How electricity works in Bulgaria.
Bulgaria electricity market 2026: KEVR-set household prices, ESO, regional DSOs, metering-point codes, rooftop solar export, licensing, batteries and flexibility.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Bulgaria energy at a glance.
Key figures for households in Bulgaria. Each one links to its source on the full overview below.
Electricity price.
0.136 EUR per kWh for households, including taxes. Figures for 2025-S2.
Household use.
4,504 kWh a year for a typical household. Figures for 2024.
Renewable share.
31.6% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Bulgaria.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Bulgaria below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Bulgaria requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Bulgaria.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Bulgaria, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Bulgaria, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Bulgaria.
The energy market in Bulgaria, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Bulgaria has one of the lowest household electricity prices in the European Union. Households still mostly buy from one of four end suppliers (крайни снабдители) under a universal service. The regulator, the Energy and Water Regulatory Commission (KEVR, also written EWRC), sets a single national energy price for this service each year from 1 July, together with regulated network charges. The Electricity System Security Fund then compensates suppliers for the gap between that price and what they pay on the exchange. Bulgaria adopted the euro on 1 January 2026, so tariffs are now set in euros.
From 1 July 2026 the regulated energy component is 9.297 c€/kWh for day and single-rate use and 4.103 c€/kWh at night, before network charges and 20% VAT. Eurostat puts the average household price at 13.55 c€/kWh including taxes in the second half of 2025, less than half the EU average.
Generation is dominated by nuclear power and lignite-fired plants, but solar is growing fast. Installed solar capacity was 6,104 MW at the end of 2025 and 6,643 MW by mid-May 2026. Battery storage grew from 1,382 MW at the end of 2025 to 3,432 MW by mid-May 2026, much of it funded through the RESTORE grant scheme. Bulgaria was a net exporter of 1.32 TWh in 2025.
Energy snapshot.
Headline figures for electricity in Bulgaria. Each shows its data year and links to its source.
- Population6,423,207 peopleSource 1731 Dec 2025
- Households2,866,657 householdsSource 182021 census
- Average household size2.2 people/householdSource 182021 census
- Electricity use per household4,504 kWh/yrSource 102024
- Household price (EUR)0.136 EUR/kWhSource 92025-S2
- Renewable electricity share31.6%Source 112025
- Solar capacity6.643 GWSource 115 May 2026
- Wind capacity0.715 GWSource 20end 2025
- Energy storage capacity3.432 GWSource 115 May 2026
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy and Water Regulatory Commission (KEVR / EWRC)
- System operator
- Electricity System Operator (ESO EAD)
- Distribution networks
- Three regional DSOs (ERM Zapad in the west, Elektrorazpredelenie Yug in the south, Elektrorazpredelenie Sever in the north-east) plus the small Elektrorazpredelenie Zlatni Pyasatsi
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Bulgaria.
- Household price (EUR)
- 0.136 EUR/kWh (2025-S2)Source 9Eurostat average household price, all taxes included, for consumption of 2,500–4,999 kWh a year. The only tax in Eurostat’s breakdown is 20% VAT (0.1129 EUR/kWh before VAT).
- Typical annual electricity bill
- 610 EUR/yr (2024–2025)Source 9Derived: average household consumption of 4,504 kWh (2024) multiplied by Eurostat’s 2025-S2 average price of 0.1355 EUR/kWh including VAT. It is a rough indication, not an official typical bill.
Household price trend (EUR per kWh).Source 9
| 2019-S1 | 0.0997 EUR/kWh |
|---|---|
| 2019-S2 | 0.0958 EUR/kWh |
| 2020-S1 | 0.0997 EUR/kWh |
| 2020-S2 | 0.0982 EUR/kWh |
| 2021-S1 | 0.1024 EUR/kWh |
| 2021-S2 | 0.1091 EUR/kWh |
| 2022-S1 | 0.1093 EUR/kWh |
| 2022-S2 | 0.1147 EUR/kWh |
| 2023-S1 | 0.1138 EUR/kWh |
| 2023-S2 | 0.1192 EUR/kWh |
| 2024-S1 | 0.1187 EUR/kWh |
| 2024-S2 | 0.1217 EUR/kWh |
| 2025-S1 | 0.13 EUR/kWh |
| 2025-S2 | 0.1355 EUR/kWh |
How the household price is built
A household bill has two parts. The first is the price paid to the end supplier, built on a “base value” of energy (74.54 €/MWh from 1 July 2026) plus a supplier component of 5.18 €/MWh. KEVR spreads this across the day and night rates. The second part is network charges: transmission (0.801 c€/kWh), access to the transmission grid (0.018 c€/kWh), and the DSO’s own access and distribution charges. With ERM Zapad these add up to 3.557 c€/kWh, so the day rate there comes to 12.854 c€/kWh before VAT, or about 15.4 c€/kWh with 20% VAT. In the Elektrorazpredelenie Sever area, ENERGO-PRO Sales quotes 12.927 c€/kWh (day) and 7.733 c€/kWh (night) before VAT.
Who pays the difference
The base value is set below the market cost of electricity. For July 2026 to June 2027, KEVR forecast a baseload price of 114.11 €/MWh. Each month the Electricity System Security Fund (FSES) compensates each end supplier for the gap between its average purchase price on the exchange and the base value. KEVR set aside €340.5 million for this in 2026–27, about 24.56 €/MWh across 13.86 TWh of household consumption. The levy for obligations to society (the “price for obligations to society”), which funds renewable and cogeneration premiums, is set at zero for July 2026 to June 2027.
Regional differences and trend
The energy part of the price is the same everywhere. Only the DSO charges differ, by a few tenths of a cent per kWh between the four distribution areas. Eurostat data show the average household price rising from about 10 c€/kWh in 2019–2021 to 13.55 c€/kWh in the second half of 2025. The rise during 2022 was modest compared with most EU countries. In June 2026 the national ombudsman objected to the proposed rise from 1 July as insufficiently justified. ENERGO-PRO Sales reported an average increase of 2.53% for its customers.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Universal service from the end supplier for the area. Since 1 July 2026 KEVR has set a single national energy component of 0.09297 EUR/kWh (day and single-rate) and 0.04103 EUR/kWh (night), before VAT, plus regulated transmission and distribution charges that differ slightly by DSO. |
| Time-of-use | Yes | Two-rate (day/night) metering is standard for households. The night zone runs from 22:00 to 06:00 between 1 November and 31 March, and from 23:00 to 07:00 between 1 April and 31 October. Night energy costs less than half the day rate. |
| Variable | Limited | Households may leave universal service and sign a freely negotiated contract with a licensed trader. They then need an access and transmission contract with their DSO and are settled on a standardised load profile. |
| Dynamic | No | No household tariff that follows day-ahead prices was identified. DSOs are not obliged to fit hourly metering for households, which limits dynamic pricing. |
| Other | Yes | Households with renewable installations up to 30 kW can sell surplus electricity to their end supplier under a purchase contract, at freely negotiated prices, or at preferential prices where the installation is legally eligible for them. |
Household prices compared with neighbouring countries (EUR per kWh).
- Romania€0.291
- Greece€0.238
- Bulgaria€0.136
- Serbia€0.119
- North Macedonia€0.116
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,504 kWh/yr (2024)Source 10Derived: Eurostat household final electricity consumption of 12,908 GWh in 2024 divided by the 2,865,708 private households counted at the 2021 census. It is a national average, not a metered median.
- Average daily use per household
- 12.3 kWh/day (2024)Source 10Derived: 4,504 kWh a year divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,005 kWh/person/yr (residential) (2024)Source 10Derived: 12,908 GWh of household consumption divided by a population of 6,437,360 at the end of 2024 (NSI).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 6 % of new car sales (plug-in) (2025)Source 38Derived: 2,420 battery-electric and 566 plug-in hybrid cars out of 49,419 new passenger car registrations (ACEA). Battery-electric alone was 4.9%.
- Electric cooking
- Not identified from a reliable public source.
Bulgarian households use a lot of electricity for a country with low incomes. Household consumption rose from 10.8 TWh in 2019 to 12.9 TWh in 2024. Low regulated prices and a cheap night rate favour electric water and space heating. Many homes still heat with solid fuels, which is why the 2023 household solar scheme was limited to permanent homes using inefficient wood or coal heating. District heating companies operate in several cities under KEVR-regulated prices.
Demand peaks in winter. The national record for 2025 was 7,332 MW on 20 February 2025. The two-rate tariff encourages households to run water heaters and storage heating at night. No official statistics were identified for heat-pump numbers, air-conditioning ownership or electric cooking.
Housing and households.
- Dwellings
- 4,360,805 dwellings (31 Dec 2025)Source 19Many more dwellings than households: a large share are vacant or second homes, especially in villages.
- Owner-occupied
- 86.1 % of population (2025)Source 14Only 1.7% are owners with a mortgage or loan.
- Private rented
- 2.2 % of population (2025)Source 14Tenants paying market rent.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 53.5 % of population (2025)Source 1544.4% detached, 9.1% semi-detached.
- Apartments and flats
- 46.2 % of population (2025)Source 1540.0% live in blocks with ten or more dwellings.
- Urban population
- 73.9 % of population (31 Dec 2025)Source 17
Bulgaria has one of the highest home-ownership rates in Europe, and very few homes are mortgaged. About half the population lives in houses and half in flats (40% of the population lives in blocks with ten or more dwellings). For rooftop solar this creates two very different cases. Detached houses in towns and villages can use the simplified self-consumption route on their own roof. Flats in multi-owner blocks typically need the co-owners to agree, and rules for sharing energy within buildings are still developing.
How the grid works in Bulgaria.
- TransmissionElectricity System Operator (ESO EAD)
- DistributionThree regional DSOs (ERM Zapad in the west, Elektrorazpredelenie Yug in the south, Elektrorazpredelenie Sever in the north-east) plus the small Elektrorazpredelenie Zlatni Pyasatsi
- MeteringDSOs (metering is a network activity)
- Supply4 or more retail suppliers
Physically, power from the nuclear plant, lignite plants, hydro and a growing fleet of solar parks travels over ESO’s high-voltage transmission network to substations. There the regional DSO takes over at medium and low voltage. Bulgaria is interconnected with Romania, Serbia, North Macedonia, Greece and Turkey, and was a net exporter of 1.32 TWh in 2025. On sunny spring days solar can push daytime demand on the transmission system very low: the 2025 minimum was 2,515 MW on 7 May.
Commercially, a household on universal service has a contract with its end supplier. The supplier buys power on IBEX and through end-supplier auctions, and pays the network charges on the customer’s behalf. ESO’s market-administration system settles balance-responsible parties. Households are allocated consumption on standardised load profiles from their monthly meter reading. From 1 July 2025 the National Electricity Company (NEK) stopped acting as public supplier, and end suppliers buy their household volumes on the market.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy and the National Energy and Climate Plan, and manages Recovery Plan energy schemes such as RESTORE and the household solar programme. |
| Regulator | Energy and Water Regulatory Commission (KEVR / EWRC) | Issues licences, approves network charges and the household base value and supplier component each 1 July, sets monthly household compensations, and adopts connection, metering and trading rules. |
| TSO | Electricity System Operator (ESO EAD) | Owns and operates the transmission network, dispatches the system, runs the balancing market and the market-administration system, and acts as the Bulgarian EIC issuing office. Connected to the EU PICASSO (aFRR) platform since 10 February 2025 and MARI (mFRR) since 18 February 2026. |
| DSO | Elektrorazpredelitelni Mrezhi Zapad (ERM Zapad) | Western Bulgaria; part of the Electrohold group (formerly CEZ). Transported 10.43 TWh in KEVR’s 2026–27 forecast, the largest DSO. |
| DSO | Elektrorazpredelenie Yug (ER Yug) | Southern Bulgaria, headquartered in Plovdiv; part of EVN Bulgaria. More than 1.8 million connected customers in nine districts; 8.61 TWh forecast. |
| DSO | Elektrorazpredelenie Sever (ER Sever) | North-east Bulgaria, part of ENERGO-PRO; 5.45 TWh forecast. |
| DSO | Elektrorazpredelenie Zlatni Pyasatsi | Very small DSO for the Golden Sands resort area near Varna (62 GWh forecast). |
| Supplier | End suppliers (Electrohold Sales, EVN Bulgaria Elektrosnabdyavane, ENERGO-PRO Sales, ESP Zlatni Pyasatsi) | Licensed to provide universal service to households at the KEVR-determined price. Since 1 July 2025 they may offer universal service outside their traditional territory. |
| Exchange | Independent Bulgarian Energy Exchange (IBEX) | Day-ahead (15-minute products since 1 October 2025), intraday and bilateral contract markets, coupled with the EU single day-ahead market. End suppliers buy household volumes here. |
| Settlement | Electricity System Security Fund (FSES) | Pays monthly compensation to end suppliers for household supply, premiums to renewable and cogeneration producers, and costs of legacy long-term contracts. |
| Metering | DSOs (metering is a network activity) | Each DSO owns, installs and reads the meters in its area and gives the data to suppliers, ESO and the customer. |
Compared with the UK system.
| UK concept | Bulgaria equivalent | How it works |
|---|---|---|
| DNO | Оператор на електроразпределителна мрежа (DSO) | Three regional DSOs cover almost the whole country, each owned by a private group (Electrohold, EVN, ENERGO-PRO) and regulated by KEVR under a revenue-cap method. Unlike GB, there are no independent network operators building alongside them, apart from a tiny resort network at Golden Sands. |
| National Grid / NESO | ESO EAD (Електроенергиен системен оператор) | ESO is both transmission owner and system operator, organised as an independent transmission operator. It also runs the market-administration system used for settlement and the balancing market. |
| MPAN | Metering-point identification code (often shown as ИТН or “точка на доставка”) | Every metering point must have a permanent alphanumeric code, but the structure is set by each network operator. There is no single national format like the 13-digit MPAN core. Households mostly deal with a supplier client number (12 digits at Electrohold) and the DSO’s metering-point code. |
| MPRN | Gas metering point at the gas distribution company | Gas delivery points are identified separately by the local gas distribution company. They have no link to the electricity metering-point code. |
| Meter operator | DSO (no competitive metering) | Meters are owned and read by the DSO and checked under KEVR’s metering rules. Households cannot choose a meter operator. A bidirectional meter is fitted by the DSO when a home starts exporting. |
| Supplier | Краен снабдител (end supplier) or licensed trader | Most homes are on universal service from an end supplier at the KEVR-determined price. Households can switch to a licensed trader on the free market, but this requires an access and transmission contract with the DSO and is still uncommon. |
| Smart-meter infrastructure (DCC / SMETS2) | DSO remote-reading systems | No national smart-meter programme or central data company exists. Each DSO runs its own remote-reading system (EVN’s, for example, uses PLC communication), and households are settled on standardised load profiles rather than measured interval data. |
How a supply point is identified.
Client number 310045678912; subscriber number 4501237788 (fictional, Electrohold/ERM Zapad style)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Идентификационен код на мястото на измерване (metering-point identification code) (Shown as ИТН (identification point number), “Точка на доставка (PoD)” or УИН depending on the DSO) |
| Who issues it? | The distribution network operator the home is connected to (ERM Zapad, Elektrorazpredelenie Yug, Elektrorazpredelenie Sever or Elektrorazpredelenie Zlatni Pyasatsi) |
| Format | A permanent alphanumeric code for the metering point. KEVR’s metering rules require one for every metering point but leave its structure to each network operator, so there is no national format. Households also have a supplier client number (12 digits at Electrohold Sales and ERM Zapad) and, in the ERM Zapad area, an 8–10-digit subscriber number (абонатен номер), both linked to the metering point in the DSO’s database. |
| Length | Not standardised nationally; set by each DSO. Client number 12 digits in the Electrohold/ERM Zapad area. |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On the electricity invoice, in the block with the property (обект) details: object number, object address and the metering-point identifier. Electrohold prints the 12-digit client number at the top of the bill. The meter’s own serial number is separate. |
| Electronic access | DSOs run online portals for e-invoices, self-reading, service requests and meter data. ERM Zapad, for example, has a portal for data access under Article 120(9) of the Energy Act. Registration usually needs the client number and part of the holder’s personal or company ID. |
| Third-party access | A new supplier or trader can act for the customer in the switching procedure, which identifies each site by the metering-point identifier used by the DSO. After switching, the DSO gives the customer and its sites an identification code in its database for the free market. Data is shared with suppliers, ESO and the market-administration system for settlement. Other parties need the customer’s authorisation. |
| Who keeps the register | Each DSO keeps its own register of metering points and meter data under KEVR’s Rules for Measuring the Quantity of Electricity (2019). ESO holds the market-administration data used for settlement and issues EIC codes to market participants, not to individual homes. |
| Register scope | Per DSO |
Bulgaria identifies a home’s connection through the DSO rather than a national registry. KEVR’s 2019 metering rules say every metering point must have a permanent alphanumeric code, and that each network operator decides its structure. Each DSO therefore uses its own identifiers. Older 2004 rules had proposed a 16-character national structure (country code, DSO, area and serial number), but the current rules dropped that requirement.
How it is used
For most households the number they actually use is the supplier client number printed on the bill. Behind it sits the DSO’s metering-point identifier, which stays with the property when the occupant or supplier changes. To move to a free-market trader, the customer (or the trader for them) applies to the DSO with the site’s address and its metering-point identifier. Under ESO’s instruction the DSO checks the application within 10 working days, then offers an access and transmission contract, which must be signed within 30 days. A rooftop solar notification, a request for a two-way meter and a contract to sell surplus all refer to the same site and its identifiers.
Metering and data
Meters must be read at least once a month (no more than 31 days apart), and the customer may self-read with the DSO’s agreement. DSOs are not obliged to install hourly metering for households or for low-voltage sites up to 100 kW, so most homes are settled on standardised load profiles. Static meters must be able to store 15-minute values for 62 days where the DSO requires it.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Surplus from household installations up to 30 kW is bought by the end supplier under a purchase contract: freely negotiated prices, with preferential (feed-in) prices only where a producer is legally eligible. No licence or trader registration is needed. |
| Is there net metering? | No. Self-consumed electricity reduces what the household buys, and exported surplus is sold separately under a purchase contract. Imports and exports are not netted on the bill. |
| Who buys surplus from a home system? | The end supplier for the area, such as ENERGO-PRO Sales in the north-east, which buys from household installations up to 30 kW that are legally connected to the network. It needs the connection documents, a notarised declaration on any public funding received and a two-way meter. |
| What if the system is larger than 30 kW? | It must follow the full connection procedure under Ordinance No. 6: a grid study, connection conditions, a preliminary and then a final connection contract, and acceptance. ERM Zapad requires a guarantee of €25,564.59 per MW of increased connected capacity. |
| Is a building permit needed? | Not for single-family residential or holiday buildings with up to 20 kW. For other cases the DSO’s additional agreement is a condition for the municipal building permit. |
| Do producers pay network charges? | From 1 July 2026 solar and wind producers pay ESO a transmission access charge of 2.72 €/MWh on all electricity produced, collected through the DSO for distribution-connected plants. |
Connecting a home system.
- Check that the site is a connected property in an urban area with no existing self-consumption RES, and size the system. The simplified Article 25a route allows up to twice the property’s contracted power (a 6 kW connection allows 12 kW) and no more than 5 MW.
- Submit a notification under Article 25a(1) of the Energy from Renewable Sources Act to the DSO, usually through its online portal.
- Receive and sign the DSO’s additional agreement to the access and transmission contract (within 14 days at Elektrorazpredelenie Yug), which sets the technical connection requirements.
- Apply to the municipality for any permit needed. Single-family houses and holiday homes with up to 20 kW need no building permit (Article 151(10) of the Spatial Development Act).
- Install the system, then notify the DSO that it has been built and connected.
- To sell surplus: sign a purchase contract with the end supplier (for installations up to 30 kW) and have the DSO fit a bidirectional meter. Larger exporting plants go through the full producer connection procedure under KEVR Ordinance No. 6 of 28 March 2024.
Preferential feed-in prices still apply to eligible older contracts, and FSES compensates end suppliers for buying from renewable producers under 500 kW (about €24.4 million in 2026–27). New household systems are treated mainly as self-consumption. The 2022 Article 25a regime made building easier by replacing a full producer connection with a notification and an additional agreement to the existing grid contract.
Selling surplus is possible but secondary. With a regulated day price of about 15 c€/kWh including VAT, the main value of a home system lies in the electricity it avoids buying. The rapid growth of utility-scale solar has also pushed midday wholesale prices down. That is one reason for the move towards co-located batteries, and for KEVR’s 2026 proposals on adding storage to existing connections.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Licence from KEVR only for power plants above 20 MW of total installed capacity (threshold raised from 5 MW by Energy Act amendments in January 2023). Plants of 20 MW or less need no generation licence. | KEVR | Grid connection under Ordinance No. 6, plus spatial-planning and environmental permits, still apply at every size. |
| Store electricity | No licence. Since January 2023 the Energy Act has stated that storage facilities of any size are not subject to licensing. | KEVR (connection and tariff rules); DSO or ESO (connection) | Adding storage at an existing site without increasing connected capacity uses a notification and technical agreement. A March 2026 KEVR draft would tighten rules where co-located storage charges from the grid. |
| Self-consume on site (rooftop or façade RES) | No licence. Notification to the DSO under Article 25a of the Energy from Renewable Sources Act, up to twice the contracted power and 5 MW. | DSO | No building permit for houses up to 20 kW. |
| Export and sell surplus (household) | No licence or trader registration for households with installations up to 30 kW selling surplus to their end supplier. | End supplier; DSO (metering) | A bidirectional meter and purchase contract are required. |
| Supply final customers | Licence from KEVR for trading in electricity. Universal service to households needs a separate “end supplier” licence; KEVR’s 2026 decision covers licences issued between 1 July 2025 and 30 June 2027. | KEVR | Traders must also join or form a balancing group with ESO. |
| Wholesale trading | KEVR trading licence, registration with ESO as a market participant (with an EIC code) and IBEX membership for exchange trading. | KEVR; ESO; IBEX | REMIT surveillance applies. |
| Balancing and ancillary services | Pre-qualification and contracts with ESO as a balancing service provider. No KEVR licence specific to balancing was identified. | ESO | ESO trades aFRR energy through PICASSO and is technically ready on MARI for mFRR. |
| Aggregate / VPP / remote control of home assets | No aggregator-specific licence was identified. Aggregated portfolios take part through a licensed trader or balancing group coordinator registered with ESO. | KEVR (trading licence); ESO (registration) | Rules for independent aggregators, active customers and energy communities have been transposed from EU law in stages. Detailed demand-response rules are still developing. |
| Distribution in a closed or integrated network | Distribution licence from KEVR. Amendments approved by Parliament’s energy committee in July 2026 simplify licensing for networks serving integrated facilities not separately connected to the grid. | KEVR | Relevant to industrial parks and hybrid generation sites. |
Bulgaria has removed licensing from most small and medium generation and from storage altogether, so small projects mainly deal with the DSO, the municipality and, if they sell, their buyer. The licensed activities are supply and trading (KEVR licences), network operation, and generation above 20 MW. Market roles such as balancing services are handled through registration and contracts with ESO.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Automatic Frequency Restoration Reserve (aFRR) | Yes | — | Limited | ESO. ESO procures aFRR capacity and, since 10 February 2025, exchanges aFRR balancing energy through the European PICASSO platform. It was the first South-East European TSO to join, and Greece’s IPTO later joined as well, allowing exchange between the two. |
| Manual Frequency Restoration Reserve (mFRR) | Yes | — | Limited | ESO. ESO went live on the MARI platform on 18 February 2026 but works in island mode, with no bids or demands submitted, until a neighbouring TSO joins. |
| Balancing groups / imbalance settlement | Yes | — | Yes | ESO. Producers and consumers are grouped under balancing group coordinators. The 2025 trading-rule changes let former feed-in renewable producers join standard or special balancing groups, which creates portfolios that can be optimised with storage. |
| Day-ahead and intraday markets | Yes | — | Yes | IBEX. Coupled with the EU single day-ahead and intraday markets. 15-minute day-ahead products have run since 1 October 2025, which suits batteries. |
Flexibility in Bulgaria currently means mainly large batteries and conventional plant providing balancing services and trading on IBEX. Battery capacity rose from 1,382 MW at the end of 2025 to 3,432 MW by mid-May 2026. ESO recorded battery charging of 452 GWh and discharge of 407 GWh in 2025, and a record discharge of 942 MW on 31 December 2025. KEVR noted in July 2026 that the spread of batteries had reduced the role of gas plants in setting peak prices in the region.
Household flexibility is at an early stage. Homes are settled on standardised load profiles from monthly readings, there are no dynamic retail tariffs, and the night rate is the main price signal. Aggregating home batteries or EV chargers would require interval metering and a trader or balancing group willing to pool them.
Flexibility and aggregation platforms.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national programme; DSOs deploy remote-reading meters at their own pace. No official national penetration figure is published |
| Reading interval | Monthly reading for households (settled on standardised load profiles); 15-minute storage capability where the DSO requires it |
| Owner / operator | Regional DSO; no competitive metering |
| Reading frequency | At least monthly, at most 31 days apart (KEVR metering rules) |
| Hourly metering obligation | Not required for households or low-voltage sites up to 100 kW |
| EVN area | Over 1.2 million smart meters deployed, according to supplier ADD Grup (PLC communication) |
| Funding | No national roll-out plan or target date identified |
Bulgaria never adopted a national smart-meter roll-out plan with a target date, unlike most EU states. Meters remain a regulated DSO asset paid for through network charges, and each DSO decides what technology to install. The EVN group says its meter supplier has fitted more than 1.2 million smart meters in its southern network, which has about 1.8 million customers. Other DSOs are also installing remote-reading systems with two-way communication.
Even where a smart meter is fitted, households are still billed monthly on day/night registers and settled on load profiles. In its 2026 tariff application ERM Zapad argued for power-based (kW) household access charges, citing the growth of self-consumption, storage and energy communities. KEVR kept the energy-based charge for 2026–27.
Renewable electricity.
Electricity generation mix (2025).
- Nuclear: 39.6%
- Coal (mainly lignite): 22%
- Solar: 17.4%
- Hydro (incl. pumped storage): 7.9%
- Natural gas: 5.1%
- Bioenergy: 4%
- Wind: 3.5%
- Oil and other: 0.5%
- Renewable electricity share
- 31.6% (2025)Source 11Derived from Eurostat monthly electricity data: 11,600 GWh from renewables (excluding pumped-storage hydro) out of 36,700 GWh total net generation. The ESO statistical book gives 2025 gross generation of 40,198 GWh including battery discharge.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 1.535 GW (2025)Source 20Derived from ESO: 6,104 MW at the end of 2025, a 33.6% increase on the previous year.
- Solar PV
- 6.643 GW (15 May 2026)Source 16,104 MW at the end of 2025 (ESO).
- Hydro
- 3.218 GW (end 2025)Source 20ESO hydro category. Eurostat’s 2024 data show 864 MW of pumped-storage hydro.
- Nuclear
- 2 GW (end 2025)Source 20
- Lignite
- 4.119 GW (end 2025)Source 20
- Onshore wind
- 0.715 GW (end 2025)Source 20
- Biomass
- 0.06 GW (end 2025)Source 20
- Battery storage
- 3.432 GW (15 May 2026)Source 1
Targets.
- Updated NECP: at least 34.96% renewables in gross final energy consumption by 2030.
- Recovery Plan (RESTORE): at least 3 GWh of standalone battery storage, exceeded with 9.71 GWh of projects awarded grants.
Nuclear power provides about 40% of generation and coal (mainly lignite) about 22%, so Bulgaria’s low-carbon share is well above its renewable share. Solar is the main area of growth. It produced 6.4 TWh in 2025, up 22.8%, and on 27 July 2025 renewables reached a record 41% of daily generation. Wind capacity has barely changed, at around 0.7 GW. Hydro output depends heavily on rainfall.
Eurostat’s normative measure of renewables in gross electricity consumption, which adjusts for weather, rose from 20.4% in 2022 to 34.4% in 2025.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 3.432 GW (15 May 2026)Source 1Expected by KEVR to exceed 5 GW by the end of 2026. ESO: 1,382 MW at the end of 2025, a 1,514.7% increase on the previous year.
Bulgaria has become one of Europe’s fastest-growing battery markets. Grants under RESTORE, low midday prices and evening price peaks attracted standalone and co-located projects. Most are large transmission- or distribution-connected systems. Home batteries were eligible under the 2023 household solar scheme, but no national statistics on them exist.
Storage needs no licence, but the surge in co-located batteries charging from the grid prompted KEVR in March 2026 to propose amending Ordinance No. 6. Under the draft, adding storage to existing sites would be explicitly regulated, guarantees for storage connections would be adjusted, and grid capacity could be shared among several users.
Storage projects.
- RESTORE grant scheme: Recovery Plan scheme that awarded €587 million to 82 standalone battery projects totalling 9.71 GWh, an average of about €60,000 per MWh. Projects had to be commissioned by March 2026.
- BESS Burgas: Largest RESTORE project: 125 MW / 500 MWh, with about €90 million of investment.
- Pumped-storage hydro: Bulgaria had 864 MW of pumped-storage hydro capacity in 2024 (Eurostat), which absorbed 443 GWh of pumping in 2025 (ESO).
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electrohold Sales | End supplier for the ERM Zapad area (western Bulgaria) | Unknown | Yes | No | Yes |
| EVN Bulgaria Elektrosnabdyavane | End supplier for the Elektrorazpredelenie Yug area | Unknown | Yes | No | Yes |
| ENERGO-PRO Sales | End supplier for the Elektrorazpredelenie Sever area | Unknown | Yes | No | Yes |
| ESP Zlatni Pyasatsi | End supplier for the Golden Sands resort network | Unknown | Yes | No | Unknown |
The household market is still organised around the four end suppliers that belong to the same groups as the DSOs. They all charge the same KEVR-determined energy price, and differ only by the network charges of their area. Since 1 July 2025 they may offer universal service outside their home territory. Business customers buy from licensed traders on the free market. No market-share data for households were identified.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy | Government | Energy policy, NECP and Recovery Plan energy schemes | Runs grant schemes such as RESTORE and the household solar programme and drafts energy legislation. |
| Energy and Water Regulatory Commission (KEVR / EWRC) | Regulator | Licensing, tariffs, connection and metering rules | Publishes the annual price decisions, monthly household compensations and Ordinance No. 6 on connection. |
| Electricity System Operator (ESO EAD) | Transmission | Transmission owner and system operator | Balancing market, market data, annual statistical book and EIC issuing office. |
| ERM Zapad | Distribution | DSO for western Bulgaria | Connections, capacity checks for RES producers and meter data in western Bulgaria. |
| Elektrorazpredelenie Yug | Distribution | DSO for southern Bulgaria (EVN group) | Online Article 25a notification service for self-consumption installations. |
| Elektrorazpredelenie Sever | Distribution | DSO for north-east Bulgaria (ENERGO-PRO group) | Connection and producer services in the Varna and Ruse regions. |
| Independent Bulgarian Energy Exchange (IBEX) | Market | Power exchange | Reference wholesale prices and the market where end suppliers buy household volumes. |
| Electricity System Security Fund (FSES) | Market | Fund paying household compensations and renewable premiums | Finances the gap between the household base value and market cost. |
| Bulgarian Photovoltaic Association (BPVA) | Solar | Solar industry association | Industry voice on solar regulation, the NECP and grid access. |
| Association for Production, Storage and Trading of Electricity (APSTE) | Storage | Industry association for renewables, storage and trading | Represents developers of solar, wind and battery projects. |
| Ombudsman of the Republic of Bulgaria | Consumer | Public defender, takes part in price consultations | Formally challenges household price proposals in KEVR consultations. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (generators) | Regulation (EU) 2016/631 (Requirements for Generators, RfG) | European Commission; applied by ESO and DSOs | Directly applicable EU network code defining technical requirements by generator type. |
| Connection procedure | Ordinance No. 6 of 28 March 2024 on connecting sites to electricity networks | KEVR | Covers studies, connection conditions, contracts, guarantees and timeframes. Amended in 2024; further amendments proposed in March 2026. |
| Inverters (low voltage) | EN 50549-1 | CENELEC (published nationally as BDS EN) | European standard for generating plant connected in parallel with LV distribution networks. The specific certificates each DSO accepts were not verified. |
| Metering | Rules for Measuring the Quantity of Electricity (2019) | KEVR | Metering-point codes, reading frequency, accuracy and data storage requirements; set the time zones for night tariffs. |
| Self-consumption RES | Energy from Renewable Sources Act, Article 25a | National Assembly | Simplified notification regime for rooftop, façade and adjacent-yard installations for own use. |
| Building permission | Spatial Development Act, Article 151(10) | National Assembly | No building permit for RES installations up to 20 kW on single-family residential and holiday buildings. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO notification (self-consumption) | Yes | Regional | Article 25a notification to the DSO, followed by an additional agreement to the access and transmission contract, issued within 14 days at Elektrorazpredelenie Yug. |
| Full producer connection | Limited | Regional | Needed if the system will sell surplus beyond the household route or exceeds the Article 25a limits. Follows Ordinance No. 6, with a guarantee per MW. |
| Building permit | Limited | Local | Not needed for houses and holiday homes up to 20 kW. Otherwise the municipality issues it, with the DSO agreement as a precondition. |
| Generation licence | No | National | Only plants above 20 MW need a KEVR licence. |
| Bidirectional meter | Limited | Regional | Fitted by the DSO when the household will export and sell surplus. |
For a typical house the process is a notification to the DSO, an additional agreement and, if the system is small, no building permit. A fuller procedure applies to blocks of flats (owner consent), to larger systems and to anyone who wants to sell surplus, which needs a purchase contract and metering changes.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Household compensation via end suppliers | Active | Retail price support | Households pay a KEVR-determined base value (74.54 €/MWh before VAT from 1 July 2026). FSES compensates end suppliers monthly for the difference from their market purchase cost; €340.5 million was budgeted for 2026–27. | Jul 2026 – Jun 2027 (set annually) |
| Household RES scheme (Recovery Plan) | Closed | Grant | Up to 70% of the cost of PV systems up to 10 kWp (maximum BGN 15,000), with or without batteries, and 100% of solar water heaters (maximum BGN 1,961), for permanent homes heated by solid fuel. The first call closed on 10 November 2023, and a second call did not go ahead. | May – Nov 2023 |
| RESTORE battery storage grants (Recovery Plan) | Closed | Grant | €587 million awarded to 82 standalone battery projects (9.71 GWh), with commissioning required by March 2026. | 2024 – Mar 2026 |
| Legacy feed-in tariffs for small RES | Closed | Feed-in tariff | Preferential prices continue only for existing contracts. End suppliers are compensated by FSES for purchases from producers under 500 kW. New household systems sell at negotiated prices. | — |
Data and connectivity.
- Fixed broadband
- 96.6 % of households covered (>30 Mbps) (2025)Source 16Gigabit (>1 Gbps) coverage 93.5%.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- 94.8 % of households (basic 5G coverage) (2025)Source 37EU average 96.8%.
Fixed connectivity is a relative strength. Fibre-to-the-premises coverage reached 93.5% of households in 2025, above the EU average, although take-up of gigabit services lags behind coverage. 5G coverage rose sharply to 94.8%. For meters, DSOs mainly use power-line communication (PLC; EVN’s system uses PRIME or hybrid PLC), so in-home energy devices usually rely on the household’s own Wi-Fi or mobile connection rather than the meter.
Grid conditions.
- National peak demand
- 7.332 GW (2025)Source 20Gross peak on 20 February 2025.
- Annual electricity demand
- 38.9 TWh (2025)Source 20Gross consumption, up 4.4%. It includes 33.58 TWh of final consumption, power-plant own use, losses, pumping and battery charging.
- Generation capacity
- 18.7 GW (end 2025)Source 20Includes 1,382 MW of batteries.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The system has plenty of capacity in winter but is increasingly stretched by midday solar in spring and summer. Minimum load fell to 2,515 MW in May 2025, while installed solar exceeded 6 GW. Batteries, exports and pumped storage absorb the surplus. Network access in solar-rich regions is the main constraint for new projects, which is why KEVR and Parliament are working on grid capacity sharing and longer validity periods for connection terms.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Euro adoption | Current | 1 January 2026 | Bulgaria joined the euro area at BGN 1.95583 per euro. Energy prices and network charges are now set in euros. |
| End of NEK as public supplier; universal service without territorial limits | Current | 1 July 2025 | Amended trading rules ended NEK’s role as public supplier. End suppliers now buy household volumes on the market, may serve households outside their historic areas, and are compensated by FSES against a KEVR base value. |
| 15-minute day-ahead market | Current | 1 October 2025 | IBEX moved to 15-minute market time units with the rest of the EU single day-ahead coupling. |
| MARI (mFRR) platform | Current | 18 February 2026 | ESO is technically live on MARI but operating in island mode until a neighbouring TSO joins. |
| Amendments to Ordinance No. 6 on grid connection | Upcoming | Draft published March 2026 | Proposals for grid capacity sharing between users (a Recovery Plan milestone), explicit rules for adding storage at existing sites, simpler connection of EV chargers, adjusted guarantees for storage and rules for closed distribution networks. |
| RES Act and Energy Act amendments | Upcoming | Approved by the energy committee at second reading, 28 July 2026 | Extends the validity period for wind producers’ connection terms from three to nine months and simplifies licensing for distribution within integrated sites. Awaiting final adoption at the time of writing. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official count of household systems. The 2023 household grant scheme ran only one call, and low regulated retail prices (about 15 c€/kWh with VAT) weaken the case for self-consumption. Solar growth is dominated by utility-scale and commercial plants. |
| Distributed energy market | Medium | Simplified Article 25a self-consumption regime, no generation licence up to 20 MW, and rapid growth of distribution-connected solar and co-located storage. Retail market and interval metering remain limited. |
| Grid flexibility market | Medium | ESO trades aFRR through PICASSO since 2025 and joined MARI in 2026; IBEX runs 15-minute day-ahead products; battery fleet above 3 GW. Household demand response and independent aggregation are still undeveloped. |
| Energy storage adoption | High | Battery capacity rose from 1,382 MW at the end of 2025 to 3,432 MW by mid-May 2026 (KEVR), with RESTORE grants for 9.71 GWh. |
| Renewable growth environment | High | Solar capacity grew 33.6% in 2025 to 6,104 MW and reached 6,643 MW by May 2026; solar output rose 22.8% in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 40 sources
- Decision No. Ts-13 of 01.07.2026 (prices, base value and end-supplier component from 1 July 2026). Energy and Water Regulatory Commission (KEVR), 2026. accessed 1 October 2026.
- Decision No. KBK-13 of 26.08.2026 (household compensation for July 2026). Energy and Water Regulatory Commission (KEVR), 2026. accessed 1 October 2026.
- Report on draft amendments to Ordinance No. 6 of 28.03.2024 on connecting sites to electricity networks. Energy and Water Regulatory Commission (KEVR), 2026. accessed 1 October 2026.
- Rules for Measuring the Quantity of Electricity (2019 draft as published for consultation). Energy and Water Regulatory Commission (KEVR), 2019. accessed 1 October 2026.
- Rules for Measuring the Quantity of Electricity (2004, superseded). State Energy Regulatory Commission, 2004. accessed 1 October 2026.
- KEVR approved new electricity prices from 1 July 2026. ENERGO-PRO Bulgaria, 2026. accessed 1 October 2026.
- Purchase of electricity from household producers. ENERGO-PRO Sales, 2026. accessed 1 October 2026.
- Ombudsman: the new household electricity prices are unjustifiably high. BTA, 2026. accessed 1 October 2026.
- Electricity prices for household consumers, bi-annual data (nrg_pc_204), band DC. Eurostat, 2026. accessed 1 October 2026.
- Complete energy balances (nrg_bal_c): household electricity. Eurostat, 2026. accessed 1 October 2026.
- Net electricity generation by type of fuel, monthly data (nrg_cb_pem). Eurostat, 2026. accessed 1 October 2026.
- Electricity production capacities (nrg_inf_epc). Eurostat, 2026. accessed 1 October 2026.
- Share of renewable energy, electricity (nrg_ind_ren). Eurostat, 2026. accessed 1 October 2026.
- Distribution of population by tenure status (ilc_lvho02). Eurostat, 2026. accessed 1 October 2026.
- Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2026. accessed 1 October 2026.
- Broadband internet coverage by speed (isoc_cbs). Eurostat, 2026. accessed 1 October 2026.
- Population and demographic processes in 2025. National Statistical Institute, 2026. accessed 1 October 2026.
- Households in the Republic of Bulgaria as of September 7, 2021. National Statistical Institute, 2022. accessed 1 October 2026.
- Housing fund 2025. National Statistical Institute, 2026. accessed 1 October 2026.
- Statistical book 2025. Electricity System Operator (ESO EAD), 2026. accessed 1 October 2026.
- Instruction No. 1 on obtaining access to the transmission and/or distribution network. Electricity System Operator (ESO EAD). accessed 1 October 2026.
- ESO connected to the PICASSO balancing platform. Electricity System Operator (ESO EAD), 2025. accessed 1 October 2026.
- Manually Activated Reserves Initiative (MARI). ENTSO-E, 2026. accessed 1 October 2026.
- Declaration of meter readings (self-reading). Electrohold / ERM Zapad. accessed 1 October 2026.
- Building RES for own consumption – now easier online. Elektrorazpredelenie Yug, 2023. accessed 1 October 2026.
- About Elektrorazpredelenie Yug. Elektrorazpredelenie Yug. accessed 1 October 2026.
- Connection of a producer above 30 kW. ERM Zapad. accessed 1 October 2026.
- Bulgaria liberalises its electricity trading rules. CMS, 2025. accessed 1 October 2026.
- Bulgaria to develop electricity storage to enhance development of renewables sector. CMS, 2023. accessed 1 October 2026.
- Parliament lifts licensing requirements for electricity production by up to 20 MW power plant owners. BTA, 2023. accessed 1 October 2026.
- Energy Committee approves Renewable Energy Act amendments at second reading. BTA, 2026. accessed 1 October 2026.
- Bulgaria grants EUR 587 million to 82 battery storage projects. Balkan Green Energy News, 2026. accessed 1 October 2026.
- Bulgaria launches household solar rebate scheme. pv magazine, 2023. accessed 1 October 2026.
- Bulgaria updated NECP 2021–2030. IEA, 2025. accessed 1 October 2026.
- Bulgaria adopts euro as of 1 January 2026. European Commission (Access2Markets), 2026. accessed 1 October 2026.
- IBEX introduces 15-minute intervals in the day-ahead market from 1 October 2025. DPC, 2025. accessed 1 October 2026.
- Digital Decade 2026: country report Bulgaria (COM(2026) 288 annex). European Commission / Council of the EU, 2026. accessed 1 October 2026.
- New passenger car registrations in Bulgaria in 2025 up 15.1% y/y. The Sofia Globe (ACEA data), 2026. accessed 1 October 2026.
- ADD Grup will manufacture 500,000 smart electricity meters and 4,500 data concentrators for EVN Bulgaria. ADD Grup. accessed 1 October 2026.
- Smart meter roll-out across Southeast Europe – 2024. ACER, 2025. accessed 1 October 2026.
Questions about energy in Bulgaria.
From 1 July 2026 households on universal service pay a national energy price of 9.297 c€/kWh (day or single rate) and 4.103 c€/kWh (night), plus network charges of about 3.3–3.6 c€/kWh depending on the DSO, before 20% VAT. In the ERM Zapad area the day rate comes to about 15.4 c€/kWh including VAT. Eurostat’s average for the second half of 2025 was 13.55 c€/kWh.
The Energy and Water Regulatory Commission (KEVR/EWRC). Every 1 July it sets the household base value, the end-supplier component, the day/night prices and all network charges. Each month it also sets the compensation paid to end suppliers by the Electricity System Security Fund.
There is no national format. Each DSO gives every metering point a permanent alphanumeric code, shown on bills as the ИТН, “точка на доставка (PoD)” or similar. Households mostly use the supplier client number, which is 12 digits at Electrohold. The code stays with the property and is used for switching supplier and connecting solar.
Yes. Households with installations up to 30 kW can sell surplus to their end supplier under a purchase contract without a licence, once a bidirectional meter is fitted. New contracts use negotiated prices; there is no net metering.
For self-consumption you notify your DSO under Article 25a of the Energy from Renewable Sources Act, up to twice your contracted power. Single-family houses and holiday homes with up to 20 kW need no building permit.
ERM Zapad (west), Elektrorazpredelenie Yug (south, EVN group) and Elektrorazpredelenie Sever (north-east, ENERGO-PRO group), plus the small Elektrorazpredelenie Zlatni Pyasatsi at Golden Sands.
Some, but there is no national roll-out. DSOs own the meters and install remote-reading models at their own pace. EVN’s supplier reports more than 1.2 million smart meters in southern Bulgaria. Households are still billed monthly on day/night readings.