How electricity works in Seychelles.
Seychelles electricity 2026: PUC block tariffs, URC regulation, net billing for rooftop solar, the PV Rebate 2.0 grant, licensing, grid rules and storage.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Seychelles rupee (SCR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Seychelles energy at a glance.
Key figures for households in Seychelles. Each one links to its source on the full overview below.
Electricity price.
2.74 SCR per kWh for households, including taxes. Figures for 2023.
Renewable share.
5.6% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Seychelles.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Seychelles below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Seychelles requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Seychelles.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Seychelles, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Seychelles, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Seychelles.
The energy market in Seychelles, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Seychelles is an archipelago of 115 islands whose public power supply is concentrated on the three main inhabited islands, Mahé, Praslin and La Digue. The state-owned Public Utilities Corporation (PUC) generates, transmits, distributes and sells electricity there, and also runs water and sewerage services. There is no interconnection with any other country, and the system has historically run almost entirely on imported diesel and heavy fuel oil burnt in three power stations: Roche Caiman and New Port on Mahé, and Baie Ste Anne on Praslin.
The legal framework was rebuilt in 2024. The Electricity Act 2023 came into operation on 18 October 2024, and the Utilities Regulatory Commission Act 2023, in force the same day, repealed the Energy Act 2012 and replaced the Seychelles Energy Commission with an independent Utilities Regulatory Commission (URC) covering electricity, water and sewerage. The URC’s five commissioners took office on 1 May 2025. New regulations made in October 2024 cover licensing, independent power producers and distributed generation, introducing net billing for rooftop systems of up to 100 kW.
Renewables supplied about 6% of electricity in 2023, mainly from the 5 MW Ile de Romainville solar park, the 6 MW Port Victoria wind farm and rooftop solar. The national target is 15% renewable electricity by 2030. In 2026 the government endorsed the Seychelles Integrated Resource Plan 2023–2043, adopted an interim framework for self-consumption systems, ordered a review of the 2023 electricity laws, and approved a “One PV per Household” rooftop programme. A 5.8 MW floating solar plant in Providence Lagoon is due to start operating in December 2026.
Energy snapshot.
Headline figures for electricity in Seychelles. Each shows its data year and links to its source.
- Population122,038 peopleSource 1131 Dec 2024
- Households28,060 householdsSource 122022
- Average household size3.2 people/householdSource 122022
- Electricity use per householdNot identified from a reliable public source.
- Household price (SCR)2.74 SCR/kWhSource 82023
- Household price (EUR)0.165 EUR/kWhSource 202023
- Renewable electricity share5.6%Source 92023
- Solar capacity0.018 GWSource 92024
- Wind capacity0.006 GWSource 92024
- Energy storage capacity0.005 GWSource 182021
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Utilities Regulatory Commission (URC)
- System operator
- Public Utilities Corporation (PUC)
- Distribution networks
- PUC is the only distribution and supply licensee, serving Mahé, Praslin and La Digue
- Currency
- Seychelles rupee (SCR)
- Voltage and frequency
- 240 V / 50 Hz
Electricity prices in Seychelles.
- Household price (SCR)
- 2.74 SCR/kWh (2023)Source 8Derived: the World Bank’s average residential tariff of US$0.19/kWh (2023) converted at the Central Bank of Seychelles mid rate of SCR 14.4277 per US dollar on 2 October 2026. The gazetted block rates were changed in January 2025, so this is an indicative average, not a current tariff. VAT treatment of domestic bills was not confirmed from an official source.
- Household price (EUR)
- 0.165 EUR/kWh (2023)Source 20Converted from US$0.19/kWh (World Bank average residential tariff, 2023) via the Central Bank of Seychelles consolidated mid rates of 2 October 2026: SCR 14.4277/USD and SCR 16.5914/EUR (0.19 × 14.4277 ÷ 16.5914 = 0.165).
- Typical annual electricity bill
- Not identified from a reliable public source.
How prices are set
Electricity tariffs are set in the Schedule to the Electricity Regulations made under the Public Utilities Corporation Act. The current schedule was substituted by the Electricity (Amendment) Regulations 2025 (S.I. 2 of 2025), deemed in force from 15 January 2025. The Utilities Regulatory Commission Act 2023 gives the URC the job of regulating tariffs, while Cabinet decides major adjustments: the July 2026 Fuel Cost Adjustment was approved by Cabinet to keep the first 400 kWh of every household’s monthly use free of any increase, recovering the cost from higher domestic use, commercial and government customers.
Cross-subsidy
Households pay much less than other users. The World Bank reported average end-user tariffs of about US$0.28/kWh in 2023, with residential customers paying about US$0.19 while commercial and government customers paid about US$0.38 and US$0.41. The 2025 schedule reflects this: commercial energy rates run from SCR 4.41 to 5.34/kWh, government users pay SCR 6.08/kWh plus a demand charge, and bulk consumers above 150 kVA pay SCR 5.05–5.34/kWh plus SCR 85.25/kVA.
What a household pays
A domestic bill is made up of the block energy charge, any demand charge for a larger subscribed load and the fuel variation. Because the blocks rise steeply above 300 kWh, the average price climbs quickly with use: a home using 200 kWh a month pays SCR 1.97/kWh at base rates, while use above 600 kWh is charged at SCR 4.95/kWh. Unpaid bills attract a 2% compounding surcharge for each 30 days overdue, and a new tenant or occupier pays a reconnection fee of SCR 150 (single-phase) or SCR 420 (three-phase).
Trends
Prices follow fuel costs. A rise of 60 cents per kWh took effect on 15 January 2024 (49 cents from fuel price variation and 11 cents from a 2.5% increase in average tariffs), followed by a further 19 cents across all sectors for mid-October 2024 to mid-January 2025. The 2026 fuel adjustment is the first to protect lower domestic consumption explicitly.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Domestic Tariffs 110, 120 and 130 (Electricity (Amendment) Regulations 2025, in force from 15 January 2025) share one rising-block energy charge: SCR 1.97/kWh for the first 200 kWh a month, 2.26 for 201–300 kWh, 3.90 for 301–400 kWh, 4.30 for 401–600 kWh and 4.95 above 600 kWh. They differ only in the demand charge for the subscribed load: none up to 2.4 kVA (110), SCR 4.90/kVA between 2.4 and 9.6 kVA (120), and SCR 9.85/kVA at 9.6 kVA or more (130). |
| Variable | Yes | A fuel variation clause moves every rate by 0.28 cent for each one cent per litre change in the weighted average fuel price, from the next meter-reading period. Under the July 2026 Fuel Cost Adjustment approved by Cabinet, domestic use up to 400 kWh a month is shielded and use above 400 kWh rises by 25–29 cents per kWh once implementation arrangements are finalised. |
| Prepayment | Limited | Prepaid meters, introduced in 2019, are installed only at selected low-income households identified by the Agency for Social Protection. The same tariffs apply as for post-paid meters. |
| Time-of-use | No | No domestic time-of-use tariff is published. The distributed generation regulations require prosumer meters to record time of day if such a tariff is introduced. |
| Fixed | No | PUC is the only supplier, so there are no competing fixed-price contracts; prices are set in regulations. |
| Dynamic | No | There is no wholesale market, so no wholesale-indexed tariffs exist. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 3,600 kWh/person/yr (2023)Source 8Approximate national per-capita consumption, all sectors (“c. 3,600 kWh/year”), as reported by the World Bank.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Electricity demand in Seychelles is driven as much by tourism and commerce as by households. Hotels, offices and government buildings pay higher tariffs and cross-subsidise domestic users, and the World Bank notes that the country spent US$279 million on oil imports in 2023, about a quarter of which went on power generation.
Demand on Mahé reached 63.8 MW in 2024 and PUC expects it to grow by about 4–5% a year. Praslin peaked at 10.0 MW in 2023. National consumption per person was about 3,600 kWh in 2023, high for Africa and reflecting the island economy’s cooling and tourism load. The tariff blocks, which rise sharply above 300 kWh a month, and the government’s choice of 400 kWh as the protected threshold in 2026, suggest that most households use less than that each month, but PUC does not publish the distribution of household consumption.
Housing and households.
- Dwellings
- 30,835 dwelling houses (2022)Source 12Provisional 2022 census count; 91% were occupied.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 59.8 % of population (2025)Source 21
Most homes are on Mahé, which had 26,934 of the 30,835 dwelling houses counted in the provisional 2022 census, concentrated in the central districts around Victoria. Praslin had 2,701 dwelling houses and La Digue 1,180. Average household size fell from 3.7 in 2010 to 3.2 in 2022.
Tenure matters for electricity administration. PUC asks for a location plan, proof of identity and, where applicable, planning approval for a new connection. When a tenant takes over a supply, PUC asks for a letter from the landlord showing no objection, the tenant’s identity card and a copy of an existing bill. The PV Rebate 2.0 grant is open only to people who own and live in the property.
How the grid works in Seychelles.
- TransmissionPublic Utilities Corporation (PUC), PUC
- DistributionPUC is the only distribution and supply licensee, serving Mahé, Praslin and La Digue
- MeteringPUC
- Supply1 or more retail suppliers
Physical flow
The World Bank put thermal capacity at just over 125 MW in 2024: Roche Caiman (77.5 MW) and New Port (28.8 MW) on Mahé, and Baie Ste Anne (15.4 MW) on Praslin. PUC planned to add two 8 MW Wärtsilä engines at Roche Caiman by the end of 2025, taking the station to 90 MW. Renewable plant comprises the Port Victoria wind farm (eight 750 kW turbines, three on Ile du Port and five on Ile de Romainville), the 5 MW Ile de Romainville solar park with a 5 MW / 3.3 MWh battery, and rooftop systems; IRENA counts 131 MW of total capacity in 2024.
On Mahé, power is carried on a 33 kV underground cable network to substations and then on 11 kV feeders to local transformers. PUC says its South Mahé 33 kV project, about 300 km of 33 kV and 40 km of 11 kV cable across nine substations, cut network losses from about 16% to 6%. Praslin and La Digue form a second grid, linked by submarine cable.
Commercial flow
There is no wholesale market. PUC buys output from independent power producers under power purchase agreements, and since October 2024 any contract for more than 500 kW of renewable power must be awarded through competitive procurement under the Electricity (Independent Power Producer) Regulations 2024, with documents approved by the URC. The first such plant, Qair’s 5.8 MW floating solar farm in Providence Lagoon, will sell all its output to PUC. Rooftop prosumers are credited through their PUC bills.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Environment, Climate, Energy and Natural Resources | Responsible for energy policy since the government formed in November 2025; makes regulations under the Electricity Act 2023. Its Climate Change and Energy department runs renewable-energy programmes with the Ministry of Finance. |
| Regulator | Utilities Regulatory Commission (URC) | Independent regulator for electricity, water and sewerage under the URC Act 2023. Issues licences, regulates tariffs, sets export rates for prosumers, receives applications to connect distributed generation and settles disputes. Commissioners appointed from 1 May 2025. |
| TSO | Public Utilities Corporation (PUC) | Owns and runs the 33 kV underground transmission network on Mahé and the submarine cables linking Praslin and La Digue (a third cable was completed in November 2024). |
| System operator | PUC | Dispatches its own diesel and heavy-fuel-oil stations, the wind farm and solar park, and balances variable renewable output on two small isolated grids (Mahé, and Praslin–La Digue). |
| DSO | PUC | Runs the 11 kV and low-voltage networks, connects new supplies, carries out technical feasibility studies for distributed generation and publishes hosting capacity. |
| Supplier | PUC | Sole retailer, billing at the tariffs set in the Electricity Regulations. |
| Metering | PUC | Procures, installs, seals and maintains all meters, including net and check meters for prosumers, and operates prepaid meters for selected low-income homes. |
| Settlement | PUC as sole offtaker | Buys all output from independent power producers under power purchase agreements and credits rooftop exports through customers’ bills. |
Compared with the UK system.
| UK concept | Seychelles equivalent | How it works |
|---|---|---|
| DNO | PUC (distribution and supply licensee) | There are no regional network companies. PUC owns and runs every distribution network on the main islands and is also the retailer, so the network operator and supplier are the same body. |
| National Grid/NESO | PUC | PUC owns most generation, the 33 kV transmission network and the inter-island cables, and dispatches the system. The URC regulates it from outside; there is no separate system operator. |
| MPAN | PUC customer number | A supply is identified by the customer (account) number in PUC’s billing system, printed on the bill and used to pay and to register online. There is no separate national supply-point number. |
| MPRN | No equivalent | There is no piped natural-gas network for homes, so there is no gas supply-point register. |
| Meter operator | PUC | PUC supplies, tests, seals and maintains meters. Under the 2024 distributed generation regulations it must also procure and install prosumer net, export and check meters, which must have advanced metering capability. |
| Supplier | PUC (single supplier) | Households cannot change supplier. They can reduce what they buy by installing rooftop solar under net billing. |
| Smart-meter infrastructure | No national smart-meter programme published | There is no DCC-style data network. PUC reads meters for monthly bills, offers keypad prepaid meters to some low-income homes and shows consumption on its MyAccount portal. |
How a supply point is identified.
Customer No. 0123456 (fictional; illustrative only)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | PUC customer number (Customer No.) |
| Who issues it? | Public Utilities Corporation, when a new service connection is approved |
| Format | Numeric customer (account) number printed on the PUC bill. PUC does not publish its length or structure; the meter serial number is a separate identifier. |
| Length | Not published by PUC |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the PUC electricity bill; also shown in the PUC MyAccount portal once linked. |
| Electronic access | Customers register for MyAccount (myaccount.puc.sc) by sending their name, email, mobile number, customer number(s) and a copy of their identity card to PUC by WhatsApp or email. They can then view consumption graphs, invoices and transaction history and pay online. |
| Third-party access | No regulated scheme gives installers or other third parties access to consumption data. Anyone can pay a bill using the customer number through banks, Airtel Money, ATMs and other channels. Tenants need the account holder to request a name transfer before they can use the portal. |
| Who keeps the register | PUC’s customer and billing system |
| Register scope | National |
How a home is identified
In Seychelles a household electricity supply is identified by the customer number PUC assigns to the account. It is printed on every bill and is the reference needed to pay, to register on the MyAccount portal and to follow up a service connection enquiry. There is no national supply-point register separate from PUC’s billing system, because PUC is the only network operator and supplier.
PUC does not publish the length or structure of the number, so the example above is illustrative only. The meter installed at the premises has its own serial number. For prepaid customers, credit is bought as vouchers carrying a 20-digit code that is entered on an in-home keypad.
Connecting and moving
For a new connection PUC asks for a location plan, a copy of the applicant’s identity card, planning approval where applicable and an enclosed structure to house the electrical equipment; the applicant is responsible for clearing trees and civil works. PUC says applications are usually validated within two weeks. The first 50 m of overhead service line is free, with longer or underground lines charged at cost, and each new installation is tested before connection (SCR 150 single-phase, SCR 420 three-phase).
When a tenant moves in, PUC asks for a letter from the landlord showing no objection, the tenant’s identity card and a copy of an existing bill, and a reconnection fee applies to a new tenant or occupier. PUC does not say whether the customer number is reissued or transferred, so it is not stated here whether the identifier stays with the property; the meter does.
Who keeps the register
PUC keeps customer, account and meter records for the whole of its supply area. For distributed generation, the URC also gives each application a unique registration number, and PUC must keep a record of every distributed generation system, its type and capacity and report it to the URC quarterly.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Net billing under the Electricity (Distributed Generation System) Regulations 2024: imports are charged at the normal retail tariff and exports are credited at a rate set by the URC based on the levelised cost of a representative system and PUC’s avoided purchase cost. Credits carry forward and are settled annually, capped at 20% of the notional value of a year’s output. The current URC export rate was not identified from a published source. |
| Is there a size limit? | Net billing is open to consumers with a prescribed demand of 100 kW or less, and the system may not exceed that demand. Consumers with a contracted demand between 100 kW and 500 kW use gross metering, capped at their previous year’s maximum demand. The minimum size for net billing is 1 kW. |
| Can the network refuse a connection? | Yes. The total distributed generation on a feeder or distribution transformer may not exceed 100% of its capacity. If PUC finds a connection is not technically feasible, the application goes on a priority waiting list until capacity becomes available. PUC must publish cumulative installed capacity and available hosting capacity monthly. |
| How are credits settled? | Monthly, any export credit above the bill’s fixed charges and levies carries forward. At the end of the annual settlement period PUC pays out the remaining credit, but no more than 20% of the notional value of the energy the system could produce in a year at the capacity factor set by the URC. |
| Are batteries allowed? | Yes. The regulations expressly allow prosumers to install distributed generation with battery storage. |
| Can a third party own the system? | Yes. A prosumer may own the system or contract a third party to install it on the premises. |
| What metering is used? | A single bi-directional meter for net billing, with a check meter for systems above 100 kW. Gross metering uses separate import and export meters plus a check meter. All meters must have advanced metering capability and are procured, installed and sealed by PUC. |
| Can diesel or other non-renewable generators export? | Only when PUC asks. Consumers with non-renewable generators for their own use may offer surplus power when PUC publicly requests it, under gross metering at a URC-determined rate cap. A PUC permit is needed to operate a generator (SCR 150 a year). |
Connecting a home system.
- Choose a system no larger than the home’s prescribed (contracted) demand, with a minimum of 1 kW; systems up to 100 kW qualify for net billing.
- Apply to the Utilities Regulatory Commission with the information required by the licensing regulations; the URC issues a unique registration number and acknowledgement.
- The URC forwards the application to PUC, which carries out a technical feasibility study within 60 days and reports any deficiencies, which the applicant must fix within 15 days.
- Once the URC confirms approval, install the system to BS 7671 within 180 days.
- Submit a work completion report to PUC, which inspects the installation and carries out safety checks within 7 working days.
- PUC synchronises the system, installs the bi-directional (net) meter, issues a letter of synchronisation with the commissioning date and copies it to the URC.
- Optionally apply for the PV Rebate 2.0 grant within six months of commissioning.
Rooftop solar export has been allowed in Seychelles since the Energy Act 2012 era, when applications went to the Seychelles Energy Commission and households could size systems to cover their own consumption. Since October 2024 the Electricity (Distributed Generation System) Regulations 2024 set the rules. Applications now go to the URC, PUC checks technical feasibility, and the regime has changed from netting kWh to net billing, where exports are valued at a regulated rate rather than offsetting imports unit for unit. Existing prosumers could choose within 90 days whether to keep their previous arrangement or move to the new one.
The framework is still developing. In July 2026 Cabinet adopted an interim administrative framework for self-consumption renewable systems, pending a full review of the URC Act and Electricity Act. A low-voltage hosting capacity study confirmed that the renewable targets remain achievable despite network constraints. Cabinet also approved a phased “One PV per Household” programme of rooftop systems on government and private homes, carried out with Chinese cooperation and run by the URC, the energy department and PUC.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (utility scale, renewable) | Generation licence from the URC under the Electricity Act 2023. Renewable contracts above 500 kW must be awarded by PUC through competitive procurement, on build-own-operate or build-own-operate-transfer terms, using URC-approved documents. | Utilities Regulatory Commission; PUC (procurement) | Electricity (Independent Power Producer) Regulations 2024 (S.I. 87 of 2024). All output is bought by PUC. |
| Generate on own premises (rooftop / distributed) | Application to the URC for interconnection, technical feasibility study by PUC, installation to BS 7671 and inspection before synchronisation. Systems over 100 kW also need a URC safety certificate. A separate generation licence threshold for small systems was not confirmed from the licensing regulations. | Utilities Regulatory Commission; PUC | Electricity (Distributed Generation System) Regulations 2024 (S.I. 84 of 2024). |
| Operate a standby generator | Annual PUC permit (SCR 150) and inspection at cost. | PUC | Schedule to the Electricity Regulations as amended in 2025. |
| Store electricity | No separate storage licence identified. Batteries are allowed with distributed generation, and renewable IPP projects may include storage. | Utilities Regulatory Commission | The IPP regulations define storage widely, including batteries, flow batteries, pumped storage and hydrogen. |
| Export to the grid | Only under net billing (up to 100 kW) or gross metering (100–500 kW) after URC approval and PUC commissioning, within feeder hosting capacity. | Utilities Regulatory Commission; PUC | Export rates are set by the URC. |
| Supply / retail to third parties | Licence required under the Electricity Act 2023. PUC is the only distribution and supply licensee; no competing retailer operates. | Utilities Regulatory Commission | Third-party-owned rooftop systems on a prosumer’s premises are permitted. |
| Transmission, distribution, system operation | Licence required; all carried out by PUC. | Utilities Regulatory Commission | Electricity Act 2023, in force 18 October 2024. |
| Wholesale trading | Not applicable: there is no wholesale market or exchange. | — | Bulk purchases are bilateral power purchase agreements with PUC. |
| Aggregation / virtual power plant | No licence category for independent aggregators. The distributed generation regulations allow the distribution and supply licensee itself to undertake demand aggregation. | — | S.I. 84 of 2024, regulation 9. |
| Balancing and grid services | Provided by PUC with its own plant and battery; no third-party procurement is published. | PUC | PUC may buy surplus from non-renewable distributed generators when it publicly requests it. |
| Remote control of customer assets | No dispatch or control right over household systems is set out in the regulations. | — | Prosumer meters must have advanced metering capability. |
| Electrical installation work | Wireman’s and electrical contractor’s certificates, renewed annually; certificate decisions are made by the Chief Electrical Inspector, with appeal to the Minister. | Chief Electrical Inspector | Application fees: SCR 150 (wireman) and SCR 525 (contractor). Failed installation retests are charged to the licensed electrical contractor. |
The Electricity Act 2023 and the URC Act 2023 both came into operation on 18 October 2024, replacing the Energy Act 2012. Licensing now sits with the Utilities Regulatory Commission. Three sets of regulations made in October 2024 – on licensing, independent power producers and distributed generation – define how generation, network and supply activities are authorised, how renewable plants above 500 kW are procured and how rooftop systems connect.
In practice PUC still carries out every regulated network and supply activity. Private investment comes either through competitive IPP tenders, where PUC is the only buyer, or through behind-the-meter systems connected under the distributed generation regulations. In July 2026 Cabinet ordered a comprehensive review of the URC Act, the Electricity Act and all associated regulations to address inconsistencies and gaps exposed by the energy transition, so the licensing rules may change.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency and reserve | No | — | No | PUC. Provided by PUC’s own thermal plant and the 5 MW / 3.3 MWh Romainville battery; no market is open to distributed assets. |
| Renewable IPP procurement | Restricted | Above 500 kW | No | PUC (approved by URC). Renewable plant above 500 kW, with or without storage, is procured through competitive tenders under the IPP regulations. |
| Surplus from non-renewable distributed generators | Restricted | — | No | PUC. When PUC needs power it may publicly request surplus from consumers’ own generators, paying under gross metering up to a URC rate cap, with competitive offers if supply exceeds need. |
| Demand response | No | — | No | No household demand-response programme or time-of-use tariff is published. |
Seychelles has no flexibility market. Each grid is small and isolated, and PUC balances it with its own engines, the wind farm, the solar park and its battery. There is no legal role for independent aggregators or virtual power plants; the only aggregation the 2024 regulations mention is by the distribution and supply licensee itself.
The main flexibility issue is how much variable renewable output the small grids can take. The distributed generation regulations limit rooftop systems to the capacity of each feeder or transformer and require PUC to study the impact of distributed generation every two years. The World Bank Renewable Energy Acceleration Project includes grid upgrades and training on battery storage to support the 15% renewable target.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| PUC MyAccount | Customer portal for consumption graphs, invoices and online payment. It is not a flexibility platform. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter rollout published; prosumer meters must be AMI-capable and prepaid meters serve selected low-income homes |
| Reading interval | Monthly billing reads |
| Meter ownership | PUC procures, installs and seals all meters |
| Prosumer meters | Bi-directional net meter with advanced metering capability; check meter above 100 kW |
| Prepaid meters | First batch of 2,000 received in 2019; installed for selected low-income households |
| Prepaid top-up | 20-digit voucher code entered on an in-home keypad |
| Online access | PUC MyAccount portal (consumption graphs, invoices, payment) |
PUC has not announced a national smart-meter programme. Most homes have post-paid meters read for monthly bills, payable within 30 days. In 2019 PUC introduced keypad prepaid meters, starting with 200 households under social protection schemes on Mahé, Praslin and La Digue; they remain limited to low-income households identified by the Agency for Social Protection and use the same tariffs as other homes.
The 2024 distributed generation regulations set a higher standard for prosumers: all meters at the interconnection point must have advanced metering capability with a communication port, comply with the National Electricity Grid Code and record time of day if a time-of-day tariff applies. The World Bank notes that government energy-efficiency plans include smart meters.
Renewable electricity.
Electricity generation mix (2023).
- Oil (diesel & heavy fuel oil): 94.2%
- Solar: 4.4%
- Wind: 1.3%
- Renewable electricity share
- 5.6% (2023)Source 9Derived from IRENA: 27 GWh renewable (solar 21, wind 6) of 480 GWh generated in 2023. The World Bank reports 3.6% for 2023 on PUC data, which may exclude rooftop solar.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0 MW (2024)Source 9IRENA records no net change in solar capacity between 2023 and 2024; solar capacity grew by 245% between 2019 and 2024.
- Solar PV
- 18 MW (2024)Source 9
- Wind
- 6 MW (2024)Source 9
- Fossil fuel (oil-fired)
- 107 MW (2024)Source 9IRENA non-renewable capacity. The World Bank lists just over 125 MW across Roche Caiman, New Port and Baie Ste Anne.
Targets.
- 15% of electricity from renewable sources by 2030 (Seychelles Energy Policy 2010–2030)
- 100% renewable electricity in the longer term, beyond 2030
- Seychelles Integrated Resource Plan 2023–2043 endorsed by Cabinet in July 2026 as the least-cost pathway for the sector
Seychelles has little land and no hydro or bioenergy resource of note, so its renewable options are solar, wind and, potentially, ocean energy. The 6 MW Port Victoria wind farm, built in 2013 with funding from the United Arab Emirates, was followed in 2021 by the 5 MW Ile de Romainville solar park, built on reclaimed land with a 5 MW / 3.3 MWh battery and financed by a concessional loan from the IRENA/Abu Dhabi Fund for Development facility; PUC says it produces about 7 GWh a year. Rooftop solar adds the rest of the 18 MW of solar counted by IRENA.
The next step is Qair’s 5.8 MW Seysun floating solar plant in Providence Lagoon, the first renewable IPP, with 9,980 panels and a cost of US$5.7 million. Construction began in 2025; in July 2026 installation was about 10% complete after supply-chain delays and commercial operation was expected in December 2026, adding about 1.5% of national generation. The World Bank estimated that reaching 15% by 2030 needs US$50–60 million in generation and US$35 million in grid upgrades.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 3.3 MWh (2021)Source 18Ile de Romainville battery, 5 MW / 3.3 MWh.
Storage in Seychelles is so far limited to the Romainville battery, which supports the solar park rather than providing system-wide services. The 2024 regulations allow both rooftop systems and renewable IPP projects to include storage, which will matter as more variable output is added to the small grids.
Storage projects.
- Ile de Romainville solar park battery: 5 MW / 3.3 MWh battery integrated with the 5 MW solar park on Mahé, smoothing solar output into the main grid.
- World Bank Renewable Energy Acceleration Project: Grid-stability investments and training on planning and integrating battery storage and variable renewables, to support the 15% target.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Public Utilities Corporation (PUC) | Sole supplier on Mahé, Praslin and La Digue | No | No | No | Yes |
PUC, a parastatal formed in 1986, is the only electricity supplier on the main islands. Households cannot switch supplier, and every tariff is set in regulation. Bills can be paid through the MyAccount portal, Airtel Money, banking apps, ATMs and at PUC customer service centres, banks, credit unions and post offices.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Environment, Climate, Energy and Natural Resources | Government | Energy policy and regulations under the Electricity Act 2023 | Sets renewable-energy policy and targets and, with the Ministry of Finance, runs household solar support. |
| Utilities Regulatory Commission (URC) | Regulator | Independent regulator for electricity, water and sewerage | Licenses activities, regulates tariffs and export rates, approves rooftop solar connections and issues PV rebate application forms. |
| Public Utilities Corporation (PUC) | Distribution | Generation, transmission, distribution, supply and metering | Runs the whole grid on the main islands and connects, meters and bills every customer and prosumer. |
| Ministry of Finance, National Planning and Trade | Government | Funds the PV Rebate 2.0 scheme | Pays residential solar rebates from the national budget and links them to the SEEREP subsidised-loan programme. |
| Qair Seychelles | Solar | Developer of the 5.8 MW Providence Lagoon floating solar plant | First independent renewable power producer selling to PUC. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Electrical installation | BS 7671 | Applied by the Electricity (Distributed Generation System) Regulations 2024 | The UK wiring regulations are named as the installation standard for distributed generation systems. |
| Grid connection | National Electricity Grid Code | Referenced by the 2024 regulations | Sets connection voltage, metering rules and harmonic distortion limits for distributed generation. A published copy was not identified. |
| Metering | Electricity (Distributed Generation System) Regulations 2024, regulation 5 | Minister responsible for energy | AMI-capable meters installed and sealed by PUC; check meters for systems above 100 kW and on gross-metering export meters; joint inspection with the prosumer. |
| Anti-islanding | Distributed generation regulations and grid code | URC / PUC | The 2024 regulations define an “unintended island”; detailed protection settings were not identified in a published document. |
| Installer accreditation | Wireman’s and electrical contractor’s certificates | Chief Electrical Inspector (Electricity Regulations) | Certificates require an examination and annual renewal; installation testing is charged to the licensed electrical contractor. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| URC approval to connect distributed generation | Yes | National | Applications go to the URC, which issues a registration number and decides within 3 months after PUC’s feasibility study. |
| PUC technical feasibility study | Yes | National | Completed within 60 days; infeasible applications go on a priority waiting list. |
| Inspection and safety certificate | Yes | National | PUC inspects systems up to 100 kW within 7 working days; for 100–500 kW the URC inspects and issues a safety certificate. |
| Planning approval | Unknown | National | PUC asks for planning approval “if applicable” for new connections; a specific rule for rooftop solar was not identified. |
| Generator operating permit | Limited | National | Needed for standby generators (SCR 150 a year), not for solar. |
Connecting a rooftop system is a two-agency process: the URC handles the application and approval, and PUC studies feasibility, inspects and connects. The regulations set firm deadlines for each step and allow the URC to fine PUC SCR 1,500 a day for missed timelines. The installation must be completed within 180 days of approval or the application lapses.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| PV Rebate 2.0 (residential) | Active | Grant | SCR 10,500 per kWp for up to 3 kWp, a maximum of SCR 31,500 (up from SCR 25,200 under the 2012 scheme). Open to owner-occupiers who are active PUC customers, for systems commissioned from January 2025. Forms come from the URC; the claim must be made within six months of PUC commissioning, either directly or through the installer as an upfront discount. SCR 5 million was allocated for 2025. | From 8 September 2025 |
| Seychelles Energy Efficiency and Renewable Energy Programme (SEEREP) | Active | Subsidised loan | Subsidised commercial bank loans for renewable energy and efficiency investments by households and businesses; the government describes PV Rebate 2.0 as complementing it. | — |
| Net billing for distributed generation | Active | Net billing | Exports from systems up to 100 kW credited at a URC-determined rate, settled annually. | From October 2024 |
| One PV per Household | Scheduled | Rooftop installation programme | Phased programme of rooftop solar on government and individual residential properties with Chinese cooperation, approved by Cabinet on 1 July 2026; to be implemented by the URC, the energy department and PUC. | — |
Data and connectivity.
- Fixed broadband
- 87.4 % of population using the internet (End 2025)Source 21Internet users, not fixed broadband subscriptions.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Mobile networks are well developed: Airtel Seychelles and Cable & Wireless Seychelles operate nationwide, and Airtel launched 5G in July 2026. About 87% of residents used the internet at the end of 2025. For electricity, the relevant communications are PUC’s own: the 2024 regulations require prosumer meters to have advanced metering capability and a communication port, while household data is otherwise available only through the MyAccount portal.
Grid conditions.
- National peak demand
- 0.064 GW (2024)Source 13Mahé only (63.8 MW). Praslin peaked at 10.0 MW in 2023 (World Bank).
- Annual electricity demand
- 0.48 TWh (2023)Source 9Total generation (480 GWh); the World Bank reports 476 GWh.
- Generation capacity
- 0.131 GW (2024)Source 9
- Interconnection
- 0 GWSource 13Isolated island grids with no international interconnection; Praslin and La Digue are linked to each other by submarine cable.
- Curtailment
- Not identified from a reliable public source.
The grids are small and isolated, so stability limits how fast variable renewables can grow. The 2024 rules cap rooftop generation at the capacity of each feeder or transformer, and a 2026 low-voltage hosting capacity study concluded that the renewable targets remain achievable despite network constraints. Reliability on Praslin and La Digue improved with a third submarine cable completed in November 2024.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Electricity Act 2023 and URC Act 2023 in force | Current | 18 October 2024 | New legal framework for the electricity sector; the Energy Act 2012 was repealed and the Utilities Regulatory Commission replaced the Seychelles Energy Commission. |
| Distributed generation, IPP and licensing regulations | Current | October 2024 | Net billing up to 100 kW and gross metering up to 500 kW; competitive procurement for renewable plants above 500 kW. |
| Utilities Regulatory Commission appointed | Current | 1 May 2025 | Five commissioners appointed on staggered three- to five-year terms. |
| PV Rebate 2.0 launched | Current | 8 September 2025 | Grant of SCR 10,500/kWp up to 3 kWp for owner-occupied homes. |
| Interim framework for self-consumption renewables; IRP endorsed | Current | 1 July 2026 | Cabinet adopted an interim administrative framework for self-consumption systems and endorsed the Seychelles Integrated Resource Plan 2023–2043. |
| Review of the URC Act, Electricity Act and regulations | Upcoming | Approved July 2026; timing not announced | Comprehensive review to fix inconsistencies, regulatory gaps and implementation problems in the transition to renewables. |
| July 2026 Fuel Cost Adjustment | Upcoming | Once implementation structures are finalised | No increase on the first 400 kWh of domestic use each month; 25–29 cents per kWh more above 400 kWh, plus revised commercial and government tariffs. |
| Providence Lagoon floating solar commissioning | Upcoming | December 2026 (expected) | 5.8 MW floating PV plant selling all output to PUC. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | Total solar capacity was 18 MW in 2024 including the 5 MW utility park; the household rebate is capped at 3 kWp and no residential capacity figure is published. |
| Distributed energy market | Low | Net billing framework only since October 2024; connections limited by feeder hosting capacity and subject to URC approval. |
| Grid flexibility market | Low | No flexibility or balancing market, no aggregator licence; PUC balances the system with its own plant. |
| Energy storage adoption | Low | One grid battery (5 MW / 3.3 MWh); no published data on home batteries. |
| Renewable growth environment | Medium | Renewable capacity rose 113% between 2019 and 2024 (IRENA) but was flat in 2023–24; a 5.8 MW floating plant is due in December 2026 against a 15% target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 25 sources
- S.I. 2 of 2025 – Electricity (Amendment) Regulations, 2025. Government of Seychelles (Official Gazette), 2025. accessed 1 October 2026.
- Government shields households from fuel cost adjustment on first 400 kWh. State House, Seychelles, 2026. accessed 1 October 2026.
- Cabinet Business (1 July 2026). State House, Seychelles, 2026. accessed 1 October 2026.
- Appointment of the Utilities Regulatory Commission. State House, Seychelles, 2025. accessed 1 October 2026.
- S.I. 80 of 2024 – Electricity Act, 2023 (Commencement) Notice, 2024. Government of Seychelles (Official Gazette), 2024. accessed 1 October 2026.
- S.I. 84 of 2024 – Electricity (Distributed Generation System) Regulations, 2024. Government of Seychelles (Official Gazette), 2024. accessed 1 October 2026.
- S.I. 87 of 2024 – Electricity (Independent Power Producer) Regulations, 2024. National Assembly of Seychelles, 2024. accessed 1 October 2026.
- Renewable Energy Acceleration Project (P505856) – Project Information Document. World Bank, 2024. accessed 1 October 2026.
- Energy Profile: Seychelles. IRENA, 2025. accessed 1 October 2026.
- Government launches revamped Residential PV Rebate Scheme. Ministry of Finance, National Planning and Trade, 2025. accessed 1 October 2026.
- Seychelles sees small population growth in 2024. Seychelles Nation (National Bureau of Statistics data), 2025. accessed 1 October 2026.
- Seychelles’ population surpasses 100,000 mark (provisional 2022 census results). Seychelles Nation (National Bureau of Statistics data), 2022. accessed 1 October 2026.
- Electricity. Public Utilities Corporation. accessed 1 October 2026.
- Renewable Energy. Public Utilities Corporation. accessed 1 October 2026.
- FAQs. Public Utilities Corporation. accessed 1 October 2026.
- PUC MyAccount customer portal. Public Utilities Corporation. accessed 1 October 2026.
- Electricity prepaid meters to be available at PUC soon. Seychelles Nation, 2019. accessed 1 October 2026.
- The Ile de Romainville Solar Park. Masdar. accessed 1 October 2026.
- Seychelles’ first floating solar project expected to be operational in December. Blue Economy Seychelles (citing Seychelles News Agency), 2026. accessed 1 October 2026.
- Consolidated Average Exchange Rates of Authorised Dealers. Central Bank of Seychelles, 2026. accessed 1 October 2026.
- Digital 2026: Seychelles. DataReportal, 2026. accessed 1 October 2026.
- Airtel Seychelles launches 5G network and partners with SBC. Seychelles Nation, 2026. accessed 1 October 2026.
- PUC revises utility tariffs effective January 15, 2024. Seychelles Nation, 2024. accessed 1 October 2026.
- 19cts increase in electricity tariff across all sectors for Q4 of 2024. Seychelles Nation, 2024. accessed 1 October 2026.
- New Government of Seychelles: 14 New Ministers Announced. Honorary Consulate of Seychelles in Bulgaria, 2025. accessed 1 October 2026.
Questions about energy in Seychelles.
Households pay a rising-block tariff: SCR 1.97/kWh for the first 200 kWh a month, 2.26 up to 300 kWh, 3.90 up to 400 kWh, 4.30 up to 600 kWh and 4.95 above that (2025 schedule), plus a fuel variation. The World Bank put the average residential tariff at about US$0.19/kWh in 2023, far below commercial and government rates.
The state-owned Public Utilities Corporation (PUC) generates, transmits, distributes and sells electricity on Mahé, Praslin and La Digue. Households cannot choose another supplier. The Utilities Regulatory Commission regulates the sector.
Yes. Under the Electricity (Distributed Generation System) Regulations 2024, systems up to 100 kW use net billing: exports are credited at a rate set by the URC and settled annually, with a payout cap. You apply to the URC, PUC checks feasibility and connects the system after inspection.
Yes. PV Rebate 2.0, launched in September 2025, pays SCR 10,500 per kWp for up to 3 kWp (maximum SCR 31,500) to owner-occupiers, claimed within six months of commissioning. Subsidised loans are available through SEEREP.
There is no national supply-point number. Each supply is identified by its PUC customer number, printed on the bill and used for payments and the MyAccount portal.
About 6% in 2023 (IRENA: 27 of 480 GWh), from solar and wind; the rest came from oil-fired engines. The target is 15% by 2030.
You need URC approval to connect, a PUC feasibility study and inspection, and installation to BS 7671 by a certified electrical contractor. Systems over 100 kW also need a URC safety certificate.