 TND per kWh for households, including taxes. Figures for 2026.
Household use.
1,636 kWh a year for a typical household. Figures for 2019.
Renewable share.
5.4% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Tunisia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Tunisia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Tunisia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Tunisia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Tunisia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Tunisia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Tunisia.
The energy market in Tunisia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Tunisia’s electricity sector is built around one state-owned company. The Société Tunisienne de l’Électricité et du Gaz (STEG), created in 1962, owns most of the generating fleet, runs the national transmission grid and the national dispatch, and distributes and sells electricity to every connected customer in the country. Private generators exist, but they sell to STEG: independent power producers under concessions, renewable plants under the authorisation and concession regimes of Law 2015-12, and businesses and households that produce their own electricity and sell any surplus to STEG.
There is no independent electricity regulator. Tariffs, the price STEG pays for surplus renewable electricity and the rules for connecting generators are set by the Ministry of Industry, Mines and Energy. A bill to create an independent regulatory authority for the electricity sector was sent to the head of government in April 2024, but no such authority has started work. Households cannot choose a supplier. They pay STEG’s regulated block tariff, which has been unchanged since 1 May 2022 and is well below STEG’s average cost of supply.
The power system runs almost entirely on natural gas, much of it imported from Algeria, and about a tenth of the electricity Tunisia uses is bought directly from Algeria’s Sonelgaz. Renewables produced about 5% of national generation in 2025 and 9% in the first seven months of 2026, driven by rooftop solar. Around 515 MW of residential rooftop photovoltaics had been installed by July 2026, mostly through the Prosol Elec programme run by STEG and the national energy agency ANME. A 600 MW submarine cable to Sicily, ELMED, is under construction.
Energy snapshot.
Headline figures for electricity in Tunisia. Each shows its data year and links to its source.
- Population11,972,169 peopleSource 96 November 2024
- Households3,472,188 householdsSource 102024
- Average household size3.45 people/householdSource 102024
- Electricity use per household1,635.9 kWh/yrSource 192019
- Household price (TND)0.198 TND/kWhSource 12026
- Household price (EUR)0.059 EUR/kWhSource 132026
- Renewable electricity share5.4%Source 82025
- Solar capacity0.775 GWSource 12End 2024
- Wind capacity0.245 GWSource 12End 2024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Ministry of Industry, Mines and Energy (no independent electricity regulator)
- System operator
- Société Tunisienne de l’Électricité et du Gaz (STEG) — national dispatch
- Distribution networks
- STEG is the single distributor and supplier nationwide, organised into regional districts
- Currency
- Tunisian dinar (TND)
- Voltage and frequency
- 230 V / 50 Hz (400 V three-phase)
Electricity prices in Tunisia.
- Household price (TND)
- 0.198 TND/kWh (2026)Source 1Derived for a household using 101–200 kWh a month: STEG residential energy price of 176 millimes/kWh excluding taxes (in force since 1 May 2022), plus 7% VAT (rate for households using up to 300 kWh a month), plus the municipal surcharge of 5 millimes/kWh and the Energy Transition Fund (FTE) levy of 5 millimes/kWh. 1,000 millimes = 1 dinar. The monthly power charge (700 millimes per kVA subscribed) and the RTT broadcasting contribution are not included.
- Household price (EUR)
- 0.059 EUR/kWh (2026)Source 13Converted from TND 0.198/kWh (0.19832 before rounding) at the Central Bank of Tunisia interbank average rate of 1 October 2026 (EUR 1 = TND 3.3740).
- Typical annual electricity bill
- 374 TND/yr (2026)Source 1Illustrative, derived for a household using 150 kWh a month on a 2 kVA subscription: 1,800 kWh × TND 0.19832 (176 millimes + 7% VAT + 10 millimes of surcharges) = TND 356.98, plus the power charge of 700 millimes/kVA/month × 2 kVA × 12 = TND 16.80 excluding VAT. The RTT contribution and connection-related charges are not included. Not an official average bill.
How household tariffs work
STEG’s low-voltage tariff is set per month of consumption. The cheapest prices, 62 and 96 millimes per kWh, are reserved for small 1–2 kVA connections using no more than 100 kWh a month, which are also exempt from the Energy Transition Fund levy. Households above that threshold, or with a subscription above 2 kVA, move onto the band prices from 176 to 414 millimes per kWh. The highest price, for consumption above 500 kWh a month, is more than six times the lowest. Readings are taken every two months in towns and every six months in rural areas, and STEG issues estimated interim bills in between, so monthly band thresholds are applied to readings that cover several months.
Taxes and levies
VAT on residential electricity is 7% for households using up to 300 kWh a month and 13% above that, against 19% for other uses. Every kWh also carries a municipal surcharge of 5 millimes, and all but the smallest users pay 5 millimes per kWh to the Energy Transition Fund (FTE), which finances ANME’s efficiency and renewable programmes, including Prosol Elec. Bills also include a contribution collected for the national broadcaster (RTT).
Subsidy and cost gap
Tariffs are well below cost. According to the National Observatory of Energy and Mines (ONEM), STEG’s average selling price in 2025 was 290.7 millimes per kWh excluding tax, against an average cost of 456.3 millimes, a gap of 165.6 millimes per kWh that is covered by the state budget and by STEG’s accumulated losses. Because most of Tunisia’s electricity is made from imported or purchased gas, the gap moves with gas prices and the dinar.
Regional differences and trend
STEG applies one national tariff, so there are no regional price differences. The current grid dates from 1 May 2022. STEG publicly denied rumours of increases in 2024, stating that the Finance Law ruled them out, and no change has been published since.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households pay STEG’s regulated low-voltage “general” tariff (in force since 1 May 2022, excluding taxes). Small subscriptions of 1–2 kVA using no more than 100 kWh a month pay 62 millimes/kWh if consumption is up to 50 kWh and 96 millimes/kWh between 51 and 100 kWh. Above that, the residential energy prices are 176 millimes (101–200 kWh a month), 218 millimes (201–300 kWh), 341 millimes (301–500 kWh) and 414 millimes (above 500 kWh). The power charge is 700 millimes per kVA per month. |
| Time-of-use | No | Households have no time-of-use option. Medium-voltage customers on the time-band tariff pay 290 (day), 417 (summer morning peak), 377 (evening peak) and 222 (night) millimes/kWh plus 11,000 millimes per kW per month (from 1 October 2022). A three-band low-voltage irrigation tariff exists for farms. |
| Off-peak | Limited | A special low-voltage water-heater tariff (341 millimes/kWh with supply cut during the summer morning peak and the winter evening peak) and a heating and air-conditioning tariff (414 millimes/kWh) appear in STEG’s tariff table, but STEG states that the heating/air-conditioning tariff is no longer granted to new customers. |
| Dynamic | No | There is no wholesale market and therefore no wholesale-linked retail tariff. |
| Fixed | No | There is no supplier choice. Prices change only when the government revises STEG’s tariff, and the 2024 Finance Law confirmed no increase that year. |
| Prepayment | No | No prepayment tariff was identified. Bills follow meter readings or estimates and can be paid at STEG and post-office counters, by direct debit, online in the STEG customer space, or by mobile USSD codes of the three mobile operators. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,635.9 kWh/yr (2019)Source 19Average household electricity consumption from STEG’s household energy survey (sample of 2,850 low-voltage customers, fieldwork November 2019 to March 2020, results published in 2022). The 2014 survey found 1,508.4 kWh. Reported by the press; the survey report itself was not found online. STEG and ANME carried out a further survey in 2024 whose average has not been published.
- Average daily use per household
- 4.48 kWh/day (2019)Source 19Derived: 1,635.9 kWh a year divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,822 kWh/person/yr (all sectors) (2025)Source 8Derived: 21,810 GWh available for the local market in 2025 (national production plus imports) divided by the 2024 census population of 11,972,169.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 50 % of homes (2024)Source 10Share of households with a room or central air conditioner: 58% in urban areas and 27.1% in rural areas (RGPH 2024).
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 1.5 % of homes (2024)Source 10Share of households using electricity as the main cooking energy. 72.3% use bottled LPG and 24.9% natural gas.
Demand is rising steadily and peaks in summer. National production reached 20,533 GWh in 2025, about 6% more than in 2024, and 21,810 GWh were available to the local market once imports from Algeria were included. National peak demand reached 4,924 MW in July 2026, up from 4,837 MW a year earlier. STEG and ANME estimate that air conditioners account for around half of the summer peak.
Low-voltage customers, mostly households, bought 9,068 GWh in 2025, more than half of all STEG sales; ONEM puts the residential share of low-voltage sales at close to 75% but warns that bimonthly billing, half of it estimated, makes the figures imprecise. Industry takes 58% of high- and medium-voltage sales.
Gas dominates household heat. The 2024 census found that 97.2% of households cook mainly with bottled or piped gas and 88.6% heat water with gas; electricity is the main water-heating energy in only 4.7% of homes and solar water heaters in 3.5%. Electricity is the main space-heating energy in 10.5% of homes. Access is near universal: 99.8% of households use STEG electricity for lighting.
Housing and households.
- Dwellings
- 4,265,636 dwellings (2024)Source 113,440,207 (80.7%) were occupied at the census; the rest were vacant (10.0%), second homes (5.8%) or held for households living abroad (3.2%).
- Owner-occupied
- 75.1 % of households (2024)Source 1069.2% in urban areas and 92% in rural areas.
- Private rented
- 17.9 % of households (2024)Source 10All tenants (619.9 thousand households), almost all in urban areas. A further 6.7% are housed free of charge.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 91.1 % of dwellings (2024)Source 11Derived: semi-detached houses or floors of a shared house (49.1%), villas or duplexes (26.1%) and traditional houch, dar arbi or borj houses (15.9%).
- Apartments and flats
- 8.4 % of dwellings (2024)Source 1111.4% in urban areas and 0.7% in rural areas.
- Urban population
- Not identified from a reliable public source.
Most Tunisians own the home they live in and most homes are individual houses with their own roof and their own STEG meter. Only 8.4% of dwellings are apartments, so rooftop solar decisions are usually taken by a single owner-occupier rather than a building association. Many houses are built in stages, with additional floors added for family members, which is why “logement jumelé ou étage” is the largest category.
The housing stock grew by 975,700 dwellings between 2014 and 2024, faster than the number of households, and almost one dwelling in five is not a main residence. Coastal governorates such as Nabeul, Sfax and Sousse saw the largest increases.
How the grid works in Tunisia.
- TransmissionSTEG, STEG national dispatch
- DistributionSTEG is the single distributor and supplier nationwide, organised into regional districts
- MeteringSTEG
- Supply1 or more retail suppliers
Physical flow
About 94% of Tunisia’s electricity is generated from natural gas, mostly in STEG’s combined-cycle and steam plants on the coast. Power flows over STEG’s 400, 225, 150 and 90 kV transmission network to 30 kV distribution networks (10 and 17 kV in some areas) and then to 230/400 V low-voltage lines, which are mostly overhead bundled aluminium conductors. STEG’s technical rules use a TT earthing system on low-voltage networks.
The grid is synchronously connected to Algeria through several AC lines, including a 400 kV line between Jendouba and Chefia, and to Libya. Purchases from Algeria’s Sonelgaz and Libya’s GECOL covered about 11% of local demand in 2025 (2,461 GWh). The ELMED high-voltage direct-current cable, 600 MW and about 220 km long between Mlaabi on Cap Bon and Partanna in Sicily, is being built by STEG and Terna.
Commercial flow
There is no wholesale market. STEG buys gas (largely Algerian), generates most of the power itself, buys from independent producers and private renewable plants under long-term contracts, and imports from Sonelgaz. It then sells to all end customers at regulated prices. Self-producers connected at medium and high voltage can sell surplus to STEG and pay STEG a transport charge when the consuming site is remote from the plant; households sell or offset their surplus only with STEG.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Industry, Mines and Energy (MIME) | Sets energy policy and electricity tariffs, approves STEG’s standard contracts and the prices paid for surplus renewable electricity, runs calls for projects under the authorisation regime and tenders for concessions, and hosts the National Observatory of Energy and Mines (ONEM), which publishes monthly energy statistics. |
| Regulator | No independent regulator | Regulatory functions sit with the ministry. A bill creating an independent electricity regulatory authority was submitted to the head of government in April 2024 and had not produced a functioning regulator by 2026. |
| TSO | STEG | Owns and operates the 90–400 kV transmission network and the interconnections with Algeria and Libya, and is Terna’s partner in the ELMED link to Italy. |
| System operator | STEG national dispatch | Balances generation and demand in real time and schedules STEG plants, IPP plants and imports from Sonelgaz. |
| DSO | STEG distribution (regional districts) | STEG owns and operates the medium- and low-voltage networks across the whole country. Customers deal with their local STEG district for connections, meters, contracts and complaints. |
| Supplier | STEG | Sole retail supplier to about 4.58 million electricity customers (2024). It also buys the surplus of self-producers and the output of private renewable plants. |
| Metering | STEG | Installs, owns and reads all meters, including the bidirectional meters fitted for rooftop solar, and runs the smart grid programme. |
Compared with the UK system.
| UK concept | Tunisia equivalent | How it works |
|---|---|---|
| DNO | STEG (district network) | There is one distribution network owner for the whole country. STEG’s regional districts play the role a DNO plays for connections, faults and meters, but they are part of the same company that generates, transmits and sells the electricity. |
| National Grid/NESO | STEG transmission and national dispatch | STEG both owns the transmission grid and operates the system. There is no separate system operator and no balancing market; STEG dispatches its own plants, contracted private plants and imports directly. |
| MPAN | Référence de l’abonnement STEG (9 digits) | Each supply contract is identified by a 9-digit STEG subscription reference printed at the top left of the green bill. It is used to pay bills, register in the online customer space and make service requests. It identifies a contract held with STEG rather than a standardised metering point code shared between market participants. |
| MPRN | Separate STEG gas subscription reference | STEG also distributes natural gas, and a gas connection has its own STEG subscription and bill reference. Customers applying for gas at a property already supplied with electricity show a STEG electricity bill for that property. |
| Meter operator | STEG | STEG supplies, installs, seals and reads all meters. There is no competitive metering market. |
| Supplier | STEG (no choice) | Households cannot switch supplier. The tariff is set by the government and is the same nationwide. |
| Smart-meter infrastructure | STEG smart grid programme (AMI pilot zones) | There is no national smart-meter data hub like the DCC. STEG is deploying communicating meters with its own head-end and IT systems (SI-AMI, a new customer information system and a GIS) in Sfax and Kerkennah, parts of Sousse and Sidi Bouzid, and parts of Le Kram and Béja. |
How a supply point is identified.
407215538 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Référence de l’abonnement STEG (Référence STEG) |
| Who issues it? | STEG, when a supply contract (abonnement) is opened at the local district |
| Format | Numeric subscription reference printed at the top left of the STEG (green) electricity bill. STEG does not publish the internal structure of the number. The meter has its own separate serial number. |
| Length | 9 digits |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Top left of the green STEG bill (both the bill based on a meter reading and the estimated interim bill). |
| Electronic access | Customers register on STEG’s online customer space and add up to 20 subscription references to view consumption history and bills, pay by e-dinar or bank card, and submit service requests. Bills can also be paid with the reference through post-office and mobile channels. |
| Third-party access | No regulated third-party data access exists. Payment intermediaries (La Poste, banks, mobile operators) use the reference to pay bills; Prosol Elec installers work with STEG on the customer’s behalf for the connection file. |
| Who keeps the register | STEG customer information system |
| Register scope | National |
How a supply point is created
To connect a home, the owner or tenant goes to the STEG district that serves the property with an identity card and proof of the right to occupy it: a recent property certificate, a sale contract, an occupation certificate or municipal lighting authorisation for owners, or a registered lease and the owner’s legalised authorisation for tenants. The district agent advises on the meter power to subscribe and arranges a site study. Work is carried out after the customer pays a connection quote and a refundable consumption deposit, and a subscription contract is opened with its own reference.
The subscription reference
The 9-digit reference is the number a customer gives STEG for anything to do with the account: paying bills, registering online, requesting a change of power or reporting a fault. It is printed at the top left of every green electricity bill. Unlike the UK MPAN, it is not a published, standardised metering-point code used by several competing companies, because STEG is the only network operator and supplier. STEG keeps the register of subscriptions, meters and addresses in its own customer information system, which it is replacing as part of the smart grid programme.
Change of occupant
When a household moves, the outgoing customer cancels the subscription and the new occupant takes over or opens a contract through the district (STEG lists “résiliation / mutation abonnement” as a service). STEG does not state publicly whether the reference number is kept or reissued on a change of occupant, so whether it stays with the property is not confirmed.
Subscribed power
Each subscription has a subscribed power in kVA, limited by a circuit breaker on the meter board. Standard low-voltage connections go up to 7 kVA single-phase and 13 kVA three-phase. The subscribed power matters for rooftop solar, because a household’s PV system may not exceed it.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Low voltage: surplus injected through a bidirectional STEG meter is offset against later consumption; legally, surplus may be sold only to STEG and is capped at 30% of annual production. Medium/high voltage: surplus bought by STEG at a ministerial price (80 millimes/kWh for projects approved from 12 December 2023). |
| Maximum size for a household PV system | The peak power may not exceed the subscribed power. Single-phase customers are limited to 6 kWp; three-phase customers can install three-phase systems up to their subscribed power, with 200 kWp the ceiling on the low-voltage network. |
| When is a grid study needed? | STEG carries out a connection impact study for low-voltage plants above 40 kWp. |
| Limit on surplus | Renewable self-producers may sell surplus only to STEG, up to 30% of the electricity they produce in a year (a limit introduced by Law 2009-7 and retained in Law 2015-12). |
| Is surplus paid in cash on low voltage? | Historically no: surplus from low-voltage systems was carried forward to the next bill and not paid. Law 2015-12 allows low-voltage self-producers to sell surplus to STEG under a ministerially approved standard contract, but STEG does not publish a low-voltage surplus price. |
| Inverter requirements | Inverters must meet DIN VDE V 0126-1-1, VDE-AR-N 4105 and IEC 61727, and three-phase inverters are required above 4.6 kVA per phase. The PV plant must disconnect when a back-up generator runs. |
| Medium- and high-voltage surplus price | 80 millimes/kWh for projects approved from 12 December 2023, plus transport charges of 25–54 millimes/kWh where power is carried to a remote site. Earlier projects receive 87–182 millimes/kWh by time band. |
Connecting a home system.
- Choose an installer on ANME’s list of companies eligible to install low-voltage PV systems (about 716 companies were listed in September 2026).
- The installer sizes the system within the limits of the STEG/ANME technical reference (no more than the subscribed power, 6 kWp maximum for single-phase) and prepares the Prosol Elec or self-production file.
- STEG reviews the connection; for low-voltage plants above 40 kWp it carries out a grid impact study and may require a smaller system or network reinforcement at the producer’s cost.
- The household signs STEG’s standard low-voltage contract for surplus electricity and, where applicable, the Prosol Elec credit and subsidy documents.
- The installer installs the system; STEG replaces the existing meter with a bidirectional meter in the same position and connects the plant.
- Injected and consumed energy are recorded by the bidirectional meter and settled on the STEG bill.
Households can connect rooftop solar to the grid and use it to offset their own consumption. The legal basis is Law 2015-12 on electricity from renewable energy, its implementing Decree 2016-1123 (revised by Decree 2020-105), and the ministerial order of 9 February 2017 approving the technical specification for connecting renewable installations to the low-voltage network. In practice almost all residential systems go through Prosol Elec, under which STEG fits a bidirectional meter and the household’s injected surplus is set against its later consumption.
Self-production is designed to cover the producer’s own needs, not to sell power. Surplus may be sold only to STEG and only up to 30% of annual production. For medium- and high-voltage self-producers STEG pays a fixed ministerial price, now 80 millimes per kWh for new projects, and charges transport if the plant and the consuming site are in different places. Selling to third parties is possible only for designated bodies selling renewable electricity to self-consumers, under STEG’s published transport and surplus tariffs.
The detailed low-voltage settlement method is set out in STEG’s standard contract, which is not published on STEG’s website. The most recent detailed public description found (GIZ, 2014) states that low-voltage surplus is carried forward to the following billing period and not paid for.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (renewable, for own use) | No licence. Low-voltage systems need only STEG connection approval; since a ministerial order published on 22 November 2022, medium/high-voltage self-production projects below 1 MW need only STEG’s connection authorisation. Larger projects need the minister’s approval. | STEG; Ministry of Industry, Mines and Energy | System size is capped by subscribed power on low voltage. Installers must be ANME-eligible for Prosol Elec subsidies. |
| Generate electricity (renewable, for sale to STEG) | Authorisation regime for small and medium plants through ministry calls for projects (solar categories of 1, 2 and 10 MW in recent rounds), with a power purchase agreement with STEG. Larger plants need a concession awarded by tender and approved by parliament. | Ministry of Industry, Mines and Energy; Assembly of the Representatives of the People and National Council of Regions and Districts for concessions | All output is sold exclusively to STEG. The sixth call for projects (April–June 2026) granted 309 approvals totalling 455 MW. |
| Generate electricity (conventional) | Concession as an independent power producer under Law 96-27, selling exclusively to STEG; otherwise STEG’s own plants. | Ministry of Industry, Mines and Energy | Self-producers using gas (other than efficient cogeneration) can sell surplus to STEG at the ministerial time-band prices. |
| Store energy | No specific licensing regime for storage was identified. Storage is being introduced inside STEG and tendered projects (STEG’s 20 MWh battery at Beni M’Hira; the 300 MW + 540 MWh Kébili tender). | Ministry of Industry, Mines and Energy; STEG | Behind-the-meter batteries are not covered by the low-voltage connection rules, which deal with PV and back-up generators. |
| Export to the grid | Allowed for self-producers through STEG’s standard contract, with sale limited to STEG and to 30% of annual production. | STEG; Ministry of Industry, Mines and Energy | Bidirectional STEG meter required. No separate licence. |
| Sell or supply electricity to end customers | Reserved to STEG. Exception: bodies granted the right to sell renewable electricity to self-consumers, which pay STEG transport tariffs. | Ministry of Industry, Mines and Energy | No household supplier choice. |
| Export electricity abroad | Law 2015-12 allows renewable projects for export under concession; cross-border trade is otherwise carried out by STEG. | Ministry of Industry, Mines and Energy | ELMED is intended to make large-scale exchanges with Italy possible. |
| Wholesale trading | Not possible: there is no wholesale market or exchange. | Not applicable | STEG is the single buyer of all generation and imports. |
| Aggregate, run a VPP or provide balancing/grid services | No framework. Balancing and reserves are provided by STEG’s own plants and imports. | Not applicable | No aggregator role exists in Tunisian law. |
| Remote control of household assets | No rules specific to remote control of customer assets were identified. | Not applicable | The low-voltage technical reference requires automatic decoupling protection in inverters. |
Tunisia does not license electricity activities the way liberalised markets do. Instead, Law 2015-12 defines three ways to produce renewable electricity: self-production for own consumption (with surplus to STEG), production for sale to STEG under the authorisation regime, and larger production under concessions, which include export projects. Everything else in the chain, from transmission to supply, is STEG’s by law.
For households the only permission that matters is STEG’s connection approval, normally obtained through an ANME-eligible installer under Prosol Elec. Projects under the authorisation regime are awarded through calls for projects; concessions are awarded by tender and each concession agreement is approved by parliament before it takes effect.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing and reserves | No | — | No | STEG. STEG holds reserves on its own plants and relies on the Algerian interconnection. There is no market in which third parties can offer balancing. |
| Demand response / interruptible supply | Restricted | — | No | STEG. Interruption is built into some tariffs rather than traded: irrigation and water-heater tariffs include “effacement” periods with no supply during the summer morning or winter evening peak. |
| Wholesale energy | No | — | No | No wholesale market exists. |
Distributed resources cannot take part in any flexibility market in Tunisia because there is none. STEG manages the system as a single integrated utility, and its tools for managing peaks are tariff design (time bands for medium and high voltage, “effacement” periods for some special tariffs), imports from Algeria and, in extreme heat, load shedding.
The smart grid programme lists demand management and renewable integration as goals for the period to 2030, but no aggregation or demand-response product for households has been announced.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Pilot deployment: 340,000 low-voltage smart electricity meters planned in three zones; 150,000 smart meters (electricity and gas) targeted by early 2027 |
| Reading interval | Not published |
| Programme | STEG smart grid programme, phase 1 (AMI) from 2021 |
| Planned meters | 340,000 low-voltage electricity, 140,000 low-pressure gas, 25,000 medium-voltage and large customers |
| Zones | Sfax city and Kerkennah; part of Sousse and Sidi Bouzid; part of Le Kram and Béja |
| Status (July 2026) | 150,000 smart meters planned by early 2027 (first phase) |
| Meter owner | STEG |
| Current reading cycle | Every 2 months in urban areas, every 6 months in rural areas |
Almost all Tunisian homes still have conventional meters that are read by hand. STEG reads them every two months in towns and every six months in the countryside and issues estimated bills in between; ONEM notes that about half of low-voltage bills are based on estimates.
STEG’s smart grid programme is replacing meters in three pilot zones with communicating meters connected to a new advanced metering infrastructure, customer information system and geographic information system. The programme has been slow: phase 1 was planned over three years from 2021, but in July 2026 the minister in charge of energy told parliament that the first phase of 150,000 meters would be completed in early 2027, within an overall programme of about 450,000 meters. Households with rooftop solar receive a bidirectional meter, which is not necessarily a communicating one.
Renewable electricity.
Electricity generation mix (2025).
- Natural gas: 93.4%
- Solar: 4.1%
- Wind: 1.3%
- Third-party purchases (incl. cogeneration): 1.1%
- Oil: 0.1%
- Hydro: 0.1%
- Renewable electricity share
- 5.4% (2025)Source 8Derived from ONEM data for 2025: STEG hydro 13 GWh, wind 259 GWh and solar 37 GWh, IPP solar 81 GWh and self-producers’ solar 721 GWh, out of 20,533 GWh national production. ONEM reports 9% for January–July 2026. Imports (2,461 GWh in 2025) are not counted in national production.
- Home solar
- 515 MW (End July 2026)Source 8Approximate low-voltage rooftop PV installed in the residential sector (ONEM). A further 130 MW of self-production is connected at medium and high voltage.
- Solar added each year
- 267 MW (2024)Source 12Net solar capacity added in 2024.
- Solar PV
- 775 MW (End 2024)Source 12
- Wind
- 245 MW (End 2024)Source 12
- Hydro
- 66 MW (End 2024)Source 12
- Fossil fuels
- 6,072 MW (End 2024)Source 12
Targets.
- 30% of electricity generation from renewables by 2030 (Tunisian Solar Plan, as stated by ANME and STEG).
- About 3,725 MW of renewable capacity by 2030 under the Tunisian Solar Plan, including 1,700 MW of wind (ANME).
Shares are derived from ONEM’s 2025 production table: STEG gas 19,183 GWh, oil 18 GWh, hydro 13 GWh, wind 259 GWh and solar 37 GWh; private IPP solar 81 GWh; self-producers’ solar 721 GWh (low and medium voltage); and third-party purchases 221 GWh, out of 20,533 GWh. Imports are excluded.
Rooftop solar has been the main source of renewable growth. Self-producers generated 721 GWh in 2025, far more than STEG’s own solar plants, and 607 GWh in the first seven months of 2026 alone. Utility-scale solar is now arriving: the 100 MW Kairouan plant (2018 tender) entered service in December 2025, and Sidi Bouzid and Tozeur (50 MW each) in April 2026. Concessions of 100 MW each at El Ksar (Gafsa), Mezzouna (Sidi Bouzid) and Menzel Habib (Gabès), awarded in the 2022 tender, are expected in 2027, and further 100–198 MW plants were awarded in 2026.
Wind has stalled. STEG’s farms at Sidi Daoud, Métline and Kchabta total about 245 MW and produced less in 2025 and 2026 than earlier, and the first private wind project from the 2022 tender (75 MW at El Fahs) was only awarded in January 2026. Under the authorisation regime, 16 of the 54 projects approved in 2017–2020 and 5 of the 186 approved in the fifth call had been commissioned by mid-2026.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is at an early stage. Neither STEG’s system nor the household tariff gives any reward for shifting consumption, and the low-voltage connection rules deal with PV inverters and back-up generators but not batteries. The first grid batteries are being built alongside solar plants, by STEG at Beni M’Hira and through the Kébili tender, to manage the intermittency of new solar capacity in the south.
Storage projects.
- STEG Beni M’Hira solar plant with battery storage (Tataouine): 50 MWac PV plant with a 20 MWh battery system and high-voltage connection, financed by the EBRD (up to €40 million plus up to €20 million from the Clean Technology Fund). The EBRD describes it as the first investment in battery storage in Tunisia.
- Bazma solar and storage tender (Kébili): Call for proposals 01-2026 launched by the Ministry of Industry, Mines and Energy in March 2026 for a 300 MW PV plant with a 540 MWh battery system.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| STEG (Société Tunisienne de l’Électricité et du Gaz) | Sole retail supplier (about 4.58 million electricity customers, 2024) | No | Limited | No | Limited |
STEG is the only electricity supplier. In 2024 it had 4,561,070 low-voltage customers, 21,602 medium-voltage customers and 22 high-voltage customers. It sold 17,544 GWh, of which 8,868 GWh at low voltage. Time-of-use pricing is available only at medium and high voltage and on special low-voltage irrigation tariffs; households offset rooftop solar output through a bidirectional meter rather than through an export tariff.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Industry, Mines and Energy | Government | Energy policy, tariffs, renewable calls for projects and tenders | Sets the rules and prices for the whole sector and publishes ONEM’s monthly energy statistics. |
| Agence Nationale pour la Maîtrise de l’Énergie (ANME) | Government | National energy efficiency and renewable energy agency | Runs Prosol Elec and Prosol solar water heating with STEG, manages FTE subsidies and keeps the lists of eligible PV installers and design offices. |
| STEG | Transmission | Integrated utility: generation, transmission, dispatch, distribution and supply | Connects every customer and generator and buys all surplus and private generation. |
| STEG smart grid programme | Metering | Advanced metering infrastructure deployment | The only smart-meter roll-out in the country. |
| Fonds de Transition Énergétique (FTE) | Renewable Energy | Fund financing energy transition subsidies | Funded partly by the 5 millimes/kWh levy on electricity bills; finances Prosol Elec subsidies. |
| Observatoire National de l’Énergie et des Mines (ONEM) | Market | Official energy statistics | Publishes monthly production, sales, peak demand and renewable progress reports. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Low-voltage PV connection | Technical reference for PV installations connected to the national low-voltage network | STEG / ANME working group | Sets size limits (subscribed power; 6 kWp single-phase; 200 kWp on LV), bidirectional metering, earthing, cabling, protection and commissioning tests. |
| Grid code (LV) | Ministerial order of 9 February 2017 approving the specification for connecting renewable installations to the LV network | Ministry in charge of energy | A parallel specification covers high and medium voltage. |
| Inverters and anti-islanding | DIN VDE V 0126-1-1; VDE-AR-N 4105; IEC 61727 | DKE/VDE; IEC (referenced by STEG/ANME) | Automatic decoupling protection required; three-phase inverters above 4.6 kVA per phase. |
| PV modules | IEC 61730 (and related module qualification standards) | IEC (referenced by STEG/ANME) | Module safety qualification. |
| Installer accreditation | ANME list of eligible installers for LV and MV PV | ANME | About 716 companies eligible for low-voltage installations in September 2026, each with an approval number and expiry date. |
| Structures | Eurocodes | CEN (referenced by STEG/ANME) | Roof loads and wind; a design calculation checked by an inspection body is needed for structures 3 m high or more. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| STEG connection approval | Yes | National | Required for every grid-connected PV system; grid impact study above 40 kWp on low voltage. |
| Bidirectional meter | Yes | National | Installed by STEG in place of the existing meter. |
| Ministerial approval | Limited | National | Not needed for household systems; required for larger medium/high-voltage self-production projects (medium/high-voltage projects below 1 MW need only STEG authorisation since the order of 22 November 2022). |
| Planning permission | Unknown | Local | No national rule specific to rooftop PV was identified; ordinary municipal building rules apply. |
| Use of an eligible installer | Limited | National | Required to obtain Prosol Elec subsidies and credit. |
A household rooftop system is essentially a STEG connection matter. The installer prepares the file, STEG checks that the system respects the subscribed-power and single-phase limits, and STEG fits the bidirectional meter. Ministerial approvals and parliamentary approval apply only to commercial generation projects.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Prosol Elec | Active | Subsidy and on-bill credit | Rooftop PV programme for low-voltage households, run by ANME and STEG since 2010, originally for homes using more than 1,800 kWh a year. Households receive an FTE subsidy and a bank loan guaranteed by STEG and repaid through the electricity bill. STEG secured around one billion dinars of financing for 2026–2028. About 300 MW in nearly 90,000 homes had been installed by 2024, and around 450 MW by April 2026. | 2010 – ongoing |
| Prosol Elec Économique | Active | Subsidy and on-bill credit | For households using 1,200–1,800 kWh a year: a subsidy of TND 1,500 per installation and a 3% bank loan over 10 years repaid through the STEG bill. In August 2026 ANME was signing contracts with the selected installers. | 2025 – ongoing |
| Prosol Elec Social | Scheduled | Free installation | Free solar systems for low-income households using less than 1,200 kWh a year; a pilot is under way in Tozeur governorate. | — |
| Reduced VAT on household electricity | Active | VAT relief | 7% VAT for households using up to 300 kWh a month and 13% above, against 19% for other uses. | — |
| Medium/high-voltage surplus purchase | Active | Export payment | STEG pays 80 millimes/kWh for surplus from renewable self-production projects approved from 12 December 2023, within the 30% annual limit. | From 12 December 2023 |
Data and connectivity.
- Fixed broadband
- 40.4 % of households (2024)Source 9Households connected to the internet (RGPH 2024). 59.5% have a connected television.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Fixed broadband reaches a minority of homes: the 2024 census found 40.4% of households connected to the internet, and the telecoms regulator INT reports rapid growth in 5G fixed-wireless access since the 2025 launch. Mobile coverage is the more practical path for connected home devices.
STEG’s smart grid programme uses its own telecommunications infrastructure and head-end systems for metering. There is no national standard for home-energy device communication; inverter monitoring generally relies on the household’s own internet connection.
Grid conditions.
- National peak demand
- 4.924 GW (July 2026)Source 8Peak up to end July 2026, 2% above the 4,837 MW recorded by end July 2025.
- Annual electricity demand
- 21.8 TWh (2025)Source 8Electricity available for the local market: national production 20,533 GWh plus purchases from Sonelgaz and GECOL 2,461 GWh and net exchanges.
- Generation capacity
- 7.158 GW (End 2024)Source 12IRENA total installed capacity: 6,072 MW fossil, 1,086 MW renewable.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The system is tight in summer. Peak demand rises each year with air-conditioning use, and imports from Algeria, which met about a tenth of local demand in 2025 and 2026, are a structural part of supply rather than an emergency measure. STEG’s generation is concentrated in large gas plants, so the system depends heavily on gas supplies and on the Algerian link.
New solar capacity is concentrated in the centre and south (Kairouan, Sidi Bouzid, Tozeur, Gafsa, Gabès, Tataouine, Kébili), far from the coastal load centres, which is why Med-TSO studies and STEG plans include new 400 kV corridors and why the first battery projects are in the south. ELMED will connect the grid to Europe for the first time; Hitachi Energy was awarded the converter-station contract in June 2026.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| ELMED Tunisia–Italy interconnector | Upcoming | Under construction (converter contract awarded June 2026) | 600 MW HVDC link of about 220 km between Mlaabi (Cap Bon) and Partanna (Sicily), built by STEG and Terna, with €307 million from the EU Connecting Europe Facility. Authorised in Italy in May 2024. |
| Independent electricity regulator | Upcoming | Bill submitted April 2024; not yet in force | A bill creating an independent regulatory authority for the electricity sector, including a binding opinion on how surplus purchase tariffs for self-producers are set, was sent to the head of government. A renewable energy code covering export and green hydrogen was also being prepared. |
| Smart meter roll-out, first phase | Upcoming | Early 2027 | 150,000 smart electricity and gas meters to be installed by early 2027 within a programme of about 450,000 meters. |
| Solar concessions and 2026 call for projects | Upcoming | 2027 onwards | Three 100 MW concessions expected in 2027, further 2026 awards, and 455 MW of authorisation-regime projects approved in the sixth call (April–June 2026). |
| Surplus price for new self-production projects | Current | 12 December 2023 | Single price of 80 millimes/kWh for surplus from renewable projects at high and medium voltage approved from this date, replacing time-band prices of 87–182 millimes/kWh. |
| Prosol Elec Économique | Current | 2025 | Extension of rooftop PV support to households using 1,200–1,800 kWh a year. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 515 MW of residential rooftop PV by July 2026 (ONEM), roughly 150 W per household; self-producers generated 721 GWh in 2025. |
| Distributed energy market | Medium | Self-production (LV and MV/HV) is the largest source of renewable electricity, ahead of STEG and IPP plants (ONEM 2025). |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market and no aggregator role. |
| Energy storage adoption | Low | No operating grid storage; the first 20 MWh battery is being financed and a 540 MWh project was tendered in 2026. |
| Renewable growth environment | Medium | Renewable share rose from about 5% in 2025 to 9% in January–July 2026, with 200 MW of utility solar commissioned between December 2025 and April 2026. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 32 sources
- Les tarifs d’électricité (basse tension, à compter du 01/05/2022). STEG, 2022. accessed 1 October 2026.
- Comprendre votre facture. STEG. accessed 1 October 2026.
- Espace client. STEG. accessed 1 October 2026.
- Vous êtes un nouveau client. STEG. accessed 1 October 2026.
- Programme Smart Grid. STEG. accessed 1 October 2026.
- STEG en chiffres. STEG, 2024. accessed 1 October 2026.
- Coûts des facteurs (janvier 2025). Tunisia Investment Authority / FIPA-Tunisia, 2025. accessed 1 October 2026.
- Conjoncture énergétique – fin juillet 2026. Observatoire National de l’Énergie et des Mines, Ministry of Industry, Mines and Energy, 2026. accessed 1 October 2026.
- Diffusion des analyses thématiques du RGPH 2024 – communiqué de presse. Institut National de la Statistique, 2025. accessed 1 October 2026.
- Flash Ménages (RGPH 2024). Institut National de la Statistique, 2025. accessed 1 October 2026.
- Flash Logements (RGPH 2024). Institut National de la Statistique, 2025. accessed 1 October 2026.
- Tunisia – Renewable energy statistical profile. IRENA, 2025. accessed 1 October 2026.
- Cours moyens des devises cotées en dinar tunisien (journée du 01/10/2026). Banque Centrale de Tunisie, 2026. accessed 1 October 2026.
- Référentiel technique des installations photovoltaïques raccordées au réseau électrique national basse tension. ANME / STEG, 2018. accessed 1 October 2026.
- Liste des sociétés installatrices éligibles à la réalisation des installations photovoltaïques pour la basse tension. ANME, 2026. accessed 1 October 2026.
- Énergie éolienne. ANME. accessed 1 October 2026.
- Projets d’énergie renouvelable en Tunisie – guide détaillé (mai 2019). Ministry of Industry and SMEs, 2019. accessed 1 October 2026.
- Le solaire photovoltaïque en Tunisie – modèles commerciaux. GIZ, 2014. accessed 1 October 2026.
- Les ménages tunisiens utilisent de plus en plus les lampes économiques. African Manager, 2022. accessed 1 October 2026.
- La création d’une autorité de régulation du secteur de l’électricité sous la loupe du gouvernement. African Manager, 2024. accessed 1 October 2026.
- Compteurs intelligents : la STEG prévoit 150 000 installations d’ici début 2027. Webdo, 2026. accessed 1 October 2026.
- PROSOL Élec : près de 450 MW installés sur les toits résidentiels. La Presse de Tunisie, 2026. accessed 1 October 2026.
- Prosol Elec 2026 : les entreprises passent-elles à l’étape concrète ?. Managers, 2026. accessed 1 October 2026.
- Tunisia allocates $121 million for residential solar rebates. pv magazine, 2024. accessed 1 October 2026.
- Elmed: MASE authorises the Italy–Tunisia interconnection. Terna, 2024. accessed 1 October 2026.
- ELMED – Un contrat de 770 millions d’euros attribué à Hitachi Energy pour l’interconnexion Tunisie-Italie. AllAfrica / La Presse, 2026. accessed 1 October 2026.
- DZTN project – detailed project description. Med-TSO, 2022. accessed 1 October 2026.
- Centrale photovoltaïque avec stockage par batteries – STEG (PSD 56916). EBRD. accessed 1 October 2026.
- Énergie : la Tunisie lance l’appel d’offres d’un mégaprojet solaire avec stockage à Kébili. Webdo, 2026. accessed 1 October 2026.
- Tunisie : la STEG dément toute augmentation des tarifs de l’électricité et du gaz. Webdo, 2024. accessed 1 October 2026.
- Transition énergétique : simplification des procédures relatives à l’autoproduction d’électricité à partir des ER. WMC (Webmanagercenter), 2022. accessed 1 October 2026.
- Tunisie : qui consomme le plus d’électricité à la maison ?. L’Économiste Maghrébin, 2026. accessed 1 October 2026.
Questions about energy in Tunisia.
Households pay STEG’s regulated tariff, unchanged since May 2022. A household using 101–200 kWh a month pays 176 millimes per kWh before tax, or about TND 0.198 per kWh including 7% VAT and two 5-millime levies (about €0.059). Small users below 100 kWh a month pay 62–96 millimes, and the price rises to 414 millimes above 500 kWh a month.
Only STEG, the state-owned Société Tunisienne de l’Électricité et du Gaz. It generates most of the power, runs the grid and is the sole supplier, so households cannot switch.
The closest equivalent is the 9-digit STEG subscription reference printed at the top left of the green electricity bill. It identifies the supply contract with STEG and is used to pay bills, register online and request services. There is no separate national metering-point code because STEG is the only network operator and supplier.
Households can connect rooftop PV and offset their consumption through a bidirectional STEG meter. By law, surplus may be sold only to STEG and only up to 30% of annual production. Medium- and high-voltage self-producers are paid 80 millimes/kWh for surplus from projects approved since December 2023; STEG does not publish a cash price for low-voltage surplus.
No larger than the subscribed power on the STEG contract, and no more than 6 kWp on a single-phase connection. Three-phase customers can go up to their subscribed power, with 200 kWp the maximum on the low-voltage network, and STEG studies grid impact above 40 kWp.
The national rooftop solar programme run by ANME and STEG since 2010. Households get a subsidy from the Energy Transition Fund and a bank loan repaid through the STEG bill, provided they use an ANME-eligible installer. Prosol Elec Économique (from 2025) gives TND 1,500 and a 3% ten-year loan to households using 1,200–1,800 kWh a year.
About 5% of national generation in 2025 and 9% in January–July 2026, mostly solar. Natural gas produced about 93% of electricity in 2025. The official target is 30% renewable electricity by 2030.
Only in pilot zones. STEG’s smart grid programme covers parts of Sfax, Kerkennah, Sousse, Sidi Bouzid, Le Kram and Béja, with 150,000 smart meters targeted by early 2027. Most homes are still read manually every two or six months.