Energy in North Macedonia, explained.

How electricity works in North Macedonia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in North Macedonia: Not yet available.Olmack is not offered in North Macedonia yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in North Macedonia.

North Macedonia electricity 2026: ERC-set block tariffs, MEPSO, Elektrodistribucija, metering-point codes, prosumer export, licensing, storage rules and incentives.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Macedonian denar (MKD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

North Macedonia energy at a glance.

Key figures for households in North Macedonia. Each one links to its source on the full overview below.

  • Electricity price.

    7.148 MKD per kWh for households, including taxes. Figures for 2025-S2.

  • Household use.

    5,263 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    48.3% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in North Macedonia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for North Macedonia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications North Macedonia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in North Macedonia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in North Macedonia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in North Macedonia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in North Macedonia.

Full overview

The energy market in North Macedonia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

North Macedonia’s electricity market has been legally open to every customer since 2019, but almost all households still buy from the universal supplier, EVN Home, at prices that pass through the regulator. The Energy, Water Services and Municipal Waste Management Services Regulatory Commission (ERC, РКЕ) checks EVN Home’s prices against a tariff system. For 2026 the energy part of the household bill uses four monthly consumption blocks: 4.7074 MKD/kWh for the first 210 kWh, rising to 19.1904 MKD/kWh above 1,050 kWh, with a cheap rate of 2.1893 MKD/kWh. Network charges and 18% VAT are added on top.

Eurostat puts the average household price at 7.148 MKD/kWh (0.1161 EUR/kWh) including taxes in the second half of 2025, less than half the EU average. One state-owned TSO (MEPSO) and one main distribution company (Elektrodistribucija, part of the EVN Macedonia group) run the networks. The state generator ESM sells most of the electricity that EVN Home needs.

The generation mix is changing fast. Renewables supplied 48.3% of net generation in 2025, according to Eurostat monthly data, up from 39.4% in 2024. Solar overtook hydro to become the largest renewable source, with about 1.2 GW connected by the end of 2025. A new Energy Law adopted in May 2025 transposed the EU’s 2019 electricity rules. It requires new solar and wind plants to include storage equal to 20% of their capacity, and a separate Law on the Use of Energy from Renewable Sources, adopted on 30 June 2026, introduces net metering and net billing for prosumers.

Energy snapshot.

Headline figures for electricity in North Macedonia. Each shows its data year and links to its source.

  • Population1,819,074 peopleSource 61 Jan 2026
  • Households598,632 householdsSource 122021 census
  • Average household size3.07 people/householdSource 122021 census
  • Electricity use per household5,263 kWh/yrSource 22024
  • Household price (MKD)7.148 MKD/kWhSource 12025-S2
  • Household price (EUR)0.116 EUR/kWhSource 12025-S2
  • Renewable electricity share48.3%Source 32025
  • Solar capacity1.2 GWSource 28end 2025
  • Wind capacity0.073 GWSource 5end 2024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Energy, Water Services and Municipal Waste Management Services Regulatory Commission (ERC / РКЕ)
System operator
MEPSO (Macedonian Transmission System Operator)
Distribution networks
One national DSO, Elektrodistribucija DOOEL Skopje (EVN Macedonia group). The law also allows closed distribution systems
Currency
Macedonian denar (MKD)
Voltage and frequency
230 V / 50 Hz

Electricity prices in North Macedonia.

Household price (MKD)
7.148 MKD/kWh (2025-S2)Source 1Eurostat average household price, all taxes included, for annual consumption of 2,500–4,999 kWh. 6.057 MKD/kWh before VAT; 18% VAT is the only tax in Eurostat’s breakdown.
Household price (EUR)
0.116 EUR/kWh (2025-S2)Source 1Eurostat’s own EUR figure for the same band, so no separate conversion was applied. It implies about 61.6 MKD per EUR (7.148 ÷ 0.1161), Eurostat’s average rate for the second half of 2025.
Typical annual electricity bill
37,617 MKD/yr (2024–2025)Source 1Derived: average household consumption of 5,263 kWh (2024) multiplied by Eurostat’s 2025-S2 average price of 7.148 MKD/kWh including VAT (about €611). It is a rough indication, not an official typical bill.

Household price trend (MKD per kWh).Source 1

4.8195.9837.1482019-S12025-S2
North Macedonia household electricity price, MKD per kWh
2019-S14.8192 MKD/kWh
2019-S24.8558 MKD/kWh
2020-S14.8186 MKD/kWh
2020-S25.1382 MKD/kWh
2021-S15.1836 MKD/kWh
2021-S25.179 MKD/kWh
2022-S15.7963 MKD/kWh
2022-S26.3435 MKD/kWh
2023-S16.4855 MKD/kWh
2023-S27.1289 MKD/kWh
2024-S16.3843 MKD/kWh
2024-S27.0696 MKD/kWh
2025-S17.0447 MKD/kWh
2025-S27.148 MKD/kWh

How the household bill is built

EVN Home’s bill has separate lines for electricity consumed (high tariff split into blocks, plus low tariff), the charge for using transmission and distribution, the charge for access to the distribution system, a municipal fee for public lighting, VAT and any late-payment interest. ERC’s 2026 calculation shows how the regulated price is built. EVN Home buys 3,063 GWh from the state generator ESM at 3.9975 MKD/kWh and takes 254 GWh from preferential (feed-in) producers at 6.09 MKD/kWh. Transmission is charged at 0.3018 MKD/kWh, the market operator fee at 0.0141 MKD/kWh, and household (LV2) distribution at 1.7321 MKD/kWh plus a fixed charge of MKD 2,400 a year per connection. The supplier’s gross margin, set in the tender that selected it, is 9.9%.

Who sets the price

Under the tariff system for universal service, EVN Home proposes its prices and ERC approves them. In its decision of 22 December 2025, ERC obliged EVN Home to adopt a new price decision with the block prices ERC set out, applying from 1 January 2026. A year earlier ERC had likewise refused EVN Home’s proposed 2025 prices and spread an accumulated correction factor over later years to avoid sharp increases. The four-block structure was introduced in 2022 to encourage saving. VAT on household electricity has been 18% since 1 July 2023. The Energy Community notes that about 41% of national consumption was supplied at non-regulated prices in 2024. That share is almost entirely business demand.

Trend

Eurostat data show the average household price stable at about 4.8–5.2 MKD/kWh between 2014 and 2021. It then rose to 6.3–7.1 MKD/kWh from late 2022, as the energy crisis and the end of reduced VAT fed through. It has stayed at about 7.0–7.1 MKD/kWh since the second half of 2024. Prices remain among the lowest in Europe in euro terms.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesUniversal service from EVN Home. For 2026, ERC’s decision fixes the household energy component in four monthly blocks: 4.7074 MKD/kWh up to 210 kWh, 5.8976 MKD/kWh for 211–630 kWh, 7.8537 MKD/kWh for 631–1,050 kWh and 19.1904 MKD/kWh above 1,050 kWh. Transmission, distribution and access charges, the municipal street-lighting fee and VAT are billed on top.
Time-of-useYesTwo-rate meters record a high and a low tariff. The low rate (2.1893 MKD/kWh in 2026) applies from 22:00 to 07:00 and all day on Sundays. Since 1 December 2023 it also applies from 13:00 to 15:00, a midday window that continues in 2026. The block structure applies only to high-tariff consumption.
VariableLimitedHouseholds may leave universal service and sign with one of the 21 other active suppliers (2024). ERC’s Switch.mk tool compares offers. Switching must be completed within 48 hours and is free for households. In practice the free market serves mainly business customers.
DynamicLimitedThe 2025 Energy Law lets suppliers, but not the universal supplier, offer dynamic-price contracts. A supplier with more than 200,000 customers must offer one to any customer with a smart meter. Switch.mk has listed dynamic offers since February 2025. Few households have the interval metering needed.
OtherYesProsumer contracts: households with rooftop solar up to the legal limit sign a supply-and-surplus contract with their supplier. Surplus is currently credited at 90% of the average energy price over six-month periods.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
5,263 kWh/yr (2024)Source 2Derived: Eurostat household electricity consumption of 3,150 GWh in 2024 divided by the 598,632 households counted at the 2021 census. It is a national average, not a metered median.
Average daily use per household
14.4 kWh/day (2024)Source 2Derived: 5,263 kWh a year divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,728 kWh/person/yr (residential) (2024)Source 2Derived: 3,150 GWh of household consumption divided by a population of 1,822,612 on 1 January 2025 (Eurostat).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
2,047 battery-electric cars (stock) (2025)Source 9Out of 615,382 registered passenger cars (0.3%); up from 1,507 in 2024.
Electric cooking
Not identified from a reliable public source.

Households use a lot of electricity: about 5,260 kWh a year on average, well above the level in many richer EU countries. Electricity is widely used for heating. District heating serves mainly Skopje, and only 2% of the country’s small gas supply goes through distribution networks. The cheap night, Sunday and 13:00–15:00 rates encourage storage water heaters and heating outside peak hours. The fourth price block (above 1,050 kWh a month at more than four times the first-block price) penalises very high winter use.

Household consumption was 3.0–3.3 TWh a year between 2019 and 2024. It dipped in 2022–2023 when prices rose and recovered to 3.15 TWh in 2024. Electric cars are still rare, at about 2,000 battery-electric cars in 2025. Energy poverty is significant: in 2023, 30.7% of households were unable to keep their home adequately warm and 26.3% had arrears on utility bills.

Housing and households.

Dwellings
839,174 dwellings (2021 census)Source 12Far more dwellings than households (598,632), reflecting vacant homes, second homes and emigration.
Owner-occupied
87 % of population (2024)Source 7Only 0.6% are owners with a mortgage or loan.
Private rented
0.7 % of population (2024)Source 7Tenants paying market rent.
Social or public housing
Not identified from a reliable public source.
Houses
82 % of population (2024)Source 865.9% detached, 16.2% semi-detached.
Apartments and flats
17.9 % of population (2024)Source 815.9% live in blocks with ten or more dwellings.
Urban population
62.9 % of population (2025)Source 11

North Macedonia is a country of owner-occupied houses. 87% of people own their home, almost always without a mortgage, and 82% live in houses rather than flats. Flats are concentrated in Skopje and other larger towns. For rooftop solar this means most households can decide on their own roof. In blocks of flats, the prosumer rules allow a community of apartment owners to install a system for the building’s common parts, but it needs majority consent from the owners.

How the grid works in North Macedonia.

  1. TransmissionMEPSO
  2. DistributionOne national DSO, Elektrodistribucija DOOEL Skopje (EVN Macedonia group). The law also allows closed distribution systems
  3. MeteringElektrodistribucija (metering is a network activity)
  4. Supply2 or more retail suppliers

Physically, power from lignite, hydro and gas-fired plants and a fast-growing fleet of solar parks flows through MEPSO’s transmission network to substations, where Elektrodistribucija takes it on to homes over medium- and low-voltage (0.4 kV) networks. The country trades heavily across its borders: in 2025 it imported 7.4 TWh and exported 6.5 TWh, so it was a net importer of 0.92 TWh against inland demand of 7.09 TWh (Eurostat).

Commercially, a household on universal service has one contract with EVN Home, which buys most of its energy from ESM and pays network charges to MEPSO and Elektrodistribucija for the customer. Elektrodistribucija reads the meter and sends the data to the supplier and to MEMO for settlement. Suppliers and traders form balancing groups and pay for imbalances, and the supplier takes balancing responsibility for a prosumer’s metering point. The Energy Community notes that the day-ahead market was expected to cover about 20% of final consumption in 2025.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy, Mining and Mineral Resources (МЕРМС)Drafts the Energy Law and renewables law, adopts the Rulebook on Renewable Energy Sources, issues construction authorisations for plants and storage of 1 MW and above, approves the annual plan for building energy facilities, and runs household energy-poverty programmes.
RegulatorEnergy, Water Services and Municipal Waste Management Services Regulatory Commission (ERC / РКЕ)Issues licences for all energy activities, approves transmission and distribution tariffs, checks the universal supplier’s prices, approves the grid codes and supply rules, runs the Switch.mk comparison tool and keeps the REMIT register (81 market participants in October 2025).
TSOMEPSOState-owned, unbundled and certified transmission system operator. Dispatches the system, procures aFRR and mFRR balancing, allocates cross-border capacity, and acts as the local issuing office for ENTSO-E EIC codes. Part of a load-frequency control block with Serbia and Montenegro.
DSOElektrodistribucija DOOEL SkopjeThe distribution system operator for the whole country, legally and functionally unbundled within the EVN Macedonia group since 2017. Connects customers and generators to the distribution network, owns and reads the meters, keeps the metering database and processes supplier switches (10,553 in 2024).
SupplierEVN Home DOO SkopjeUniversal supplier and supplier of last resort for households and small customers, chosen by tender and obliged to provide the service until mid-2029. Serves more than 800,000 customers.
SupplierESM (Elektrani na Severna Makedonija)State-owned generator, which secured financing for a 134 MW solar project in December 2025. Sells the regulated household volumes to EVN Home: 3,063 GWh at 3.9975 MKD/kWh in ERC’s 2026 calculation.
ExchangeMEMO (Market Operator of Electricity)Electricity market operator and nominated electricity market operator (NEMO), re-designated for four years on 5 June 2025. Has run the day-ahead market since May 2023 (gate closure 10:35, results 10:45, prices 0.1–1,000 €/MWh, traded in euros since February 2025). Also runs the guarantees-of-origin registry, operational since April 2025.
SettlementElectricity market operator (MEMO)Sets imbalance costs for balance-responsible parties on the basis of the imbalance prices calculated under MEPSO’s balancing rules. The 2025 Energy Law sets a 15-minute imbalance settlement period.
MeteringElektrodistribucija (metering is a network activity)Meters belong to the DSO, which installs, seals and reads them and keeps the meter-data database. Households cannot choose a meter operator.

Compared with the UK system.

Compared with the UK system.
UK conceptNorth Macedonia equivalentHow it works
DNOОператор на електродистрибутивниот систем (Elektrodistribucija)One company runs the low- and medium-voltage network for the whole country, so there is no regional patchwork as in GB. Its revenues and tariffs are regulated by ERC. The 2025 Energy Law also allows closed distribution systems, such as industrial sites.
National Grid / NESOMEPSOMEPSO owns the transmission network and also acts as system operator. It runs the balancing market and allocates interconnector capacity with Serbia and Bulgaria (moving to JAO in 2026) and with Greece and Kosovo (through the SEE CAO platform).
MPANIdentification code of the billing metering point (идентификациски код на пресметковно мерно место); shown on bills as the consumption point numberUnder the distribution grid code, the DSO gives each billing metering point its own identification code under its own identification scheme, separate from the customer’s code. The structure is not published, so unlike the MPAN there is no publicly documented format. Households see it on the EVN Home bill as the “number of the consumption point”, next to the customer number and the meter serial number.
MPRNGas supply point at a local gas distributorVery few homes have mains gas: only 2% of national gas supply passes through the three small distribution networks. Their supply points are identified by those distributors and have no link to the electricity code.
Meter operatorElektrodistribucija (no competitive metering)The DSO owns the meters and meter cabinets (except in blocks of flats, where the cabinets belong to the building). Households cannot appoint a meter operator. The DSO fits a two-way meter free of charge for prosumers.
SupplierУниверзален снабдувач (EVN Home) or a licensed supplierAlmost all households stay on universal service from EVN Home at ERC-checked prices. Switching to one of about 21 other licensed suppliers is free and must take no more than 48 hours, but is mostly used by businesses.
Smart-meter infrastructure (DCC / SMETS2)DSO remote-reading system; no national roll-out decision yetThere is no central data company. Elektrodistribucija has installed more than 200,000 remotely read meters. Under the 2025 Energy Law, a national smart-meter programme follows only if a cost-benefit analysis is positive and the Government then decides on roll-out. That decision would require 80% coverage within seven years.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Identification code of the billing metering point (идентификациски код на пресметковно мерно место) (Shown on EVN Home bills as “Број на местото на потрошувачка” (consumption point number))
Who issues it?Elektrodistribucija DOOEL Skopje, the distribution system operator
FormatA code the DSO assigns to each billing metering point under its own identification scheme (distribution grid code). The scheme is not published. The metering point record also holds the customer details, the metering point address, the connection approval number, the approved maximum power and the metering quantities. Separately, EVN Home gives each customer a customer number (број на корисник), and each meter has its own serial number.
LengthNot published
Stays with the property when you switch supplier?Yes
Where to find itOn the EVN Home bill. The customer number is at the top right, with the invoice number below it. The consumption-point block shows the consumption point number, the connection tariff and category, and the address where the meter is recorded. The consumption table lists the meter serial number.
Electronic accessEVN Online’s “My EVN Home” service needs the customer number and the consumption point number to register a profile. Several consumption points can be added to one profile. Customers can view and pay bills there and submit self-readings through the “Report reading” service using the meter serial number.
Third-party accessA new supplier starts the switching procedure with the DSO on the customer’s behalf for each metering point, giving the metering point details and the customer’s identification (name, address, personal or tax number). Under the 2025 Energy Law, smart-metered customers can ask the DSO to give their consumption and export data to a third party acting for them, and an aggregator must have free access to the data it needs.
Who keeps the registerElektrodistribucija keeps the national database of billing metering points and meter data and owns that data under the distribution grid code. ERC approves the grid code. MEPSO issues EIC codes to market participants, not to individual homes.
Register scopeNational

North Macedonia identifies a home’s connection through its single DSO. The distribution grid code says every billing metering point and every network user gets its own identification code, assigned under the DSO’s identification scheme. The metering point code therefore identifies the physical point of delivery, while the customer number identifies the person or company on the contract. Neither ERC nor the DSO publishes the structure of the code, so no example format is given here.

How it is used

Most households deal with two numbers on the EVN Home bill: the customer number, used for online services and payments, and the consumption point number, which ties the account to a specific meter location, tariff and connection category. To reactivate a deactivated metering point, the owner submits a metering point registration form with proof of ownership through their supplier, which forwards it to Elektrodistribucija. Deactivation works the same way, through a request submitted via the supplier. A prosumer installation, a two-way meter and a supplier-switch request all refer to the same metering point.

Metering and data

Households up to 40 kW of approved power are metered directly with class 2 (MID A) meters owned and sealed by the DSO. Bills mark each reading as read (О) or estimated (М). A meter that has not been read is estimated from the history of that consumption point, and the ministry said in 2025 that about 85% of meters were being read. The 2025 Energy Law requires smart meters to give customers daily access to 15-minute data free of charge, The 2026 renewables bill also requires the system operator to send hourly data on prosumer imports, exports and generation to the supplier by the tenth of each month.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringLimited
Net billingYes
How exported electricity is paidUnder the 2024 Rulebook on Renewable Energy Sources, a prosumer’s surplus is valued at 90% of the average energy price they pay (excluding network charges and taxes). It is reduced in proportion if they exported more than they imported, and settled over six-month periods. The 2026 renewables law replaces this with kWh-based net metering for small systems and value-based net billing for mid-sized ones.
How large can a household system be?The 2024 Rulebook allows 6 kW for a household, 6 kW for an owners’ community in a block of flats, and 40 kW for small businesses and public bodies. In 2025 the ministry proposed raising the limits to 10 kW for households and 70 kW for companies. The Government’s May 2026 proposal for the renewables law set net metering up to 10 kW and net billing from 10 kW to 70 kW. Press reports on the adopted law cite thresholds of 16 kW and 50 kW, so the final by-laws should be checked.
How is surplus paid for today?Each half-year (January–June and July–December), surplus is credited at 90% of the average energy price the prosumer pays. If exports exceed imports, the credit is scaled down by imports ÷ exports. Where EVN Home is the supplier, the reference price is its average purchase price for households and small customers. A supplier may offer better terms.
What changes under the 2026 renewables law?In the Government’s proposal, kWh-based net metering carries surplus forward each month as an “energy deposit”. A final annual settlement takes place by 1 April, and any remaining surplus is bought at the contract price without network fees and paid within 30 days. Under net billing, the value of surplus less 5% is carried as a money credit. Plants above 300 kW must send daily schedules and bear their imbalance costs.
Do I need a licence to export?No. The Energy Law exempts renewable self-consumption with surplus fed into the distribution grid from the generation licence, provided the prosumer rules are met.
Can businesses sell all their output to a supplier?Yes, outside the prosumer scheme. EVN Macedonia Elektrosnabduvanje, for example, publishes an offtake agreement for renewable plants and batteries behind the same meter. It acts as aggregator in its balancing group and pays the hourly MEMO day-ahead price weighted by the delivery profile, minus a fixed fee.

Connecting a home system.

  1. Check eligibility: households (and owners’ communities in blocks of flats) may install a rooftop PV or small wind plant up to the prosumer limit (6 kW in the 2024 Rulebook; the Government has since moved to raise it to 10 kW) on a building they own or have the right to use. They must not be on supplier-of-last-resort supply.
  2. Have a licensed designer prepare a technical project (architectural, structural and electrical). In a block of flats, obtain majority consent from the owners.
  3. Notify the municipality before installation, with ID, proof of ownership and the technical project.
  4. Apply to Elektrodistribucija for connection (form BSP-1) with proof of ownership and the technical project.
  5. Install the system. The contractor gives a notarised statement to the municipality and the Energy Agency confirming compliance and the power limit; the Energy Agency issues its decision on the electrical installation within 15 days.
  6. Request commissioning from the DSO (form BSN). The DSO fits a two-way meter free of charge.
  7. Sign a supply-and-surplus contract with the supplier (EVN Home or a market supplier), which must be concluded within 30 days of the request.

Rooftop self-consumption is still small. Eurostat records only 9.2 MW of rooftop PV under 30 kW in 2024, against 364 MW in the 30 kW–1 MW band and 496 MW above 1 MW. Solar Macedonia attributes the slow residential uptake to a lack of grants and favourable credit. Low regulated prices in the first consumption block also weaken the case. Households on the higher blocks gain more, because self-consumption cuts the most expensive kWh first.

Grid capacity is the main constraint for larger systems. The Energy Law caps variable renewable capacity connected to distribution at 80% of the transformer capacity of the supply substation, with conditions on reverse flow to transmission. Elektrodistribucija publishes an interactive map of available high-voltage substation capacity for photovoltaic connections.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityLicence from ERC for any grid-connected generation (Energy Law, Article 74). Exempt: off-grid self-consumption and prosumer self-consumption with surplus export. Separately, a ministry construction authorisation is needed for plants of 1 MW and above. It is not needed below 1 MW on private land.ERC (licence); Ministry of Energy, Mining and Mineral Resources (construction authorisation)ERC uses a simplified licensing procedure for renewables. A trial-operation licence is issued within 15 days and lasts up to nine months.
Store electricityStorage is an energy activity requiring an ERC licence when run as a standalone business. Exempt: storage used only for own needs, storage forming part of a power plant under Article 130, and storage fully integrated into the transmission or distribution grid.ERC; ministry (construction authorisation for storage)Storage of up to 40% of a plant’s capacity counts as integrated with the plant and may charge from and discharge to the grid within the connection limit. Since 2025, new variable renewable plants must install storage equal to 20% of their capacity with at least two hours’ duration.
Self-consume and export surplus (household)No licence. Prosumer status under the renewables rules (6 kW household limit in the 2024 Rulebook, being raised), connection approval from the DSO and a contract with the supplier.Elektrodistribucija; supplier; ministry (rules)Prosumer plants above 1 kW are entered in the ministry’s register of renewable power plants with a code beginning “REMK”.
Supply final customersERC supply licence. Applicants must prove €100,000 (in denars) in a bank account or in fixed assets. Universal service is awarded separately by tender.ERCOnly non-universal suppliers may offer dynamic-price contracts. Switching must be completed within 48 hours.
Wholesale tradingERC trading licence (same €100,000 capital test), an EIC code from MEPSO, and registration with the market operator. Membership of MEMO is needed for day-ahead trading.ERC; MEPSO; MEMOREMIT applies; ERC keeps the national register of participants.
Aggregate / VPP / remote control of home assetsA licensed energy-activity holder (such as a supplier or trader) acts as aggregator under an aggregation contract. Customers, active customers, producers and storage operators may sign one without their supplier’s consent.ERC (underlying licence); MEPSO (balancing participation)17 aggregators were registered as “virtual producers” in 2025. Active customers may appoint a third party to install and operate their plant without that party becoming an active customer.
Balancing and ancillary servicesPre-qualification as a balancing service provider with MEPSO, individually or through an aggregator. Storage of 1 MW or more may contract with MEPSO to take part in balancing.MEPSOSince April 2025, balancing service providers may bid in one direction only.
Share energy (energy communities, multi-flat buildings)The 2026 renewables law (as proposed) exempts households sharing renewable power from a supply licence up to 10 kW per single household and 50 kW for blocks of flats. An organiser may own up to 6 MW of generation or storage for sharing.Ministry; ERC; system operators (registration of sharing agreements)Implementing by-laws for energy communities were still pending.

Licensing in North Macedonia is broad. Every activity listed in Article 4 of the 2025 Energy Law, including generation, storage, supply and trading, needs an ERC licence unless an explicit exemption applies. For small distributed assets the important exemptions are prosumer self-consumption and storage that is either for own use or part of a power plant. Larger projects deal with two separate approvals: a ministry construction authorisation (1 MW and above) and an ERC licence once the plant is built. A €25,000 per MW guarantee applies to authorisation applications.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Automatic Frequency Restoration Reserve (aFRR)Yes—LimitedMEPSO. MEPSO buys aFRR capacity and energy in monthly auctions for the following month. April 2025 rule changes introduced new price caps and single-direction bids. MEPSO is not yet connected to the European PICASSO platform.
Manual Frequency Restoration Reserve (mFRR)Yes—LimitedMEPSO. mFRR capacity is bought monthly and mFRR energy daily for the next day. Balancing cooperation is limited to exchanges within the control block with Serbia and Montenegro.
Day-ahead marketYes—YesMEMO. Running since May 2023, with prices between 0.1 and 1,000 €/MWh, and not yet coupled with neighbouring markets. MEMO and MEPSO joined the Italian Borders Working Table in September 2025 to prepare coupling with Greece, Albania and Kosovo.
Intraday marketDevelopingNot yet definedUnknownMEMO. Launch was planned for the second quarter of 2026 (Energy Community); a launch was not confirmed in the sources reviewed.
Demand response / local flexibilityDeveloping—LimitedMEPSO / Elektrodistribucija. The 2025 Energy Law gives final customers the right to offer demand response alone or through independent aggregators and requires DSO flexibility provisions. Detailed rules depend on secondary legislation due from 2026.

Flexibility in North Macedonia is provided mainly by ESM’s hydro and thermal plants through MEPSO’s national balancing market. MEPSO has not yet submitted the national terms and conditions for balancing that EU-derived rules require, and has not joined the EU balancing platforms. The market changes faster at the commercial level: 17 aggregators were registered in 2025, and suppliers such as EVN Macedonia Elektrosnabduvanje pool renewable plants and co-located batteries in their balancing groups at day-ahead prices.

Household flexibility is at an early stage. Homes are read monthly, dynamic tariffs are new, and the main price signals are the night, Sunday and midday low rates and the consumption blocks. The new storage obligation for solar and wind plants, and a ministry construction plan covering 96 storage facilities (2.2 GW / 4.9 GWh), point to batteries becoming the main new source of flexibility.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
MEMODay-ahead market results, market rules and the guarantees-of-origin registry.
MEPSOBalancing rules, auctions for balancing capacity and cross-border capacity, and EIC code applications.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutDSO-led installation of remote-reading meters (more than 200,000 by 2025); a national roll-out depends on an ERC cost-benefit analysis and a Government decision under the 2025 Energy Law
Reading intervalMonthly reading and billing for households; smart meters must provide 15-minute data daily under the 2025 Energy Law
Owner / operatorElektrodistribucija; no competitive metering
Remote-read metersMore than 200,000 (ministry, June 2025)
Legal target80% of customers within seven years of a positive Government roll-out decision
Minimum functionsDaily access to 15-minute consumption and export data, measurement in the imbalance settlement interval, free standardised interface
ProsumersTwo-way meter fitted free of charge by the DSO

Metering is a DSO responsibility paid for through network tariffs. Elektrodistribucija has been replacing old meters with remotely read units, partly because the 13:00–15:00 cheap rate reinstated in December 2023 required older meters to be reprogrammed or replaced. At the 2025 briefings on the new Energy Law, the ministry cited more than 200,000 remotely read meters and a goal of smart meters for 80% of households by 2031.

The law follows the EU model: ERC must carry out a cost-benefit analysis with the network operators. If the result is positive the Government decides on a ten-year roll-out, and ERC then allows the costs in network tariffs. Until then, households without smart meters are billed on monthly readings or estimates, and the bill shows which method was used.

Renewable electricity.

Electricity generation mix (2025).

  • Coal (lignite): 33.6%
  • Solar: 22.5%
  • Hydro: 20.5%
  • Natural gas: 18.1%
  • Wind: 4.5%
  • Bioenergy: 0.8%
Source 3
Renewable electricity share
48.3% (2025)Source 3Derived from Eurostat monthly data: 2,979 GWh from renewables out of 6,167 GWh total net generation in 2025. The 2024 annual balance gives 39.4% (2,481 of 6,305 GWh gross).
Home solar
0.009 GW (end 2024)Source 5Rooftop PV under 30 kW (9.237 MW). This band covers household and small business prosumers.
Solar added each year
0.21 GW (2025)Source 28Approximate, reported by Solar Macedonia. Eurostat shows 322 MW added in 2024 (548 MW to 869 MW).
Solar PV
1.2 GW (end 2025)Source 28Approximate (Solar Macedonia). Eurostat: 869 MW at the end of 2024.
Hydro
0.72 GW (end 2024)Source 5Net capacity; no pumped storage.
Onshore wind
0.073 GW (end 2024)Source 5
Biogas
0.012 GW (end 2024)Source 5

Targets.

  • NECP (2022): 38% renewables in gross final energy consumption by 2030, with 66% in electricity, 45% in heating and cooling and 10% in transport.
  • NECP 2030 greenhouse gas target: −82% (2.20 MtCO2eq), in line with the Energy Community target.
  • The NECP update was still being prepared in 2025.

North Macedonia’s electricity has traditionally come from lignite, hydro and imports. In 2025 lignite still provided about a third of net generation, gas a further 18%, and renewables 48%. Solar produced 1,387 GWh in 2025, more than hydro (1,264 GWh), which depends heavily on rainfall. Wind grew to 275 GWh. The Energy Community records 1,663 MW of renewable capacity in 2024, an increase of 351 MW in a year.

Support has moved from feed-in tariffs to auctions for feed-in premiums. Administratively set feed-in tariffs still apply to wind (up to 50 MW) and small hydro (up to 10 MW) within quotas, which the Energy Community considers out of line with EU rules. The June 2026 renewables law replaces them with a two-way contract-for-difference model and allows MEMO to join the Association of Issuing Bodies (AIB) for guarantees of origin.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage was almost absent until 2026, but the legal framework now pushes it strongly. The 2025 Energy Law defines three forms of storage (standalone, integrated in a power plant, and grid component). It requires every new variable renewable plant to add storage equal to 20% of its capacity with at least two hours’ duration. Elektrodistribucija’s grid code was amended in May 2025 with specific provisions for connecting storage.

Home batteries are allowed behind a prosumer meter, and active customers with storage are protected from double charging for stored electricity. However, current prosumer compensation is settled over six-month periods, so a battery adds little value to a household on universal service. Hourly or 15-minute pricing would change that.

Storage projects.

  • Mey Energy, Novaci: 30 MW / 60 MWh battery co-located with a solar park, commissioned in February 2026 by YESS Power and described as the first grid-scale system in the country.
  • EVN Macedonia, Probištip: 10 MW / 20 MWh LFP battery at a 10.9 MW solar park, licensed on 9 April 2026 and in operation from May 2026, with an expansion to 40 MWh under way.
  • Renalfa, Oslomej: 50 MW / 200 MWh co-located battery under construction from May 2026 at a 65.8 MWp solar plant.
  • Ministry construction plan: The annual plan for building energy facilities approved 96 storage facilities (77 integrated with plants, 19 standalone) totalling 2.2 GW / 4.9 GWh.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EVN HomeUniversal supplier for households and small customers; over 800,000 customersUnknownYesNoYes
EVN Macedonia Elektrosnabduvanje (EVN Supply)Largest supplier on the open market (48.2% of open-market consumption, 2023)UnknownUnknownUnknownYes

The household market is effectively one supplier: EVN Home, selected by tender as universal supplier until mid-2029. Besides EVN Home, 21 suppliers were active in 2024, mainly serving businesses, which take most of the roughly 41% of consumption supplied at non-regulated prices. ERC’s Switch.mk compares offers, including dynamic ones. No household market-share data beyond the universal supplier were identified.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy, Mining and Mineral ResourcesGovernmentEnergy policy, renewables rules, construction authorisations, energy-poverty programmesAdopts the Rulebook on Renewable Energy Sources and the annual plan for building energy facilities, and publishes draft laws for consultation.
Energy, Water Services and Municipal Waste Management Services Regulatory Commission (ERC)RegulatorLicensing, tariffs, grid codes, universal-service pricesPublishes tariff decisions, licences, the grid codes and its annual report on the energy sector.
MEPSOTransmissionTransmission system operatorBalancing market, cross-border capacity, transmission grid code and EIC codes.
Elektrodistribucija DOOEL SkopjeDistributionNational distribution system operator and meter ownerConnection applications, prosumer connections, metering points and supplier switching.
MEMO (Market Operator of Electricity)MarketMarket operator, NEMO, guarantees-of-origin registryRuns the day-ahead market whose hourly prices are used in renewable offtake contracts.
Energy Agency of the Republic of North MacedoniaGovernmentTechnical body for energy efficiency and renewablesIssues the decision on a prosumer installation’s electrical compliance within 15 days, part of the prosumer process.
Solar Macedonia (Солар Македонија)SolarSolar industry associationPublishes step-by-step guidance on prosumer procedures and annual market figures.
Switch.mkConsumerERC’s price comparison toolCompares supplier offers, including dynamic-price offers since February 2025.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Distribution connectionNetwork Rules for Distribution of Electricity (Мрежни правила за дистрибуција), updated 2024 and amended May 2025 for storageElektrodistribucija, approved by ERCSets connection points by power (for example, up to 100 kW on a 0.4 kV feeder), voltage quality (±10% at low voltage), and metering requirements. The link is to the 2019 edition.
Grid code requirements for generatorsEU connection network codes (RfG, DCC, HVDC)Energy Community acquis, applied directly under the Energy LawThe previous Energy Law declared the connection codes directly applicable, and the distribution grid code implements them.
MeteringDirect metering with class 2 (MID A) active-energy meters up to 40 kW; class 1 (MID B) with current transformers above 40 kWDistribution grid code (ERC)Meters showing both directions are required where two-way metering is needed. Meter clocks are set to Central European Time.
Prosumer installationRulebook on Renewable Energy Sources (Official Gazette 186/2024)Ministry of Energy, Mining and Mineral ResourcesSets prosumer size limits, technical conditions by reference to the distribution grid code, the surplus valuation formula and the register of renewable plants.
Smart metersEnergy Law 2025, Articles 186–187 (functional requirements)Parliament / ERCDaily access to 15-minute data, standardised interface, cyber-security and data-protection requirements.
Guarantees of originRegulation on guarantees of origin; electronic GO registryGovernment; MEMORegistry operational since April 2025, set up under an Energy Community regional project.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Municipal notification / building documentationYesLocalNotify the municipality before installing, with ID, proof of ownership and a technical project; in blocks of flats, majority owner consent.
DSO connection approvalYesNationalConnection request to Elektrodistribucija (form BSP-1). A prosumer pays administrative fees if within the thresholds; otherwise actual connection costs apply.
Energy Agency electrical complianceYesNationalDecision within 15 days on the basis of the contractor’s notarised statement.
Supplier contract for surplusYesNationalSupply-and-surplus contract to be concluded within 30 days of the prosumer’s request.
Ministry construction authorisationLimitedNationalOnly for generation or storage of 1 MW and above (or on state land, concessions and PPPs). Not needed for household systems.
ERC licenceLimitedNationalNot needed for prosumers; required for grid-connected generation outside the prosumer scheme and for standalone storage.

For a household, the process involves the municipality, the DSO, the Energy Agency and the supplier, but no licence. The amendments to the Law on Energy Efficiency proposed in August 2025 also set legal deadlines: one month to issue permits for rooftop PV up to 100 kW, 15 days for the DSO to propose an alternative connection point, and one month to connect an approved plant.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Prosumer surplus compensation (2024 Rulebook)ActiveNet billingSurplus credited at 90% of the average energy price over six-month settlement periods, scaled down when exports exceed imports. Applies to households up to 6 kW and small businesses up to 40 kW.Since September 2024
Net metering and net billing under the 2026 renewables lawScheduledNet meteringAdopted on 30 June 2026: kWh-based net metering with an annual true-up by 1 April for small systems, and value-based net billing (credit less 5%) for mid-sized systems. Thresholds and implementation depend on the final text and by-laws.From entry into force of the law and by-laws
Feed-in premium auctions and two-way CfDsActiveMarket premium / CfDLarge renewable plants have been supported through auctions for fixed feed-in premiums. The 2026 law introduces two-way contracts for difference allocated by auction.—
Feed-in tariffs for wind and small hydroActiveFeed-in tariffAdministratively set tariffs still apply to wind up to 50 MW and hydro up to 10 MW within quotas (Energy Community, 2025). Preferential producers supplied 254 GWh to EVN Home at 6.09 MKD/kWh in the 2026 calculation.—
Inverter air-conditioner vouchers for vulnerable householdsActiveVoucherVouchers worth up to MKD 28,000 (including VAT) for A+ inverter air conditioners for low-income and pensioner households under the Programme for Protection of Vulnerable Energy Consumers. The 2026 call for participating retailers opened in March 2026.2026
Household subsidy for rooftop PV (Ministry of Economy)ClosedGrantMKD 80,000 per household PV system up to 6 kW installed in 2023, alongside grants for PVC windows and heat pumps (total budget MKD 70 million). No equivalent general household PV grant was identified for 2026.Jan – Oct 2023

Data and connectivity.

Fixed broadband
91.2 % of households with internet access (2025)Source 10
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

More than 90% of households have internet access. The distribution grid code allows remote meter reading over PLC, GSM/GPRS, radio, fibre and leased lines, and requires access to meter data to be protected by pre-assigned rights. The 2025 Energy Law requires smart meters to give 15-minute data through a standardised interface, which is the basis for third-party energy-management and demand-response services.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
7.09 TWh (2025)Source 4Inland demand (7,087 GWh), including distribution losses of 1,000 GWh. Final consumption was 6,087 GWh.
Generation capacity
Not identified from a reliable public source.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The system relies heavily on cross-border trade. Gross flows in each direction are larger than domestic demand, and the country was a net importer of 0.92 TWh in 2025. Distribution losses are high, at about 1 TWh, or 14% of inland demand. The main new constraint is solar connections. The ministry said in 2025 that network capacity was fully used in places, and the Energy Law now caps variable renewables per substation and requires storage alongside new plants.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
New Energy Law (Electricity Integration Package)CurrentAdopted 14 May 2025; Official Gazette 101/2025 (21 May 2025), amended 135/2025Transposes Directive (EU) 2019/944 and related regulations: active customers, aggregators, energy communities, dynamic-price contracts, 48-hour switching, smart-meter rules, 15-minute imbalance settlement, a storage licensing framework and the 20% storage obligation for new variable renewables. Secondary legislation was planned for the first quarter of 2026.
Law on the Use of Energy from Renewable SourcesCurrentAdopted 30 June 2026First standalone renewables law: net metering and net billing for prosumers, energy communities and energy sharing, two-way CfD auctions, guarantees of origin (MEMO to join AIB) and REDII-based targets. Implementation depends on by-laws.
MEMO re-designated as NEMOCurrent5 June 2025Four-year designation by Government decision; preparation for coupling with Greece, Albania and Kosovo under the Italian Borders Working Table.
Cross-border capacity allocation through JAOUpcomingExpected from 2026Yearly, monthly and daily capacities on the Serbian and Bulgarian borders to be allocated via the Joint Allocation Office.
Intraday marketUpcomingPlanned Q2 2026MEMO intraday market planned by the Energy Community timetable.
Smart-meter cost-benefit analysis and roll-out decisionUpcomingUnder the 2025 Energy LawIf ERC’s analysis is positive, the Government decides a ten-year roll-out with 80% coverage within seven years.
Higher prosumer limitsUpcomingProposed 2025–2026The household limit is being raised from 6 kW (10 kW in the energy-efficiency law amendments and the Government’s renewables bill; 16 kW reported for the adopted renewables law). Small-business limits are rising from 40 kW to 50–70 kW.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowEurostat records only 9.2 MW of rooftop PV under 30 kW at the end of 2024, a 6 kW household cap applied until the new rules, and no general household PV grant since 2023. Solar Macedonia reports limited residential expansion in 2025.
Distributed energy marketMediumRapid growth of distribution-connected solar (364 MW in the 30 kW–1 MW band and 496 MW above 1 MW in 2024), licence exemptions for prosumers, and 17 registered aggregators. Interval metering and household market participation remain limited.
Grid flexibility marketLowNational aFRR/mFRR auctions run by MEPSO, a day-ahead market not yet coupled with neighbours, no connection to EU balancing platforms, and an intraday market still being launched.
Energy storage adoptionLowThe first grid-scale batteries (30 MW and 10 MW) entered service in 2026. The pipeline is large (2.2 GW / 4.9 GWh in the ministry’s construction plan) and the 20% storage obligation applies to new solar and wind plants.
Renewable growth environmentHighRenewables rose from 39.4% of generation in 2024 to 48.3% in 2025 (Eurostat). Solar capacity grew from 548 MW (2023) to about 1.2 GW (end 2025), and renewable capacity rose by 351 MW in 2024.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 35 sources
  1. Electricity prices for household consumers, bi-annual data (nrg_pc_204), band DC, North Macedonia. Eurostat, 2026. accessed 1 October 2026.
  2. Complete energy balances (nrg_bal_c): household electricity consumption. Eurostat, 2026. accessed 1 October 2026.
  3. Net electricity generation by type of fuel, monthly data (nrg_cb_pem). Eurostat, 2026. accessed 1 October 2026.
  4. Electricity supply, transformation and consumption, annual data (nrg_cb_e). Eurostat, 2026. accessed 1 October 2026.
  5. Electricity production capacities for renewables and wastes (nrg_inf_epcrw). Eurostat, 2026. accessed 1 October 2026.
  6. Population on 1 January (tps00001). Eurostat, 2026. accessed 1 October 2026.
  7. Distribution of population by tenure status (ilc_lvho02). Eurostat, 2026. accessed 1 October 2026.
  8. Distribution of population by degree of urbanisation, dwelling type and income group (ilc_lvho01). Eurostat, 2026. accessed 1 October 2026.
  9. Passenger cars by type of motor energy (road_eqs_carpda). Eurostat, 2026. accessed 1 October 2026.
  10. Households – level of internet access (isoc_ci_in_h). Eurostat, 2026. accessed 1 October 2026.
  11. Urban population (% of total population) – North Macedonia. World Bank, 2025. accessed 1 October 2026.
  12. Census of Population, Households and Dwellings 2021. State Statistical Office of the Republic of North Macedonia, 2022. accessed 1 October 2026.
  13. Decision of 22 December 2025 on EVN Home’s selling prices for 2026 (universal service). Energy, Water Services and Municipal Waste Management Services Regulatory Commission (ERC), 2025. accessed 1 October 2026.
  14. Annual Implementation Report 2025 – North Macedonia. Energy Community Secretariat, 2025. accessed 1 October 2026.
  15. Energy Law, Official Gazette No. 101 of 21 May 2025. ERC (Official Gazette of the Republic of North Macedonia), 2025. accessed 1 October 2026.
  16. Rulebook on Renewable Energy Sources, Official Gazette No. 186 of 5 September 2024. Ministry of Energy, Mining and Mineral Resources (via Economic Chamber of North Macedonia), 2024. accessed 1 October 2026.
  17. Proposal of the Law on the Use of Energy from Renewable Sources (May 2026). Government of the Republic of North Macedonia (via Economic Chamber of North Macedonia), 2026. accessed 1 October 2026.
  18. New Renewable Energy Law: a reform that changes Macedonia’s energy future. Ministry of Energy, Mining and Mineral Resources, 2026. accessed 1 October 2026.
  19. Net metering: what the new Law on the Use of Energy from Renewable Sources brings. Arno.mk, 2026. accessed 1 October 2026.
  20. Threshold raised: households will be able to install PV up to 10 kW. Nezavisen Vesnik, 2025. accessed 1 October 2026.
  21. Network Rules for Distribution of Electricity (2019). Elektrodistribucija / ERC, 2019. accessed 1 October 2026.
  22. All about invoices. EVN Home, 2026. accessed 1 October 2026.
  23. Registration and deregistration of a metering point. Elektrodistribucija, 2026. accessed 1 October 2026.
  24. Electricity purchase agreement for energy produced from renewable sources (March 2026). EVN Macedonia Elektrosnabduvanje, 2026. accessed 1 October 2026.
  25. Numerous benefits of the new Energy Law; flat-rate bills will become a thing of the past. Ministry of Energy, Mining and Mineral Resources, 2025. accessed 1 October 2026.
  26. North Macedonia to reinstate cheaper afternoon power tariff for households. Balkan Green Energy News, 2023. accessed 1 October 2026.
  27. Cheap daytime tariff also in 2026, from 13:00 to 15:00. Biznis Vesti, 2026. accessed 1 October 2026.
  28. North Macedonia adds 210 MW of solar in 2025. pv magazine, 2026. accessed 1 October 2026.
  29. EVN Macedonia puts BESS of 10 MW into operation at its solar park. Balkan Green Energy News, 2026. accessed 1 October 2026.
  30. Procedure for investing in PV systems up to 40 kW under current regulations. Solar Macedonia, 2024. accessed 1 October 2026.
  31. Vouchers of MKD 28,000 for inverter air conditioners in 2026: MERMS call open for retailers. Zurnal.mk, 2026. accessed 1 October 2026.
  32. New subsidies for households for PVC windows, heat pumps and PV plants. Radio Free Europe (Slobodna Evropa), 2023. accessed 1 October 2026.
  33. EVN Macedonia with steady growth. Club 200, 2026. accessed 1 October 2026.
  34. North Macedonia enacts new Energy Law aimed at facilitating the country’s energy transition and climate goals. Karanovic & Partners, 2025. accessed 1 October 2026.
  35. ERC annual report published: more than half of available capacity is renewable. Makfax, 2025. accessed 1 October 2026.

Questions about energy in North Macedonia.

Talk to us about Olmack in North Macedonia.Tell us about your home, housing portfolio or school estate in North Macedonia. We'll explain what is possible there now.