How electricity works in Palestine.
Palestine electricity 2026: PERC regulation, PETL single buyer, six distribution companies, imported supply, rooftop solar growth and the Gaza supply situation.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Israeli new shekel (ILS) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Palestine energy at a glance.
Key figures for households in Palestine. Each one links to its source on the full overview below.
Renewable share.
4.9% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Palestine.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Palestine below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Palestine requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Palestine.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Palestine, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Palestine, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Palestine.
The energy market in Palestine, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
The Palestinian electricity system is made up of two separate networks, one in the West Bank and one in the Gaza Strip, and depends heavily on imported power. According to the World Bank, the Israel Electric Corporation (IEC) supplied 92.5% of the West Bank’s electricity and over half of Gaza’s in 2023. Ember data show domestic generation of about 0.99 TWh in 2024 against demand of about 7.99 TWh, with net imports of about 7 TWh.
Policy is set by the Palestinian Energy and Natural Resources Authority (PENRA). The Palestinian Electricity Regulatory Council (PERC), created in 2009, is the sector regulator. The Palestinian Electricity Transmission Company (PETL), established in 2013, is being built up as the single buyer and transmission system operator. Distribution is handled by five distribution companies in the West Bank (JDECO, NEDCO, HEPCO, SELCO and TEDCO) and one in Gaza (GEDCO), with the remainder of West Bank supply still managed by municipalities and village councils.
Solar power is the only significant domestic renewable source. IRENA data put installed solar PV at about 308 MW in 2025, and the World Bank estimated about 275 MW in the West Bank at the end of 2024, of which about 192 MW was distributed solar on rooftops and other customer sites. In Gaza, the World Bank reports that grid imports were halted and the Gaza Power Plant shut down after October 2023, leaving households reliant on off-grid rooftop solar and diesel generators.
Energy snapshot.
Headline figures for electricity in Palestine. Each shows its data year and links to its source.
- Population5,413,596 peopleSource 12025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (ILS)Not identified from a reliable public source.
- Household price (EUR)Not identified from a reliable public source.
- Renewable electricity share4.9 % of consumptionSource 42024
- Solar capacity0.308 GWSource 92025
- Wind capacityNot identified from a reliable public source.
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Palestinian Electricity Regulatory Council (PERC)
- System operator
- Palestinian Electricity Transmission Company (PETL), being developed as single buyer and transmission system operator
- Distribution networks
- Five regional distribution companies in the West Bank (JDECO, NEDCO, HEPCO, SELCO, TEDCO) plus municipalities and village councils, and GEDCO in Gaza
- Currency
- Israeli new shekel (ILS)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Palestine.
- Household price (ILS)
- Not identified from a reliable public source.
- Household price (EUR)
- Not identified from a reliable public source.
- Typical annual electricity bill
- Not identified from a reliable public source.
How prices are set
Most electricity is bought in bulk from the Israel Electric Corporation and resold to households by the distribution companies, or by municipalities and village councils where they still run the local network. PERC is responsible for regulating the tariffs that these distributors apply. The World Bank notes that the sector’s payment shortfall has been made worse by the lack of uniform application of cost-recovery tariffs and the lack of transfer of subsidies.
Net lending
Unpaid bills for imported electricity are recovered through "net lending": the Government of Israel deducts outstanding electricity payments from the clearance revenues it collects on behalf of the Palestinian Authority. The World Bank reports that electricity-related net lending deductions exceeded 37% of clearance-revenue deductions in 2024, and earlier estimated sector financial deficits of nearly US$150 million a year.
Gaza
Since October 2023, grid electricity in Gaza has been largely unavailable. PENRA regulates the price charged by private commercial generator operators instead, setting a maximum price per kWh that is reviewed every two weeks and taking complaints through an online form.
A reliable, accessible series of household tariffs was not found, so no price history is shown.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Retail tariffs are regulated: PERC was set up in 2009 as the regulatory agency, and the World Bank has supported it in establishing bulk-supply tariffs and distribution and retail tariffs. Each distribution company publishes the approved tariff (SELCO, for example, lists an "approved tariff" document among its subscriber services). Customers cannot choose their supplier. |
| Prepayment | Yes | Prepaid card meters are widely used. HEPCO, for example, offers conversion from a billed meter to a prepaid meter, conversion from a prepaid card meter to a smart meter that can be topped up through a mobile app, and a dispute procedure for estimated consumption when a prepaid meter fails. |
| Other | Limited | In Gaza, households without grid supply buy power from commercial generator operators. PENRA sets a maximum selling price, reviewed every two weeks to reflect fuel, oil, maintenance and operating costs; the cap was ILS 25 per kWh until 31 May 2026. |
| Time-of-use | Unknown | No verified information was found on household time-of-use tariffs. |
| Dynamic | No | There is no wholesale market, so no tariff is linked to wholesale prices. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,454 kWh/person/yr (all sectors) (2024)Source 8Per capita electricity demand (1,453.93 kWh) from Ember via Our World in Data.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity demand was about 7.99 TWh in 2024 according to Ember, or about 1,454 kWh per person across all sectors. The World Bank projects West Bank demand to grow by about 3.5% a year, reaching an estimated 8,779 GWh by 2035, and growth in Gaza at around 8% a year.
Before October 2023, Gaza’s total demand exceeded 600 MW while only about 120 MW was imported from the IEC and about 70 MW generated by the Gaza Power Plant, so supply was rationed; the World Bank described available supply of 6 to 12 hours a day depending on imports and power plant operation.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 87.4 % of population (2025)Source 2World Bank (UN World Urbanization Prospects) estimate for West Bank and Gaza.
The population is largely urban: the World Bank estimates 87.4% in 2025. Detailed dwelling-type and tenure statistics are produced by the Palestinian Central Bureau of Statistics, but could not be verified for this profile.
The World Bank notes that rooftop solar under net metering has grown quickly in urban areas of the West Bank, to the point of saturating parts of the distribution grid. In Gaza, before October 2023, distributed solar systems had been installed on schools, health facilities and homes.
How the grid works in Palestine.
- TransmissionPalestinian Electricity Transmission Company (PETL)
- DistributionFive regional distribution companies in the West Bank (JDECO, NEDCO, HEPCO, SELCO, TEDCO) plus municipalities and village councils, and GEDCO in Gaza
- MeteringDistribution companies
- Supply5 or more retail suppliers
Physical flow
Most electricity is imported from the Israel Electric Corporation. In the West Bank it enters either through PETL’s high-voltage substations, which step 161 kV down to 33 kV (Beit Ula near Hebron is rated at 90 MW, expandable to 180 MW), or through direct medium- and low-voltage connection points that PETL is gradually consolidating. Distribution companies and local councils then deliver it to homes. Domestic generation comes mainly from solar plants and rooftop systems.
Commercial flow
Distribution companies buy bulk power and sell it to end users at regulated tariffs. PETL is intended to become the single buyer; the World Bank reported its market share at 27% in 2024. The ASPIRE Phase 3 project includes a US$20 million liquidity support account for competitively procured utility-scale solar IPPs.
Other import sources
The World Bank reported in 2020 that imports from Egypt to Gaza had stopped in February 2018, and that imports from Jordan were viable but required extensive coordination in the Jordan Valley.
Gaza
The World Bank reports that after October 2023 electricity imports to Gaza were halted and fuel imports for the Gaza Power Plant stopped, leading to its shutdown, and that about 80% of power generation and distribution assets were destroyed or rendered non-operational. Activities of the World Bank energy project in Gaza remained on hold in July 2026.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Palestinian Energy and Natural Resources Authority (PENRA) | Leads energy policy and sector management, runs the project management unit for World Bank energy projects, licenses generation units through the government e-services portal, invites investment in generation projects, and in Gaza regulates commercial generator prices. |
| Regulator | Palestinian Electricity Regulatory Council (PERC) | Created in 2009 as the electricity regulator. Responsible for tariffs, including bulk-supply, distribution and retail tariffs. |
| TSO | Palestinian Electricity Transmission Company (PETL) | Government-owned company established on 1 October 2013 to build and operate a national transmission system and to act as sole buyer of bulk power. Operates high-voltage substations at Qalandia, Tulkarm, Sarra (Nablus), Al-Jilma (Jenin) and Beit Ula (Hebron); its market share was 27% in 2024. |
| DSO | Jerusalem District Electricity Company (JDECO) | Distribution and supply in East Jerusalem, Ramallah, Bethlehem and Jericho. |
| DSO | Northern Electricity Distribution Company (NEDCO) | One of the five West Bank distribution companies. |
| DSO | Hebron Electric Power Company (HEPCO) | Distribution and supply in Hebron, with more than 70,000 subscribers. Established in 2000 and operating since 2005. |
| DSO | Southern Electricity Company (SELCO) | Distribution and supply in the southern West Bank; publishes an approved tariff and a guide to connecting renewable energy systems. |
| DSO | Tubas District Electricity Company (TEDCO) | One of the five West Bank distribution companies. |
| DSO | Gaza Electricity Distribution Company (GEDCO) | The single distribution company in the Gaza Strip. Supplies daily electricity data to UN OCHA. |
| Supplier | Distribution companies and local councils | The distribution company, or the municipality or village council where it still runs the network, is also the retail supplier and bills the customer. The World Bank reports that the five West Bank companies handle over 80% of West Bank supply. |
| Metering | Distribution companies | Install and manage customer meters, including prepaid card meters and smart meters. |
Compared with the UK system.
| UK concept | Palestine equivalent | How it works |
|---|---|---|
| DNO | Distribution company (JDECO, NEDCO, HEPCO, SELCO, TEDCO, GEDCO) or local council | Regional distribution companies own and operate the local network in their areas, like UK DNOs, but they also buy power in bulk and bill customers. In parts of the West Bank, municipalities and village councils still run the local network. |
| National Grid/NESO | PETL, alongside direct IEC connection points | There is no single national grid. Power enters through PETL substations and through about 200 direct connection points with the Israeli grid (reduced from over 500). PETL is being prepared to act as transmission system operator and single buyer. |
| MPAN | Subscription (account) with the distribution company | A home’s supply is a subscription with the local distributor. Distributors identify it in their own customer systems; no national supply-point register or published national format was found. |
| MPRN | No household gas network identified | No piped household gas supply-point system was identified. |
| Meter operator | The distribution company | There are no independent meter operators; the distributor fits and manages billed, prepaid and smart meters. |
| Supplier | The distribution company or local council | There is no supplier choice; the distributor for the address supplies at the regulated tariff. |
| Smart-meter infrastructure | Distribution company systems | There is no central communications body. Smart meters and control centres have been installed for selected distribution companies under a World Bank-supported revenue protection programme. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Electricity subscription (ishtirak) account |
| Who issues it? | The distribution company or local council serving the address |
| Format | An account reference assigned by each distributor in its own customer system. No national structure is published, so no fictional example is given. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the electricity bill or prepaid account with the distribution company. |
| Electronic access | Distribution companies offer online services and apps for bill enquiries, payment and prepaid top-ups; HEPCO, for example, runs a bill inquiry portal and a mobile app that can recharge smart meters. |
| Third-party access | No regulated data-access scheme for third parties was identified. |
| Who keeps the register | Each distribution company or council keeps its own customer and meter records. No national supply-point database was identified. |
| Register scope | Per DSO |
How a connection is identified
A household electricity supply is a subscription with the distributor for its area. Distributors manage requests by subscription: HEPCO’s online services cover new subscription requests, changes to subscription data (for example reclassifying between commercial and residential use), subscription maintenance and termination.
Meter types
Customers may have a billed meter, a prepaid card meter or a smart meter. HEPCO offers conversion from billed to prepaid metering, and from a prepaid card meter to a smart meter topped up through an app.
Limits of public information
The format of subscription numbers, whether they transfer with the property, and arrangements for third-party access are not published by the distributors whose websites could be read, so these fields are left unconfirmed.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Yes |
| Net billing | Unknown |
| How exported electricity is paid | Net metering through the distribution company. Settlement details and current compensation rates could not be verified. |
| Is net metering available? | Yes. The World Bank reported in 2020 that most solar systems in the West Bank operated on a net-metering basis in Area A, ranging from 5 kWp to 5 MWp, with only a few IPPs. |
| Are there grid limits? | The World Bank notes that rooftop solar using net metering has caused grid saturation in some urban areas and potential stability concerns, so grid upgrades are needed. Specific capacity limits were not verified. |
| How much distributed solar is connected? | The World Bank estimated about 192.2 MW of distributed solar in the West Bank at the end of 2024, alongside 83.79 MWp of connected solar IPP plants. |
Connecting a home system.
- Consult the distribution company’s guide for connecting renewable energy systems (SELCO publishes one).
- Apply to the distribution company for connection under the net metering arrangements.
- Install the system and have it connected and metered by the distribution company.
Rooftop and customer-sited solar has grown quickly in the West Bank under net metering arrangements administered by the distribution companies. The World Bank-supported ASPIRE programme has run a revolving fund for distributed solar for residential and commercial consumers, expected to reach over 400 recipients and about 2 MWp by December 2025, and its third phase targets 22 MW of new renewable supply by December 2028.
The current net metering instructions, settlement periods and size limits could not be read from an accessible official source, so they are not detailed here.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (behind the meter, rooftop) | Connection approval from the distribution company under net metering arrangements; specific thresholds not verified. | Distribution company; PERC | Installers should check the distributor’s renewable connection guide. |
| Generate electricity (generation units and projects) | PENRA offers licensing and licence renewal for generation units through the government e-services portal and invites expressions of interest in generation projects. | PENRA | The May 2026 call covered diesel generators and solar energy. |
| Sell to the grid as an IPP | Utility-scale solar IPPs sell under power purchase arrangements; the World Bank supports competitive procurement with a liquidity support account. | PENRA; PETL; PERC | 83.79 MWp of IPP solar was connected in the West Bank by the end of 2024. |
| Supply electricity to consumers | Supply is carried out by the distribution companies and local councils in their areas. | PERC | No competitive retail market. |
| Wholesale purchase (single buyer) | PETL is designated as single buyer and transmission system operator. | PENRA; PETL | PETL’s market share was 27% in 2024. |
| Commercial generator supply in Gaza | Operators must comply with PENRA’s official pricing and service guidelines. | PENRA | Price cap ILS 25/kWh until 31 May 2026. |
| Store electricity | No specific licensing framework for storage was verified. | PERC; PENRA | Battery storage is planned at distribution companies under ASPIRE Phase 3. |
| Aggregation, VPP, balancing or remote control of assets | No licence category or framework was identified. | PERC | There is no market for these services. |
The sector has a regulator (PERC, since 2009), a designated single buyer and transmission operator (PETL, since 2013) and licensed distribution companies. Activity-specific licensing thresholds for small generation, storage and supply could not be verified from accessible official texts, so installers and investors should check directly with PERC, PENRA and the relevant distribution company.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing, reserve and frequency services | No | — | No | The Palestinian networks are supplied mainly through connections to the Israeli grid; no ancillary services market open to distributed assets exists. |
| Distribution-level storage | Developing | — | No | Distribution companies (World Bank ASPIRE Phase 3). Hybrid solar and battery systems and battery storage at distribution companies are to be deployed where needed. |
There is no wholesale, capacity or demand-response market. Flexibility needs arise mainly from the saturation of distribution grids by rooftop solar, which the World Bank-supported programmes address through grid upgrades and battery storage rather than markets.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Targeted rollout to large consumers in the West Bank: 19,622 smart meters installed in five distribution companies under a World Bank project |
| Reading interval | Not published |
| Smart meters installed (World Bank project) | 19,622 in the five West Bank distribution companies |
| Focus | Revenue protection for the highest-consumption customers (stage 2 targeting 30% of largest consumption) |
| Prepaid metering | Widely offered; card and app-recharged smart meters (HEPCO) |
| Owner and operator | The distribution company |
Smart meters have been deployed mainly to improve billing and collection from high-value customers under the Revenue Protection Program supported by the World Bank, which also funded software and control centres for selected distribution companies. The projects exceeded their installation target of 16,700 meters.
Losses remain high: aggregate technical and commercial losses in the West Bank distribution companies fell from 23% to 19%, and the target is 17% by December 2028.
Renewable electricity.
Electricity generation mix (2024).
- Solar: 39.4%
- Oil: 60.6%
- Renewable electricity share
- 4.9 % of consumption (2024)Source 4Derived: solar generation of about 0.39 TWh (39.39% of 0.99 TWh domestic generation, Ember via Our World in Data) divided by electricity demand of 7.99 TWh. Because about 7 TWh is imported, the share of consumption is used; solar supplied 39.39% of domestic generation.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0.005 GW (2025)Source 9Derived from IRENA capacity: 0.308395 GW in 2025 minus 0.303035 GW in 2024 (about 5.4 MW). Additions were 43 MW in 2024 and 67 MW in 2023.
- Solar PV
- 0.308 GW (2025)Source 9IRENA data via Our World in Data.
- Solar IPP plants (West Bank)
- 0.084 GW (End 2024)Source 1083.79 MWp.
- Distributed solar (West Bank)
- 0.192 GW (End 2024)Source 10World Bank estimate.
Targets.
- ASPIRE Phase 3: 22 MW of new renewable supply connected by December 2028
- ASPIRE Phase 3: aggregate technical and commercial losses of 17% by December 2028
The mix above covers domestic generation only, about 0.99 TWh in 2024, which is around one-eighth of demand; the rest is imported. Solar has grown from 1.9% of domestic generation in 2015 to 39.4% in 2024, according to Ember, with the remainder from oil-fired generation.
Installed solar capacity rose from about 13 MW in 2015 to about 303 MW in 2024 according to IRENA, with little change in 2025. Most of it is distributed, on rooftops and customer sites under net metering.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is at an early stage. The World Bank’s ASPIRE Phase 3 project, appraised in March 2025, plans battery storage at distribution companies to help absorb solar output. No dedicated storage regulation was verified.
Storage projects.
- ASPIRE Phase 3 battery storage: World Bank-financed support for distribution companies to deploy battery energy storage and hybrid solar-plus-storage systems where needed.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Hebron Electric Power Company (HEPCO) | More than 70,000 subscribers | No | Unknown | No | Yes |
| Southern Electricity Company (SELCO) | — | No | Unknown | No | Yes |
| Jerusalem District Electricity Company (JDECO) | — | No | Unknown | No | Yes |
| Northern Electricity Distribution Company (NEDCO) | — | No | Unknown | No | Yes |
| Gaza Electricity Distribution Company (GEDCO) | — | No | No | No | Unknown |
The distribution companies are regional monopolies for networks and retail supply, so the supplier is fixed by address. Export is marked as available for West Bank distributors because net metering is administered through them; smart meters are marked where the World Bank reports installations in the five West Bank companies. Subscriber numbers were verified only for HEPCO. GEDCO’s own website could not be reached; the link points to the UN OCHA page that publishes its daily supply data.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Palestinian Energy and Natural Resources Authority (PENRA) | Government | Energy policy, sector management, generation licensing | Publishes notices on generation investment, solar damage assessment and Gaza generator pricing. |
| Palestinian Electricity Regulatory Council (PERC) | Regulator | Electricity regulator | Regulates tariffs and the conduct of licensed companies. |
| Palestinian Electricity Transmission Company (PETL) | Transmission | Transmission and single buyer | Operates the high-voltage substations and is taking over bulk purchasing. |
| Hebron Electric Power Company (HEPCO) | Distribution | Distribution and supply in Hebron | Publishes annual reports, its 2026–2030 strategic plan and online subscription services. |
| Southern Electricity Company (SELCO) | Distribution | Distribution and supply in the southern West Bank | Publishes a guide to connecting renewable energy systems. |
| UN OCHA – Gaza Strip electricity supply | Consumer | Electricity supply dashboard | Publishes GEDCO’s daily supply data. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection of renewable systems | Distribution company renewable connection guide | Distribution companies under PERC oversight | The specific technical standards referenced could not be verified from an accessible text. |
| Installer accreditation | Not verified | PENRA / PERC | No accessible information on installer accreditation was found. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distribution company connection approval | Yes | Regional | Grid-connected systems are connected and metered by the local distribution company under net metering arrangements. |
| PENRA generation unit licence | Limited | National | PENRA licenses generation units through the e-services portal; the threshold at which this applies was not verified. |
For a household system the distribution company is the main point of contact. Location affects feasibility: the World Bank notes that most net-metered systems are in Area A, and project routes have been planned to avoid areas where Israeli permits would be needed.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for distributed solar | Active | Net metering | Customer-sited solar systems offset consumption through net metering with the distribution company. Current settlement terms not verified. | — |
| ASPIRE distributed solar revolving fund | Active | Financing | World Bank-supported revolving fund for residential and commercial solar, expected to benefit over 400 recipients with about 2 MWp by December 2025; lessons are being carried into ASPIRE Phase 3. | 2020 – 2028 (programme) |
| Solar damage assessment registration (Gaza) | Active | Damage assessment | PENRA form for citizens to register damage to solar systems for assessment. | — |
Data and connectivity.
- Fixed broadband
- 86.6 % of individuals using the internet (2023)Source 3World Bank / ITU indicator; this is internet use, not fixed broadband subscriptions.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use is high, which supports app-based services such as HEPCO’s mobile app for bill payment and smart-meter top-ups. The communications technology used by distribution companies’ smart meters is not published.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 7.99 TWh (2024)Source 6Ember electricity demand via Our World in Data.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The West Bank network relies on imported supply delivered through many connection points, with distribution grids in urban areas increasingly saturated by rooftop solar. ASPIRE Phase 3 plans to rehabilitate and upgrade 50 connection points and add 32.5 MW of transmission capacity from PETL’s network by December 2028.
In Gaza, the World Bank reports extensive damage to the transmission and distribution networks after October 2023, with supply dependent on off-grid solar and diesel generators.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| ASPIRE Phase 3 energy sector project | Current | Appraised March 2025; closing December 2028 | World Bank-supported programme for new renewable supply (22 MW target), transmission capacity, connection-point upgrades, battery storage and loss reduction in the West Bank and, when resumed, Gaza. |
| PETL as single buyer and transmission system operator | Upcoming | Ongoing; no completion date set | PETL’s share of bulk purchases was 27% in 2024; the programme aims to consolidate purchasing and connection points under PETL. |
| Generation investment call | Current | May 2026 | PENRA invited companies and investors to express interest in diesel and solar generation projects to address supply shortages. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | — | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 192 MW of distributed solar in the West Bank at the end of 2024 under net metering (World Bank), but no household-only count was verified. |
| Distributed energy market | Medium | Distributed solar makes up most of the roughly 300 MW of solar capacity, and off-grid solar is a key source in Gaza; there is no aggregation or market access. |
| Grid flexibility market | Low | No wholesale, ancillary or demand-response market; supply is mainly imported through bulk connections. |
| Energy storage adoption | Low | No operating grid-scale battery identified; storage is planned under ASPIRE Phase 3. |
| Renewable growth environment | Medium | Solar capacity grew from about 13 MW in 2015 to about 308 MW in 2025 (IRENA), but additions slowed to about 5 MW in 2025 and solar meets around 5% of demand. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 27 sources
- Population, total – West Bank and Gaza (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
- Urban population (% of total) – West Bank and Gaza. World Bank, 2025. accessed 10 October 2026.
- Individuals using the Internet (% of population) – West Bank and Gaza. World Bank, 2023. accessed 10 October 2026.
- Share of electricity production by source – Palestine (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity generation – Palestine (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Electricity demand – Palestine (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Net electricity imports – Palestine (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Per capita electricity demand – Palestine (Ember). Our World in Data, 2024. accessed 10 October 2026.
- Installed solar PV capacity – Palestine (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Project Appraisal Document: Third Phase of the MPA Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector (ASPIRE) Project. World Bank, 2025. accessed 10 October 2026.
- Implementation Status and Results Report: ASPIRE Phase 3 (Sequence No. 3). World Bank, 2026. accessed 10 October 2026.
- West Bank and Gaza – Phase 1 of the MPA Advancing Sustainability in Performance, Infrastructure and Reliability of Energy Sector Project. World Bank, 2020. accessed 10 October 2026.
- West Bank and Gaza – Electricity Sector Performance Improvement Project (completion report). World Bank, 2024. accessed 10 October 2026.
- From Scarcity to Security: Examining the Water-Energy-Food Nexus in the West Bank and Gaza within the Context of Climate Change. World Bank, 2025. accessed 10 October 2026.
- Palestinian Electricity Transmission Ltd – about and substations. PETL. accessed 10 October 2026.
- PETL substations (Arabic). PETL. accessed 10 October 2026.
- Palestinian Energy and Natural Resources Authority – home and e-services. PENRA. accessed 10 October 2026.
- Periodic update of the commercial generator kWh price (Arabic). PENRA, 2026. accessed 10 October 2026.
- Announcement on investment in electricity generation (Arabic). PENRA, 2026. accessed 10 October 2026.
- Announcement on the solar energy damage assessment form (Arabic). PENRA, 2025. accessed 10 October 2026.
- Hebron Electric Power Company – home page. HEPCO. accessed 10 October 2026.
- HEPCO electronic services (Arabic). HEPCO. accessed 10 October 2026.
- About HEPCO (Arabic). HEPCO. accessed 10 October 2026.
- HEPCO news and tenders (Arabic). HEPCO, 2026. accessed 10 October 2026.
- Southern Electricity Company – subscriber services. SELCO. accessed 10 October 2026.
- Jerusalem District Electricity Company (service area). Wikipedia. accessed 10 October 2026.
- Gaza Strip electricity supply. UN OCHA oPt. accessed 10 October 2026.
Questions about energy in Palestine.
Mostly from imports. The World Bank reports that the Israel Electric Corporation supplied 92.5% of the West Bank’s electricity and over half of Gaza’s in 2023. Ember data show about 7 TWh of net imports in 2024 against about 0.99 TWh of domestic generation, mostly solar and oil-fired.
The Palestinian Electricity Regulatory Council (PERC), created in 2009. Policy is led by the Palestinian Energy and Natural Resources Authority (PENRA), and the Palestinian Electricity Transmission Company (PETL) is the transmission company and designated single buyer.
In the West Bank: JDECO, NEDCO, HEPCO, SELCO and TEDCO, which handle over 80% of supply, with municipalities and village councils covering the rest. In Gaza: GEDCO. Each is the only supplier in its area.
Rooftop and customer-sited solar in the West Bank is connected under net metering arrangements with the distribution company. Current settlement terms and size limits should be checked with the local distributor.
IRENA data show about 308 MW of solar PV in 2025. The World Bank estimated about 275 MW in the West Bank at the end of 2024, including about 192 MW of distributed systems.
The World Bank reports that after October 2023 grid imports to Gaza were halted and the Gaza Power Plant shut down, leaving consumers dependent on off-grid rooftop solar and diesel generators. PENRA sets a maximum price for commercial generator electricity, which was ILS 25 per kWh until 31 May 2026.