How electricity works in Israel.
Israel electricity market 2026: Electricity Authority tariffs, IEC grid, Noga system operator, supplier switching, rooftop solar tariffs, smart meters and licensing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Israeli new shekel (ILS) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Israel energy at a glance.
Key figures for households in Israel. Each one links to its source on the full overview below.
Electricity price.
0.635 ILS per kWh for households, including taxes. Figures for From 1 July 2026.
Renewable share.
16.9% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Israel.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Israel below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Israel requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Israel.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Israel, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Israel, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Israel.
The energy market in Israel, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Israel runs an isolated national grid with no power links to neighbouring countries’ systems. The state-owned Israel Electric Corporation (IEC) owns and operates the transmission and distribution networks, installs and reads meters, and remains the default supplier for most homes. Since a 2018 reform, system operation, dispatch and wholesale settlement sit with Noga, a separate government company, while the Electricity Authority licenses the sector and sets every regulated tariff.
Households pay a single regulated "uniform" tariff of 53.83 agorot per kWh before VAT (63.52 agorot with 18% VAT) from 1 July 2026, plus fixed distribution, supply and capacity charges. A voluntary time-of-use tariff is available. Since July 2024 every household, including those with basic meters, can move to a private supplier; by October 2026 more than 500,000 customers had switched, and Noga listed 21 active supply companies without their own generation in March 2026.
Natural gas produced about 80% of electricity in 2025 and coal is being phased out. Renewables, almost all solar, reached 16.9% of generation in 2025 according to Ember, short of the 20% target set for that year; the government’s targets are 30% of electricity by 2030 and 26 GW of renewable capacity by 2035.
Energy snapshot.
Headline figures for electricity in Israel. Each shows its data year and links to its source.
- Population10,122,800 peopleSource 252025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (ILS)0.635 ILS/kWhSource 1From 1 July 2026
- Household price (EUR)0.185 EUR/kWhSource 28From 1 July 2026
- Renewable electricity share16.9%Source 232025
- Solar capacity7.36 GWSource 23End 2025
- Wind capacity0.35 GWSource 23End 2025
- Energy storage capacity0.557 GWSource 162024
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Electricity Authority (Rashut HaHashmal)
- System operator
- Noga – Israel Independent System Operator
- Distribution networks
- Israel Electric Corporation (IEC) owns and operates the national transmission and distribution networks; a separate concession company serves East Jerusalem and parts of the West Bank
- Currency
- Israeli new shekel (ILS)
- Voltage and frequency
- 230 V / 50 Hz (400 V three-phase)
Electricity prices in Israel.
- Household price (ILS)
- 0.635 ILS/kWh (From 1 July 2026)Source 1Regulated household ("domestic") uniform tariff of 63.52 agorot per kWh including 18% VAT (53.83 agorot before VAT). Fixed distribution and supply charges and an annual capacity charge per kVA are billed in addition.
- Household price (EUR)
- 0.185 EUR/kWh (From 1 July 2026)Source 28Converted from ILS 0.6352/kWh at the Bank of Israel representative rate of ILS 3.4361 per euro on 7 October 2026. Energy charge only; fixed charges excluded.
- Typical annual electricity bill
- 4,200 ILS/yr (2024)Source 39Derived: the average family-of-three bill of about NIS 350 a month cited by the Jerusalem Post when the February 2024 tariff change was announced, multiplied by 12. Bills vary widely with water heating: in December 2025 the Times of Israel reported NIS 220–440 a month for homes with solar water heaters and NIS 900–1,800 for homes without.
Household price trend (ILS per kWh).Source 3
| 2019-01 | 0.5518 ILS/kWh |
|---|---|
| 2021-01 | 0.5066 ILS/kWh |
| 2022-02 | 0.538 ILS/kWh |
| 2022-08 | 0.574 ILS/kWh |
| 2023-01 | 0.625 ILS/kWh |
| 2023-04 | 0.6007 ILS/kWh |
| 2024-02 | 0.6145 ILS/kWh |
| 2025-01 | 0.6402 ILS/kWh |
| 2026-01 | 0.6432 ILS/kWh |
| 2026-07 | 0.6352 ILS/kWh |
How the household bill is built
The Electricity Authority sets the tariffs; the IEC applies them and lists the components on the bill: an energy charge per kWh, a capacity charge based on the size of the connection in kVA (separated from the kWh rate in January 2019), a fixed distribution charge covering meter reading, operation and maintenance per meter, a fixed supply charge covering billing and collection, and VAT at 18% (17% until the end of 2024). Most homes are billed every two months; some customers are billed monthly, with higher fixed charges.
Recent changes
The household energy rate including VAT rose from 50.66 agorot in January 2021 to 62.50 agorot in January 2023 after gas and coal costs increased, eased to 60.07 agorot in April 2023 and reached 64.32 agorot in January 2026, after a rise of about 1.5% that the Times of Israel attributed to inflation indexation, interest rates and fuel costs including carbon tax. The July 2026 update lowered it to 63.52 agorot.
Comparison
In its June 2026 investor presentation the IEC compared its pre-tax household rate (January 2026, converted at ILS 3.39 per euro) with Eurostat prices for second-half 2025 and placed Israel below the EU average for households using 5,000–14,999 kWh a year.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Uniform household tariff set by the Electricity Authority and applied by the IEC: 53.83 agorot/kWh before VAT (63.52 with VAT) from 1 July 2026. Fixed charges for a bi-monthly customer with a basic single-phase meter are ILS 9.97 (distribution) and ILS 15.60 (supply) before VAT; customers billed monthly pay ILS 157.31 and ILS 107.70. A capacity charge of ILS 6.18 per kVA of connection size per year (before VAT) is added. |
| Time-of-use | Yes | Voluntary "TAOZ" tariff (by system load and time of use) for customers on uniform tariffs. From 1 July 2026, including VAT: summer (June–September) peak 172.23 agorot (Sunday–Thursday 17:00–23:00) and off-peak 50.42; winter (December–February) peak 114.70 (17:00–22:00 every day) and off-peak 46.63; spring and autumn peak 49.58 and off-peak 45.78. The IEC fits a special electronic meter; the minimum stay is one year and changing meters costs ILS 105.02 including VAT where several meters are removed. |
| Variable | Yes | Private suppliers sell at a discount to the regulated IEC rate. The Jerusalem Post reported discounts of 7% to 20% in October 2026, depending on the supplier and plan. |
| Prepayment | Limited | The IEC operates prepayment meters (MATAM) for some customers; with smart meters the credit balance is managed centrally rather than by typing a code into the meter. |
| Dynamic | No | No household tariff linked to the hourly system marginal price was identified. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 7,950 kWh/person/yr (all sectors) (2025)Source 23Electricity demand per capita (7.95 MWh) from Ember, based on total demand of 75.7 TWh.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Demand is growing quickly because of population growth and rising use per household. Ember puts total electricity demand at 75.7 TWh in 2025, up from 70.0 TWh in 2022, and Noga forecasts average annual growth of 2.6% between 2025 and 2029. National demand set a record of 16,970 MW on 12 August 2025 during a heatwave, the third record on consecutive days.
IEC data on average household use show a summer cooling peak and a smaller winter heating peak on top of base load. Water heating is distinctive: about 85% of households use rooftop solar water heaters, and water heating still accounts for roughly 14% of annual household electricity use. Electric boosting of water heaters during evening shower hours can account for up to a quarter of electricity produced at that time, according to figures reported by the Times of Israel in December 2025.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 91.6 % of population (2025)Source 26World Bank urban population share (91.58%).
Apartment buildings limit rooftop solar: the Times of Israel reported in December 2025 that solar water heaters cannot practically serve flats more than about seven floors below the roof. The government’s 100,000-rooftop target to 2030 is estimated to cover about 15% of the country’s roofs.
Meters in apartment buildings are usually grouped in a meter room or cabinet, and in private houses in a cabinet outside the home. Building committees can register with the IEC for a shared-consumption arrangement that splits the common-area bill between residents.
Reliable official figures on tenure and dwelling type could not be retrieved from the Central Bureau of Statistics for this profile.
How the grid works in Israel.
- TransmissionNoga – Israel Independent System Operator, Israel Electric Corporation (IEC) – transmission
- DistributionIsrael Electric Corporation (IEC) owns and operates the national transmission and distribution networks; a separate concession company serves East Jerusalem and parts of the West Bank
- MeteringIEC metering (smart metering centre)
- Supply8 or more retail suppliers
Physical system
Israel’s grid is an "electricity island": it has no interconnections with the grids of neighbouring countries, so all reserves must be held domestically. Power flows from gas-fired, coal and solar plants through the IEC’s 400 kV and 161 kV transmission network to substations and then through the IEC’s distribution network to homes at 230 V. The IEC also supplies electricity to the Palestinian areas, which is why Ember records Israel as a net exporter.
Generation is split between the IEC and private producers. The IEC’s own installed capacity was 10,114 MW from 7 January 2026 after it sold several power stations under the reform; the rest is owned by private conventional and renewable generators. Noga dispatches all of it.
Commercial flow
Generators sell to Noga’s pool at regulated or contracted prices, or directly to suppliers through bilateral contracts (permitted since 2024). Suppliers pay Noga for the energy they buy, and pay the IEC regulated charges for transmission and distribution. Customers pay their supplier; those who have not switched pay the IEC at the regulated tariff. Noga settles roughly ILS 40 billion a year between these parties.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Infrastructure | Sets energy policy, renewable targets (30% of electricity by 2030; 26 GW of renewable capacity by 2035) and the coal phase-out, and, with the Electricity Authority, issues licences to Noga and other licensees. Led the 2018 sector reform and the opening of retail supply. |
| Regulator | Electricity Authority | Independent regulator under the Electricity Sector Law. Sets all regulated tariffs and service standards ("amot mida"), licenses generators, suppliers and storage, sets the rules for rooftop solar, smart-meter deployment and supplier switching. Had licensed 50 suppliers without generation assets by February 2026. |
| System operator | Noga – Israel Independent System Operator | Government company created by the 2018 reform from the IEC’s system-management, planning and statistics units. Dispatches generation, publishes the system marginal price (SMP) and the new market clearing price (MCP), settles about ILS 40 billion a year between generators and suppliers, plans the transmission system, and runs the process for moving customers between suppliers. |
| TSO | Israel Electric Corporation (IEC) – transmission | Owns the 400 kV (1,071 circuit-km) and 161 kV (5,158 circuit-km) transmission network and 164 substations. Holds a transmission and storage licence that lets it build storage at substations up to 15% of the volume advanced by private developers in the previous year. |
| DSO | Israel Electric Corporation (IEC) – distribution | Natural monopoly distributor for almost the whole country: 32,905 km of high-voltage and 44,411 km of low-voltage distribution lines and 56,907 distribution transformers. Connects customers and generators, gives the "distributor’s answer" on solar connection requests, and owns, installs and reads meters. |
| Supplier | IEC supply unit (default supplier) | Supplies every customer who has not chosen another supplier at the regulated tariff. About 89% of low-voltage customers still bought from the IEC at the end of 2025. |
| Supplier | Private (virtual and bilateral) suppliers | Licensed companies that buy power from Noga’s wholesale pool or from private generators and resell it at a discount. Noga counted 21 active suppliers without generation and 14 with generation in March 2026. |
| Metering | IEC metering (smart metering centre) | The IEC owns all household meters and runs the national smart-meter rollout under Electricity Authority decisions. Smart meters record every 15 minutes and transmit once a day to the IEC’s meter data management centre. |
| Settlement | Noga trade division | Signs power purchase agreements, settles payments between suppliers and generators and publishes wholesale prices. Developing a wholesale market and market management system (MMS) and ancillary-service products. |
Compared with the UK system.
| UK concept | Israel equivalent | How it works |
|---|---|---|
| DNO | Israel Electric Corporation (IEC) | There is effectively one distribution company for the whole country. The IEC owns the low- and high-voltage networks, connects homes and solar systems and is responsible for supply quality. The only other network licensee is a concession company serving East Jerusalem and parts of the West Bank. |
| National Grid/NESO | Noga (system operator) and IEC (transmission owner) | As in Britain, operation and ownership are split: Noga dispatches the system, plans transmission and runs settlement, while the IEC owns and maintains the transmission lines and substations. |
| MPAN | Contract account number (mispar heshbon hoze) plus meter number | There is no separate national meter-point number. A home is identified by the IEC contract account number on the bill, used together with the number embossed on the meter. Private suppliers use both to submit switching requests. |
| MPRN | No equivalent | No household gas meter-point register comparable to the MPRN was identified. |
| Meter operator | IEC | The IEC owns, installs, reads and replaces all household meters, including smart meters. Neither customers nor private suppliers appoint a meter operator. |
| Supplier | IEC default supply or a licensed private supplier | Households stay with the IEC unless they choose a licensed supplier. Switching is free, needs no visit or disconnection, and contracts can be ended at any time without charge. The IEC continues to own the network and meter whichever supplier is chosen. |
| Smart-meter infrastructure | IEC meter data management centre | Unlike Britain’s DCC, there is no separate national data company. Smart meters communicate over power-line carrier (PLC) or cellular (M2M) links to the IEC, which passes consumption data to the chosen supplier. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Contract account number (mispar heshbon hoze) |
| Who issues it? | Israel Electric Corporation (IEC), as distributor and default supplier |
| Format | Numeric account number assigned by the IEC to the electricity contract for a premises, printed on every bill. It is used together with the meter number embossed on the meter plate. |
| Length | Not published by the IEC |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the IEC electricity bill (needed to report a reading, pay or check the meter type). The meter number is on the meter itself, usually in the building’s meter room or a cabinet outside a house. |
| Electronic access | Customers identify on the IEC website or app with their ID number and mobile phone, or with the contract account number and meter number, to see consumption data and check whether a smart meter is installed. |
| Third-party access | Private suppliers file switching requests with Noga using the contract account number, meter number and the customer’s details with a digital power of attorney. Other third parties use the IEC’s power-of-attorney and third-party declaration forms. |
| Who keeps the register | IEC customer and billing system; Noga manages the switching process between suppliers |
| Register scope | National |
How a home is identified
Israel does not use a separate meter-point identifier of the MPAN type. The IEC opens an electricity contract ("hoze") for the customer at each premises and gives it a contract account number, which appears on the bill. The physical connection is identified by the meter number on the meter plate. Most IEC online services ask for the contract number, the bill date and the meter reading, or for the contract number and meter number together.
When someone moves into a new home they must register the electricity contract in their own name with the IEC, using change-of-customer forms. When a rooftop solar system is separated from consumption, the IEC opens a new contract for either the producer or the consumer, so the contract is tied to a customer at a premises rather than being a permanent property code. The IEC does not publish the structure or length of the number, so no example is given here.
Switching supplier
The customer chooses a supplier, which files a request with Noga using the contract account number and meter number, the customer’s name, ID number and contact details, and a digital power of attorney. Noga passes the request to the IEC and approves it if the details match. Since July 2024 households with basic meters can switch too: the customer sends photographs of the meter reading on set days near the end of the month and the switch takes effect on the first of the following month. Customers on time-of-use, prepayment or solar meters with basic meters cannot switch. In October 2026 the switching period was reported as having been cut from 14 to 7 days.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Unknown |
| Net billing | Yes |
| How exported electricity is paid | Regulated fixed tariff paid by the IEC for 25 years on small rooftop systems (48 agorot/kWh up to 15 kW in the fixed track), either on all generation or on exported energy |
| Which settlement methods exist for small rooftop systems? | Under the Electricity Authority’s rooftop regime (decision of 22 March 2018) a producer can choose payment for all generation or payment for energy exported to the grid. A homeowner can later ask the IEC to separate generation from consumption so that the solar payments go to a separate producer contract. |
| What tariff is paid? | The fixed track pays 48 agorot per kWh for 25 years for systems up to 15 kW, as described by the Energy Ministry in February 2025. Earlier IEC guidance listed 41 agorot for 15–100 kW and a tariff linked to the latest competitive rooftop tender for 100–630 kW. The ministry said new tracks with higher early payments or CPI linkage were being brought to the Electricity Authority. |
| How large can a system be? | Total installed capacity at a consumption site may not exceed 630 kVA on the low-voltage network or 16 MVA on the high-voltage network. For PV the capacity is measured as inverter kVA multiplied by 0.9, so systems above 567 kW need a high-voltage connection and the connection size must match the requested capacity. |
| Is there a fast track for homes? | A "green track" fast-tracks connection of home systems up to 15 kW nationwide, according to the Energy Ministry (February 2025). |
| How are solar payments taxed? | Household producers who do not keep business accounts pay no income tax on generation income below ILS 27,900 a year and 10% on income between that level and ILS 120,000, using Tax Authority form 1400. |
Connecting a home system.
- Check grid capacity on the IEC probability map and Noga’s absorption-capacity map.
- Register a request on the IEC producers’ portal, choosing the type of tariff regulation and the system size, and pay the registration fee.
- Receive the IEC "distributor’s answer" on whether and how the system can be connected.
- Confirm the installation is exempt from a building permit under the planning regulations, or obtain a permit and, where required, an occupancy certificate (Form 4).
- Install the system and meet the IEC synchronisation conditions, including proof of insurance cover.
- The IEC installs a bi-directional meter (and a separate generation meter where needed), connects the system and starts paying for generation.
Households can export and are paid for rooftop solar through the IEC, which acts as the counterparty for small systems. About 30,000 residential roofs had solar in early 2025, and the Energy Ministry aims to add 100,000 rooftops (about 1.6 GW) by the end of 2030.
Grid capacity is the main constraint. The Electricity Authority has introduced incentives to shift solar output into evening hours with storage, and Noga publishes annual maps of the network’s ability to absorb new solar. The IEC publishes quarterly lists of systems that received a distributor’s answer and of those connected.
Whether a household-scale net-metering option (offsetting imports against exports at the retail rate) is currently open was not confirmed from an accessible official page.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (rooftop, household) | No separate generation licence identified for small rooftop systems; the system is registered with the IEC under the Electricity Authority’s tariff regulation and connected under its service standards | Electricity Authority (rules); IEC (registration and connection) | Registration via the IEC producers’ portal with a fee; capacity limits of 630 kVA (low voltage) and 16 MVA (high voltage) per site. |
| Generate electricity (utility scale) | Generation licence under the Electricity Sector Law, plus tender award or regulation quota and Noga connection survey | Electricity Authority and Ministry of Energy and Infrastructure | Large solar is mostly procured through competitive tenders and regulation quotas; agrivoltaics follow a national outline plan approved in 2026. |
| Store electricity | Storage facilities connect under Electricity Authority market-model rules; capacity is allocated with Noga transmission guidelines | Electricity Authority; Noga | Noga guidelines on storage under the market model (March 2024, updated July 2025). The IEC holds a transmission and storage licence. |
| Export to the grid | Allowed for registered producers; requires the IEC distributor’s answer and synchronisation approval | IEC under Electricity Authority standards | Bi-directional or generation meter installed by the IEC. |
| Supply / sell to consumers | Supply licence required | Electricity Authority | 50 licences for suppliers without generation had been issued by February 2026; 21 were active in March 2026. |
| Wholesale trading | Licensed generators and suppliers trade through Noga’s pool or bilateral contracts | Noga under Electricity Authority rules | No independent power exchange; Noga publishes the SMP and MCP prices. |
| Aggregation | No specific aggregator licence identified | Electricity Authority | Noga runs load-management agreements directly with large consumers. |
| Balancing / grid services | Contract with Noga; ancillary-service market under development | Noga | Load-shedding and diesel-generator agreements are open to consumers with generators or at least 173 kW of demand. |
| Virtual power plant / remote control of assets | No dedicated framework identified | Electricity Authority | Not identified from an accessible official page. |
The Electricity Sector Law, 1996 makes every activity in the sector subject to a licence from the Electricity Authority and the minister, with system management licensed to Noga and transmission, distribution and storage to the IEC. Small rooftop producers are handled through tariff "regulations" (asdarot) administered by the IEC rather than individual licences.
Supply licences without generation assets ("virtual suppliers") were introduced from March 2021 and are the main route into the retail market; suppliers licensed before then with their own generation are known as bilateral suppliers.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Load management and voluntary load-shedding agreements | Restricted | 173 kW of consumption, or a backup diesel generator | Unknown | Noga. Noga contracts with consumers who reduce demand or run their own generators when called, and publishes the activation dates each year. It encouraged more participants to join in April 2025 as part of emergency preparations. |
| Wholesale pool (SMP / MCP) | Restricted | — | No | Noga. Suppliers buy energy from Noga at the system marginal price; Noga published a new market clearing price (MCP) method in 2025. Only licensed generators and suppliers take part. |
| Ancillary services | Developing | — | Unknown | Noga. Noga’s trade division is developing ancillary-service products and a market management system as part of a future wholesale market. |
| Storage under the market model | Developing | — | Unknown | Electricity Authority / Noga. Grid-scale and solar-coupled storage connects under market-model rules; the Electricity Authority introduced evening and night export incentives for storage in 2023. |
Flexibility is still centrally managed. Noga dispatches generation and storage and contracts directly with large consumers for demand reduction; there is no open market in which household batteries or aggregated small assets can sell services.
Retail competition and the IEC’s voluntary time-of-use tariff give households the first price signals. Smart-meter data at 15-minute resolution is the precondition for wider use of such tariffs.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Noga load-management agreements | Voluntary load shedding and diesel-generator agreements with annual activation schedules. |
| Noga SMP and MCP publications | Published wholesale prices used to settle trades between generators and suppliers. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | IEC national rollout under Electricity Authority decisions of 2021–2023; target of smart meters everywhere by 2028 (2024 statement) |
| Reading interval | 15 minutes |
| Official name | Continuous meter (mone rafif) |
| Owner and installer | Israel Electric Corporation |
| Data transmission | Once a day to the IEC meter data management centre |
| Communications | Power-line carrier (PLC) and cellular (M2M) |
| Regulatory basis | Electricity Authority decisions 61611 (13 Oct 2021), 62404 (26 Feb 2022) and 65701 (4 Jun 2023) |
| National penetration | Not published |
The IEC is replacing basic meters with smart meters across the country. Decisions by the Electricity Authority set the principles for deployment to households (2021), the installation rules (2022) and the expansion and acceleration of the national rollout (2023). The IEC publishes annual address lists of planned installations for 2025, 2026 and 2027, noting that plans may change because of the security situation.
Smart meters record consumption every 15 minutes and send it once a day to the IEC. Customers can check online whether they have one. Data is not passed to third parties without the customer’s consent; the project is overseen by the National Cyber Directorate and privacy rules apply. In September 2026, 14,083 switching requests came from homes with smart meters and 7,666 from homes with basic meters.
Renewable electricity.
Electricity generation mix (2025).
- Natural gas: 79.7%
- Solar: 16.2%
- Coal: 3.4%
- Wind: 0.6%
- Bioenergy: 0.2%
- Renewable electricity share
- 16.9% (2025)Source 23Share of electricity generation (82.1 TWh). Israel is a net exporter of electricity (net imports of −6.4 TWh, supplying Palestinian areas), so the generation share is used. The Energy Ministry reported that 16% of electricity came from renewables by the end of 2025.
- Home solar
- 30,000 homes with rooftop PV (Early 2025)Source 32Number of residential roofs with solar reported by the Energy Ministry.
- Solar added each year
- 1.758 GW (2025)Source 29Derived: 7,121 MW at the end of 2025 minus 5,363 MW at the end of 2024.
- Solar PV
- 7.36 GW (End 2025)Source 23pv magazine reports 7,121 MW, citing IRENA.
- Wind
- 0.35 GW (End 2025)Source 23
- Bioenergy
- 0.05 GW (End 2025)Source 23
- Pumped storage
- 0.3 GW (2024)Source 16
Targets.
- 30% of electricity from renewable sources by 2030 (government target)
- 26 GW of installed renewable capacity by 2035 (Energy Ministry roadmap, May 2026)
- 100,000 additional residential rooftops with solar (about 1.6 GW) by the end of 2030
Solar is almost the whole of Israel’s renewable output. Its share of generation rose from 9.2% in 2022 to 16.2% in 2025 (Ember), but the country missed its 20% target for 2025. Coal fell from 21.7% of generation in 2022 to 3.4% in 2025 as coal units were converted to gas or placed in reserve.
The Energy Ministry’s 2035 roadmap counts about 8 GW installed and 4 GW under construction, and plans the remaining 14 GW as 5 GW of agrivoltaics, 4.5 GW of ground-mounted fields, 4 GW of dual-use sites (such as reservoirs and fishponds) and 0.5 GW of other technologies. A national outline plan for agrivoltaics approved in February 2026 limits panel coverage to 30% of cultivated land and allows storage structures of up to 50 m² per MWh.
Land is scarce and network capacity is limited, so policy favours dual use and rooftops, and storage paired with solar to move output into the evening peak.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 0.557 GW (2024)Source 16300 MW pumped storage plus 257 MW standalone and solar-coupled storage (Electricity Authority data).
Storage is growing from a small base: 369 MW in 2023 and 557 MW in 2024 including pumped storage, with the Electricity Authority forecasting about 9,250 MW by 2030 based on connection surveys and distributor answers already issued. Most of the pipeline is solar-coupled or standalone batteries.
Noga sets the transmission-side rules for connecting storage under the market model and has issued updated guidance for the congested centre of the country. The IEC may build storage at its substations up to 15% of the volume advanced by the private market in the previous year.
Storage projects.
- Pumped-storage facility (PSP): The 300 MW pumped-storage capacity in the national figures. Noga sought penalties from its operator over availability shortfalls in 2022–2023 after a shutdown.
- Mekorot reservoir solar-and-storage tender: The national water company launched a tender in 2026 for solar and storage facilities at its reservoirs.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Israel Electric Corporation (supply) | About 89% of low-voltage customers (end 2025) | No | Yes | No | Yes |
| Cellcom Energy | — | Unknown | Unknown | Unknown | Unknown |
| Bezeq Energy | — | Unknown | Unknown | Unknown | Unknown |
| Partner Power | — | Unknown | Unknown | Unknown | Unknown |
| HOT Energy | — | Unknown | Unknown | Unknown | Unknown |
| Electra Power | — | Unknown | Unknown | Unknown | Unknown |
| Pazgas | — | Unknown | Unknown | Unknown | Unknown |
| Amisragas | — | Unknown | Unknown | Unknown | Unknown |
Retail competition opened gradually: business and smart-meter customers first, then all households from July 2024. By October 2026 more than 500,000 customers had switched from the IEC, mainly to telecoms groups (Cellcom, Bezeq, Partner, HOT) and gas and energy companies (Electra Power, Pazgas, Amisragas), which offer discounts of 7–20% on the regulated rate. In September 2026 alone 23,286 switching requests were filed. Individual supplier market shares are not published.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Infrastructure | Government | Energy policy, targets and licensing with the regulator | Sets renewable targets, the 2035 roadmap and the coal phase-out. |
| Electricity Authority | Regulator | Tariffs, licences and service standards | Sets household tariffs, solar rules, smart-meter policy and switching rules. |
| Noga – Israel Independent System Operator | Market | System operator, settlement and supplier switching | Publishes demand, generation mix, wholesale prices and grid absorption maps. |
| Israel Electric Corporation | Transmission | Transmission, distribution, metering and default supply | Connects homes and solar systems, owns meters and applies the tariffs. |
| IEC renewable energy service | Distribution | Registration and connection of private producers | Handles rooftop solar registration, distributor answers and payments. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid code | Grid Code (Takanon HaReshet) | Noga | Technical rules for users of the transmission system. |
| Distribution-connected generation | Technical requirements for facilities connected to the distribution network | Noga | Requirements for generating units connected at distribution voltages. |
| PV absorption | System-operator guidelines for absorbing PV in distribution networks | Noga | Includes the 2026 maps of system absorption capacity and answers issued. |
| Storage | Guidelines for absorbing storage facilities under the market model | Noga | Issued 22 March 2024; updates for the centre of the country in March and July 2025. |
| Connection size | Electricity Authority service standard 35 | Electricity Authority | Up to 630 kVA per site on low voltage and 16 MVA on high voltage; PV rated at inverter kVA × 0.9. |
| Metering | International metering standards (as stated by the IEC) | IEC | Meters undergo acceptance and sample testing in IEC laboratories before installation. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Building permit for rooftop PV | Limited | Local | Rooftop systems that meet the planning exemption regulations need only a declaration; others need a building or limited-works permit from the local planning committee and, where relevant, Form 4. |
| Registration with the IEC | Yes | National | Through the IEC producers’ portal, with a registration fee. |
| Distributor’s answer (grid approval) | Yes | National | The IEC confirms whether the network can take the system and on what terms. |
| Synchronisation approval | Yes | National | Required before connection, including proof of insurance cover. |
| Agrivoltaic installations | Yes | National | Governed by the national outline plan approved in February 2026, with fast-track permits for small plots and detailed plans for larger projects. |
Permissions are mostly national: the Electricity Authority sets the rules and the IEC administers them. Local planning committees are involved only where a rooftop system falls outside the permit exemption, and for ground-mounted or agrivoltaic projects.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Rooftop solar fixed tariff | Active | Feed-in tariff | 48 agorot/kWh for 25 years for home systems up to 15 kW (fixed track), with payment on generation or exports. Additional tracks with faster payback or CPI linkage were proposed by the Energy Ministry in February 2025. | — |
| Income tax relief on household solar income | Active | Tax relief | No income tax on generation income below ILS 27,900 a year for household producers without business accounts; 10% between that level and ILS 120,000. | — |
| Agrivoltaics pilot tender | Closed | Tender with fixed tariff | 100 MW pilot launched in January 2022 at a fixed ILS 0.2091/kWh for 23 years. | 2022 |
Data and connectivity.
- Fixed broadband
- 29.2 fixed broadband subscriptions per 100 people (2024)Source 27
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters connect to the IEC over power-line carrier or cellular (M2M) links. The IEC buys cellular communication modules and radio services for its smart-meter centre through public tenders. World Bank data show 88% of the population using the internet in 2024.
Grid conditions.
- National peak demand
- 17 GW (12 Aug 2025)Source 18All-time record; renewables supplied 4,038 MW at the time.
- Annual electricity demand
- 75.7 TWh (2025)Source 23
- Generation capacity
- 25.8 GW (2025)Source 23Derived: 18.06 GW fossil plus 7.77 GW renewable capacity in Ember data.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Because the grid is isolated, Noga must keep enough reserve within Israel to cover outages and peaks. Summer heatwaves set new records in 2023 and again in August 2025. The government has approved new gas-fired plants that are expected to raise gas-fired output by 20–25% by 2031.
Network capacity limits the connection of new solar and storage, especially in the centre of the country. The IEC chairman said in June 2026 that the company invests ILS 7–8 billion a year to prepare the sector.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Retail competition for all households | Current | July 2024 | Households with basic meters can switch to private suppliers. More than 500,000 customers had switched by October 2026 and the switching period has been shortened to 7 days. |
| July 2026 tariff update | Current | 1 July 2026 | Household rate reduced to 53.83 agorot/kWh before VAT from 54.51 agorot set in January 2026. |
| Smart meters for all homes | Upcoming | 2028 | Target date for national smart-meter coverage stated by the Electricity Authority in 2024. |
| Coal phase-out | Upcoming | 2026–2028 | Two coal units are due to stop routine coal use by the end of 2026 and four units are to be kept in warm reserve until the end of 2028, under an Electricity Authority decision of 27 November 2025. |
| Renewable roadmap to 2035 | Upcoming | 2030–2035 | 30% renewable electricity by 2030 and 26 GW of renewable capacity by 2035, with a planned ILS 40 billion loan for grid expansion to 2030. |
| Heat-pump water heating in new buildings | Upcoming | 2026 | Rules replacing solar water heaters with heat pumps and PV in new buildings; already in force for single-family homes and non-residential buildings, with multi-storey residential buildings targeted for 2026. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 30,000 residential roofs with solar in early 2025 under a 25-year fixed tariff, with a target of 100,000 more by 2030. |
| Distributed energy market | Medium | Rooftop and commercial solar connect under regulated tariffs and capacity limits, but grid absorption is constrained and there is no market access for small assets. |
| Grid flexibility market | Low | Central dispatch by Noga; demand response limited to load-management contracts for sites of 173 kW or more; ancillary-service market still under development. |
| Energy storage adoption | Medium | 557 MW of storage in 2024 including 300 MW of pumped storage, with about 9,250 MW forecast by 2030 from connection surveys. |
| Renewable growth environment | High | Renewable share of generation rose from 9.7% in 2022 to 16.9% in 2025 (Ember), with 1.76 GW of solar added in 2025, though the 20% target for 2025 was missed. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 40 sources
- Household electricity tariff (tariffs in force from 01.07.2026). Israel Electric Corporation, 2026. accessed 9 October 2026.
- Voluntary time-of-use (TAOZ) tariff for uniform-tariff customers. Israel Electric Corporation, 2026. accessed 9 October 2026.
- Previous electricity tariffs (tariff files 2019–2026). Israel Electric Corporation, 2026. accessed 9 October 2026.
- Structure of the electricity bill (questions and answers). Israel Electric Corporation, 2023. accessed 9 October 2026.
- Questions and answers on the smart meter. Israel Electric Corporation, 2026. accessed 9 October 2026.
- Everything you need to know about the smart meter. Israel Electric Corporation, 2023. accessed 9 October 2026.
- Switchable meters – meter type check and annual smart-meter rollout plans. Israel Electric Corporation, 2026. accessed 9 October 2026.
- Meter reading – reporting a reading. Israel Electric Corporation, 2023. accessed 9 October 2026.
- Switching to a private supplier for customers with a basic meter. Israel Electric Corporation, 2025. accessed 9 October 2026.
- Change of customers and registration at a property. Israel Electric Corporation, 2026. accessed 9 October 2026.
- Photovoltaic systems – small rooftop regulation and tariffs. Israel Electric Corporation, 2023. accessed 9 October 2026.
- Separating consumption from solar generation (incl. tax relief on solar income). Israel Electric Corporation, 2026. accessed 9 October 2026.
- Registration process for tariff regulation (producers’ portal). Israel Electric Corporation, 2024. accessed 9 October 2026.
- Matching connection size to requested generating capacity (service standard 35). Israel Electric Corporation, 2022. accessed 9 October 2026.
- Implementation of the planning regulations for generating facilities. Israel Electric Corporation, 2025. accessed 9 October 2026.
- Investor presentation, June 2026 (Hebrew). Israel Electric Corporation, 2026. accessed 9 October 2026.
- Noga – about the company and announcements. Noga – Israel Independent System Operator, 2026. accessed 9 October 2026.
- All-time record in electricity consumption in Israel (12.8.25). Noga – Israel Independent System Operator, 2025. accessed 9 October 2026.
- Trade division. Noga – Israel Independent System Operator, 2026. accessed 9 October 2026.
- Switching status for private suppliers, March 2026. Noga – Israel Independent System Operator, 2026. accessed 9 October 2026.
- Voluntary load-shedding and diesel-generator agreements. Noga – Israel Independent System Operator, 2026. accessed 9 October 2026.
- Guidelines for absorbing storage facilities in distribution. Noga – Israel Independent System Operator, 2025. accessed 9 October 2026.
- Yearly electricity data (Israel). Ember, 2025. accessed 9 October 2026.
- Energy Profile: Israel. IRENA, 2025. accessed 9 October 2026.
- Population, total – Israel. World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total population) – Israel. World Bank, 2025. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people) – Israel. World Bank, 2024. accessed 9 October 2026.
- Representative exchange rate EUR/ILS (series RER_EUR_ILS). Bank of Israel, 2026. accessed 9 October 2026.
- Israel targets 26 GW of renewables by 2035. pv magazine, 2026. accessed 9 October 2026.
- Israel approves rules for agrivoltaics. pv magazine, 2026. accessed 9 October 2026.
- Israeli storage developer moves into solar EPC with majority stake deal. pv magazine, 2026. accessed 9 October 2026.
- Energy Ministry: Invest in solar panels, enjoy 15% annual return for 25 years. The Times of Israel, 2025. accessed 9 October 2026.
- New plan looks to replace Israel’s solar water heaters with PV cells and heat pumps. The Times of Israel, 2025. accessed 9 October 2026.
- Energy Ministry presents strategic roadmap for renewable energy by 2035. The Times of Israel, 2026. accessed 9 October 2026.
- Electricity bills expected to drop as major privatization reform enters into effect. The Times of Israel, 2024. accessed 9 October 2026.
- Wave of price rises and tax hikes takes effect, fueling costs for Israelis in 2026. The Times of Israel, 2026. accessed 9 October 2026.
- Electricity Authority announces move to increase renewable energy production. The Times of Israel, 2023. accessed 9 October 2026.
- Israel’s electricity reform: Israelis are leaving one of the country’s oldest companies. The Jerusalem Post, 2026. accessed 9 October 2026.
- Price of electricity in Israel to rise 2.6% in February. The Jerusalem Post, 2024. accessed 9 October 2026.
- NIS 75M on the way to our pockets: The offset that will affect electricity bills. The Jerusalem Post, 2026. accessed 9 October 2026.
Questions about energy in Israel.
From 1 July 2026 the regulated household rate is 53.83 agorot per kWh before VAT, or 63.52 agorot with 18% VAT (about EUR 0.18 at the Bank of Israel rate on 7 October 2026). Fixed distribution and supply charges and a capacity charge based on the connection size are added. Private suppliers offer discounts on this rate.
Yes. Since July 2024 every household can move from the Israel Electric Corporation to a licensed private supplier, even with a basic meter. The new supplier files the request through Noga; there is no visit or disconnection, and contracts can be ended at any time without charge. The IEC still owns the network and meter.
There is no separate meter-point number. Homes are identified by the IEC contract account number printed on the bill together with the meter number on the meter. Suppliers use both when you switch.
Yes. Home systems registered with the IEC are paid a fixed tariff, 48 agorot per kWh for 25 years for systems up to 15 kW in the fixed track, either on all generation or on exports. Systems up to 15 kW can use a fast-track connection.
Noga, a government company, operates the system and dispatches power stations. The Israel Electric Corporation owns the transmission and distribution networks and the meters, and the Electricity Authority regulates the sector and sets tariffs.
Yes. The IEC is rolling out smart ("continuous") meters that record use every 15 minutes and send it daily. The aim is national coverage by 2028; you can check online with your contract and meter numbers whether you have one.
About 17% of generation in 2025, almost all solar, according to Ember. Natural gas supplied about 80% and coal 3.4%. The targets are 30% by 2030 and 26 GW of renewable capacity by 2035.