How electricity works in Syria: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Syria: Not yet available.Olmack is not offered in Syria yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Syria.

Syria electricity 2026: Ministry of Energy, the new Syrian Electricity Company, tiered household tariffs, gas-fired supply, grid rebuilding and fast solar growth.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Syrian pound (new pound, from 2026) (SYP) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Syria energy at a glance.

Key figures for households in Syria. Each one links to its source on the full overview below.

  • Electricity price.

    6 SYP per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    3.5% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Syria.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Syria below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Syria requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Syria.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Syria, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Syria, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Syria.

Full overview

The energy market in Syria, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Syria’s electricity system is state-owned and is being rebuilt after more than a decade of conflict. The World Bank reports that available generation capacity fell from 9,838 MW in 2011 to 5,403 MW in 2023, that about 40% of the transmission network was damaged, and that in mid-2025 households received on average only 2–4 hours of grid power a day. In September 2026 the Minister of Energy told the People’s Assembly that output had risen to 3,500 MW and that most governorates now receive 18–20 hours of supply a day.

Policy is set by the Ministry of Energy, created by merging the former ministries of electricity, oil and mineral resources, and water resources. In April 2026 Legislative Decrees 44–46 created the Syrian Electricity Company (SEC), which replaces the former Public Establishment for Electricity Generation and the Public Establishment for Transmission and Distribution of Electricity (PETDE). Distribution and retail supply are carried out by regional electricity companies in each governorate. There is no independent regulator.

Grid generation is almost entirely from gas and oil: Ember data put gas at 52.3% and oil at 44.2% of generation in 2024, with hydropower at 3.0% and solar at 0.4%. Off the grid, solar has grown very quickly; IRENA data show installed solar PV rising from about 33 MW in 2021 to about 2.25 GW in 2025, much of it on homes and businesses coping with long outages.

Energy snapshot.

Headline figures for electricity in Syria. Each shows its data year and links to its source.

  • Population25,620,427 peopleSource 12025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (SYP)6 SYP/kWhSource 182026
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share3.5 % of generationSource 42024
  • Solar capacity2.249 GWSource 92025
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
No independent regulator; tariffs and licensing are set by the Ministry of Energy
System operator
Syrian Electricity Company (SEC), state-owned
Distribution networks
State-owned regional electricity companies in each governorate (14 distribution subsidiaries of PETDE in 2025), now under the Syrian Electricity Company
Currency
Syrian pound (new pound, from 2026) (SYP)
Voltage and frequency
220 V / 50 Hz

Electricity prices in Syria.

Household price (SYP)
6 SYP/kWh (2026)Source 18First residential tier (up to 300 kWh per two-month billing cycle) in new Syrian pounds; consumption above 300 kWh per cycle is charged at SYP 14/kWh. Set by Ministry of Energy decisions 686 and 687 from 1 November 2025 at 600 and 1,400 old pounds; the new pound introduced on 1 January 2026 removes two zeros (derived from the old- and new-pound figures published by SANA).
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

How prices are set

Tariffs are set by ministerial decision; there is no independent regulator and no supplier choice. The World Bank reports that in 2023 the average tariff was 1.5 US cents per kWh against a supply cost of about 12.5 US cents, leaving a sector deficit of about US$2 billion, and that collection rates were only about 55%.

The November 2025 tariff reform

Decisions 686 and 687 of the Ministry of Energy raised prices from 1 November 2025. Households keep a subsidised first block of 300 kWh per two-month cycle (150 kWh a month), which SANA reported as covering 60% of production cost at introduction; consumption above it, and all government, commercial and industrial use, pays higher rates. The government cited monthly losses of over US$75 million and a production cost of about 15 US cents per kWh. In September 2026 the Minister of Energy put the remaining subsidy at 75% for the first tier, 42% for the second and 26% for high-voltage industry.

Currency

The Central Bank of Syria began replacing the old pound with the new Syrian pound on 1 January 2026, with the exchange deadline extended to 30 June 2026. Tariffs published in 2025 are in old pounds; the same tariffs are quoted in 2026 in new pounds (600 old = 6 new).

Off-grid costs

Where grid supply is absent, households rely on private diesel generators and solar systems. The World Bank notes that off-grid diesel generation can cost as much as US$1.10 per kWh.

No reliable household price series was found, so no price history is shown.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesTwo-tier residential tariff set by the Ministry of Energy from 1 November 2025: SYP 6/kWh (600 old pounds) for the first 300 kWh per two-month cycle and SYP 14/kWh (1,400 old pounds) above that. Bills are issued every two months by the regional electricity company.
OtherYesNon-residential tariffs: SYP 1,700 (old pounds) per kWh for government bodies, commercial, agricultural and small industrial users at low voltage and for customers exempted from load-shedding; SYP 1,800 for energy-intensive industry such as smelting and for billboard lighting.
OtherLimitedUnmetered homes are billed on an estimate of 400 kWh per two-month cycle as a temporary measure until single-phase meters can be fitted; SANA reports an estimated-consumption rate of SYP 17/kWh for some unmetered subscribers.
Time-of-useNoNo time-of-use household tariff was identified.
DynamicNoThere is no wholesale market to link a tariff to.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
984 kWh/person/yr (all sectors) (2024)Source 8Ember per capita electricity demand (984.08 kWh). The World Bank gives 2,378 kWh per capita in 2011 and 1,190 kWh in 2020.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Demand has far exceeded supply for years. The World Bank estimates that energy supplied fell from 25.5 TWh in 2020 to 17.1 TWh in 2024 while unserved energy rose to 25.4 TWh, more than the amount actually delivered. Ember records electricity demand of about 24.3 TWh in 2024; the two series measure different things, but both show consumption well below pre-war levels.

Because grid power was rationed to a few hours a day, households have relied on private generators, batteries and rooftop solar. The Minister of Energy expects electricity demand to double by 2030 as the economy recovers.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
72.1 % of population (2025)Source 2World Bank (UN World Urbanization Prospects) estimate.

About 72% of the population lives in urban areas according to World Bank estimates. Recent dwelling and tenure statistics from the Central Bureau of Statistics could not be verified.

Large-scale displacement and return shape the housing stock: the World Bank reports that more than 1.2 million people had returned since November 2024, and SANA reports towns in Aleppo countryside, such as Haritan, being reconnected to the grid in 2026 after about 12 years without supply.

How the grid works in Syria.

  1. TransmissionSyrian Electricity Company (SEC), Syrian Electricity Company (SEC)
  2. DistributionState-owned regional electricity companies in each governorate (14 distribution subsidiaries of PETDE in 2025), now under the Syrian Electricity Company
  3. MeteringRegional electricity companies
  4. Supply1 or more retail suppliers

Physical flow

Power comes mainly from gas- and oil-fired thermal plants plus hydropower on the Euphrates. The World Bank reports thermal capacity fell from 8,293 MW in 2011 to 4,434 MW in 2023 and hydropower from 1,535 MW to 970 MW, as fuel supply dropped and plants were damaged. The Minister of Energy reported 12 generating stations and 458 transformer substations in operation in September 2026. Power is carried over a high-voltage transmission network, including 400 kV lines, to regional distribution networks.

Fuel supply

Gas supply is the main constraint. Qatar has financed gas deliveries to Syrian power plants through the Arab Gas Pipeline using Jordan’s floating regasification unit, and further gas from Qatar and Türkiye supports plants such as Deir Ali. In November 2025 SANA reported that producing 2,200 MW required 10 million cubic metres of gas a month, of which domestic production covered 7 million.

Losses

The World Bank estimates total system losses at 33%: more than 6% in transmission, about 22% in distribution (almost half of it commercial, from meter tampering and illegal connections) and 5% inside power plants.

Commercial flow

Under Law 32 of 2010 and Law 41 of 2022, private investors may build generation and sell to the state company under power purchase agreements, or use wheeling and self-consumption arrangements. In practice almost all electricity is produced, transmitted and sold by state entities, with tariffs well below cost and the gap covered by the state budget.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of EnergyFormed by merging the ministries of electricity, oil and mineral resources, and water resources. Sets electricity tariffs (Decisions 686 and 687 of 2025), signs generation agreements and supervises the Syrian Electricity Company. Under Law 41 of 2022, private generation is licensed through the ministry responsible for electricity.
TSOSyrian Electricity Company (SEC)State-owned company created by legislative decree in April 2026 to replace the Public Establishment for Electricity Generation and the Public Establishment for Transmission and Distribution of Electricity (PETDE). It operates under Ministry of Energy supervision with financial and administrative autonomy, may set up subsidiary companies and may enter partnerships with international firms.
System operatorSyrian Electricity Company (SEC)Operates the national grid and dispatch. A supervisory control system contract with a Saudi company was reported by the Minister of Energy in September 2026.
DSORegional electricity companies (one per governorate)The World Bank reports that PETDE sold power to high-voltage customers directly and to end users through 14 subsidiary distribution companies across the governorates, such as the Damascus Electricity Company. They connect customers, read meters, bill and handle complaints.
SupplierRegional electricity companiesThe local electricity company is the only supplier for each address and bills at the ministry tariff every two months.
MeteringRegional electricity companiesInstall and read meters. About 1.9 million of 4.9 million residential consumers were unmetered in 2025 according to the World Bank.

Compared with the UK system.

Compared with the UK system.
UK conceptSyria equivalentHow it works
DNORegional electricity company (one per governorate)Each governorate has a state-owned electricity company that owns the local network and is also the retailer, unlike UK DNOs, which do not sell electricity.
National Grid/NESOSyrian Electricity Company (SEC)A single state company now owns generation and transmission and runs the system; before April 2026 these roles were split between two public establishments. There is no separate system operator.
MPANSubscription (ishtirak) account with the electricity companyA home’s supply is a subscription with the regional electricity company, identified in that company’s billing system. No national supply-point number or register was identified.
MPRNNo piped household gas network identifiedNatural gas is used mainly for power generation. No household gas supply-point system was identified.
Meter operatorThe regional electricity companyThere are no independent meter operators; the electricity company installs and reads meters. In parts of Aleppo countryside, SANA reports meters being installed by the Syrian-Turkish Electricity Company.
SupplierThe regional electricity companyThere is no retail competition; the tariff is fixed by the Ministry of Energy.
Smart-meter infrastructurePlanned Ministry of Energy smart-meter programmeNo national smart-meter communications body exists. The ministry plans 300,000 smart electricity and water meters in Damascus and Idlib in 2026 using internet-based communications and a central management centre, with later expansion to other governorates.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Electricity subscription (ishtirak) account
Who issues it?The regional electricity company for the governorate (now within the Syrian Electricity Company group)
FormatAn account reference assigned by each regional electricity company in its own billing system. No national structure is published, so no fictional example is given.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the two-monthly electricity bill issued by the regional electricity company.
Electronic accessLimited. The Damascus Electricity Company accepts bill complaints electronically through the Shaam Cash application, according to SANA.
Third-party accessNo regulated data-access arrangement for third parties was identified.
Who keeps the registerEach regional electricity company keeps its own subscriber and meter records. No national supply-point database was identified.
Register scopePer DSO

How a connection is identified

A household’s grid supply is a subscription with the electricity company for its governorate. Bills are calculated every two months from the difference between the current and previous meter readings and priced at the ministry tariff.

Unmetered connections

Many homes have no working meter: the World Bank counted about 1.9 million unmetered residential consumers out of 4.9 million. Where no single-phase meter can be fitted, the transmission and distribution establishment set a temporary estimated consumption of 400 kWh per two-month cycle, to be replaced by metered billing once meters are installed.

Disputes

Subscribers can object to a bill through their electricity company, which reviews readings and accumulated balances.

Limits of public information

The format of subscription numbers, whether they transfer with the property, and any arrangements for third-party data access are not published, so these fields are left unconfirmed.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidPrivate generators may sell to the state company under power purchase agreements (Law 41 of 2022). No household export or net-metering tariff was verified.
Can private companies sell electricity to the grid?Yes. Law 32 of 2010 opened generation and distribution to private and public-private investment, and Law 41 of 2022 lets the state transmission and distribution company sign power purchase agreements with licensed private generators and allows wheeling and self-consumption.
Can households export rooftop solar?No household net-metering or export scheme was verified from an official source. Most home solar systems are used with batteries to cover outages rather than to export.
Are large solar projects being connected?Agreements signed in 2026 include a 210 MW solar plant with 827 MWh of batteries and three projects in Damascus countryside totalling 760 MW of solar with 1,077 MW of battery storage, all with Saudi firm Al-Harfi.

Connecting a home system.

  1. Utility-scale projects: obtain a generation licence through the Ministry of Energy under Law 41 of 2022.
  2. Agree a power purchase agreement, or a wheeling or self-consumption arrangement, with the state electricity company.
  3. Connect to the network under the terms agreed with the Syrian Electricity Company and its regional companies.

The legal basis for private generation exists, but the framework is aimed at utility-scale and self-supply projects rather than households. With supply only recently improving to most of the day, home solar has been used for backup and self-consumption.

The World Bank-supported Syria Electricity Emergency Project includes technical assistance for sector reform, starting with distribution and unbundling, which may shape future connection and export rules.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (private plants)Licence from the ministry responsible for electricity under Law 41 of 2022; thresholds for small systems not verified.Ministry of EnergyLaw 32 of 2010 first opened generation to private and public-private investment.
Generate for own use (self-consumption)Permitted for private generation under Law 41 of 2022; detailed conditions and any exemption for small rooftop systems not verified.Ministry of EnergyWheeling to a separate site is also allowed under the law.
Sell to the gridPower purchase agreement with the state electricity company (formerly PETDE, now SEC).Ministry of Energy; Syrian Electricity CompanySeveral 2025–2026 agreements cover gas, solar, wind and battery projects.
Transmission and system operationReserved to the state.Syrian Electricity CompanyCreated by legislative decree in April 2026.
Distribution and retail supplyCarried out by the state regional electricity companies; Law 32 of 2010 allows private investment in distribution, but no private distributor was identified.Ministry of Energy; Syrian Electricity CompanyNo retail competition.
Store electricityNo specific storage licensing framework was verified.Ministry of EnergyStorage is being contracted alongside solar plants in 2026 agreements.
Aggregation, VPP, balancing or remote control of assetsNo licence category or framework identified.Ministry of EnergyNo market exists for these services.

Licensing is ministerial rather than regulatory: there is no independent electricity regulator, and the Ministry of Energy both licenses private generators and supervises the state company that buys their output. Detailed thresholds and procedures under Law 41 of 2022 could not be read from an accessible official text, so investors should confirm requirements with the ministry.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Balancing, reserve and frequency servicesNo—NoSyrian Electricity Company. Handled internally by the state company; there is no ancillary services market.
Grid-scale storage under PPAsDeveloping—NoBattery storage is being contracted alongside new solar plants, under bilateral agreements rather than a market.

There is no wholesale, capacity or demand-response market. The system has been managed through load-shedding (rationing), with some customers exempted from rationing at higher tariffs. Interconnectors with Jordan and Türkiye, which once supported regional trade and grid stability, were reported by the World Bank as non-operational in 2025 and are being rehabilitated.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEarly stage: 300,000 smart electricity and water meters planned for Damascus and Idlib in 2026, with later national expansion
Reading intervalNot published
Residential consumers4.9 million, of which about 1.9 million unmetered (World Bank, 2025)
Smart meters planned in 2026300,000 (electricity and water) in Damascus and Idlib
CommunicationsInternet-based with a central management centre (Minister of Energy)
Billing cycleTwo months
Owner and operatorThe regional electricity company

Metering is the first priority: a large share of homes is unmetered or billed on estimates, and the World Bank links high commercial losses to meter tampering and illegal connections. The Ministry of Energy has announced tenders to renew networks and install large numbers of smart electricity and water meters.

Renewable electricity.

Electricity generation mix (2024).

  • Gas: 52.3%
  • Oil: 44.2%
  • Hydropower: 3%
  • Solar: 0.4%
  • Bioenergy: 0.1%
Source 4
Renewable electricity share
3.5 % of generation (2024)Source 4Derived from Ember: hydropower 3.01% + solar 0.40% + bioenergy 0.12% of grid generation. Syria was a small net exporter (net imports of −0.6 TWh), so the generation share is used. Off-grid solar output is not captured.
Home solar
Not identified from a reliable public source.
Solar added each year
0.643 GW (2025)Source 9Derived from IRENA capacity: 2.249 GW in 2025 minus 1.606 GW in 2024. Additions were about 0.58 GW in 2024 and 0.72 GW in 2023.
Solar PV
2.249 GW (2025)Source 9IRENA data via Our World in Data; includes distributed and off-grid systems.
Hydropower (available)
0.97 GW (2023)Source 10Available hydropower capacity, down from 1,535 MW in 2011.
Wind
Not identified from a reliable public source.

Targets.

  • Renewable plant contracts of 4,500 MW announced by the Minister of Energy (November 2025)
  • 700 MW wind agreement with Marv Energy, to be built in phases over five to seven years (February 2026)
  • Electricity demand expected to double by 2030 (Minister of Energy, September 2026)

Grid generation remains almost entirely fossil-fuelled. The World Bank notes that intermittent renewables rose only from 0.1% of supply in 2020 to 0.4% in 2024, while hydropower output has been limited by damage and low river flows.

Distributed solar tells a different story: IRENA data show installed solar PV rising from about 0.3 GW in 2022 to about 2.25 GW in 2025, driven by households, farms and businesses installing panels and batteries to cope with outages. The government is now contracting utility-scale solar, solar-plus-storage and wind, including projects in Damascus countryside and industrial cities such as Adra, Hasiyah and Sheikh Najjar.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is mainly behind the meter, in home and business battery systems used to ride through rationing. Utility-scale storage is entering through solar-plus-storage agreements signed in 2026; no dedicated storage regulation was identified.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Regional electricity companies (Syrian Electricity Company group)Sole supplier in each governorateNoNoNoNo

Each governorate has a single state-owned electricity company that connects, meters and bills customers at the ministry tariff, so the supplier is fixed by address. Individual company websites could not be verified, so the link points to SANA’s explanation of how bills are calculated.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of EnergyGovernmentEnergy, electricity and water policy; tariffs; generation agreementsSets tariffs and signs generation, storage and grid agreements. The ministry’s own website could not be reached securely, so the link is to its September 2026 statement to parliament.
Syrian Electricity Company (SEC)TransmissionState generation, transmission and distribution holding companyCreated in April 2026 to replace the generation and transmission-distribution establishments.
World Bank – Syria Electricity Emergency ProjectGovernmentGrid rehabilitation and sector reform supportUS$146 million grant for transmission lines, substations, interconnection and sector technical assistance.
UNDP SyriaRenewable EnergyDevelopment partner for energy and electricityCo-organised the August 2026 workshop with the Ministry of Energy on electricity sector priorities and runs energy initiatives.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionNot publishedMinistry of Energy / Syrian Electricity CompanyNo accessible grid code or connection standard for distributed generation was found.
Installer accreditationNot verifiedMinistry of EnergyNo accessible information on solar installer accreditation was found.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Electricity subscription and meterYesRegionalA grid connection is a subscription with the governorate electricity company, which installs the meter and bills every two months.
Generation licenceLimitedNationalRequired for private generators under Law 41 of 2022; the threshold, if any, for small rooftop systems was not verified.

Small off-grid home solar and battery systems are sold and installed widely without a published connection procedure. Anyone planning a grid-connected or larger system should confirm licensing and connection requirements with the Ministry of Energy and the local electricity company.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Subsidised first residential tariff blockActiveTariff subsidyThe first 300 kWh per two-month cycle is charged at SYP 6/kWh; the Minister of Energy stated in September 2026 that this block carries a 75% subsidy.From 1 November 2025

Data and connectivity.

Fixed broadband
33.8 % of individuals using the internet (2018)Source 3Latest World Bank / ITU value; this is internet use, not fixed broadband subscriptions, and is several years old.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Recent connectivity statistics are not available. The planned smart meters are described as internet-based with a central management centre, and some electricity companies accept complaints through mobile payment apps.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
24.3 TWh (2024)Source 6Ember electricity demand. The World Bank estimates energy actually supplied at 17.1 TWh in 2024, with 25.4 TWh unserved.
Generation capacity
5.403 GW (2023)Source 10Available capacity (thermal 4,434 MW, hydro 970 MW), excluding off-grid solar. The Minister of Energy reported output of 3,500 MW in September 2026.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The grid is being rehabilitated. The World Bank-funded Syria Electricity Emergency Project, approved in June 2025 and effective from January 2026, will rehabilitate about 28 km of high-voltage lines and seven substations and restore interconnection capacity with Jordan; for now the line to Türkiye has been left out of the first tender package. The Minister of Energy reported in September 2026 that 8% of the interconnection lines with Türkiye and Jordan had been rehabilitated.

The World Bank estimates that rehabilitating transmission and distribution will require about US$1 billion. New gas-fired plants, including the Tishreen thermal station, and agreements for eight plants totalling 5,000 MW signed in November 2025 are intended to close the supply gap.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
New household and business tariffsCurrent1 November 2025Ministry of Energy Decisions 686 and 687 introduced a two-tier residential tariff and higher non-residential rates.
New Syrian poundCurrent1 January 2026Currency replacement removing two zeros; tariffs are now quoted in new pounds (SYP 6 and 14 per kWh).
Syrian Electricity Company createdCurrentApril 2026Legislative decree merged the generation and transmission-distribution establishments into one state company under the Ministry of Energy.
Syria Electricity Emergency ProjectCurrentEffective January 2026; closing December 2029US$146 million World Bank grant for transmission lines, substations, 600 MW of interconnection capacity and sector reform studies.
Sector reform and unbundling studiesUpcomingFrom late 2026 (World Bank FY27 Q2)Technical assistance with the Ministry of Energy starting with the distribution sector and unbundling.
Smart-meter rolloutUpcoming2026 onwards300,000 smart electricity and water meters in Damascus and Idlib, then other governorates.
Utility-scale solar, storage and wind projectsUpcoming2026–2033Agreements for 760 MW of solar with 1,077 MW of batteries, a 210 MW solar plant with 827 MWh of storage, and 700 MW of wind over five to seven years.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumIRENA records about 2.25 GW of solar PV in 2025, largely distributed and off-grid, and SANA reports strong demand for home systems; there is no grid-export framework for households.
Distributed energy marketMediumWidespread self-supply through rooftop solar, batteries and private generators, but no aggregation or market access.
Grid flexibility marketLowVertically integrated state system with load-shedding and no wholesale, ancillary or demand-response market.
Energy storage adoptionLowNo operating grid-scale storage identified; battery projects signed in 2026 are not yet built. Home batteries are common but unquantified.
Renewable growth environmentMediumRapid growth of solar capacity (0.03 GW in 2021 to 2.25 GW in 2025, IRENA), but renewables were only about 3.5% of grid generation in 2024 (Ember).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 27 sources
  1. Population, total – Syrian Arab Republic (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  2. Urban population (% of total) – Syrian Arab Republic. World Bank, 2025. accessed 10 October 2026.
  3. Individuals using the Internet (% of population) – Syrian Arab Republic. World Bank, 2018. accessed 10 October 2026.
  4. Share of electricity production by source – Syria (Ember). Our World in Data, 2024. accessed 10 October 2026.
  5. Electricity generation (Ember). Our World in Data, 2024. accessed 10 October 2026.
  6. Electricity demand (Ember). Our World in Data, 2024. accessed 10 October 2026.
  7. Net electricity imports (Ember). Our World in Data, 2024. accessed 10 October 2026.
  8. Per capita electricity demand (Ember). Our World in Data, 2024. accessed 10 October 2026.
  9. Installed solar PV capacity – Syria (IRENA). Our World in Data, 2025. accessed 10 October 2026.
  10. Project Appraisal Document: Syrian Arab Republic – Electricity Emergency Project (P511407). World Bank, 2025. accessed 10 October 2026.
  11. Implementation Status and Results Report: Syria Electricity Emergency Project (Sequence No. 2). World Bank, 2026. accessed 10 October 2026.
  12. Syria Electricity Emergency Project: Hybrid Energy Sector Mission, 9–11 June 2026 (Aide Memoire). World Bank, 2026. accessed 10 October 2026.
  13. Energy minister says Syria boosts power generation to 3,500 MW, with new plants planned. SANA, 2026. accessed 10 October 2026.
  14. Energy Minister before the People’s Assembly (Arabic). SANA, 2026. accessed 10 October 2026.
  15. President al-Sharaa issues decrees establishing mining, electricity, and water bodies. SANA, 2026. accessed 10 October 2026.
  16. Complete details of the new electricity tariff in Syria (Arabic). SANA, 2025. accessed 10 October 2026.
  17. Why did the electricity price change in Syria? Tiers and rationale (Arabic). SANA, 2025. accessed 10 October 2026.
  18. How electricity bills are calculated and how to object (Arabic). SANA, 2026. accessed 10 October 2026.
  19. Rate set for unmetered single-phase subscribers (Arabic). SANA, 2025. accessed 10 October 2026.
  20. Syrian Electricity Company, Saudi Al-Harfi sign three agreements on energy production. SANA, 2026. accessed 10 October 2026.
  21. Syria’s energy Ministry signs 700 MW wind deal. SANA, 2026. accessed 10 October 2026.
  22. Energy Minister: Ending the legacy of deposed regime marks Syria’s rebuilding. SANA, 2025. accessed 10 October 2026.
  23. Alternative energy systems see rising market demand in Syria (Arabic). SANA, 2026. accessed 10 October 2026.
  24. Alternative energy in Syria: the sustainability gamble in times of challenges (Arabic). SANA, 2025. accessed 10 October 2026.
  25. Energy Ministry discusses electricity sector priorities with international partners. SANA, 2026. accessed 10 October 2026.
  26. Syrian central bank says 56 percent of old currency replaced. SANA, 2026. accessed 10 October 2026.
  27. Electricity meters installed in Haritan ahead of supply restoration after 12 years (Arabic). SANA, 2026. accessed 10 October 2026.

Questions about energy in Syria.

Talk to us about Olmack in Syria.Tell us about your home, housing portfolio or school estate in Syria. We'll explain what is possible there now.