How electricity works in Mauritius.
Mauritius electricity 2026: CEB block tariffs, URA regulation, the Household Rooftop Solar PV Scheme, net and gross metering, licensing, grid codes and storage.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Mauritian rupee (MUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Mauritius energy at a glance.
Key figures for households in Mauritius. Each one links to its source on the full overview below.
Electricity price.
6.2 MUR per kWh for households, including taxes. Figures for From 1 May 2026.
Household use.
2,419 kWh a year for a typical household. Figures for 2025.
Renewable share.
17.8% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Mauritius.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Mauritius below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Mauritius requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Mauritius.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Mauritius, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Mauritius, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Mauritius.
The energy market in Mauritius, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Mauritius runs a small, isolated island power system with no interconnection to any other country. The state-owned Central Electricity Board (CEB), created in 1952 and governed by the Central Electricity Board Act 1963, is the only transmission, distribution and retail supply company. It generated 54.1% of the electricity produced in 2025 from its own fuel-oil, kerosene, hydro and solar plants and bought the rest from independent power producers (IPPs). Policy sits with the Ministry of Energy and Public Utilities.
Since the Electricity Act 2005 came into operation in June 2022, the Utility Regulatory Authority (URA) has licensed electricity activities and approves tariffs. CEB holds licences as generator, transmission licensee, system operator, distribution licensee and single buyer, so the market is a single-buyer model: IPPs and rooftop prosumers sell to CEB, and households cannot choose their supplier.
The system still relies heavily on imported fuel. In 2025 fuel oil and diesel produced 49.6% of electricity and coal 31.4%; renewables, mostly sugar-cane bagasse and solar, supplied 17.8%. The national target is 60% renewable electricity by 2035 and a gradual exit from coal. From 1 May 2026 the URA authorised temporary tariffs that raised most prices by about 15%, and in April 2026 CEB opened a new Household Rooftop Solar PV Scheme with gross- and net-metering options, a battery requirement above 3.5 kWac and a government grant of 25% of the system cost, up to Rs 75,000.
Energy snapshot.
Headline figures for electricity in Mauritius. Each shows its data year and links to its source.
- Population1,243,000 peopleSource 12025
- Households369,000 householdsSource 42022
- Average household size3.3 people/householdSource 42022
- Electricity use per household2,419 kWh/yrSource 12025
- Household price (MUR)6.2 MUR/kWhSource 5From 1 May 2026
- Household price (EUR)0.113 EUR/kWhSource 11From 1 May 2026
- Renewable electricity share17.8%Source 12025
- Solar capacity0.146 GWSource 2030 June 2024
- Wind capacity0.011 GWSource 2030 June 2024
- Energy storage capacity0.04 GWSource 182024
- Smart-meter share22.8%Source 20June 2024
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Utility Regulatory Authority (URA)
- System operator
- Central Electricity Board (CEB) System Control Centre
- Distribution networks
- CEB is the sole distribution licensee for Mauritius and Rodrigues; Agalega runs on local generators
- Currency
- Mauritian rupee (MUR)
- Voltage and frequency
- 230 V single-phase / 400 V three-phase, 50 Hz
Electricity prices in Mauritius.
- Household price (MUR)
- 6.2 MUR/kWh (From 1 May 2026)Source 5Derived: bill for the average domestic account (201.5 kWh a month in 2025) under the Tariff 110 block rates in force from 1 May 2026 (Rs 1,229.25 energy charge) plus the Rs 20 single-phase meter rent, divided by 201.5 kWh. VAT treatment of domestic bills was not confirmed from an official source and is not included. Statistics Mauritius reports an average domestic sales price of Rs 6.52/kWh for 2025 (before the May 2026 increase, excluding VAT and meter rent); that average is higher because large users pay much higher block rates.
- Household price (EUR)
- 0.113 EUR/kWh (From 1 May 2026)Source 11Converted from Rs 6.20/kWh at the Bank of Mauritius consolidated indicative EUR selling rate of 54.91 MUR on 30 September 2026 (6.20 ÷ 54.91 = 0.113).
- Typical annual electricity bill
- 14,991 MUR/yr (From 1 May 2026)Source 5Derived: 12 × (Tariff 110 energy charge for 201.5 kWh a month, Rs 1,229.25, plus Rs 20 single-phase meter rent). Excludes the MBC television licence fee that CEB collects on domestic bills and any VAT.
Household price trend (MUR per kWh).Source 1
| 2020 | 5.87 MUR/kWh |
|---|---|
| 2021 | 5.9 MUR/kWh |
| 2022 | 5.92 MUR/kWh |
| 2023 | 6.19 MUR/kWh |
| 2024 | 6.37 MUR/kWh |
| 2025 | 6.52 MUR/kWh |
How prices are set
Tariffs are published as General Notices in the Government Gazette. Under the Electricity Act 2005 the URA approves them after CEB files a tariff petition. In April 2026 the URA authorised Electricity Tariffs (Temporary Charges) – 2026 under sections 26 and 28(4)(a) of the Act, pending a final determination. They were published in Government Gazette Extraordinary No. 29 of 30 April 2026 (General Notice No. 473 of 2026) and took effect on 1 May 2026, replacing the schedule in force since February 2023.
The government said the increase would be about 15%. Customers on Tariff 110A, households on the Social Register and small and medium enterprises were exempt – about 128,800 of 541,127 consumers, according to the press. The rise followed higher heavy-fuel-oil costs, which matter because fuel oil and diesel produced almost half of the country’s electricity in 2025.
What a household pays
A domestic bill has an energy charge calculated on the rising blocks, a monthly meter rent (Rs 20 for single-phase, Rs 120 for direct-connected three-phase), and a minimum charge that applies if the energy charge is lower. CEB also collects the Mauritius Broadcasting Corporation television licence fee on domestic bills. Paying after the due date adds a 5% surcharge. Because of the blocks, the average price rises steeply with use: a home using 200 kWh a month pays about Rs 6.2/kWh, while use above 600 kWh a month is charged at more than Rs 12/kWh.
Trends
Statistics Mauritius reports that the average domestic sales price (excluding VAT and meter rent) rose from Rs 5.87/kWh in 2020 to Rs 6.52/kWh in 2025. The May 2026 temporary schedule raised block rates further. Prices are the same everywhere in the Republic, including Rodrigues, where generation is mostly diesel and fuel oil.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Domestic Tariffs 110, 120 and 140 share one rising-block energy charge from 1 May 2026: Rs 3.63/kWh for the first 25 kWh a month, then 5.04, 5.45 and 6.27 for the next three 25 kWh blocks, 7.07 for the next 100 kWh, 8.07 and 9.09 for the next two 50 kWh blocks, 12.03 for the next 200 kWh, rising to Rs 13.06 for all use above 1,500 kWh. They differ in minimum monthly charge (Rs 50.60, 211.60 and 424.35) and security deposit. |
| Other | Limited | Residential Social Tariff 110A for eligible low-income households: Rs 2.18/kWh for the first 25 kWh, rising to Rs 11.36 above 1,500 kWh, with a Rs 31 minimum charge. 110A customers and households on the Social Register were exempted from the May 2026 increase. |
| Time-of-use | Limited | Tariff 150C is a time-of-use tariff for a separate domestic account used only to charge an electric car (set in 2021 at Rs 5.40 day, Rs 10.00 evening 18:00–21:00, Rs 4.00 night). Tariff 150D, a time-of-use net-metering tariff for prosumers in Integrated Resort Scheme and Real Estate Scheme properties, has been filed with the URA. |
| Fixed | No | There is no competing supplier offering fixed-price contracts; all prices are set in tariff notices approved by the URA. |
| Dynamic | No | No wholesale market exists, so no wholesale-indexed retail tariffs are offered. |
| Prepayment | No | Households are billed monthly in arrears from meter readings; no domestic prepayment tariff is published by CEB. |
Household prices compared with neighbouring countries (EUR per kWh).
- France€0.2
- South Africa€0.185
- Seychelles€0.165
- Mauritius€0.113
- India€0.043
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,419 kWh/yr (2025)Source 1Derived: domestic sales of 1,172,239 MWh in 2025 ÷ 484,680 domestic consumers. This is use per domestic account, not per census household.
- Average daily use per household
- 6.6 kWh/day (2025)Source 1Derived: 2,419 kWh a year per domestic account ÷ 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,469 kWh/person/yr (2025)Source 1Electricity sold per person, all sectors (2,468.9 kWh). Island of Mauritius 2,520 kWh; Rodrigues 1,089 kWh.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 29.9 % of homes (2022)Source 4Share of households with an air conditioner, 2022 Housing Census.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households are the largest group of customers by number and, by a small margin, the largest by volume: in 2025 the domestic sector bought 1,172 GWh, 38.2% of the 3,070 GWh CEB sold, slightly ahead of commercial customers (38.0%) and well ahead of industry (22.4%). Domestic sales rose 8.0% in a year, faster than the number of domestic accounts (2.1%).
Electricity and LPG supply almost all household energy outside transport – 58.0% and 40.6% respectively in 2025. LPG dominates cooking, solar water heaters are common, and about three in ten households have air conditioning. That makes cooling the main driver of growth in household demand. The national system peaks on summer evenings: the all-time peak of 567.9 MW was reached at 21:00 on 5 February 2025.
Almost every home is connected: the 2022 census found 99.6% of households had electricity. Rodrigues uses much less per head (1,089 kWh in 2025) than the main island (2,520 kWh).
Housing and households.
- Dwellings
- 411,700 housing units (2022)Source 484.5% were principal residences, 1.5% secondary residences and 14.0% vacant.
- Owner-occupied
- 90.4% (2022)Source 4Share of private households owning the unit they occupy.
- Private rented
- 6.5% (2022)Source 4Tenants and sub-tenants (all landlords; the census does not separate social from private renting).
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 77.8 % of residential buildings (2022)Source 4Separate (single-unit) buildings as a share of residential and partly residential buildings, not of dwellings.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 39 % of population (2025)Source 40
Mauritius has one of the highest rates of home ownership anywhere: 90.4% of households owned their home in 2022, most without a mortgage, and only 6.5% rented. Separate single-unit buildings make up nearly four-fifths of residential buildings, so most households have their own roof. Residences in Integrated Resort Scheme (IRS) and Real Estate Scheme (RES) developments are treated separately in CEB’s prosumer tariffs.
Tenure matters for electricity administration. To open a domestic account CEB asks for the applicant’s identity card or passport and a title deed, a State Land lease, a transcription, or the landlord’s written authorisation plus the landlord’s title deed, along with a Building and Land Use Permit where applicable and a list of appliances. The rooftop solar scheme likewise requires a title deed or lease, and a third-party account holder must consent.
How the grid works in Mauritius.
- TransmissionCentral Electricity Board (CEB), CEB System Control Centre, Curepipe
- DistributionCEB is the sole distribution licensee for Mauritius and Rodrigues; Agalega runs on local generators
- MeteringCEB
- Supply1 or more retail suppliers
Physical flow
Most electricity comes from thermal plants near Port Louis and the north: CEB’s heavy-fuel-oil stations at Fort George (140 MW), St Louis (110 MW) and Fort Victoria (109.6 MW), its kerosene gas turbines at Nicolay (78.4 MW) used at peak times, and four IPP plants that burn bagasse during the sugar-cane harvest and coal the rest of the year. Ten CEB hydro stations (56.5 MW in total), about ten IPP solar farms, the Plaine des Roches wind farm, a landfill-gas plant and thousands of rooftop systems add renewable output. Installed capacity was 946.1 MW in 2025 (850.4 MW effective).
Power is carried on a 66 kV ring, with a radial feeder to the south, to bulk substations and then on 22 kV and 6.6 kV lines to local transformers. CEB is converting 6.6 kV networks to 22 kV and putting more lines underground to cope with cyclones. Rodrigues has its own small grid (15.3 MW installed in 2023/24, mostly fuel oil, plus wind and solar), and Agalega runs on local generators.
Commercial flow
There is no wholesale market or power exchange. CEB, as licensed single buyer, buys IPP output under long-term power purchase agreements – the coal and bagasse plants of Alteo Energy, Terragen and Omnicane, solar farms and wind – and buys from small and medium distributed generators under scheme tariffs. New utility-scale capacity is procured through CEB requests for proposals, such as the April 2026 call for 10 × 10 MW solar-plus-battery hybrid plants. CEB recovers its costs through URA-approved retail tariffs.
System losses were 6.10% in 2024. Reliability is measured by region: in 2024 the average customer was without power for 3.3 to 4.4 hours across the north, centre and south.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Public Utilities | Sets energy policy and the renewable energy roadmap, makes regulations under the Electricity Act 2005 after consulting the URA, and oversees CEB and the Mauritius Renewable Energy Agency. |
| Regulator | Utility Regulatory Authority (URA) | Licenses generation, transmission, distribution, system operation and single-buyer activities through an online e-licensing platform; issues certificates of exemption for off-grid self-generation; approves tariffs; publishes the National Grid Code for plant above 2 MW and the Distribution Code. |
| TSO | Central Electricity Board (CEB) | Owns and operates the 66 kV transmission ring (442 km of overhead line and 36.9 km of cable at end-2024) that carries power from power stations to bulk supply substations. |
| System operator | CEB System Control Centre, Curepipe | Runs the isolated island system 24/7, dispatching CEB and IPP plants and using CEB’s grid batteries for peak shaving and frequency regulation. |
| DSO | CEB Distribution | Runs the 22 kV and 6.6 kV medium-voltage networks (about 4,100 km) and the 400/230 V low-voltage network (about 6,460 km), and connects new supplies and distributed generators. |
| Supplier | CEB | Sole retail supplier for Mauritius and Rodrigues, billing about 541,000 customers monthly at URA-approved tariffs. |
| Metering | CEB | Supplies, seals, owns and reads all revenue meters, including the import/export and production meters of prosumers, and runs the smart-meter (AMR) programme over its optical-fibre network. |
| Settlement | CEB as single buyer | Buys all power from IPPs and distributed generators under power purchase agreements or scheme connection agreements, and credits prosumers through their electricity accounts. |
Compared with the UK system.
| UK concept | Mauritius equivalent | How it works |
|---|---|---|
| DNO | CEB (sole distribution licensee) | There are no regional network companies. CEB owns and operates the whole low- and medium-voltage network on Mauritius and Rodrigues, and is also the retailer, so the network operator and the supplier are the same organisation. |
| National Grid/NESO | CEB transmission and System Control Centre | CEB holds the transmission, system operation and single-buyer licences together, and also owns more than half of generating capacity. Planning, dispatch and power purchasing all sit inside one state company, with the URA as an outside regulator. |
| MPAN | CEB contract account number (with Business Partner number) | Each supply is billed under a CEB electricity contract account; the customer is a Business Partner (BP) in CEB’s billing system and can hold several contract accounts. There is no separate national supply-point number independent of CEB’s customer system. |
| MPRN | No equivalent | There is no piped gas network for homes. Households cook with bottled LPG (99.2% of homes in 2022), so there is no gas supply-point register. |
| Meter operator | CEB | CEB bears the cost of meters, seals them, charges a monthly meter rent and must have safe access to read and inspect them. Prosumers pay for the extra import/export and production meters, which remain under CEB’s control. |
| Supplier | CEB (single supplier) | Households cannot switch supplier. The only way to reduce what they buy from CEB is self-generation under a CEB scheme or an exempt off-grid system. |
| Smart-meter infrastructure | CEB AMR meters over CEB’s fibre network | There is no DCC-style independent data network. CEB’s own smart meters are read remotely over its optical-fibre network, can be disconnected and reconnected remotely, and feed the CEB Customer Service Portal. |
How a supply point is identified.
Contract Account No. 0012345678 (fictional; illustrative only)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Electricity contract account number (Contract Account No.) |
| Who issues it? | CEB, when a new supply or account is approved; the customer also receives a Business Partner (BP) number on first application |
| Format | Numeric account number printed on the monthly Statement of Account, used for payments and the Customer Service Portal. The customer-level BP number and the meter serial number are separate identifiers. |
| Length | Not published by CEB |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the CEB Statement of Account (electricity bill), which shows the BP number, contract account and invoice numbers; also in the CEB Customer Service Portal and the MoKouran app once the account has been added. |
| Electronic access | Customers register on the CEB Customer Service Portal (csp.ceb.mu) and link an account using their BP number, identity card or passport number and a recent invoice number. They can then view bills, statements and consumption trends, pay online, submit their own meter reading and report faults. Smart-metered customers’ data is read remotely. |
| Third-party access | There is no regulated scheme for third parties such as installers to access consumption data. Anyone can pay a bill with the account number through payment channels. Prosumers in CEB schemes must give CEB free access to their inverter and energy-management data. |
| Who keeps the register | CEB’s customer information and billing system. Distributed generators are also recorded in a CEB SSDG register after commissioning. |
| Register scope | National |
How a home is identified
In Mauritius a domestic supply is identified through CEB’s billing system rather than a national supply-point register. A person who applies for electricity for the first time is given a Business Partner (BP) number, which identifies the customer. Each supply they take is then set up as an electricity contract account with its own number and tariff category (110A, 110, 120 or 140 for homes), linked to the meter installed at the premises. A customer with more than one supply – for example a separate account for an electric-vehicle charger on Tariff 150C – holds several contract accounts under one BP number.
CEB does not publish the length or internal structure of its account numbers, so the example above is illustrative only. The numbers customers actually quote are printed on the monthly Statement of Account and are needed to pay, to link the account online and for any service request.
Connecting and moving
To open a domestic account the applicant applies in person, in writing or by email to a CEB Customer Service Centre with proof of identity, proof of the right to occupy the premises, a Building and Land Use Permit where relevant and a list of appliances. A CEB technical officer inspects the site, the owner’s electrician completes any works (a residual current device is mandatory), and after a second inspection the customer pays a Rs 750 connection fee and a security deposit (Rs 200 to Rs 1,200, depending on tariff) before connection. Since August 2019 CEB has not charged new residential customers for extending the low-voltage network by up to five spans.
CEB does not publish whether a contract account passes to a new occupant. In practice each account is tied to a named customer and to documents proving their right to the premises, while the meter stays with the building. Outstanding balances on closed accounts remain recoverable from the former account holder.
Who keeps the register
CEB keeps the customer, contract-account and meter records for the whole Republic in one system; there is no independent data hub. The URA regulates metering and billing through the Electricity (Metering, Billing and Collection) Regulations 2022, which oblige CEB to seal and maintain meters, set rules for estimated bills and allow remote reading, disconnection and reconnection. Rooftop and other distributed generators are additionally logged in CEB’s SSDG register and under the connection agreement for their scheme.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Yes |
| How exported electricity is paid | Regulated scheme rates under the CEB Household Rooftop Solar PV Scheme (2026): gross metering credits all production at Rs 4.83/kWh; net metering offsets imports kWh for kWh, with surplus net exports credited at Rs 3.00/kWh. Credits are applied to the electricity contract account monthly, for a 20-year term. |
| Is there a size limit? | Under the 2026 household scheme the maximum installed capacity is 50 kW, but power injected into the CEB network may not exceed 5 kWac per phase at any time. The SSDG Grid Code caps active power injection at 50 kWac at the supply terminal. |
| Is a battery required? | Yes, if the export capacity is above 3.5 kWac. The battery should let the home meet its own evening demand for at least three hours. Systems up to 3.5 kWac may be installed without one. |
| Single-phase or three-phase? | Exports above 5 kWac require a three-phase supply. Under the grid code, generators with export capacity of 5 kWac or more must have three-phase output. |
| Gross or net metering? | The customer chooses. Under gross metering, all production is treated as exported and credited at Rs 4.83/kWh, while consumption is billed normally. Under net metering (Tariff 150A_NM, subject to URA approval), monthly imports are offset by exports. Households using over 500 kWh a month pay a Contribution Solidarité Tarifaire of Rs 0.82/kWh (501–1,000 kWh) or Rs 1.63/kWh (above 1,000 kWh) on the energy offset. Net surplus is credited at Rs 3.00/kWh. |
| Are there extra charges for prosumers? | Net-metering households are exempt until further notice from the Power Base Generation & Network Costs Charge of Rs 163 per kW of PV installed. IRS/RES prosumers on Tariff 150D would pay it, plus Rs 2.61/kWh “other charges” and the CST on energy offset. All prosumers pay for their extra metering. |
| What technical protections apply? | The system must disconnect within 0.2 s if an island forms, trip outside set voltage and frequency limits (for example above 230 V + 10% within 0.2 s), meet IEEE 519 harmonic limits and operate at a power factor between 0.95 leading and lagging. A battery system may supply the home in island mode but must not feed an isolated CEB network. |
| Who can join? | Only CEB domestic customers (households). Customers in litigation with CEB, or already running a renewable installation on the same contract account under another agreement, are excluded until that is resolved. |
Connecting a home system.
- Size the system to the household’s past or expected consumption and choose an installer able to certify the work; CEB publishes a list of potential PV suppliers/installers.
- Register at a CEB Customer Service Centre with an identity card or passport, a title deed or lease, and a recent bill; pay the Rs 2,000 non-refundable processing fee and sign the Connection Agreement.
- If the export capacity will exceed 10 kWac, wait for CEB’s network survey and Letter of Intent before installing.
- Apply to the Development Bank of Mauritius for the 25% grant (up to Rs 75,000), presenting the signed Connection Agreement.
- Install the system to the SSDG Grid Code (April 2026), adding a battery if export capacity exceeds 3.5 kWac and three-phase supply if it exceeds 5 kWac.
- Submit Annex 1 (facility description), the Certificate of Installation signed by the customer and a qualified installer, and the as-built schematic diagram.
- CEB inspects the installation; any required corrective work must be done within a week and reported on hotline 8912.
- CEB fits the import/export and production meters, witnesses testing and commissioning in sequence, and the account is reclassified for prosumer billing.
Rooftop export has been possible in Mauritius since CEB’s first Small Scale Distributed Generation (SSDG) net-metering scheme in 2015. It is managed through successive CEB schemes with fixed capacity envelopes, not an open right to connect. In April 2026 CEB merged the 2015 net-metering scheme and the 2021 gross-metering Solar PV Scheme for Domestic Customers into a single Household Rooftop Solar PV Scheme. It amended the scheme on 27 July 2026, dropping the separate application form and confirming the 3.5 kWac battery threshold, the 5 kWac three-phase threshold, the 10 kWac network-survey threshold and the 50 kW / 5 kWac-per-phase limits.
Because the gross-metering rate of Rs 4.83/kWh is well below the upper block tariffs, net metering usually suits higher-consuming households, while gross metering gives a predictable income for smaller ones. Separate CEB schemes cover farms (agrivoltaics), the commercial sector (Carbon Neutral Commercial Sector scheme with a time-of-use tariff, launched January 2026), industry, public bodies, NGOs and religious bodies. Medium-scale systems above 50 kW follow the MSDG grid codes.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (grid-connected) | Generation licence from the URA for any grid-connected generator; for installations up to 5 kW all fees are nil, and fees rise in bands (5–50 kW, 50–200 kW, 200–400 kW, above 400 kW). A provisional licence is available for project development and finance. | Utility Regulatory Authority | Electricity (Licensing, Registration and Fees) Regulations 2022 (GN 143 of 2022). Household scheme prosumers must also obtain all applicable authorisations before CEB commissions the system. |
| Generate for own use, off-grid | Exempt activity: a certificate of exemption is needed for a generator not connected to a licensee’s network. The registration fee is nil up to 50 kW, then banded up to 400 kW. | Utility Regulatory Authority | Covers own consumption and supply to employees or tenants on the owner’s premises. Applications are made on the URA online platform. |
| Store electricity (behind the meter) | No separate storage licence category in the 2022 fee schedule. Household batteries are covered by the CEB scheme and the SSDG Grid Code, and are mandatory where export capacity exceeds 3.5 kWac. | CEB (connection); URA (licensing framework) | The grid code lists battery standards (for example IEC 62619 and IEC 63056) and recommends fire detection. |
| Export to the grid | Only under a signed CEB connection agreement for a specific scheme, within its capacity and per-phase limits, after inspection and commissioning by CEB. | CEB | Unauthorised or non-compliant export can lead to disconnection of the system or of the premises. |
| Sell electricity to the grid (utility scale) | Generation licence plus a power purchase agreement with CEB as single buyer, normally won through a CEB request for proposals. | URA (licence); CEB (procurement and PPA) | Plants above 2 MW must comply with the URA National Grid Code. |
| Supply / retail to third parties | Not open to competition. CEB is the only licensed distribution licensee and retailer; private sale to neighbours over the public network is not provided for. | Utility Regulatory Authority | The exemption for off-grid generators extends only to the owner’s own premises, employees and resident tenants. |
| Transmission, distribution, system operation, single buyer | Licence required. CEB received transitional licences for all these roles in 2022 and must submit a yearly plan to comply with the Act. | Utility Regulatory Authority | Electricity (Transitional Licence) Regulations 2022 (GN 144 of 2022). Annual licence fees are per MW of peak demand or per GWh sold. |
| Wholesale trading | Not applicable: there is no wholesale market or exchange. | — | All bulk purchases are bilateral PPAs with CEB. |
| Aggregation / virtual power plant | No licence category or market role exists for independent aggregators or VPP operators. | — | CEB operates its own grid batteries centrally. |
| Balancing and grid services | Provided by CEB as system operator using its own plant and batteries; no procurement from third parties is published. | CEB | Amaury BESS is used for peak shaving and frequency regulation. |
| Remote control of customer assets | No dispatch or control right over household systems is set out in the household scheme. Prosumers must, however, give CEB free access to download inverter and energy-management data and free physical access to the facility. | CEB | CEB can remotely disconnect and reconnect its smart meters. |
The Electricity Act 2005 came into operation in June 2022, together with four sets of regulations made on 10 June 2022, and brought electricity licensing under the URA. Every grid-connected generator now falls within the licensing regime, but the fee schedule is designed so that household systems of up to 5 kW pay nothing for a licence, its amendment, renewal or annual fee. Larger systems pay modest application fees and, above 5 kW, an annual fee of Rs 20,700 per MW installed for a permanent licence.
In practice the CEB scheme, not the licence, determines whether and how a household can connect: capacity envelopes, export limits, meter configuration and compensation rates are all set in CEB scheme documents and connection agreements, and new prosumer tariffs (150A_NM, 150D) go to the URA for approval. The 2022 licensing regulations do not set out an installer licence. The SSDG Grid Code requires them to be skilled in distributed generation and battery systems and to hold a relevant, approved certificate, and the installer co-signs the Certificate of Installation.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency regulation and peak shaving | No | — | No | CEB. Provided by CEB’s own plant and its 38 MW of grid batteries; there is no market or tender open to distributed assets. |
| Capacity / peaking supply | Restricted | 10 MW per facility (2026 RFP) | No | CEB. New firm and hybrid capacity is procured from IPPs through CEB requests for proposals, such as the 10 × 10 MW solar-plus-battery RFP with bids due on 15 July 2026. |
| Demand response | No | — | No | No household demand-response programme is published. Time-of-use pricing exists only for EV-charging accounts, certain IRS/RES prosumers and commercial and industrial tariffs. |
Mauritius has no flexibility market. As an isolated grid with a single buyer, it balances supply and demand inside CEB: the System Control Centre dispatches CEB and IPP plants, uses kerosene gas turbines and batteries for peaks, and since 2024 has used the 20 MW Amaury battery for peak shaving and frequency regulation. There is no legal role for aggregators or virtual power plants, and households are paid only for energy under scheme tariffs.
The 2026 household scheme nevertheless shapes how home batteries behave. Systems above 3.5 kWac must have storage sized to cover at least three hours of evening demand, and any battery system must disconnect from the grid during a network outage while it may keep supplying the home. The aim is to stop rooftop solar adding to the steep evening peak rather than to sell services to the grid.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| CEB Customer Service Portal | Online account management: bills, consumption trends, payments, self-reading and service requests. It is not a flexibility platform. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Utility-led AMR rollout: about 120,000 smart meters read remotely by June 2024, prioritising large users |
| Reading interval | Monthly billing reads; demand charges for large customers use 30-minute maximum demand |
| Smart meters read remotely | About 120,000 (June 2024) |
| Share of CEB revenue covered | About 65% (June 2024) |
| Customers billed through AMR | 67,650, accounting for 66% of sales (2023/24) |
| Communications | CEB optical-fibre network |
| Meter ownership | CEB; monthly rent Rs 20 (single-phase) or Rs 120 (three-phase) |
| Remote disconnection | In use since 2023/24 (about 1,200 disconnections that year) |
CEB is replacing electromechanical meters with smart meters that can be read remotely over its own optical-fibre network. It started with high-tension customers, IPPs and maximum-demand accounts, and continued with clustered residential areas and new supplies. In 2023/24 it fitted 403 smart meters for maximum-demand customers, 19,861 in clustered regions and 14,449 for new supplies and replacements. By June 2024 about 120,000 meters were being read remotely – roughly 23% of customers but around two-thirds of revenue.
The meters let CEB detect tampering, disconnect and reconnect remotely, monitor feeders for losses, and show customers their consumption trends and projected use on the Customer Service Portal. The programme is run entirely by CEB; there is no separate data company and no regulated data access for third parties. Prosumers have separate import/export and production meters provided by CEB at the customer’s cost.
Renewable electricity.
Electricity generation mix (2025).
- Fuel oil & diesel: 49.6%
- Coal: 31.4%
- Kerosene (gas turbines): 1.2%
- Bagasse & fuelwood: 8.3%
- Solar: 6.5%
- Hydro: 2.5%
- Wind: 0.3%
- Landfill gas: 0.2%
- Renewable electricity share
- 17.8% (2025)Source 1632.4 GWh of 3,551.6 GWh generated (provisional): bagasse and fuelwood 8.3%, solar PV 6.5%, hydro 2.5%, wind 0.3%, landfill gas 0.2%.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV
- 145.6 MW (30 June 2024)Source 20Derived sum of CEB, IPP, SSDG and MSDG solar on Mauritius (143.85 MW) and Rodrigues (1.78 MW).
- Hydro
- 56.5 MW (2024)Source 21
- Wind
- 10.6 MW (30 June 2024)Source 20Plaine des Roches 9.35 MW plus Grenade 1.1 MW and Trèfles 0.12 MW on Rodrigues.
- Bagasse / coal IPP plants
- 230.4 MW (30 June 2024)Source 20Installed capacity of the four IPP thermal plants (Alteo Energy 36.7, Terragen 71.2, Omnicane La Baraque 90.0, Omnicane Saint-Aubin 32.5 MW). Three burn bagasse in the crop season and coal otherwise; Saint-Aubin uses coal only. Renewable capacity cannot be separated.
- Landfill gas
- 3.45 MW (30 June 2024)Source 20
Targets.
- 60% renewable electricity by 2035 (originally 2030; revised in the national roadmap).
- Gradual phase-out of coal-fired generation, beginning with a two-year pilot to replace 15% of IPP coal with biomass.
- Around 405 MW of new renewable and storage capacity within three years, announced in April 2026 (including 120 MW solar with 100 MW batteries, floating solar at Tamarind Falls and wind expansion at Plaine des Roches).
Renewable electricity in Mauritius is still dominated by bagasse, the fibre left after crushing sugar cane, which IPPs burn during the harvest season. Because sugar output and rainfall vary, the renewable share has drifted down from 23.9% in 2020 to 17.8% in 2025, even as solar has grown fast. Solar became the second-largest renewable source in 2025 at 230.8 GWh, while hydro fell 26.4% in a dry year and wind fell 21.1%.
Solar resources are good – CEB cites average radiation of about 6 kWh/m² a day – but land is scarce, so growth comes from rooftops, agrivoltaics, floating PV on reservoirs and mid-sized solar farms paired with batteries. The government’s April 2026 programme adds about 405 MW within three years, including 100,000 home solar kits for households. In May 2026 the energy minister set out a biomass framework that would start replacing imported coal at the IPP plants with local and imported wood chips.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 39.5 MW (2024)Source 1838 MW on Mauritius and 1.5 MW on Rodrigues. Energy capacity (MWh) is not published for the whole fleet.
Batteries are already central to how CEB runs an island grid with growing solar output. Its fleet grew from 4 MW in 2018 to 38 MW on Mauritius in 2024, plus 1.5 MW on Rodrigues. The government’s April 2026 plan adds another 20 MW of batteries and about 100 MW of storage paired with 120 MW of solar.
At household level, storage is becoming standard rather than optional. The 2026 rooftop scheme requires a battery above 3.5 kWac of export capacity, and the SSDG Grid Code sets requirements for battery safety (IEC 62619, IEC 63056, IEC 62485-2, UL 1973/9540), installation, ventilation, labelling and islanding behaviour.
Storage projects.
- Amaury BESS (20 MW / 10 MWh): Built by Siemens Energy and handed over to CEB in February 2024; used for peak shaving and frequency regulation, bringing CEB’s fleet to 38 MW.
- Green Climate Fund batteries: 2 MW at Amaury and 2 MW at Henrietta (2018), then 14 MW at La Tour Koenig, Anahita, Wooton and Jin Fei (by 2021), financed under the “Accelerating the Transformational Shift to a Low-Carbon Economy” programme.
- L’Avenir BESS (2 × 20 MW / 60 MWh): Planned CEB peaking battery to supply the grid during peak demand. The tender was being prepared for issue in mid-2024; current status was not confirmed.
- 10 × 10 MW solar + BESS hybrid RFP: CEB request for proposals RFP-CPR-2026-10508, issued 13 April 2026, for energy from ten 10 MW hybrid facilities; bids were due 15 July 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Central Electricity Board (CEB) | 100% of retail customers (541,155 consumers in 2025) | No | Limited | No | Yes |
CEB is the only electricity retailer in Mauritius and Rodrigues. Independent power producers – Alteo Energy, Terragen and Omnicane’s two coal and bagasse plants, solar-farm companies and the Plaine des Roches wind farm – sell only to CEB and have no retail customers. Commercial customers can also join CEB renewable schemes, but they still buy their residual electricity from CEB.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Public Utilities | Government | Energy policy and oversight of CEB | Sets the renewable energy roadmap, the 60%-by-2035 target, coal phase-out policy and the energy regulations made under the Electricity Act. |
| Utility Regulatory Authority (URA) | Regulator | Electricity regulator | Licenses generators and network roles, issues exemption certificates and approves tariffs, including the 2026 temporary charges. |
| Central Electricity Board (CEB) | Transmission | Integrated state utility: generation, transmission, distribution, supply and single buyer | Runs every household connection, meter and rooftop solar scheme, and publishes the SSDG and MSDG grid codes. |
| Mauritius Renewable Energy Agency (MARENA) | Renewable Energy | Renewable energy promotion agency | Set up in 2016 under the Ministry of Energy and Public Utilities to promote renewables, support investors and help plan the shift away from coal. |
| Development Bank of Mauritius (DBM) | Solar | State development bank | Administers the 2026–27 rooftop solar grant (25% up to Rs 75,000) and a concessionary loan for household PV. |
| Statistics Mauritius | Consumer | National statistics office | Publishes the annual Energy and Water Statistics and the Housing and Population Census used throughout this profile. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (up to 50 kW, low voltage) | CEB Grid Code for Small Scale Distributed Generators (SSDG), April 2026 | CEB | Covers voltage and frequency windows (230/400 V ± 6%, 50 Hz), protection settings, islanding, harmonics, earthing, labelling, metering and testing; applies with or without a battery. |
| Grid connection (medium scale) | CEB MSDG Grid Codes (50–500 kW, Sept 2024; 500 kW–2 MW, Aug 2024) | CEB | Plants above 2 MW follow the URA National Grid Code; the URA also publishes a Distribution Code (December 2022). |
| Inverters | IEC 62109-1/-2, IEC 61727, EN 50438, IEC 61683 | IEC / CENELEC (listed in CEB SSDG Grid Code) | Safety of PV power converters, utility interface characteristics and efficiency measurement. |
| Anti-islanding | IEC 62116; disconnection within 0.2 s | IEC / CEB | Systems without batteries must not supply the network during an island; battery systems may island only the home. |
| Power quality | IEEE 519-2014; IEC 61000-3-2, 61000-3-3, 61000-6-1, 61000-6-3 | IEEE / IEC | Voltage THD no more than 5%; flicker and EMC limits; power factor between 0.95 leading and lagging. |
| PV modules and installation | IEC 61215, IEC 61730, IEC 61701 (salt mist), IEC 60364-7-712, IEC 62446, IEC 60364-5-55 (earthing) | IEC | Salt-mist corrosion testing is especially relevant on a tropical island. |
| Battery storage | IEC 62619, IEC 63056, IEC 62485-2, IEC 62933 series, IEC 62477-1, UL 1973 / UL 9540 | IEC / UL | Installation must follow the manufacturer’s instructions with adequate ventilation; fire detection is recommended. |
| Installer competence | Qualified installer with a relevant approved certificate; Certificate of Installation | CEB | CEB also publishes a list of potential suppliers/installers of solar PV systems. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| CEB scheme registration and Connection Agreement | Yes | National | Mandatory before any household system is connected; Rs 2,000 processing fee; 20-year term. |
| CEB network survey and Letter of Intent | Limited | National | Required before installing if export capacity exceeds 10 kWac. |
| URA generation licence | Yes | National | Required for grid-connected generation; nil fees up to 5 kW. Off-grid own-use systems need a certificate of exemption instead. |
| CEB inspection and commissioning | Yes | National | CEB inspects, fits meters and witnesses testing; corrective works are due within a week. |
| Other authorisations and permits | Limited | Mixed | The scheme requires the prosumer to obtain all applicable authorisations, licences and permits before commissioning; CEB does not list them. Building and Land Use Permits are issued by local authorities. |
| Landlord or account-holder consent | Limited | National | Needed where the electricity account is in a third party’s name or the applicant is not the owner. |
For a household the practical route is short: register with CEB, get the URA licence (free up to 5 kW), install to the grid code, and have CEB inspect and commission. The main constraints are technical – the battery, three-phase and network-survey thresholds – and CEB connects systems in sequence as installations are completed, within the scheme’s capacity limits.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Household Rooftop Solar PV Scheme | Active | Net metering / export payment | Choice of gross metering (all production credited at Rs 4.83/kWh) or net metering (imports offset kWh for kWh, surplus at Rs 3.00/kWh) for CEB domestic customers, for a 20-year term. | Launched 11 April 2026; amended 27 July 2026 |
| DBM rooftop solar grant and concessionary loan | Active | Grant | 25% of the cost of a rooftop PV system, up to Rs 75,000 per application (Budget 2026–27 measure 131), with Rs 270 million allocated from the Climate and Sustainability Fund for 2026–27. Applied for at the Development Bank of Mauritius with the signed CEB Connection Agreement. | Financial year 2026–27 |
| Solar Energy Investment Allowance (SEIA) | Active | Income tax deduction | Eligible individuals may deduct the amount invested in a solar energy unit during the income year from their taxable income (administered by the Mauritius Revenue Authority). | — |
| CEB Home Solar Project | Active | Free PV kits | CEB-owned rooftop kits for low-income households (Social Register, NSIF beneficiaries, NHDC residents, Tariff 110A customers); 2,000 kits of 1.5 kW were installed by June 2024. In April 2026 the government announced 100,000 home solar kits for domestic houses. | — |
| Residential Social Tariff 110A | Active | Social tariff | Lower block rates and a Rs 31 minimum charge for eligible households; excluded from the May 2026 tariff increase. | — |
| Free low-voltage network extension for new homes | Active | Connection subsidy | Since 1 August 2019 CEB does not charge new residential customers for extending the LV network by up to five spans to a single building; connection fee and deposit still apply. | From August 2019 |
| CEB Solar PV Scheme for Domestic Customers (Households) | Closed | Gross metering | 10 MW gross-metering scheme launched in November 2021; merged into the 2026 Household Rooftop Solar PV Scheme. | Dec 2021 – Apr 2026 |
| CEB SSDG Net Metering Scheme | Closed | Net metering | Original household net-metering scheme of 2015 (three phases); merged into the 2026 Household Rooftop Solar PV Scheme. | 2015 – Apr 2026 |
Data and connectivity.
- Fixed broadband
- 28 fixed subscriptions per 100 people (2024)Source 39ITU data via the World Bank. In the 2022 census, 75.0% of households had internet access.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
CEB reads its smart meters over its own optical-fibre network rather than public mobile networks. Households interact with CEB through the Customer Service Portal and the MoKouran app. The household rooftop scheme requires prosumers to give CEB web-link access to their system’s output profile and, on request, to download data directly from the inverter or energy-management system, so internet-connected inverters with monitoring portals are the norm.
Grid conditions.
- National peak demand
- 0.568 GW (2025)Source 1All-time peak of 567.9 MW on the Island of Mauritius in February 2025 (21:00 on 5 February, per CEB). Rodrigues peaked at 9.5 MW.
- Annual electricity demand
- 3.55 TWh (2025)Source 1Electricity generated (3,551.6 GWh, provisional). Electricity sold was 3,069.8 GWh.
- Generation capacity
- 0.946 GW (2025)Source 1Installed capacity 946.1 MW; effective capacity 850.4 MW.
- Interconnection
- 0 GWSource 23Mauritius and Rodrigues are isolated island grids with no external interconnection.
- Curtailment
- Not identified from a reliable public source.
As an isolated system, Mauritius must hold all its own reserves. Peak demand rose 8.0% in 2025 to 567.9 MW, reached on a hot summer evening, while effective capacity was 850.4 MW, with a large part of that being ageing fuel-oil and coal units. CEB has warned that new dependable baseload and flexible backup capacity are urgently needed, and fuel supply is a vulnerability: about 91% of primary energy is imported.
Rooftop solar connections are limited by low-voltage network capacity. This is why the scheme caps export at 5 kWac per phase, requires surveys above 10 kWac and connects installations in sequence within scheme envelopes. CEB is commissioning an Advanced Distribution Management System, converting 6.6 kV networks to 22 kV and undergrounding lines to improve resilience to cyclones.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Temporary electricity tariffs (about 15% increase) | Current | 1 May 2026 | URA-authorised Electricity Tariffs (Temporary Charges) – 2026, published in Government Gazette Extraordinary No. 29 of 30 April 2026. Tariff 110A, Social Register households and SMEs were exempt. |
| Final URA tariff determination | Upcoming | Pending (2026) | The temporary charges apply pending the URA’s final determination on CEB’s tariff petition. |
| Household Rooftop Solar PV Scheme and SSDG Grid Code 2026 | Current | April 2026 (amended 27 July 2026) | Merged net- and gross-metering schemes; mandatory battery above 3.5 kWac; three-phase above 5 kWac; 50 kW / 5 kWac-per-phase limits; new grid code issued April 2026. |
| Prosumer tariffs 150A_NM and 150D | Upcoming | Subject to URA approval | Net-metering tariff for households and a time-of-use net tariff for IRS/RES residences, including Contribution Solidarité Tarifaire and a Rs 163/kW generation and network charge (waived for households until further notice). |
| 405 MW renewable and storage programme | Upcoming | 2026–2029 | Announced 6 April 2026: 120 MW solar with 100 MW of batteries, 17.5–20 MW floating PV at Tamarind Falls, 15–20 MW extra wind at Plaine des Roches, 20 MW batteries, a 20 MW commercial carbon-neutral scheme, 30 MW Stor’Sun private hybrids and 100,000 home solar kits. |
| 10 × 10 MW solar + battery hybrid procurement | Upcoming | Bids closed 15 July 2026 | CEB RFP-CPR-2026-10508 for IPP-owned hybrid facilities selling to CEB. |
| Coal phase-out via biomass | Upcoming | Two-year pilot announced May 2026 | A national biomass framework and a biomass fuel aggregation company to replace 15% of IPP coal with biomass in a pilot phase, followed by a gradual exit from coal. |
| Electricity Act 2005 licensing regime | Current | June 2022 | URA licensing of all electricity activities, with CEB on transitional licences for generation, transmission, distribution, system operation and single buyer. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Low | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | Several thousand household systems connected through CEB schemes since 2015 (7,456 SSDG/MSDG installations, 34.3 MW, by June 2024), a new scheme with a 25% grant opened in 2026, and very high home ownership; but connections are capped by scheme envelopes and per-phase export limits. |
| Distributed energy market | Medium | Distributed solar, agrivoltaics and commercial schemes are expanding, and household batteries are now mandatory above 3.5 kWac, but all within CEB-defined schemes on a single-buyer grid. |
| Grid flexibility market | Low | No flexibility, balancing or capacity market open to distributed assets; no aggregator or VPP role; system services provided by CEB’s own plant and batteries. |
| Energy storage adoption | Medium | 39.5 MW of utility batteries in operation, a 100 MW storage programme and 10 × 10 MW hybrid tender under way, and mandatory home batteries for larger rooftop systems from 2026; no official household battery count. |
| Renewable growth environment | Medium | Solar generation up 29.7% in 2025 and a 405 MW pipeline announced, but the overall renewable share fell from 23.9% (2020) to 17.8% (2025) as bagasse and hydro output declined. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 41 sources
- Energy and Water Statistics – Year 2025 (Economic and Social Indicators No. 1929). Statistics Mauritius, 2026. accessed 1 October 2026.
- Energy and Water Statistics – Year 2023 (Economic and Social Indicators No. 1791). Statistics Mauritius, 2024. accessed 1 October 2026.
- Energy and Water Statistics – Year 2021 (Economic and Social Indicators No. 1653). Statistics Mauritius, 2022. accessed 1 October 2026.
- 2022 Housing Census – Main Results. Statistics Mauritius, 2022. accessed 1 October 2026.
- Customer information – consumption charges as from 1st May 2026. Central Electricity Board, 2026. accessed 1 October 2026.
- Electricity tariffs and applicable rates (connection fees, deposits, tariff notices). Central Electricity Board, 2026. accessed 1 October 2026.
- Meter rental rates applicable as from 1 February 2023. Central Electricity Board, 2023. accessed 1 October 2026.
- General Notice No. 1856 of 2021 – Time-of-use Tariff 150C for domestic EV chargers. Central Electricity Board, 2021. accessed 1 October 2026.
- Public Notice – Electricity Tariffs (Temporary Charges) – 2026. Utility Regulatory Authority, 2026. accessed 1 October 2026.
- Ile Maurice: Le Conseil des ministres passe à l’action (electricity tariffs +15% from 1 May). L’Express (via AllAfrica), 2026. accessed 1 October 2026.
- Indicative exchange rates – consolidated indicative rates. Bank of Mauritius, 2026. accessed 1 October 2026.
- Household Rooftop Solar Photovoltaic (PV) Scheme – Information Leaflet (revised July 2026). Central Electricity Board, 2026. accessed 1 October 2026.
- Household Rooftop Solar Photovoltaic (PV) Scheme 2026. Central Electricity Board, 2026. accessed 1 October 2026.
- Communiqué – Household Rooftop Solar PV Scheme: amendements et précisions (27 July 2026). Central Electricity Board, 2026. accessed 1 October 2026.
- Grid Code for Small Scale Distributed Generators (SSDG) – April 2026. Central Electricity Board, 2026. accessed 1 October 2026.
- Grid Codes. Central Electricity Board, 2026. accessed 1 October 2026.
- Renewable energy schemes. Central Electricity Board, 2026. accessed 1 October 2026.
- Battery Energy Storage System (BESS). Central Electricity Board, 2024. accessed 1 October 2026.
- Smart meters – smart meter deployment. Central Electricity Board. accessed 1 October 2026.
- Annual Report 2023/2024. Central Electricity Board, 2024. accessed 1 October 2026.
- Production overview. Central Electricity Board, 2024. accessed 1 October 2026.
- Production facts and figures – energy generated/purchased 2023/2024. Central Electricity Board, 2024. accessed 1 October 2026.
- Transmission and distribution. Central Electricity Board. accessed 1 October 2026.
- Transmission and distribution (facts & figures) – reliability and losses. Central Electricity Board, 2024. accessed 1 October 2026.
- Grid infrastructure fact sheet. Central Electricity Board, 2024. accessed 1 October 2026.
- System losses / maximum demand. Central Electricity Board, 2025. accessed 1 October 2026.
- About us. Central Electricity Board. accessed 1 October 2026.
- Frequently asked questions – applying for a domestic supply. Central Electricity Board. accessed 1 October 2026.
- Residential supply. Central Electricity Board. accessed 1 October 2026.
- Assistance schemes. Central Electricity Board. accessed 1 October 2026.
- Guidelines for using the CEB Web Customer Service Portal. Central Electricity Board. accessed 1 October 2026.
- Paying your bill. Central Electricity Board. accessed 1 October 2026.
- Electricity (Licensing, Registration and Fees) Regulations 2022 – GN No. 143 of 2022. Government of Mauritius (copy published by CEB), 2022. accessed 1 October 2026.
- Electricity (Transitional Licence) Regulations 2022 – GN No. 144 of 2022. Government of Mauritius (copy published by CEB), 2022. accessed 1 October 2026.
- Electricity (Metering, Billing and Collection) Regulations 2022. Government of Mauritius (copy published by CEB), 2022. accessed 1 October 2026.
- Press notice – RFP-CPR-2026-10508: 10 × 10 MW renewable energy hybrid facilities (solar PV + BESS). Central Electricity Board, 2026. accessed 1 October 2026.
- Mauritius accelerates energy transition with renewable projects of 405 MW. Africa.com (Government of Mauritius press release), 2026. accessed 1 October 2026.
- Ile Maurice: Biomasse et transition énergétique – L’État détaille sa stratégie de sortie progressive du charbon. L’Express (via AllAfrica), 2026. accessed 1 October 2026.
- Fixed broadband subscriptions (per 100 people) – Mauritius. World Bank (ITU data), 2024. accessed 1 October 2026.
- Urban population (% of total population) – Mauritius. World Bank, 2025. accessed 1 October 2026.
- Mauritius Renewable Energy Agency (MARENA). IEA Policies Database. accessed 1 October 2026.
Questions about energy in Mauritius.
Household prices are set in rising blocks by CEB and approved by the URA. From 1 May 2026, Tariff 110 starts at Rs 3.63/kWh for the first 25 kWh a month and reaches Rs 13.06/kWh above 1,500 kWh. A home using the 2025 average of about 200 kWh a month pays roughly Rs 6.2/kWh including meter rent, or about Rs 15,000 a year.
Yes, through the CEB Household Rooftop Solar PV Scheme. You choose gross metering, where all production is credited at Rs 4.83/kWh, or net metering, where exports offset imports and any net surplus earns Rs 3.00/kWh. Export is limited to 5 kWac per phase and systems exporting more than 3.5 kWac must include a battery.
There is no national supply-point number. Each supply is identified by a CEB electricity contract account number, held under the customer’s Business Partner (BP) number in CEB’s billing system, and is linked to the meter at the premises. Both numbers appear on the CEB bill.
No. The Central Electricity Board is the only retail supplier and network operator. Independent power producers and rooftop prosumers can sell electricity only to CEB, which acts as the licensed single buyer.
Grid-connected generation falls under URA licensing, but for systems up to 5 kW the licence fees are nil. You must also register with CEB, sign a Connection Agreement and have the system inspected and commissioned. Off-grid systems for your own use need a URA certificate of exemption, free up to 50 kW.
Yes. Under the 2026–27 Budget, the Development Bank of Mauritius offers a grant of 25% of the cost of a rooftop PV system, up to Rs 75,000, plus a concessionary loan. Individuals may also claim the Solar Energy Investment Allowance against income tax.
In 2025, 17.8% of electricity came from renewables – mainly bagasse (8.3%) and solar (6.5%), plus hydro, wind and landfill gas. The rest came from fuel oil, diesel and coal. The government target is 60% renewables by 2035.